sustainable facility life cycle management

87

Upload: antoine-loup

Post on 13-May-2015

829 views

Category:

Business


0 download

DESCRIPTION

Fluid applied membranes such as the Astec Re-Ply Roofing and Ceramic Coating Systems can have dramatic effects on both maintenance and capital expenditure budgets. This presentation shows how you can promote sustainable facility life-cycle management with products such as Astec.

TRANSCRIPT

Page 1: Sustainable Facility Life Cycle Management
Page 2: Sustainable Facility Life Cycle Management
Page 3: Sustainable Facility Life Cycle Management

INSULATING COATINGS CORPORATION

Page 4: Sustainable Facility Life Cycle Management

PRESENTS

Page 5: Sustainable Facility Life Cycle Management

Rethinking Life Cycle Costs

with

Fluid Applied Roof Membranes.

Page 6: Sustainable Facility Life Cycle Management

Cool Roofs = Good Economics

98 degrees Fahrenheit 98 degrees Fahrenheit 178 degrees Fahrenheit178 degrees Fahrenheit

Page 7: Sustainable Facility Life Cycle Management

Definition of a Fluid Applied Membrane

An aqueous liquid suspension, applied to roofingsubstrates, which dries to a seamless, resilient,durable membrane which is flexible across a broadtemperature range.

Page 8: Sustainable Facility Life Cycle Management

Paint: An aqueous liquid continuous film applied at a film thickness of 3 - 8 wet mils.

Coating: An aqueous liquid continuous membrane applied (in multiple coats) at a film thickness of 8 - 50 wet mils.

What is the difference between a paint and a coating?

Page 9: Sustainable Facility Life Cycle Management

Benefits of Roof Coatings vs. Paint

Remains flexibleResists standing water Excellent adhesion to a variety of substratesResists UV exposure Applied at greater film thickness for increased

flexibilityResistances to foot traffic, i.e. tensile strengthHigher reflectivity and increased emissivity

Page 10: Sustainable Facility Life Cycle Management

What makes a quality Fluid Applied Membrane?

Page 11: Sustainable Facility Life Cycle Management

Volume Solids (VS)High Quality Coating

Pigments

Resin

Lower Quality Coating

Pigments

Resin

Ratio of the

Pigments to

the Resin is

PVC

Lower PVC is better Higher the PVC the lower the quality

Page 12: Sustainable Facility Life Cycle Management

Life-Cycle Costs

Page 13: Sustainable Facility Life Cycle Management

The sum of all recurring and one-time (non-recurring) costs over the full life span or a specified period of a good, service, structure, or system.

The sum of all recurring and one-time (non-recurring) costs over the full life span or a specified period of a good, service, structure, or system.

Life-Cycle Costs

Page 14: Sustainable Facility Life Cycle Management

How Fluid Applied coatings effect Life cycle cost

PurchaseInstallationsMaintenanceEnergy savingsA/C life extensionsSystem UpgradeRenewability

Page 15: Sustainable Facility Life Cycle Management

Purchase Economics

“Cool Roof” Costs vs. Benefits

Page 16: Sustainable Facility Life Cycle Management

Where to use a Fluid Applied Roof.

Page 17: Sustainable Facility Life Cycle Management

MetalConcreteEPDM

(Ethylene –Propylene-Diene-Monomer)Asphalt, Modified Bitumen, BUR

(smooth and granulated)Hypalon / PVC

Typically Fluid Applied Systems are selected for the following roof types:

Typically Fluid Applied Systems are selected for the following roof types:

Page 18: Sustainable Facility Life Cycle Management

Considering a Fluid Applied Roof System / Roof Restoration

System?

Yes, it is definitely less expensive, but you need to know…

Page 19: Sustainable Facility Life Cycle Management

When do you consider Roof Restoration?

Percentage wet roofType of Roof Type of Deck/InsulationCondition of SubstrateNumber of re-roofs It’s just as important to know when not to use a

restoration system

Page 20: Sustainable Facility Life Cycle Management

Not every roof “Qualifies”

for a fluid applied system.

Page 21: Sustainable Facility Life Cycle Management
Page 22: Sustainable Facility Life Cycle Management

Where to Start?

Every roof needs to be evaluated.

Page 23: Sustainable Facility Life Cycle Management

Roof inspection

Page 24: Sustainable Facility Life Cycle Management

Roof inspection

Page 25: Sustainable Facility Life Cycle Management

Repair bad areas

Page 26: Sustainable Facility Life Cycle Management

“Qualified” roof for fluid applied system.

No need to tear off old roof.No need to raise equipment on roof.Makes most roofs better than original.Sustainable, Renewable…lower life-cycle cost.Substantial savings over other conventional roofing

systems…more details later.

Page 27: Sustainable Facility Life Cycle Management
Page 28: Sustainable Facility Life Cycle Management
Page 29: Sustainable Facility Life Cycle Management

Labor cost reductions

Roof Equipment

Penetrations

Page 30: Sustainable Facility Life Cycle Management

No need to raise equipment on roof.No need to raise equipment on roof.

Page 31: Sustainable Facility Life Cycle Management

No need to raise equipment on roof.No need to raise equipment on roof.

Page 32: Sustainable Facility Life Cycle Management

Penetrations

Page 33: Sustainable Facility Life Cycle Management

Penetrations

Page 34: Sustainable Facility Life Cycle Management

Waterproof Penetrations

Page 35: Sustainable Facility Life Cycle Management

Maintenance

Fluid Applied roof systems are seamless, require less maintenance

Conventional roof systems fail at the seams

Maintenance

Fluid Applied roof systems are seamless, require less maintenance

Conventional roof systems fail at the seams

Page 36: Sustainable Facility Life Cycle Management

Seams…separating

Page 37: Sustainable Facility Life Cycle Management

Repairing seams is standard roof maintenance on seamed roofs.

Seamless roofs require less maintenance: lower roof life-cycle costs

Page 38: Sustainable Facility Life Cycle Management

Seams

Page 39: Sustainable Facility Life Cycle Management

Tape & Waterproof seams

Page 40: Sustainable Facility Life Cycle Management

See Seam Sample

Page 41: Sustainable Facility Life Cycle Management

Metal seams & fasteners

Page 42: Sustainable Facility Life Cycle Management

Seam Preparation

Page 43: Sustainable Facility Life Cycle Management

Penetration details

Page 44: Sustainable Facility Life Cycle Management

Penetration details

Page 45: Sustainable Facility Life Cycle Management

Details

Page 46: Sustainable Facility Life Cycle Management

Basecoat…multi-layer system

Page 47: Sustainable Facility Life Cycle Management

Finished Fluid Applied “Cool Roof”

Page 48: Sustainable Facility Life Cycle Management

Finished Fluid Applied “Cool Roof”

Page 49: Sustainable Facility Life Cycle Management

Finished Fluid Applied “Cool Roof”

Page 50: Sustainable Facility Life Cycle Management

ENERGY SAVINGSTHROUGHREDUCED

TEMPERATURES

Page 51: Sustainable Facility Life Cycle Management

A 7 story building is exposed to more radiation on the walls than on the roof.

A single story building receives 70% of it’s solar radiation on the roof.

Radiation Exposure SOLAR RADIATION

Page 52: Sustainable Facility Life Cycle Management
Page 53: Sustainable Facility Life Cycle Management
Page 54: Sustainable Facility Life Cycle Management

A radiant heat barrier… Reduces surface temperatures by as much as 20˚ C

Reflects between 80% and 87% or radiant heat

Limits radiant heat absorption between 15% and 20%

Reduces energy consumption by as much as 40%

Page 55: Sustainable Facility Life Cycle Management
Page 56: Sustainable Facility Life Cycle Management
Page 57: Sustainable Facility Life Cycle Management

United States Air Force

“… After the application of the coating, the average peak temperature in the warehouse area dropped to 86° F, a decrease of 17° F. “

- James A., Capt. USAF Chief RSD of Civil Engineering

Page 58: Sustainable Facility Life Cycle Management

Before

After

Page 59: Sustainable Facility Life Cycle Management

United States Army

“… a 64° F reduction in roof surface temperature, a 23° F reduction in attic temperature and a 10° F reduction in room temperature as a result of the insulative and reflective value of the coating.”

- Benjamin S., Col, Dept. of the Army

Page 60: Sustainable Facility Life Cycle Management
Page 61: Sustainable Facility Life Cycle Management
Page 62: Sustainable Facility Life Cycle Management
Page 63: Sustainable Facility Life Cycle Management
Page 64: Sustainable Facility Life Cycle Management
Page 65: Sustainable Facility Life Cycle Management
Page 66: Sustainable Facility Life Cycle Management

Cool Roofing improves insulation performance

“The thermal resistance of insulation installed immediately below a black membrane has been found to be up to 30% lower than advertised, when measured at peak summertime temperatures in Austin, Texas.”

- Konopacki and Akbari, 2001

Page 67: Sustainable Facility Life Cycle Management

“Cool Roofs” increase insulation performance

Page 68: Sustainable Facility Life Cycle Management

Hashem Akbari Heat Island Group

Lawrence Berkeley National Laboratory

Cool roof standards are designed to reduce a/c demand, save money, and save emissions. In Los Angeles they will eventually save ~$100,000 per hr.

Page 69: Sustainable Facility Life Cycle Management

Added roof cycle cost savings for ENERGY STAR® Fluid Applied Cool Roof Systems.

According to EPA about $40 billion is spent annually in the United States alone to air condition buildings-1/6 of all electricity generated in a year.

ENERGY STAR® qualified roof products reduce the amount of air conditioning needed in buildings, and reduce energy bills by up to 50%. – Department of Energy

Page 70: Sustainable Facility Life Cycle Management

Downsizes Cooling Equipment-A reflective roof can reduce peak cooling demand by 10-15%. As a result the building owner may be able purchase a smaller, more efficient and less expensive cooling system. -EPA

Existing cooling systems will not have to work as hard to maintain the same comfort levels and may require less maintenance.

Page 71: Sustainable Facility Life Cycle Management

Increases Roof Product life- ENERGY STAR® qualified roof products maintain a more constant temperature and reduce thermal shock; cool rain/hot roof causes sharp drop in temperature, extremes of expansion and contraction.

Thermal Shock = stress and roof degradation.

Page 72: Sustainable Facility Life Cycle Management

Solar Shield Energy Savings

Page 73: Sustainable Facility Life Cycle Management

Renewability / SustainabilityRenewability / Sustainability

After ten years - extend the life an additional 10 years

At only 40 -70% of the original cost of the coating system.

After ten years - extend the life an additional 10 years

At only 40 -70% of the original cost of the coating system.

Page 74: Sustainable Facility Life Cycle Management

“…almost immediately the room temperature inside was cooled by 19° F.”

-Donald E., Yakima Ice Arena

Substantiated results… Substantiated results…

Page 75: Sustainable Facility Life Cycle Management

“In the past, we have struggled to maintain minus 12° F… Since the application, we have been able to maintain minus 15° F or less.”

-Plant Superintendent, Land-O-Sun Dairies

Page 76: Sustainable Facility Life Cycle Management

“Our engineering department reported that the plant is consuming less energy …”

-Vice President, Rainier Cold Storage & Ice

Page 77: Sustainable Facility Life Cycle Management

Q.T.G. Quaker, Tropicana, Gatorade 140,000 Square Ft. of smooth built up roofing in Dallas, TX.

Page 78: Sustainable Facility Life Cycle Management

Inteplast 1.3 million square feet currently under contract.

Page 79: Sustainable Facility Life Cycle Management

Extend the usefulness of existing roofs.Protect from Ultra-violet degradation Eliminates/minimizes roof tear-off. No need to raise equipment on roof.Makes most roofs better than original.Sustainable, Renewable, lower life-cycle cost.

Fluid Applied MembranesFluid Applied Membranes

Page 80: Sustainable Facility Life Cycle Management
Page 81: Sustainable Facility Life Cycle Management
Page 82: Sustainable Facility Life Cycle Management
Page 83: Sustainable Facility Life Cycle Management
Page 84: Sustainable Facility Life Cycle Management
Page 85: Sustainable Facility Life Cycle Management

I.C.C. Corporate Headquarters103 Main St. Binghamton, NY 13905 USA

Telephone: +1.607.723.1727Fax: +1.607.723.1700www.icc-astec.com

Page 86: Sustainable Facility Life Cycle Management

THANK YOU

Page 87: Sustainable Facility Life Cycle Management