preservation of section 8

47
Preservation: HUD’s Re-Development Program Can be Part of Your Preservation Plan July 28-30, 2014 Hilton Hotel Austin, TX

Upload: zan

Post on 05-Jan-2016

42 views

Category:

Documents


0 download

DESCRIPTION

Preservation: HUD’s Re-Development Program Can be Part of Your Preservation Plan July 28-30, 2014 Hilton Hotel Austin, TX. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Preservation of Section 8

Preservation: HUD’s Re-Development Program Can be Part of Your Preservation Plan

July 28-30, 2014Hilton HotelAustin, TX

Page 2: Preservation of Section 8

Presenters

Michael Backman, Amerisphere Multifamily Finance, L.L.C.Ray Landry, Davis-Penn Mortgage Company

Gretchen Marchand, HUDJoyce Moskovitz, Bank of America Merrill Lynch

Monica Sussman, Nixon Peabody LLP

Page 3: Preservation of Section 8
Page 4: Preservation of Section 8

Key HUD Goal Among HUD’s core strategic goals is the goal to

meet the need for quality affordable rental homes. The focus of this section is aligned with this specific

Key HUD Goal: Preserve the affordability and improve the quality

of federally assisted and private unassisted affordable rental homes.

Page 5: Preservation of Section 8
Page 6: Preservation of Section 8
Page 7: Preservation of Section 8
Page 8: Preservation of Section 8
Page 9: Preservation of Section 8
Page 10: Preservation of Section 8
Page 11: Preservation of Section 8
Page 12: Preservation of Section 8
Page 13: Preservation of Section 8
Page 14: Preservation of Section 8
Page 15: Preservation of Section 8
Page 16: Preservation of Section 8
Page 17: Preservation of Section 8
Page 18: Preservation of Section 8
Page 19: Preservation of Section 8
Page 20: Preservation of Section 8
Page 21: Preservation of Section 8
Page 22: Preservation of Section 8
Page 23: Preservation of Section 8
Page 24: Preservation of Section 8
Page 25: Preservation of Section 8
Page 26: Preservation of Section 8
Page 27: Preservation of Section 8
Page 28: Preservation of Section 8
Page 29: Preservation of Section 8
Page 30: Preservation of Section 8
Page 31: Preservation of Section 8
Page 32: Preservation of Section 8
Page 33: Preservation of Section 8
Page 34: Preservation of Section 8
Page 35: Preservation of Section 8
Page 36: Preservation of Section 8
Page 37: Preservation of Section 8

Preservation of Section 8EXAMPLE OF PRESERVATION IN OUR FIELD OFFICE:To preserve Section 8 apartments in Austin, TX, an affordable housing property assisted by a project-based Section 8 Housing Assistance Payments Contract, a long term rental assistance contract to replace the expiring contract was needed.

The owner intended to demolish and reconstruct a 43-year old Project in order to address its deteriorating physical condition while maintaining affordability for the residents for 35 years.

The owner has requested the termination of the existing HAP Contract and renewal of the HAP Contract for an additional twenty years under Option 1-B.

Page 38: Preservation of Section 8

Financing

• Conventional loan $26,000,000 • Subordinate Rental Housing Redevelopment

Assistance Funds (Assistance Funds) $2,000,000 loan from the City of Austin, 0% interest;

• 9% federal LIHTCs awarded by the TDHCA. A $18,798,120, the syndication of the LIHTCs to an investor.

Page 39: Preservation of Section 8

Benefits to Residents• Residents will benefit from landscaped green space that

includes a splash pad, tot lot, covered pavilion, and barbeque grills. A landscaped courtyard will offer relaxation space and the preservation of mature native oak trees providing shade and social spaces. New amenities will include a community room, fitness center, business center, and theatre/classroom. The units in the new buildings will be larger and the 2-, 3-, and 4-bedroom units will include additional bathrooms. In addition, while the current project does not have any fully accessible units, ten percent of units in the redeveloped property will be accessible.

Page 40: Preservation of Section 8

Section 15 Waivers Required

Tax Credit Rents would not support the costs of the transaction.

The guide requires the project manager or contract administrator to lower the comparable market rents in the rent comparability study to reflect any use restriction on the rents that can be charged; for example, tax credit restricted rents. The waiver was necessary to enable this transaction. The parties to this transaction need to be certain of the post-rehabilitation rents.

The prohibition against for-profit owners who wish to comply with the requirements of Chapter 15 from obtaining the benefits available under the chapter and the post completion market rents to be effective when the construction was complete was waived to secure the loan commitment and attendant credit enhancement and LIHTC equity investment . Sufficient income would be generated to cover operating expenses and the additional debt from the rehab of the property.

Page 41: Preservation of Section 8

Requirements for Approval

• High priority for the local community1. Redevelopment partly financed with Assistance Funds

from the City of Austin;2. 9% LIHTC awarded by TDHCA • Finding no evidence of a use restriction that would

prohibit.• All residents will have the right to return to the

redeveloped property. The Purchaser will pay all fees and moving costs associated with relocation, including the cost to initiate utilities.

Page 42: Preservation of Section 8

Relocation Requirements:

• Section 8 payments continue while the residents are temporarily relocated off-site utilizing the Section 8 pass through process described in Housing Handbook 4350.1.

• Relocated tenants will not be required to submit an application to the newly developed project and will not be placed on a waiting list.

• The purchaser will negotiate a Master Lease with the owners of the temporary units.

• The residents will not be relocated off-site for longer than 12 months- (because construction is phased).

Page 43: Preservation of Section 8
Page 44: Preservation of Section 8
Page 45: Preservation of Section 8
Page 46: Preservation of Section 8
Page 47: Preservation of Section 8

FY14 CLOSINGS FOR SAN ANTONIO PROGRAM CENTER

Total Number of Closings - 21• Total Number of Units - 4088• Total FHA Loan Dollar Amount - $227,161,200

Affordable Number of Closings- 14• Affordable Number of Units – 2992• Total FHA Loan Dollar Amount - $162,893,000