    Thiess John HollandJoint Venture

    Airport Link | NorthernBusway | EWAG

    Global - Supplementary

    Specification - Tunnel -Waterproofing andDrainage GLTSP107

    Document refBC-PBA-GLTSP107-SPC-0001-0-0220 January 2010

    AFC RE-ISSUE

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    2/33

    Thiess John HollandJoint Venture

    Airport Link | NorthernBusway | EWAG

    Global - Supplementary

    Specification - Tunnel -Waterproofing andDrainage GLTSP107

    January 2010

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    3/33

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    4/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Contents

    Page

    1 General 1

    1.1 Scope 1

    1.2 Waterproofing Requirements and Methods 2

    1.3 Definition of Terms 3

    1.4 Standards and Related Specifications 4

    1.5

    Discrepancy Between Drawings and Specification 6

    2 Quality System Requirements 7

    2.1 General 7

    2.2 Hold Points, Witness Points and Milestones 7

    2.3 Work Method Statements 9

    3

    Waterproof Membranes 9

    3.1 General 9

    3.2 Preformed Polymer Membranes 11

    3.3 Installation of Preformed Polymer Membrane (PPM) 15

    3.4 Spray-on Membranes 17

    3.5 Submissions 19

    4

    Ancillary Items 19

    4.1 Waterstops 19

    4.2 Penetrations / Proprietary Membrane Fixing 19

    4.3 Submission Requirements 20

    4.4 Re-injectable Tubes 20

    4.5

    Bentonite Bands 20

    5 Geotextiles and Drainage Materials 20

    5.1 Geotextiles 20

    5.2 Drainage Materials 21

    6 Concrete 22

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    5/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Table 10 Geotextile Fleece for use with PPM Properties

    Appendices

    Appendix A

    Verification Records

    Appendix B

    Response to Comments

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    6/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    1 General

    This technical specification has been provided by Parsons Brinckerhoff Arup Joint Ventureon behalf of Thiess John Holland Joint Venture for use in execution of the Design and

    Construct Contract with the Airport Link, Northern Busway and ARU project (the Project).

    1.1 Scope

    This specification covers the waterproofing and drainage requirements for drained and

    undrained tunnels.

    The tunnels covered by this Specification include:

    Mined (or Driven), including mainline tunnels, caverns, cross passages, ramps,

    substations, low point sumps and shafts.

    TBM connections to cut and cover structures

    Cross passages and junctions with mined tunnels and TBM tunnels

    Substations and Sumps

    The extent of drained and undrained tunnels is in accordance with the Concept Design

    1.1.1 Exclusions

    The gaskets that seal between TBM segments are covered in Global Supplementary

    Specification Tunnel Segmental Lining (reference BC-PBA-GLTSP110-SPC-0001).

    1.1.2 Drained Tunnels

    Mined cast-insitu concrete lined drained tunnels are to be provided at the following

    locations:

    Northbound and Southbound mainlines;

    Bowen Hills cavern (at southbound tunnel off ramp)

    Southbound off ramp

    Lutwyche caverns (at northbound mainline tunnel off ramp and southbound

    mainline tunnel on ramp)

    Kedron northbound and southbound caverns (at entry and exit from TBM tunnels

    with westbound off ramp and eastbound on ramp);

    Mined tunnel cross-passages

    Substations

    Sumps

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    7/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    1.2 Waterproofing Requirements and Methods

    1.2.1 GeneralThe tunnel waterproofing systems shall be installed in accordance with:

    the Design Drawings

    the Specification for Tunnelling, British Tunnelling Society and Institution of Civil

    Engineers, June 2000 or

    equivalent international standard and installed in accordance with the manufacturers

    specifications

    1.2.2 Project Deed Requirements

    The project Deed requires that:

    Any groundwater seepage into the completed tunnels and associated Project Works

    shall not be visible and no water shall be permitted to drip or flow onto or over road

    pavements, walkways, egress passages and plant and equipment rooms.

    Permanent waterproofing treatments shall ensure that any water present on internal

    surfaces of the tunnels does not affect the safety, durability and function of the tunnels.

    where leakage exceeds the limits specified by the Project Deed, the leakage shall be

    reduced to those specified limits

    1.2.3 Drained Tunnels

    The waterproofing system for the drained tunnels shall include:

    a waterproof membrane installed over the crown to shoulder level or down to the tunnel

    formation level

    a lower wall drain of membrane (or approved drainage medium) from the tunnel arch to

    the longitudinal invert perimeter drain

    a geotextile drainage fleece layer installed between the ground and membrane over the

    crown and the lower wall drain

    the waterproof membrane type shall have a proven history and reputation for

    satisfactory performance in tunnels with similar groundwater conditions

    a waterproof membrane and geotextile that is self extinguishing to minimum class E or

    B2 (EN ISO 1925-2 / EN 13501-1 or DIN 4102)

    evidence obtained from the manufacturer that no components of the membrane shall

    leach out and deleteriously affect the durability of any of the following:

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    8/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Geotextile fleece in accordance with Section 5

    Drainage mat / net, anchor drain, strip drain and / or dimple sheet for tunnel arch / wall

    drainage in accordance with Section 5

    Sheet Preformed Polymer Membrane in accordance with Section 3.2.

    Rearguard waterstops in accordance with Section 4.1

    Hydrophilic waterstops as required to construction joints and TBM precast segmental

    linings in accordance with Section 4.1

    Grout injection tubes for post-construction grouting of joints and supplementarywaterproofing elements installed in case of excessive leak detection in accordance with

    Section 4.4

    Supplementary waterproofing elements such as bentonite strips and protective

    membrane strips at construction joints in accordance with Section 4.5

    Compartmentalisation and termination fixings including rearguard waterstop

    arrangements and membrane tapes with epoxy adhesives in accordance with the

    design drawings. Spray-on waterproofing membranes in special areas where nominated by the Design

    Drawings and in accordance with Section 3.4

    All associated fixings for membranes including any special fittings for sealing around

    penetrations and anchor bolts in accordance with Section 4

    Slotted flexi-drain pipes and strip drains fixed in the shotcrete subgrade in areas where

    the Waterproofing Supervisor considers that the inflow of water will impede the ability to

    install the waterproofing membrane in accordance with this specification.

    Slotted pipes, trench formers, inspection and maintenance pits and rockfill or gravel

    drainage layers / pipe-surrounds in accordance with Section 5.2.

    No-fines concrete in areas of subgrade and invert drainage in accordance with

    Specification (reference BC-PBA-GLRSP301-SPC-0001).

    Smoothing shotcrete to tunnel lining substrate surfaces in accordance with specification

    (reference BC-PBA-GLTSP102-SPC-0001).

    Blinding concrete to undrained tunnel invert substrate surfaces in accordance with

    Specification (reference BC-PBA-GLTSP106-SPC-0001).

    1.3 Definition of Terms

    Definitions applicable to many specifications including this Specification shall include those

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    9/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    designed for the part of the expected full hydrostatic

    pressure and to direct the collected seepage groundwater

    to a dedicated seepage drainage system without directingit onto the roadways.

    Undrained Tunnel

    (Mined)

    A tunnel where the permanent lining will be fully enclosed

    over its entire perimeter by a waterproof membrane that

    prevents the ingress of water into the tunnel and the

    drawdown of the ground water table.

    Extrados Exterior curve of an arch

    FPO Flexible Polyolefine Elastomer (PE-PP copolymer)

    HDPE High-density polyethylene

    HDPP High-density polypropylene

    Hot Works Permit TJH Procedure for undertaking hot works in the underground

    works. (Hot works include welding, flame or arc cutting, burning

    or heating.)

    Intrados Inner curve of an arch

    LLDPE Linear Low Density Polyethylene -

    PPM Preformed Polymer Membrane

    PVC-P Advanced plasticized Polyvinyl-chloride

    Project Engineer Person nominated by TJHJV to oversee and approve the

    construction of a defined portion of the Works, and to ensure that

    the work is in compliance with the requirements of the

    specifications and Quality Assurance System

    Waterproofing

    Supervisor

    Person nominated by TJHJV to oversee and approve the

    construction and installation of all Waterproofing Project Works

    for the Driven Tunnels in accordance with the Project Deed

    Annexure 2 Part 1 Construction Requirements Section 2.4

    Waterproofing of Tunnel Structures

    VLDPE Very Low Density Polyethylene

    1.4 Standards and Related Specifications

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    10/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    BC-PBA-GLSSP405-SPC-0001 Global - Supplementary Specification - Structures

    Grouting for Ground Water Control

    BC-PBA-GLTSP101-SPC-0001 Global Supplementary Specification Tunnel Rock

    Reinforcement

    BC-PBA-GLTSP102-SPC-0001 Global - Supplementary Specification - Tunnel - Shotcrete

    Lining

    BC-PBA-GLTSP103-SPC-0001 Global - Supplementary Specification - Tunnel - Mined

    Tunnels Excavation and Implementation

    BC-PBA-GLTSP106-SPC-0001 Global - Supplementary Specification - Tunnel - Cast-in-place Concrete

    BC-PBA-GLTSP109-SPC-0001 Global - Supplementary Specification - Tunnel - Precast

    Concrete for Segmental Linings

    BC-PBA-GLTSP110-SPC-0001 Global - Supplementary Specification - Tunnel - Segmental

    Lining

    BC-PBA-GLTSP111-SPC-0001 Global - Supplementary Specification - Tunnel - TBM

    Instrumentation and Monitoring

    BC-PBA-GLTSP112-SPC-0001 Global - Supplementary Specification - Tunnel - Opening

    Sets

    BC-PBA-GLRDR100-RPT-0100-G-02 Design Manual Global Drainage

    BC-PBA-AGGHG100-RPT-0001-G-01 Global Geotechnical Hydrogeology Analysis

    BC-PBA-AGDTR100-RPT-0001-F-02 Global Durability Technical Report

    American Standards

    ASTM D4533 - Standard Test Method for Trapezoidal Tearing Strength of Geotextiles

    ASTM D1438 - Methods of Test for Pentosans in Cellulose

    ASTM D4487 Standard Test Methods for Analysis of Calcium Borosilicate

    ASTM D4787 - Standard Practice for Continuity Verification of Liquid or Sheet Linings

    Applied to Concrete Substrates

    ASTM D6132 - Standard Test Method for Non-destructive Measurement of Dry Film

    Thickness of Applied Organic Coatings Using an Ultrasonic Gage

    Austral ian Standards

    HB 90.3 - Guide to ISO 9001:2000

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    11/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    DIN 4102 - Fire Behaviour of Building Materials and Building Components -Requirements

    and Testing

    DIN 16726 Perforation Test

    DIN 16776 Plastic Moulding Materials; Polyethylene Moulding Materials; Classification

    and Designation

    EN1542 Products and Systems for the Protection and Repair of Concrete Structures

    Test Methods Measurement of Bond Strength by Pull-off

    EN13562 - Testing of Geotextiles Part 4: Determination of Permeability of Geotextiles

    Normal to their Planes under Load of Constant Hydraulic Height Difference

    EN ISO 10319 - Geosynthetics Wide-width Tensile Test

    EN ISO 12236 - Geosynthetics Static Puncture Test (CBR Test)

    EN ISO 12956 - Geotextiles and Geotextile Related Products -Determination of the

    Characteristic Opening Size

    EN ISO 12958 - Geotextiles and Geotextile Related Products Determination of Water Flow

    Capacity in their Plane

    EN 9864 - Geotextiles and Geotextile Related Products Determination of Mass per Unit

    Area

    EN 9863 - Geotextiles and Geotextile Related Products -Determination of Thickness at

    Specified Pressures - Part 1: Single Layers

    EN 13433 - Geotextiles and Geotextile Related Products -Dynamic Perforation Test (Cone

    Drop Test)

    SIA 280 - Swiss Association of Standardisation 280 - Geomembranes Products and

    Construction Material Testings

    Other

    ISO 9002 Quality Systems - Model for Quality Assurance in Production, Installation and

    Servicing

    Specification for tunnelling, British Tunnelling Society and the Institution of Civil Engineers,

    June 2000DVS 2225-2 Joint of lining membranes made of poly materials in geotechnical and

    hydraulic engineering site testing

    NACE RP0188 Discontinuity Testing of New Protective Coatings on Conductive

    Substrates

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    12/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    2 Quality System Requirements

    2.1 General

    Specific quality system requirements are detailed within PSTS50. Construction activities

    shall be carried out in accordance with the provisions of the Contractors Quality System

    which shall comply with the requirements of AS/NZS ISO 9001.

    2.2 Hold Points, Witness Points and Milestones

    The Hold Points, Witness Points and Milestones particular to this Specification are listed in

    Table 2, Table 3 and Table 4 below respectively. Refer General Specification (referenceBC-PBA-GLRSP000-SPC-0001) for Hold Point, Witness Point and Milestone definitions and

    requirements.

    The Contractor shall not proceed beyond a Hold Point until the Hold Point has been

    released by the person nominated in Table 2. The Contractor shall notify the relevant

    person when a Hold Point will be reached so that they can review and/or witness any work

    process, record or test being undertaken by the Contractor and thus expedite the release of

    that Hold Point.

    Table 2 Hold Points

    Specification

    Clause

    Hold

    Point

    Number

    Hold Point Details For Release By

    All relevant Hold Points outlined in the Specifications

    and Project Deed including the hold points referred

    to in the QDMR Project Specific TechnicalStandards (PSTS) as described in Annexure 1 Part

    1.

    IV

    Hold Points as the Contractor deems necessary to

    meet its obligations under the deedContractor

    TJH shall provide necessary evidence, for the

    approval of the following:

    Approval of membrane details, samplesand installation methodology from the

    manufacturer

    Approval of the method statement for

    installation of the membrane

    Approval of the performance of the pre-

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    13/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Specification

    Clause

    Hold

    Point

    Number

    Hold Point Details For Release By

    3.3 3Visual inspection of shotcrete smoothing layer prior

    to membrane installation

    Waterproofing

    Supervisor

    3.3.1 4 Pressure testing of every welded seam

    Waterproofing

    Supervisor or his

    nominated

    competent

    Membrane

    Welder / Installer

    3.3.1 5Inspection of membrane prior to moving form into

    position for casting permanent liningContractor

    3.3.3 6

    Inspection of installed membrane prior to installation

    of membrane protective layer before casting base

    slab

    Contractor

    4.3 7Approval of the proposed ancillary items, including

    details of installation procedures for PPM

    Construction

    Certifier

    The Contractor shall provide the person nominated in Table 3 reasonable notice (minimum

    24 hours or as otherwise specified) of all Witness Points so that inspection may be made of

    the following:

    Table 3 Witness Points

    Specification Clause Witness Point Details For Release By

    All relevant witness points the Independent

    Verifier deems necessary to comply with their

    requirement under the Deed.

    IV

    Witness points as the Contractor deems

    necessary to meet its obligations under the

    Deed.

    Contractor

    3.3.1 Pressure testing of welded seams (one offnotification thereafter no notification for dailywork activities)

    Construction Certifier

    3.3.1

    Inspection of membrane prior to moving forminto position for casting permanent lining (oneoff notification thereafter no notification fordaily work activities)

    Construction Certifier

    Inspection of installed membrane prior to

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    14/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    2.3 Work Method Statements

    Work Method Statements which are required to be submitted by the Contractor to theConstruction Certifier in accordance with the quality system requirements of the Contract

    are listed below in Table 5.

    The Contractor shall not vary the materials and the method statement(s) once they have

    been accepted by the Construction Certifier without further review and acceptance by the

    Construction Certifier.

    Table 5 Work Method Statements

    Specification Clause Work Method Statements

    3.2Construction Method Statement for Installation of WaterproofingMembranes, Ancillary Items and Tunnel Drainage

    Note: TBM tunnels are covered in Specification BC-PBA-GLTSP111-SPC-0001

    3 Waterproof Membranes

    3.1 General

    3.1.1 Materials

    Waterproof membranes shall be sheet polymer membranes in areas where a cast-insitu

    concrete permanent lining is used (refer to Section 3.2).Spray-on waterproofing membranes

    are permitted to be installed in special areas such as drained-cross-passages, substations,

    sumps and ventilation tunnels, as nominated by the Design Drawings and in accordance

    with Section 3.3.

    In all cases where waterproofing is required the Contractor shall submit a method statement

    and the full details as detailed in Table 3 (together with samples) of the proposed

    waterproofing / drainage system materials for acceptance by the Construction Certifier HoldPoint 1 . The Contractor shall carry out pre-production trials to demonstrate that the

    materials and proposed methods of working are suitable for their intended purpose for the

    acceptance of the Construction Certifier as detailed in Table 6 below.

    Table 6 Pre-Production / Installation Trials

    Category of Work Description of Trial

    Spray-on Membrane Pre-production panel in accordance with the manufacturers

    recommendations or as otherwise agreed with the Construction Certifier

    to demonstrate installation method to ensure:

    minimum thickness

    consistency of coating

    bonding strength (including proposed test method)

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    15/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    All waterproofing materials shall be stored in accordance with the relevant manufacturers

    recommendations.

    All waterproofing materials shall capable of resisting the environmental conditions that they

    are exposed to during construction and operation such that their design life is not impaired.

    This includes exposure to sunlight, atmospheric conditions or ultra violet light and all

    chemicals with which they are likely to come into contact.

    3.1.2 Preparation of surfaces prior to Installation of membrane/geotextile/spay

    on membranes

    The Contractor shall ensure that surfaces on which waterproofing systems are installed are

    clean, free from loose aggregate, sharp projections or any edges, projecting tying wire,release agents and other substances which are likely to damage or affect the waterproofing

    system in accordance with the Design Drawings and section 6.2.

    The Contractor shall survey the profile of the shotcrete smoothing layer to confirm it is to the

    correct profile and meets the requirements of the membrane prior to fixing either a

    separation layer of geotextile (or other approved drainage medium) or waterproof

    membrane Hold Point 2.

    The Contractor shall undertake any remedial measures required to meet the specifiedprofiles in accordance with the relevant shotcrete work method statements.

    Shotcrete surfaces onto which a waterproof membrane is to be applied shall be prepared if

    necessary by the addition of a shotcrete smoothing layer to remove local peaks and infill

    hollows (reference BC-PBA-GLTSP102-SPC-0001) and to meet the manufacturers

    requirements.

    In areas where excessive groundwater is encountered during tunnel excavation as defined

    by the Waterproofing Supervisor flexi-drains or strip-drains shall be installed within theshotcrete to divert water to the invert for collection.

    Slotted flexi-drain pipes and strip drains fixed in the shotcrete subgrade in areas where the

    Waterproofing Supervisor considers that the inflow of water will impede the ability to install

    the waterproofing membrane in accordance with this specification.

    Spray on membranes shall not be used in areas where the presence of water exceeds the

    limits of the manufacturers recommendations.

    3.1.3 Material Manufacturers Instructions

    Waterproof membranes shall be installed in accordance with the manufacturer's

    requirements

    The installation of all waterproofing systems and surface preparation as specified shall be in

    accordance with the material manufacturers' instructions unless a higher standard is

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    16/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Construction Certifier prior to implementation and be subject to all of the conditions of this

    specification

    3.1.5 Interaction with the Environment

    The Contractor shall obtain information from the manufacturer(s) to demonstrate that the

    waterproofing systems shall have no significant effect (short-term or long-term) on any part

    of its environment, and must not provide any hazard to, or degradation of, the groundwater

    quality or potability.

    3.2 Preformed Polymer Membranes

    3.2.1 MaterialsPreformed Polymer Membrane (PPM) shall consist of heat welded sheets of any of the

    following materials:

    high-density polyethylene (HDPE) as per DIN 16776 Parts 1 and 2

    linear low-density polyethylene (LLDPE) Refer to Table 8

    very low-density polyethylene (VLDPE) Refer

    to Table 8

    advanced plasticized polyvinyl-chloride (PVC-P) Refer to Table 9

    flexible polyolefine elastomer (FPO) Refer to Table 9

    PPM shall have the mechanical and physical properties specified in Table 7 and Table 9 in

    both the longitudinal and transverse directions.

    PPM may be used as a waterproof barrier for all, drained or undrained, underground tunnels

    structures, shafts and portal headwalls (excluding TBM driven tunnels)

    The membrane shall be supplied with a signal layer, i.e. a thin layer of different colour,

    bonded to one side, which is intended to facilitate the detection of damage

    Where reinforced concrete and/or embedded steelwork is to be placed against the

    waterproofing membrane a signalling layer, to give a visual indication of any mechanical

    damage, shall be provided on the exposed surface of the waterproofing membrane. The

    signalling layer shall be such that it does not adversely affect the seam welds.

    Evidence shall be obtained from the manufacturer that no components of a PPM leach out

    in the long term such that the durability of any of the following components is adversely

    affected:

    the waterproofing membrane

    the geotextile drainage/protective layer

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    17/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Table 7- PPM (VLDPE and LLDPE) Material Mechanical and Physical Properties

    Tests Requirements

    Thickness (Undrained Tunnels) as per DIN 53370

    Minimum 2mm at 5% strain

    Invert 2mm to 3mm

    Thickness (Drained Tunnels) as per DIN 53370

    Minimum 1.5mm or 2mm at 5% strain

    Arch Crown 2mm

    Lower arch wall 1.5mm to 2mm

    Tensile strength in N/mm2 as per DIN EN ISO 5273

    longitudinally min. 12 N/mm2

    transversely min. 12 N/mm2

    alternatively as per DIN 16726

    min. 15 N/mm2(long, &trans)

    Elongation at tear strain in% as per DIN EN ISO 5273

    min. 300% (long &trans)

    State during and following storage at 80C:

    General

    Change in Dimensions

    Change in Tensile Strength

    Change in Elongation

    as per DIN 16726 or alternatively as per SIA 280

    No blister formation

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    18/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Tests Requirements

    Constant compressive strength as per SIA 280no leak at 7N/mm

    2

    Seam strength as per SIA 280

    for homogeneously welded sheets: 80%

    Signal Layer Membranes shall have a signal layer bonded to one

    side of a different colour to facilitate detection of

    damage

    Table 8 - PPM (PVC-P and FPO) Material Mechanical and Physical Properties

    Description Standard PVC-P FPO

    Thickness incl. signal layer 1.5mm or 2 mm for seepage water

    2mm or 3 mm for pressurizedwater

    Thickness of signal layer

    EN 1849-2 (DIN 16726-5.3,

    DIN 53352)

    0.2 mm

    Mass per unit area/ density

    (Tolerance/ Internal Audit)

    EN 1849-2 (DIN 53479) individual

    0.02 g/cm3

    individual

    0.005 g/cm3

    Appearance EN 1850-2 (DIN 16726-5.1) free from blisters, cracks, external

    capsule and voids

    Straightness:

    Flatness

    EN 1848-2 (DIN 16726-5.2) 50 mm

    10 mm

    DSC-Analysis

    (Internal Audit)

    EN ISO 11357-1 u. -3 individual evaluation

    of diagramm

    MFR (Melt-Flow-Index)

    (Internal Audit)

    EN ISO 1133, 190C,

    m=5kg

    only for

    polyolefin

    materials

    individual

    tolerance: 15%

    Tensile strength ISO 527-1/3/5 (DIN 16726-

    5.6/ EN 12311-2)

    12 N/mm2 15 N/mm2

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    19/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Description Standard PVC-P FPO

    Dynamic perforation DIN 16726-5.12) 1500mm for

    3mm

    1250 mm for 3

    mm

    Behaviour under hydrostatic

    pressure 5bar/72h (10

    bar/24h)

    EN 1928 (DIN 16726-5.11) no leakage

    Long term compressionstrength (48h)

    SIA V 280-14 No leakage at 7 N/mm2

    Elastic modulus E1-2

    (Material Flexibility)

    ISO 527-1/3/5 (DIN 16726-

    5.6)

    20 N/mm2 70 N/mm2

    Behaviour after storage in

    aqueous solutions 28d/23C

    Change of tensile strength

    Change of elongation at

    break

    No cracks at -20C

    EN 1847 (SIA V280-18; DIN

    16726-5.18; EN 14414

    A/B)

    H2SO3 (5-6%);

    Ca(OH)2(sat.);

    NaCl(10%)

    15%

    15%

    fulfil

    15%

    15%

    fulfil

    Thermal ageing(70d/70C/ hot air)

    Change of weight

    Change of tensile strength

    Change of elongation

    No Cracks at -20C

    EN 1296 (SIA V280-8, DIN16726-5.13, pr EN 14575)

    2.0%

    20%

    20%

    fulfil

    2.0%

    20%

    20%

    fulfil

    Behaviour after storage in

    warm water (8 month/ 50 C/

    weekly exchange of water)

    Change of weight

    SIA V280-13 (acc. to EN

    14415 (DIN 53495, DIN

    16726-5.18)

    Jkjlds asdkfjasdf

    k asdkfjas dfkasd

    dfasfk asdfk

    asdfk asd

    4%

    Not applicable to

    FPO

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    20/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Description Standard PVC-P FPO

    (for connections to cut &

    cover structures)

    Reaction to fire EN ISO 1925-2 /EN 13501-1

    (DIN 4102)

    min. class E (B2) min. class E

    (B2)

    Welding behaviour

    Behaviour of the welding

    seam at shearing :

    Short-time-jointing-factor fz

    Behaviour of the welding

    seam at peeling

    Resistance of peeling

    DVS 2225-Part2/5

    EN 12317-2

    EN 12316-2

    break outside

    seam

    0.6

    Peeling is

    possible, if

    resistance of

    peeling is

    reached

    6 N/mm

    break outside

    seam

    0.6

    Peeling is

    possible, if

    resistance of

    peeling is

    reached

    6 N/mm

    3.3 Installation of Preformed Polymer Membrane (PPM)

    The Waterproofing Supervisor shall conduct a visual inspection of the profile prior to the

    installation of geotextile fleece and membrane Hold Point 3.

    PPMs shall be installed in accordance with the manufacturers specifications and relevant

    international specification and guidelines and comply with the following principals:

    The membrane sheets shall be fixed at all the nailing discs (roundels) by spot heat

    welding. Alternative methods of fixing the waterproofing membrane may also be used

    subject to acceptance by the Construction Certifier

    Nails, welding tools or any other object shall not penetrate the membrane except in

    accordance with fixing details having been accepted by the Construction Certifier

    Welding of the membrane sheet edges shall be carried out by trained and suitably

    experienced personnel and with purpose made equipment to form a flat double weld

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    21/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    The Contractor shall notify the Construction Certifier of his intention to commence seam

    testing which shall be carried out on a daily basis as membrane lots are completed and

    signed off to be handed over for permanent concrete lining works.

    The test pressure shall be applied at one end of the seams and measured at the other

    end to test the integrity of the whole joint.

    The test pressure shall be not less than 2 bar and reduction of pressure after 10

    minutes shall not exceed 20%.

    Vacuum testing to 0.2 bar using a -0.8bar gauge shall be carried out on solid extrusion

    welds and hot air welded patches with no loss of vacuum or visual indication of faulty

    weld.

    Testing pressures and results shall be marked on the membrane and recorded on the

    relevant quality assurance checklist as detailed by the Contractors approved method

    statement. The marking method shall not damage the membrane

    Any areas failing to achieve the specified requirements shall be repaired in accordance

    with the manufacturers recommendations and the repair methods detailed in the

    Contractors approved method statement. In the event the area cannot be repaired it

    shall be replaced. Any areas which have been repaired shall be recorded and details

    submitted to the Construction Certifier in accordance with the Contractors approved

    method statement.

    The inspection and testing procedure for the permanent concrete lining works shall

    ensure that a visual inspection of the membrane shall be made before the final lining is

    sprayed or cast Hold Point 5 and Witness Point.

    3.3.2 Protection

    Reinforcement used adjacent to the waterproofing membrane shall be provided with suitable

    protection that ensures no damage to the membrane. The protection method shall be

    detailed in the Contractors approved method statement and can include plastic caps, solid

    tape or heat shrink wrap over exposed cut ends and plastic flywheel or flat bottomed plastic

    circular spacers to ensure suitable separation of steel to membrane. These spacers shall be

    of sufficient diameter and of sufficiently short length that they will be filled with concrete.

    Any burning, or welding of steel within the tunnel shall only be carried out in accordance

    with the relevant Hot Works Permit and only where the membrane has been protected asdetailed by Contractors approved method statement.

    Water percolating outside the membrane shall be piped to avoid the formation of water-filled

    blisters. Pipes for disposal of water shall be "lay-flat" type or small diameter polypropylene

    pipe suitable for removal and membrane patching prior to final permanent concrete lining

    placement Where this is not possible then a proprietary system allowing the formation of a

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    22/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    The inspection and testing procedure for the permanent concrete lining works shall ensure

    that a visual inspection of the membrane shall be made before the base slab is sprayed or

    cast Hold Point 6 andWitness Point.

    3.4 Spray-on Membranes

    3.4.1 General

    Spray on membranes shall not be used in areas where the presence of water exceeds the

    limits of the manufacturers recommendations.

    3.4.2 Materials

    Spray-on waterproofing membrane shall possess the properties listed in Table 9 and shallhave a proven track record of successfully performing in a tunnel environment.

    Table 9 - Spray-on Membrane Properties

    Material Property Sprayed Waterproofing Membrane Requirement

    Material type Cement Latex Membrane

    Minimum thickness Each of the following must be satisfied:3.0mm minimum DFT(dry film thickness) applied in two coats

    of 1.5mm DFT each or as otherwise recommended by the

    material manufacturer

    DFT measurements shall be taken in accordance with ASTM

    D 1438 or ASTM D6132

    Solids Content 90% minimum solids content

    Behaviour when subjected to

    hydrostatic pressure

    Water tight in accordance with DIN 16726 tested at 4 bar for

    72 hours.

    Behaviour when subjected to gas

    vapour pressures

    Less than 1.55 x 10-9

    for CO2applied at 1 bar.

    Bond strength with shotcrete 1.0 MPa in accordance with EN1542:1999. Values of less

    than 1.0MPa are acceptable where failure is within the

    concrete substrate.

    Tensile Strength 5MPa @ 28 days

    Colour Minimum 2 layers; applied in alternating different colours.

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    23/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Combustion toxicity Non-toxic

    Fire resistance Self extinguishing in accordance with DIN 4102-B2

    3.4.3 Installation

    The surface shall be prepared in accordance with Section 3.1.2

    Shotcrete surface must be at least 28 days old to ensure initial shrinkage is mostly

    complete.

    High pressure cleaning shall be undertaken with at least 200bar/20MPa of water pressure to

    remove loose particles, dirt, oil, laitance

    A consistent and continuous coating shall be attained of minimum thickness as specified in

    Table 9. No shadowing due to the substrate profile shall compromise the minimum

    thickness. If, on inspection, shadowing is observed, the membrane shall be inspected to

    assess if the minimum thickness has been attained and any required remedial action taken.

    Thickness measurements shall be taken in accordance with Table 9.

    Continuous adhesion testing on site shall be completed in accordance with Table 9 to

    ensure the waterproofing membrane is fully bonded to the shotcrete and shall be carried out

    in accordance with EN 1542.

    A multi-coat system shall be used with alternating contrasting colours for each applied layer.

    Each layer shall be allowed to cure for the times recommended by the manufacturer for the

    relevant conditions before installation of the subsequent layer. The final colour shall be

    white or otherwise highly light reflective to assist with overall lighting performance within the

    tunnel.

    The operatives shall be certified as competent by the Waterproofing Supervisor.

    Spraying techniques shall eliminate all pinholing, holidays (i.e. missing sections) and water-

    making features compromising the integrity of the waterproofing membrane. Testing for

    continuity shall be completed in accordance with Table 9

    3.4.4 Penetrations and Corners

    All installation detailsat penetrations fixings, changes in direction, termination and the like

    shall be as shown on the Design Drawings, and in accordance with the manufacturer's

    recommendations. Details shall be submitted to the Construction Certifierfor approval.

    3.4.5 Compliance Testing

    Thickness during installation shall be monitored by utilisation of three measurements

    continuously throughout the work:

    Th ti f t i l h ll b h k d d d d fi ti f th

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    24/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    The Contractor shall keep detailed records of the above checks and measurements, and

    repair any deficiencies found prior to placement of the tunnel permanent lining.

    3.5 Submissions

    The following particulars of the proposed spray applied waterproofing systems shall be

    submitted to the Construction Certifier.

    Manufacturer's literature and a certificate showing the waterproofing manufacturer's

    name, the date and place of manufacture and showing that the waterproofing

    membrane complies with the requirements stated in the Contract and including results

    of tests for the following items in accordance with the minimum requirements

    established in Table 9:

    resistance to hydrostatic pressure

    resistance to gas vapour pressure

    bond stress

    tensile strength

    elongation

    statement of durability for 100 year service life

    detailed drawings from the manufacturer for termination, penetrations, fixings and

    the like

    Manufacturers literation to confirm the spray on membrane is compatible with any

    waterstops used at the locations shown on the drawings

    Particulars of ancillary items such as primer, mastic, liquid membrane, and protectionboards as recommended by the manufacturers.

    The particulars, including certificates, shall be submitted in accordance with the

    Contractor's Quality Assurance procedures. Certificates shall be submitted for each

    batch of the material delivered to the Site.

    4 Ancillary Items

    4.1 Waterstops

    Ancillary items such as rearguard waterstops, hydrophilic waterstops, penetrations, rondels,

    proprietary membrane fixings shall be as shown on the Design Drawings and as approved

    by the Construction Certifier.

    All ill it h ll b tibl ith th b d b fl d

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    25/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    4.3 Submission Requirements

    The Contractor shall review the compatibility of all membrane penetration and fixing

    systems to ensure the integrity of the total waterproofing system and shall submit full details

    of the proposed ancillary items, including details of installation procedures for approval by

    the Construction Certifier Hold Point 7.

    4.4 Re-injectable Tubes

    The Contractor shall submit details of his proposed injection system to demonstrate that it

    has a successful track record in similar tunnel environments.

    Re-injectable tubes shall be installed, injected and reinjected according to themanufacturers requirements.

    Re-injectable tubes are to be installed at the locations shown on the design drawings

    After a satisfactory seal has been effected, all re-injectable tubes shall be fully and

    permanently grouted with a 100-year durable grout.

    4.5 Bentonite Bands

    Bentonite bands shall be installed in the transition Zone between drained and undrained

    tunnel length in accordance with the manufacturers instructions and recommendations.

    The geotextile placed between the membrane and the rock shall be omitted where there is a

    bentonite band.

    The bands shall be installed at each end of a transition length and at the intervals shown on

    the drawings.

    The bentonite band shall be supplied in overlapping sheets or rolls and shall be overlapped

    on the tunnel inside face by the adjacent membrane sheet by 100mm minimum (and in

    accordance with the manufacturers instructions.).

    Bentonite membrane shall be fixed to the substrate by nailing through roundelles or using

    suitable large headed nails.

    The membrane shall be fixed such that it is firmly against the substrate, to avoid stretching

    and dislocation during concrete placement.

    Penetrations of the bentonite band shall be avoided wherever possible. Where fixings arerequired into the rock to support loads, the penetration of the membrane shall be cut tight to

    the fixing and the joint shall be sealed using a minimum 20mm fillet of bentonite paste.

    A full inspection shall be carried out before casting of the final lining and any damage

    rectified to the Waterproofing Supervisors approval.

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    26/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    Perforation strength (CBR) as per EN ISO 12236

    1500N

    Dynamic cone puncture as per EN 13433

    1.5kN/m

    Elongation at failure as per EN ISO 10319

    > 10%

    Tear strength ASTM D4533

    > 200 N

    Water permeability (in-plane) at2bar as per EN ISO 12958

    < 0.55 mm/s

    Pore opening size O90 WET as per EN ISO 12956

    < 0.09 mm

    Flammability Classification as per DIN 4102

    Class B2

    Geotextiles shall be installed as separation and filter membranes for groundwater drainage

    pipes and strip drains/dimple sheets. Materials and workmanship shall conform to PSTS27,

    with the following additional provisions:

    Geotextiles shall be Strength Class C in accordance with Table 3, PSTS27 Geotextiles shall be Filtration Class II in accordance with Table 4, PSTS27

    5.2 Drainage Materials

    Groundwater drainage pipes shall be provided at the base of the drained tunnel permanent

    linings for the collection of groundwater in accordance with the Design Drawings included in

    Design Lot AGTDR 200

    Materials and Workmanship must conform to PSTS03, with the following additionalprovisions:

    Groundwater drainage pipes shall be PVC, or perforated plastic pipes, conforming to AS

    1254 or AS 2439 respectively

    Minimum falls for drainage pipes shall be in accordance with the Design Drawings

    Thi J h H ll d J i V Ai Li k | N h B | EWAG

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    27/33

    Thiess John Holland Joint Venture Airport Link | Northern Busway | EWAGGlobal - Supplementary Specification - Tunnel - Waterproofing and Drainage GLTSP107

    6 Concrete

    6.1 No-fines Concrete

    No-fines concrete shall conform to the requirements of the No Fines Concrete Subbase

    Specification (reference BC-PBA-GLRSP301-SPC-0001)

    6.2 Smoothing Shotcrete

    Smoothing shotcrete shall conform to the general requirements of PSTS04 and the

    Supplementary Specification for Shotcrete lining (reference BC-PBA-GLTSP102-SPC-0001)

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    28/33

    Appendix A

    Verification Records

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    29/33

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    30/33

    Appendix B

    Response to Comments

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    31/33

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    32/33

    No. Name Discipline Area-Organisation Document Revision Reference Reviewer Comment - IV - STAGE 2Rating

    ImpactIV Status TJH Comment Designer response

    Response

    agreementIncorporation status

  • 8/10/2019 Specification - Tunnel Waterproofing and Drainage Specification

    33/33

    Impact agreement

    19 The Lateral and longitudinal pipes draining the NFC layer will be

    located In small drainage trenhces below the NFC layer. These pipes

    will be surrounded by 20mm graval and will act to drain water out of

    the NFC layer. Thereby minimising the likelihood of water ponding in

    the NFC layer for extended periods.

    The system is designed to allow forced flushing of the NFC drainage

    layer by inserting an inflatable plug at the lower end of the of the

    lateral pipe and inserting a high pressure hose at the upper end of the

    lateral pipe.

    Maintenance of the groundwater drainage pipes will be undertaken bywater jetting and rodding. Maintence access to the pipes will be

    provided by flush out points located at the blind end of all lateral

    drainage pipes and at 60m centresalong the longitudinal drainage

    pipes. Intermediategroundwater pits will replace every tird flush out

    point, to provied improved access for blockage removal. Flush out

    points and groundwater pits will be located at the toe of the barrier

    within the road shoulder and will double as pressure relief caps to the

    groundwater system.

    CLOSED N/A

    20 Short term and long term design groundwater inflows have been

    factored by 3.0. Additional clogging factors were adopted for the NFC

    drainage layer, based on 10% clogging in the short term (5 years) and

    90% clogging in the long term (100 years).

    Compliance with the Performance Specification will be achieved by the

    adoption of robust. design elements for the groundwater drainage

    system, including allowance for system redundancy via flow safety

    factors, allowance for flushing of the NFC drainage layer andallowance for water jetting and rodding of the drainage pipes via

    regular flushing points and groundwater pits

    CLOSED N/A

    21

    22

    23

    24

    25

    26

    27

    28

    29

    IV Status

    * Means Response acceptable - wi ll be closed when completed

    Y Means Complies with Project requirementsN Means Does not comply with Project requirements

    M Means Minor non compliance with Project Requirements

    N/A Means Not Applicable to this design lot

    Transmittal Stage Doc Number Revision Area Element Title

    Review Comment External-IV-CNI