stp study 125 kld at bch faridabad
DESCRIPTION
Power point presentation of 3 no STP installed by bidders of Mukatsar STP - Report on study tour- STP constcructed by SIMA LABTRANSCRIPT
STP STUDY 125 KLD AT BCH FARIDABAD
M/S SIMA LAB
VIEW OF STP
EQUALIZATION TANK AT GL
LIFT PUMP AT EQUALIZATION TANK
MBBR -1 MS CIRCULAR
TOP VIEW MBBR - I
PVC STRAINER AT OUT LET
RETURN SLUDGE PIPE IN MBBR-I
MBBR MEDIA IN MOTION IN MBBR TANK
MEDIA
MBBR MEDIA INSIDE MBBR TANK
MBBR -II
MBBR – II TOP VIEW
PARTIALLY FILLER MBBR II
ELECTRIC CONTROL PANEL
AIR COMPRESOR UNIT
2ND AIR COMPRESOR UNIT
TUBE SETTLER MS
EMPTY CHOLORINE DOSING TANK WITH DOSING PUMP
MULTI GRADE FILTER AFTER CLARIFIER
ACTIVATED CARBON FILTER AFTER MGF
SLUDGE TANK MS
SLUDGE FILTER PRESS
SLUDGE DRYING BEDS
SLUDGE LYING ON GROUND NEAR MBBR TANKS
SEWAGE SAMPLE BEFORE AND AFTER TREATMENT
Pictures of 3.0 MLD STP completed by m/s SIMA LAB at NOIDA but yet Not commissioned (Pictures furnished by Bidder)
Pictures of 3.0 MLD STP completed by m/s SIMA LAB at NOIDA but yet Not commissioned (Pictures furnished by Bidder)
Pictures of 3.0 MLD STP completed by m/s SIMA LAB at NOIDA but yet Not commissioned (Pictures furnished by Bidder)
Isometric view of 3.0 MLD STP completed by m/s SIMA LAB at NOIDA but yet Not commissioned (Pictures furnished by Bidder)