Telecom in the real sense means transfer of informationbetween two distant points in space.
Telecom is a huge and very big network, that is truly global in
nature.
Telecom stands as one of the most essential elements of the
business world in terms of Connecting the World.
-
7/29/2019 Project Management in Telecom
3/16
09-03-2013 PASSION FOR PERFECTION 3
What is PROJECT ?
A project is a temporaryendeavor undertaken to
create auniqueproduct or service with a limited
source.
Temporary means that every project has adefinite
beginning and a definite ending.
Unique means that the product or serviceisdifferent in some distinguishing wayfrom all other
products or services.
-
7/29/2019 Project Management in Telecom
4/16
09-03-2013 PASSION FOR PERFECTION 4
What are the main requirement of
PROJECT ?
On time
On budget
With full scope
And quality work
-
7/29/2019 Project Management in Telecom
5/16
09-03-2013 PASSION FOR PERFECTION 5
The application ofknowledge, skills, tools andtechniques to project activities in order to meet or exceed
stakeholder needs and expectations from the project.
PROJECT MANAGEMENT
-
7/29/2019 Project Management in Telecom
6/16
09-03-2013 PASSION FOR PERFECTION 6
Specific to Telecommunication Projects
Project management consist of management all the
activities of a given project right from SITE SURVEY to
SITE INTEGRATION .
This helps the operator/ client in having optimum
manpower and executing the project successfully in time.
-
7/29/2019 Project Management in Telecom
7/16
09-03-2013 PASSION FOR PERFECTION 7
In project management we can deal with four basic
function.
Scheduling
Planning
Monitoring
Control
-
7/29/2019 Project Management in Telecom
8/16
09-03-2013 PASSION FOR PERFECTION 8
1. RF and Site Survey
2. Site layout and marking
3. Obtaining no objection certificate
4. License with state electricity board for obtaining required power
5. Contracting and identification of risks
6. Soil testing , structural design and layout of ground based sites
7. Structural analysis of existing buildings and layout of roof top sites
8. Finalizing of specification for equipment , work in consolation with technical and commercial
teams
9. Preparation of bill of quantities and bill of services
10. Plan and scheduling of equipment and inform to warehouse & logistics department
11. Monitoring all the activities on daily basis and report to the boss
12. Warehouse management
13. Provision of security at site
14. Supervision of civil, Electrical , Tower and Other equipment installations
15. Quality inspection and punch points
16. Site RFI
17. Co- ordination with all suppliers18. Documentation
19. Final inspection
20. Bills verification and certification
SCOPE OF
WORK
-
7/29/2019 Project Management in Telecom
9/16
09-03-2013 PASSION FOR PERFECTION 9
RF & Site Survey
Expansion Capacity Quality
-
7/29/2019 Project Management in Telecom
10/16
09-03-2013 PASSION FOR PERFECTION 10
SITE BUILD UP
PROCESS1. Site acquisition : Acquire the land in terms of rent/lease from the owner
with NOC.
2. Electricity power connection : Immediately after the site is handed over
to the site development team action is initiated to obtain power connection
from respective state electricity board.
Obtaining the connection involves following activities:
Preparation and submission of application Estimation by the state electricity board
Payment of the estimated amount including security deposit
Release and provision of permanent connection.
3. Contracting and Identification of Risk : Take a details of a site location
and identified the risk factor.
4. Documentation : The need to specify the type of document, the format,
and acceptance and certification procedure needs to emphasis.
It directly affect the payment terms and thus the cash flow.
-
7/29/2019 Project Management in Telecom
11/16
09-03-2013 PASSION FOR PERFECTION 11
5. Non Availability of site : Non- availability of sites, cancelation, sites
on hold and dispute sites has adverse affect on the roll out plan.
6. Change in specification: Due to the very nature of the project,
specification changes occur.
7. Tenancy : During the preliminary survey certain sites are selected
based on the anticipated traffic and location.
8. Integration of supply of material : Diverse kind of material and
equipment are supplied by respective agencies and their delivery iscoordinated with the progress at respective sites.
9. Soil Testing : to under take field and laboratory investigation to
assess the nature and bearing capacity of soil.
10.Design : Design should be simple , flexible executable on ground.
11.Structural analysis of Existing Building
-
7/29/2019 Project Management in Telecom
12/16
09-03-2013 PASSION FOR PERFECTION 12
12.Bill of material
13.Scheduling of delivery of material and equipment.
14.Daily progress report
15.Tracking sheet for civil work
16.Documentation
Site folder Security guard attendance register
Diesel consumption register
Material register
Visitors register
-
7/29/2019 Project Management in Telecom
13/16
09-03-2013 PASSION FOR PERFECTION 13
QUALITY MANAGEMENT
SYSTEM
1. Tower
2. Erection
3. DG
4. Shelter
5. Electrical
6. Civil works7. Meeting of Commitments
8. Monitoring of quality
9. Documentation of Punch point
10.Supervision at site
-
7/29/2019 Project Management in Telecom
14/16
09-03-2013 PASSION FOR PERFECTION 14
FINANCIAL AND WAREHOUSE
MANAGEMENT
OPERATION AND MAINTENANCE
MANAGEMENT
-
7/29/2019 Project Management in Telecom
15/16
09-03-2013 PASSION FOR PERFECTION 15
WHAT MAKES A PROJECT
SUCCESSFULL ?
Good people
Clear objectives
Team work
Clearly defined deliverables
Good planning
-