project organization by mohd samim faizy

18
Project Organization Prepared By : Mohd Samim Faizy 1

Upload: samimfaizy1

Post on 14-Jun-2015

122 views

Category:

Business


0 download

DESCRIPTION

Project Organization Project as Part of Functional Organization Pure Project Organization Matrix Organization Staff Organization Project Team Key Team Members Human Factors

TRANSCRIPT

Page 1: Project organization By Mohd Samim Faizy

Project OrganizationProject OrganizationPrepared By : Mohd Samim Faizy

1

Page 2: Project organization By Mohd Samim Faizy

Learning Objectives

Project OrganizationProject as Part of Functional OrganizationPure Project OrganizationMatrix OrganizationStaff OrganizationProject TeamKey Team MembersHuman Factors

2

Page 3: Project organization By Mohd Samim Faizy

Project Organization

• Specialization of the human elements• Different types = functional, product line,

geographical location, production process, type of customer, subsidiary organization, time, vertical or horizontal organization

• How to tie project to the parent firm• How to organize the project itself

3

Page 4: Project organization By Mohd Samim Faizy

Project as Part of Functional Organization

• E.g. new technology project – under voice president of engineering

• Introduction of new product line – under voice president of marketing

• Project assigned to the functional unit that has most interest

4

Page 5: Project organization By Mohd Samim Faizy

Major Advantages

• Maximum flexibility in the use of staff• Individual experts can be utilized by many different

projects• Specialist in the division can be grouped to share

knowledge and experience• Functional division serves as a base of technological

continuity• Functional division contains normal of advancement

5

Page 6: Project organization By Mohd Samim Faizy

Disadvantages

• The client is not the focus of activity and concern• No individual is given full responsibility for the

project• Slow response to client’s needs• Tendency to sub-optimize the project• Motivation of project team is weak• Does not facilitate a holistic approach to the project

6

Page 7: Project organization By Mohd Samim Faizy

Pure Project Organization

• Project is separated from the rest of the parent system

• Becomes self contained unit

7

Page 8: Project organization By Mohd Samim Faizy

Advantages

• PM has full line authority over the project• All project workforce directly responsible to the PM• Lines of communication are shortened• Maintain permanent group of experts• High level of commitment• Ability to make swift decisions• Unity of command• Simple and flexible structure

8

Page 9: Project organization By Mohd Samim Faizy

Project Organization

F in an ce M a nu fa c tu ring

V ice P re s id en t P ro je c t A

F in an ce M a nu fa c tu ring

V ice P re s id en t P ro je c t B

F in an ce M a nu fa c tu ring

V ice P re s id en t P ro je c t C

P re sid e n t

9

Page 10: Project organization By Mohd Samim Faizy

Disadvantages

• Duplication of effort• Lack of expertise in high technology project• Foster changeability and cutting corners• Project takes on a life of its own• Worry about “life after project ends”

10

Page 11: Project organization By Mohd Samim Faizy

Matrix Organization

• Combination of functional and pure project organizations

• Matrix project is not separated from parent organizations

• Individuals come from respective functions divisions and are assigned to the project full time or part time

11

Page 12: Project organization By Mohd Samim Faizy

Matrix Organization

• Cross-functional team members• Draw temporarily on technological expertise of

relevant functions• High technology areas – integrate functional

specialties• Systems approach – integrity of product design• Close coordination and communication among all

parties

12

Page 13: Project organization By Mohd Samim Faizy

Staff Organization

• Set up like functional organization• Adds a staff office to administer projects• Used for small, short run projects

13

Page 14: Project organization By Mohd Samim Faizy

Project Team

• Project office – control center, chart room (focus of all project activity)

• Close location to project manager• Co-location of external parties• Reduce physical distance• Better communication• Pressure to complete tasks

14

Page 15: Project organization By Mohd Samim Faizy

Key Team Members

• Project Engineer• Manufacturing Engineer• Field Manager• Contract Administrator• Project Controller• Support Services Manager

15

Page 16: Project organization By Mohd Samim Faizy

Work Organization

• Project engineer (technical performance) and project controller (budget) report to PM

• PM forecast of personnel needs• Skills requirements are assessed and aggregated• Outsourcing of certain tasks

16

Page 17: Project organization By Mohd Samim Faizy

Human Factors

• Technical problem with a human dimension• Perfectionist – can cause delay• Motivation – recognition, achievement,

responsibility, advancement, the work itself• Interpersonal conflict• Management by Objectives (MBO) – allows worker

to take responsibility for design and performance of a task

17

Page 18: Project organization By Mohd Samim Faizy

Chapter 4 Project Organization 18