sso update 4 july 2013
DESCRIPTION
Safety Office. SSO Update 4 July 2013. John Sutherland} Ann Hallam}Safety Office Sarah Watson} Andrew Deakin } Robin Nathaniel ( Hendersons ) – Jackson Reforms ( pdf ) - Supplement ( pdf ) Holly Blake (School of Nursing, Midwifery & Physiotherapy) - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/1.jpg)
SSO Update 4 July 2013John Sutherland }Ann Hallam } Safety OfficeSarah Watson }Andrew Deakin }
Robin Nathaniel (Hendersons) – Jackson Reforms (pdf)- Supplement (pdf)
Holly Blake (School of Nursing, Midwifery & Physiotherapy)Steve Robertson (Crowthorne) – Local Exhaustion Ventilation (pdf)Representative from (Alpha Labs) – Pipetting Ergonomics (pdf)Cerian Miller (Ansell) – Protective Gloves (pdf)
Safety Office
![Page 2: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/2.jpg)
Programme
• General Matters• Introduction, Overview and Strategy• Insurance Claims• Fieldwork• First Aid• Slips• Website development• Wellbeing initiatives in the School of Nursing
• Refreshments and Exhibition – A42
• Specific Interest• Flammable and explosive atmospheres• Work equipment• Laboratory gas systems• Fumecupboards and extraction systems• Ergonomic pipetting• Protective gloves
Safety Office
![Page 3: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/3.jpg)
Strategic Changes
Outcome from Review of F&BS – 2012
To maximise opportunities and clarify boundaries:•The Safety is moved from FABS to sit within the Registrars areas of responsibility, working within HR.
•The Safety Committee and Statutory Safety Committee should be combined and be chaired by the Registrar
•The Registrar will report to Council on all Health and Safety matters
•Anticipated transfer date 1 August 2013
•The Safety Office will not be relocating.
![Page 4: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/4.jpg)
14 respondents = 7%
70-80% very or fairly satisfied on most elements
Does the poorer response on “Advance notification of disruptions and changes” reflect a low rate of these?
Adverse Comments- Slow response- More collaborative or constructive approach requested
F&BS Review – Service Delivery Survey (Survey Unit)
![Page 5: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/5.jpg)
Professional Services Strategy
Mission• Advise and support the University on H&S compliance.• Primary responsibility is Corporate Governance
Context • Safe working is integral to good management and a line management
responsibility
Values• Professional, competent, responsive, co-operative, supportive
Strategy• University response to legislative change• Maintain good standing with the regulators• Maximise impact from a small central team
through supporting and collaborating with the wider “Safety Network“ to influence and enable managers
H&S Network
Safety Office
Resources
![Page 6: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/6.jpg)
Legislative Developments
• Löfstedt review of health and safety legislation– Focus on outdated or redundant legislation
• Currently Factories Act and OSRPA (+ miscellany)• Further changes RIDDOR• First Aid ACoP and Training Approval• Various ACOPS – DSEAR; COSHH; Asbestos; Workplace/Management Regs
• Single Regulatory Framework – Biological Hazards– consolidation of GMO by October 2014?– longer term regulatory consolidation of underpinning EU Regs?
![Page 7: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/7.jpg)
EMF Directive – July 2016?• 4th Physical Agents Aspect (Vibration; Noise; Artificial Optical Radiation)
•Electromagnetic fields 0-300 GHz–Sensory effect on nerves and tissue heating effects. –Long term effects not currently included–Static magnetic fields; –low-frequency electric and magnetic fields; –radio and microwave frequencies–NMR; MRI; RF Welding and other industrial applications.
•Publication in July 2013; Adoption October 2013?
•Guidance - early 2015; Regulation in place July 2016
Electrical & Magnetic Fields
![Page 8: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/8.jpg)
Electrical & Magnetic Fields
•Exposure Limit Values – fields in the body calculated from external measurements.• Action Levels – limits to external fields that ensure ELV not exceeded.• Measurement might be required in complex situations.• Controls – signage; demarcation; access control; training.• Derogations (vague) for MRI; Industrial applications (and armed forces)
–Risk assessment; state of the art physical and organisational controls;
![Page 9: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/9.jpg)
Regulator Involvement
• Fee for Intervention - £124 per hour• EA Charge Escalator• Enforcement Agency Visits
– HSE: Information to contractors. • Job Tickets now contain more information on hazards and asbestos• Ensure local hazard plans are updated on Estates Building Info System
– Environment Agency: 3 audits of radioactive substances– Fire Brigade: Introducing quarterly strategic reviews – but stalled in
organisation changes– Police: substance security.
![Page 10: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/10.jpg)
Incident Statistics for 2012
• Total incidents 585 (610 in 2011)• 331 staff• 217 students• 37 others (visitors, members of the public,
contractors)
• 77% required no treatment or just first aid• 20 RIDDORs (22 in 2010)
– Most were >3/7 days lost time injuries for staff– 1 major involving fractures – slip on ice
![Page 11: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/11.jpg)
Incidence Rates – number of incidents per 1000 people at risk - enables comparison with other institutions. Staff RIDDOR incidence rate a little below the sector averageStudent RIDDOR incidence rate a little above the sector average
Russell Group Comparison
Sector Benchmarking
![Page 12: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/12.jpg)
Comparison - 2012 and 2000
2012 2000
Staff - Reportable incidents 1.8 4.6
Staff – All incidents 28 78
Students – Reportable incidents 0.15 0.4
Comparison of number of incidents per 1000 people at risk 2012 and 2000
![Page 13: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/13.jpg)
Incidents Statistics
• Main causes of incidents at UoN:• Sharps (includes glass & needles) 22%• Slips, trips and falls 16%• Struck by object 10%• Striking against object 7%• Manual Handling 7%
• Main types of injury as would be expected:– Cuts, Puncture wounds, Bruising, Strains & Sprains, Burns/Scalds
• Claims– 10 claims received in 2012– Similar level as in previous years– Main causes:
• Slips and falls – defective flooring• Being struck by or striking against an object
![Page 14: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/14.jpg)
Fires
• Good standards being maintained• Incidents 2012• 14 trivial or minor.• No significant incidents
– 3 flash fires in laboratories.– 4 cooking-related fires (3 microwave ovens, 1 toaster).– 3 fires involving plant or equipment.– 1 arson fire involving a car.– 1 tree fire.– 2 external waste bin fires.
• Estates expenditure 2012-13– £340k system improvements– £190k maintenance
![Page 15: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/15.jpg)
International Campuses• UNNC
– Vivian Chen, Environment, Health and Safety Officer– Doris Zhang, Asst EHSO– Website: http://www.nottingham.edu.cn/en/estates/ehs/index.aspx– Chair of UNNC H&S Committee – Dr Philip Hall, Environmental
Engineering
• UNMC– Sahizam Abd Wahab, Senior Safety Executive– Chair of Campus H&S Committee: Prof Ian Harrison, Dean of
Engineering
![Page 16: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/16.jpg)
H&S Priorities 2013-14
• Health and Safety Reviews– Specific focus on
• Risk assessment and SOPs– Quality – do they
» Identify hazards and exposure points» Specify physical and procedural controls» Placements / fieldwork / outreach activities
– Availability– Current
• First aid assessments• Policy Development
– Management of local exhaust ventilation systems– COSHH
• MOODLE Training• Corporate Manslaughter Podcast
– Legal Services leading– Reinforce message to managers and PIs
![Page 17: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/17.jpg)
Risk assessment/approval/authorisation notification requirements
Risk category RA Rev/App/Auth Notification period to I.O/USO
Notes
Cat 1- Negligible risk
Generic* LM [Ind. Concur]SSO [group]
None *Traveller to ensure arrangements are in accordance with generic risk assessment [Appendix II], where they are not additional risk assessment would be required
Cat 2a/2bLow-Medium/Med
Yes SSO to approveHoS /NI to authorise
New trips 2 months
Repeat trips - there is no requirement to do a risk assessment for each trip, though the existing assessment should be reviewed in the light of any additions or changes to the original activities.
Cat 3 High risk
Yes - detailed
EPRP review & approval.HoS or Registrar to authorise*
6 months** to USO
* If EPRP considers there are significant residual risks that cannot be addressed.** To allow sufficient time for EPRP to review and for I.O to confirm insurance will cover. In certain instances it may be necessary to have input from Chubb/Red 24
Cat 4V High risk
Yes & Threat Analysis for area
RA approved by USO & I.ORegistrar to authorise
2 months Where additional hazardous activities may be involved as detailed in Cat 3 above, 6 months notification & ERP
review/approval will be required.
Fieldwork
![Page 18: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/18.jpg)
TrainingRisk category Training Notes
Cat 1- Negligible risk
Minimal Traveller to have read information on Travel workspace which includes pre travel checklist and safety advice. https://workspace.nottingham.ac.uk/display/TravelandExpenses/Pre+trip+requirements
Cat 2a/2bLow-Medium/Med
Yes Fieldwork leaders and independent fieldworkers should be trained in the content and application of this guidance and in how to carry out risk assessments and must have demonstrated that they have the necessary experience and competence to the satisfaction of the Head of School and School Safety Officer.
Cat 3 High risk
Yes If not having led an expedition before must attend relevant expedition leadership training, have participated in fieldwork and shadowed an experienced leader. In the case of expeditions to remote locations a minimum of two people must have attended wilderness medical training
Cat 4V High risk
Yes Relevant to the threat analysis and area to be visited. Where additional hazardous activities may be involved as detailed in Cat 3 above.
Fieldwork
![Page 19: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/19.jpg)
Training provisionExternal provider Training Expertise (formerly Fieldskills)
http://www.training-expertise.co.uk/
Trainer has practical experience gained over many years of leading and planning expeditions.•Introduction to Planning - why is it important•Information gathering and trip planning•Risk assessment - including dynamic RA practical session•Crisis management•Fieldwork planning exercise•Practical scenario – table top exercise in crisis management
Low cost - £60 pp based on 12 participants
Delivered in house Jan 2013 – very good feedback from attendees
Plan to run in 2014 – subject to demand. When is best time?
Fieldwork
![Page 20: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/20.jpg)
First Aid
Revised University Code of Practice
– Two types of general training• First Aid at Work (3-day + 2-day refresher every 3 yrs)• Emergency First Aid (1-day, refresher every 3 yrs)
– Specific Hazards• Cyanide• Hydrofluoric Acid• Fieldwork
![Page 21: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/21.jpg)
First Aid
Risk assessment of First Aid Requirements
• Each School/Dept is responsible for assessing its needs for both first aiders and first aid equipment
• Specific form for recording this
![Page 22: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/22.jpg)
![Page 23: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/23.jpg)
![Page 24: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/24.jpg)
![Page 25: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/25.jpg)
First AidHazard level Numbers at risk Suggested number of
first aid personnelOther factors to consider
Lower hazard e.g. offices, libraries, classroom based teaching, conferences
<50 1 EFAW (or FAW). Very small sections should liaise with neighbours to share first aiders.
Hours of workStudent/public presence
First aider absences
Distance of cover
Consider specific hazards such as work with cyanides and hydrofluoric acid
Off-site work – visits or fieldwork
>50 1 FAW for first 100, + EFAW for every 100 employed (or part thereof)
Higher hazard
e.g. laboratories, workshops, kitchens, farm
<50 1 FAW depending on nature of injuries
>50 1 FAW for every 50 employed
![Page 26: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/26.jpg)
First Aid
First Aid Kits – British Standard for contents now in place
– Not essential to have a “BS kit”– Review against UoN code of practice
![Page 27: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/27.jpg)
Slips
• Slips and trips - 16% of UoN Incidents• Slip measurements survey - Mar 2013• Selection of floor types measured• SlipAlert equipment used – approved by HSE as an indicative
method of measuring slip risk.
SlipAlert Equipment
![Page 28: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/28.jpg)
Slips
Key Findings
• Floor type is generally appropriate to the location and activity. One or two exceptions.
• There is no difference in slip risk between a thoroughly wet floor and one that has been mopped and left damp
• Varnished/polished surfaces sometimes increase slip risk
![Page 29: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/29.jpg)
SlipsTo reduce risk
• SPECIFICATION - Select appropriate flooring for activity considering likely contamination, likely frequency of occurrence, footfall, etc.
• CLEANING REGIME that is appropriate in frequency, timing and type
• SPILLAGES - Prompt clearing of spillages/leaks, aiming to keep people away or leave dry for best risk reduction
HSE Shattered Lives Campaign
![Page 31: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/31.jpg)
Safety Office Website
![Page 32: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/32.jpg)
Safety Office Website
![Page 33: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/33.jpg)
Work, Health and Wellbeinga whistle-stop tour!
Dr Holly Blake
On behalf of the Work, Health and Wellbeing Committee at the
School of Nursing, Midwifery and Physiotherapy
We hope to make it easier to locate information and processes relating to work, health and wellbeing. We seek to make practical, positive changes in the school by promoting health and wellbeing and contributing to alleviating stress. We are a channel for communicating staff comments and suggestions to School management.
![Page 34: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/34.jpg)
The bigger picture
Work and Wellbeing
Make employee wellness part of our vision and
valuesRecognise and
work to minimise workplace stress
Promote health and wellbeing in the workplace
Provide opportunities for
personal development
Promote positive engagement
with work
Promote a positive work-life balance
![Page 35: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/35.jpg)
Make employee wellness part of our vision and values
• Assembled a committee • Identified appropriate training • Developed a school strategy• Written terms of reference • Set up a website• Delivered a staff health needs assessment survey • Focused heavily on staff wellbeing at our yearly staff
forum events.
![Page 36: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/36.jpg)
Work to minimise workplace stress• 89% find their job stressful• Relaxation classes and complementary therapies across
centres at three school-run HWB days. • Bespoke workshops for staff on ‘coping with change’, ‘stress
management’ , ‘positive thinking’.• Line manager resources on managing stress in teams• Line manager online training courses on stress management
and change management. • Site welcome packs for visiting staff and students • Mindfulness Meditation and Relaxation classes• Massage therapies • Mental health awareness .
![Page 37: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/37.jpg)
Promote health and wellbeing• Wellbeing days in Nottingham, Derby and Mansfield - information
stands, free nurse-led health checks, exercise and relaxation classes, complementary therapies and staff health-related competitions.
• Worked on mental health awareness• Staff health checks (BMI, waist-hip ratio, blood pressure) – undertaken
onsite by a nurse, across our centres • Identified musculoskeletal issues via staff survey• Provided physiotherapy-led advice sessions at our school forum• Offered bespoke New Leaf smoking cessation sessions. • Organised staff exercise classes (yoga, tai chi, circuits, boxercise) and
offered a free local gym trial. • Organised 6-12 week staff ‘challenges’ for health improvement
(pedometer walking challenge, waist-watcher challenge, Biggest Loser Competition)
![Page 38: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/38.jpg)
Provide opportunities for personal development
• Individual coaching sessions (up to 6) to discuss anything from how to deal with change, to stuck in a rut.
• Team coaching sessions to reach consensus on how to move forward effectively
• Wellbeing sessions - on coping with change, managing stress, positive thinking and emotional resilience
![Page 39: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/39.jpg)
Promote positive engagement with work and a positive work-life balance
• Activities to promote team working and improved wellbeing
• School-wide social events • Site-specific social activities
(e.g. christmas party, dragon boat racing, lunches , lakeside walks, dancing, it’s a knockout, rounders, Ladies Day at Ascot).
‘It feels as though the School is looking after us and giving something back. After all, without us they cannot reach their goals and ambitions’
![Page 40: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/40.jpg)
For more information:[email protected]
or join the 2013 APPLE programme health and wellbeing learning set
or speak to committee member Jackie Hollowell today
![Page 41: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/41.jpg)
Dangerous Substances & Explosive Atmospheres (DSEAR) 2002
![Page 42: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/42.jpg)
Structure and scope of new guidance
• Safety web site guidance document.
• Rough cut assessment template.
• Detailed assessment template.
• Model assessment for lab work.
![Page 43: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/43.jpg)
Does DSEAR apply?• Relevant Dangerous Substances are classified as -
– explosive, – oxidising, – extremely flammable, – highly flammable, or – flammable
• Material not classified as above but could as a result of the process become a risk e.g.– decompose, or – react exothermically with other substances
• Dust which could cause an explosive atmosphere:– fine powders or fibres– organic material, metals, nanopowders
![Page 44: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/44.jpg)
Will there be a risk?• How will the material be used, can it be released
as a gas; vapour; mist; dust?– how much; how long for – will this release create a dangerous atmosphere.
• There needs to be the correct mixture of fuel and air e.g. Petrol vapour 1.4% - 7.6%; Hydrogen 4% - 74%; Methane (Natural Gas) 5% - 15%
• Is there a source of ignition?– electrical equipment, switches, motors, lights,
instruments, – sparks (electrical discharge and friction) – naked flames– hot surfaces
![Page 45: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/45.jpg)
Classification of zones with explosive atmospheres• Based on the likelihood and extent of an explosive atmosphere
being present. e.g. – Continuously in normal operation.– Likely in normal operation.– Unlikely in normal operation…….. but possible – Highly unlikely.
• Identified zones with a risk of forming an explosive atmosphere must be marked with the appropriate pictogram, and a clearly identified zone category.
2
![Page 46: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/46.jpg)
Hierarchy of risk control• Elimination/substitution – are there safer materials that might be
used?• Prevent explosive atmospheres from developing – use efficient
ventilation• Avoidance of release/containment –
– containment e.g. sealed systems, • Reduction in quantity of materials in use to minimise consequence• Control the process at source – keep tight control over the process.• Avoid build up of potentially dangerous materials - by correct
delivery reception, storage, collection and disposal• Remove potential for ignition –
– electrical equipment which is not certified. – intrinsically safe / flameproof equipment may be required.– restrict personnel access to zoned area, no smoking, mobile
phones, sparking tools etc.
![Page 47: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/47.jpg)
Piped compressed gas systems attached to gas cylinders and stand-alone compressed gas cylinder installations
![Page 48: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/48.jpg)
Structure and scope of new guidance
• Provides compliance with Pressure Systems Safety Regulations 2000 (PSSR) e.g. the requirement for a Written Scheme of Examination to be in place prior to the system being used.
• Typically will not require input from Allianz Inspecting Engineers.
• Applies to all piped compressed gas systems attached to pressure cylinders and stand-alone compressed gas cylinder installations.
• Discourages use of stand alone systems where piped options are possible.
![Page 49: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/49.jpg)
Rolls and responsibilities• Competencies associated with the use, inspection, testing, maintenance
and installation of piped compressed gas systems attached to gas cylinders
Level 1• Before use checks, carried out by persons who have received sufficient
instruction to operate the system safely.
Level 2• Annual checks, including, Regulator creep test; System low pressure leak test
at normal operating pressures; Visual and functional check of all system components.
Level 3• System design, installation, modification and component replacement should
only be undertaken by a person who has undertaken relevant training by a suitably approved provider.
![Page 50: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/50.jpg)
Inspection & Maintenance
• Programme of annual high pressure component inspection.– High pressure regulators, hoses, pig-tails, pressure relief
valves, bursting disks, flame arrestors, isolation valves.– Low pressure hoses, regulators, pipe-work.
• Programme of high pressure component swop out.– High pressure regulators, hoses, pig-tails, pressure relief
valves, bursting disks, flame arrestors, isolation valves.• Typically 5 years but can be extended subject to
certain criteria.
![Page 51: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/51.jpg)
System performance testing
• Visual inspection.• Annual regulator ‘Creep’ test. • Annual low pressure pipe-work ‘pressure drop’
test.
![Page 52: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/52.jpg)
Stand alone systems• High pressure component management same as piped
systems.• Low pressure hoses confirmed to be -
– Capable of safely handling gas pressure applied.– Made of a material which has been proved to be compatible with the gas used.– Protected from excess heat.– Kept as short as possible.– Not allowed to become contaminated with grease or other materials.– Fastened with appropriate fastenings.– Where multiple low pressure hoses are used in close proximity, a unique marker to
include the gas name should be used to identify each end of each hose.– A fire in a coiled hose is difficult to extinguish; oxygen or fuel gas hoses should not
be coiled around the cylinders, regulators or cylinder trolley during operation.– Discarded when worn or damaged.
![Page 53: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/53.jpg)
Work equipment
![Page 54: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/54.jpg)
Structure and scope of new guidance• Safety web site guidance document.• Detailed check-list to help with the identification and
recording of Technical File contents and essential safety requirements ESR’s.
![Page 55: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/55.jpg)
Equipment we purchase
• Just about anything we buy to help us ‘do work’ is likely to be classified as ‘Work Equipment’.
• How do we know its safe?• Provision and Use of Work Equipment Regulations
1998.• The Supply of Machinery (Safety) Regulations
1992.• Application of CE certification.• Beware of ‘Grey Imports’ – use reputable
suppliers.
![Page 56: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/56.jpg)
Equipment we make or modify
• We tend to forget that anything we make or modify buy to help us ‘do work’ is also classified as ‘Work Equipment’.
• We also tend to forget that we then become responsible for its safety.
![Page 57: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/57.jpg)
Equipment we make or modify• We must be able to demonstrate that machinery, rigs
or apparatus etc. constructed or modified by the University is safe.
• To achieve it is strongly recommended that you adopt the broad principles and requirements of the Supply of Machinery (Safety) Regulations 1992, which require the production of a Technical File.
• A Technical File documents the design, manufacture and requirements for safe operation of work equipment……… it’s a bit like a Risk Assessment, documenting – why we did it this way.
![Page 58: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/58.jpg)
Contents of a Technical File• Description of the equipment.• General Arrangement drawing.• Wiring and circuit diagrams.• Description of control philosophy/logic.• Description of function and operating parameters of any safety
devices.• Description of critical operating pressures, temperatures, speeds etc.• Datasheets for critical sub-assemblies and relevant fluids, gases etc.• Copies of relevant test reports.• Copies of quality control, commissioning and operating procedures.• Identification of Essential Safety Requirements ESR's associated
with equipment.
![Page 59: SSO Update 4 July 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062422/56812b48550346895d8f6610/html5/thumbnails/59.jpg)
What are ESR’s• Basically, its all the things you should consider when designing/building a piece
of equipment to make sure its safe.• Materials, Gases, Fluids etc. used to construct machinery, Products used or
created during use.• Ergonomics, Access, Facilities for handling, Operating positions, Fall from
height, Seating, Lighting.• Safety and reliability of control systems, Control devices, Safety devices,
Indicators, Control Position, Starting, Stopping Controls, Normal stop, Operational stop, Emergency stop, Failure of the power supply.
• Protection against mechanical hazards, Break-up during operation, Falling or ejected objects, sharp/abrasive surfaces, edges or angles, trapping by moving parts, uncontrolled movements, guarding, interlocking.
• Electricity, Static electricity, Energy supply other than electricity.• Extreme temperatures, Noise, Vibration, Radiation, Fire, Explosion.• Maintenance, Foreseeable operator interventions.• Information, Training, Supervision, Restrictions of use.