December 9, 2019, Meeting – Item 5 EUGENE URBAN RENEWAL AGENCY AGENDA ITEM SUMMARY Public Hearing and Action: A Resolution Adopting a Supplemental Budget; Making Appropriations for the Urban Renewal Agency of the City of Eugene for the Fiscal Year Beginning July 1, 2019, and Ending June 30, 2020 Meeting Date: December 9, 2019 Agenda Item Number: 5 Department: Central Services Staff Contact: Vicki Silvers www.eugene-or.gov Contact Telephone Number: 541-682-5082 ISSUE STATEMENT Urban Renewal Agency Board approval of the first Supplemental Budget for Fiscal Year 2020 is requested. Oregon Local Budget Law (Oregon Revised Statute 294.471) allows for supplemental budgets in the event of “an occurrence or condition that is not ascertained when preparing the original budget or a previous supplemental budget for the current year or current budget period and that requires a change in financial planning.” ORS 294.471 also allows for a supplemental budget if there are “funds that are made available by another unit of federal, state or local government and the availability of which could not reasonably be foreseen when preparing the original budget or a previous supplemental budget for the current year or current budget period.” This supplemental budget does not authorize any increase in the property tax levy and has been published in compliance with the Oregon Local Budget Law. BACKGROUND The supplemental budget that occurs in December of a fiscal year is usually the largest because of the audit adjustments to budgeted Beginning Working Capital and the reappropriation of funds from the prior fiscal year for contracts, program initiatives or projects that were started but not completed in that fiscal year. This supplemental budget consists of transactions to amend the URA Adopted Budget to reconcile Beginning Working Capital and Capital Carryover, to reappropriate those dollars or place them into reserve, and authorizes other unanticipated changes in legal appropriations. Transactions Related to Beginning Working Capital Isler CPA, the URA's external auditor, has completed its Fiscal Year 2019 audit and this supplemental budget includes Marginal Beginning Working Capital adjustments for all URA funds. The MBWC is the difference between the estimate of FY19 ending working capital that was made in the FY20 Adopted Budget and the audited actual FY19 ending working capital. The total audited adjustment to the FY20 budgeted Beginning Working Capital for all URA funds is a decrease of $626,712. A detailed description of these transactions is provided in Attachment A. CC Agenda - Page 339

Upload: others

Post on 03-Jul-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public Hearing and Action: A Resolution Adopting a

December 9, 2019, Meeting – Item 5

EUGENE URBAN RENEWAL AGENCY AGENDA ITEM SUMMARY

Public Hearing and Action: A Resolution Adopting a Supplemental Budget; Making Appropriations for the Urban Renewal Agency of the City of Eugene for the Fiscal

Year Beginning July 1, 2019, and Ending June 30, 2020

Meeting Date: December 9, 2019 Agenda Item Number: 5 Department: Central Services Staff Contact: Vicki Silvers www.eugene-or.gov Contact Telephone Number: 541-682-5082

ISSUE STATEMENT Urban Renewal Agency Board approval of the first Supplemental Budget for Fiscal Year 2020 is requested. Oregon Local Budget Law (Oregon Revised Statute 294.471) allows for supplemental budgets in the event of “an occurrence or condition that is not ascertained when preparing the original budget or a previous supplemental budget for the current year or current budget period and that requires a change in financial planning.” ORS 294.471 also allows for a supplemental budget if there are “funds that are made available by another unit of federal, state or local government and the availability of which could not reasonably be foreseen when preparing the original budget or a previous supplemental budget for the current year or current budget period.” This supplemental budget does not authorize any increase in the property tax levy and has been published in compliance with the Oregon Local Budget Law.

BACKGROUND The supplemental budget that occurs in December of a fiscal year is usually the largest because of the audit adjustments to budgeted Beginning Working Capital and the reappropriation of funds from the prior fiscal year for contracts, program initiatives or projects that were started but not completed in that fiscal year. This supplemental budget consists of transactions to amend the URA Adopted Budget to reconcile Beginning Working Capital and Capital Carryover, to reappropriate those dollars or place them into reserve, and authorizes other unanticipated changes in legal appropriations.

Transactions Related to Beginning Working Capital Isler CPA, the URA's external auditor, has completed its Fiscal Year 2019 audit and this supplemental budget includes Marginal Beginning Working Capital adjustments for all URA funds. The MBWC is the difference between the estimate of FY19 ending working capital that was made in the FY20 Adopted Budget and the audited actual FY19 ending working capital. The total audited adjustment to the FY20 budgeted Beginning Working Capital for all URA funds is a decrease of $626,712.

A detailed description of these transactions is provided in Attachment A.

CC Agenda - Page 339

Page 2: Public Hearing and Action: A Resolution Adopting a

December 9, 2019, Meeting – Item 5

One-Time Funding Request There is a one-time funding request of $1,300,000 for the Railroad Quiet Zone (three eastern crossings) in the Riverfront District. The offset is a decrease to the URA Riverfront Program Revenue Fund Balance Available by the same amount.

Reappropriations This Supplemental Budget includes reappropriation requests in the amount of $411,669 in the Downtown District and $100,000 in the Riverfront District for continued efforts related to the high-speed fiber project not completed in the prior fiscal year.

Capital Carryover The Capital Project Carryover Reconciliation is also included in this supplemental budget. An estimate of the unspent balance in each capital project was established in the FY20 Adopted Budget. These estimates have been reconciled with the actual FY19 expenditures, and the Capital Budget is adjusted to reflect the remaining unspent balances in each project. The Capital Carryover on this supplemental budget decreases the Capital Budget by $1,118,407 and increases Balance Available by the same amount.

Timing In some cases, expenditure authority is needed immediately to carry out URA Board direction or to meet legal or program requirements. Approval of SB1 in December allows the organization to prepare more accurate mid-year projections by having the general ledger reflect the audited balances in each fund. This, in turn, enables staff to more accurately estimate the Beginning Working Capital for the next fiscal year’s Proposed Budget.

PREVIOUS BOARD DIRECTION October 28, 2019, Work Session Agency Board received an update on the financial capacity of the Riverfront District, including an update on the Railroad Quiet Zone cost increase.

BOARD OPTIONS Particular requests requiring more information or discussion may be removed from SB#1 and delayed for action in a future supplemental budget. In certain cases, there may be a financial or legal impact to delaying budget approval. The URA Board may also adopt amended appropriation amounts or funding sources for specific requests in the supplemental budget.

AGENCY DIRECTOR’S RECOMMENDATION Approve the resolution in Attachment B adopting Supplemental Budget 1.

SUGGESTED MOTION Move to adopt a resolution, adopting a Supplemental Budget; making appropriations for the Urban Renewal Agency of the City of Eugene for the fiscal year beginning July 1, 2019, and ending June 30, 2020.

CC Agenda - Page 340

Page 3: Public Hearing and Action: A Resolution Adopting a

December 9, 2019, Meeting – Item 5

ATTACHMENTS A. Transaction SummaryB. Resolution

FOR MORE INFORMATION Staff Contact: Vicki Silvers Telephone: 541-682-5082Staff E-Mail: [email protected]

CC Agenda - Page 341

Page 4: Public Hearing and Action: A Resolution Adopting a

CC Agenda - Page 342

Page 5: Public Hearing and Action: A Resolution Adopting a

Attachment ATransaction Summary

817 Urban Renewal Agency Downtown General Fund

FY20 FY20 FY20Adopted SB1 Action Revised

I. RESOURCES

BEGINNING WORKING CAPITAL 2,920,476 (413,940) a 2,506,536

CHANGE TO WORKING CAPITAL

REVENUE Miscellaneous 112,000 0 112,000 Interfund Transfers 2,173,414 411,669 b 2,585,083 Fiscal Transactions 115,000 0 115,000Total Revenue 2,400,414 411,669 2,812,083

TOTAL RESOURCES 5,320,890 (2,271) 5,318,619

II. REQUIREMENTS

Department OperatingPlanning and Development 2,173,414 411,669 b 2,585,083

Total Department Operating 2,173,414 411,669 2,585,083

Non-DepartmentalSpecial Payments 3,060,476 (413,940) a 2,646,536Balance Available 87,000 0 87,000

Total Non-Departmental 3,147,476 (413,940) 2,733,536

TOTAL REQUIREMENTS 5,320,890 (2,271) 5,318,619

817 Urban Renewal Agency Downtown General Fund

a) Beginning Working Capital Reconciliation: Decrease the budgeted Beginning Working Capitalby $413,940 and decrease Special Payments by the same amount. This adjustment brings the FY20budgeted Beginning Working Capital in compliance with the audited FY19 actual revenues andexpenditures as determined by Isler CPA, the City's external auditor.

b) Reappropriation: Increase Interfund Transfer revenues by $411,669 for continued efforts relatedto the Downtown Urban Renewal Agency Fiber Project not completed in the prior fiscal year andincrease the Planning and Development Department operating appropriations by the same amount.

December 9, 2019, Meeting – Item 5CC Agenda - Page 343

Page 6: Public Hearing and Action: A Resolution Adopting a

812 Urban Renewal Agency Downtown Debt Service Fund

FY20 FY20 FY20Adopted SB1 Action Revised

I. RESOURCES

BEGINNING WORKING CAPITAL 2,905,176 664,247 a 3,569,423

CHANGE TO WORKING CAPITAL

REVENUE Taxes 2,603,000 0 2,603,000 Miscellaneous 103,000 0 103,000Total Revenue 2,706,000 0 2,706,000

TOTAL RESOURCES 5,611,176 664,247 6,275,423

II. REQUIREMENTS

Non-DepartmentalInterfund Transfers 2,173,414 411,669 b 2,585,083Balance Available 3,437,762 252,578 a,b 3,690,340

Total Non-Departmental 5,611,176 664,247 6,275,423

TOTAL REQUIREMENTS 5,611,176 664,247 6,275,423

812 Urban Renewal Agency Downtown Debt Service

a) Beginning Working Capital Reconciliation: Increase the budgeted Beginning Working Capitalby $664,247 and increase Balance Available by the same amount. This adjustment brings the FY20budgeted Beginning Working Capital in compliance with the audited FY19 actual revenues andexpenditures as determined by Isler CPA, the City's external auditor.b) Reappropriation: Increase Interfund Transfers to the URA Downtown General Fund by$411,669 for continued efforts related to the Downtown Urban Renewal Agency Fiber Project anddecrease Balance Available by the same amount.

December 9, 2019, Meeting – Item 5CC Agenda - Page 344

Page 7: Public Hearing and Action: A Resolution Adopting a

813 Urban Renewal Agency Downtown Capital Projects Fund

FY20 FY20 FY20Adopted SB1 Action Revised

I. RESOURCES

BEGINNING WORKING CAPITAL 195,291 (9,479) a 185,812

CHANGE TO WORKING CAPITAL

REVENUE Miscellaneous 13,000 0 13,000Total Revenue 13,000 0 13,000

TOTAL RESOURCES 208,291 (9,479) 198,812

II. REQUIREMENTS

Capital ProjectsCapital Carryover 149,285 0 149,285

Total Capital Projects 149,285 0 149,285

Non-DepartmentalBalance Available 59,006 (9,479) a 49,527

Total Non-Departmental 59,006 (9,479) 49,527

TOTAL REQUIREMENTS 208,291 (9,479) 198,812

813 Urban Renewal Agency Downtown Capital Projects Fund

a) Beginning Working Capital Reconciliation: Decrease the budgeted Beginning Working Capitalby $9,479 and decrease Balance Available by the same amount. This adjustment brings the FY20budgeted Beginning Working Capital in compliance with the audited FY19 actual revenues andexpenditures as determined by Isler CPA, the City's external auditor.

December 9, 2019, Meeting – Item 5CC Agenda - Page 345

Page 8: Public Hearing and Action: A Resolution Adopting a

821 Urban Renewal Agency Riverfront General Fund

FY20 FY20 FY20Adopted SB1 Action Revised

I. RESOURCES

BEGINNING WORKING CAPITAL 1,301,081 236,683 a 1,537,764

CHANGE TO WORKING CAPITAL

REVENUE Taxes 2,433,000 0 2,433,000 Miscellaneous 33,000 0 33,000Total Revenue 2,466,000 0 2,466,000

TOTAL RESOURCES 3,767,081 236,683 4,003,764

II. REQUIREMENTS

Department OperatingPlanning and Development 704,098 100,000 b 804,098

Total Department Operating 704,098 100,000 804,098

Non-Departmental Interfund Transfers 2,500,000 0 2,500,000Balance Available 562,983 136,683 a, b 699,666

Total Non-Departmental 3,062,983 136,683 3,199,666

TOTAL REQUIREMENTS 3,767,081 236,683 4,003,764

821 Urban Renewal Agency Riverfront General Fund

a) Beginning Working Capital Reconciliation: Increase the budgeted Beginning Working Capitalby $236,683 and increase Balance Available by the same amount. This adjustment brings the FY20budgeted Beginning Working Capital in compliance with the audited FY19 actual revenues andexpenditures as determined by Isler CPA, the City's external auditor.b) Reappropriation: Increase the Planning and Developmnent operating appropriations by$100,000 for continued efforts related to the Riverfront Urban Renewal Agency Fiber Project notcompleted in the prior fiscal year and decrease balance available by the same amount.

December 9, 2019, Meeting – Item 5CC Agenda - Page 346

Page 9: Public Hearing and Action: A Resolution Adopting a

823 Urban Renewal Agency Riverfront Capital Projects Fund

FY20 FY20 FY20Adopted SB1 Action Revised

I. RESOURCES

BEGINNING WORKING CAPITAL 7,918,636 (1,093,463) a 6,825,173

CHANGE TO WORKING CAPITAL

REVENUE Miscellaneous 10,257,000 0 10,257,000

Interfund Transfers 4,300,000 1,300,000 b 5,600,000Total Revenue 14,557,000 1,300,000 15,857,000

TOTAL RESOURCES 22,475,636 206,537 22,682,173

II. REQUIREMENTS

Capital ProjectsCapital Projects 15,100,000 1,300,000 b 16,400,000Capital Carryover 4,055,563 (1,118,407) c 2,937,156

Total Capital Projects 19,155,563 181,593 19,337,156

Non-Departmental Interfund Transfers 3,203,333 0 3,203,333Balance Available 116,740 24,944 a,c 141,684

Total Non-Departmental 3,320,073 24,944 3,345,017

TOTAL REQUIREMENTS 22,475,636 206,537 22,682,173

823 Urban Renewal Agency Riverfront Capital Projects Fund

c) Capital Carryover Reconciliation: Decrease capital carryover appropriations by $1,118,407 andincrease Balance Available by the same amount. This action reconciles the FY20 Capital CarryoverEstimate to the actual ending FY19 capital projects balance.

a) Beginning Working Capital Reconciliation: Decrease the budgeted Beginning Working Capitalby $1,093,463 and decrease Balance Available by the same amount. This adjustment brings theFY20 budgeted Beginning Working Capital in compliance with the audited FY19 actual revenues andexpenditures as determined by Isler CPA, the City's external auditor.

b) One-Time Funding Request: Recognize Interfund Transfer revenues from the URA RiverfrontProgram Revenue Fund in the amount of $1,300,000 and increase Capital Projects by the sameamount for the Railroad Quiet Zone.

December 9, 2019, Meeting – Item 5CC Agenda - Page 347

Page 10: Public Hearing and Action: A Resolution Adopting a

824 Urban Renewal Agency Riverfront Program Revenue Fund

FY20 FY20 FY20Adopted SB1 Action Revised

I. RESOURCES

BEGINNING WORKING CAPITAL 3,253,279 10,766 a 3,264,045

CHANGE TO WORKING CAPITAL

REVENUE Interfund Transfers 3,203,333 0 3,203,333 Miscellaneous 81,000 0 81,000Total Revenue 3,284,333 0 3,284,333

TOTAL RESOURCES 6,537,612 10,766 6,548,378

II. REQUIREMENTS

Non-Departmental Interfund Transfers 1,800,000 1,300,000 b 3,100,000Special Payments 1,000,000 10,766 a 1,010,766Balance Available 3,737,612 (1,300,000) b 2,437,612

Total Non-Departmental 6,537,612 10,766 6,548,378

b) R TOTAL REQUIREMENTS 6,537,612 10,766 6,548,378

824 Urban Renewal Agency Riverfront Revenue Fund

a) Beginning Working Capital Reconciliation: Increase the budgeted Beginning Working Capitalby $10,766 and increase Special Payments by the same amount. This adjustment brings the FY20budgeted Beginning Working Capital in compliance with the audited FY19 actual revenues andexpenditures as determined by Isler CPA, the City's external auditor.b) One-Time Funding Request: Increase Interfund Transfers to the URA Riverfront CapitalProjects Fund in the amount of $1,300,000 and decrease Balance Available by the same amount forthe Railroad Quiet Zone.

December 9, 2019, Meeting – Item 5CC Agenda - Page 348

Page 11: Public Hearing and Action: A Resolution Adopting a

ATTACHMENT B

NOW THEREFORE,

Section 1.

Section 2.

Section 3.

Section 4.

The foregoing resolution adopted this 9th day of December, 2019.

This resolution complies with ORS 294.471(4), and does not authorize an increasein the levy of property taxes above the amount in the Annual Budget publication.

City Recorder

That this Supplemental Budget is prepared in accordance with ORS 294.471(1),which authorizes the formulation of a supplemental budget resulting from "Anoccurrence or condition that is not ascertained when preparing the original budgetor a previous supplemental budget for the current year or current budget period andthat requires a change in financial planning." This Supplemental Budget waspublished in accordance with ORS 294.471(3).

Resolution Number 1092

A RESOLUTION ADOPTING A SUPPLEMENTAL BUDGET;MAKING APPROPRIATIONS FOR THE URBAN RENEWAL AGENCY

OF THE CITY OF EUGENEFOR THE FISCAL YEAR BEGINNING JULY 1, 2019,

AND ENDING JUNE 30, 2020.

The Urban Renewal Agency of the City of Eugene finds that adopting the Supplemental Budget and making appropriations is necessary under ORS 294.471.

BE IT RESOLVED BY THE URBAN RENEWAL AGENCY OF THE CITY OF EUGENE as follows:

That the Supplemental Budget for the Urban Renewal Agency of the City ofEugene, Oregon, for the fiscal year beginning July 1, 2019, and ending June 30,2020, as set forth in attached Exhibit A is hereby adopted.

The supplemental amounts for the fiscal year beginning July 1, 2019, and endingJune 30, 2020, and for the purposes shown in attached Exhibit A are herebyappropriated.

December 9, 2019, Meeting – Item 5CC Agenda - Page 349

Page 12: Public Hearing and Action: A Resolution Adopting a

In dollars

Departmental OperatingPlanning and Development 411,669

Total Departmental Operating 411,669

Non-DepartmentalSpecial Payments (413,940)

Total Non-Departmental (413,940)

TOTAL URA DOWNTOWN GENERAL FUND (2,271)

Non-DepartmentalInterfund Transfers 411,669

* Balance Available 252,578Total Non-Departmental 664,247

TOTAL URA DOWNTOWN DEBT SERVICE FUND 664,247

Non-Departmental* Balance Available (9,479)

Total Non-Departmental (9,479)

TOTAL URA DOWNTOWN CAPITAL PROJECTS FUND (9,479)

URBAN RENEWAL AGENCY DOWNTOWN CAPITAL PROJECTS FUND

EXHIBIT A

URBAN RENEWAL AGENCY DOWNTOWN GENERAL FUND

URBAN RENEWAL AGENCY DOWNTOWN DEBT SERVICE FUND

December 9, 2019, Meeting – Item 5CC Agenda - Page 350

Page 13: Public Hearing and Action: A Resolution Adopting a

URBAN RENEWAL AGENCY RIVERFRONT GENERAL FUND

Departmental OperatingPlanning and Development 100,000

Total Departmental Operating 100,000

Non-Departmental* Balance Available 136,683

Total Non-Departmental 136,683

TOTAL URA RIVERFRONT GENERAL FUND 236,683

Capital ProjectsCapital Projects 181,593

Total Capital Projects 181,593

Non-Departmental* Balance Available 24,944

Total Non-Departmental 24,944

TOTAL URA RIVERFRONT CAPITAL PROJECTS FUND 206,537

URBAN RENEWAL AGENCY RIVERFRONT PROGRAM REVENUE FUND

Non-DepartmentalInterfund Transfers 1,300,000

* Balance Available (1,300,000)Special Payments 10,766

Total Non-Departmental 10,766

TOTAL URA RIVERFRONT PROGRAM REVENUE 10,766

TOTAL REQUIREMENTS - ALL FUNDS 1,106,483

* Reserves and Balance Available amounts are not appropriated for spendingand are shown for informational purposes only.

URBAN RENEWAL AGENCY RIVERFRONT CAPITAL PROJECTS FUND

December 9, 2019, Meeting – Item 5CC Agenda - Page 351