stress log

6
PIPING STRESS LOG Instruction # 1 Instruction # 2 Instruction # 3 Instruction #4 After all changes are made, relock the sheet. Make a copy of t Instruction #5 Instruction #6 User Advisory - Each sheet of this Excel Workbook "Tool" is locked an protected. The user may only enter date in the "yellow" cells. Other "Tool" includes locked "cells" that may contain complex math formulas. taken to learn where these cells are and if the streadsheet is ever un cells with the formulas are not disturbed. Disturbing or altering the Simply copy the form from the website to your company server and save copy Study the Sample and the blank form. Test it by entering some sample the form so you will understand what you will get. To modify the form for Celceus of Farenheight (C or F ) the sheet must the appropreate change made then the sheet should be Locked again. The password for each sheet of this "Tool" is jop . You may sellect a choice when you re-lock the sheet. If you have any questions please contect me by e-mail (jopennock@netsc

Upload: desmond-chang

Post on 10-Nov-2015

218 views

Category:

Documents


5 download

DESCRIPTION

stress log sample

TRANSCRIPT

InstructionsPIPING STRESS LOGUser Advisory - Each sheet of this Excel Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells. Other cells on this "Tool" includes locked "cells" that may contain complex math formulas. Care should be taken to learn where these cells are and if the streadsheet is ever unlocked that the cells with the formulas are not disturbed. Disturbing or altering the formulas in these cells may render the "Tool" unable to function properly.Instruction # 1Simply copy the form from the website to your company server and save it as your Master copyInstruction # 2Study the Sample and the blank form. Test it by entering some sample data and print out the form so you will understand what you will get.Instruction # 3To modify the form for Celceus of Farenheight (C or F ) the sheet must be unlocked and the appropreate change made then the sheet should be Locked again.Instruction #4After all changes are made, relock the sheet. Make a copy of the electronic form for each Unit.Instruction #5The password for each sheet of this "Tool" is jop . You may sellect a password of your choice when you re-lock the sheet.Instruction #6If you have any questions please contect me by e-mail ([email protected])

SampleProject:SAMPLE PROJECTSTRESS LOGStress Eng. Name:C. SimmonsNumber:12345678Stress Check Sub-TotalsTotalProgress StatusReport Date:4/1/10Unit No.:10-Unit No. is the Prefix for all Line Numbers114171141% Complete=14.3%Notes: (1) R&R = "Revise as discussed/noted and Resubmit", (2) "IFC" = Issued For Construction (3) Enter a number of sheets in these columesStress Check CategoryStatusLine NumberLine ClassDominate Size (Enter one size only)Sheet(s)MaterialCommodityOper. Temp (C)Visual (3)Informal (3)Formal (3)Special (3)Date ReceivedDate ReturnedApproved (3)R & R (1) (3)Hold (3)IFC (2) (3)Resubmit DateResubmit Return DateDate Final IFC Issue Sign Off (2)101AA1C101CSHydrocarbon10016/1/106/1/10116/6/10102CA2C121SSHydrocarbon10016/1/106/3/101110CA2C81-4SSHydrocarbon17546/5/106/9/104125FA2C1219CrHydrocarbon20016/6/10SAMPLE

Blank FormProject:STRESS LOGStress Eng. Name:Number:Stress Check Sub-TotalsTotalProgress StatusReport Date:Unit No.:Unit No. is the Prefix for all Line Numbers000000000% Complete=0.0%Notes: (1) R&R = "Revise as discussed/noted and Resubmit", (2) "IFC" = Issued For Construction (3) Enter a number of sheets in these columesStress Check CategoryStatusLine NumberLine ClassDominate Size (Enter one size only)Sheet(s)MaterialCommodityOper. Temp (C or F)Visual (3)Informal (3)Formal (3)Special (3)Date ReceivedDate ReturnedApproved (3)R & R (1) (3)Hold (3)IFC (2) (3)Resubmit DateResubmit Return DateDate Final IFC Issue Sign Off (2)