ACRYLIC SPRAY WATERPROOFING SYSTEM RESEARCH AND APPLICATION Reporting Date July 7 th ,2016 Colin Leung +86 15928474171(whatsapp)

Upload: colin-leung

Post on 17-Jan-2017

141 views

Category:

Business


0 download

TRANSCRIPT

Page 1: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

ACRYLIC SPRAY WATERPROOFING SYSTEM

RESEARCH AND APPLICATION

Reporting Date: July 7th,2016

Colin Leung +86 15928474171(whatsapp)

Page 2: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 2

CONTENT

2

4

33

Technical Background31

Technical Content

Projects Application

Prospects and benefits

35 Technical Prospects

Page 3: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 3

Technical Background[1]

Page 4: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023 4

1 TECHNICAL BACKGROUND

1.1 Underground Projects Leakage Current Situation

Acrylic Spray Waterproofing System Research and Application

Highway Tunnels Underground Railway Parking Civil Air Defence

Common underground projects types

Underpass Tunnels Underground Street Underpass Underground Buildings

Page 5: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 5

High Leaking Rate of the Underground Projects Up to 30%

1 TECHNICAL BACKGROUND

Page 6: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 6

1 TECHNICAL BACKGROUND

Covered-excavation TunnelingWaterproofing System

Cut and Covering Tunneling Waterproofing System

1.2 Underground projects Leakage Reasons Analysis

Waterproofing Layer

Waterproofing Layer

First Lining

Lining Structural Waterproofing

Waterproofing layer

Central Sulcus

Confining Bed

Backfilling soil

Building Envelope Waterproofing

Building Envelope Waterproofing

Central Sulcus

Surrounding Rock for Seepage-proof

Secondary Lining

Lateral Sulcus

Lateral Sulcus

Surface Treatment

Page 7: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 7

1 TECHNICAL BACKGROUND

Covered-excavationWaterproofing System

Cut and Covering Tunnel Waterproofing

Page 8: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 8

Cut and Covering Metro Station Waterproofing System

Waterproofing Layer

1 TECHNICAL BACKGROUND

Page 9: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 9

1 TECHNICAL BACKGROUND

Page 10: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 10

1 TECHNICAL BACKGROUND

The development of water migration during the both concrete membrane interfaces makes: the leaking area expands, wide influence,difficulties to find the leaking area, difficulties to repair, high cost to repair.

Page 11: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 11

1 TECHNICAL BACKGROUND

Disadvantages of Coiled Waterproofing Membranes: Certainly not seamless Easy to be damaged in the subsequent

handling by welding spark, nails, rebar Easy to be influenced by the surface

evenness Easy to develop water migration during

the both concrete membranes interfaces

Page 12: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 12

1 TECHNICAL BACKGROUND1.3 Acrylic Spray Waterproofing

Page 13: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 13

1 TECHNICAL BACKGROUND

Advantages of Acrylic Spray Film Seamless Strong Resistance to the

Subsequent Handling Damages A1 Grade Fireproof Fully Bonded System Prevent the Development of

Water Migration During the Both Concrete Membrane Interfaces

Play a Role In Lining Pressure Resistance

Page 14: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 14

1 TECHNICAL BACKGROUND

1999Dazhulin Tunnel

2004 ~ 2007Technology

System Modified

2010Munigou Tunnel

Page 15: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 15

1 TECHNICAL BACKGROUND

Scope of Application

Mountain Tunnels

Underpass Metro Stations Running Tunnel Shaft Immersed

Tunnels Cave Tunnel Repairing

Page 16: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 16

Technical Content[2]

Page 17: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 17

2 TECHNICAL CONTENT2.1 Polymerization Mechanism

Produce Radical

Chain Initiation

Chain Growth

Chain Termination

Page 18: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 18

2 TECHNICAL CONTENTMain Liquid

AOxidant

Emulsion A

Spray Gun

Waterproofing Film

Surface

Emulsion B

Main Liquid B

Deoxidant

Mix Mix

Page 19: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 19

2 TECHNICAL CONTENT

2.2 Main Technology ConsistFilm Materials• Polymerization Mechanism, Material

Comparison and Selection,Fomula,Manufacturing Technology

• Film Materials Modify Technology,Durability Research

Spraying Machine• Spraying Delivering Machine• Spray Gun

Construction Technology• Construction Progress• Construction Technology Standards

Page 20: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 20

2 TECHNICAL BACKGROUND

Waterproofing Materials Research

Spraying Machines Research

Construction Technology

Page 21: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 21

2 TECHNICAL CONTENT

2.3 Main Technical Data

Inspection Item

Performance Requirement

Test MethodEmulsion A Emulsion B

Appearance

White or Grey Suspension Liquid

White or Grey Suspension Liquid Visual Inspection

Solid Content≥45 ≥45

GB/T 16777pH Value 7.0 ~ 8.0 6.0 ~ 7.0 pH test paper

Gel Time ≤5 secondsAccording to relevant regulation

Inspection Item Performance Requirement Test MethodBreaking Tensile Strength ( Mpa)

≥1.1

GB/T 16777Elongation at Break ( % ) ≥200

Tear Strength(kN/m) ≥5Watertightness No Leakage

Page 22: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 22

2 TECHNICAL CONTENT

2.4 Waterproofing Performance Research

Property Project Requirement

Basic Property Watertightness The basic function requirement to waterproofing material

Mechanical Property

Strength External Stress ResistantTenacity External Abrasive Resistant

Drainage Function Prevent the underground water behind the lining accumulation

Chemical Resistance

Resistance to Corrosion

Resistance to the special ion in the underground water corrosion

Acrylic Spray Waterproofing Film Main Functions Requirements

Page 23: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 23

2 TECHNICAL CONTENT Long-Term Impermeability Test ( 0.3Mpa , 30 Days )

Page 24: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 24

2 TECHNICAL CONTENT Impermeability Contrast Test Operated on Different Parts

1.2 MPa 1.2 MPa 2.4 MPa

Page 25: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 25

2 TECHNICAL CONTENT Chemical Solution

Immersion Test

Page 26: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 26

2 TECHNICAL CONTENTDrying ( Dehydration ) Contrast Test ( 100℃ , Dry to Constant Weight )

Page 27: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 27

Tensile Splitting Strength Test

2 TECHNICAL CONTENTMixed-Mode Test-Pieces Mechanical Test

Tensile Test

Earlier Pouring Concrete

Later Pouring Concrete

Waterproofing Layer

Page 28: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 28

2 TECHNICAL CONTENT Compound Concrete Water Moving Behind the Lining

Prevention Test ( 0.6 MPa )

Page 29: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 29

2 TECHNICAL CONTENT Compound Concrete Control Drainage Test

Max Rated Hydraulic Pressure is 6.3 Mpa , Max Stable Hydraulic Pressure Can Be Added is 0.25 Mpa

Page 30: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 30

2 TECHNICAL CONTENT2.5 Part of Technological

Achievements Academic Achievements 14 Authorized Patents

Over 40 Articles( SCI included one, EI included 5) One Monograph( Tunnel and

Underground Spraying Film Waterproofing)

Training over 20 doctors and masters

Write an Industry Standard Book

Page 31: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 31

2 TECHNICAL CONTENTAcademic Communication Home and Abroad

Page 32: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 32

2 TECHNICAL CONTENT Awards

The Second Class Prize of National Science and Technology Progress Award certificated by State Council, the highest honor in People's Republic of China in science and technology, in order to recognize citizens and organizations who have made remarkable contributions to scientific and technological progress, and to promote the development of science and technology.

Page 33: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 33

Projects Application[3]

Page 34: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 34

3 PROJECTS APPLICATION

Railways Tunnels

Highways Tunnels

Underpass

Other

• 1999 Dazhulin Tunnel• 2002 Mogouling Tunnel• 2012 Tianpingshan Tunnel• 2014 Wujiawan Tunnel

• 2001 Lianhuang Tunnel• 2010 Munigou Tunnel• 2011 Balangshan Tunnel• 2013 Xueliangshan Tunnel • 2013 Nanjing Youth

Olympic Center J-2 Part• 2015 Langzhong Railway

Station Underpass• 2013 An Underground Oil

Depot Cave• 2014 Pengzhou Petrochemical

Base Tanks Bottom Seepage Prevention

• 2014 Shenzhen LNG Terminal

Page 35: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 35

3 PROJECT APPLICATION

3.1 Scope of Application

Airtight, Backfilled, Covered Tunnels, Underground Projects, Caves and Similar Projects

High Grade Requirement of Waterproof(Design Thickness is 3mm and thicker)

Operation On Upstream Face Or Behind Structure Supported Parts

Page 36: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 36

3 PROJECT APPLICATION

3.2 Operation

Operation Procedures Surface Clear Install Drainage Materials

Spray the film Inspection

Page 37: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 37

3 PROJECT APPLICATION

Surface Clear Requirements

Surface protrusion should be cut or hit to be flat

Water on surface is not allowed, otherwise, water shutoff or drainage is required

It is better to ensure a certain evenness of the surface to save spraying materials, otherwise, Leveling or Isolation is required

Surface Leaking Water pH Value should be less than 13

Page 38: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 38

3 PROJECT APPLICATION Thickness of the

Film Management Spraying Machine

Parameter Control Spray Gun Movement

Locus

Spray Worker Training

Thickness Inspection Methods

Defect Repairing

Page 39: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 39

3 PROJECT APPLICATION

Spraying Machine Parameter

Use High Pressure Airless Spraying Apparatus for Large Area Operation

Mix inside the gun and mix outside the gun

Spraying Speed Rate should be more than 1 m2/min

Compressed Air Output Pressure should be more than 1.0 MPa , Gas Production Rate should be more than1 m3/min

(1)

(2)

(1)

(2)

Page 40: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 40

3 PROJECT APPLICATION

Spraying Operation Requirement Do In Time Protection and

Coverage to the Film

Do Safeguarding Measures to the workers

Quality Inspection and Repairing to the Film :Thickness 、 Appearance 、 Leaking ( Dominant Items )

Page 41: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023 41

3 PROJECTS APPLICATION

3.3 Munigou Tunnel

Acrylic Spray Waterproofing System Research and ApplicationMunigou Tunnel Location

Munigou Tunnel

Page 42: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 42

3 PROJECT APPLICATION Munigou Tunnel is 1835m long,

Two-Lane , Max Driving Speed 60km/h

This project was on the altitude over 3000 meters, with the feature of high altitude, low air pressure, low temperature and large temperature difference between day and night, minimum temperature reached -6 in the spring construction, ℃The groundwater is developed in the tunnel.

Page 43: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 43

3 PROJECT APPLICATION

Open Cut Tunnel Lining, Waterproofing and Insulation Structure

Waterproofing and Insulation Design

Waterproofing and Insulation Layer

Secondary Lining

Page 44: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 44

3 PROJECT APPLICATION

Undercutting Part Lining, Waterproofing and Insulation Structure

Shotcrete First Lining

Drainage System Waterproofing and Insulation Layer

Concrete Secondary Lining

Waterproofing and Insulation Design

Page 45: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 45

3 PROJECT APPLICATION Waterproofing and Insulation

Design

Undercutting Part Lining Conventional Waterproofing Structure

Shotcrete First Lining

Drainage System Waterproofing and Insulation Layer

Concrete Secondary Lining

Concrete Secondary Lining

EVA Membrane

Non-Woven Buffer Layer

Shotcrete First Lining

Page 46: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 46

3 PROJECTS APPLICATION

Acrylic Spray Waterproofing in Munigou Tunnel

Page 47: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

3 工程应用

05/01/2023隧道及地下工程丙烯酸盐喷膜防水技术研究及应用 47

Waterproofing Comparison After Construction

Waterproofing Comparison During the Construction

Page 48: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 48

3 PROJECT APPLICATION3.4 Nanjing Youth Olympic Center Axis Underpass Nanjing Meizizhou Under-River

Tunnel-Youth Olympic Axis Underground Construction Project is one of the auxiliary projects for 2014 Youth Olympic Game, consisted of Meizizhou Under-River Tunnel, Youth Olympic Axis Underground Transportation System and Youth Olympic Axis Plaza Underground Space three parts.

Project Planning Block Satellite Map

Our project B2-J1 Part

Page 49: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 49

3 PROJECT APPLICATION This project’s core

control area is B2-J1 part , consisted of Meizizhou Tunnel, Bingzhou Road, Interchange Ramps and underground space, it is a partial underground three layers framing structure, cut and covering method adopted, A grade waterproofing requirement.

The Acrylic Spray Film Waterproofing Area

Page 50: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 50

3 PROJECT APPLICATION

Page 51: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 51

3 PROJECTS APPLICATION

Page 52: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 52

3 PROJECT APPLICATION

August,2015(rainy season) Return Visit Result

Page 53: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 53

3 PROJECT APPLICATION

3.5 Shenzhen East-West Dapeng and Diefu offshore LNG Terminal connects the harbor trestle and the receiving station tank field, total length 584m, max depth of the tunnel 43m

This is the first LNG terminal in China and the third in the world, related documents and construction experiences for reference are very limited.

Page 54: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 54

3 PROJECT APPLICATION

The Terminal

Page 55: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 55

3 PROJECT APPLICATION There are total 10 pipes

crossing through the tunnel portal endwall,1 LNG Receiving Pipe,1 BOG Recirculatory Pipe,1 LNG Circulating Pipe,1 VENT Pipe,1 Fire Water Supply Pipe and 5 Utility Pipes, protected by filling nitrogen, with high level requirements on waterproofing and gas tightness.(Special Grade of waterproofing) LNG Terminal Sectional View and Tubes Arrangement Diagram

Page 56: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 56

3 PROJECT APPLICATION

The ground water under the tunnel is fissure bedrock water that mainly lays in medium-grained granites and vein rocks, spreading over the fissuring in the strong and medium weathered layer. Atmospheric precipitation supplies the ground water. Depth of the ground water is 1.20 to 18.30 meters during the geological exploration.

Page 57: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 57

3 PROJECT APPLICATION

• Two Geotextile-Two Membranes waterproofing method:

• Geotextile waterproofing layer(400g Geotextile) + Composite Waterproofing Sheet(1.5mm thick EVA waterproofing sheet+100g geotextile) + Acrylic Spray Membrane(4mm thick), the original steel plate waterproofing design cancelled because steel plate needs welding(no fire is allowed in the construction),rough handling on the welding, heavy weight, high costs, long operation period time. Adopting PMC-S saved 303 million US dollars and one year construction period time.

Page 58: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 58

3 PROJECT APPLICATION

EVA Membrane Installation in LNG Terminal

Page 59: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 59

3 PROJECT APPLICATION

Our Acrylic Spray Waterproofing Operation in Shenzhen LNG Terminal

Page 60: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 60

3 PROJECT APPLICATION

Acrylic Waterproofing Film Was not Damaged By the Second Lining Reinforcement Assembling and Welding

Page 61: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 61

3 PROJECT APPLICATIONPerfect waterproofing effects in our return visit during the equipment construction stage( June,2015)

Page 62: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 62

3 PROJECT APPLICATION

3.6 Other Projects

Page 63: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 63

Prospects and Benefits[4]

Page 64: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 64

4 PROSPECTS AND BENEFITS

4.1 Technical Advantages: Spraying leads to efficient, fast construction, saving labors,

it is a new generation and the main direction of waterproofing technology development in the future

Strong Adaptability to the surface, safe seams handle, avoid the important hidden danger to waterproofing

Fireproof, strong puncture resistant, strong subsequent handling damage resistant

Could be applied with waterproofing sheets to achieve gas tightness, meet high waterproofing grade

Save a huge amount of subsequent repairing and maintenance cost, overall economic benefit is excellent.

Page 65: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 65

4 PROSPECTS AND BENEFITS

4.2 Prospects

Page 66: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 66

4 PROSPECTS AND BENEFITS

4.3 Benefits Analysis

Subsurface Structure Performance-Time Graph

Benefit

Quality

Cost

Total Cost

Construction cost

Maintenance Cost

Subsurface Structure Cost-Quality Graph

Performance

Good

Bad

Construction Time

Now Time

C:Failure and Accident

A:Initial Condition

D:Repairing, reinforcement

Boundary Condition

Current Condition

Page 67: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 67

Technical Prospects[5]

Page 68: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 68

5 TECHNICAL PROSPECTS Spray waterproofing materials types is growing in the

market , including acrylic, polyurea, rapid-hardening spray applied liquid rubber asphalt, methyl methacrylate and so on, project application cases of these spray waterproofing materials are also growing gradually

Page 69: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 69

5 TECHNICAL PROSPECTS Application in tunnels and

underground projects cases are growing one by one , including mountain tunnels 、 underground railway and tunnels 、 underground Park 、 underpass 、 immersed pipes tunnels 、 shaft 、 cave and tunnel repairing, etc.

Page 70: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 70

5 TECHNICAL PROSPECTS Spray waterproofing materials types for tunnels and

underground projects are growing, exclusive spraying machines are updating, spray waterproofing systems are improving

Page 71: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 71

5 TECHNICAL PROSPECTS Relevant industry and national standards are coming on

and being revised, which lays the foundation of applying new spraying waterproofing technologies

( Revising)

Page 72: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 72

5 TECHNICAL PROSPECT

New Technical contents and researching methods are updating

Page 73: PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

05/01/2023Acrylic Spray Waterproofing System Research and Application 73

Thanks for Watching.If any inquiries, please contact mailto:[email protected]