Copyright 2006 CVR/IT Consulting LLC Risk Register Your Organization Name Here Risk Register [Rev. 1.5 1/15/2009] Page 1 of 29 Printed on: 05/25/2022 Project Name: Instructions: Threat Priority Thresholds 1. Enter Impact and Probability Scores (or use default provided) High 4.5 2. Enter Priority Cutoff scores for Threats Medium 2 3. Enter Priority Cutoff scores for Opportunities Opportunity Priority Thresholds Threats Opportunities High 4 = High Priority = High Priority Medium 2 = Medium Priority = Medium Priority = Low Priority = Low Priority Threats Opportunities Impact 9 0.9 2.7 4.5 6.3 8.1 8.1 6.3 4.5 2.7 0.9 7 0.7 2.1 3.5 4.9 6.3 6.3 4.9 3.5 2.1 0.7 5 0.5 1.5 2.5 3.5 4.5 4.5 3.5 2.5 1.5 0.5 3 0.3 0.9 1.5 2.1 2.7 2.7 2.1 1.5 0.9 0.3 1 0.1 0.3 0.5 0.7 0.9 0.9 0.7 0.5 0.3 0.1 0.1 0.3 0.5 0.7 0.9 0.9 0.7 0.5 0.3 0.1 Probability 4. Enter risk impact and probability scores on the main worksheets. Color coding indicates priority of Risks and Opportunities

Upload: nirmalmthp

Post on 20-Dec-2015

9 views

Category:

Documents


0 download

DESCRIPTION

Project Risk Template

TRANSCRIPT

Page 1: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 1 of 17 Printed on: 04/18/2023

Project Name:

Instructions:

Threat Priority Thresholds 1. Enter Impact and Probability Scores (or use default provided)

High 4.5 2. Enter Priority Cutoff scores for Threats

Medium 2 3. Enter Priority Cutoff scores for Opportunities

Opportunity Priority Thresholds Threats Opportunities

High 4 = High Priority = High Priority

Medium 2 = Medium Priority = Medium Priority

= Low Priority = Low Priority

Threats Opportunities

Imp

act

9 0.9 2.7 4.5 6.3 8.1 8.1 6.3 4.5 2.7 0.9

7 0.7 2.1 3.5 4.9 6.3 6.3 4.9 3.5 2.1 0.7

5 0.5 1.5 2.5 3.5 4.5 4.5 3.5 2.5 1.5 0.5

3 0.3 0.9 1.5 2.1 2.7 2.7 2.1 1.5 0.9 0.3

1 0.1 0.3 0.5 0.7 0.9 0.9 0.7 0.5 0.3 0.1

0.1 0.3 0.5 0.7 0.9 0.9 0.7 0.5 0.3 0.1

Probability

4. Enter risk impact and probability scores on the main worksheets. Color coding indicates priority of Risks and Opportunities

Page 2: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 2 of 17 Printed on: 04/18/2023

Note: Be certain to fill out the Risk Management Plan before using this workbook. Available at www.cvr-it.com.

Page 3: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 3 of 17 Printed on: 04/18/2023

Copyright 2009 CVR/IT Consulting LLCAll Rights Reserved

Page 4: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 4 of 17 Print Date: 04/18/2023

Threat Register

Project Name: 0

Risk ID Risk Description Risk Cause Probability Status Assigned to Trigger Event

Example:071111a Schedule Critical Very High 8.1 Low Active Joe Smith

071123a Very High 6.3 High

071123b Serious Very High 4.5 Low

071210a Moderate Very High 2.7 High

071211a Minor Very High 0.9 Low

071222a Moderate High 2.1 High

080105a Moderate Low 0.9 Low

080109a High 4.9 High

080109b Low 2.1 Low

080111a Serious Med 2.5 Med0000000000000

Impact Area

Impact Score

Risk Score

Detecta-bility

New technology presents IT with a steep learning curve, could cause delay in implementation

Staff do not have experinece in this technology

Staff does not obtain training; early "prove feasibility" tasks are not completed

Sample data on this tab are displayed on the ThreatChart tab

Very Serious

Very Serious

Very Serious

A6
Use the following format for the Risk ID: YYMMDDx Where YY = year MM = month DD = day x = a count of risks entered on this day Example: 051112a = first risk logged on Nov 12, 2005)
C6
Indicate where this risk is most likely to have impact. Can be on Schedule, Cost, Scope or Quality
E6
Impact Score is an indication of how severly the project would be affected if the risk event were to occur. It can be any of the following values: 1,3,5,7,9 where: 1 = Minor impact 3 = Moderate impact 5 = Serious impact 7 = Very Serious impact 9 = Critical impact
F6
Probability is the likelihood that the risk event will occur. It is a decimal. Choose from .1, .3, .5, .7 or .9 where: .1 = very low probability .3 = low probability .5 = med probability .7 = high probability .9 = very high probability
G6
Priority is a calculated score: Probability x Risk Score Priority indicates how closely this Risk should be monitored. Color indicates priority as follows: Green = Low Yellow = Medium Red = Migh High Risks should be watched closely. The Red / Yellow / Green cutoffs are based on decisions documented in the Risk Response Plan and set in the Priority Chart tab of this spreadsheet.
H6
Will you be able to see this risk event coming? 1 =high detectability 3 = medium detectability 5 = low detectability
I6
Active = Action is being taken to deal with this risk Observe = not imminent but keep an eye on it Closed - no longer a threat to the project
J6
The person who is responsible for watching and/or dealing with this risk
K6
Indication that the risk event has or is about to occur. May cause initiation of the Response Plan
G7
Do Not enter data into this column. Data are calculated automatically.
Page 5: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 5 of 17 Print Date: 04/18/2023

Threat Register

Project Name: 0

Risk ID Risk Description Risk Cause Probability Status Assigned to Trigger EventImpact Area

Impact Score

Risk Score

Detecta-bility

00000000000000000000000000000000

A6
Use the following format for the Risk ID: YYMMDDx Where YY = year MM = month DD = day x = a count of risks entered on this day Example: 051112a = first risk logged on Nov 12, 2005)
C6
Indicate where this risk is most likely to have impact. Can be on Schedule, Cost, Scope or Quality
E6
Impact Score is an indication of how severly the project would be affected if the risk event were to occur. It can be any of the following values: 1,3,5,7,9 where: 1 = Minor impact 3 = Moderate impact 5 = Serious impact 7 = Very Serious impact 9 = Critical impact
F6
Probability is the likelihood that the risk event will occur. It is a decimal. Choose from .1, .3, .5, .7 or .9 where: .1 = very low probability .3 = low probability .5 = med probability .7 = high probability .9 = very high probability
G6
Priority is a calculated score: Probability x Risk Score Priority indicates how closely this Risk should be monitored. Color indicates priority as follows: Green = Low Yellow = Medium Red = Migh High Risks should be watched closely. The Red / Yellow / Green cutoffs are based on decisions documented in the Risk Response Plan and set in the Priority Chart tab of this spreadsheet.
H6
Will you be able to see this risk event coming? 1 =high detectability 3 = medium detectability 5 = low detectability
I6
Active = Action is being taken to deal with this risk Observe = not imminent but keep an eye on it Closed - no longer a threat to the project
J6
The person who is responsible for watching and/or dealing with this risk
K6
Indication that the risk event has or is about to occur. May cause initiation of the Response Plan
Page 6: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 6 of 17 Print Date: 04/18/2023

Threat Register

Project Name: 0

Risk ID Risk Description Risk Cause Probability Status Assigned to Trigger EventImpact Area

Impact Score

Risk Score

Detecta-bility

00000

A6
Use the following format for the Risk ID: YYMMDDx Where YY = year MM = month DD = day x = a count of risks entered on this day Example: 051112a = first risk logged on Nov 12, 2005)
C6
Indicate where this risk is most likely to have impact. Can be on Schedule, Cost, Scope or Quality
E6
Impact Score is an indication of how severly the project would be affected if the risk event were to occur. It can be any of the following values: 1,3,5,7,9 where: 1 = Minor impact 3 = Moderate impact 5 = Serious impact 7 = Very Serious impact 9 = Critical impact
F6
Probability is the likelihood that the risk event will occur. It is a decimal. Choose from .1, .3, .5, .7 or .9 where: .1 = very low probability .3 = low probability .5 = med probability .7 = high probability .9 = very high probability
G6
Priority is a calculated score: Probability x Risk Score Priority indicates how closely this Risk should be monitored. Color indicates priority as follows: Green = Low Yellow = Medium Red = Migh High Risks should be watched closely. The Red / Yellow / Green cutoffs are based on decisions documented in the Risk Response Plan and set in the Priority Chart tab of this spreadsheet.
H6
Will you be able to see this risk event coming? 1 =high detectability 3 = medium detectability 5 = low detectability
I6
Active = Action is being taken to deal with this risk Observe = not imminent but keep an eye on it Closed - no longer a threat to the project
J6
The person who is responsible for watching and/or dealing with this risk
K6
Indication that the risk event has or is about to occur. May cause initiation of the Response Plan
Page 7: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 7 of 17 Print Date: 04/18/2023

Risk ID Results of formal analysis Response Strategy Comments; Fallback plans

Example:071111a 04-Mar-06 Example text

071123a

071123b

071210a

071211a

071222a

080105a

080109a

080109b

080111a0000000000000

Contingency Reserve; Cost and Schedule adjustments to Project

Plan

Date of Plan Approval

Advanced training planned for 3 staff to occur on 12/2/03

M6
Put results of detailed quantitative analysis here
N6
A description of the plan in place to deal with this risk. Can be: Mitigation - reduce the impact of the risk event on the project Contingency - alternate course of action should the risk even occur Transfer (Insurance) - make the risk event someone else's problem Avoidance - make the risk less likely to occur at all
O6
Use Expected Monetary Value (EMV) to calculate the Contingency Reserve. EMV (cost) = Probability x Cost EMV (time) = Probability x Delay Example: Probability = 50% Cost if risk event occurs = $5,000 EMV (cost) = $5,000 x 0.5 = $2,500 Total of all EMV = Contingency Reserve for the project.
P6
Date that agreement was reached on the Response Strategy
L7
Do Not enter data into this column. Data are calculated automatically.
Page 8: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 8 of 17 Print Date: 04/18/2023

Risk ID Results of formal analysis Response Strategy Comments; Fallback plansContingency Reserve; Cost and Schedule adjustments to Project

Plan

Date of Plan Approval

00000000000000000000000000000000

M6
Put results of detailed quantitative analysis here
N6
A description of the plan in place to deal with this risk. Can be: Mitigation - reduce the impact of the risk event on the project Contingency - alternate course of action should the risk even occur Transfer (Insurance) - make the risk event someone else's problem Avoidance - make the risk less likely to occur at all
O6
Use Expected Monetary Value (EMV) to calculate the Contingency Reserve. EMV (cost) = Probability x Cost EMV (time) = Probability x Delay Example: Probability = 50% Cost if risk event occurs = $5,000 EMV (cost) = $5,000 x 0.5 = $2,500 Total of all EMV = Contingency Reserve for the project.
P6
Date that agreement was reached on the Response Strategy
Page 9: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 9 of 17 Print Date: 04/18/2023

Risk ID Results of formal analysis Response Strategy Comments; Fallback plansContingency Reserve; Cost and Schedule adjustments to Project

Plan

Date of Plan Approval

00000

M6
Put results of detailed quantitative analysis here
N6
A description of the plan in place to deal with this risk. Can be: Mitigation - reduce the impact of the risk event on the project Contingency - alternate course of action should the risk even occur Transfer (Insurance) - make the risk event someone else's problem Avoidance - make the risk less likely to occur at all
O6
Use Expected Monetary Value (EMV) to calculate the Contingency Reserve. EMV (cost) = Probability x Cost EMV (time) = Probability x Delay Example: Probability = 50% Cost if risk event occurs = $5,000 EMV (cost) = $5,000 x 0.5 = $2,500 Total of all EMV = Contingency Reserve for the project.
P6
Date that agreement was reached on the Response Strategy
Page 10: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 10 of 17 Print Date: 04/18/2023

Opportunity Register

Project Name: 0

Opportunity Description Opportunity Cause Probability Status Assigned to Trigger Event

Example:021111a Schedule Med 4.5 High Active Joe Smith

Very Low 0.9 Med

Low 2.7 Low

High Very High 6.3

High High 4.9

High Med 3.5

High Low 2.1

High Very Low 0.7

000000000000000

Opportunity ID

Impact Area

Impact Score

Opportunity Score

Detecta-bility

New technology presents IT with a real opportunity, could shave weeks off of implementation

Very High

Very High

Very High

A6
Use the following format for the Risk ID: YYMMDDx Where YY = year MM = month DD = day x = a count of risks entered on this day Example: 051112a = first risk logged on Nov 12, 2005)
C6
Indicate where this opportunity is most likely to have impact. Can be on Schedule, Cost, Scope or Quality
E6
Impact Score is an indication of how much the project would be helped if the opportunity were to occur. It can be any of the following values: 1,3,5,7,9 where: 1 = very low impact 3 = low impact 5 = med impact 7 = high impact 9 = very high impact
F6
Probability is the likelihood that the opportunity will occur. It is a decimal. Choose from .1, .3, .5, .7 or .9 where: .1 = very low probability .3 = low probability .5 = med probability .7 = high probability .9 = very high probability
G6
Priority is a calculated score: Probability x Opportunity Score Priority indicates how closely this Opportunity should be monitored. Color indicates priority as follows: Green = Low Yellow = Medium Blue = High High Opportunitiess should be watched closely. The Blue / Yellow / Green cutoffs are based on decisions documented in the Risk Response Plan and set in the Priority Chart tab of this spreadsheet.
H6
Will you be able to see this risk event coming? 1 =high detectability 3 = medium detectability 5 = low detectability
I6
Active = Action is being taken to deal with this opportunity Observe = not imminent but keep an eye on it Closed - no longer a opportunity for the project
J6
The person who is responsible for watching and/or dealing with this opportunity
K6
Indication that the opportunity has or is about to occur. May cause initiation of the Response Plan
Page 11: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 11 of 17 Print Date: 04/18/2023

Opportunity Register

Project Name: 0

Opportunity Description Opportunity Cause Probability Status Assigned to Trigger EventOpportunity

IDImpact Area

Impact Score

Opportunity Score

Detecta-bility

000000000000000000000000000000

A6
Use the following format for the Risk ID: YYMMDDx Where YY = year MM = month DD = day x = a count of risks entered on this day Example: 051112a = first risk logged on Nov 12, 2005)
C6
Indicate where this opportunity is most likely to have impact. Can be on Schedule, Cost, Scope or Quality
E6
Impact Score is an indication of how much the project would be helped if the opportunity were to occur. It can be any of the following values: 1,3,5,7,9 where: 1 = very low impact 3 = low impact 5 = med impact 7 = high impact 9 = very high impact
F6
Probability is the likelihood that the opportunity will occur. It is a decimal. Choose from .1, .3, .5, .7 or .9 where: .1 = very low probability .3 = low probability .5 = med probability .7 = high probability .9 = very high probability
G6
Priority is a calculated score: Probability x Opportunity Score Priority indicates how closely this Opportunity should be monitored. Color indicates priority as follows: Green = Low Yellow = Medium Blue = High High Opportunitiess should be watched closely. The Blue / Yellow / Green cutoffs are based on decisions documented in the Risk Response Plan and set in the Priority Chart tab of this spreadsheet.
H6
Will you be able to see this risk event coming? 1 =high detectability 3 = medium detectability 5 = low detectability
I6
Active = Action is being taken to deal with this opportunity Observe = not imminent but keep an eye on it Closed - no longer a opportunity for the project
J6
The person who is responsible for watching and/or dealing with this opportunity
K6
Indication that the opportunity has or is about to occur. May cause initiation of the Response Plan
Page 12: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 12 of 17 Print Date: 04/18/2023

Opportunity Register

Project Name: 0

Opportunity Description Opportunity Cause Probability Status Assigned to Trigger EventOpportunity

IDImpact Area

Impact Score

Opportunity Score

Detecta-bility

0000000

A6
Use the following format for the Risk ID: YYMMDDx Where YY = year MM = month DD = day x = a count of risks entered on this day Example: 051112a = first risk logged on Nov 12, 2005)
C6
Indicate where this opportunity is most likely to have impact. Can be on Schedule, Cost, Scope or Quality
E6
Impact Score is an indication of how much the project would be helped if the opportunity were to occur. It can be any of the following values: 1,3,5,7,9 where: 1 = very low impact 3 = low impact 5 = med impact 7 = high impact 9 = very high impact
F6
Probability is the likelihood that the opportunity will occur. It is a decimal. Choose from .1, .3, .5, .7 or .9 where: .1 = very low probability .3 = low probability .5 = med probability .7 = high probability .9 = very high probability
G6
Priority is a calculated score: Probability x Opportunity Score Priority indicates how closely this Opportunity should be monitored. Color indicates priority as follows: Green = Low Yellow = Medium Blue = High High Opportunitiess should be watched closely. The Blue / Yellow / Green cutoffs are based on decisions documented in the Risk Response Plan and set in the Priority Chart tab of this spreadsheet.
H6
Will you be able to see this risk event coming? 1 =high detectability 3 = medium detectability 5 = low detectability
I6
Active = Action is being taken to deal with this opportunity Observe = not imminent but keep an eye on it Closed - no longer a opportunity for the project
J6
The person who is responsible for watching and/or dealing with this opportunity
K6
Indication that the opportunity has or is about to occur. May cause initiation of the Response Plan
Page 13: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 13 of 17 Print Date: 04/18/2023

Risk ID Signs and Symptoms Response Strategy Comments; Fallback plans

Example:021111a 04-Mar-06 Example text

0

0

0

0

0

0

0

000000000000000

Results of formal analysis

Contingency Reserve; Cost and Schedule adjustments to Project

Plan

Date of Plan Approval

Vendor announces availability of the new product

Expedite purchase of a sample of the new technology

M6
These are indicators that the opportunity is likely to occur.
N6
Put results of detailed quantitative analysis here
O6
A description of the plan in place to deal with this opportunity. Can be: Exploit - eliminate uncertainty that an opportunity will occur Share - give responsibility for the opportunity to a third party Enhance - increase probability or impact of an opportunity Acceptance - Deal with it (threat or opportunity) if and when it occurs but make no plans now Contingency - set aside a dollar or time reserve that will absorb impact of the risk event
P6
See comment in Contingency Reserve column on Threat Register for info on EMV. Note: EMV for Opportunities is positive and serves to reduce the Contingency Reserve.
Q6
Date that agreement was reached on the Response Strategy
L7
Do Not enter data into this column. Data are calculated automatically.
Page 14: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 14 of 17 Print Date: 04/18/2023

Risk ID Signs and Symptoms Response Strategy Comments; Fallback plansResults of formal

analysis

Contingency Reserve; Cost and Schedule adjustments to Project

Plan

Date of Plan Approval

000000000000000000000000000000

M6
These are indicators that the opportunity is likely to occur.
N6
Put results of detailed quantitative analysis here
O6
A description of the plan in place to deal with this opportunity. Can be: Exploit - eliminate uncertainty that an opportunity will occur Share - give responsibility for the opportunity to a third party Enhance - increase probability or impact of an opportunity Acceptance - Deal with it (threat or opportunity) if and when it occurs but make no plans now Contingency - set aside a dollar or time reserve that will absorb impact of the risk event
P6
See comment in Contingency Reserve column on Threat Register for info on EMV. Note: EMV for Opportunities is positive and serves to reduce the Contingency Reserve.
Q6
Date that agreement was reached on the Response Strategy
Page 15: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register Your OrganizationName Here

Risk Register [Rev. 1.5 1/15/2009] Page 15 of 17 Print Date: 04/18/2023

Risk ID Signs and Symptoms Response Strategy Comments; Fallback plansResults of formal

analysis

Contingency Reserve; Cost and Schedule adjustments to Project

Plan

Date of Plan Approval

0000000

M6
These are indicators that the opportunity is likely to occur.
N6
Put results of detailed quantitative analysis here
O6
A description of the plan in place to deal with this opportunity. Can be: Exploit - eliminate uncertainty that an opportunity will occur Share - give responsibility for the opportunity to a third party Enhance - increase probability or impact of an opportunity Acceptance - Deal with it (threat or opportunity) if and when it occurs but make no plans now Contingency - set aside a dollar or time reserve that will absorb impact of the risk event
P6
See comment in Contingency Reserve column on Threat Register for info on EMV. Note: EMV for Opportunities is positive and serves to reduce the Contingency Reserve.
Q6
Date that agreement was reached on the Response Strategy
Page 16: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register

Risk Register [Rev. 1.5 1/15/2009] Template Source: www.cvr-it.com

Risk Chart - Risk Score x DetectabilityThis chart displays one data point for each risk.

Low Risk Scores are on the leftHigh Risk Scores are on the rightHighly detectable risks are at the bottomPoorly detectable risks are at the top

To identify highest priority risks (i.e. high Risk Score and Low Detectability), do the following:1. Select all rows below that have risk data (starting with row 19)2. Sort on column C, Descending, then sort on Column B, Descending, as follows

3. For each unique Risk Score, the highest Risk x Detectability values will be at the top4. Data on this page are updated automatically as you revise or enter new data on the ThreatRegister tab

Risk ID Risk Score

071111a 8.1 40.5071123a 6.3 6.3071123b 4.5 22.5071210a 2.7 2.7071211a 0.9 4.5071222a 2.1 2.1080105a 0.9 4.5080109a 4.9 4.9080109b 2.1 10.5080111a 2.5 7.5

0 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 0

Pay specific attention to risks in the top right quadrant. These are high risks with low detectability.

Click on Data; Click on Sort; Click on No Header Row; Select Column C (Risk Score x Detectability) Descending; Click on OK

Click on Data; Click on Sort; Click on No Header Row; Select Column B (Risk Score) Descending; Click on OK

Risk Scorex

Detectability

0 1 2 3 4 5 6 7 8 90

5

10

15

20

25

30

35

40

45

Risk Detectability

Risk Score

De

tec

tab

ility

Sc

ore

Page 17: Risk Response Plan Template

Copyright 2006 CVR/IT Consulting LLC Risk Register

Risk Register [Rev. 1.5 1/15/2009] Template Source: www.cvr-it.com

Definitions

Risk ID

Impact Area Cost, Schedule, Scope, Quality

Probability 0.1/0.3/0.5/0.7/0.9 where 0.1 is very low and 0.9 is very high

Risk Score Impact x Probability

Detectability

Priority Determined by criteria set on Priority Chart tab

Status Active (being worked), Observe, Closed

To add more rows, copy and insert formatted rows.

http://www.cvr-it.com

For a complete explanation of how to use this template, see the companion document, Risk Management Plan.

YYMMDDx (e.g., 021112a = first risk, logged on Nov 12, 2002)

Impact Score (Threat)

1/3/5/7/9 where: 1 = Minor impact (could have minimal effect on project cost, schedule or deliverables) 3 = Moderate impact (could have moderate effect on project cost, schedule or deliverables) 5 = Serious impact (could significantly increase cost, delay the schedule or degrade deliverables) 7 = Very Serious impact (could kill the project or seriously reduce project value) 9 = Critical impact (will kill the project)

Impact Score (Opportunity)

1/3/5/7/9 where: 1 = very low impact (may have slight impact on cost reduction or shortening of schedule) 3 = low impact (may have some impact in cost reduction or shortening of schedule) 5 = med impact (could have substantial impact by reducing cost, shortening the schedule or improving the quality of deliverables) 7 = high impact (could make this project a stunning success) 9 = very high impact (could have a positive impact at the business level by enhancing Business Value)

An indication of how easy it will be to see this risk event coming before it actually occurs. 1=high (can see the event well in advance) 3=medium (can see the event just before it happens) 5=low (can see the event as it happens or after it happens)

Note: Values for Probability and Impact Score are derived from the Risk Management Plan

Template Source