    Project Summary

    The National Aeronautics and Space Administration

    (NASA) Ames Research Center at Moffett Field, in

    the heart of Californias Silicon Valley, conducts crit-

    ical research and development for the space agency,

    with a primary focus on supercomputing, net-

    working, and intelligent systems. Recently, NASA

    Ames initiated work on the Sustainability Base, a

    $20.6-million facility designed to surpass standards

    for LEED Platinum sustainable design certification

    and approach net-zero energy consumption. When

    complete, it will be one of the federal systems

    greenest buildings and the first new NASA Ames

    facility in 20 years. NASA Ames selected William

    McDonough + Partners (WM+P) as design architect

    and AECOM as architect of record for the project.

    The WM+P and AECOM team provided a robust

    combination of programming, architecture, interiorand landscape design, and LEEDconsulting as

    well as structural, civil, mechanical, electrical, and

    plumbing engineering services. Swinerton Builders

    served as general contractor.

    The Challenge

    The buildings design challenges included a com

    radial geometry, an innovative steel-frame exo

    eton, and numerous eco-friendly features, such

    geothermal wells, natural ventilation, high-perf

    mance wastewater treatment, and a photovolta

    roof, which will provide 30 percent of the build

    power. The facility, which will house administra

    and research groups, will also feature an adapt

    building control system and a flexible, open flo

    plan. Our ultimate goal was to create a self-su

    ing building that produces virtually all of the en

    it consumes on-site, says June Grant, the proje

    manager for AECOM.

    Budgetary restrictions forced NASA Ames to

    accelerate the project timeline or risk loss of fu

    ing. We needed a common platform that woulenable us to produce the project in a very quick

    time frame, says Grant. In particular, it was cr

    that the structural engineers and architects be

    constant communication.

    Communicate across barriers

    William McDonough + Partners andAECOM deliver to NASA one of thefederal systems greenest facilities.

    AECOMWilliam McDonough + PartnersSwinerton Builders

    Customer Success Story

    Client:NASA Ames Research Center

    AutodeskRevitArchitecture

    AutodeskRevitStructure

    AutoCADMEP

    AutodeskNavisworksManage

    AutodeskEcotectAnalysis

    AECOM recognizes thevalue of BIM and itsability to enhance projectcollaboration to deliverbetter, more sustainableproject designs. Autodeskis one of our primarystrategic partners inmeeting these goals.

    Brion Boucher, AIA, LEED AP Associate Vice President,

    Director of Design Technologies AECOM, Planning Design +

    Development Group

    Courtyard scene. Image courtesy of AECOM and William McDonough + Partners.

  • 8/13/2019 Sustainability Base

    2/4

    A common BIM software platform helped the architects toquickly see how structural changes impacted the architecture

    Communication isthe forte of the Revitplatform. It helps us tocommunicate with a mucbroader cross-section ofindividualsalmost inreal time. That leads tothe creation of a far moreinteresting building.

    June Grant Project Manager AECOM

    On this project, AECOM team members were

    ased in San Francisco, Moffett Field, and Orange

    ounty, California; Albuquerque, New Mexico; and

    hoenix, Arizona. To connect the geographically

    ispersed team, AECOM relied upon Autodesk

    uilding information modeling (BIM) solutions,

    ncluding AutodeskRevitArchitecture soft-

    ware and AutodeskRevitStructure software,

    omplemented by AutodeskNavisworksManage

    oftware, AutodeskEcotectAnalysis software,

    nd tools based on the AutoCADplatform, such

    s AutoCADMEP software. These powerful tools

    elped provide the rapid responses we needed on

    his complex, fast-track project, says Tom Horan,

    ice president at AECOM and AECOMs site director

    t NASA Ames. NASAs support for using BIM on

    his project is in alignment with its mandate requir-

    ng BIM use on all projects exceeding $10 million

    hat are initiated after October 2010.

    he Solution

    o better obtain the full benefits of the BIM

    pproach, design architect WM+P used Revit

    rchitecture software to help develop the initial

    model and perform preliminary structural and

    mechanical studies before passing the model on

    o AECOM. That enabled the engineers to move

    orward, while we continued design work on the

    xterior skin, says Alastair Reilly, director at WM+P.We were an integrated team working together in

    eal time.

    Revit Architecture was an ideal solution for the

    buildings complex, radial geometry. Every poten-

    tial design change had numerous implications,

    says Horan. The BIM process, supported by Revit

    Architecture, helped us understand those implica-

    tions, communicate them to the other team mem-

    bers, and make faster, more-informed decisions.

    Revit Architecture also enabled AECOM to more

    quickly examine and evaluate multiple design sce-

    narios. For example, at one point during the design

    process, rapidly rising material prices forced the

    team to change the design in order to stay within

    budget. The model enabled us to adjust the floor-

    to-floor heights more quickly so that we were able

    to save enough on material costs to help meet the

    budget requirements, says Horan.

    Link the Disciplines

    One of the most visible aspects of the new facility

    was its innovative steel-frame exoskeleton, which

    required close coordination between the architects

    and structural engineers, who were using Revit

    Structure software. A common BIM software

    platform enabled the architects to avoid duplicat-

    ing the engineers work, says Horan. They could

    more quickly see how structural changes impacted

    the architecture.

    This level of connectivity helped increase design

    accuracy. For example, when the structural engineer

    adjusted a piece of steel, Revit Architecture auto-

    matically flagged the change, informing the project

    manager that the connections no longer worke

    For added design accuracy, the team conducted

    weekly clash detection with Navisworks Manag

    Navisworks was crucial to better understandin

    how architecture and structure aligned, says G

    The exoskeleton was an essential component oanother design goal: an openbut narrowco

    free floor plan that will encourage flexibility an

    collaboration among the buildings end users.

    putting the lateral resisting system on the outs

    the building, we were able to free up the entire

    plan, says Horan. The exoskeleton also increas

    structural performance during seismic events a

    served as an armature for modular shading dev

    ection view of building. Image courtesy of William McDonough + Partners.

  • 8/13/2019 Sustainability Base

    3/4

    Attain the Highest Efficiency Standards

    Our clients goal was never simply to get to LEED

    Platinum, says Horan. That was understood as a

    baseline. Right from the start, AECOM examined

    local climatic conditions and how the sun moved

    across the sky throughout the year, searching for

    ways to take advantage of passive solar lighting in

    the building. To help meet the projects exactingsustainability standards, AECOM exported data

    from the model to a variety of analysis software

    applications, including Ecotect Analysis. AECOM

    used these tools to compare the performance of the

    lighting layout against the teams goals, designing,

    fine tuning, and analyzing in a constant loop.

    Traditional office spaces hide behind high walls,

    says Grant. To encourage collaboration, AECOM

    wanted to introduce a new culture of lower

    walls and open spaces. With data from the Revit

    Architecture model, AECOM used Ecotect Ana

    to investigate how far sunlight would extend in

    the buildings open workspaces. That helped u

    determine the impact that lower partition wall

    would have on energy consumption and gave u

    valuable feedback about the design.

    WM+P also utilized information from the RevitArchitecture model, using Ecotect Analysis to b

    understand the cost impacts of its design decis

    particularly around floor-to-ceiling heights and

    gration of daylight into the design. We were a

    to optimize the daylighting, making sure that w

    we created worked for the benefit of the buildi

    from both an engineering and cost standpoint,

    Reilly. Ecotect Analysis helped us study the im

    of potential design changes faster, more effect

    and earlier in the design process.

    ncrease Coordination

    During construction, which began in August 2009,

    he contractor, Swinerton Builders, imported the

    evit Architecture model into Navisworks Manage

    oftware, using it as the foundation for further

    ash detection. Our mechanical, electrical, and

    lumbing; fire protection; and sprinkler system

    ubcontractors created models using AutoCAD

    MEP and other CAD tools, says Daniel Gonzales,

    EED AP, corporate manager of virtual design and

    onstruction at Swinerton Builders. Twice a month,

    we imported all of these models into Navisworks

    Manage and performed clash detection, using the

    evit Architecture model as background.

    winerton has fully adopted model-based coordina-

    on. In past projects, these bimonthly coordination

    meetings required members of the contracting

    eam to gather in a conference room around a light

    able. A single meeting could last up to five hours,

    ot including travel time, says Gonzales. With help

    rom Navisworks Manage, Swinerton and the sub-

    ontractors were able to conduct online coordina-

    on meetings that typically lasted no more than 90

    minutes. Use of Navisworks Manage is standard

    ractice at Swinerton. It provides a tremendous

    ompetitive advantage.

    ECOM introduced lower workstation walls. Image cour-

    esy of AECOM.

    Axonometric of building. Image courtesy of William McDonough + Partners.

  • 8/13/2019 Sustainability Base

    4/4

    s the design developed, AECOM exported the

    evit model to a third-party application for energy

    nalysis by the teams high-performance build-

    ng engineers, who supplied feedback on window

    zes and locations, helping the team validate the

    esign direction. We were able to fine-tune the

    esign within a very short time frame, says Grant.

    Typically, on a project like this, you would not have

    chance to do that much benchmark testing to

    make sure you are performing according to your tar-

    ets. Revit Architecture software and its ability to

    alk to other applications helped make the process

    elatively easy.

    howcase the Future

    ASA Ames wanted the completed building to

    erve as a platform for experimentation with

    dvanced technologies. One such technology is the

    uildings integrated control system. The build-

    ng was designed to operate as an intelligent unit,

    where the shading devices, lights, windows, andentilation are all driven by monitoring devices and

    omputers, says Horan.

    uch a systemand the real-time data it pro-

    ucescan help NASA Ames reduce energy usage.

    or example, to prepare a conference room for a

    reviously scheduled meeting, the system can fac-

    or in current weather conditions and the number

    f people in attendance and adjust the thermostat

    ccordingly at the appropriate time.

    he Result

    onstruction on the project is scheduled for

    ompletion in early 2011. Using Autodesk BIM

    olutions, we completed the drawings and design in

    bout nine monthshalf the time originally sched-

    led for this project, says Grant.

    Autodesk BIM solutions were a crucial component

    in both the production of the design documents and

    in the analysis required to evaluate our recommen-

    dations, says Grant. They were the tools of choice

    for communication because they help facilitate

    dialogue and coordination within the design team.

    We were very impressed.

    WM+P shared Grants viewpoint. Although geo-

    graphically quite dispersed, the team was integrated

    through the BIM process and the model, says Reilly.

    We were very happy with the results.

    With as many offices as we have within AECOM,

    the ability to collaborate is a top priority, says Brion

    Boucher, AIA, LEED AP, the associate vice president

    and director of design technologies for AECOMs

    Planning Design + Development Group. The BIM

    process helps us to utilize our best resources and

    expertise from anywhere within the company to

    deliver a consistent, high-quality product to our cli-ents. BIM is a very important initiative at AECOM.

    For more information, please visit www.autodesk.

    com/BIMand www.autodesk.com/government .

    Autodesk BIM solutions helped the design team finish work ihalf the originally scheduled time.

    Autodesk, AutoCAD, Ecotect, Navisworks, and Revit are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or ain the USA and/or other countries. All other brand names, produc t names, or trademarks belong to their respective holders. Autodesk reservesright to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical

    graphical errors that may appear in this do cument. 2010 Autodesk, Inc. All rights reserved.

    Autodesk BIM solutions enable our clients to utilize theinformation gained during the design process much furtherinto the building lifecycle, facilitating construction, cost

    estimating, and scheduling, and potentially aiding in buildingoperations, asset management, and more.

    Brion Boucher, AIA, LEED AP Associate Vice President, Director of Design Technologies AECOM, Planning Design + Development Group

    Aerial view of site. Image courtesy of William McDono

    Partners.

    uilding along Bush Circle. Image courtesy of AECOM and

    William McDonough + Partners.