  • 8/8/2019 Quality Plans

    1/34

    Quality

  • 8/8/2019 Quality Plans

    2/34

    Quality is the degree to which a set ofinherent characteristics fulfils requirements.

  • 8/8/2019 Quality Plans

    3/34

    Traditional approaches to quality

    y The inspection process does not itself add value.

    y The production of substandard product is a waste of

    resources.

    yInspection department takes up expensive land andwarehousing space.

    y Not compatible with just in time, where there is no time for

    inspection.

    y Working capital is tied up.

  • 8/8/2019 Quality Plans

    4/34

    Quality management systems

    Quality management system is the organizational structure for

    responsibilities, activities, resources and events that together

    provide procedures and methods of implementation to ensure the

    capability of an organisation to meet quality requirements.

  • 8/8/2019 Quality Plans

    5/34

    Quality assurance and quality control

    Quality control is the part of quality management focused on

    fulfilling quality requirements.

    Quality assurance is the part of quality management focused on

    providing confidence that quality requirements will be fulfilled.

  • 8/8/2019 Quality Plans

    6/34

    Quality plans Project plansIn tandem with

    project deliverables.

    allocation of staff. timescales of the project.

    the frame work within which the

    work will be accomplished.

    Given by the project manager

    or project management team

  • 8/8/2019 Quality Plans

    7/34

    Project manager must ensure that allproject staff are aware of the existence,

    purpose and content of the Project Quality

    plan.

  • 8/8/2019 Quality Plans

    8/34

    Quality plan contentsy Introduction.

    y Project overview.

    y Glossary of terms.

    y Product requirement.

    y Project organisation.

    yMonitoring and reporting procedures.

    y Development life cycles.

    y Quality assurance.

    y .Testing

    y Quality documentation.

    y Procurement.

    y Sub contractors.

    y Non-conformance.

    y Change management.

    y Configuration management.

    y Risk management.

    y Delivery.

    Passport to success

  • 8/8/2019 Quality Plans

    9/34

    Quality plan contents

    The introduction should include a definition of the purpose of a ProjectQuality Plan and how it fits into the planning and management of a project. It

    should also indicate whether the plan is part of the contractual requirement

    and, if so, how this has influenced the content and format of the plan.

  • 8/8/2019 Quality Plans

    10/34

    Quality plan contents

    This section contains a general description of the project including the client,

    the objectives and the major deliverables of the project.

  • 8/8/2019 Quality Plans

    11/34

    Quality plan contents

    The glossary provides definitions of general terms with particular meanings

    used in the plan and any terms specific to the project. This enables thereader to correctly interpret the contents of the Project Quality Plan.

  • 8/8/2019 Quality Plans

    12/34

    Quality plan contents

    This is a description of the work to be carried out with a list of times scales,

    deliverables and project milestones with appropriate references to relevantspecifications. The description of the work may include areas such as

    performance criteria, security requirements, legal constraints and client

    standards.

  • 8/8/2019 Quality Plans

    13/34

    Quality plan contents

    This section details the organisation and management of the project,

    specifying management roles (with named individuals) and theirresponsibilities. This might include:

    contact points for technical information within the client organisation

    required resources and their origin (departments, sub-contractors etc).

  • 8/8/2019 Quality Plans

    14/34

    Quality plan contents

    This section is a description of the procedures that will be in place forplanning, monitoring and controlling the project. This will cross-reference

    project standards that define how the plans will be constructed and

    presented, how progress will be monitored and slippage addressed and the

    frequency and contents of project reports.

  • 8/8/2019 Quality Plans

    15/34

    Quality plan contents

    This section will describe the main project phases of systems development,with details of the :

    start criteria for the phase standards, methods and procedures to be used

    in the phase

    test, inspection and review procedures for the phase phase completion

    criteria.

  • 8/8/2019 Quality Plans

    16/34

    Quality plan contents

    Quality Assurance (QA) is concerned with reviewing the project work as itprogresses. It aims to discover errors as early in the project lifecycle as

    possible. Reviews may be:

    . self-checking

    peer-to-peer review

    subject to formal project review subject to formal external review.

  • 8/8/2019 Quality Plans

    17/34

    Quality plan contents

    The dynamic testing phases (unit testing, system testing, user acceptancetesting etc) will be defined in this section.

  • 8/8/2019 Quality Plans

    18/34

    Quality plan contents

    It is important that the results of quality assurance and testing are

    documented so that quality management can be verified as rigorous and

    avoid inadvertent repetition. A simple process may be used, where for each

    quality check a form is completed showing:

    . review date deliverable(s) reviewed or tested

    reviewer(s) description of errors found

    action point(s) for error correction

    severity of error.

  • 8/8/2019 Quality Plans

    19/34

    Quality plan contents

    The project may require certain products (for example, hardware) to be

    purchased, rather than developed. A process must be defined for effectiveprocurement. This process will include:

    the purchasing policy

    the system for supplier selection and evaluation

    the goods inspection methods).

  • 8/8/2019 Quality Plans

    20/34

    Quality plan contents

    The project may require that certain parts of the systems development are

    sub-contracted to a separate organisation. This section will describe:

    details of sub-contracts

    the system for sub-contractor selection and evaluation

    how work will be distributed to sub-contractors

    how sub-contract work is monitored and quality checked

    acceptance procedures for work produced by the sub-contractor.

  • 8/8/2019 Quality Plans

    21/34

    Quality plan contents

    The project may have to purchase goods and services that do not conformto the quality requirements of the project. This section will describe how they

    will be dealt with.

  • 8/8/2019 Quality Plans

    22/34

    Quality plan contents

    Describes the procedures to document and control changes to the scope of

    the project. This will include the system for logging change requests, the

    method of impact analysis and gaining and documenting the

    authorization/approval to apply the change.

  • 8/8/2019 Quality Plans

    23/34

    Quality plan contents

    Risk management is concerned with identifying potential problems andeliminating or reducing the damage the realization of those risks would

    cause. Risk assessment and management must be conducted at the start of

    the project and also throughout the project lifecycle to ensure that risks are

    understood and controlled.

  • 8/8/2019 Quality Plans

    24/34

    Quality plan contents

    This section specifies the arrangements for handling, delivering andinstalling the deliverables defined in the Product Requirement section of the

    Project Quality Plan.

  • 8/8/2019 Quality Plans

    25/34

  • 8/8/2019 Quality Plans

    26/34

  • 8/8/2019 Quality Plans

    27/34

    Capability Maturity Model Integration

    (CMMI)

    CMMI is a process improvement approach that provides organizations with

    the means to deliver its projects, products and services to the required level of

    quality.

    CMMI defines five levels of capability maturity that an organisation may attain

    in the efficiency and completeness of its working practices.

  • 8/8/2019 Quality Plans

    28/34

  • 8/8/2019 Quality Plans

    29/34

    Six Sigma is a quality management system (developed by Motorola)

    aimed at systematically improving processes as a metric for

    measuring defects and improving quality.

    Six sigma

  • 8/8/2019 Quality Plans

    30/34

  • 8/8/2019 Quality Plans

    31/34

    The main Six Sigma methodology takes the form of specificimprovement projects that follow a standard five-phase pattern (DMAIC).

    These are used to improve an existing business process.

    (a) Define the process improvement goals that are consistent with

    customer demands and enterprise strategy.

    (b) Measure the current process and collect relevant data for future

    comparison.(c) Analyze to verify relationship and causality of factors. Determine

    what the relationship is, and attempt to ensure that all factors have

    been considered.

    (d) Improve or optimize the process based upon the analysis using

    techniques like Design of Experiments.

    (e) Control to ensure that any variances are corrected before theyresult in defects. Set up pilot runs to establish process capability,

    transition to production and thereafter continuously measure the process

    and institute control mechanisms.

  • 8/8/2019 Quality Plans

    32/34

  • 8/8/2019 Quality Plans

    33/34

    Six Sigma requires effective organisation, including the following key

    elements

    (a) Steering committee nominate process areas for improvement.

    (b) Each process area will constitute a separate project and will have its own SixSigma project team. The project team will be made up of staff

    experienced in the process under review. For smaller scale projects, they

    will be the staff actually operating the process.

    (c) Project leaders run the project teams and hold varying grades of

    qualification, these are:

    Master Black Belt: First and foremost teachers, who alsoreview and mentor. They are especially skilled in the

    statistical techniques involved and will contribute to several

    projects simultaneously.

    Black Belt: Leaders of teams responsible for measuring,

    analyzing, improving and controlling key processes that

    influence customer satisfaction and/or productivity growth.Black Belts are full-time positions.

    Green Belt: Similar to Black Belt but not a full-time

    position, they retain other responsibilities alongside Six

    Sigma.

  • 8/8/2019 Quality Plans

    34/34