 GOVERNMENT OF INDIA MINISTRY OF RAILWAYS SCHEDULE OF TECHNICAL REQUIREMENTS FOR MANUFACTURE AND SUPPLY OF RADIATOR ASSLY To EMD/DLW PART No 10631855/17450408 & 10631856/17450410 for HHP LOCOMOTIVES No. MP.STR.ES.01.09.13, (Rev. 00) August ‐2013 Issued by: MOTIVE POWER DIRECTORATE RESEARCH DESIGNS AND STANDARDS ORGANISATION MANAK NAGAR, LUCKNOW226011 

Upload: sushil-kumar-singh

Post on 14-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STR _MBR

7/27/2019 STR _MBR

http://slidepdf.com/reader/full/str-mbr 1/6

 

GOVERNMENT OF INDIA 

MINISTRY OF RAILWAYS 

SCHEDULE OF TECHNICAL REQUIREMENTS FOR MANUFACTURE AND SUPPLY OF RADIATOR 

ASSLY To EMD/DLW PART No 10631855/17450408 & 10631856/17450410 for HHP 

LOCOMOTIVES 

No. MP.STR.ES.01.09.13,

 (Rev.

 00)

 

August ‐2013 

Issued by:

 

MOTIVE POWER DIRECTORATE 

RESEARCH DESIGNS AND STANDARDS ORGANISATION 

MANAK NAGAR, LUCKNOW‐226011 

Page 2: STR _MBR

7/27/2019 STR _MBR

http://slidepdf.com/reader/full/str-mbr 2/6

 

2

SCHEDULE OF TECHNICAL REQUIREMENTS FOR MANUFACTURE, SUPPLY OF RADIATOR ASSY TO 

EMD /DLW PART No 10631855/17450408 & 10631856/17450410 for HHP LOCOMOTIVES 

1. SCOPE 

The Locomotive

 radiator

 assembly

 is

 a very

 vital

 part

 of 

 the

 locomotive

 and

 it

 needs

 to

 have

 very

 

high reliability during the entire service of  the  locomotive. The Schedule of  Technical Requirement 

(STR)  mentioned  hereunder  is  issued  to  serve  as  a  guide  to  manufacturers  (called  the  “firm” 

hereinafter)  and  shall  be  read  in  conjunction  with  the  relevant  drawings  &  specification 

MP.0.0500.01 (Rev. 03). The firm shall satisfy themselves of  having complied with the requirements 

of  the latest product drawings and STR. 

The technical requirements are meant to serve as guidelines only and are not exhaustive. 

2. GENERAL REQUIREMENTS 

2.1 The firm shall have currently valid ISO‐9001 certification issued by an approved agency with the 

activity desired

 clearly

 mentioned

 in

 the

 scope

 of 

 certification.

 The

 firm

 shall

 have

 a Quality

 

Manual indicating the extent of  control over production. 

2.2  A system of   regular  submission of  rejection details of  material giving  rejection  rate, cause of  

rejection, corrective action  taken etc. preferably on quarterly basis  shall be  followed by  the 

firm. 

2.3 The firm shall have a system of  documentation in respect of  rejection at customer end, warranty 

replacement and failure of  item supplied by them during service. 

2.4  The  firm  shall  have  a  system  of   recording  the  plant,  machinery  and  control  equipments 

remaining out of  service, nature of  repairs done etc. 

2.5  The  testing and measuring equipment  shall be duly  calibrated and  the validity of   calibration 

shall be

 current

 and

 verified

 by

 physically

 checking

 the

 calibration

 certificate

 issued

 by

 the

 

Calibration Agency from whom it was calibrated. 

2.6 The  firm  shall have a  system of  easy  traceability of   the product  from manufacturing stage  to 

finished product stage. Stamped identification marking with serial number of  radiator shall be 

used for this purpose. 

3.0 ELIGIBLILITY: 

The  firm  shall  have  at  least  five  year  satisfactory  performance  experience  in  manufacturing  & 

supplying the MBR of  same size or larger / smaller in size of  Mechanical Bonded Radiators for use in 

stationary / moveable rail road equipments  like Gen  –set application, earth movers/ excavators or 

Rail 

Engines 

to 

reputed 

Diesel 

Generator 

set 

locomotive 

manufacturers 

viz. 

Cummins, 

San 

Engg., 

BEML, Mahendra, TELCO etc. 

4.0 QUALITY ASSURANCE PLAN (QAP) 

The firm shall prepare a Quality Assurance Plan (QAP) for all items for which approval is sought and 

submit  the  same  as  a  part  of   compliance  with  this  STR  &  specification.  The  QAP  shall  be  a 

comprehensive document covering the following aspects: 

i) Detailed Quality Control Organisation of  the firm along with key personnel engaged in the QC 

function. 

ii) Quality Assurance Process of  incoming materials used for the subject items. 

Page 3: STR _MBR

7/27/2019 STR _MBR

http://slidepdf.com/reader/full/str-mbr 3/6

 

3

iii) Process Flow Chart indicating process of  manufacture for an individual product or for a family 

of  products if  the process is same. 

iv)  Quality  Assurance  System   –  Inspection  process  control  &  Testing  Plan  including  stage 

inspections. 

v) Calibration

 scheme

 and

 status

 of 

 calibration

 of 

 equipments

 used

 in

 the

 quality

 process.

 

Details of  the above aspects are described  in the following paragraphs. The QAP shall be approved 

by RDSO and shall form the basis of  the approval process. 

5.0  QUALITY CONTROL ORGANISATION 

5.1 The complete organizational setup of  the Quality control key personnel and officials along with 

their qualification and experience shall be furnished. 

The Quality Control organization shall be headed by a senior level official having adequate technical 

qualification, who shall directly report to the plant in‐charge. 

6.0  INCOMING MATERIAL 

6.1 A complete Bill of  Material indicating all input material items required for manufacturing of  the 

product,  governing  specification  and  their  sources  of   supplies  as  approved  by  the  firm  in 

accordance with Clause 7.4.1 of  ISO‐9001 (2008) shall be furnished. Test results of  incoming raw 

material with reference to Test Certificate issued by the supplier and the results of  internal tests 

carried out by the firm for verification shall be submitted as a part of  the QAP. 

7.0  PROCESS OF MANUFACTURE 

7.1  Complete  Process  Flow  Chart  covering  all  steps  of   process  of  manufacture  for  an  individual 

product (or for a family of  products if  the process is same) shall be clearly enlisted as a part of  

the QAP.

 

7.2 The  following details of  machines used  for all  the  steps  for manufacturing  the MBR‐

Preparations shall be included: 

o  Make and model of  the machine 

o  Accuracy 

o  Details of  machining operations. 

o  Calibration frequency  – firm shall submit the details of  the calibration last done and due 

dates. 

7.3  Machining process shall be such that all critical dimensions (i.e. header plates & tanks) are final 

machined on CNC machining centres, preferably  in a single setting or may be procured  from 

another service

 having

 similar

 facilities.

 

7.4  Details of  Jigs and fixtures used during manufacture shall be furnished mentioning the steps of  

the process. 

7.5 List of  typical M & P required for manufacture is furnished in Annexure‐I. The list is for general 

guidance only and actual manufacturing operations shall be  submitted and got approved by 

the firm as a part of  the QAP. 

8.0  QUALITY ASSURANCE PROCESS‐INSPECTION AND TESTING PLAN 

8.1  Complete  Inspection  and  testing  Chart  covering  all  steps  of   process  of   manufacture  for  an 

individual product including final inspection shall be clearly enlisted as a part of  QAP. 

Page 4: STR _MBR

7/27/2019 STR _MBR

http://slidepdf.com/reader/full/str-mbr 4/6

 

4

8.2 The following details of  measuring instruments/equipments/jigs/fixtures used for manufacturing 

the subject item at all the steps of  measurement operations shall be included: 

  o  Make and model of  the measuring equipment . 

  o  Accuracy 

  o Quantity

 to

 be

 measured

 and

 acceptable

 value

 range.

 

8.3  Stage  inspection  detailing  inspection  procedure,  inspection  parameters,  destructive  /  non‐

destructive testing. Record of  test results of  stage inspection shall be available and furnished. 

8.4 The list of  Testing and Measuring instruments are shown in Annexure‐II respectively for general 

guidance only. However the specific Testing & measuring instruments, gauges used by the firm 

will also form a part of  the QAP, which shall be submitted and got approved by the firm. 

8.3 Dimensional measurements shall be made by accurate measuring instruments preferably 3D‐Co‐

ordinate Measurement Machines on prototype and on sample lots. The firm shall have the said 

facility with requisite accuracy  in accordance with the dimensions of  the  jobs to be measured. 

Measurements shall be included as a part of  the QAP. 

Page 5: STR _MBR

7/27/2019 STR _MBR

http://slidepdf.com/reader/full/str-mbr 5/6

 

5

ANNEXURE ‐1 

A. MACHINERY & PLANT (M& P) FOR MANUFACTURING 

The following is the indicative list of  machining facilities to be available with the firm: 

E= Essential  V=Vital  D= Desirable 

S N  Description  E/V/D 

1.  Fin making machine  E 

2.  Precise tube cutting machine  E 

3.  Core builder  E 

4.  Header fixing machine  E 

5.  Baking oven  E 

6.  Tube flaring machine  E 

7.  Uniform tube expander machine  E 

8.  Tube annealing machine  V 

9. 

CNC 

drilling 

machines 

for 

headers 

10.  Top tank fixtures / Jigs  E 

11.  CNC Turret machine for side frame  V 

12.  CNC bending machine for side frame  E 

13.  Template Gauges  D 

14.  Torque wrench  D 

15.  EOT crane  E 

16.  Paint booth  E 

17.  Weighing machine  D 

18.  Welding machines  D 

19. 

Spot Welding

 machines

 D

 

20.  Air Compressor  V 

21.  Pedestal Grinder  V 

22.  Surface Grinder  D 

23.  Power Press  D 

24.  VMC  D 

25.  HMC  D 

26.  Hydraulic Press  D 

27.  Fluxing Bath  E 

28.  Shearing Machines  D 

29.  Bending Machines  D 

B. LIST OF TESTING FACILITIES 

1  Calibration of  the Testing / Measuring Equipments shall be done at least  once in a year or 

prior, according to the criticality of  the equipment. 

2  Inspection Staff  conducting non‐destructive testing shall be adequately trained and qualified 

by a recognized agency and shall have adequate experience. 

3  Staff  conducting tests like Chemical Analysis and Mechanical Properties shall have adequate 

skill &  competence  and  shall  have under  gone  sufficient  training.  Skill  of   such  staff   shall 

periodically be qualified by making them carry out tests on blind samples. 

Page 6: STR _MBR

7/27/2019 STR _MBR

http://slidepdf.com/reader/full/str-mbr 6/6

 

6

Following testing facilities shall be available with the firm or alternatively may be outsourced: 

ANNEXURE‐II 

A. 

S N  Description  E/V/D 

1. 

Vibration test

 rig

 for

 three

 axis

 up

 to

 15g

 D

 

2.  Wind tunnel test rig for heat dissipation as per IS standard  E 

3.  Pressure impulse testing machine  E 

4.  Hot air & Cold Water cyclic temperature testing machine  E 

5.  Hot water & Cold Air cyclic temperature testing machine  E 

6.  Internal Corrosion Testing  D 

7.  Salt Spray test Stand  V 

8.  Pressure Testing  E 

9.  Chemical Testing of  non Ferrous elements  D 

10.  Squareness Testing  E 

11.  Surface Plate  E 

12. 

Air leak

 and

 water

 leak

 testing

 facilities

 D

 

13.  Paint Testing Facilities  V 

14.  Vernier Calliper gauge  E 

15.  Height gauges  E 

16.  Go, No‐go gauge  E 

17.  Measuring tape  E 

18.  Tube solder thickness measurement M/c  D 

B. METALLURGICAL AND CHEMICAL LABORATORY: 

Manufacturer shall have facility to conduct metallurgical testing of  the product in their premises or 

shall have arrangement to get it done from NABL lab. 

o  Magnaflux /Dye Penetrate Test (DPT) facilities for checking of  surface cracks. 

o  Magnetic Particle Inspection (MPI) facilities for checking sub‐surface flaws. 

o  Metallurgical Microscope with magnification  power up  to  500x & metallographic  sample 

preparation facilities with appropriate accessories to take photographs of  slides. 

C. PHYSICAL LABORATORY: 

Manufacturer shall have facility to conduct physical testing of  the product in their premises or shall 

have arrangement to get it done from NABL lab.