    Pages 1 through 9 redacted for the following reasons:- - - - - - - - - - - - - - - - - - - - - - - - - - - -All pages withheld under exemption (b)(5) - drafts

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    2/185

    DEPARTMENT OF HEALTH AND HUMAN SERVICES

    Office of the Secretary

    Washington DC 20201

    Meeting MinutesCTO Council Meeting

    Januar 10:30 AMDial in number: Participant:

    Roll CallCeline Neves, OCIO/EA

    Office Member Present

    ACF Jenkins, David Jim TysonFu, James

    AHRQ Erny, Tim Phone

    AoA Banning, Sue

    CDC Sagoo, Jaspal PhoneCDC Boyd, Terry Phone

    CDC Baum, Earl W Phone

    CMS Margush, Doug C.

    CMS Wilke, Sherry Phone

    FDA Coene, Michael

    NIH Burton, Adriane Phone

    NIH Bailey, Steve Phone

    NIH Akiyama, Darrick Phone

    OCIO Mitchell, Timothy Phone

    OCIO Neves, Celine Phone

    PSC Rollins, Dwayne Phone

    SAMHSA Walters, James R. Phone

    Welcome - Opening RemarksChair Jaspal Sagoo, CDC Chief Technology Officer (CTO)

    Jaspal Sagoo recapped the last meeting and encouraged everyone to read thedocuments in SharePoint. He went on to say that we are in Phase II and assignmentswere distributed.

    CDC Transition Plan, Process Documentation, Alternative Analysis Process HHS EA Service Architecture (all of back office support: data architecture,

    SOA) ?? Technical Architecture Not yet assigned because it is dependent on

    design of the service architecture.

    Jas indicated that Celine and he would be reaching out to the members to solicit furtherparticipation as the tasks are rather large.

    0010

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    3/185

    Page 2 of 4

    Business

    Status of Alternate Analysis guidance

    The first priority is to provide the guidance to all the OPDIVs on how to conduct the

    alternate analysis for cloud computing. The old OMB passback language had givenenough time and latitude to conduct the analysis, but in December new passbacklanguage came out specifying Cloud first for ALL IT investments. What it means for theDepartment is that for every investment, whether it is minor or major, whether it isreported in the OMB-300 or not, the IT organization has to do the analysis for cloud aswell as doing the analysis for hosting internally. As a result, the workgroup needs todevelop the guidance.

    After reviewing the OMB-300 submission, where we had put standard language for whatthe Department was doing, OMB came back and asked the Department to specify whatwe are doing and identify timelines for our initiatives. As such, the CTO Council

    requested guidance on how to conduct the alternative analysis by the end of January.Jas and the team have started developing the guidance and are seeking assistance.The intent is to present the guidance to the CTO Council so that IT organizations haveguidance on how to conduct the analysis; the draft guidance needs to be completed bythe end of the week, the final guidance needs to be completed by the end of the month,and the alternative analysis needs to be completed by the mid or end of February. Theguidance will go before the CIO council for ratification. The intent of giving the alternateanalysis guidance to the IT organizations is so that they can disseminate it to thebusiness owners that need it so that they can do the analysis come mid-February. Thisis why the timeline has been set so aggressively.

    Jas provided a paragraph to Mary Forbes so she can respond back to OMB and satisfytheir requirements. OMB is pushing us to show them we are in earnest makingattempts for all of our investments to look at Cloud first. The paragraph discusses thework the HHS CCAC group is doing; to include the timeline and when the guidance willbe in place. Mary is going to be sending the information to OMB this week. ProvidingOMB accepts our proposal, this committee has a little bit more latitude in timeline if wehave to shift back on the timeline.

    The first guidance tells the business owner what they have to tell their IT organizationabout their system; it could be a new system or an enhancement or steady state. Thepass back language doesnt discriminate against investments. All investments must

    consider cloud alternative. Jas said they are developing a set of questions in a templateform, similar to a security base line, which asks the same kinds of questions. As soonas the template is ready, it will be sent to the committee to vet. The turn-around time isgoing to be very short. Thats the first part.

    Then the analysis begins. The IT organization then determines costing within their ownorganization. The committee will provide guidance on the vendors. Jas is looking atFedRAMP and the Fed CCAC. They are putting together a care package for us. This

    0011

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    4/185

    Page 3 of 4

    will turn into a list of questions to ask vendors, which will be forwarded to the HHSCCAC members for vetting.

    The HHS Governance council has not yet been established.

    How does a system already in steady state, production, etc, get back into the loop sothat analysis is done. The obvious choice was the ELPC process.

    IT infrastructure is not well represented in the ELPC process; there was a critical partnerrole for EA but not one that specifically addressed the impact of IT initiatives to theoverall IT infrastructure of an organization. So they are proposing to the EA PMO thatIT infrastructure be included in the partnership review so that they can conduct theanalysis in the review process.

    Need to ensure that the IT organization has visibility into the earliest stages of an ITinitiative so that we can capture not only the business requirement but also technical

    and infrastructure requirements and make sure those are directed to best serviceprovider (remembering that the current guidance from OMB is cloud first). Is there acommercial or government-wide cloud provider that can provide the services at whatsecurity level needed? If not direct the project internally. An RFI is being developed.

    The question was posed, where the money is going to come from to transition currentsystems into the cloud. When you do the analysis you need to take this intoconsideration. If its an existing system, part of the analysis will be what the cost will beto transition the system into the cloud. It could well be that the cost is the prohibitingfactor and that is going to have to be factored in. If the cost of moving it is not costeffective, then that will be one of the factors that determine whether the system istransitioned to the cloud. All OMB is saying is that we have to consider cloud first andat least do the analysis.

    OMB recognizes the financial constraints that agencies are facing and are working torectify this matter, in particular the way that funding is handled. Many organizationsdont have IT funds for such initiatives.

    25 point Implementation plan to reform Federal IT management

    Cloud first OMB is expecting us to favor cloud first and address the funding issues(the color of money).

    The work breakdown structure is posted in SharePoint.

    Discuss the formation of an HHS Cloud Computing Governance Council

    Its critical that we have a permanent body that deals with ongoing cloud governance forthe department. It could be that this committee morphs into the governance body. Weneed representation from all the OPDIVs.

    0012

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    5/185

    Page 4 of 4

    Since there was no dissention, the topic will be raised at the Tuesdays CTO Councilmeeting and will seek membership so that the charter to be developed.

    Wrap up

    Draft guidance will be distributed to the members for review. There will be a request fora quick turnaround.

    CDC will compile a list of vehicles that are being used for procurements throughout thedepartment and the POC as to who the contract holder. That way if theres a particularvendor that the OPDIVs can use, they can leverage the contract.

    Next Meeting January 25, 2011 9:00 10:30

    0013

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    6/185

    ITSO 1 of 6 Revision: 7/20/204-CCAC Minutes Jan-25-2011 (tracker plus roll call)

    CCAC Meeting MinutesDate: 1/25/2011Time: 9:00 10:30 AMLocation: Phone

    Attendees: OFFICE MEMBER PRESENT OFFICE MEMBER PRESENT

    ACF David Jenkins NIH Steve Bailey

    ACF James Fu x NIH Adriane Burton x

    ACF Jim Tyson x NIH Darrick Akiyama x

    AHRQ Tim Erny x OCIO Timothy Mitchell x

    AoA Sue Banning x OCIO Celine Neves x

    CDC Jaspal Sagoo x PSC Dwayne Rollins x

    CDC Terry Boyd x SAMHSA James R.Walters

    CDC Earl W. Baum x EA/OCIO/CTR KumarRadhakrishnan

    x

    CMS Sherry Wilke x EA/OCIO/CTR Brian Leitao x

    CMS Doug C. Margush EA/OCIO/CTR Nick Mistry x

    FDA Michael Coene

    IHS Bernie Dailleboust

    IHS Mark Rives x

    Facilitator: Jaspal Sagoo, CDC

    Recorder: Nicole DElia

    Agenda & NotesTopic/Time/Lead Notes

    Welcome/Opening Remarks

    - Chair Jaspal Sagoo, CDC ChiefTechnology Officer (CTO)

    Action Items:

    Need to get minutes out on time for review; need to approve minutes asfirst order of business in future meetings starting with Feb 8

    thmeeting

    Introduction of New HHS EA TeamMembers

    - Earl Baum, CDC& HHS EA Team

    Introduction Kumar and Brian: EA portion and helping out with cloudportion for the organization

    Have prior experience with implementing cloud; working to enable agood cloud strategy for HHS and making sure we have a goodformulated strategy

    Nick Mistry, et al. working with Earl and Jaspal

    HHS Cloud Update

    - Jaspal Sagoo, CDC

    The HHS Cloud Computing Advisory Committee is developing the HHS

    Cloud Computing Architecture and Transition Plan, based on input fromthe following sources:

    Original OMB Pass back Language Federal CIOs 25-Point document Draft Federal Cloud Computing Strategy document

    OMB Cloud Computing Alternative Analysis necessary first step indeveloping and deploying Cloud-hosted services in a consistentmanner across HHS

    Customer Requirements Development part of the existing EPLCprocess; done during initiation/concept phase; want to capture sufficient

    0014

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    7/185

    ITSO 2 of 6 Revision: 7/20/204-CCAC Minutes Jan-25-2011 (tracker plus roll call)

    CCAC Meeting MinutesDate: 1/25/2011Time: 9:00 10:30 AMLocation: Phone

    information in the concept stage gate

    Cloud Computing Governance provides additional input into thealternative analysis; need to nail down the actual processes and how

    they relate to the other processes Looking at forming Governance Council for Cloud Computing

    Services, Costs, and Contracts tracking, developing standardizedlanguage for RFIs, cloud service providers, maintain list of approvedvendors/service providers that can be applied to initiatives

    Cloud Service Provider Analysis RFI care package (from GSA?) developing templates where each vendor can provide standardized ratecards/includes how to request customized quotes

    To some extent looking at internal IT organizations as cloud serviceprovider during Alternative Analysis each internal IT org at OPDIVlevel provide rate card information as well

    Proposing formalizing an IA critical partner role for major and smaller

    investments, starts at conceptual stage/first stage gate Need to know what it will cost for the existing internal IT organization to

    host the system/gather RFI information to see cost for external host

    Business Steward IT organization will send from EPLC orindependently to the Business Steward questions that BusinessSteward has to answer about characteristics of the system (similar tosecurity baseline)

    Questions/Responses

    When is the Alternative Analysis triggered? New investment triggerduring initiation and concept; Steady state/upgrading existing atminimum Alternative Analysis before the 53s and 300s.

    Action Items:

    Target Key Business Process Model Responsibility: CDC, In Progress carry-on work from reference

    architecture worked on last summer

    All top-level Cloud Service Processes

    Cloud vendor service catalog/rate-sheet maintenance

    Cloud alternative analysis

    EPLC extensions - IT Infrastructure Critical Partner Role

    Target Service Component Architecture

    Responsibility: HHS EA, Not Started

    HHS Federated Data Architecture

    HHS Federated SOA Catalog

    Target Technical Architecture

    Responsibility: Unassigned, Not Started

    Depends on input from the previous steps need to see what thedependencies are

    Transition Recommendation & Blueprint Document

    Responsibility: CDC, In Progress Terry Boyd

    Depends on input from the previous steps; in a holding pattern at themoment

    Will need to divide the work up

    Sequence Diagram and Milestones should be complete within 90 days,to feed into OMB 120-day guidance core components need to be

    0015

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    8/185

    ITSO 3 of 6 Revision: 7/20/204-CCAC Minutes Jan-25-2011 (tracker plus roll call)

    CCAC Meeting MinutesDate: 1/25/2011Time: 9:00 10:30 AMLocation: Phone

    fairly far along in 120 days

    Guidance Development

    Target Key Business Process Model: (This flows out of statement of

    work) Key Points: nailing down key processes and relationships between

    processes

    Assigning who owns each process

    Define target business processes and their performance includingorganizational relationships

    Define target data relationships and business data stewards

    Define the target information services

    Ensure target business and information architecture addressesstrategic improvement opportunities

    Progress To-Date

    - Earl Baum, CDC& Charles Martin,CDC

    On the contract side CDC, HHS contracting staff; make sure wereasking for enough information from each service provider to come up

    with a rate card that is sufficiently useful and complete/accurate

    Likewise with the governance enough guidance but not too much

    To make this happen: Taking a federated approach each OPDIVmaintains own suite of contracts and list of approved vendors; one sizefits all process is the goal for feeding into analysis

    On the back end; adopt recommendation; looking at tying clouddeployment into standardized data architecture HHS wide

    Federated approach to SOA; to ensure/have a useful catalog ofservices as we deploy cloud

    Overarching set of HHS wide processes/standards; implemented atOPDIV level with OPDIV level additional conditions and procedures ensure everyone is following same general process

    Internal IT organizations have potential to become cloud providers forother organizations, not just your own internal programs

    Funding issues will ensure that strategies and processes that wedevelop stay within boundaries of current appropriations laws andlanguage

    Document templates sanity check, are we capturing everything youneed to know? Feed information back to us

    Action Items:

    Defined individual/group specific to IT infrastructure within each OPDIVwho handles the alternative analysis; tie to existing EPLC process aswell will send out within next wk or so (recommended for HHS wide)

    want consistent POC within each OPDIV Responsibility: CDC? Due around February 1

    st

    Requirements Definition trying to get enough information w/ogathering too much to do effective analysis; scope, security level- willsensitive data be posted on system?Timeline for system; tie into EPLCdocumentation

    Responsibility: CDC? Due around February 1

    st

    Document Templates for Alternative Analysis Responsibility: CDC?

    0016

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    9/185

    ITSO 4 of 6 Revision: 7/20/204-CCAC Minutes Jan-25-2011 (tracker plus roll call)

    CCAC Meeting MinutesDate: 1/25/2011Time: 9:00 10:30 AMLocation: Phone

    Due around February 1st

    Reaching out for contract vehicles, data call for existing contractvehicles and vendors within the OPDIVs; then will figure out how to

    request information from all these vendors Responsibility: Jaspal/CDC Due prior to February 8

    thmeeting?

    Wrap Up Hoping to receive care package RFI from GSA

    Prior to next meeting: End of this week/beginning of next week: Jaspalwill be sending out a lot of these documents for comment, first to theCTO Council, then to Mary and John Teeter to be put on the agenda forthe CIO Council.

    Next Meeting February 8, 2011 9:00 10:30

    0017

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    10/185

    ITSO 5 of 6 Revision: 7/20/201104-CCAC Minutes Jan-25-2011 (tracker plus roll call)

    Action Item Tracker:

    ID Action Accountable Due Date Status

    1

    Need to get minutes out on time for review; need to approve minutes

    as first order of business in future meetings starting with Feb 8th

    meeting

    2

    Target Key Business Process Model

    All top-level Cloud Service Processes

    Cloud vendor service catalog/rate-sheet maintenance

    Cloud alternative analysis EPLC extensions - IT Infrastructure Critical Partner Role

    CDC In Progress

    3

    Target Service Component Architecture

    HHS Federated Data Architecture

    HHS Federated SOA CatalogHHS EA Not Started

    4Target Technical Architecture

    Depends on input from the previous steps

    Unassigned Not Started

    5

    Transition Recommendation & Blueprint Document

    Depends on input from the previous steps; in a holding pattern at

    the moment

    Will need to divide the work up

    Sequence Diagram and Milestones should be complete within 90

    days, to feed into OMB 120-day guidance

    CDC Terry Boyd In

    Progress/Holding

    Pattern

    6

    Guidance Development

    Target Key Business Process Model

    Assigning who owns each process

    Define target business processes and their performance including

    organizational relationships

    Define target data relationships and business data stewards

    Define the target information services

    Ensure target business and information architecture addresses

    strategic improvement opportunities

    CDC?

    7Defined individual/group specific to IT infrastructure within each

    OPDIV who handles the alternative analysis; tie to existing EPLC

    CDC? Around

    February 1st

    0018

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    11/185

    ITSO 6 of 6 Revision: 7/20/201104-CCAC Minutes Jan-25-2011 (tracker plus roll call)

    process as well (recommended for HHS wide) identify consistent

    POC within each OPDIV

    8Requirements Definition/Gathering Timeline for system; tie into

    EPLC documentation

    CDC? Around

    February 1st

    9Document Templates for Alternative Analysis CDC? Around

    February 1st

    10

    Data call for existing contract vehicles and vendors within the

    OPDIVs, then will figure out how to request information from all

    these vendors

    CDC Jaspal Prior to

    February 8th

    0019

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    12/185

    ITSO 1 of 6 Revision: 7/20/205-CCAC Minutes Feb-8-2011

    CCAC Meeting MinutesDate: 2/8/2011Time: 9:00 10:30 AMLocation: Phone

    Attendees: OFFICE MEMBER PRESENT OFFICE MEMBER PRESENT

    ACF David Jenkins NIH Steve Bailey

    ACF James Fu X NIH Adriane Burton X

    ACF Jim Tyson X NIH Darrick Akiyama X

    AHRQ Tim Erny X OCIO Timothy Mitchell X

    AoA Sue Banning X OCIO Celine Neves

    CDC Jaspal Sagoo X PSC Dwayne Rollins X

    CDC Terry Boyd X SAMHSA James R.Walters X

    CDC Earl W. Baum X EA/OCIO/CTR KumarRadhakrishnan

    X

    CMS Sherry Wilke X EA/OCIO/CTR Brian Leitao X

    CMS Doug C. Margush X EA/OCIO/CTR Nick Mistry

    FDA Michael Coene Jay Burton X

    IHS Bernie Dailleboust CDC Charles Martin X

    IHS Mark Rives X

    Facilitator: Brian Leitao, EA/OCIO/CTR

    Recorder: Nicole DElia, EA/OCIO/CTR

    Agenda & NotesTopic/Time/Lead Notes

    Welcome/Opening Remarks- Chair Jaspal Sagoo, CDC ChiefTechnology Officer (CTO)

    Alternative Analysis and SupportingProcesses

    - Jaspal Sagoo, CDC

    Developing the Alternative Analysis for Cloud first will be used onceratified as guidance for Analysis for each OPDIV; needed for OMB 300s

    Action Items:

    Read HHS Cloud Computing Implementation and Governance Draftv0.1 (Alternative Analysis first draft) provideinput/comments/questions/errors/omissions

    CIO Slides- Jaspal Sagoo, CDC

    Slides for the upcoming presentation for CIO Council

    3 Must Move services to the Cloud in the next 18 months

    CIOCouncil will deliberate

    Need to provide guidance to HHS and OPDIVs to consider Cloud first this will be accomplished through the Alternative Analysis

    The NIST Definition of Cloud Computing will be covered with the CIOs Will be considering all three service models: SaaS, PaaS, IaaS

    The CCAC is: Developing Guidance on Alternatives Analysis for Program

    Managers; Developing Information Gathering Template; Developing Process Models and Rules;

    0020

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    13/185

    ITSO 2 of 6 Revision: 7/20/205-CCAC Minutes Feb-8-2011

    CCAC Meeting MinutesDate: 2/8/2011Time: 9:00 10:30 AMLocation: Phone

    Updating EPLC to account for Cloud Innovation

    Draft Alternative Analysis document contains: roles, functions,processes and criteria

    RFI building in standard way of requesting customized quotes Governance Body will maintain and update list of vendors, make

    available to all stakeholders; maintain service provider cost and securitydata

    Internal Analysis (cost of hosting system internally) then ExternalAnalysis; based on the RFI responses you get back, makerecommendation this is an iterative process (not a one-time process)

    Can accept/reject recommendation but then need to follow protocols

    Cloud Training will need to be provided for Critical Partner as well

    Work Assignments- Jaspal Sagoo and Earl Baum, CDC

    Deliverable A0 Customer Requirements Development

    Lead: Earl Baum

    Leveraging existing processes to the extent possible

    Adding Critical Partner / Alternative Analysis to the EPLCprocess

    Security adding to existing CNA process

    Trying to provide standardized language and feed into existingprocesses

    Tim Mitchell requested to join this workgroup

    Deliverable E0 Cloud Computing Support Governance

    Lead: should be Sherry Wilke or Doug Margush

    Leveraging existing processes to the extent possible here too

    Need to fine tune procurement cycle, security

    Deliverable B0 Services, Costs, Contracts Ginny Howard, Terry Boyd

    Lead: not determined

    Internal and external hosting providers

    Early draft of contract language for RFI

    Potential for interagency collaboration

    Need a lead for all of these areas

    Deliverable C0 Cloud Support Services

    Lead: Kumar

    Longer term

    Support overall Cloud and other EA HHS architecture

    Develop consistent HHS-wide data architecture

    NIH working on this as well as HHS EA team Deliverable F0 Solution Implementation

    Lead: not determined/CDC?

    Date due is after 4/1/2011

    Need support from anyone and everyone

    Transition Plan/Blueprint that ties everything together turningthis all into a roadmap

    End goal: turn suite of processes over to CTO and CIOCouncils for them to use

    0021

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    14/185

    ITSO 3 of 6 Revision: 7/20/205-CCAC Minutes Feb-8-2011

    CCAC Meeting MinutesDate: 2/8/2011Time: 9:00 10:30 AMLocation: Phone

    As deliverables are developed, theyre being tied into this

    Security Jay Burton tied closely with Governance workflow

    Action Items:

    Draft timeline, work assignments for each team

    Top level work plan/timeline; include any information needed from otherworkgroups

    Look for any gaps in information

    Be prepared to talk about your work plans

    Jaspal and Earl will provide feedback from the CIO Council, updates onthe document; submission to OMB on February 11th

    Wrap Up Contact Brian and Kumar (CC: Earl and Jaspal) to join a workgroup

    Next Meeting February 22, 2011 9:00 10:30

    Send all information by Friday, February 18th

    since Monday, February21

    stis Presidents Day

    0022

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    15/185

    TSO 4 of 6 Revision: 7/20/201105-CCAC Minutes Feb-8-2011

    Action Item Tracker:

    ID OPDIV/

    Department

    Action Item Description Priority

    Level

    Owner/

    Lead

    Date

    Assigned

    Date Due Date

    Complete

    Percent

    Complete

    Progress Notes

    1

    CCAC Minutes Need to get minutes out on time forreview; need to approve minutes as first

    order of business in future meetings

    starting with Feb 8th

    meeting

    1/25/2011 In Progress

    2

    Target Key Business

    Process Model

    All top-level Cloud Service Processes

    Cloud vendor service catalog/rate-sheetmaintenance

    Cloud alternative analysis EPLC extensions - IT Infrastructure

    Critical Partner Role

    CDC 1/25/2011 In Progress

    3

    Target Service

    ComponentArchitecture

    HHS Federated Data Architecture

    HHS Federated SOA Catalog

    HHS EA 1/25/2011 Not Started

    4Target Technical

    Architecture

    Depends on input from the previous steps Unassigned 1/25/2011 Not Started

    5

    Transition

    Recommendation &

    Blueprint Document

    Depends on input from the previous

    steps; in a holding pattern at the

    moment

    Will need to divide the work up

    Sequence Diagram and Milestones

    should be complete within 90 days, to

    feed into OMB 120-day guidance

    CDC Terry

    Boyd

    1/25/2011 In

    Progress/Holding

    Pattern

    6

    Guidance

    Development

    Target Key Business Process Model

    Assigning who owns each process

    Define target business processes and

    their performance including

    organizational relationships

    Define target data relationships andbusiness data stewards

    CDC? 1/25/2011

    0023

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    16/185

    TSO 5 of 6 Revision: 7/20/201105-CCAC Minutes Feb-8-2011

    ID OPDIV/

    Department

    Action Item Description Priority

    Level

    Owner/

    Lead

    Date

    Assigned

    Date Due Date

    Complete

    Percent

    Complete

    Progress Notes

    Define the target information services

    Ensure target business and information

    architecture addresses strategicimprovement opportunities

    7

    Defined IT

    Infrastructure POC

    Defined individual/group specific to IT

    infrastructure within each OPDIV who

    handles the alternative analysis; tie to

    existing EPLC process as well (recommended for HHS wide) identify

    consistent POC within each OPDIV

    CDC? 1/25/2011 Around

    2/1/2011

    8Requirements

    Definition/Gathering

    Timeline for system; tie into EPLC

    documentation

    CDC? 1/25/2011 Around

    2/1/2011

    9

    Document

    Templates forAlternative Analysis

    CDC? 1/25/2011 Around

    2/1/2011

    10

    Data call for existing

    contract vehiclesand vendors within

    the OPDIVs, then

    will figure out howto request

    information from all

    these vendors

    CDC

    Jaspal

    1/25/2011 Prior to

    2/8/2011

    11

    HHS Cloud

    ComputingImplementation and

    Governance Draft

    v0.1

    Read Alternative Analysis first draft and

    provideinput/comments/questions/errors/omissions

    Medium 2/8/2011 2/22/2011 0% Not Started

    12

    Workgroup

    Timeline and WorkPlan

    Draft timeline, work assignments for each

    team; include any information needed fromother workgroups

    Look for any gaps in information

    Be prepared to talk about your work plans

    High Workgroup

    Leads

    2/8/2011 2/22/2011 0% Not Started

    0024

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    17/185

    TSO 6 of 6 Revision: 7/20/201105-CCAC Minutes Feb-8-2011

    ID OPDIV/

    Department

    Action Item Description Priority

    Level

    Owner/

    Lead

    Date

    Assigned

    Date Due Date

    Complete

    Percent

    Complete

    Progress Notes

    13

    CDC Feedback from CIO

    Council

    Provide feedback from the CIO Council,

    updates on the document; submission to

    OMB on February 11th

    Medium Jaspal

    Sagoo/Earl

    Baum

    2/8/2011 2/22/2011 0% Not Started

    0025

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    18/185

    ITSO 1 of 6 Revision: 7/20/206-CCAC Minutes Mar-1-2011

    CCAC Meeting MinutesDate: 3/1/2011Time: 9:00 10:30 AMLocation: Phone

    Attendees: OFFICE MEMBER PRESENT OFFICE MEMBER PRESENT

    ACF David Jenkins NIH Steve Bailey X

    ACF James Fu X NIH Adriane Burton

    ACF Jim Tyson X NIH Darrick Akiyama X

    AHRQ Tim Erny X NIH Debbie Bucci X

    AoA Sue Banning OCIO Timothy Mitchell

    CDC Jaspal Sagoo X OCIO Celine Neves

    CDC Terry Boyd X PSC Dwayne Rollins X

    CDC Earl W. Baum X SAMHSA James R.Walters

    CMS Sherry Wilke EA/OCIO/CTR Kumar

    Radhakrishnan

    X

    CMS Doug C. Margush X EA/OCIO/CTR Brian Leitao

    FDA Michael Coene X CDC Jay Burton X

    IHS Bernie Dailleboust CDC Charles Martin X

    IHS Mark Rives X CDC Ginny Howard X

    Facilitator: Nicole DElia, EA/OCIO/CTR

    Recorder: Nicole DElia, EA/OCIO/CTR

    Agenda & NotesTopic/Time/Lead Notes

    Welcome/Opening Remarks- Chair Jaspal Sagoo, CDC ChiefTechnology Officer (CTO)

    Alternative Analysis and SupportingProcesses / CTO and CIO CouncilUpdates

    - Jaspal Sagoo, CDC

    The CTO and CIO Councils expressed anxiety over the governanceprocess

    Alternative Analysis EPLC Integration: Various trigger points depending on the lifecycle of the system Trying to simplify and streamline this process; but there is

    additional work that is going to need to be done (due to OMBCloud First mandate)

    Need full CPIC support

    Our job to make sure stakeholders understand their roles andresponsibilities

    IT Critical Partner up to the individual programs and IT organizations

    A lot of this information should be gathered during the EPLC processalready; not necessarily new work, just formalizing the process

    New Initiatives Alternative Analysis triggered: At the end of concept phase determining whether the

    initiative can be cloud At the end of the requirements analysis stage Prior to implementation stage sanity check, make sure

    0026

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    19/185

    ITSO 2 of 6 Revision: 7/20/206-CCAC Minutes Mar-1-2011

    CCAC Meeting MinutesDate: 3/1/2011Time: 9:00 10:30 AMLocation: Phone

    sufficient information has been collected

    Enhancements Alternative Analysis triggered: Similar process as for new initiatives

    Quick touch point on previous stage gates to see what haschanged With upgrades and enhancements, is cloud now feasible?

    Steady State Alternative Analysis triggered when OMB 300 isproduced every year

    If updates, enhancements, or a technology refresh are planned,they still will have to do the Alternative Analysis

    Data Call- Jaspal Sagoo, CDC

    Trying to develop vendor list with standard rate cards

    Looking to control sprawl; every OPDIV has contract vehicles in place

    Asking each OPDIV for feedback on existing contract vehicles, theCOTR, and POC (both on the vendor side and on the procurementside)

    Then we will be able to reach out with RFIs weve agreed on

    Will compile working spreadsheet of vendors, servicesprovided, and standard rate cards

    As soon as the Alternative Analysis document has been blessed, thislist will be necessary to move forward

    Work with your CTO to get this information going

    Looking for both development vehicles and service vehicles

    Action Items:

    Will send out generic RFI template; please provide feedback on thisdocument.

    Market Research Briefings withVendors

    - Jaspal Sagoo, CDC

    Vendors have been asking for time to brief the committee

    As we look at the vendor list were developing, were going to want tolook at those vendors first

    Want to make sure that when vendors provide briefing, it is lessmarketing and more services oriented, including their rate cards

    Action Items:

    Develop template of questions/formatting for the briefing for eachvendor Kumar will come up with a template and circulate to thecommunity

    Work Plan and Timeline Overview- Jaspal Sagoo and Earl Baum, CDC& Workgroup Leads

    Deliverable A0 Customer Requirements Development

    Lead: Earl Baum

    Timeline is complete, pending review

    Deliverable will be complete EOM March

    Deliverable E0 Cloud Computing Support Governance

    Lead: Sherry Wilke or Doug Margush

    Still aiming for April 1st

    deadline, but need requirements

    Deliverable B0 Services, Costs, Contracts Ginny Howard, Terry Boyd

    Lead: not determined

    Should be able to complete by April 1st

    Draft of contract language for RFI has incorporated Ginnyscomments

    All committee members need to review the RFI draft so that itcan be sent out to the vendors

    0027

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    20/185

    ITSO 3 of 6 Revision: 7/20/206-CCAC Minutes Mar-1-2011

    CCAC Meeting MinutesDate: 3/1/2011Time: 9:00 10:30 AMLocation: Phone

    Deliverable C0 Cloud Support Services

    Lead: Kumar Radhakrishnan

    Draft timeline will be sent to Earl by EOW

    Deliverable F0 Solution Implementation

    Lead: not determined/CDC?

    Looking at 5/1/2011 for the Transition Plan

    As deliverables are developed, theyre being tied into this

    Security Jay Burton tied closely with Governance workflow

    Ties GSA FEDRAMP ANA into CNA process

    Tie this to HHS driver

    Action Items:

    Workgroup leads need to send an email to Earl, CC: Jaspal and Kumarto confirm timelines

    Review and comment on draft documents by EOW HHS Cloud Computing RFI Draft v0.1.2 HHS Cloud Computing Implementation and Governance Draft

    v0.2.1

    Wrap Up Action Items:

    Will create list of published documents to track comments, feedback,and approval from each OPDIV for each version Jaspal will showtracker to the CTO Council at the March 8

    thmeeting

    Next Meeting March 22, 2011 9:00 10:30 AM

    0028

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    21/185

    TSO 4 of 6 Revision: 7/20/201106-CCAC Minutes Mar-1-2011

    Action Item Tracker:

    ID OPDIV/Department

    Action Item Description Priority

    Level

    Owner/ Lead Date

    Assigned

    Date

    Due

    Date

    Complete

    Percent

    CompleteProgress Notes

    1CCAC Minutes Need to get minutes out on time for review;

    need to approve minutes as first order of

    business in future meetings

    High Nicole DElia 1/25/2011 In Progress

    2

    Target Key Business Process

    Model

    All top-level Cloud Service Processes

    Cloud vendor service catalog/rate-sheetmaintenance

    Cloud alternative analysis EPLC extensions - IT Infrastructure

    Critical Partner Role

    CDC 1/25/2011 In Progress; Jay Burton will

    be providing the CISOviewpoint; Transition Planstill needs to be finalized;

    Addressed as far as the

    Alternative Analysis draft

    document (just need review

    and approval)

    3

    Target Service ComponentArchitecture

    HHS Federated Data Architecture

    HHS Federated SOA CatalogHHS EA 1/25/2011 In Progress timeline will

    be out by Mar 4; will be

    reaching out to NIH as

    soon as Transition Plan isfinalized

    4Target Technical

    Architecture

    Depends on input from the previous steps Unassigned 1/25/2011 Not Started Dependent on

    Item 3

    5

    Transition Recommendation

    & Blueprint Document

    Depends on input from the previous

    steps; in holding pattern Will need to divide the work up

    Sequence Diagram and Milestones

    should be complete within 90 days, to

    feed into OMB 120-day guidance

    CDC Terry

    Boyd

    1/25/2011 In Progress/Holding Pattern

    initial drafts are beingstarted, still need a lot ofinformation

    6

    Guidance Development Target Key Business Process Model

    Assigning who owns each process

    Define target business processes andtheir performance including

    organizational relationships

    Define target data relationships andbusiness data stewards

    Define the target information services

    Ensure target business and information

    architecture addresses strategic

    CDC? 1/25/2011 In Progress ties back toItem 2

    0029

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    22/185

    TSO 5 of 6 Revision: 7/20/201106-CCAC Minutes Mar-1-2011

    ID OPDIV/Department

    Action Item Description PriorityLevel

    Owner/ Lead DateAssigned

    DateDue

    DateComplete

    PercentComplete

    Progress Notes

    improvement opportunities

    7

    Defined IT Infrastructure

    POC

    Defined individual/group specific to IT

    infrastructure within each OPDIV whohandles the alternative analysis; tie toexisting EPLC process as well

    (recommended for HHS wide) identify

    consistent POC within each OPDIV

    Committee

    members needto talk to CTOs& CIOs

    1/25/2011 Around

    2/1/2011

    In Progress: Need to have

    POC for each OPDIV forcoordination purposes;dont need to necessarily

    provide name to the CCAC

    8RequirementsDefinition/Gathering

    Timeline for system; tie into EPLCdocumentation Draft of this is in the

    Governance Document

    CDC? 1/25/2011 Around2/1/2011

    9Document Templates for

    Alternative Analysis

    CDC? 1/25/2011 Around

    2/1/2011

    In Progress: Draft is

    complete pending review

    10

    Data call for existing

    contract vehicles and

    vendors within the OPDIVs

    Data call went out (2/28/2011) Kumar

    Radhakrishnan

    1/25/2011 Prior to

    2/8/2011

    In Progress: As information

    comes back, will compile

    spreadsheet

    11HHS Cloud ComputingImplementation and

    Governance Draft v0.1

    Read Alternative Analysis first draft andprovide

    input/comments/questions/errors/omissions

    Medium 2/8/2011 2/22/2011

    100% Complete: See Item 16

    12

    Workgroup Timeline andWork Plan

    Draft timeline, work assignments for eachteam; include any information needed from

    other workgroups

    Look for any gaps in informationBe prepared to talk about your work plans

    High WorkgroupLeads

    2/8/2011 2/22/2011

    0% In Progress: See Item 18

    13

    CDC Feedback from CIO Council Provide feedback from the CIO Council,

    updates on the document; submission to

    OMB on February 11th

    Medium Jaspal

    Sagoo/Earl

    Baum

    2/8/2011 2/22/201

    1

    3/1/2011 100% Complete

    14Market Vendor Question

    Template

    Starter template of questions for vendors

    when they brief the CCAC

    Medium Kumar

    Radhakrishnan

    3/1/2011 In Progress

    15

    CCAC Published

    Documents Tracker

    Create tracker to log comments, feedback,

    and approval for each OPDIV for CCACdocuments

    High Nicole DElia 3/1/2011 3/4/2011 In Progress

    16

    HHS Cloud Computing

    Implementation andGovernance Draft v0.2.1

    Read Alternative Analysis draft and provide

    input/comments/questions/errors/omissions

    High Committee

    Members

    3/1/2011 3/4/2011 In Progress

    17HHS Cloud Computing RFI

    Draft v0.1.2

    Read RFI draft and provide

    input/comments/questions/errors/omissions

    High Committee

    Members

    3/1/2011 3/4/2011 In Progress

    0030

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    23/185

    TSO 6 of 6 Revision: 7/20/201106-CCAC Minutes Mar-1-2011

    ID OPDIV/Department

    Action Item Description PriorityLevel

    Owner/ Lead DateAssigned

    DateDue

    DateComplete

    PercentComplete

    Progress Notes

    18Confirm Workgroup

    Timelines

    Send email to Earl Baum to confirm the

    timeline for each workgroup

    High Earl Baum 3/1/2011

    0031

    I

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    24/185

    ITSO 1 of 7 Revision: 7/20/207-CCAC Minutes Mar-22-2011

    CCAC Meeting MinutesDate: 3/22/2011Time: 9:00 10:30 AMLocation: Phone

    Attendees: OFFICE MEMBER PRESENT OFFICE MEMBER PRESENT

    ACF David Jenkins NIH Steve Bailey

    ACF James Fu X NIH Adriane Burton X

    ACF Jim Tyson NIH Darrick Akiyama X

    AHRQ Tim Erny X NIH Debbie Bucci X

    AoA Sue Banning OCIO Timothy Mitchell X

    CDC Jaspal Sagoo OCIO Celine Neves

    CDC Terry Boyd PSC Dwayne Rollins X

    CDC Earl W. Baum X PSC/CTR Ali Bilgrami X

    CMS Sherry Wilke SAMHSA James R. Walters X

    CMS Doug C. Margush X EA/OCIO/CTR KumarRadhakrishnan

    CMS Daniel Lazenby X CDC Michelle Hines X

    FDA Michael Coene CDC Jay Burton

    IHS Bernie Dailleboust CDC Charles Martin X

    IHS Mark Rives X CDC Ginny Howard X

    Facilitator: Nicole DElia, EA/OCIO/CTR

    Recorder: Nicole DElia, EA/OCIO/CTR

    Agenda & NotesTopic/Time/Lead Notes

    Welcome/Opening Remarks- Earl Baum, CDC

    SharePoint site now has three additional documents for the committeeto review

    We are also working on RFQ documents which will be shared with thecommittee shortly

    Action Items:

    Review and comment on draft documents by March 29th HHS Cloud Computing RFI Draft v0.1.3 RACI Document Draft v 9 Role of an IT Infrastructure Critical Partner v0.9.8

    Approval of 3-1-2011 Minutes- Earl Baum, CDC

    Minutes were reviewed by the committee and approved as is

    Alternative Analysis and SupportingProcesses / CTO Council Update

    - Earl Baum, CDC

    We have been focusing our efforts on infrastructure elements

    There will be additional work involved and there are questions on wheregovernance is going

    Please take the governance document and EPLC IT Infrastructuredocument out to your people to get feedback

    We want to make sure we are capturing the right level of detail

    Jaspal presented the Governance and Implementation document to theCTO Council

    0032

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    25/185

    ITSO 2 of 7 Revision: 7/20/207-CCAC Minutes Mar-22-2011

    CCAC Meeting MinutesDate: 3/22/2011Time: 9:00 10:30 AMLocation: Phone

    Received mostly positive responses, with 2 exceptions Security Comments: the document is being too restrictive at

    this point for what can go to the cloud

    Check with your local CISOs and ask for feedback Want to achieve a consensus

    Maybe add caveat to the document OPDIVs can bemore restrictive than what we proscribe, but cannot beless restrictive than this document

    NIH Comments: regarded the level of effort/work/moneyrequired to implement

    We acknowledge there is additional work, trying tominimize this to the extent possible, but still need tomake sure we capture enough information

    Working on trying to make sure the right people/SMEsare doing this work

    Funding will continue to be an issue until Congress

    changes appropriations language, but this is amandate, we have to consider Cloud First

    Action Items:

    Nicole will send out the CTO Council comments on the Governanceand Implementation Document

    Committee members need to review the comments and theGovernance Document with their CISOs and other relevant members ofyour organization

    Data Call- Earl Baum, CDC

    Asking each OPDIV for feedback on existing contract vehicles (thatinclude cloud services), the COTR, and POC (both on the vendor sideand on the procurement side)

    Work with your CTO to get this information going

    Looking for both development vehicles and service vehicles, not limited

    to cloud hosting providers If you are able to support other OPDIVs on the contract vehicles, make

    note of that as well

    Action Items:

    Data Call needs to be answered by EOW

    Market Research Briefings withVendors

    - Earl Baum, CDC

    Propos

    Committee agreed on having 2 presentations per call during existing

    CCAC meetings 40 minutes for each presentation 10 minutes for committee business

    Committee reviewed Draft Vendor Questionnaire for IaaS want tomake sure that when vendors provide briefing, it is less marketing andmore services oriented, including their rate cards

    Additional questions were added to the Security portion of theQuestionnaire, including:

    Has the vendor already gone through FedRAMP A&A

    0033

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    26/185

    ITSO 3 of 7 Revision: 7/20/207-CCAC Minutes Mar-22-2011

    CCAC Meeting MinutesDate: 3/22/2011Time: 9:00 10:30 AMLocation: Phone

    and at what level? TIC

    Intrusions, Detections

    Monitoring health and well-being of the systems from

    both SLA and reporting standpoint as well as who hasaccess to those tools/logs and at what level?

    HIPPA

    2 factor authentication under IAM

    Action Items:

    If committee members already have representatives for any of thesevendors, please send contact information to Earl, Jaspal, and Nicole

    Once the updated Vendor Questionnaire is ready, committee needs toreview for completeness

    Then similar questionnaires will be produced for PaaS andSaaS

    Jaspal and Earl will begin scheduling these vendor presentations

    Work Plan and Timeline Overview- Earl Baum, CDC & WorkgroupLeads

    Deliverable A0 Customer Requirements Development Lead: Earl Baum

    Ongoing; tied to EPLC ITI Critical Partner documents

    Deliverable should be complete and pending review EOMMarch

    Customer Requirements documents; RFI; RFQ

    Deliverable E0 Cloud Computing Support Governance

    Lead: Sherry Wilke / Doug Margush

    Meeting this afternoon with Earl to discuss status

    Will tie back to Governance and Implementation document

    May need to push back April 1st

    deadline

    Deliverable B0 Services, Costs, Contracts Ginny Howard, Terry Boyd Lead: not determined

    Should be able to complete by April 1

    Changed to fit SIMs contract (CDC specific)

    Get the draft RFQs to Ginny this week

    RFQ is driven by what the government needs specifically

    Let us know if we are way off base

    Number of contracts will be between 1 and many

    There are questions that have to be asked strategy wise atHHS level and OPDIV level

    What services do we actually want to implement, how do we

    pay for it? TBD

    Deliverable C0 Cloud Support Services

    Lead: Kumar Radhakrishnan

    Earl will follow-up with Kumar and team; begin tying NIH intothis

    Deliverable F0 Solution Implementation

    Lead: Terry Boyd

    Looking at 5/1/2011 for the Transition Plan

    0034

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    27/185

    ITSO 4 of 7 Revision: 7/20/207-CCAC Minutes Mar-22-2011

    CCAC Meeting MinutesDate: 3/22/2011Time: 9:00 10:30 AMLocation: Phone

    As deliverables are developed, theyre being tied into this

    Looking for specific template and guidance information

    Security Jay Burton commented extensively on the draft that went

    to the CTO Council Still reviewing the Critical Partner Documents

    Ties GSA FedRAMP A&A into C&A process

    Action Items:

    Review and comment on draft documents by March 29th

    Wrap Up Next Meeting April 5, 2011 9:00 10:30 AM

    0035

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    28/185

    TSO 5 of 7 Revision: 7/20/201107-CCAC Minutes Mar-22-2011

    Action Item Tracker:

    ID Action Item Description Priority

    Level

    Owner/ Lead Date

    Assigned

    Date

    Due

    Date

    Complete

    Percent

    CompleteProgress Notes

    1CCAC Minutes Need to get minutes out on time for review;

    need to approve minutes as first order of

    business in future meetings

    High Nicole DElia 1/25/11 3/22/11 100% Complete; this is now a regular part ofthe agenda

    2

    Target Key Business Process

    Model

    All top-level Cloud Service Processes

    Cloud vendor service catalog/rate-sheetmaintenance

    Cloud alternative analysis EPLC extensions - IT Infrastructure

    Critical Partner Role

    CDC 1/25/11 In Progress; Jay Burton will be

    providing the CISO viewpoint;Transition Plan still needs to befinalized; Addressed as far as the

    Alternative Analysis draft document

    (just need review and approval)

    3Target Service ComponentArchitecture

    HHS Federated Data Architecture HHS Federated SOA Catalog

    HHS EA 1/25/11 In Progress timeline will be out byMar 4; will be reaching out to NIH as

    soon as Transition Plan is finalized

    4 Target Technical Architecture Depends on input from the previous steps Unassigned 1/25/11 Not Started Dependent on Item 3

    5

    Transition Recommendation &Blueprint Document

    Depends on input from the previous steps;in holding pattern

    Will need to divide the work up

    Sequence Diagram and Milestones should

    be complete within 90 days, to feed intoOMB 120-day guidance

    CDC TerryBoyd

    1/25/11 In Progress/Holding Pattern initialdrafts are being started, still need a lot

    of information

    6

    Guidance Development Target Key Business Process Model

    Assigning who owns each process

    Define target business processes and their

    performance including organizationalrelationships

    Define target data relationships andbusiness data stewards

    Define the target information services

    Ensure target business and informationarchitecture addresses strategic

    improvement opportunities

    CDC? 1/25/11 In Progress ties back to Item 2

    7

    Defined IT Infrastructure POC Defined individual/group specific to IT

    infrastructure within each OPDIV whohandles the alternative analysis; tie to existing

    Committee

    members needto talk to CTOs

    1/25/11 Around

    2/1/11

    In Progress: Need to have POC for

    each OPDIV for coordinationpurposes; dont need to necessarily

    0036

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    29/185

    TSO 6 of 7 Revision: 7/20/201107-CCAC Minutes Mar-22-2011

    ID Action Item Description PriorityLevel

    Owner/ Lead DateAssigned

    DateDue

    DateComplete

    PercentComplete

    Progress Notes

    EPLC process as well (recommended for

    HHS wide) identify consistent POC withineach OPDIV

    & CIOs provide name to the CCAC

    8RequirementsDefinition/Gathering

    Timeline for system; tie into EPLCdocumentation Draft of this is in the

    Governance Document

    CDC? 1/25/11 Around2/1/11

    In Progress

    9Document Templates for

    Alternative Analysis

    CDC? 1/25/11 Around

    2/1/11

    In Progress: Draft is complete

    pending review

    10Data call for existing contractvehicles and vendors within the

    OPDIVs

    Data call went out (2/28/2011) High KumarRadhakrishnan

    1/25/11 3/25/11 20% In Progress: As information comesback, will compile spreadsheet

    11HHS Cloud ComputingImplementation and Governance

    Draft v0.1

    Read Alternative Analysis first draft andprovide

    input/comments/questions/errors/omissions

    Medium 2/8/11 2/22/11 100% Complete: See Item 16

    12

    Workgroup Timeline and Work

    Plan

    Draft timeline, work assignments for each

    team; include any information needed fromother workgroups

    Look for any gaps in informationBe prepared to talk about your work plans

    High Workgroup

    Leads

    2/8/11 2/22/11 0% In Progress: See Item 18

    13

    Feedback from CIO Council Provide feedback from the CIO Council,

    updates on the document; submission to OMB

    on February 11th

    Medium Jaspal

    Sagoo/Earl

    Baum

    2/8/11 2/22/11 3/1/11 100% Complete

    14

    Market Vendor Question

    Template

    Starter template of questions for vendors

    when they brief the CCAC

    Medium Kumar

    Radhakrishnan

    3/1/11 75% In Progress awaiting additional

    feedback from Earl & committee

    members; then similar questionnaires

    will be developed for PaaS and SaaS

    15

    CCAC Published Documents

    Tracker

    Create tracker to log comments, feedback, and

    approval for each OPDIV for CCACdocuments

    High Nicole DElia 3/1/11 3/4/11 3/8/11 100% Complete and posted to SharePoint

    16HHS Cloud ComputingImplementation and GovernanceDraft v0.2.1

    Read Alternative Analysis draft and provideinput/comments/questions/errors/omissions

    High CommitteeMembers

    3/1/11 3/4/11 3/7/11 75% In Progress

    17 HHS Cloud Computing RFIDraft v0.1.2

    Read RFI draft and provideinput/comments/questions/errors/omissions

    High CommitteeMembers

    3/1/11 3/4/11 3/7/11 100% Complete: See Item 19

    18Confirm Workgroup Timelines Send email to Earl Baum to confirm the

    timeline for each workgroup

    High Earl Baum 3/1/11 In Progress

    0037

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    30/185

    TSO 7 of 7 Revision: 7/20/201107-CCAC Minutes Mar-22-2011

    ID Action Item Description PriorityLevel

    Owner/ Lead DateAssigned

    DateDue

    DateComplete

    PercentComplete

    Progress Notes

    19HHS Cloud Computing RFI

    Draft v0.1.3

    Read RFI draft and provide

    input/comments/feedback

    High Committee

    Members

    3/22/11 3/29/11

    20RACI Document Draft v 9 Read RACI drafts and provide

    input/comments/feedbackHigh Committee

    Members3/22/11 3/29/11

    21Role of an IT Infrastructure

    Critical Partner v0.9.8

    Read Critical Partner draft and provide

    input/comments/feedback

    High Committee

    Members

    3/22/11 3/29/11

    22CTO Council Comments on theImplementation and Governance

    Document

    Review these comments and theImplementation and Governance document

    with your CISOs

    High CommitteeMembers

    3/22/11 3/31/11

    23Vendor Contact Information Send contact information for any vendor

    representatives that you are already working

    with

    High CommitteeMembers

    3/22/11

    24Set up Market VendorPresentations

    Begin scheduling these vendor presentations Medium Jaspal Sagoo/Earl Baum

    3/22/11

    0038

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    31/185

    ITSO 1 of 6 Revision: 7/20/208-CCAC Minutes Apr-05-2011

    CCAC Meeting MinutesDate: 4/05/2011Time: 9:00 10:30 AMLocation: Phone

    Attendees: OFFICE MEMBER PRESENT OFFICE MEMBER PRESENT

    ACF David Jenkins NIH Steve Bailey X

    ACF James Fu NIH Adriane Burton

    ACF Jim Tyson NIH Darrick Akiyama X

    AHRQ Tim Erny NIH Debbie Bucci X

    AoA Sue Banning OCIO Timothy Mitchell

    CDC Jaspal Sagoo X PSC Dwayne Rollins

    CDC Terry Boyd PSC/CTR Ali Bilgrami

    CDC Earl W. Baum X SAMHSA James R. Walters

    CMS Sherry Wilke X EA/OCIO/CTR Kumar

    Radhakrishnan

    X

    CMS Doug C. Margush X EA/OCIO/CTR Brian Leitao

    CMS Daniel Lazenby EA/OCIO/CTR Robert Patt-Corner

    X

    CMS Don Bartley X CDC Michelle Hines

    FDA Michael Coene X CDC Jay Burton

    IHS Bernie Dailleboust CDC Charles Martin X

    IHS Mark Rives CDC Ginny Howard X

    Facilitator: Nicole DElia, EA/OCIO/CTR

    Recorder: Nicole DElia, EA/OCIO/CTR

    Agenda & NotesTopic/Time/Lead Notes

    Welcome/Opening Remarks- Chair Jaspal Sagoo, CDC ChiefTechnology Officer (CTO)

    Approval of 3-22-2011 Minutes

    - Jaspal Sagoo, CDC

    Action Items:

    Review the minutes from 3-22-2011 so we can approve them at thenext meeting If there are any errors/omissions please let Nicole know

    Alternative Analysis and SupportingProcesses Update

    - Jaspal Sagoo, CDC

    We are on a fast track to get the documents we have created approved Want to get all of the committee members comments consolidated

    On April 11th, the documents will be sent out to the CTO Council so that

    they can vote on the documents at the meeting on the 19th

    HHS Cloud Computing Information System Questionnaire v0.2.0 Let us know if there are still any areas that need to be captured This is going to be a living document

    HHS Cloud Computing RFI Draft v0.1.3 This is a key artifact we have to have complete so that the

    Alternative Analysis can be completed We have refined a lot of the language in this document

    0039

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    32/185

    ITSO 2 of 6 Revision: 7/20/208-CCAC Minutes Apr-05-2011

    CCAC Meeting MinutesDate: 4/05/2011Time: 9:00 10:30 AMLocation: Phone

    Pass this along to your procurement staff for them to review, ifyou have time

    ITI CP RACI Draft v0.9.1

    This document was designed to enumerate who hasresponsibility for what Added a column for accountability

    Role of an IT infrastructure Architecture Critical Partner v0.9.8 Dont expect a lot of changes to this document, but we are still

    adding members to this workgroup

    Once the CTO Council approves these documents, they will be passedalong to the CIO Council for approval the following week

    Action Items:

    Committee members need to review the following documents andprovide comments and feedback by Friday April 8

    th:

    HHS Cloud Computing Information System Questionnairev0.2.0

    HHS Cloud Computing RFI Draft v0.1.3 ITI CP RACI Draft v0.9.1 Role of an IT infrastructure Architecture Critical Partner v0.9.8

    Governance Processes Update

    - Doug Margush, CMS

    Weve gone through a rough draft , and are working on refining beforesending out to the group

    The document that was sent to Jaspal and Earl seems to be on target

    Missed the 4/1/2011 deadline, but looks like it will be ready to send tothe group before next Tuesday (4/12)

    SOA and Data Architecture Update

    - Kumar Radhakrisnan,OCIO/EA/CTR

    Working through scheduling issues in order to discuss more in depthwith NIH

    Should be beginning to nail stuff down over the next week or so

    Data Call- Jaspal Sagoo, CDC

    Once we have a complete list, need to send RFI out to the procurement

    vehicles Asking each OPDIV for feedback on existing contract vehicles (that

    include cloud services), the COTR, and POC (both on the vendor sideand on the procurement side)

    Work with your CTO to get this information going

    Looking for both development vehicles and service vehicles, not limitedto cloud hosting providers

    Action Items:

    Will be contacting those OPDIVs who have not yet responded to theData Call

    Vendor RFIs and Analysis

    - Jaspal Sagoo, CDC

    The workload for this is going to be quite large

    Going to try to stand up a permanent governance council to maintain

    this data Will bring up a permanent governing body again at the CTO

    Council meeting Rates and services are in constant flux Our information/baseline data may become stale after a month

    or two

    Baseline will have to be tackled by this committee, to capture existingcontract vehicles

    Need to address the number one concern of the CIO Council preventvendor sprawl, want defined boundary of approved vendors

    Even getting this baseline is proving to be a large project

    0040

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    33/185

    ITSO 3 of 6 Revision: 7/20/208-CCAC Minutes Apr-05-2011

    CCAC Meeting MinutesDate: 4/05/2011Time: 9:00 10:30 AMLocation: Phone

    Need some volunteers (2 or 3) to channel this along Coordinate and start working on matrix of vendors and rate

    cards

    Critical part of the Alternative Analysis IT community needsthis information Send your name to Nicole, if you would like to volunteer If no one volunteers, a lead will be chosen

    Once the RFI is ratified, it can be sent to contract offices, who canforward it on to their vendors

    CDC sent out a preliminary RFI, which is due back by 4/8, as a litmustest

    Will make sure that the RFI is updated based on this litmus test

    Action Items:

    If you would like to volunteer to be the lead on the RFI analysis, pleasesend an email to Nicole, Jaspal, and Earl

    RFI will be updated after CDC litmus test RFI is analyzed

    Work Plan and Timeline Overview- Earl Baum, CDC

    Looking to tie SOA and Data Architecture into the transition plan byMay

    Final transition plan will lag by about a month compared to the otherdeliverables

    Built some flexibility into this

    How do we assure we get input from every OPDIVs EA/PMO?

    Will develop something to send out to the OPDIVs EA, andCPIC offices

    Maybe make an announcement to the EA Community

    This should be a consideration in the Data Architecture

    Action Items:

    Reach out to OPDIV EA and CPIC offices regarding the DataArchitecture

    Wrap Up Next Meeting April 19, 2011 9:00 10:30 AM

    0041

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    34/185

    TSO 4 of 6 Revision: 7/20/201108-CCAC Minutes Apr-05-2011

    Action Item Tracker:

    ID Action Item Description Priority

    Level

    Owner/ Lead Date

    Assigned

    Date

    Due

    Date

    Complete

    Percent

    CompleteProgress Notes

    1CCAC Minutes Need to get minutes out on time for review;

    need to approve minutes as first order of

    business in future meetings

    High Nicole DElia 1/25/11 3/22/11 100% Complete; this is now a regular part ofthe agenda

    2

    Target Key Business Process

    Model

    All top-level Cloud Service Processes

    Cloud vendor service catalog/rate-sheetmaintenance

    Cloud alternative analysis EPLC extensions - IT Infrastructure

    Critical Partner Role

    CDC 1/25/11 In Progress; Jay Burton will be

    providing the CISO viewpoint;Transition Plan still needs to befinalized; Addressed as far as the

    Alternative Analysis draft document

    (just need review and approval)

    3Target Service ComponentArchitecture

    HHS Federated Data Architecture HHS Federated SOA Catalog

    HHS EA 1/25/11 In Progress timeline will be out byMar 4; will be reaching out to NIH as

    soon as Transition Plan is finalized

    4 Target Technical Architecture Depends on input from the previous steps Unassigned 1/25/11 Not Started Dependent on Item 3

    5

    Transition Recommendation &Blueprint Document

    Depends on input from the previous steps;in holding pattern

    Will need to divide the work up

    Sequence Diagram and Milestones should

    be complete within 90 days, to feed intoOMB 120-day guidance

    CDC TerryBoyd

    1/25/11 In Progress/Holding Pattern initialdrafts are being started, still need a lot

    of information

    6

    Guidance Development Target Key Business Process Model

    Assigning who owns each process

    Define target business processes and their

    performance including organizationalrelationships

    Define target data relationships andbusiness data stewards

    Define the target information services

    Ensure target business and informationarchitecture addresses strategic

    improvement opportunities

    CDC? 1/25/11 In Progress ties back to Item 2

    7

    Defined IT Infrastructure POC Defined individual/group specific to IT

    infrastructure within each OPDIV whohandles the alternative analysis; tie to existing

    Committee

    members needto talk to CTOs

    1/25/11 Around

    2/1/11

    In Progress: Need to have POC for

    each OPDIV for coordinationpurposes; dont need to necessarily

    0042

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    35/185

    TSO 5 of 6 Revision: 7/20/201108-CCAC Minutes Apr-05-2011

    ID Action Item Description PriorityLevel

    Owner/ Lead DateAssigned

    DateDue

    DateComplete

    PercentComplete

    Progress Notes

    EPLC process as well (recommended for

    HHS wide) identify consistent POC withineach OPDIV

    & CIOs provide name to the CCAC

    8RequirementsDefinition/Gathering

    Timeline for system; tie into EPLCdocumentation Draft of this is in the

    Governance Document

    CDC? 1/25/11 Around2/1/11

    In Progress

    9Document Templates for

    Alternative Analysis

    CDC? 1/25/11 Around

    2/1/11

    In Progress: Draft is complete

    pending review

    10Data call for existing contractvehicles and vendors within the

    OPDIVs

    Data call went out (2/28/2011) High KumarRadhakrishnan

    1/25/11 3/25/11 75% In Progress: As information comesback, will compile spreadsheet

    11HHS Cloud ComputingImplementation and Governance

    Draft v0.1

    Read Alternative Analysis first draft andprovide

    input/comments/questions/errors/omissions

    Medium 2/8/11 2/22/11 100% Complete: See Item 16

    12

    Workgroup Timeline and Work

    Plan

    Draft timeline, work assignments for each

    team; include any information needed fromother workgroups

    Look for any gaps in informationBe prepared to talk about your work plans

    High Workgroup

    Leads

    2/8/11 2/22/11 0% In Progress: See Item 18

    13

    Feedback from CIO Council Provide feedback from the CIO Council,

    updates on the document; submission to OMB

    on February 11th

    Medium Jaspal

    Sagoo/Earl

    Baum

    2/8/11 2/22/11 3/1/11 100% Complete

    14

    Market Vendor Question

    Template

    Starter template of questions for vendors

    when they brief the CCAC

    Medium Kumar

    Radhakrishnan

    3/1/11 75% In Progress awaiting additional

    feedback from Earl & committee

    members; then similar questionnaires

    will be developed for PaaS and SaaS

    15

    CCAC Published Documents

    Tracker

    Create tracker to log comments, feedback, and

    approval for each OPDIV for CCACdocuments

    High Nicole DElia 3/1/11 3/4/11 3/8/11 100% Complete and posted to SharePoint

    16HHS Cloud ComputingImplementation and GovernanceDraft v0.2.1

    Read Alternative Analysis draft and provideinput/comments/questions/errors/omissions

    High CommitteeMembers

    3/1/11 3/4/11 3/7/11 75% In Progress

    17 HHS Cloud Computing RFIDraft v0.1.2

    Read RFI draft and provideinput/comments/questions/errors/omissions

    High CommitteeMembers

    3/1/11 3/4/11 3/7/11 100% Complete: See Item 19

    18Confirm Workgroup Timelines Send email to Earl Baum to confirm the

    timeline for each workgroup

    High Earl Baum 3/1/11 In Progress

    0043

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    36/185

    TSO 6 of 6 Revision: 7/20/201108-CCAC Minutes Apr-05-2011

    ID Action Item Description PriorityLevel

    Owner/ Lead DateAssigned

    DateDue

    DateComplete

    PercentComplete

    Progress Notes

    19HHS Cloud Computing RFI

    Draft v0.1.3

    Read RFI draft and provide

    input/comments/feedback

    High Committee

    Members

    3/22/11 3/29/11 3/29/11 100% Updates were made to the Document

    Comment Tracker on SharePoint

    20RACI Document Draft v 9 Read RACI drafts and provide

    input/comments/feedbackHigh Committee

    Members3/22/11 3/29/11 3/29/11 100% Updates were made to the Document

    Comment Tracker on SharePoint

    21Role of an IT Infrastructure

    Critical Partner v0.9.8

    Read Critical Partner draft and provide

    input/comments/feedback

    High Committee

    Members

    3/22/11 3/29/11 3/29/11 100% Updates were made to the Document

    Comment Tracker on SharePoint

    22CTO Council Comments on theImplementation and Governance

    Document

    Review these comments and theImplementation and Governance document

    with your CISOs

    High CommitteeMembers

    3/22/11 3/31/11 In progress; updates were made to theDocument Comment Tracker on

    SharePoint

    23Vendor Contact Information Send contact information for any vendor

    representatives that you are already working

    with

    High CommitteeMembers

    3/22/11

    24Set up Market VendorPresentations

    Begin scheduling these vendor presentations Medium Jaspal Sagoo/Earl Baum

    3/22/11

    25HHS Cloud ComputingInformation System

    Questionnaire v0.2.0Read Questionnaire and provideinput/comments/feedback

    High CommitteeMembers

    4/4/11 4/8/11

    26HHS Cloud Computing RFI

    Draft v0.1.3 Read RFI draft and provideinput/comments/feedback High CommitteeMembers 4/4/11 4/8/1127

    ITI CP RACI Draft v0.9.1 Read RACI drafts and provide

    input/comments/feedback

    High Committee

    Members

    4/4/11 4/8/11

    28

    Role of an IT infrastructure

    Architecture Critical Partner

    v0.9.8Read Critical Partner draft and provide

    input/comments/feedback

    High Committee

    Members

    4/4/11 4/8/11

    293-22-2011 Meeting Minutes Review meeting minutes and provide errors

    and omissions to NicoleHigh Nicole DElia 4/5/11 4/19/11

    30

    Vendor RFI Analysis Need two or three committee member to

    volunteer to be the lead on creating baseline

    matrix of vendors, services, and rate cards

    High Jaspal Sagoo 4/5/11

    0044

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    37/185

    ITSO 1 of 8 Revision: 7/20/209-CCAC Minutes Apr-19-2011

    CCAC Meeting MinutesDate: 4/19/2011Time: 9:00 10:30 AMLocation: 502H Humphrey, Phone

    Attendees: OFFICE MEMBER PRESENT OFFICE MEMBER PRESENT

    ACF David Jenkins NIH Darrick Akiyama X

    ACF Gary Cochran Present NIH Debbie Bucci Present

    ACF James Fu Present NIH Steve Thornton X

    ACF Jim Tyson OCIO Mary Forbes X

    AHRQ Tim Erny X OCIO Timothy Mitchell X

    AoA Sue Banning X PSC Dwayne Rollins X

    CDC Jaspal Sagoo Present PSC/CTR Ali Bilgrami X

    CDC Terry Boyd PSC/CTR DeniseUnderwood

    X

    CDC Earl W. Baum X PSC Ellen Vizzini X

    CMS Sherry Wilke X SAMHSA James R. Walters X

    CMS Doug C. Margush X HHS/ASPA Richard Stapleton

    CMS Daniel Lazenby HHS/ASPA Craig Lafond X

    CMS Don Bartley EA/OCIO/CTR KumarRadhakrishnan

    Present

    CMS Bryce Golwalla EA/OCIO/CTR Robert Patt-Corner

    Present

    FDA Michael Coene X EA/OCIO/CTR Brian Leitao X

    IHS Bernie Dailleboust CDC Michelle Hines XIHS Mark Rives CDC Jay Burton X

    NIH Steve Bailey X CDC Charles Martin X

    NIH Adriane Burton X CDC Ginny Howard X

    Facilitator: Nicole DElia, EA/OCIO/CTR

    Recorder: Nicole DElia, EA/OCIO/CTR

    Agenda & NotesTopic/Time/Lead Notes

    Welcome/Opening Remarks- Chair Jaspal Sagoo, CDC ChiefTechnology Officer (CTO)

    Approval of 3-22-2011 and 4-05-2011Minutes

    - Jaspal Sagoo, CDC

    Minutes were approved for the March 22nd and April 5th meetings.

    Action Items:

    Email Nicole if you have any questions/comments/errors/omissions forthe minutes

    Alternative Analysis and SupportingProcesses / CTO Council Update

    Going to try to get these four documents approved by the CTO Councillater today:

    0045

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    38/185

    ITSO 2 of 8 Revision: 7/20/209-CCAC Minutes Apr-19-2011

    CCAC Meeting MinutesDate: 4/19/2011Time: 9:00 10:30 AMLocation: 502H Humphrey, Phone

    - Jaspal Sagoo, CDC HHS Cloud Computing Information System Questionnaire v1.0 HHS Cloud Computing RFI v1.0 ITI CP RACI Draft v1.0

    Role of an IT infrastructure Architecture Critical Partner v1.0 They will be living documents, but we need to freeze them in time for

    now with the understanding that we will make additional updates asnecessary based on continued feedback and comments

    Process for amending approved documents will be discussedat todays CTO Council meeting.

    Programs are waiting for the Alternatives Analysis and Guidance

    Governance document comments (this document was alreadyapproved by the CTO Council)

    We are addressing a mandate up to the individualorganization to determine whether to use cloud, based oncriteria and the EPLC process

    We have tidied up some security language FedRAMP simplifies the A&A/C&A, does not replace it

    Role of an IT infrastructure Architecture Critical Partner v1.0 This critical partner is very narrowly defined Will be reviewing with CPIC staff to incorporate other existing

    critical partners into this documentation James Walters (SAMHSA) who will fill this role for the smaller

    OPDIVs that are supported by the ITIO? In general whichever organization supports your IT should be

    taking on this role As more programs adopt the EPLC, more stage gates Required to do the Alternatives Analysis burden will fall on

    the IT Critical Partner, but should already be gathering most ofthis information

    Trying to develop a more streamlined process If a small OPDIV does a program outside of ITIO, then there is

    a void only certain programs have followed to EPLC processso far.

    We are developing a workflow with swim lanes on how to conduct theAlternative Analysis, which will show roles

    Should be ready for distribution in 1-2 weeks

    HHS Cloud Computing Information System Questionnaire v1.0 Purpose is to be incorporated in the EPLC process, adding

    cloud computing questions

    Cloud Alternatives Analysis will be wrapped into the Critical Partner role(IT Infrastructure CP)

    There are two Alternatives Analysis processes: CPIC AlternativesAnalysis and now Cloud Alternatives Analysis (triggered first)

    Will be changes to the EPLC process going forward Need to meet with the EPLC group

    Action Items:

    No Action Items

    Governance Processes Update

    - Doug Margush, CMS

    We have a draft for the Governance Process

    It is now posted on SharePoint for the committee to view and providecomments (in the Documents for Review folder)

    The governance process will be too much work for this body, but iscritical to the implementation of cloud going forward

    0046

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    39/185

    ITSO 3 of 8 Revision: 7/20/209-CCAC Minutes Apr-19-2011

    CCAC Meeting MinutesDate: 4/19/2011Time: 9:00 10:30 AMLocation: 502H Humphrey, Phone

    Action Items:

    Please review the Governance Process draft and provide commentsand feedback before May 3rd

    SOA and Data Architecture Update

    - Kumar Radhakrisnan,OCIO/EA/CTR

    Working on pulling necessary documents together Have been simultaneously working on the HHS Cloud Computing

    Strategy, trying to divide up time equally

    Will be going through documents from NIH

    Will provide an update by the end of the week

    Action Items:

    No Action Items

    Data Call- Jaspal Sagoo, CDC

    Data Call is almost complete

    Still waiting on HRSA and ACF

    Once the RFI is ratified, will reach out to these vendors and contractingoffices

    Action Items:

    Please respond to the Data Call if your OPDIV has not already done so

    Vendor RFIs and Analysis

    - Group 1: Michael Coene, FDA;Bernie Dailleboust & Mark Rives, IHS

    - Group 2: David Jenkins, James Fu,& Jim Tyson, ACF; Tim Erny, AHRQ;Sue Banning, AoA

    Were developing the tasks for the two groups now

    Will take the RFI to contract vehicles, work with the contract officers

    Reach out to vendors; they may come back asking additional clarifyingquestions

    End result should be a fairly clear, vetted list of vendors

    Required to have completed FedRAMP and submit rate cards forstandard services

    Will still have to go through new procurement cycle

    Cannot exclude a vendor if they did not answer the RFI, if already havea contract with them

    Can get around this issue by issuing a BPA, but this path could limit

    options going forward Similar vendors may be on multiple contract vehicles

    Need to consider what meets the requirements as well as whats thepath of least resistance.

    Action Items:

    Set up a conference call for the two workgroups

    Review initial RFI analysis from CIMS responses

    Work Plan and Timeline Overview- Earl Baum, CDC

    Still looking at completing all outstanding draft documents by the end ofMay

    Looks like there is sufficient governance to at least generate keymilestones

    High level architecture to map out long-term Transition Plan

    Still in the May timeframe

    Once everything else is complete, 30 days later the Transition Planshould be complete

    Need to circle back to the HHS Cloud Computing Strategy

    Nothing has really been done yet on the CCAC side

    Shared Services and Cloud Computing Architecture is coming out fromScott Bernard (OMB) probably around June or July

    Will probably be akin to the LOB work that has been done in

    0047

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    40/185

    ITSO 4 of 8 Revision: 7/20/209-CCAC Minutes Apr-19-2011

    CCAC Meeting MinutesDate: 4/19/2011Time: 9:00 10:30 AMLocation: 502H Humphrey, Phone

    the past

    We are at a more detail level here

    Action Items:

    No Action Items

    Wrap Up Next Meeting May 3, 2011 9:00 10:30 AM

    Action Items:

    Please let Nicole know if you are having any issues accessing thedocuments on SharePoint

    Review the Action Item Tracker at the end of the minutes for accuracyand completeness

    0048

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    41/185

    TSO 5 of 8 Revision: 7/20/201109-CCAC Minutes Apr-19-2011

    Action Item Tracker:

    ID Action Item Description Priority

    Level

    Owner/ Lead Date

    Assigned

    Date

    Due

    Date

    Complete

    Percent

    CompleteProgress Notes

    2

    Target Key Business ProcessModel

    All top-level Cloud Service Processes

    Cloud vendor service catalog/rate-sheet

    maintenance

    Cloud alternative analysis EPLC extensions - IT Infrastructure

    Critical Partner Role

    CDC 1/25/11 In Progress; Jay Burton will beproviding the CISO viewpoint;

    Transition Plan still needs to befinalized; Addressed as far as the

    Alternative Analysis draft document

    (just need review and approval)

    3

    Target Service Component

    Architecture

    HHS Federated Data Architecture

    HHS Federated SOA Catalog

    HHS EA 1/25/11 In Progress timeline will be out by

    Mar 4; will be reaching out to NIH assoon as Transition Plan is finalized

    4 Target Technical Architecture Depends on input from the previous steps Unassigned 1/25/11 Not Started Dependent on Item 3

    5

    Transition Recommendation &

    Blueprint Document Depends on input from the previous steps;

    in holding pattern Will need to divide the work up

    Sequence Diagram and Milestones shouldbe complete within 90 days, to feed into

    OMB 120-day guidance

    CDC Terry

    Boyd

    1/25/11 In Progress/Holding Pattern initial

    drafts are being started, still need a lotof information

    6

    Guidance Development Target Key Business Process Model

    Assigning who owns each process Define target business processes and their

    performance including organizationalrelationships

    Define target data relationships and

    business data stewards Define the target information services

    Ensure target business and informationarchitecture addresses strategic

    improvement opportunities

    CDC? 1/25/11 In Progress ties back to Item 2

    7

    Defined IT Infrastructure POC Defined individual/group specific to ITinfrastructure within each OPDIV who

    handles the alternative analysis; tie to existingEPLC process as well (recommended for

    HHS wide) identify consistent POC within

    each OPDIV

    Committeemembers need

    to talk to CTOs& CIOs

    1/25/11 Around2/1/11

    In Progress: Need to have POC foreach OPDIV for coordination

    purposes; dont need to necessarilyprovide name to the CCAC

    0049

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    42/185

    TSO 6 of 8 Revision: 7/20/201109-CCAC Minutes Apr-19-2011

    ID Action Item Description PriorityLevel

    Owner/ Lead DateAssigned

    DateDue

    DateComplete

    PercentComplete

    Progress Notes

    8

    Requirements

    Definition/Gathering

    Timeline for system; tie into EPLC

    documentation Draft of this is in theGovernance Document

    CDC? 1/25/11 Around

    2/1/11

    In Progress

    10Data call for existing contractvehicles and vendors within the

    OPDIVs

    Data call went out (2/28/2011) High Nicole DElia 1/25/11 3/25/11 75% In Progress: As information comesback, will compile spreadsheet

    12

    Workgroup Timeline and Work

    Plan

    Draft timeline, work assignments for each

    team; include any information needed fromother workgroups

    Look for any gaps in informationBe prepared to talk about your work plans

    High Workgroup

    Leads

    2/8/11 2/22/11 0% In Progress: See Item 18

    14

    Market Vendor QuestionTemplate

    Starter template of questions for vendorswhen they brief the CCAC

    Medium KumarRadhakrishnan

    3/1/11 75% In Progress awaiting additionalfeedback from Earl & committee

    members; then similar questionnaireswill be developed for PaaS and SaaS

    18Confirm Workgroup Timelines Send email to Earl Baum to confirm the

    timeline for each workgroup

    High Earl Baum 3/1/11 In Progress

    24Set up Market VendorPresentations

    Begin scheduling these vendor presentations Medium Jaspal Sagoo/Earl Baum

    3/22/11 In Progress

    30

    Vendor RFI Analysis Two workgroups will be responsible for

    creating baseline matrix of vendors, services,

    and rate cards

    High RFI Analysis

    Workgroups

    4/5/11 Before

    5/3/11

    Need to set up conference call for the

    workgroups to discuss tasks that need

    to be completed

    31

    Governance Process Draft Review Governance Process Draft and

    provide

    input/comments/questions/errors/omissions

    High Committee

    Members

    4/19/11 5/3/11

    32RFI Analysis from CIMSContract Responses

    Review the analysis on the CIMS contractvendor responses to the RFI document

    High CommitteeMembers

    4/19/11 5/3/11

    33

    Action Item Tracker Review Action Item Tracker at end of minutes

    for accuracy and completeness; send

    updates/corrections to Nicole

    High Nicole DElia 4/19/11 5/3/11

    0050

  • 8/6/2019 Responsive Document CREW: HHS: Regarding Record Management and Cloud Computing (6/24/2011 FOIA Reques

    43/185

    TSO 7 of 8 Revision: 7/20/201109-CCAC Minutes Apr-19-2011

    CompletedAction Items:

    ID Action Item Description Priority

    Level

    Owner/ Lead Date

    Assigned

    Date

    Due

    Date

    Complete

    Percent

    CompleteProgress Notes

    1

    CCAC Minutes Need to get minutes out on time for review;

    need to approve minutes as first order ofbusiness in future meetings

    High Nicole DElia 1/25/11 3/22/11 100% Complete; this is now a regular part of

    the agenda

    9Document Templates for

    Alternative Analysis

    CDC? 1/25/11 Around

    2/1/11

    100% Complete

    11HHS Cloud ComputingImplementation and Governance

    Draft v0.1

    Read Alternative Analysis first draft andprovide

    input/comments/questions/errors/omissions

    Medium 2/8/11 2/22/11 100% Complete: See Item 16

    13

    Feedback from CIO Council Provide feedback from the CIO Council,

    updates on the document; submission to OMBon February 11th

    Medium Jaspal

    Sagoo/EarlBaum

    2/8/11 2/22/11 3/1/11 100% Complete

    15

    CCAC Published Documents

    Tracker

    Create tracker to log comments, feedback, and

    approval for each OPDIV for CCACdocuments

    High Nicole DE