STP Study M/s Hydrotech Paryavaran India Pvt Ltd CAA II UC Chennai Auto Ancillary Industrial Infrastructure Up gradation Company Ambattur Industrial Estate Near HCL Unit - V Chennai

Upload: ishfaq-mohd

Post on 27-Jun-2015

1.245 views

Category:

Technology


0 download

DESCRIPTION

Power point presentation of 3 no STP installed by bidders of Mukatsar STP - Report on study tour- at Amabttur Chhenai

TRANSCRIPT

Page 1: Stp study chhenai

STP Study M/s Hydrotech Paryavaran India

Pvt Ltd

CAA II UC Chennai Auto Ancillary Industrial Infrastructure

Up gradation CompanyAmbattur Industrial Estate Near HCL Unit - V

Chennai

Page 2: Stp study chhenai

STP (Gross Size 30 mt x70 mt)

Page 3: Stp study chhenai

View of STP from Top

Page 4: Stp study chhenai

Coarse Bar Screen (Constructed earlier but renovated by the firm )

Coarse Bar Screen Circular Tank Diameter 3 m depth 5 mt

Page 5: Stp study chhenai

Grit Chamber - constructed earlier

Grit Chamber I Diameter 4.5 mt depth 6.5 mt RCC const

Grit Chamber Ii Dia 5.0 mt depth 6.5 RCC Construction

Page 6: Stp study chhenai

Pumping Station Submersible Pump set 2 no ( 1 +1 standbye) each of 7.5 HP Collection tank dia 4.0 mt depth 6.5 mt RCC

Page 7: Stp study chhenai

Bye Pass structure Not in use @the Time of visit

Page 8: Stp study chhenai

STP Control Unit (Inside Brick Masonry Room)

Page 9: Stp study chhenai

CI Inlet Pipe( i/d 300 mm 2 no) to Equalization Tank

Page 10: Stp study chhenai

Collection Tank Cum Equalization Tank

Diameter 11 mt Depth RCC Const 3.8 mt

Excess effluent

again fed to tank

Inlet (One Inlet pipe no effluent)

Page 11: Stp study chhenai

Over flow Out Let at Equalization Tank

Page 12: Stp study chhenai

Electric Control of Two no Submersible Pumps at Equalization Tank

Page 13: Stp study chhenai

Stilling Chamber Rectangular- RCC

Page 14: Stp study chhenai

Fine Bar Screen Two numbers

Page 15: Stp study chhenai

Grit Chamber

Page 16: Stp study chhenai

FAB II (dia 7.3 mt )

Media in FAB II Out let of FAB II to Clarifier

Page 17: Stp study chhenai

MBBR Bio Reactor FAB I

Oil and Grease in F AB I MBBR Media in FAB I

Page 18: Stp study chhenai

Return sludge in FAB I

Return sludge Pump 2 HP

Return Sludge fed in to FAB I Pipe dia 63

mm

Page 19: Stp study chhenai

Air Compressor Unit( 3 no Compressors)

Page 20: Stp study chhenai

Air compressor distribution Header

Page 21: Stp study chhenai

Sludge and Grit Out lets to sludge bed

Grit out let from Grit Chamber

Sludge out at FAB I

Page 22: Stp study chhenai

RCC Clarifier (Dia 8.7 mt)

Page 23: Stp study chhenai

Clarifier Out fall to disinfection

Settled Effluent at the out let of clarifier

Page 24: Stp study chhenai

Disinfection unit

Page 25: Stp study chhenai

Steel structures ( like stair and Platform)

Page 26: Stp study chhenai

Sludge Bed

Page 27: Stp study chhenai

Sludge infilitrate collection sump

Page 28: Stp study chhenai

Sludge Distribution

Page 29: Stp study chhenai

Out Let Houdi and Out let into pond

Page 30: Stp study chhenai

Katcha Pond used to collect Treated effluent

Page 31: Stp study chhenai

Raw sewage and Treated Sewage

Page 32: Stp study chhenai

Lab at Site

Page 33: Stp study chhenai

Inspecting Team

Page 34: Stp study chhenai

Observations• Oil and grease has been observed in the FAB I so this needs to be removed at preliminary stage by

constructing oil and grease trap . This may constructed by department also• Return sludge is being fed in to FAB I . Normally in MBBR return sludge is not fed • STP was not running at Full capacity at the time of visit and no discharge meter was installed to check the

flow• Disinfection needs to be done regularly• Handling and Disposal of sludge agreement needs to be finalized with the operator • Plant was in good working condition .• Lab should have more testing equipment• Flow meter should be installed at STP• Following officers were present during visit• 1. Mr S Srinivasan Director and Mr N Palaniraja Chennai auto Ancillary Industrial Infrastructure Up

gradation Company • 2.Mr Rakesh Verma Sr Manger Projects M/s Hydro Tech Paryavaran India Pvt Ltd • 3Mr S Selvam Site Engineer M/s Hydro Tech Paryavaran India Pvt Ltd • Mr S Srinivasan is satisfied with the performance of the Plant executed by M/s Hydro Tech Paryavaran

India Pvt Ltd • Project was allotted on June 19 2006 vide CAAIIUC/STP and WTP /920 dt 19/6/2006 and completion time

was 15 months and it was completed June 17 2009 .The delay needs to be explained .and cost overruns if any needs to be checked .