RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 1 of 47
1. SCOPE
This document defines the process and data return requirements for contractors modifying, adding or disposing of SPEN operational network assets.
2. ISSUE RECORD
This is a Controlled document. The current version of Controlled and Reference documents is held on the EN Document library. It is your responsibility to ensure you work to the current version.
Issue Date Issue No. Author Amendment Details
1 Craig Arthur Original document
30th May 2012 2 G Coogan Complete Review of Document
1st August 2015 3 S Stevenson Changes to reflect new OHL contract
data requirements and sketch templates
3. ISSUE AUTHORITY
Author Owner Issue Authority
Name: S Stevenson Title: Head of Asset Data, RPR Project
Name: Paul Parry Title: Process and Systems Manager
Name: Scott Mathieson Title: Network Planning and Regulation Director
Date: 20/08/2015
4. REVIEW
This is a Controlled document and shall be reviewed as dictated by business / legislative change but at a period of no greater than three years from the last issue date.
5. DISTRIBUTION
This document is not part of a Manual maintained by Document control and does not have a maintained distribution list, but is published on the SPEN internet site.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 2 of 47
6. CONTENTS
1. SCOPE ....................................................................................................................................... 1
2. ISSUE RECORD ........................................................................................................................ 1
3. ISSUE AUTHORITY .................................................................................................................. 1
4. REVIEW ..................................................................................................................................... 1
5. DISTRIBUTION .......................................................................................................................... 1
6. CONTENTS ............................................................................................................................... 2
7. RELATED DOCUMENTS .......................................................................................................... 4
8. DEFINITIONS AND ABBREVIATIONS ..................................................................................... 4
9. GENERAL .................................................................................................................................. 5
10. CONTACT DETAILS FOR DATA SUBMISSION...................................................................... 7
11. GENERAL RECORDING OF COMPANY OWNED ASSETS ................................................... 8
12. DATA FORMAT FOR OHL, POLES & TOWERS ................................................................... 10
12.1 General ..................................................................................................................... 10
12.2 Patrol Number (for distribution assets only) ........................................................ 13
12.3 Route Identifier (for Transmission assets only) .................................................. 13
12.4 Pole Classification .................................................................................................. 14
12.5 Spatial Hazards........................................................................................................ 14
13. DATA FORMAT FOR UNDERGROUND ASSETS (ALL VOLTAGES) AND GROUND MOUNTED LV ASSETS ................................................................................................................ 16
13.1 General ..................................................................................................................... 16
13.2 Points to Note when Taking Records. .................................................................. 16
13.3 Mandatory Information: As-Laid Service Cable Route Records ........................ 17
13.4 Mandatory Information: LV Switch points ............................................................ 18
13.5 Mandatory Information: LV switch point classifications .................................... 18
13.6 Mandatory Information: Switching Points ............................................................ 18
13.7 Mandatory Information: Cables ............................................................................. 18
13.8 Mandatory Information: Joints .............................................................................. 19
13.9 Mandatory Information: Ducts ............................................................................... 19
13.10 Mandatory Information: Supply Sensitive Customers ........................................ 19
13.11 Developers Plans .................................................................................................... 19
14. NOTICE OF CONFIGURATION ALTERATIONS TO THE HV NETWORK ........................... 20
15. SUBMISSION OF PLANT DATA SHEETS ............................................................................. 22
16. RECORDING OF HAZARD AND DEFECT INFORMATION .................................................. 22
17. DATA REQUIREMENT MATRIX ............................................................................................. 24
APPENDIX 1: SAP INPUT SHEET – REQUEST FOR A NEW FUNCTIONAL LOCATION ........ 25
APPENDIX 2: 11KV POWER ON PATCH REQUEST FORM ...................................................... 26
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 3 of 47
APPENDIX 3: BEFORE AND AFTER POWER ON DIAGRAMS ................................................. 28
APPENDIX 4: MANDATORY ATTRIBUTES FOR OHL, POLES AND TOWERS ....................... 28
APPENDIX 5: MANDATORY ATTRIBUTES FOR LV SWITCHPOINTS, CABLES AND JOINTS .. ................................................................................................................................................. 30
APPENDIX 6: EXAMPLE OHL SKETCH ...................................................................................... 31
APPENDIX 7: EXAMPLE POLE DATA SHEET ............................................................................ 31
APPENDIX 8 : EXAMPLE POLE SCHEDULE – BLANK ............................................................. 33
APPENDIX 9 : EXAMPLE POLE SCHEDULE – COMPLETED ................................................... 34
APPENDIX 10 – EXAMPLE ACTIVITY SHEET ............................................................................ 35
APPENDIX 11 – EXAMPLE ACTIVITY SHEET AND ACCOMPANYING PLAN ......................... 36
APPENDIX 13: EXAMPLE SKETCH INDICATING ALTERATION TO OPEN POINTS .............. 46
APPENDIX 14: SUBSTATION SWITCH ATTRIBUTES ............................................................... 47
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 4 of 47
7. RELATED DOCUMENTS National Joint Utilities Group – Publication Numbers 4, 5, 6 & 7 Service Level Agreement for Asset Data (BUPR-22-014) EPS-01-009 - Hazard/Defect Management Policy for 33kV,11kV & Low Voltage Overhead Lines EPS-01-002 - Hazard and Defect Management Policy. ASSET-01-021 - Asset Inspection and Condition Assessment Policy 8. DEFINITIONS AND ABBREVIATIONS The following definitions apply throughout this document: Approved Policy and design parameters contained within this document and its
appendices or the written approval of SP Distribution Ltd / SP Manweb plc.
CDM The Construction (Design and Management) Regulations 2007.
CNE Combined neutral and earth (of cable construction).
Customer The recipients of the power supply being a tenant or owner of a domestic dwelling.
Distributors A main electricity cable laid externally in the ground and supplying more than one customer.
External Meter Cupboard A cupboard, supplied by SP Distribution Ltd / SP Manweb plc, positioned external to the property and containing the customer’s point of supply.
Housing Site A development consisting of domestic dwellings.
Incoming Supply Cable An electricity cable connecting the building to the SP Distribution Ltd / SP Manweb plc network.
Link Boxes A device buried in the ground but accessible from street level that enables cables to be isolated by the removal of links.
Mains See distributor definition.
Network Pillars An outdoor cupboard arrangement that enables cables to be isolated by the removal of links / fuses.
NRSWA New Roads and Street Works Act.
PME Protective multiple earthing.
Point of connection The position at which a developer’s network would connect to the existing distribution system.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 5 of 47
Point of Supply The point at which the ownership of the electrical cable network passes from SP Distribution Ltd / SP Manweb plc to the customer.
Service A cable providing supply to an individual house.
Service Position The location in the customer’s property at which the SP Distribution Ltd / SP Manweb plc cable termination (cut-out) is located.
Service Strips A clear route through a housing site containing utility infrastructure.
SP Distribution Ltd The Distribution Licence Holder for the Distribution service area formally known as Scottish Power.
SP Manweb plc The Distribution Licence Holder for the Distribution service area formally known as Manweb.
The Company
A term used throughout this document to refer to SP PowerSystems Ltd, SP Distribution Limited and SP Manweb plc including all associated design and planning practices.
In addition, the following abbreviations apply: ABSW - Air Break Switch BWP - Best Working Practice CSRAS - Connection and Site Responsibility Agreement System DOM - Distribution Operations Manual EGI - Equipment Group Identifier EHV - Extra High Voltage ENID - Energy Networks Identification GIS - Geographical Information System GND - Generic Network Diagram H.V. - High Voltage I.T. - Information Technology L.V. - Low Voltage MPAN - Meter Point Administration Number MPAS - Meter Point Administration System MSC - Medically Sensitive Customer MST - Maintenance Scheduling Task OHL - Overhead Lines O.R. - Operational Restriction PMAR - Pole Mounted Auto Recloser POWERON - Control and Operational Network System PTE - PoleTop Equipment RMU - Ring Main Unit SAP - Systems, Applications and Products in Data Processing SCA - Standard Connection Agreement SSC - Supply Sensitive Customer UMV - Utility Map Viewer UoS - Use of System 9. GENERAL The data and guidance contained within this document remains the property of the Company and may not be used for purposes other than that for which it has been supplied and may not be reproduced either wholly or in part, in any way whatsoever, nor may it be used by, or its contents divulged to, any other person whosoever, without the prior written permission of the Company.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 6 of 47
The Company reserves the right to change the data contained within this document without notification. Although detailed requirements are covered in this document there may be circumstances where the Company reserve the right to apply other criteria where necessary. The Company accepts no responsibility for any inaccuracies in, or omissions from the document. It is the Contractor’s responsibility to ensure they have an up to date version of this document. The data and guidance contained within this document details the recording of the electrical asset only and does not embrace the physical construction of the network or the associated safety, environmental and legal requirements. The Contractor is responsible for ensuring they have gathered all relevant information to accurately record the asset. Only Contractors possessing the appropriate skills, training and experience shall use the guidance contained within this document.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 7 of 47
10. CONTACT DETAILS FOR DATA SUBMISSION
License area of SCOTLAND
E-mail [email protected]
Telephone External 0131 472 4920 Internal 776 4920
Mobile 07753 624652
Address Network Data Bureau, Energy Networks, 55 Fullarton Drive, Cambuslang, G32 8FA
License area of ENGLAND & WALES
E-mail [email protected]
Telephone External 0151 609 2102 Internal 744 5664
Address Network Data Bureau, Energy Networks, Prenton Way, North Cheshire Trading Estate, Prenton, CH43 3ET.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 8 of 47
11. GENERAL RECORDING OF COMPANY OWNED ASSETS The Company’s Asset I.T. Systems require timely and accurate data submission and input to ensure that the company complies with safety, statutory and legislative requirements. Data requirements and submission times are largely dependent on the type of asset to be created or deleted. The following section relates to all ENGIS owned asset types that must be recorded by the Company (refer to Figure 1):
Overhead lines – LV, HV and EHV
Poles, Towers
Cables and Joints – LV, HV, EHV
LV Switchpoints
Figure 1
Corporate Asset I.T. Systems
Field staff forward changes to Cables, Joints, Poles,
Towers & LV Switchgear to Data Management
Data Management
SAP
ESRI
POWERON
Input ESRI Owned Asset Information.
Field Staff
as per service level agreements.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 9 of 47
In general, Network Data will receive as-laid/built records for the above asset types in the form of a drawing supported by actual measurements. A competent person should generate these drawings. The drawing will be on a UMV plot using the contractor sketch template option, an AutoCAD generated drawing, an asset update record sheet or an electronic submittal form from a mobile device. The drawing must show the position of the new assets in relation to fixed features, such as kerb lines and building lines. All other asset information to be recorded should be neatly shown on the drawing or attached to the drawing on a standard pro-forma for that asset type. High accuracy must be maintained on all record drawings. See sections 11 to 16 and the Appendices for further information and examples of as-laids. As laid cable records must be submitted within 5 days of the cable being laid. OHL as-built records and any related plant asset data returns must be submitted within 10 days of the commission date of the individual asset section
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 10 of 47
12. DATA FORMAT FOR OHL, POLES & TOWERS
12.1 General
Recording of asset additions and disposals, or any work on assets, forms the key requirement for the Company to be able to satisfy its contract with Ofgem. It is essential that the Service Partner has robust processes in place to ensure that the full asset data requirements are captured from each day’s work. The Service Partner shall comply with this policy as a minimum standard. This details the asset data standard required to be adhered to in order for records to be deemed acceptable by the Company. . The Company reserve the right to reject such records if they do not meet the agreed standard, both in terms of the template to be used, timing of the return and the quality of the return. Records rejected shall be communicated to the Service Partner. Project completion will not be authorised until the asset data is returned to an acceptable standard. Performance shall be measured and form part of Service Partner performance reviews. In particular,
All data will be returned within 10 days of the site commissioning (or outage), or at time of installation, whichever is earlier.
All equipment planned to be installed by the Service Partner on a project will be logged and tracked from the start to the end of the project, then notified to the Company to confirm total installation prior to the project being closed. Each individual item will also need to be accompanied by a specific data return form.
All poles installed and removed will be accompanied by a pole data return form / schedule
Each individual plant item will also need to be accompanied by a specific plant data return form
All Cable and jointing work completed on a project must be submitted in a format / template to be provided by the Company.
All conductors changed on a project, specifically refurbishment projects, shall be logged on a standard template to be provided by the Company , then notified to confirm total conductor installation prior to the project being closed
All ESQCR defects removed shall be logged on a standard template to be provided by the Company and notified to confirm total ESQCR defects removed prior to the project being closed.
All returns will record the Asset Unit Accounting (AUA) against the work activity. This will be provided by the Company prior to the commencement of a project; however records without this code included will be rejected.
Asset records will be required in all circumstances, including storm situations.
The Company reserve the right to modify or change these standards as required, subject to an appropriate notification period. Any changes will be made within the general context of this contract and the Service Partner will be expected to adhere to these new requirements. Specific process and data return requirements are as follows. Pre-project requirements.
New routes New routes shall be defined as routes where an existing line is not present e.g.;
New OHL off line rebuild
New line to new customer (single span included)
New line to new windfarm connections
Diversions of existing overhead lines
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 11 of 47
Where this is the case, for all voltages above low voltage connections, the following shall be supplied to Network Data prior to commencement of the project, by agreement between the Company SPEN and nominated service partner.
A detailed Overhead Line blank pole schedule is shown Appendix 8. A copy of this
spreadsheet shall be available to all service partners as standard method of communicating
pole schedules. An example of how this should be completed is shown in Appendix 9.
A clean plan of the proposals, on an appropriate scale of 1:500 or 1:1000 on a standard UMV
background. This must detail the new route and how this aligns electrically with any current
assets in the vicinity. The plan must include positions of tie-in locations to current assets.
Planning assumptions clearly articulated relating to commencement date of project and likely
duration of build.
Existing routes Existing routes shall be defined in context of work as being work undertaken on assets that does not impact upon the existing route and/or does not result in new permissions or wayleaves being required e.g.
In-line rebuild
Pole replacement, either for LGC programme or refurbishment
Defect clearance
Under these circumstances, there is no need to provide information in advance of the works proceeding. Return of asset information during and on completion of projects New Routes Information and asset data will be returned to SPEN at the earliest opportunity, and is expected upon energisation of equipment, or completion of the project, whichever is earliest. For example, on an overhead line rebuild, data returns should be provided whenever new sections are energised. When a section of the new main line is commissioned and cut into the existing line, this will be the date when the clock starts on the timeline for expected data returns. The appropriate data return forms will be expected from this date, for the assets commissioned on the particular shutdown. It is not acceptable to wait until the end of the project and then return all forms for processing, these should be sent as the project delivers. Data submissions required For all submissions, fields must be populated with appropriate information and all submissions must be in an electronic format to Network data mailboxes. Submissions must be sent firstly to the nominated Project Manager, who will review and approve and then forward on to the appropriate network data mailbox. All submissions must be in the same format at the template provided by the Company i.e. it is not acceptable to return an Excel spreadsheet template as a PDF. Any submissions that fail to meet the criteria set will be rejected.
Revised plan of OHL route and pole placements, related to the original plan submission.
Any alterations to original OHL schedule should be individually identified on a revised pole
schedule, clearly showing these changes
For a new route, it is not necessary to submit an individual pole data return form for every
new pole. However, it is critical that these must be submitted to confirm the removal of
existing poles. Spreadsheets can be used in these situations for multiple pole returns.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 12 of 47
Plant data return forms for all plant installed on the new line e.g. pole mounted transformers,
sectionalisers etc. Confirmation on these forms of all plant assets removed and disposed of.
Where plant assets have been moved i.e. pole transformer from old line to new line, these
must be confirmed specifically.
Existing routes For work on existing routes, the following requirements will apply. OHL refurbishment It is important that the service partner specifically confirms all work that has been undertaken on specific assets during refurbishment activity. The required data submissions are as follows ; Activity plan and sheet A clean plan of the activity carried out, on an appropriate scale of 1:500 or 1:1000 on a standard UMV background. This must detail the general area of work completed. The plan must be referenced by the activity codes detailed on the activity sheet which must be completed to reference the information on the plan An example blank activity sheet in shown in Appendix 10, with an example sheet shown in Appendix 11 with the updated activity plan. Pole changes A pole data sheet is required for every pole change, detailing new asset details and confirming status of existing pole, related back to the activity plan. Plant changes A plant data sheet is required for all plant changes, either installation of new assets or decommissioning of old assets, using the appropriate data forms, related to the activity plan Re-conductoring existing assets Where conductor is replaced, details must be supplied to uniquely identify the spans of OHL that have been re-conductored, and related back to the activity plan. The refurbishment activity sheet will be sued to record all such asset changes, and must be related back to the activity plan by unique reference points. Defect removal All defects removed as part of the project must be uniquely identified in the refurbishment activity sheet, and where work undertaken to replace these defects, explanation given of what activity has been carried out. LGC removal Where an activity has removed a low ground clearance defect, the activity must be uniquely identified with confirmation of new height achieved in metres at mid-span position. Individual projects to address LGC, one off pole replacements The refurbishment activity sheets shall be used in all circumstance to confirm specifically what has been done on site, where this information is not contained within a relevant data return form. For example, for a single intermediate HI 5 pole replacement, the pole data return form shall be adequate for this purpose. Where the pole replacement requires a new stay, and removes a defect, then the activity sheet should be completed and returned.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 13 of 47
12.2 Patrol Number (for distribution assets only)
Network Data require a patrol number to be clearly associated to each individual pole or tower. The Patrol Number is the Circuit Monitor Reference Number from PowerOn and is generally made up of 5 digits (with the exception of Manweb 33 kV lines, which are made up of 6 digits). For example, in the case of Patrol Number 12345 refer to figure 2:
Figure 2
12.3 Route Identifier (for Transmission assets only)
Network Data require a route identifier to be clearly associated to each individual pole or tower. The Route Identifier is the alpha code assigned to each pole or tower by Grid Control. Table 1 provides a guide to the required patrol / route identifiers per pole and tower asset:
IDENTIFIER REQUIRED
PA
TR
OL
ID
NU
MB
ER
(PO
WE
RO
N
NU
MB
ER
)
RO
UT
E
IDE
NT
IFIE
R
(AL
PH
A-N
UM
ER
IC)
PA
TR
OL
NU
MB
ER
FR
OM
FE
ED
ER
HV
CIR
CU
IT
ASSET TYPE
Pole
<= 33kv Distribution
>=33kv Transmission
LV
TOWER <= 33kv Distribution
>=33kv Transmission
Table 1
1 2 3 4 5 The number on the Power On diagram given to the Primary Substation.
The number on the Power On diagram given to the Circuit /Feeder
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 14 of 47
12.4 Pole Classification
The nature and use of the surrounding land determine the “Locational Risk Classification” which considers the probability of both wilful and inadvertent contact with live conductors in the environment where they are placed. The locational risk classification is an integral part of asset inspection process, and the reason why the site has been assessed at a particular risk level, shall be completed and reviewed at every routine inspection, to react to any changes or circumstances, that have occurred since the previous inspection. To assist with the practical interpretation of the ESQCR with respect to risk assessment, the location of the Overhead Line electrical network apparatus shall be classified as follows at the time of the routine. Distribution Poles and Towers require a Risk Classification which determines Signing and Guarding, Classifications should be provided to Network Data for each affected asset on the drawing or pole data sheet. High Risk locations
Locations where continued Trespass/Theft/Vandalism has occurred shall be classified as “High Risk”. Higher than Normal Risk locations
Where an asset is in/on a recreational area or site (e.g. parks, beaches, fishing areas, sailing clubs, caravan parks and camping sites)
Where an asset is within an area where children or youths are known to, play, or congregate (e.g. schools, play areas) Normal Risk locations
All equipment situated in Residential, Populated and Work areas, e.g. Farmland (Arable/Crops), Commercial, Industrial and equipment attached to, or internal to customer’s property. Lower than Normal Risk locations
“Sparsely Populated” locations e.g. pasture/grazing, heath-land, moorland, natural forest etc. For guidance of risk categories, refer to the policy for Hazard / Defect Management Policy for 33kv, 11kv & Low voltage Overhead Lines document (EPS-01-009). For guidance on Classifications, refer to Asset Inspection and Condition Assessment Policy (Asset 01-021).
12.5 Spatial Hazards
Pole related Spatial Hazards are for additional information only and relate to Hazards which fall outside the guidelines stated within section 15. Pole related Spatial Hazards must be noted for each effected pole on the drawing or pole schedule. They should be noted as follows:
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 15 of 47
Spatial Hazard Type Spatial Hazard Position
3rd
Party Under Line
Campsite Over Line
Farmland – Agricultural Side
Farmland - Pasture
Fishing Area
Golf course
Playground
Rail
Recreational Area
Road
Water Course
Yacht Club
Other
Layby/Parking Area
Restricted Flight Zone
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 16 of 47
13. DATA FORMAT FOR UNDERGROUND ASSETS (ALL VOLTAGES) AND GROUND MOUNTED LV ASSETS
13.1 General
All asset information must be submitted within 5 days of completion or commissioning. For information on mandatory attributes for LV switch points, cables and joints see Appendix 5. This information will be provided in the form of a drawing supported by actual measurements to the created, deleted or amended asset. These drawings shall be accurately dimensioned showing actual positions of LV switch points, cables, ducts and joints relative to buildings, footpaths and roadways. The information supplied must be sufficient to plot the asset position to the nearest 0.1 metre. See Appendix 12 for further information and examples of as-laids. Drawings should be provided at a scale of 1/500 or larger. Wherever possible, drawings must be provided to Network Data on a plot from an Ordnance Survey based drawing or in electronic format. If these are not available, the drawing must be supplied on an asset update record sheet as shown in Appendix 12E. Asset update record sheets are available on request from the Network Data section.
13.2 Points to Note when Taking Records.
Measurements can be taken from gable ends, boundary walls, fence lines, walls or kerb lines. Measurements should never be taken from lamp posts, gates, doors, windows, garden paths, driveways, road signs, street lighting pillars, trees, manhole covers or drains. Information on the cables and ducts laid must be given. These should include cable size and type, any instances where cables or plant cross, duct size and type, cross sections of how the cables, ducts and pipes are laid in the ground and an indication of which cables go through which ducts. Drawings must show:
Address and plot numbers where applicable.
LV switch point details (including classification).
Cable size and type.
Installation dates.
Indicate any instances where cables or plant cross.
Duct size and type.
Cross sections of how the cables, ducts and pipes are laid in the ground and an indication of which cables go through which ducts.
MPAN details must be written on the plan submitted in respect of services to new customers.
Where the cable is running straight, lateral position and depth should be given every 5 metres. Where the cable bends or depth varies, this should be increased to every 1 metre. (See Appendix 8H)
Drawings must be provided to Network Data on a plot from UMV, an Ordnance Survey based AutoCAD drawing, an electronic data submittal form or an asset update record sheet as shown in Appendix 12E. Asset update record sheets are available on request from the Network Data section.
Any cables / pipes / road-crossings laid at non-standard depths must be marked as such. A note of the depth must be written alongside the cable.
If multiple cables / pipes / road-crossings are laid, the configuration and depths of these must be shown on any drawings (Refer to figure 3). The configuration should be shown in a section drawing:
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 17 of 47
Figure 3
ALWAYS take measurements from permanent structures. NEVER take measurements from anything not on ordnance survey map e.g. windows, doorways, gates, lamp posts, trees, site offices etc.
ALWAYS record non-standard depths of cables and assets.
ALWAYS take Size and Type of Cable/Ducts and Date laid.
ALWAYS include an Ordnance Survey Grid Reference i.e. SJ 543-675.
NEVER take measurements from structures being altered or demolished.
NEVER use round objects to measure from, since exact positions of cables cannot be located as indicated in figure 4:
Figure 4
13.3 Mandatory Information: As-Laid Service Cable Route Records
As-laid service cable route drawings must be provided to Network Data on a plot from UMV, an Ordnance Survey based AutoCAD drawing, an electronic data submittal form or an asset update record sheet as shown in Appendix 12E. In the absence of an Ordnance Survey map or suitable builder’s plan, the following guidelines should be used to produce a service cable record:
Typical Cable Cross- Section
Typical Road Crossing Cross- Section
? ? ?
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 18 of 47
Measure the basic size/shape of the house.
Draw the house relative to its surroundings.
Take measurements to the cable and road crossing.
Indicate whereabouts of ducts and service ducting
Add all applicable details (cable size, date laid etc.) as described in 12.1 – 12.11
13.4 Mandatory Information: LV Switch points
LV switch point details must contain:
Type (link-box or pillar).
Locality (i.e. nearest address).
Electrical configuration (e.g. 2 way, 4 way).
Manufacturer (e.g. Sicame).
Date of manufacture.
Classification 1 or 2. (See 12.5)
Asset Activity Code: Who the work was completed for. Reason for work.
Any relevant information about created, deleted or amended switching points.
13.5 Mandatory Information: LV switch point classifications
For guidance on classifications, refer to Asset Inspection and Condition Assessment Policy (Asset 01-021) It is a requirement that each LV switch point has a classification. Classifications should be noted for each effected asset on the drawing or pole schedule.
13.6 Mandatory Information: Switching Points
The responsible engineer must provide Network Data with details of any changes to LV network switching points within 24 hours of the change. These must be received on a Generic Network Diagram (GND) based plot of the area concerned. An example can be seen in Appendix 13.
13.7 Mandatory Information: Cables
Cable details must contain:
Design voltage.
Working voltage.
Cross sectional area.
Construction type.
Number of conductors.
Conductors per phase.
Number of phases.
Conductor material.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 19 of 47
Installation date.
Asset Activity Code: Who the work was completed for. Reason for work.
Who owns the cable if anyone other than Scottish Power.
Where cable is a service, phase colours must be noted.
13.8 Mandatory Information: Joints
Joint details must contain:
Joint type – e.g. straight, breech, pot end etc.
Voltage.
Installation date.
Name of company that installed the cable
Where cable is a service, phase colours should be noted.
Where phases are crossed or cores are bunched, phasing should be noted. For example (‘Phases crossed: R-Y, Y-B, B-R’ or ‘RYB Bunched’).
13.9 Mandatory Information: Ducts
Duct details must contain the following information:
Duct Size – i.e. 125mm, 100mm etc.
Duct Material – i.e. PCP, PVC, Fireclay etc.
13.10 Mandatory Information: Supply Sensitive Customers
Network Data requires information about all new Supply Sensitive Customers (SSC) and amendments to existing SSC’s as soon as such information becomes available. The data required for input is:
Customer name, contact name
Telephone number, fax number, address and postcode
Type of Business
13.11 Developers Plans
Developer’s plans are required by Network Data for every new development where either Scottish Power or third party service providers will create new assets. Network Data will receive developers plans at least 10 days before site work commences (also, whenever there are alterations to the site layout, e.g. Changes to plot numbers or road layouts, while work is in progress or after completion). Wherever possible, developer’s plans will be forwarded to Network Data electronically. Network Data will also accept clear paper copies of the developers plan. It is the responsibility of the business unit (i.e. third party contractor) to supply developer’s plans prior to the submission of cable records.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 20 of 47
14. NOTICE OF CONFIGURATION ALTERATIONS TO THE HV NETWORK
The Company’s Asset I.T. Systems require timely and accurate data submission and input to ensure that the company complies with safety, statutory and legislative requirements. Data requirements and submission times are largely dependent on the type of asset to be created or deleted. Prior to commissioning assets that require changes to the configuration of the HV network diagram, a SAP input sheet, PowerOn patch request and before and after PowerOn system diagrams are needed. These should be submitted to Network Data no less than 10 days prior to the commissioning date (Refer to Figure 5). Network Data will receive the request on the standard pro-formas, which are available in either paper or electronic format from the Intranet or from Data Management. An example SAP input sheet, Power On patch request and before and after PowerOn diagram can be found in Appendices 1, 2 & 3 respectively. N.B. Major network changes (grid sub-station and primary sub-station) shall be submitted at least one month prior to the commissioning date.
Figure 5
Data Management
Corporate Asset I.T. Systems
Engineer forwards SAP notice, POWERON patch Request & before and after POWERON network
diagrams.
Major patch request - 1 month All other patch requests - 10 days
Data Management SAP
ESRI
POWER ON
Input SAP Owned Asset Data. Synchronise data across systems.
Field Staff
Send 'patch available' e-mail to engineer.
Switching schedule completed and agreed with PSMC. Plant commissioned. PSMC
Field Staff
Agree plant position
To section 'B' if commissioning new assets
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 21 of 47
Where the HV network is changing due to the creation, deletion or amendment of overhead line or underground cables, Network Data must receive a patch request and a before and after PowerOn diagram. A SAP notice is not required. Where assets are to be de-commissioned only, Network Data must receive a patch request, a before & after PowerOn diagram and a completed SAP data sheet clearly identifying the reason for decommissioning and the scrap or idle location. For example, where an RMU is being decommissioned due to an operating restriction, the completed SAP data sheet should indicate that this was the reason for decommission. It is also a requirement to associate the plant being scrapped to the correct Sub-office location.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 22 of 47
15. SUBMISSION OF PLANT DATA SHEETS
As indicated in Figure 6, SAP plant data sheets must be submitted to Network Data no later than 10 days post plant commissioning. These are required in two distinct situations:
After the commissioning process covered in section 13, all individual plant data must be input into SAP to enable plant data to be shown as asset attributes within PowerOn, GIS and SAP.
In the instance of changing plant like for like (e.g. PTE replaced) no patch request or SAP notice is required as no changes will be made to the HV network diagram. However, it is vital that plant detail sheets are submitted no later than 10 days post commissioning.
In both situations, SAP data sheets should be submitted no later than 10 days after plant commissioning.
Figure 6 Network Data will receive plant details on standard pro-formas which can be obtained from the Intranet or from Data Management. There are individual sheets for all substation plant, LV fuseboards, remote equipment including transformers, PMAR’s, switchgear and test prods. All fields on plant detail sheets are mandatory information for SAP data entry and therefore data sheets forwarded to the Network Data section must be completely filled in (wherever plant type permits). When submitting data sheets for new substation loop-ins, it is extremely important to include new circuit names. As is explained in Appendix 13, the LH and RH switch attributes for the existing substations on either side of a new substation must be updated in SAP. This information should be included in the LH and RH switch sections of the RMU detail sheet for the new substation.
16. RECORDING OF HAZARD AND DEFECT INFORMATION
Where an asset (pole, tower, conductor, switchpoint or sub-station) is created or amended and has a defect or hazard present, this must be noted on the SAP data sheet or the pole data sheet to be forwarded to Data Management. For guidance on hazards, refer to the ‘Hazard and Defect Management Policy’ document (EPS-01-002)
e-mail to engineer. Corporate Asset I.T. Systems
Engineer forwards SAP data sheets to Data Management no later than 10 days after
commissioning date.
Data Management
SAP
POWERON
ESRI
Input SAP Owned Asset Information.
Field Staff
Send 'All data synchronised and complete' email to Engineer
Data Management
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 23 of 47
Wherever hazards occur information should be added to the SAP data sheet or the pole data sheet to be forwarded to Network Data. Information supplied should contain a description of the defect and a hazard category. Assets that are affected by more than one hazard should be marked as such.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 24 of 47
17. DATA REQUIREMENT MATRIX
The following matrix (Table 2) should be used as a quick guide to the data requirements per asset type and activity (Create, amend and delete):
Data Required
For explanation see section 13
For explanation see section 14
Sections 10-12
SA
P L
oc
ati
on
Req
ue
st
Patc
h r
eq
ue
st
+
Befo
re a
nd
aft
er
dia
gra
ms
SA
P P
lan
t d
ata
sh
eet
12 f
igu
re O
rdn
an
ce
Su
rvey r
efe
ren
ce
GIS
sketc
h +
po
le
da
ta s
he
ets
wh
ere
ap
pli
cab
le
ASSET TYPE
Sub Station (change to network configuration)
Plant within substation
Change to network configuration No change to
network configuration
Transmission Plant
Transmission OHL
Remote Equipment Location (change to network configuration)
Remote equipment. (Including PTE/ABSW/PMAR/ HV fuses and sectionalisers)
Change to network configuration No change to
network configuration
EHV / HV / LV OHL
Change to network configuration
Replacement of Conductor
No change to network
configuration (* Pole data sheets
required - no sketch required)
*
HV cable/joints
Change to network configuration No change to
network configuration
LV cable/joints
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 25 of 47
APPENDIX 1: SAP INPUT SHEET – REQUEST FOR A NEW FUNCTIONAL LOCATION
Request for New Functional Location Column 1 Column 2
Project Manager Work Undertaken for A A Fail
Project Reference Reason For Work / AUA Code 2 2 Fail
Requesters Name B Date of Request B B Fail Fail
Company 2 2 Fail
Internal Contact Number 3 External Contact Number 3 3 Fail Fail
Email 4 4 Fail
Zone C Coordinates (As per UMV) C C Fail Fail
Substation Name 2 Location 2 2 Fail Fail
4 Letter S/S mnemonic 3 Does Aggregated Site Exist 3 3 Fail
(Transmission Only)
Address 4 Non Transformer 4 4 Fail Fail
Town 5 5 Fail
SAP Postcode (Allocated by DM) 6 In Square No (Allocated by DM) 6 6 Fail
SAP County Code (Allocated by DM) 7 HV Circuit for Pole Mounted Sub/REL 7 7 Fail Fail
eg, DC-AANNNNN
Substation Details
Owner of Substation D Capacity D E Fail Fail
Location Risk (see guidance box) 2 Voltage 2 2 Fail Fail
Sections below are for Data Management Use Only
ENID Number E Created On E
Functional Location 2 Created By 2
Aggregated Site Functional Location 3 Aggregated Site Object Link 3
Supernumber 4
For work sourced within the franchise area of
Scotland
Email: [email protected] [email protected]
For work sourced within the franchise area of
England & Wales
Recreational areas
including; Parks , Fishing
Sites , Caravan Parks Or
where youths are known to
play
Locations where continued
Trespass, Theft or Vandalism
have occurred
Lower than Normal Normal Higher than Normal High
X
Email:
Location Risk Guidance
Sparsely populated areas
including; Pasture or Grazing
Fields , Heath-Land , Moorland ,
Natural Forest etc
Residential areas including;
Populated and Work Areas ,
Farmland (Crops),
Commercial , Industrial ,
Internal to Customer Property
Qual-12-300
Issue No 7
Functional Location Name and Number Type of Location
Network Data
SAP Input Sheet
kV
kVA
Y
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 26 of 47
APPENDIX 2: 11KV POWER ON PATCH REQUEST FORM
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 27 of 47
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 28 of 47
APPENDIX 3: BEFORE AND AFTER POWER ON DIAGRAMS
Before
After
KINNAIRD PK
EAST NO.2
KINNAIRD PK
EAST NO.1
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 29 of 47
APPENDIX 4: MANDATORY ATTRIBUTES FOR OHL, POLES AND TOWERS
Mandatory attributes for pole asset:
Attribute Description
Type Single, H, A, 3 or 4 member, lattice, galley, strut and lay leg
Pole material Wood, steel, concrete
Associated voltage LV, 6.6kv, 11kv, 22kv, 33kv, 132kv
Height Number
Diameter Light, medium, stout, extra stout
Patrol/Route Number/Alpha
Category/Classification number
Hazard Tree, water, playground
BS Specification L10, L15, GENU2, BS1320 etc.
Date installed Date
Asset Activity Code Work completed for / Reason for work
Mandatory attributes for tower asset:
Attribute Description
Tower ID Number
Tower type Single, dual, tri or quad circuit
Route identifier Number
Patrol/Route Number/Alpha
Category/Classification Number
Design voltage LV, 6.6kv, 11kv, 22kv, 33kv, 132kv, 275kv, 400kv
Height number
Base dimension number
Commission date Date
Asset Activity Code Work completed for / Reason for work
Mandatory attributes for overhead line asset:
Attribute Description
Cross sectional area Metric/Imperial measurement
No. of conductors 1-8
Conductor material Aluminium, copper, steel, steel cored aluminium, hard drawn copper etc.
Design voltage LV, 6kv, 6.6kv, 11kv, 20kv, 22kv, 33kv, 132kv, 275kv, 400kv, pilot, earth, aux., telephone
Working voltage If different from design voltage
Number of phases 1-3
Spec L10, L20, Genu2, Genu3 etc.
Asset Activity Code Work completed for / Reason for work
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 30 of 47
APPENDIX 5: MANDATORY ATTRIBUTES FOR LV SWITCHPOINTS, CABLES AND JOINTS
Mandatory attributes for LV Switchpoint:
Attribute Description
Type Linkbox or pillar
Category 1 or 2
Electrical configuration 2 to 16 way, 4/6/7/8 way double busbar
Manufacturer Lucy, Bonar Long etc.
Date of manufacture Date
Serial number Number
Asset Activity Code Work completed for / Reason for work
Mandatory attributes for underground cable asset:
Attribute Description Cross sectional area Metric/Imperial measurement
No. of conductors 1-6 or no. of pair if pilot
No. of phases 1-3
Construction type Pilc, Waveform etc.
Conductors per phase 1-3
Conductor material Alluminium, copper
Design voltage LV, 6.6kv, 11kv, 22kv, 33kv, 132kv, 275kv, 400kv, pilot
Working voltage If different from Design voltage.
Date installed Date
Asset Activity Code Work completed for / Reason for work
Mandatory attributes for underground joint asset:
Attribute Description
Type Service, Straight, Pot end etc.
Working voltage LV, 6.6kv, 11kv, 22kv, 33kv, 132kv, 275kv, 400kv, pilot
Installation date Date
Installed by ScottishPower/Name of contractor
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 31 of 47
APPENDIX 6: EXAMPLE OHL SKETCH
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 32 of 47
APPENDIX 7: EXAMPLE POLE DATA SHEET
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 33 of 47
APPENDIX 8 : EXAMPLE POLE SCHEDULE – BLANK
CM
NC
CT
NO
SH
EE
T N
o.
WO
RK
UN
DER
TAK
EN F
OR
REA
SON
FO
R W
OR
KS
PE
CIF
ICA
TIO
NS
UR
VE
YE
D B
YD
AT
EC
HE
CK
ED
kM
Ple
ase
se
lect
fro
m t
he
dro
pd
ow
n
Ple
ase
se
lect
fro
m t
he
dro
pd
ow
n
Sp
an
(m
)S
ect
ion
Loac
atio
nO
wn
er
Occ
up
ier
No
Typ
eH
t (M
)D
IA (
mm
)D
ep
thB
lock
(Be
hin
d)
Le
ng
thP
INP
ILO
TS
TR
NN
oS
ize
SP
RD
Ris
kP
ole
Sta
yN
am
e &
Ad
dre
ssN
am
e &
Ad
dre
ssX
Y
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
Pls
se
lect
W
AY
LE
AV
E C
LA
SS
:
(1
) A
RA
BL
E
(2
) F
EN
CE
AD
JA
CE
NT
AR
AB
LE
(3)
PA
ST
UR
E
(4
) F
EN
CE
AD
JA
CE
NT
PA
ST
UR
E
(5
) R
OU
GH
(6)
FE
NC
E A
DJ
AC
EN
T R
OU
GH
AC
CO
MP
AN
YIN
G P
AP
ER
S :
PR
OF
ILE
/T
RE
E S
CH
ED
UL
E /
RO
UT
E P
LA
N /
O.S
. Co
ord
inat
e o
f N
ew
O
VE
RH
EA
D L
INE
PO
LE
SC
HE
DU
LE
Dra
win
gC
AT
A.O
.D.
CO
ND
UC
TO
R
Wa
yle
ave
sN
OT
ES
Sta
ys
(Gra
de
11
50
)
SPU
RS/
EQU
IP/X
ING
S/3r
d P
AR
TY A
TT
Insu
lato
rsP
OLE
RO
UT
E L
EN
GT
HJO
B T
ITL
E
SEC
TIO
N &
LIN
E N
o.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 34 of 47
APPENDIX 9 : EXAMPLE POLE SCHEDULE – COMPLETED
CM
NCC
T N
OS
HE
ET
No.
WO
RK U
ND
ERTA
KEN
FO
RRE
ASO
N F
OR
WO
RKS
PE
CIF
ICA
TIO
NS
UR
VE
YE
D B
YD
AT
EC
HE
CK
ED
6731
176
305
2.8
kM
1 o
f 5
Plea
se s
elec
t fro
m th
e
drop
dow
n
Plea
se s
elec
t fro
m th
e
drop
dow
nL
10T
F29
-May
-15
Sp
an
(m
)S
ect
ion
Loac
atio
nO
wn
er
Occ
up
ier
No
Type
Ht (
M)
DIA
(mm
)D
ep
thB
lock
(Be
hin
d)
Le
ng
thP
INP
ILO
TS
TR
NN
oS
ize
SP
RD
Risk
Po
leS
tay
Na
me
& A
dd
ress
Na
me
& A
dd
ress
XY
1E
xist
wit
h 1
0 x
285L
ay-L
egPl
s se
lect
Gre
tna
Ho
ldin
gs
Ltd
Mr
Alis
tair
Ho
ust
on
2T
erm
S (
DX
)
1028
51.
81
32
7/4.
008.
2Pl
s se
lect
"S
mit
hs
Ho
tel
FS
SS
P21
4747
4
3S
ect
S (
DX
)
1028
51.
81
84.4
84.4
1
6
Pls
sele
ct"
Gre
tna
SP
2147
476
4S
ect
S (
DX
)
11.5
300
21
84.4
84.4
1
6
Pls
sele
ct"
"S
P21
4747
6
5In
ter
S (
SX
)
1126
01.
81
84.4
3
Pl
s se
lect
""
SP
2147
473
6In
ter
S (
SX
)
1025
01.
81
96.3
3
Pl
s se
lect
""
SP
2147
473
7In
ter
S (
SX
)
1025
01.
81
96.3
3
Pl
s se
lect
""
SP
2147
473
8In
ter
S (
SX
)
1126
01.
81
96.3
3
Pl
s se
lect
""
SP
2147
473
9In
ter
S (
SX
)
1025
01.
81
99.1
3
Pl
s se
lect
""
SP
2147
473
10S
ect
S (
DX
)
10.5
255
1.8
199
.157
1.5
1
6
Pls
sele
ct"
"S
P21
4747
6
11S
ec/A
ng
S /
Tee
1535
02.
21
99.1
99.1
2.4
R
29
7/4.
00Pl
s se
lect
""
SP
2147
476
12S
ec/A
ng
S /
Bac
k-to
bac
k T
ee O
ffs
1535
02.
21
59.2
59.2
2.3
R
210
7/4.
00Pl
s se
lect
SP
2147
476
13S
ect
S (
DX
)
1332
02
187
.687
.6
16
Pl
s se
lect
FS
SS
P21
4747
6
14In
ter
S (
SX
)
10.5
255
1.8
187
.6
3
Pls
sele
ctS
P21
4747
3
15In
ter
S (
SX
)
1025
01.
81
87.6
3
Pl
s se
lect
SP
2147
473
16S
ect
S (
DX
)
1025
01.
81
87.6
262.
8
16
Pl
s se
lect
SP
2147
476
17S
ec/A
ng
S /
Tee
10
285
1.8
187
.687
.619
.6R
2
97/
4.00
Pls
sele
ctS
P21
4747
6
18In
ter
S (
SX
)
10.5
255
1.8
163
3
Pls
sele
ctS
P21
4747
3
19In
ter
S (
SX
) /
Bac
k-to
bac
k T
ee O
ffs
10.5
290
1.8
163
3
5
7/40
0Pl
s se
lect
SP
2147
473
20In
ter
S (
SX
)
1028
51.
81
86.6
3
Pl
s se
lect
SP
2147
473
21In
ter
S (
SX
)
1025
01.
81
80.2
3
Pl
s se
lect
SP
2147
473
22In
ter
S (
SX
)
1025
01.
81
80.2
3
Pl
s se
lect
SP
2147
473
23In
ter
S (
SX
)
1025
01.
81
80.1
3
Pl
s se
lect
SP
2147
473
24In
ter
S (
SX
)
1025
01.
81
88.5
3
Pl
s se
lect
SP
2147
473
25S
ect
S (
DX
)
1028
51.
81
88.5
630.
1
16
Pl
s se
lect
FS
SS
P21
4747
6
26In
ter
S (
SX
)
1025
01.
81
88.5
3
Pl
s se
lect
SP
2147
473
27In
ter
S (
SX
)
1025
01.
81
75.2
3
Pl
s se
lect
SP
2147
473
28S
ec/A
ng
S
10
285
1.8
164
.522
8.2
1.3
R
26
17/
4.00
8.2
Pls
sele
ctS
P21
4747
6
29In
ter
S (
SX
) /
Tee
10
285
1.8
181
.5
3
22
7/4.
007.
2Pl
s se
lect
SP
2147
473
30S
ect
S (
DX
)
1227
02
164
.314
5.8
1
6
Pls
sele
ctS
P21
4747
6
31In
ter
S (
SX
) /
Tee
10
.529
01.
81
64.3
3
2
27/
4.00
7.7
Pls
sele
ctS
P21
4747
3
32In
ter
S (
SX
)
1025
01.
81
96
3
Pls
sele
ctS
P21
4747
3
33In
ter
S (
SX
)
1025
01.
81
96
3
Pls
sele
ctS
P21
4747
3
34S
ec/A
ng
S /
Tee
11
295
1.8
172
.532
8.8
11.2
R
28
7/4.
00Pl
s se
lect
SP
2147
476
35In
ter
S (
SX
)
1025
01.
81
100
3
Pl
s se
lect
SP
2147
473
W
AY
LE
AV
E C
LA
SS
:
(1
) A
RA
BL
E
(2
) F
EN
CE
AD
JA
CE
NT
AR
AB
LE
(3)
PA
ST
UR
E
(4
) F
EN
CE
AD
JA
CE
NT
PA
ST
UR
E
(5
) R
OU
GH
(6)
FE
NC
E A
DJ
AC
EN
T R
OU
GH
AC
CO
MP
AN
YIN
G P
AP
ER
S :
PR
OF
ILE
/T
RE
E S
CH
ED
UL
E /
RO
UT
E P
LA
N /
HV
Cab
le-O
ff
O.S
. Coo
rdin
ate
of N
ew
OV
ER
HE
AD
LIN
E P
OL
E S
CH
ED
UL
E
Dra
win
gC
AT
A.O
.D.
CO
ND
UC
TO
R
3 x
50m
m A
AA
C (
Haz
el)
Go
ldie
slea
Co
ttag
eT-O
ff
Ald
erm
anse
at T
-Off
Wa
yle
ave
s
Gre
tna
Sm
ith
y 2
00kV
A P
TE
/ T
ote
m P
ole
HV
Cab
le /
LV
Cab
le O
ff
Rae
bu
rnfo
ot
T-O
ff /
T-O
ff S
tay
s in
Tan
dem
Ait
chis
on
Ban
k T
-Off
/ M
oo
rlan
d T
-Off
Bee
chw
oo
d 2
5kVA
PT
E /
LV C
able
-Off
"" " "
Qu
inti
nsh
ill T
-Off
/ T
-Off
Sta
ys
in T
and
em
Qu
inti
nsh
ill N
o.1
& S
ign
al C
abin
T-O
ff /
20A
S2
Sti
rlin
g P
rod
uct
s T
-Off
/ T
-Off
Sta
ys
in T
and
em
"
B &
V D
avid
son
Err
ols
ton
Far
m
Gre
tna
DG
16 5
HL
"
NO
TE
SS
tay
s (G
rad
e 1
15
0)
B &
V D
avid
son
" "
Err
ols
ton
Far
m
Gre
tna
DG
16 5
HL
Bry
an R
edp
ath
Bee
chw
oo
d F
arm
Sp
rin
gfi
eld
PM
AR
Sp
rin
gfi
eld
AB
SW
SPU
RS/E
QU
IP/X
ING
S/3r
d PA
RTY
ATT
" " "
Gre
tna
""
Gre
tna
- C
anonb
ie 1
1kV
OH
L R
ebui
ld
Mai
n L
ine
Pole
s 1 -
35
Insu
lato
rsPO
LE
RO
UT
E L
EN
GT
HJO
B T
ITL
E
SECT
ION
& L
INE
No.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 35 of 47
APPENDIX 10 – EXAMPLE ACTIVITY SHEET
Loca
tion
Pole
EN
ID s
tart
Span
hei
ght of ne
w c
ond
ucto
rD
ate
CO
1
CO
2
CO
3
CO
4
Loca
tion
Pole
EN
ID s
tart
Span
hei
ght of ne
w c
ond
ucto
rD
ate
L1
L2
Loca
tion
Pole
EN
ID o
f w
ork
Dat
e
Loca
tion
Pole
EN
ID o
f w
ork
Nam
e of en
gine
er (
if ap
plic
able
)D
ate
Loca
tion
Pole
EN
ID o
f w
ork
Nam
e of en
gine
er (
if ap
plic
able
)D
ate
OT
4
CB
1
CB
2
OT
2
OT
1
CB
4
L3
L4
OT
3
P1
P2
OT
HE
R I
NF
OR
MA
TIO
N
Work
und
erta
ken
Act
ivty
Pla
n re
fere
nce
Act
ivty
Pla
n re
fere
nce
P3
P4
Nam
e of Jo
inte
rW
ork
und
erta
ken
CA
BL
E R
EC
OR
DS
TO
BE
SU
BM
ITT
ED
Act
ivty
Pla
n re
fere
nce
CB
3
CO
NT
RA
CT
OR
RE
SP
ON
SIB
LE
PE
RS
ON
Cur
rent
Cond
ucto
r ty
pe
New
cond
ucto
r ty
pe
Work
und
erta
ken
Act
ivty
Pla
n re
fere
nce
Act
ivty
Pla
n re
fere
nce
Pole
EN
ID e
nd
PO
LE
DE
FE
CT
S R
EM
OV
ED
Def
ect re
move
dO
ther
work
com
ple
ted ie
new
dan
ger
pla
te in
stal
led
Pole
EN
ID e
nd
ES
QC
R D
EF
EC
TS
RE
MO
VE
D
O
VE
RH
EA
D L
INE
PR
OJ
EC
T A
CT
IVIT
Y S
HE
ET
CO
ND
UC
TO
R R
EP
LA
CE
D
JO
B T
ITL
E
SE
CT
ION
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 36 of 47
APPENDIX 11 – EXAMPLE ACTIVITY SHEET AND ACCOMPANYING PLAN
Location Pole ENID start Span height of new conductor Date
Poles 18 to 21, main line 12345678
Pole 18/19 5m
Pole 19/20 4.8m
Pole 20/21 5m
Location Pole ENID start Span height of new conductor Date
Pole 5/6, helenton mains spur 12349999 5m
L2
Location Pole ENID of work Date
Pole 2 heughnill spur 12562512
Location Pole ENID of work Name of engineer (if applicable) Date
N/A
Location Pole ENID of work Name of engineer (if applicable) Date
N/A
L1Pole 6 replaced
OT4
CB1
CB2
OT2
OT1
CB4
L3
L4
OT3
Danger plate Danger plate installed P1
P2
OTHER INFORMATION
Work undertaken Activty Plan reference
Activty Plan reference
P3
P4
Name of Jointer Work undertaken
CABLE RECORDS TO BE SUBMITTED
Activty Plan reference
CB3
CONTRACTOR
RESPONSIBLE PERSON
Current Conductor type New conductor type
23456789 32mm CU
Work undertaken
Activty Plan reference
CO1
Activty Plan referencePole ENID end
50mm ACSR
POLE DEFECTS REMOVED
Defect removed Other work completed ie new danger plate installed
Pole ENID end
ESQCR DEFECTS REMOVED
OVERHEAD LINE PROJECT ACTIVITY SHEET
CONDUCTOR REPLACED
JOB TITLE
SECTION MAIN LINE POLES 4- 11 CIRCUIT REFERENCE 74211
REFURB PROJECT SYMINGTON INSERT CONTRACTOR NAME
A N OTHER
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 37 of 47
APPENDIX 12 : EXAMPLE SKETCHES
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 38 of 47
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 39 of 47
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 40 of 47
Example E
Date
Distribution Programmes Network Operations - Distribution Connections - Demand Modernisation ESQCR
Major Projects Network Operations - Transmission Connections - Generation Reinforcement – Customer Driven AONB
Network Connections Network Technical Services Diversion Reinforcement – Fault Level
Faults Reinforcement – General
Your Name Sketch No.
Asset Unit Accounting Code (AUA) :
Northing
Note - All fields are mandatory requirements, returns without information shall be rejected and payments could be withheld. Requirement also to choose one option each in Work undertaken for and Reason for Work below
Easting
Engineer/Senior Authorised PersonWork Order No or
Fault No
Work undertaken for:
Exact location of works
Scope Order no.
ContractorYour contact telephone
number
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 41 of 47
Asset Update Record Sheet
Example F
Accurately capturing service information.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 42 of 47
Example G
LV cable installation within a new development.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 43 of 47
Example H
LV cable installation within a new development.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 44 of 47
Example I
LV cable installation through existing estate.
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 45 of 47
Example J
LV cable installation through new estate
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 46 of 47
APPENDIX 13: EXAMPLE SKETCH INDICATING ALTERATION TO OPEN POINTS
RECORDING OF ELECTRICAL ASSETS BY CONTRACTORS
BUPR-22-015 Issue No.3
© SP Power Systems Ltd Page 47 of 47
APPENDIX 14: SUBSTATION SWITCH ATTRIBUTES
This Appendix is a further detail for the description given in section 14 When submitting detail sheets for new substations, it is extremely important to include new circuit names. As can be seen in the diagram below, the LH and RH switch attributes for the existing substations on either side of the new one have now changed and must be updated within Plant and Circuits.
C-B
S/Stn
A
S/Stn
C
New
S/Stn B
A-B B-C
S/Stn
A
S/Stn
C
New
S/Stn B
AFTER
C-A B-A A-C B-C
C-A A-C
S/Stn
A
S/Stn
C
BEFORE
B-A