risk action plan and risk response
TRANSCRIPT
1 Structure collapse Catastrophic
2 Exchange rate Moderate
3 Inflation Moderate
4 Design changes Major
5 Operation cost Minor
6 Maintenance Moderate
7 Procurement management Major
8 Regulatory aspects Minor
9 Completion acceptance Catastrophic
10 Resources shortage Moderate
11 Contract management Minor
12 Training Moderate
13 Market price increase Minor
14 Management control Catastrophic
15 Time overrun Moderate
16 Cost overrun Moderate
17 Emergency conditions Minor
18 Natural crisis Minor
19 Marketing Moderate
Qualitative Risk assessment
# Risk Description Concquences
Rare Medium
Likely Medium
Almost certain High
Possible High
Likely Medium
Likely Medium
Likely High
Possible Medium
Almost Certain Extreme
Possible Medium
Possible Medium
Likely Medium
Possible Medium
Almost Certain Extreme
Possible Medium
Possible Medium
Unlikely Low
Rare Low
Likely Medium
Qualitative Risk assessment
Likelihood Risk priority
1
2
3
4
5
6
7
8
9
10
Risks Treatment Response
Ser No. RISK Risk Priority
Structure collapse LOW
Exchange rate MEDIUM
Inflation MEDIUM
Design changes HIGH
Operation cost LOW
Maintenance cost MEDIUM
Procurement
management HIGH
Regulatory
aspects LOW
Completion
acceptance HIGH
Resources
shortage MEDIUM
o Ensure a good maintenance program
o Provide on job training for staff before official operation
Risks Treatment Response
Risk Treatment Response After Treatment
Priority Risk transfer by Insurance policy, in addition to consultants' professional
liability insurance as a contract requisite Very Low
Risk Sharing as per contractual arrangements Medium - Low
Risk Sharing as per contractual arrangements Medium - Low
Refer to enclosed Action plan
Risk Mitigation by: o Afford professional operation staff
Very Low
o Provide staff training on emergency cases.
Risk Mitigation by proper planning to afford professional staff , choosing a reliable material, systems and Equipment, using a professional & good reputable contractors
Low Ensure a good maintenance program, Provide on job training for staff before official operation, and Provide staff training on emergency cases.
Refer to enclosed Action plan
Risk Retention / Acceptance. Low
Refer to enclosed Action plan
Risk Mitigation, using a prequalification system for choosing best resources, and using a good fair prices, and balanced contracts to
encourage professional resources to participate. Medium - Low
Construction Procurement Management
High High High
X Y Z " Project " Risk Action Plan
Element: RISK
Likelihood Impact Agreed Risk Level
Risk Description: ·Ensure hiring the required professional level of staff, the aimed quality material, labors and
equipment to ensure end results, quality and image.
·Availability of material in the market, and its life cycle cost is considered.
·Procurement plan and procedures should be followed. Current Controls and
Plans: Apply Procurement management plan, using standard contract forms Additional Actions
recommended: Use prequalification procedures to screen for the required professional level
Responsibility: Project Manager
Resources required: Project Manager, and Project Coordinator
Timing: Key milestones: All the project time, as needed
Closure: -
Reporting to : Top Management When: Form to be used :
Short list
Tender Evaluation report
References: Procurement management plan
Procurement Procedures
Design Changes 4
Almost Certain High High Repetitive
Design Manager / Tech. coordinator to ensure send required information on time
X Y Z " Project " Risk Action Plan
Element: RISK Risk Register No.
Technical
Likelihood Impact Agreed
Risk Level Inherent Risk Level
Risk Description: ·Applying fast track approach let us start tender and construction of contracts packages while design works is still in progress to some extent.
·Multi investors / owner with different back grounds, would make some different point of view, that may be reflected in designs.
·Starting with a P.M. on board, continuous coordination meetings, milestones on design schedule for approvals and owner decisions to reduce its impact.
Current Controls and
Plans: Project master plan, design phase have milestones for designs owner
approvals, coordination meetings for different parties to be informed and
discuss different point of view. Additional Actions
recommended: Written approvals at different design stages milestones before progressing Responsibility:
Project manager to get owner/s approvals, at the planned milestones
Resources required: Management, and design team.
Timing: Key milestones At the end of each design stage
Closure At the end of design phase.
Reporting to: Project Manager When:
Design Manager / Tech. Coordinator
Form to be used: Design Change request form ( DCRQ ) References:
Project time schedule - Detailed design phase schedule
Change management procedures
7
Repetitive
X Y Z " ProjectRisk Action Plan
Risk Register No.
Inherent Risk Level
Ensure hiring the required professional level of staff, the aimed quality material, labors and
equipment to ensure end results, quality and image.
Availability of material in the market, and its life cycle cost is considered.
Procurement plan and procedures should be followed.
Apply Procurement management plan, using standard contract forms
Use prequalification procedures to screen for the required professional level
All the project time, as needed
When: after selection
4
Repetitive
Design Manager / Tech. coordinator to ensure send required information on time
X Y Z " Project
Risk Register No.
Inherent Risk Level
Applying fast track approach let us start tender and construction of contracts packages while design works is still in progress to some extent.
Multi investors / owner with different back grounds, would make some different point of view,
Starting with a P.M. on board, continuous coordination meetings, milestones on design schedule for approvals and owner decisions to reduce its impact.
Project master plan, design phase have milestones for designs owner
approvals, coordination meetings for different parties to be informed and
discuss different point of view.
Written approvals at different design stages milestones before progressing
Project manager to get owner/s approvals, at the planned milestones
Management, and design team.
At the end of each design stage
Closure At the end of design phase.
ASAP
Project time schedule - Detailed design phase schedule