psi oil & gas - psigasandoil.com · kuwait oil company burgan, kuwait 2011 - 2013 extension of...
TRANSCRIPT
PS I Energy Oil & Ga s
Ref e r enc e L i s t
Con t r o l and Energy Managemen t Sys t ems
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 2 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 3 of 52
Reference List
Open Grid Europe GmbH
Essen
2016 - 2017
Upgrade of the control and information systems for the DAISY dispatching system.
The latest versions of PSIcontrol, simulation, gas quality reconstruction and Transport
Management were implemented. Connection between sites is carried out via site syn-
chronization.
Open Grid Europe GmbH
Essen
2000 - 2016
Annual adaptation to German and European gas market requirements for transport
management system PSItransport and nomination management system NoMa (since
2011).
PCK Raffinerie GmbH
Schwedt
2016
Upgrade to the latest version of PSIpipelines applications Leak Detection and Loca-
tion, Batch Tracking, Pig Tracking and Pipeline Stress Monitoring. The examination
by TÜV is based on the German regulations TRFL (Technical Guideline on Pipelines)
according to IEC EN 61508 SIL 1 and the Code of Practice AD-S1.
Swedegas AB
Göteborg, Sweden
2015 - 2016
Online simulation system with leak detection, pig tracking and gas quality tracking.
Input data is received via OPC communication from the Swedegas SCADA system.
The gas quality tracking calculates results for billing purposes.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 4 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
OMV Germany
Burghausen
2015 - 2016
Hardware and system upgrade for OMV Burghausen’s PSIpipelines leak detection and
location system for crude oil and product pipelines.
E.ON Netzgesellschaft
Essen
2015
Develop and implement a new generation of network control systems at 8 locations
for the EON Group. Includes homogeneous system basis and identical functionality
for the various mediums of the multi-utility control system. Incorporates optimal use
of today’s control system standards, IT, Software and hardware technology as well as
digitalised communication networks.
bayernets GmbH
Munich
2015
Migration of control system to PSIcontrol Gas with new implementation of PSI-
transport, PSIprognose, PSIganesi for online gas grid simulation and PSIganproda for
gas quality tracking for billing purposes.
Thyssengas GmbH
Dortmund
2015
Delivery of PSIportal system for display, report generation, archiving and tracking of
data from the control system and the transportation management system over a time
period of 10 years.
Thyssengas GmbH
Dortmund
2014 - 2016
Upgrade of the Gas Management System to the latest versions of PSIcontrol Gas,
PSIganesi, PSItransport and PSIcomcentre. A stand-by system was also implemented
which is connected in a disaster tolerant manner to the main system via site synchroni-
zation.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 5 of 52
E.ON IT GmbH
Essen
2014 - 2015
The Storage Management System (SMS) for E.ON for Gas Storage (EGS) was ex-
panded to include the system PSIarchive (based on PSIportal) for display, archiving
and report generation.
KGE Kommunale Gasspeichergesellschaft Epe mbH & Co. KG
Gronau
2014 - 2015
Upgrade of the Storage Management System for operative contract handling and monitor-
ing storage operations consisting of PSItransstore, PSIcontrol Gas and PSIcomcentre as
well as delivery of a test system.
Austrian Gas Grid Management AG (AGGM)
Vienna, Austria
2014 - 2015
Upgrade of the Gas Grid Management System due to changing statutory guidelines
and market driven requirements with expansion of market communication and
capacity management.
ONTRAS Gastransport GmbH
Leipzig
2014 - 2015
Upgrade to the latest version of the process control system PSIcontrol Gas as well as
modernisation of online simulation and calibrated gas quality reconstruction with
PSIganesi.
Westnetz GmbH
Dortmund
2014 - 2015
Upgrade of the existing Gas Management System to the latest versions of PSIcontrol
Gas, PSItransport, PSIprognose, PSIcomcentre and PSIfetch for the main and
secondary control centres. Connection between the facilities is carried out via site
synchronisation.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 6 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Currenta GmbH & Co. OHG
Leverkusen
2013 - 2014
Upgrade of the load management system for the most cost efficient utilization of the gas
supply contracts with multiple suppliers for various production sites using PSIcompact and
PSIfetch.
DONG Energy A/S
Hörsholm, Denmark
2013 - 2014
The DONG gas dispatching solution system which handles the business processes for
short-tern trading was realised by implementing the standard applications PSItransact,
PSIcomcentre and PSIgasaf. DONG will manage its operational activities using the PSI
AG Gas Dispatching Solution and it will be seamlessly integrated into the existing envi-
ronment.
GASCADE Gastransport GmbH
Kassel
2012 - 2014
Migration of the existing control system PSIgamos to PSIcontrol. The GASCADE trans-
mission system was realised by implementing a Gas Management System consisting of
the control system PSIcontrol, online simulation PSIganesi, model based calorific value
calculation PSIreko and transport planning with PSItransport.
Austrian Gas Grid Management AG (AGGM)
Vienna, Austria
2012
The existing Gas Grid Management System, based on the PSI solution PSItransport, was
expanded to meet the requirements of gas regulation 4 of the Austrian market.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 7 of 52
PAO Gazprom
Central Production-Dispatching Department (CPDD)
Moscow, Russia
2011-2016
Developed and delivered the basic software for the centralised control system of Gaz-
prom’s gas transport system in the Russian Federation (M ASDU ESG).
PSI supplied the software components PSIcontrol CPDD, PSItransport, PSIcomcentre
and PSILvisserver for the main supervisory level as well as PSIcontrolCPDDconnect
and PSIcomcentre for the 27 subordinate Gazprom subsidiaries.
PAO Gazprom
OOO Gazprom UGS
Moscow, Russia
2011 - 2014
Technological dispatching system for Gazprom’s 19 underground gas storage (UGS) facil-
ities throughout Russia. The system includes the standard applications PSIcontrol V7 with
MLCS Technology (Multi Level Control System), PSIstorage, PSIcomcentre, PSIportal
and PSIganesi.
PAO Gazprom
Pipeline Sakhalin – Wladiwostok
OOO Gazprom Transgaz Tomsk, Russia
2011 - 2014
Delivery of a regional dispatching system (located in Khabarovsk with the dispatching
centre in Tomsk) with four subordinate local control systems. The system includes the
standard applications PSIcontrol V7 with MLCS Technology (Multi Level Control Sys-
tem), PSItransport, PSIcomcentre, and PSIganesi. The Sakhalin – Wladiwostok pipeline
supplies the Far East as well as part of the planned export connection to China.
PAO Gazprom
Pipeline Bovanenkovo – Ukhta – Torshok
OOO Gazprom Transgaz Ukhta, Russia
2011 - 2014
Delivery of eleven regional control systems (connected to the dispatching center in
Ukhta) based on PSIcontrol V7 with MLCS Technology (Multi Level Control System)
for the Bovanenkovo – Ukhta – Torshok pipeline. The pipeline serves as one of the main
supply routes, connects to the Nord Stream Pipeline and supplies Russia domestically.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 8 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Deutsche Transalpine Oelleitung GmbH (TAL)
Munich
2011 - 2013
Upgrade to new process control system PSIcontrol. The system includes integrated
higher operating and security functions in PSIpipelines such as online simulation,
batch tracking, leak detection and load change collectivisation.
Kuwait Oil Company
Burgan, Kuwait
2011 - 2013
Extension of the existing Pipeline Leak Detection and Location System (PSIpipelines)
for the countrywide gas and condensate pipelines of KOC with the new booster station
BS171.
Saudi Aramco
Khursaniyah, Saudi Arabia
2011 - 2012
Delivery of a Pipeline Leak Detection and Location System (PSIpipelines) for the
Saudi Aramco Karan Gas Field Project with 4 offshore flow lines and a 38” offshore
trunk line 85 km in length from the gas field to the onshore gas plant.
E.ON IT GmbH
Essen
2011 - 2012
The implemented storage management system (SMS) for E.ON Gas Storage (EGS) is
responsible for operative contract handling and monitoring of storage operations using
PSItransstore.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 9 of 52
Mineralölverbundleitung GmbH (MVL)
Schwedt
2011 - 2012
Migration to new process control system PSIcontrol. The system includes integrated
higher operating functions such as leak detection and location, tank farm management
and load change collectivisation. The examination by TÜV was based on the German
regulations TRFL (Technical Guideline on Pipelines) according to IEC EN 61508 SIL
1 and the Code of Practice AD-S1.
Netzgesellschaft Berlin Brandenburg mbH & Co. KG (NBB)
Berlin
2011 - 2012
Upgrade to new control system PSIcontrol. The system includes an integrated topo-
logical data model for gas network simulation.
Open Grid Europe GmbH
Essen
2011 - 2012
Implementation of the transport management system PSItransport for a fully automat-
ic system for nomination management. The solution is comprised of PSI components
as well as portal solutions for internal and external user interfaces and message pro-
cessing. Coordination is carried out using a workflow management tool.
Dow/BSL
Böhlen
Honeywell AG, Offenbach
2011 - 2012
Migration of the leak detection and location system to PSIpipelines for the product
and gas pipeline system of DOW Central Germany in Böhlen. The implemented soft-
ware was certified according to SIL 1 by TÜV. The examination by TÜV was based
on the German regulations TRFL (Technical Guideline on Pipelines) according to IEC
EN 61508 SIL 1 and the Code of Practice AD-S1.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 10 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
KGE Kommunale Gasspeichergesellschaft
Gronau
2011 - 2012
The implemented storage management system (SMS) for Kommunale Gasspeicherge-
sellschaft (KGE) is responsible for operative contract handling and monitoring of stor-
age operations using PSItransstore.
Thyssengas GmbH
Dortmund
2011
Implementation of a Gas Management System consisting of PSIcontrol Gas, PSI-
transport as well as PSIcomcentre due to the statutory requirements of liberalizing the
German gas sector.
PAO Gazprom
Nord Stream onshore
OOO Gazprom Transgaz St. Petersburg / OOO Gazprom Transgaz Ukhta
Russia
2010 - 2013
Implementation of two central control systems in St. Petersburg and Ukhta as well as
7 subordinate regional control systems based on PSIcontrol V7 with MLCS Technol-
ogy (Multi Level Control System) for connecting the Nord Stream Pipeline to the
trunk pipelines on the Russian mainland.
Total Infrastructures Gaz France (TIGF)
Pau Cedex, France
2010 - 2013
Migration from PSIgamos to new process control system PSIcontrol. The TIGF
transmission system was realised by implementing a Gas Management System con-
sisting of PSIcontrol.
OMV
Schwechat, Austria
2010 - 2012
New leak detection and location system PSIpipelines for OMV’s Product Pipeline
West from the Schwechat refinery to the St. Valentin tank farm.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 11 of 52
Kuwait Oil Company
Burgan, Kuwait
2010 - 2012
Extension of the existing Pipeline Leak Detection and Location System (PSIpipelines)
for the countrywide gas and condensate pipelines of KOC with the new booster station
BS160.
Thyssengas GmbH
Dortmund
2010 - 2012
Delivery of an online simulation system PSIganesi for an integrated solution with
PSIcontrol.
Bayer Material Science Co., Ltd.
Shanghai, China
2010 - 2012
Load Management System: Cost optimisation of raw material flows for the production
plant using PSIcontrol.
RWE Service GmbH
Dortmund
2010 - 2012
Implementation of an emergency control system (GAS) in Arnsberg based on PSIcon-
trol, PSItransport and PSIcomcentre.
Transneft Ltd.
Samara, Russia
2010 – 2012
Dynamic online and offline simulation system for the 3900 km Drushba crude oil pipeline.
E.ON Hanse AG
Hamburg
2010 - 2011
Migration to new control system PSIcontrol. System includes integrated gas transport
management system PSItransport and gas business communication system PSIcomcentre.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 12 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
VNG AG
Leipzig
2010 - 2011
Delivery and commissioning of a storage monitoring system using PSIcontrol. Coupling
to 3rd party system carried out via TASE.2, XML and OPC.
Kuwait Oil Company
Burgan, Kuwait
2010 - 2011
Extension of the existing Pipeline Leak Detection and Location System (PSIpipelines)
for the countrywide gas and condensate pipelines of KOC with a new 40” gas pipeline
more than 100 km in length.
terranets bw GmbH
Stuttgart
2009 - 2012
Migration of the existing control system PSIgamos to PSIcontrol. The terranets trans-
mission system was realised by implementing a Gas Management System comprising
of PSIcontrol as well as components for online simulation PSIganesi, forecasting PSI-
forecast and dispatching.
Gasunie Deutschland GmbH & Co. KG
Hannover
2009 - 2011
New network control system PSIcontrol for optimising and monitoring the network.
System includes integrated gas transport management system PSItransport and gas
network simulation system PSIganesi.
Erdgas Münster GmbH
Münster
2009 - 2011
Migration to new control system PSIcontrol. The system includes integrated applica-
tions PSIforecast, gas grid simulation PSIganesi as well programming interface PSIapi
for reading basic data and for reading and modifying historical data.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 13 of 52
RWE Service GmbH
Dortmund
2009 - 2010
Delivery of network control system PSIcontrol for the “Central control system Gas”
Adria-Wien Pipeline GmbH
Vienna, Austria
2009 - 2010
New control system for AWP’s crude oil pipeline with higher functionalities tankfarm
management, online simulation, batch and pig tracking and training.
Tatneft Ltd.
Kalinovy Kljutsch, Russia
2008 - 2009
Leak detection and location system for a crude oil pipeline.
RWE Westfahlen Weser Ems Netzservice GmbH
Dortmund
2008 - 2009
Turnkey delivery of gas tracking system PSIganproda with type approval by German
certification authority and operational support.
N.V. Nederlandse Gasunie
Amsterdam, The Netherlands
2008 - 2009
PSI, in close cooperation with Gasunie, analysed the old IT environment used for rep-
resenting “Meter-to-Bill business processes and created a detailed specification based
on a modern and flexible solution concept using PSI standard products.
E.ON Ruhrgas
Essen
2008
The project included the integration of E.ON D-Gas, where the business processes are
based in The Haag, in the DAISY trading system. The technical focus of the integra-
tion project was the appropriate differentiation of the various user groups in regards to
their external business communication.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 14 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
E.ON Ruhrgas AG
Essen
2008
PSI customised the components PSItransport, PSIcomcentre and PSItransact for
E.ON Gastransport to meet the new requirements of the Energy Industry Act.
Euro-Arab Mashreq Gas Market Project (EU financed)
Damascus, Syria
2008
PSIganesi planning system for steady state and transient gas network calculations with
implementation and user education at Syria.
RWE Systems
Dortmund
2007 - 2010
Migration to new process control system PSIcontrol. System includes integrated gas
transport management system PSItransport and gas business communication system
PSIcomcentre.
VNG AG
Leipzig
2007 - 2009
Migration to new process control system PSIcontrol. System includes integrated gas
transport management system PSItransport and message handling module PSIcomcentre
E.ON Ruhrgas AG
Essen
2007 - 2008
Realisation of integrated gas quantity tracking system PSIreko based on SCADA sys-
tem PSIcontrol V7 with online interface to the gas billing infrastructure and type ap-
proval by German certification authority PTB.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 15 of 52
AGGM AG
Vienna, Austria
2007 - 2008
Gas grid management system including PSIcontrol SCADA system as well as gas
transport management system PSItransport, message handling module PSIcomcentre,
gas network simulation and closed loop control.
RWE Westfalen Weser Ems Netzservice GmbH
Dortmund
2007
Turnkey delivery of gas tracking system PSIganproda approved by German certifica-
tion authority PTB and operational support.
E.ON Gastransport AG & Co. KG
Dortmund
2007
New accounting grid functionality based on PSItransport and PSIcomcentre.
E.ON Hanse AG
Hamburg
2007
Disaster tolerant realisation of PSIgamess and PSIcomcentre.
PAO Gazprom
Blue Stream pipeline “Russia-Turkey”
OOO Gazprom Transgaz Krasnodar, Russia
2007
Implementation of three process control systems PSIgamos for the dispatching centres
in Krasnodar and Berezan with online process connection to the control systems of
Gazavtomatika/ZOND2000 and Siemens/PCS7. Introducing a 3-level control concept.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 16 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
PAO Gazprom
Gazprom Topenergy
Sofia, Bulgaria
2007
Commissioning of one PSIcomcentre for transfer of commercial data to the dispatch-
ing centre of Gazprom in Sofia (Bulgaria).
EnBW Gas GmbH
Stuttgart
2007
Turnkey delivery of gas transport management system PSItransport and message han-
dling module PSIcomcentre with online interface to the existing SCADA system.
Euro-Arab Mashreq Gas Market Project (EU financed)
Damascus, Syria
2007
PSIganesi planning system for steady state and transient gas network calculations with
implementation and user education at Syria.
Kuwait Oil Company
Kuwait-City, Kuwait
2006 - 2008
Leak detection and location system for the countrywide gas and condensate pipelines
of Kuwait Oil Company KOC.
RMR mbH
Cologne
2006 - 2007
Upgrade of all computer hardware for the control system of RMR’s product pipeline
during normal pipeline operation.
E.ON Thüringer Energie AG
Erfurt
2006 - 2007
Migration gas data management system PSIgamess to a corporate network solution with re-
dundant realisation and online interface with gas business in-house data warehouse system.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 17 of 52
Bayer Industrial Services
Leverkusen
2006 - 2007
Load management system including optimisation of supply contracts.
DREWAG
Dresden
2006 - 2007
Migration to new process control system PSIcontrol. System includes integrated gas
simulation system PSIganesi.
PAO Gazprom
Blue Stream pipeline “Russia-Turkey”
OOO Gazprom Transgaz Stavropol, Russia
2006
Commissioning of two process control systems for the dispatching centres in Stavro-
pol and Izobilnyj with online process connection to the control systems of
Gazavtomatika/ZOND2000 and Siemens/PCS7. Introducing a 3-level control concept.
RWE Westfahlen Weser Ems Netzservice GmbH
Dortmund
2005 – 2006
Feasibility study for online simulation and gas quantity tracking for billing purposes
for RWE with gas network calculations, analysis of measurement infrastructure and
realisation proposals.
E.ON AVACON AG
Salzgitter
2005 – 2006
Migration to new process control system PSIcontrol. System includes integrated gas
transport management system PSItransport, message handling module PSIcomcentre,
gas network simulation and closed loop control.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 18 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Mitteldeutsche Gasversorgung GmbH (MITGAS)
Halle (Saale)
2005 - 2006
Migration to new process control system PSIcontrol. System includes integrated fore-
casting function. Process coupling will be carried out in the future by PSIgamess.
E.ON Hanse AG
Hamburg
2005 – 2006
Migration to new process control system PSIcontrol. System includes integrated gas
transport management system PSItransport and message handling module PSIcomcentre.
E.ON Ruhrgas AG
Essen
2005 – 2006
Realisation of a Control and Information System for trading dispatching of E.ON
Ruhrgas AG in the liberalized market based on PSIcontrol, contract management sys-
tem PSItransact und business message exchange using PSIcomcentre.
OMV Deutschland
Burghausen
2005 – 2006
Pipeline leak detection and location system including batch tracking, pig tracking, and
visualisation of hydraulic profiles for OMV’s crude oil and product pipeline system.
Gasversorgung Thüringen GmbH (GVT)
Erfurt
2005
Sub-network oriented gas property billing with PSIganesi.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 19 of 52
Steirische Gas-Wärme GmbH
Graz, Austria
2004 – 2005
Delivery of a modular dual operational control system for traders and network opera-
tors based on PSIcontrol including various trader modules (i.e. contract groups, bal-
ance groups, scheduling and forecasting).
Wingas GmbH
Kassel
2004
Development of a gas industry web-portal for a liberalised gas market.
Ruhrgas AG
Essen
2003 – 2005
Realisation of the complete renewal of the Dispatching Control and Information Sys-
tem based on PSIcontrol, contract management system PSItransport und business
message exchange using PSIcomcentre. Fully integrated energy management includ-
ing simulation and optimization.
MAINOVA AG
Frankfurt
2003 – 2004
New process control system PSIcontrol for the major gas supplier of the Rhein-Main
area. System includes integrated gas network simulation PSIganesi and integrated gas
transport management system PSItransport.
AVACON AG
Salzgitter
2003 – 2004
Upgrade of TM system. Integration of a 3rd party system and interface to SAP I J-U.
Contracting authority was is-Energy.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 20 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Wingas GmbH
Kassel
2003 – 2004
Reconstruction system for determining gas property data for billing.
Acted as consultants during weights and measures certification.
SW Karlsruhe
Karlsruhe
2003
Gas data retrieval and processing with PSIgamess and integrated data retrieval.
Gasversorgung Thüringen GmbH (GVT)
Erfurt
2003
Gas data retrieval and processing with PSIgamess and integrated data retrieval as well
as mobile data acquisition and technical quantity determination.
Stora Enso Maxau GmbH & Co. KG
Karlsruhe
2003
Gas data retrieval and processing with PSIgamess and integrated data retrieval.
Hamburger Gaswerke GmbH (HeinGas)
Hamburg
2003
Delivery of PSItransport transport management system and integration with existing
PSIcontrol.
RWE Gas AG, Kavernenspeicher Staßfurt GmbH
Kalle, Staßfurt
2003
Remote monitoring of storage control system. Upgrade of two-way unmanned operations.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 21 of 52
AVACON AG
Salzgitter
2003
System upgrade and expansion of PSIganesi planning system and PSIganproda.
Contracting authority was is-Energy.
Bayerngas GmbH
Munich
2002 – 2004
Complete upgrade of PSIgamos control system incorporating the newest hardware and
software versions and IEC remote coupling.
GASAG
Berlin
2002 – 2003
New control system PSIcontrol for the entire gas grid of the largest gas municipality in Eu-
rope. Integration of higher functions such as gas grid simulation (GANESI), forecast, etc
AVACON AG
Salzgitter
2002 – 2003
Hardware and system upgrade of TM system.
Contracting authority was is-Energy.
ExxonMobil Production Deutschland GmbH
Hannover
2002
Upgrade of PSIgamos control system.
TASE.2 coupling for exchanging process data.
Wingas GmbH
Kassel
2002
Gas data retrieval and processing with PSIgamess and integrated data retrieval.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 22 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
RWE Gas AG, Kavernenspeicher Staßfurt GmbH
Kalle, Staßfurt
2002
Complete upgrade of PSIcontrol control system incorporating newest hardware and
software versions. Different enhancements.
RWE Gas AG
Dortmund
2002
Complete upgrade of PSIcontrol control system incorporating newest hardware and
software versions. Different enhancements.
AVACON AG
Salzgitter
2002
Delivery of PSItransport transport management system and integration in existing
PSIcontrol. Separation of contract based load guidance.
Verbundnetz Gas AG (VNG)
Leipzig
2002
Delivery of PSIcomcentre communication system with clear text, Edig@s and XML
communication protocols.
Gasversorgung Süddeutschland GmbH (GVS)
Stuttgart
2002
Gas data retrieval and processing with PSIgamess and integrated data retrieval as well
as automatic data retrieval in Internet.
Lukoil
Perm, Russia
2001 - 2002
Leak detection and localisation system (LEO) for a product pipeline from Perm to
Almetevsk. Coupled to Honeywell via OPC.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 23 of 52
Bayernoil
Neustadt
2001 – 2002
Leak detection and localisation system (LEO) for eight product pipelines between
Vohburg and Neustadt/Donau. Coupled to a Foxboro SCADA system via OPC.
Oberösterreichische Ferngas
Linz, Austria
2001 – 2002
The Oberösterreichische Ferngas (OÖF) is a regional distributor that is on the way to
complete unbundling. PSItransport is used for the efficient processing of transport con-
tracts on the gas grid operator side. In addition, storage and storage contracts are handled
with PSItransport. PSItransport is used with an integrated forecast to determine sales to
consumers. The existing SCADA system (not from PSI) has been linked to PSI-
transport. A convenient EXCEL-based nomination interface has been developed.
Wingas GmbH
Kassel
2001 – 2002
Planning and realisation of an integrated communication system (CommCenter) for
exchanging process data and business messages via TASE.2, OPC, XML and Edig@s.
AVACON AG
Salzgitter
2001
Topographical network illustration and additional upgrades of the PSIganesi planning
system.
Thyssengas GmbH
Duisburg
2001
Gas data retrieval and processing with PSIgamess and integrated data retrieval as well
as automatic data retrieval via Internet.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 24 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Ruhrgas AG
Essen
2000 – 2003
Realisation of the new Dispatching Control and Information System, based on PSIcon-
trol. Fully integrated Energy Management including Energy Optimisation.
PAO Gazprom
Blue Stream Pipeline
Moscow, Russia
2000 – 2003
Delivery of five hierarchic control systems that monitor and control the “Blue Stream”
gas pipeline which runs through the Black Sea between Russia and Turkey.
Mineralölverbundleitung GmbH (MVL)
Schwedt
2002 – 2002
Control system PSIcontrol for the crude oil pipelines Drushba 1, 2 and 3, Spergau 1
and 2 and the tank farm Heinersdorf.
The system includes the complete higher functionality like automatic pipeline start-up and
shut-down, leak detection and localisation, tank farm management and offline simulation.
To insure the supply of the refineries of PCK (Schwedt) and TotalFinaElf (Spergau)
the actual control system has to be replaced while the pipeline is in full operation.
BEB Erdgas- und Erdöl GmbH
Hannover
2000 – 2002
Planning and realisation of a communication server for the exchange of business mes-
sages with partners and customers. In addition, integration into the gas grid control
system. TASE.2 prototype (for process data exchange).
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 25 of 52
Snam S. p. A.
Milan, Italy
2000 – 2002
New dispatch information system “Nuovo Dispacciamento”. Main features: gas quality trac-
king using GANESI;
Required forecast; balancing; transport planning; servicing system; data warehouse and help
desk functions.
Gasversorgung Süddeutschland GmbH (GVS)
Stuttgart
2000 – 2002
Migration of the main and back-up control system to Alpha hardware. Installation and
implementation of new Windows NT user interface.
Bayerngas GmbH
Munich
2000
Gas data retrieval and processing with PSIgamess and integrated data retrieval as well
as automatic data retrieval via Internet.
Celanese Chemicals Europe GmbH
Werk Ruhrchemie
Oberhausen
1999 – 2000
Leak detection and localisation for a product pipeline certified by the German Tech-
nical Inspection authorities (TÜV).
Rhein-Main-Rohrleitungstransportgesellschaft m.b.H. (RMR)
Cologne-Godorf
1999 – 2002
Replacement of the complete supervisory system to control the 620 km product pipeline.
The new system includes the complete higher functionality like post mortem analysis
and closed loop control of the pipeline.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 26 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Messer Griesheim GmbH
Krefeld
1999 – 2001
Realisation of an updated control system and migration to Alpha hardware and new
Windows NT user interface; integration of an Oracle data base.
Wingas GmbH
Kassel
1999 – 2002
Turnkey delivery of a new gas grid control system for monitoring, controlling and op-
timising operations.
Erdgas Südsachsen GmbH (ESG)
Chemnitz
1999 – 2000
Control system PSIcontrol including all higher functionality for gas management.
Hamburger Gaswerke GmbH (HeinGas)
Hamburg
1999 – 2000
Control system PSIcontrol for the gas grid and the underground storages Reitbrook
and Kraak.
Technische Universität Freiberg
Freiberg
1999
Implementation of GANESI planning system for transient gas grid planning.
Ruhrgas AG
Essen
1998 – 1999
Requirements specification for the new Energy Management System, based on the control
system PSIcontrol; with complete, fully integrated higher functionality including optimisation.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 27 of 52
Ruhrgas AG
Essen
1998 – 1999
Control system PSIcontrol for data acquisition from the gas grid and supervision and
control of the complete telecontrol network.
Stadtwerke Bochum GmbH
Bochum
1998
Implementation of a new network work control system for the monitoring, control and
optimisation of natural gas and water supply.
Bayerngas GmbH
Munich
1998
Implementation of a gross calorific value tracking simulation based on GANESI for
billing purposes.
PCK Raffinerie GmbH
Schwedt
Hartmann & Braun GmbH, Eschborn
1998 – 2000
Control system PSIcontrol for the crude oil pipeline system Rostock-Heinersdorf-
Schwedt including all higher functionality (acceptance test by German officials TÜV).
Hardware: Digital AlphaServer 800 and Digital AlphaStation PWS 433.
Snam S. p. A.
Milan, Italy
1998
Delivery of a transient online gas grid simulation (GANESI) with client-server archi-
tecture, connecting to the existing control system.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 28 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
BEB Erdgas- und Erdöl GmbH
Hannover
1998 – 2002
Implementation of a control system for the gas grid operation at two separate locations
including several optimisation functions.
BEB Erdgas- und Erdöl GmbH
Hannover
1998
Realisation of a strategic planning instrument (PAN2000) for optimised cost disposi-
tion of gas purchases from internal production, external purchases and storage man-
agement.
Dansk Olie & Naturgas A/S (DONG)
Hørsholm, Denmark
1998 – 2001
Turnkey delivery of a new control system for the monitoring, control and optimised
operation of the natural gas grid and crude oil pipeline. Implementation of interfaces
to new telemetry system and to a leak detection system for the oil pipeline.
Sydgas
Malmø, Sweden
1998
Implementation of GANESI planning system for transient gas grid planning.
Energie- und Wasserversorgung AG (EWAG)
Nürnberg
1998 – 2000
Migration of control system to computers with RISC architecture. In addition, realisa-
tion of a new telemetry interface and implementation of an emergency control system.
Erdgas Mittelsachsen GmbH (EGS)
Schönebeck/Elbe
1998
Implementation of GANESI planning system for transient gas grid planning.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 29 of 52
Erdgasversorgungsgesellschaft mbH (EVG)
Leipzig
1998
Implementation of GANPRODA software for heat quantity determination for billing
purposes
Erdgasversorgungsgesellschaft mbH (EVG)
Leipzig
1998
Implementation of GANESI planning system for transient gas grid planning.
Berliner Gaswerke AG (GASAG)
Berlin
1997 – 2000
Implementation of a purchase optimisation system according to the study mentioned below.
Hardware: WindowsNT based PC
Verbundnetz Gas AG (VNG
Leipzig
1997 – 2000
Energy control system PSIcontrol for the new energy management system.
The focal point of this system is the complete higher functionality for the gas man-
agement concerning especially the quality tracking with PTB-accuracy.
Hardware: Digital AlphaServer 1000 and Digital Alphastation 500
Visualisation: fully graphical on 21"-monitors (1280x1024) with AlphaStation 500
Thyssengas GmbH
Duisburg
1997 – 1998
Control system PSIcontrol for the new „Netz-Management-System (NMS)“.
The integrated complex „quantity and energy balancing“ supports Thyssengas with the
supervision and control of the gas take.
Hardware: Digital AlphaServer 1000 and Digital Alphastation 500
Visualisation: fully graphical on 21"-monitors (280x1024) with AlphaStation 500
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 30 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Ferngas Nordbayern GmbH (FGN)
Bamberg
1997
Realisation of a system for uniform processing and provision of DSfG data related to meter
runs as well as additional values, providing sector-specific software solutions for the gas sector.
GAMESS is a system that harmonises the processing and provision of gas data from
the meter runs.
Wingas GmbH
Kassel
1997
Implementation of GANESI planning system for transient gas grid planning.
BEB Erdgas- und Erdöl GmbH
Hannover
1997
Implementation of GANESI planning system for transient gas grid planning.
Ruhrgas AG
Essen
1997
Conducting a study on the coupling of computers between the gas grid control system
of Ruhrgas and its partners or customers.
Messer Griesheim GmbH
Krefeld
1997
Implementation of GANESI planning system for transient gas grid planning.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 31 of 52
VEW Energie AG
Dortmund
1996 – 1998
Renewal of energy control system PSIcontrol (INFO-G); integration of higher functionality.
Hardware: Digital AlphaServer 1000 and Digital Alphastation 500
Visualisation: fully graphical on 21"-monitors (1280x1024) with AlphaStation 500
GAMESS-IG
Essen, Munich
1996 – 1997
Requirements specification for a trade solution to harmonise and provide gas data.
The GAMESS-IG represents the 11 biggest gas companies of Germany.
Deutsche Transalpine Oelleitung GmbH (TAL)
Munich
1996 – 1998
Realisation of a Computer Controlled Supervision of Tank Farm Ingolstadt (TALCCS).
DOW/BSL
Böhlen
Honeywell AG, Offenbach
1996 – 1998
Leak detection and localisation system (LEO) for the newly built system of 7 pipelines
for transporting raw material (naphtha, crude oil, and liquid petrol gas), products (pro-
pylene, ethylene, etc.) and hydrogen.
Hardware: Digital AlphaStation 500
Visualisation: fully graphical on 21"-monitors (1280x1024) with AlphaStation 500
Deutsche Transalpine Oelleitung GmbH (TAL)
Munich
1996
Control system PSIcontrol for the pipeline system TAL-IG, TAL-OR and TAL-NE
including all higher functionality (acceptance test by German officials TÜV)
Hardware: Digital AlphaServer 1000 and Digital AlphaStation 500
Visualisation: fully graphical on 21"-monitors with AlphaStation 500
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 32 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Deutsche Transalpine Oelleitung GmbH (TAL)
Munich
1996 – 1997
Realisation of a computer based operation planning for the pipeline system including the ma-
rine facility at the harbour of Trieste and the tank farms at Trieste and Ingolstadt.
Ferngas Salzgitter GmbH (FSG)
Salzgitter
1996 – 1999
Control system PSIcontrol for gas transport and distribution with all higher functional-
ity realised as interactive load management.
Hardware: Digital AlphaServer 1000 and Digital Alphastation 500
Visualisation: fully graphical on 21"-monitors (1280x1024) with Alphastations 500
Technische Universität Clausthal
1996
Delivery of a transient online gas grid simulation based on GANESI, connected to the
existing control system.
Gasversorgung Thüringen GmbH (GVT)
Erfurt
1996
Delivery of a transient online gas grid simulation based on GANESI, connected to the
existing control system.
OMV AG
Vienna, Austria
1996 – 2000
Turnkey delivery of a new gas grid control system for the monitoring, control and op-
timised operation. In addition, integrated quantity calculation of gas purchase, delivery
and transport contracts.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 33 of 52
Berliner Gaswerke AG (GASAG)
Berlin
1996
Conceptional study for the short, mid and long term gas take optimisation. The aim of the
study is a hybrid solution with conventional and knowledge based software. The knowledge
based solution serves for integrating human experiences into software solutions:
experiences of gas grid and storage operation
experiences of long term gas consumption
experiences of solving optimisation tasks of combinatory character.
An important aspect of the solution is a knowledge based solution of gas take and gas
supply contracts.
Ferngas Salzgitter GmbH (FSG)
Salzgitter
1996
Conception, realisation and implementation of a system for technical quantity evalua-
tion (TM) of gas purchasing contracts.
VEW Energie AG/Kavernenspeicher Staßfurt GmbH
1995 – 1998
Control system PSIcontrol for the underground storages Kalle and Staßfurt
Hardware: Digital Alphaserver 1000 and Digital AlphaStation 400
Visualisation: fully graphical on 21"-monitors (1280x1024) with Alphastation 400
Special features: Coupling of ABB Advant Controllers via IMS stations (TCP/IP and
ORACLE SQL*Connect).
Remote control via WAN from Dortmund.
BEB Erdgas- und Erdöl GmbH
Hannover
1995
Planning and installation of a data server to guarantee optimised operation of the pro-
duction and transport network.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 34 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
BEB Erdgas- und Erdöl GmbH
Hannover
1995
Delivery of a transient gas grid simulation with exact compressor modelling, gas qual-
ity tracking, as well as adaptive forecast system.
Erdgas Südbayern (ESB)
Munich
1995
Implementation of GANESI planning system for transient gas grid planning.
Gasversorgung Süddeutschland GmbH (GVS)
Stuttgart
1995
Implementation of GANPRODA software for heat quantity determination for billing
purposes.
Gas Union GmbH
Frankfurt
1995
Implementation of GANESI planning system for transient gas grid planning.
Implementation of GANPRODA software for heat quantity determination for billing
purposes.
Erdgas Ostschweiz AG (EGO)
Zurich, Switzerland
1995
Turnkey delivery of a new gas grid control system for the monitoring, control and op-
timised operation of the entire network. Integration of new telemetry connection and
interface to various third party systems.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 35 of 52
Gasversorgung Sachsen-Anhalt GmbH/Erdgas West-Sachsen GmbH
Halle/Saale
1994 – 1996
Specifying and realising the turnkey ready hardware and software system PSIcontrol
for the telemetry control and gas grid control system.
Hardware: DIGITAL DEC AXP in LAN, Alpha Server 1000 and Alpha Station 400
Visualisation: fully graphical on 21" monitors (1280 x 1024) with Alpha Station 400
Special features: Data acquisition from substations FlowComp via dial-up modems;
interface DSfG (G485)
Ferngas Salzgitter GmbH (FSG)
Salzgitter
1994
Conception and implementation of GANESI planning system for transient gas grid planning
Stadtwerke Dresden GmbH (DREWAG)
Dresden
1994
Creation of a gas grid control system for the monitoring, control and optimisation of
the gas supply for the city of Dresden. Integration of new telemetry technology; com-
plete realisation and start up of operation within three months.
Rhein-Main-Rohrleitungstransportgesellschaft m.b.H. (RMR)
Cologne-Godorf
1993 – 1994
Online batch tracking and leak detection and localisation (LEO) on a products pipeline.
Hardware: Twin computer system with DEC 3000-300 AXP
Visualisation: fully graphical on 19" monitors 1280x1024 Pixel)
Special features: The system runs parallel on the existing supervisory and control system yet
connected within an Ethernet-LAN. Process data are transferred from the control system.
Gaz du Sud-Quest (GSO)
Pau, France
1993
Delivery of a new control system for the control and monitoring of the gas grid in the
Southwest of France (14 départements).
Additional coupling to an external emergency control room.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 36 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Gasversorgung Süddeutschland GmbH (GVS)
Stuttgart
1993
Realisation of a back-up system for the existing control system to secure the gas grid manage-
ment. Data comparison between the control and reserve system is made on a continuous basis.
Gasversorgung Süddeutschland GmbH (GVS)
Stuttgart
1993
Coupling of computer systems between GVS and Ruhrgas AG for exchanging process data.
Mainova AG
Frankfurt
1993
Implementation of a new control system for the monitoring and control of internal and
third-party gas grids.
Stadtwerke München AG (SWM)
Munich
1993
Implementation of a gas grid control system for the monitoring, control and optimisa-
tion for supplying natural gas.
Furmanite GmbH
Markkleeberg-Gaschwitz
Hydrierwerk Zeitz GmbH, Zeitz
1993
Leak detection and localisation (LEO) on a crude oil pipeline from Spergau to Zeitz.
The system was approved by the TÜV after an appropriate security test.
Hardware: AT 80486 with SCO UNIX
Visualisation: VGA (1024x768 pixel)
Special features: The system runs remotely from the existing system; process data are
acquired from a common telecontrol system by IDS
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 37 of 52
Hamburger Wasserwerke GmbH
Hamburg
1993 – 1994
Conducting a study for a new control and automation system for the Hamburger Was-
serwerke GmbH to supply water to Hamburg and its surrounding communities, as well
as other distributors.
Vereinigte Elektrizitätswerke Westfalen AG (VEW)
Dortmund
1993 – 1994
Extension of the existing system to the substations of the low-pressure grids.
Hardware: DEC LAN with Risk workstations Wide Area Network Router
Data quantity: upgrade to about 24,000 process variables
Special features: Connection of remote workstations via fibre WAN. Stand by service
using Lap Tops. Data acquisition from substations via dial-up modem; interfaces as
required by DIN 19244 and DSfG.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 38 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Vereinigte Elektrizitätswerke Westfalen AG (VEW)
Dortmund
1993
Preparation of a total application software based on hard- and software system
PSIcontrol for the replacement of the process computer in the power plants Emsland,
Gersteinwerk, Werne and Westfalen.
Planning, delivery, installation and putting into operation of the hardware in the local,
block related network and in the superior wide area network for the process infor-
mation system PSIcontrol-K.
In each of the four power plants the block related guidance systems are connected with
block overlapping networks, amongst each other, and with the particular power plant
administration. At the same time the block related local networks are extended about
glass fibre cable.
The connection between the local networks and the superior wide area network takes
place via self-learning bridges.
The headquarters of VEW in Dortmund is connected via WAN with the concerned
power plants.
Hardware: Risc-workstations, X-terminals, WAN/LAN bridges, repeater
Visualisation: fully graphical DEC 3000 AXP with 29" monitors (1600x1280 pixel)
Data quantity: about 20,000 process variables (each power plant)
Special features: Process Data Entry Systems from ABB (Westfalen, Gersteinwerk,
Werne) and Siemens (Emsland) are connected via gateways for block related PSICon-
trol-K-Systems.
Erdgas-Verkaufs-Gesellschaft mbH (EGM)
Münster
1992 – 1994
Hardware and software system PSIcontrol for one central and three sub-central super-
visory and control stations for the gas grid.
Hardware: IBM Risc-System/6000-workstations and
IBM POWERstation 220 and 340 and
IBM POWERserver 530H in a local net (LAN)
Visualisation: fully graphical on workstations (1280x1024 pixel)
Data quantity: about 37,000 process variables
Special features: WAN ring architecture with all 4 stations. Redundant routers allow
dynamic load control for data transmission between WAN nodes.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 39 of 52
Energie- und Wasserversorgung AG (EWAG)
Nürnberg
1992 – 1994
Conducting a study for the automation concept “Network Control System Water of
EWAG”.
Ferngas Salzgitter GmbH (FSG)
Salzgitter
1992 – 1993
Delivery of the gas grid-controlling system LEO-Gas for the online grid balancing.
Hardware: DEC Risk workstations DECStation 5000
Visualisation: fully graphical on workstations (1280x1024 pixel)
Special features: The system runs remotely to the existing supervisory and control sys-
tem yet connected within an Ethernet-LAN. Process data are transferred from the con-
trol system.
Gas-, Elektrizitäts- und Wasserwerke Köln AG (GEW)
Cologne
1992 – 1994
Hardware and software system (PSIcontrol) for a new central supervisory and control
system for the grids of gas, water and heat supply.
Hardware: Digital DEC 3000-600 AXP in LAN
Visualisation: fully graphical on 29" monitors (1280x1024 pixel), four monitors per
workstation
Data quantity: about 2,000 process variables
Special features: integration of the new system into the existing GEW computer systems.
Sächsische Olefinwerke AG (SOWAG)
Böhlen
MVL GmbH Schwedt, Gaschwitz
1992
Leak detection and localisation (LEO) on a DN 200 Naphta conduit. The system was
approved by the TÜV after an appropriate security test.
Hardware: AT 80486 with SCO UNIX
Visualisation: VGA (1024x768 pixel)
Special features: The system runs remotely to the existing supervisory and control sys-
tem; process data are acquired from a common telecontrol system by IDS.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 40 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Bayerngas GmbH
Munich
1992
Implementation of an online system for gas grid optimisation including adaptive fore-
cast and online grid simulation based on GANESI.
Ferngas Nordbayern GmbH (FGN)
Bamberg
1992
Realisation of a SCADA system for the regional natural gas distributor in Northern
Bavaria.
GAZNAT S. A.
Aigle, Switzerland
1992
Turnkey delivery of a new gas grid management system, with operator interface in
French, for monitoring, controlling, and optimising operation of the natural gas net-
work. Integration of new telemetry connections and interfaces to different third-party
systems. Additional installation of a remote back-up system which is connected via fi-
bre optic cables, through Lake Geneva, to the main control center.
Messer Griesheim GmbH
Krefeld
1992
Implementation of a new gas grid control system for the monitoring, control and opti-
misation of the nitrogen and oxygen pipelines.
Implementation of a TÜV approved software system for leak detection for the pipelines.
Verbundnetz GAS AG (VNG)
Leipzig
1992
Implementation of a disposition system for optimising supply of natural gas.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 41 of 52
Erdgasversorgungsgesellschaft mbH (EVG)
Leipzig
1991
Implementation of gas grid control system including telemetry technology for the
Hesse-Thuringia pipeline. In addition, maintenance and hotline for real-time operation
and update service.
Wintershall AG (WIAG)
Kassel
AEG AG, Frankfurt am Main
1991 – 1994
Hardware and software system PSIcontrol for the super ordinate central supervisory
and control station for the long distance natural gas conduits MIDAL and STEGAL, as
well as the underground gas storage Rehden.
Hardware: Digital Risc-workstations, DECStation 5000 and DECSystem 5000 in
LAN/WAN Wide Area Network
Visualisation: fully graphical on workstations (1280x1024 pixel)
Data quantity: about 90,000 process variables
Special features: Integration of a highly sophisticated gas management system with
consumption forecast, disposition, simulation and leak detection and localisation.
GASAG
Berlin
1991 – 1994
Specifying and realising the turnkey ready hardware and software system (PSIcontrol)
including telecontrol systems for a central and a distant backup supervisory and con-
trol station for the gas grid.
Hardware: DEC Risc-workstations, DECStation 5000 and DECSystem 5000 in LAN/WAN
Visualisation: fully graphical on workstations (1280x1024 pixel)
Data quantity: about 14,000 process variables
Special features: Distributed system with LAN and WAN.
Integration of X-terminals in the mosaic-type mimic display. Telecontrol systems by
SAT, allowing substations by various vendors.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 42 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Schluchseewerk AG
Freiburg
SIEMENS, Erlangen
1991 – 1996
Specifying and realising of the whole application software system (PSIcontrol) for a central
supervisory and control station for the Kühmoos system control centre, five pumped-storage
power stations, the 380/220 KV-switching-station and the 20 KV-station service network.
Special aspects of water and energy management have to be taken into account.
Hardware: DEC with Risc-workstations, DECstation 5000 and DECsystem 5000 and
VAXstation 3100 in LAN
Visualisation: fully graphical on workstations (1280x1024 pixel)
Data quantity: about 22,000 process variables
Special features: Distributed system based on workstations with the operating system
UNIX and the programming language C
AEG
Graz, Austria
Landesregierung Steiermark
1990 – 1991
Implementation of a visualisation system for monitoring air quality of the Steiermark.
Computer system: DIGITAL workstation in LAN and WAN with DECstation 5000
Vereinigte Elektrizitätswerke Westfalen AG (VEW)
Dortmund
1989 – 1992
Specifying and realising the key turn ready hardware and software system (PSIcon-
trol) for central supervision and control of the gas grid.
Hardware: Digital workstations in LAN and with Risc-workstations, DECStation
5000 and DECSystem 3100 and DECSystem 5400
Visualisation: fully graphical on workstations (1280x1024 pixel)
Data quantity: about 6,000 process variables
Special features: Distributed system (LAN) based on workstations with the operating
system UNIX and the programming language C
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 43 of 52
Städtische Werke Krefeld AG (SWK)
Krefeld
AEG Frankfurt
1990 – 1991
Expansion of PSI’s control system in the power, gas, water & district heating sectors.
Computer system: AEG
Bayer AG
Leverkusen
1990
Strategic report for the Bayer Leverkusen AG water works to introduce a central con-
trol system for the drinking and industrial water networks
Gasversorgung Süddeutschland GmbH (GVS)
Stuttgart
1989
Study for the new design of control center. Planning and realisation of a system for the
monitoring and control of the gas grid.
Stadtwerke Göttingen
Göttingen
1988
Consulting of the communal gas distributor.
Stadtwerke Ulm
Ulm
AEG Frankfurt
1987 – 1988
Migration of PSI’s control system to new computers, expansion of the quantity struc-
ture, and expansion of user functions.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 44 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Kraftwerke Mainz-Wiesbaden AG (KMW),
Mainz
1986 – 1989
Conducting a study for implementing a new gas operation headquarters with a new te-
lemetry network of the KMW. Drawing up tender documents, evaluating tenders,
awarding contracts, supervising project up to final acceptance.
Computer system: Landis & Gyr
Network control system: LS 2000
Telemetry technology: PCA series L&G
Österreichische Mineralöl-Vertrieb AG (ÖMV)
Auersthal, Austria
AEG Austria, Wien, Austria
1986 - 1989
Concept, realisation and putting into operation of the whole software system for su-
pervision and control of the natural gas transport grid
Hardware: CCC 2 x 3231XP and 3205
Visualisation: DYNAVIS-A (Dr. Seufert GmbH) with PSI graphic software (fully graphical)
Data quantity: about 21,000 process variables
Special features: In addition to the extensive SCADA functions, application software
includes facilities
for planning, optimisation and simulation functions to support the dispatching,
for installation of data links to the central computer of ÖMV at Vienna (IBM), to
the national gas companies and to the international contractors,
Band for technical and commercial gas quantity balancing.
Rhein-Main-Rohrleitungstransportgesellschaft m.b.H. (RMR)
Cologne-Godorf
1986 – 1989
Development and installation of a software system for supervising and controlling the
650 km products pipeline of the RMR.
Hardware: 2 x CCC 3231 XP
Visualisation: DYNAVIS-A (Dr. Seufert GmbH) with PSI-Graphic software (fully graphical)
Data quantity: about 10,000 process variables
Special features: Functions for safety surveillance ("selective pump shut-down" based
on freely programmable decision tables) and for product control and tracking (batch
tracking, scraper tracking) were included in the SCADA-system.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 45 of 52
Berliner Wasserbetriebe
Berlin-Spandau
1988 – 1991
Implementation of complete control system for the Spandau works of the Berliner Wa-
terworks. The works is fully automated from the energy optimisation aspect.
Computer system: DIGITAL PDP 11
Visualisation: semi-graphics
Quantity structure: approx. 10,000 data points
SCHLESWAG AG
Rendsburg
1986 – 1987
Concept, realisation and starting up of the whole software system for supervision and
control of the gas grid.
Hardware:2 x Siemens R30
Data quantity: about 2,500 process variables
Energie- und Wasserversorgung AG (EWAG)
Nürnberg
1986
Implementation of control for monitoring, controlling and optimising gas transport.
Expansion and adaptation to the requirements of a complex gas grid with several pres-
sure levels.
Ferngas Salzgitter GmbH (FSG)
Salzgitter
1985
Concept, realisation and putting into operation of the whole software system for su-
pervision and control of the gas grid.
Bayerngas GmbH
Munich
1984
Implementation of a control system for monitoring and controlling the gas grid. In ad-
dition, service and hotline for real-time operations and update service.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 46 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Ferngas Salzgitter GmbH (FSG)
Salzgitter
1984 – 1986
Implementation of complete software system for the monitoring and control of the gas grid.
Computer system: CCC 3230, 3200MPS and 3205
Visualisation: ASEA Tesselator (semi-graphics)
Quantity structure: approx. 7,000 data points
Thomson-CSF
St. Denis Cedex, France
1983
Development and installation of a leak detection and localisation system for a 90 km
products pipeline in Tunisia.
Hardware: SEMS SOLAR 16-40
Gasunion GmbH
Frankfurt/Main
1982 – 1983
Concept and realisation of a prediction (GAPP) and simulation (GANESI) system for
a gas grid.
Hardware: DEC PDP 11
Gewerkschaft Brigitta und Elwerath Betriebsführungsgesellschaft (BEB)
Hannover
1982
Conducting a study about the ability to forecast the gas consumption of different areas
in the gas transport grid of the BEB.
Hardware: FERRANTI ARGUS 700 and DEC VAX 780
Hydranten-Betriebsgesellschaft Flughafen Frankfurt
Frankfurt/Main
1981
Consulting for a leak detection system for the aeroplane filling stations at the Rhein-
Main-Airport in Frankfurt, West-Germany.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 47 of 52
Zweckverband Ostholstein (ZVO)
Timmendorfer Strand
Landis & Gyr, Frankfurt/Main
1982 – 1983
Concept and realisation of an on-line simulation system for a high pressure gas pipe-
line using GANESI.
Hardware: DEC PDP 11/34 and 11/44
Hamburger Wasserwerke GmbH
Hamburg
1981 – 1989
Implementation of complete software system to automate all water networks in Ham-
burg. Works areas such as drinking water outlet are fully automated, while in other ar-
eas the operators are given the option (water exploitation, treatment etc.).
Computer system: 12 x FERRANTI ARGUS 700, 33 x Mikros Sprecher & Schuh
Visualisation: Barco semi-graphics
Quantity structure: approx. 6000 data points
Niederrheinische Gas- und Wasserwerke GmbH
Duisburg
1980
Delivery of a program package for the short-term forecast of gas and water consumption.
Hardware: DEC PDP 11
Erdgas Verkaufs-GmbH
Münster/Westfalen
1980
Carrying-out the call for tender-documents for software realisation for the inset at the
decentral control stations.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 48 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Steirische Ferngas Ges.m.b.H. (STFG)
Bruck an der Mur, Austria
Landis & Gyr Ges.m.b.H., Wien, Austria
1980 – 1981
Concept and realisation of the whole software system for the central supervisory con-
trol station of the gas pipeline.
Hardware: DEC PDP 11/44
Oberrheinische Mineralölwerke GmbH (OMW)
Karlsruhe
1980
Carrying-out the call for tender-documents and following evaluation of the offers for a
management information system for an oil refinery plant.
Rhein-Main-Rohrleitungstransportgesellschaft m.b.H. (RMR)
Cologne-Godorf
1979 – 1981
Consulting during planning and preparation of an inquiry for the replacement of the
old supervisory control system by a modern telecommunication system.
SÜDPETROL AG für Erdölwirtschaft
Munich
1979 – 1983
Specification of the functional requirements for a central control station for the oil
pipeline from Geneva, Italy, to Ingolstadt, West-Germany.
Consulting and chairmanship in all negotiations with federal administration and suppliers.
Zweckverband Ostholstein (ZVO)
Timmendorfer Strand
Landis & Gyr, Zug, Switzerland
1979 – 1981
Concept and realisation of the whole software system for the central supervisory con-
trol station of the drinking-water supply, the sewage and the gas distribution system
(communal supply).
Hardware: DEC PDP 11/34
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 49 of 52
Waterwinningsbedrijf Brabantse (WBB)
Biesbosch, The Netherlands
1979 – 1983
Implementation of a software system to monitor and control the waterworks with the
aid of a hierarchic computer system consisting of a central double computer and two
control computers. In addition, project co-ordination between user, hardware manufac-
turer, and electro-fitter.
Computer system: 2 x SEMS SOLAR 16-40 and 2 x T2000/20
Quantity structure: approx. 3.500 data points
Westfälische Ferngas AG
Dortmund
Landis & Gyr, Zug, Switzerland
1979 – 1981
Functional specification and realisation of the whole software system for the supervi-
sory control of the gas grid.
Installation of the energy consumption forecast program.
Hardware: 2 x DEC PDP 11/34
Firmenkonsortium Ruhrgas AG, Ruhrkohle AG und STEAG
AEG-Telefunken AG
1978 – 1979
Implementation of user software for a testing system for coal gasification.
Computer system: AEG 80-20/4
Waterwinningsbedrijf Brabantse (WBB)
Biesbosch, The Netherlands
1978
Implementation of a new monitoring and control system.
Hamburger Wasserwerke GmbH
Hamburg
1978
Planning the complete automation of Hamburg’s waterworks network.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 50 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Berliner Wasserwerke
Berlin
1977
Planning the complete automation of Tegel waterworks. The functions of the water-
works include water exploitation, treatment, storage and drinking water distribution.
PSI GmbH
Berlin
1977
Conducting a study for large waterworks networks to centrally monitor and control via
a computer supported optimisation of water distribution systems taking energy mini-
misation into account
Adria-Wien-Pipeline
Klagenfurt, Austria
Österreichische AEG-Telefunken, Wien (A)
1976
Functional specification and realisation of the whole software system for the supervi-
sory control of the gas grid.
Installation of the energy consumption forecast program.
Hardware: 2 x DEC PDP 11/34
Wasserverband Kinzig
Wächtersbach
Frankfurter Aufbau AG, Frankfurt
1975 – 1976
Implementation of a control system for Kinzig waterworks.
Oberösterreichische Ferngas GmbH
Linz, Austria
Österreichische AEG-Telefunken, Wien (A)
1975
Concept, realisation and putting into operation of the whole software system to super-
vise and control the natural gas distribution grid.
Hardware: Interdata 7/16
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
© PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc Page 51 of 52
IRAQ STATE CONSULTING COMPANY OF OIL PROJECTS (SCCOP)
Rumaila, Iraq
Österreichische AEG-Telefunken, Wien, Austria
1975
Specifying and programming of the software system for the central network control
station of the Strategic-Pipeline-Iraq (crude oil pipeline) from Haditha to Rumaila.
Hardware: 2 x Interdata 7/16
Österreichische Mineralöl-Vertrieb AG (ÖMV)
Auersthal, Austria
Österreichische AEG-Telefunken, Wien, Austria
1973 – 1979
Specifying, realising and putting into operation the whole software system based on a
twin computer system for supervision and control of the natural gas transport grid of
the ÖMV. In a second step the twin computer system was extended to a three-
computer system.
Hardware: 3 x Interdata 7/32
Österreichische Mineralöl-Vertrieb AG (ÖMV)
Baumgarten, Austria
AEG-Österreich, Wien, Austria
1973
Programming and putting into operation the application software for a supervisory
control system for measuring the gas quantity in a specially designed gas conduit.
Hardware: Interdata M70
Hamburger Wasserwerke (HWW)
Hamburg
1973
Evaluating offers for erecting a central control system for a pumping plant.
Genfer Wasserwerke
Geneva, Switzerland
Sprecher & Schuh AG, Aarau, Switzerland
1973
Conducting a study for Geneva waterworks to automate the existing plant.
P S I E n e r g y O i l & G a s
R e f e r e n c e L i s t C o n t r o l a n d E n e r g y M a n a g e m e n t S y s t e m s
Page 52 of 52 © PSI AG; 04.2017 - GO Oil Gas References EN 04 2017.doc
Berliner Wasserwerke
Berlin-Kladow
AEG-Telefunken, Berlin
1972
Conception of complete system, software realisation and implementation Berlin-
Kladow waterworks.
Computer system: AEG 60-10