schedule for mockup assembly

5
Schedule for mockup assembly 1 st week Dec 2 nd week Dec 3 rd week Dec 4 th week Dec 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 Mockup assembly DAQ ( 백백백 ) PMT gain with Diffuse ball + MC ( 백백백 , 백백백 ) LS filling ( 백백백 , 백백백 ) Gd mass production and Loading LS filling SPE with diffuse ball Data Analysis Pre. Analysi s Data taking with sources & Analysis SPE, gain measurement & HV setup Measurement of SPE, gain Source Calibration

Upload: guy-emerson

Post on 31-Dec-2015

26 views

Category:

Documents


1 download

DESCRIPTION

Schedule for mockup assembly. SPE, gain measurement & HV setup. Pre. Analysis. Data taking with sources & Analysis. LS filling. Measurement of SPE, gain. Source Calibration. SPE with diffuse ball. Data Analysis. Gd mass production and Loading. Mockup assembly - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Schedule for mockup assembly

Schedule for mockup assembly

1st week Dec 2nd week Dec 3rd week Dec 4th week Dec

2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26

Mockup assembly

DAQ ( 백승록 )

PMT gain with Diffuse ball + MC ( 정인석 ,

김동현 )

LS filling ( 이재승 , 박정식 ) Gd mass production and Loading

LS filling

SPE with diffuse ball

Data Analysis

Pre. Analysi

sData taking with sources & Analysis

SPE, gain measurement & HV setup

Measurement of SPE, gain

Source Calibration

Page 2: Schedule for mockup assembly

Mockup assembly• LS filling : 이재승 , 박정식 , 박강순

Target, Gamma catcher 는 완료 ( 각각 150L, 802L : G.C. 목 (chimney 시작부분 ) 까지 )

나머지 buffer (mineral oil) 는 오늘 중으로 모두 채울 예정 ( 현재 4233L : G.C. 목 까지 )

On going processes for Mockup daq• SPE measurement with diffuse ball : 백승록

각 채널의 PMT gain 측정 HV 값 수정

• Dark current measurement : 정인석

rate measurement : random trg 경우

fitting 결과를 Hamamatsu 데이터와 비교

• Set the MC parameters : 정인석

• Event Build : 백승록

• Converting data format & preparing manual for how to use it : 박정식

Raw data format final data format

• Energy calibration with sources : 백승록 , 정인석 , 김동현 , 박정식

Page 3: Schedule for mockup assembly

Gamma catcher

LS filling

LS fillingBuffer Target

Flowmeters

Target 적산계

Page 4: Schedule for mockup assembly

LS filling

2

3

1 1

2

3

Page 5: Schedule for mockup assembly

1

23

Chimney 에 후레쉬 삽입 동영상