  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    1/13

    I Refining and Marketing Division 1 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    INA Industrija Nafte d.d., Croatia

    CALL FOR INFORMATIVE OFFER

    for

    Supply of Basic Engineering Documentation

    For refining of topping absorber column overhead gases on CDUunit in INA Rijeka Refinery

    Rijeka, September 2012

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    2/13

    I Refining and Marketing Division 2 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    Contents

    1

    Introduction ....................................................................................................................3

    2

    Aim of this inquiry..........................................................................................................33 Investitor data .................................................................................................................3

    4

    Technical scope ..............................................................................................................4

    4.1 Feed .........................................................................................................................4

    4.2 Products ...................................................................................................................4

    4.3

    Simplified PFD.........................................................................................................5

    4.4 Battery limits for the design ......................................................................................5

    5

    Content of Basic Engineering Design and Extended Scope .............................................6

    6 Content of the informative offer ......................................................................................6

    7

    Miscellaneous .................................................................................................................6

    7.1

    Utility specifications .................................................................................................6

    7.1.1

    Nitrogen ............................................................................................................7

    7.1.2

    Instrumentation air ............................................................................................7

    7.1.3 Electric power ...................................................................................................7

    7.1.4 Steam and Fuel gas ............................................................................................7

    7.1.5

    Cooling water ....................................................................................................7

    7.1.6 Fire Water .........................................................................................................7

    7.2

    Site conditions ..........................................................................................................8

    7.3

    Spec sheets equipement to check ..............................................................................9

    7.3.1

    321-V-002 .........................................................................................................9

    7.3.2

    321-E-017 ....................................................................................................... 10

    7.3.3 321-E-030 ....................................................................................................... 12

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    3/13

    I Refining and Marketing Division 3 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    1 Introduction

    The FG/LPG produced at top of 321-C-003 (absorber topping) contains about 10 % H2S and

    44 % vol C3+C4. The purpose of this project is to purify gas via overhead reflux drum of

    debutanizer 321-V-002 and sent the fuel gas to amine treatment in FCC or HDS to reducerefinery SOx emissions, in accordance with IPPC directive. The condensed LPG will be

    processed to Merox 5.

    Removal of hazardous gases from the atmosphere is one of priorities of the Rijeka refinery.One of the unsolved source of loading the atmosphere is fuel gas from Topping-3 which

    cannot be refined with existing processes.

    Gas from the top of absorber column 321-C-003 contains a high percentage of H2S. Because

    of H2S combustion emissions of SOx are high and the air quality is poor (III category).

    The gas from 321-C-003 will be processed through new built refining of topping absorber

    column overhead gases on CDU to debutanizer C4 overhead (between control valve and E-

    017), separated in V-2 and the Fuel gas to amine plant on FCC and HDS plant (gas) and UNP

    to Merox 5. A secondary objective is to increase utilization of C3 and C4 fractions of gas

    which will instead in fuel gas end up in commercial LPG product.

    2 Aim of this inquiry

    Main goal of the informative offer to get preliminary technical and commercial informationfor supply of Basic Engineering Documentation Package which is based on the following

    technical scope and commercial conditions.

    3 Investitor data

    Company name INA Oil industry d.d., Zagreb, CroatiaLocation/Adresse Refinery Rijeka, Urinj b.b.

    51221 Rijeka

    Croatia

    Unit 321-CDU

    Project name CDU efficiency and environmental improvement

    Project number IM 6-03-002Contact person Vinja Franji

    Email [email protected] +385 (1) 64 51729

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    4/13

    I Refining and Marketing Division 4 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    4 Technical scope

    4.1 Feed

    Temperature (C) Normal/Min/Max 40/30/60Pressure (barg) Normal/Min/Max 0,8/0,5/1,3

    Flow (Nm3/hr) Normal/Min/Max 1200/300/3000

    Composition (vol %)Overhead gas of Absorber 321-C-003

    Feed 1 Feed 2

    H2 3,30 1,70

    H2S 9,3 5,1

    C1 12,1 10,1

    C2 21,9 17,6

    C2= 0,8 0,4

    C3 27,8 38,6

    C3= 0,3 0,2

    i-C4 5,4 6,4

    n-C4 5,8 6,1

    C4= 0 0

    i-C5 2,2 1,3

    n-C5 1,1 0,5

    C5= - 0,4

    C6+ 0,4 0,1

    CO2 0,9 1,6

    O2 2,6 2,3

    N2 6,1 7,6

    Total 100,0 100,0

    HC 77,7 81,7

    C3+ 43,1 53,6

    MW 37,2 38,8

    H2S content could be up to 14 %.

    Diameter of inlet piping : 8.

    Water content : saturated @ 60C.

    4.2 Products

    The first part of the project is to compress 321-C-003 overhead gas to condense and separate

    it in 321-V-002 (8 bar g). Tie-in will be between 321-PC-020 valve and 321-E-017

    (normal/min/max pressure : 8,5/6/9,5 bar g). The second part of the project is piping to route

    fuel gas from 321-V-002 to amine treatment in FCC or HDS. Liquified LPG from 321-V-002will be routed to Merox 5 as previously.

    Fuel gasPressure (barg) Normal/Min/Max 5,6/5/7,5

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    5/13

    I Refining and Marketing Division 5 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    The positions of the tie-in of fuel gas from 321-V-002 to amine plants are:

    1. Amine plant on FCC complex, feed to 329-V-004 (5,3 bar g) and 327-V-003 (1,3 barg) ~1000 m from CDU

    2. Amine plant on HDS/BHK plant, feed to 326-V-001 (6,3 bar g), ~400 m from CDU

    4.3 Simplified PFD

    321-C-003

    327-V-003

    329-V-004

    326-V001

    321-C-004

    321-V-013

    Scheme 1 : Simplified PFD

    In red = new

    Preliminary technical and commercial information for supply of Basic engineering document

    package for project based on the following technical scope and specifications and commercial

    conditions.

    The should be able to process both feeds.

    The required guarantee conditions for the project :

    - Optimized energy consumption, reliability and efficiency- Material and thermal capacities.- Pressures at B.L. of other units.- Secure liquid free gas to compressor (winter ambient design temp. = -15C)

    4.4 Battery limits for the design

    One compressor only.Split range control valves to 1. compressor or 2. blowdown system in case of compressor

    failure is included in scope of work.

    New flowmeter for overhead gas of 321-C-003 in scope of work (Max range 3000 Nm3/hr).Desulphurization is not part of the design.

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    6/13

    I Refining and Marketing Division 6 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    5 Content of Basic Engineering Design and Extended Scope

    The BEDP contains the all data and information of the project in accordance with the

    industrial standards and practices (Process description, PFDs, P&IDs, H&MB tables,

    equipment and instrument datasheets, definition of utility demands, distillation trayspecifications, pressure limitations, control and ESD-philosophy, etc.).

    Checking of exchanger 321-E-017, 321-E-030 and reflux drum 321-V-002 will be enclosed in

    the Basic engineering design.

    As an Extended Scope in the Basic Engineering Documentation, INA would like to have theRequisition for Quotation (RfQ) documentation for the compressor as a special Long Lead

    Item in the technical scope of the project. In the required RfQ documentation the details and

    materials to be specified in sufficient detail suitable to solicit Vendor bids shop drawings and

    specifications.

    The document shall include scope of supply, mechanical documentations, calculations and

    specifications, detailed mechanical drawings, data and information requirements as well as

    inspection and requirements.

    6 Content of the informative offer

    Having the informative offer INA is going to receive the following information:

    1. Simplified PFD of the proposed solution.2. Short presentation of Bidders experiences or owned know-how in similar projects

    in topping unit.

    3. Reference list of similar projects designed, installed or main contracted by theBidder.

    4. Estimate of volume requirement for compressor.5. Estimated contract price for supply the Basic Engineering Design Package (BEPD)

    +/-30%.

    6. Estimated delivery time of the BEDP.7. Any other special commercial conditions regarding the supply of BEDP.

    7 Miscellaneous

    The content of the informative offer will be handled as confidential material.

    All information will be used for project preparation only. There are no engagement to theBidder from INA side regarding any possible future cooperations and issues.

    Exclusions and deviations from this call to informative offer are allowed, but must be clearly

    indicated and justified.

    7.1 Utility specificationsThis section lists the operating and design conditions of the utilities considered to be available at theplant battery limit.

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    7/13

    I Refining and Marketing Division 7 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    7.1.1 Nitrogen

    System pressure 12 barg

    Temperature at B.L. 10-20C

    Purity 99,999% vol.

    Oxigen 2 ppm vol.Dew point -180C

    7.1.2 Instrumentation air

    Pressure, barg Temperature,C

    Instrumentation air 4-6 Ambient

    Dew point At atmospheric pressure -40

    7.1.3 Electric power

    Output, kW Voltage, V Phase Frekvency, Hz

    Instruments 230/400 1/3 50

    Lighting 230/400 1/3 50

    Elektromotors 150 6300 3 50

    7.1.4 Steam and Fuel gas

    Temperature,C Pressure, barg L.H.V.,Kcal/kg

    Fuel gas ambient 2.5-3.5 9890

    LP Steam 180-220 (norm.200) 4-6 (norm. 5.0) N/A

    MP Steam 250-320 (norm.280) 10-14 (norm. 12.0) N/A

    HP Steam 390-450 (norm.420) 33-38 (norm. 35.0) N/A

    7.1.5 Cooling water

    Temperature,C Pressure barg

    Cooling water supply 24-26 4,5-5

    Cooling water return 34-38 3-3,5

    7.1.6 Fire Water

    Pressure, barg Temperature, C

    Normal Mech. Design Normal Mech. Design

    Fire water 8.0 12.8 16 20 40At elevation: 15 -1 = 14 m above sea level.

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    8/13

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    9/13

    I Refining and Marketing Division 9 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    7.3 Spec sheets equipement to check

    7.3.1 321-V-002

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    10/13

    I Refining and Marketing Division 10 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    7.3.2 321-E-017

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    11/13

    I Refining and Marketing Division 11 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    12/13

    I Refining and Marketing Division 12 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM

    7.3.3 321-E-030

  • 7/25/2019 RNR CDU BEDP Informative Offer 2.pdf

    13/13

    I Refining and Marketing Division 13 / 13Downstream Development Sector

    FCH RNR CDU BEDP Informative Offer 2.doc 9/14/2012 12:13 PM