railway workshop jodhpur

25
Practical Training at Northen-Westren Railway Workshop VYAS INSTITUTE OF ENGINEERING AND TECHNOLOGY, Jodhpur (Rajasthan) Affiliated to Rajasthan Technical University, Kota Presented By : Pradeep Vyas

Upload: kalumutha

Post on 16-Apr-2017

244 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: railway workshop jodhpur

Practical Training at

Northen-Westren Railway Workshop

VYAS INSTITUTE OF ENGINEERING AND TECHNOLOGY,

Jodhpur (Rajasthan)

Affiliated to

Rajasthan Technical University, Kota Presented By : Pradeep Vyas (10EVEEX045)

Page 2: railway workshop jodhpur

Contents

Introduction– Role of Railway workshop– Head Quarters– Basic Training Centre Power Shop Air Conditioning Shop Train Lighting Shop Production and Control Conclusion

Page 3: railway workshop jodhpur

Introduction

Page 4: railway workshop jodhpur

Head Quarters

S.No. Railway Head Quarter S.No. Railway Head Quarter

01. Western Railway Mumbai 09. North Frontier Railway Guwahati

02. Central Railway Mumbai 10. East Central Railway Hazipur

03. Northern Railway New Delhi 11. North Central Railway Allahabad

04. Southern Railway Chennai 12. North Western Railway Jaipur

05. Eastern Railway Calcutta 13. West Central Railway Jabalpur

06. South Eastern Railway Calcutta 14. South Western Railway Hubli

07. North Eastern Railway Gorakhpur 15. South East Central Railway Bilaspur

08. South Central Railway Secundarabad 16. East Costal Railway Bhuvneshwar

Page 5: railway workshop jodhpur

Role of Railway Workshop

Acts as a middle management between the executives and the technicians.

Executes the policies and programmers of the administration. Plans for the materials, process and production. Technical interpretation of the drawings, specifications and

codes/manuals. Quality control and Quality assurance to ensure passenger safety. Ensures effective utilization of the 3 Ms. Motivating staff for higher productivity. Training staff for new products, processes, machinery and safety

awareness.

Page 6: railway workshop jodhpur

BASIC TRAINING CENTRE

Basic training centre is attached to the railway workshop, where engineering, graduate / diploma holder / ITI , Defense Personnel being imparted the training under Apprentice Act.1961.

2400 Employers 0150 Supervisors 0006 Administrative officers

Page 7: railway workshop jodhpur

Power Shop

• Introduction• Substation• Winding Section• Specification of Megger• Vacuum Pressure Insulating Plant

Page 8: railway workshop jodhpur

Introduction

Connected Load 4600 KVA

Connected Load 4600 KVA

Demand 1360 KVA

Maximum Demand 1400 KVA

Actual Utilization: Day Shift Night Shift

1100-1500 KVA 400-500 KVA

Average Consumption Per Day/Month 9000 units/ 95300 KWH

Lightning Consumption Per Month 1500 units

Page 9: railway workshop jodhpur

Substation

Railway workshop has its own 11/0.4 KV substation. Incoming feeder of 11KV is coming from 66 KV Mohanpura pulia

Jodhpur. Main Equipments of substation:-

— Insulators— Metering and Indicating Instruments— Instrument Transformer— Capacitor banks

Page 10: railway workshop jodhpur

Winding Section

All types of machine (AC and DC) used in the workshop are rewinded.

Normally periodic overhauling of the alternators is done here rewinding also when the field coil or armature coils get damaged.

They have designs, winding diagrams of every type of windings used in the workshop, behalf of these winding diagrams they do rewind of machines.

They have following procedure of doing so:-– Cleaning the dirt or dust by highly pressured air.– Checking of faulty connections or faults.

Page 11: railway workshop jodhpur

Specification of Megger

Equipment for checking the insulation level of any equipment. Main Purpose of Megger:-– Removing of faulty winding.– Cleaning of remaining structure by kerosene.– After this they connect the whole machine and check the whole working condition.

Page 12: railway workshop jodhpur

Vacuum Insulating Plant

• This plant is used for varnish paint on winding.• Varnish paint is done to save the winding from short circuiting

means it provides required insulation to the winding both inside and outside of the winding.

Page 13: railway workshop jodhpur

Operation of VPI

Step1: Open valve 1, 3, 6. Close valve 2, 4, 5, Start vacuum pump Step2: Close valve 1, stop vacuum pump. Step3: Open valve 4, varnish will start flowing into the VPI, Tank Close valve 4 when the electric

component is completely submerged in the varnish. Step4: Release vacuum in VPI tank. Open valve 1, 5. Step5: Close valve 3 and 6. Start the compressor build pressure in air tank 3 and 6. Stop air

compressor when pressure gauge shows 3 to 4 kilogram pressure. Step6: Open varnish to storage tank. Open valve 1, 2, 4 and keep these valves open till the VPI

tank empties. Step7: Close valve 1, 2, 4 in series wait for 15 minutes. Open the top lower take out the

component. Put the component in the oven for curing. Step8: Cure the oven for 8 hours at 1200C and for 4 hours at 1500C.S

Page 14: railway workshop jodhpur

Air Conditioning Shop

• Introduction• POH Schedule of Air-Conditioning Coaches• Automatic Pump Down• Roof Mountain Packages for Ac coaches

Page 15: railway workshop jodhpur

Introduction

Air conditioning means to make air fid to promote comfort and effecting or to ensure proper operation of delicate equipment or to help manufacturing operation more often it involves following operation:-

– To supply duty clean fresh air to keep low order concentration of carbon dioxide and smoke with in low limits.

– To cool the air in summer and to heat in winter in order to maintain proper temperature inside the premises of air conditions.

– To control the humidity of the air conditions. – To obtain air movement without producing annoying draught.  

Page 16: railway workshop jodhpur

POH Schedule of Air-conditioned Coaches

On arrival a shop first they note down the defects and deficiencies.

The all equipments like compressor & it’s motors condenser including liquid receiver cum dehydrator and condenser monitors evaporator units & its motor ,battery charger cum pre cooling transformer ,battery ,battery box etc….

Before overhauling, measure the insulation resistance of all the electrical equipment such as alternator, motor and wiring to know the condition of the equipments also after POH also test the writing of the insulation.

Page 17: railway workshop jodhpur

Automatic Pump Down

The prevention of refrigerant migration back to the compressor and the isolation of the refrigerant, change in the condenser/receiver had been automated by the incorporation by an automatic pump down facility. Thus when the fresh air ambient thermostat stops the cooling of refrigerant in the system is pumped into the compressor and receiver with the reenergizing of the liquid line solenoid value preventing flow of refrigerant back to compressor, the system sucks down through the low pressure cut out switch. Most of the refrigerant change is then isolated in the condenser and receiver.

Page 18: railway workshop jodhpur

Roof Mountain Packages for AC Coaches

Page 19: railway workshop jodhpur

Train and Lightning

• Introduction• Brushless Alternator• Fan Section

Page 20: railway workshop jodhpur

Introduction

• Railways being the public carrier bound to ensure that the passengers are carried not only special safety and punctuality but also comfortably. In view of this the lightning in coaches is an important electrical amenity with the steady increase in traffic, passengers expect cent percent performance of electrical fittings.

Page 21: railway workshop jodhpur

Brushless Alternator

It is the backbone of the speed of railways. It has very rugged structure, no carbon brush

problem, least maintenance, no winding on the rotor.

Its main feature is that in this no windingon the rotor is available.

Both field and armature winding are on the stator. Field winding is divided in two big slots 180 mechanically apart and the armature winding is available in small slots distributed on whole of the periphery.

Page 22: railway workshop jodhpur

Advantages of Brushless Alternator

Brushless Design, No brushes or slip rings to fail No rotating windings Non-Electrical unitized rotor shaft Large Diameter stator wire Lower I²R winding loss. Cooler stator operation High amperage output. High mechanical to electrical efficiency, saves fuel. Replaceable diodes. Positive, Negative and Isolated ground options Integral alternator and bearing housing casting providing permanent

bearing alignment & oversize grease reservoir.

Page 23: railway workshop jodhpur

Fan Section

• Indian Railways used 400 mm and 300 mm Brush Less Direct Current motor (BLDC) fans which are operated by 110V dc in the coaches.

Page 24: railway workshop jodhpur

Fan Section

Accessories:-– Regulator– Fuse Protection– Gimbal Ring

Maintenance:- The aim in maintenance is to reduce or compensate for wear and tear in operation so that the installation continues to function well and give good service.

Running Maintenance:-– Excessive noise and vibrations.– Excessive sparking/blackening of commutator and excessive wear of carbon brushes.– Inadequate air delivery.– Poor insulation.

Page 25: railway workshop jodhpur

Production and control