syngas production from petroleum coke gasification

37
Syngas Production from Petroleum Coke Gasification Team Hotel: Russel Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering March 8, 2011 1 3/8/2011

Upload: baxter-day

Post on 03-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Team Hotel: Russel Cabral, Tomi Damo , Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering March 8, 2011. Syngas Production from Petroleum Coke Gasification. Project Purpose. What we are doing - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Syngas Production from Petroleum Coke Gasification

Syngas Production from Petroleum Coke Gasification

Team Hotel:Russel Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala

Advisors:Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering

March 8, 2011 13/8/2011

Page 2: Syngas Production from Petroleum Coke Gasification

Project Purpose

What we are doing Producing syngas from petcoke Using entrained flow gasifier Implementing a rigorous syngas

cleaning Why we are doing this

Making syngas for acetic acid production

Chemical production team specs▪ CO to H2 molar ratio of 0.409▪ CO2 and N2 mixed in

2

http://coalgasificationnews.com/tag/petcoke-gasification/

3/8/2011

Page 3: Syngas Production from Petroleum Coke Gasification

Review from Presentation 2

Discussed the Shell™ membrane gasifier

Discussed our syngas cleaning processes Sulfur Removal Claus Process Water Gas Shift

Flow Sheets Early Material and Energy Balances

33/8/2011

Page 4: Syngas Production from Petroleum Coke Gasification

Questions Brought Up Last Time

What was the heat rate brought up in the gasifier comparisons?

Why use N2 as a transport gas and not CO2?

How are we absorbing CO2? What is a better definition of the

quench?

43/8/2011

Page 5: Syngas Production from Petroleum Coke Gasification

5

Agenda

Recent changes Using Selexol instead of MDEA Using the Superclaus

Aspen Simulation Heat Load Identification Economics

Aspen Price Evaluator (ICARUS) Equipment Sizing Energy Balance Location Update

3/8/2011

Page 6: Syngas Production from Petroleum Coke Gasification

6

Flow Sheeting

3/8/2011

Page 7: Syngas Production from Petroleum Coke Gasification

7

Flow Sheeting

3/8/2011

Page 8: Syngas Production from Petroleum Coke Gasification

8

Flow Sheeting

3/8/2011

Page 9: Syngas Production from Petroleum Coke Gasification

9

Flow Sheeting

3/8/2011

Page 10: Syngas Production from Petroleum Coke Gasification

10

Flow Sheeting

3/8/2011

Page 11: Syngas Production from Petroleum Coke Gasification

11

Flow Sheeting

3/8/2011

Page 12: Syngas Production from Petroleum Coke Gasification

12

Heat Load Identification

Sulfur Cleanup Table showing stripper, flash , cooler &

heat load Claus Process

Table showing furnace, flash, cat. reactor, cooler & heat load

Gasifier Section Table showing gasifier and syngas

cooling

3/8/2011

Page 13: Syngas Production from Petroleum Coke Gasification

13

Heat Sink Optimization

Stream Pre-heating Lower Heater / Cooler Duties Higher Duty vs. Heat Ex. Cost

Furnace Cooler

HX

Acid Gas Cold

Acid Gas Hot

To Claus Catalyst

s Hot Furnace

Gas

Cold Furnace

Gas

3/8/2011

Page 14: Syngas Production from Petroleum Coke Gasification

14

Heat Loads

Gasifier Equipment Heat Load (MMBtu/hr)

Gasifier -34.7

HP Steam Heat Exchanger 139.0

MP Steam Heat Exchanger 281

Cooler -106.8

Flash 2.99

Sulfur Clean Up Equipment Heat Load (MMBtu/hr)

Sulfur Stripper Reboiler 57.o

Sulfur Stripper Cooler -200.0

Selexol Cooler -40.7

Rich / Lean Heat Exchanger 274.9 3/8/2011

Page 15: Syngas Production from Petroleum Coke Gasification

15

Heat Loads (Heat Duties)

Claus Process Equipment Heat Load (MMBtu/hr)

Claus Furnace -3.26

Condenser (Modeled Cooler and Flash) 1

-31.3

Condenser 2 -11.2

Condenser 3 -5.97

Condenser 4 -3.92

Re-heater 1 9.72

Re-heater 2 5.29

Re-heater 3 3.46

Catalytic Reactor 1 3.03

Catalytic Reactor 2 1.72

Catalytic Reactor 3 -5.73 3/8/2011

Page 16: Syngas Production from Petroleum Coke Gasification

16

Energy Balance

Energy Balance

3/8/2011

Page 17: Syngas Production from Petroleum Coke Gasification

Gasification Process

Solid Removal

Claus Process

CO2 Absorption

Water-gas Shift

Final syngasproduct

Page 18: Syngas Production from Petroleum Coke Gasification

Gasification

SIZE INDIRECT COST

DIRECT COST

Air SeparationUnit

N/A N/A $100,000,000

Petroleum Coke Crusher $ 5,401,890.00

$ 7,022,455.00

Gasifier N/AN/A

$66,000,000

Heat Exchanger $305,741.91

$ 642,058.00

Total

Page 19: Syngas Production from Petroleum Coke Gasification

Gasification Process

Solid Removal

Claus Process

CO2 Absorption

Water-gas Shift

Final syngasproduct

Page 20: Syngas Production from Petroleum Coke Gasification

Solids Removal

SIZE EQUIP COST TOTAL COST

Candle Filter $ 364,770.77 $ 510,679.07

Page 21: Syngas Production from Petroleum Coke Gasification

Gasification Process

Solid Removal

Claus Process

Water-Gas Shift

CO2 Absorption

Final syngasproduct

Page 22: Syngas Production from Petroleum Coke Gasification

Claus Process (Sulfur Removal)

SIZE EQUIP COST TOTAL COST

Reactor $ 103,115.04

$ 164,984.06

Absorber 1 10737 cub. ft $ 1,500,000.00

Absorber 2 10737 cub. ft $ 1,500,000.00

Stripper 6636 cub. ft $ 102,585.15

$ 178,400.00

Heat Exchanger

1200 sq ft (trs area)

$ 121,978.84

$ 256,155.55

Cooler 1

6739 sq ft

$ 168,800.00

$ 320,600.00

Cooler 2

440 sq ft

$ 16,700.00

$ 79,200.00

Cooler 3

258 sq ft

$ 13,600.00

$ 73,600.00

Cooler 4

163 sq ft

$ 11,800.00

$ 69,800.00

Page 23: Syngas Production from Petroleum Coke Gasification

Gasification Process

Solid Removal

Claus Process

Water-Gas Shift

CO2 Absorption

Final syngasproduct

Page 24: Syngas Production from Petroleum Coke Gasification

Water-Gas Shift (WGS)

Equipment Cost Direct Cost Size

WGS reactor $224,140.08 $358,624.13 144 ft3

Page 25: Syngas Production from Petroleum Coke Gasification

Gasification Process

Solid Removal

Claus Process

Water-Gas Shift

CO2 Absorption

Final syngasproduct

Page 26: Syngas Production from Petroleum Coke Gasification

CO2 Absorption

Equipment Cost Direct Cost Size

CO2 absorber

CO2 Stripper 2020 ft3

CO2 capture n/a $ 55,477,294.50

n/a

Compressor $272,889.23 $ 409,333.84

Total

Page 27: Syngas Production from Petroleum Coke Gasification

Gasification Process

Solid Removal

Claus Process

Water-Gas Shift

CO2 Absorption

Final syngasproduct

Page 28: Syngas Production from Petroleum Coke Gasification

Summary of Equipment Cost

Page 29: Syngas Production from Petroleum Coke Gasification

Other Fixed Cost

Other Fixed Cost

License Fees and Royalties

2% of Capital Cost

$ 4.7 million

Maintenance

5% of Capital

Cost

$ 12 million

Laboratory Cost

30% Labor Cost

$ 5.4 million

Insurance 1% Capital Cost

$ 2.4 million

Capital Cost as of now= $ 237,000,000

Labor Cost as of now = $ 18,000,000

Page 30: Syngas Production from Petroleum Coke Gasification

Expected Revenue

Product and Side Products

Unit Price (per ton)

Unit Price (per year)

Syngas $150.00 $ 86.60 million

CO2 $40.00 $ 7.00 million

Sulfur $10.00 $ 0.30 million

Slag TBD TBD

Total $200.00 ~ $ 94 million

Page 31: Syngas Production from Petroleum Coke Gasification

31

Location

Victoria, Texas Between Houston

and Corpus Christi 200 acres Kansas City

Southern, Union Pacific, and Burlington Northern Santa Fe railways

Gulf Intracoastal Waterway

3/8/2011

Page 32: Syngas Production from Petroleum Coke Gasification

Report Outline

Final Report: Executive Summary IP Discussion IP Recommendations IP

Appendices Design Basis: Done Block Flow Diagram: Done Process Flow Showing Major Equip.: IP

323/8/2011

Page 33: Syngas Production from Petroleum Coke Gasification

Report Outline

Appendices (Continued) Material and Energy Balances: IP Calculations: IP Annotated Equip. List: IP Econ. Eval. Factored from Equip. Costs:

IP Utilities: IP Conceptual Control Scheme: N/A Major Equipment Layout: IP

333/8/2011

Page 34: Syngas Production from Petroleum Coke Gasification

Report Outline

Appendices (Continued) Distribution and End-use Issues:

N/A Constraints Review: IP Applicable Standards: N/A Project Communications File: IP Information Sources and References:

IP

343/8/2011

Page 36: Syngas Production from Petroleum Coke Gasification

36

CO2 Sequestration

CO2 in our syngas is absorbed on Selexol to be selectively removed