Presented to the City Council March 7, 2012
What is Floodplain Management? ◦ Definition and Glossary of terms ◦ Watersheds in Dallas ◦ Drainage Systems ◦ Floodplains
Floodplain Management History ◦ Floodplain Management Plans in Dallas
Bond Program History Needs Inventory Appendices: ◦ A – Technical Criteria ◦ B - Needs Inventory by Council District ◦ C – Needs Inventory by Category in Priority Order
2
A program of preventive and corrective measures for reducing flood damage, including flood control projects and floodplain regulations, while at the same time protecting the natural resources and functions of floodplains
Floodplains are typically analyzed and grouped into watersheds ◦ Each watershed has its own unique drainage
characteristics (topography and infrastructure)
3
5-Year and 100-Year rain event ◦ A 5-year rain event has a 20% chance of occurring annually
(1/5 = 20%) and a 100-year rain event has a 1% chance of occurring annually (1/100 = 1%).
5-Year standard and 100-Year standard ◦ Standard in this briefing refers to the standard in which
drainage infrastructure was built. If a system has a 5-year standard it can handle a “5-year” rain event, likewise a system built to 100-year standards can handle a 100-year rain event
4
100-Year Floodplain ◦ Area of flood inundation if a 100-year rain event occurs The area in a 100 year floodplain is subject to a 1% chance of
flooding annually
5
Watershed ◦ A watershed is an area of land from which all the stormwater
that falls within it drains to a certain point.
6 [Source: http://www.chescocooler.org/watersheds.shtml]
Interior drainage ◦ A drainage systems adjacent to the levees which drains to a levee
pump station. The drainage received at the pump stations is pumped over the levees and into the Trinity River.
7
8
9
Streams in Dallas Over 400 miles of streams and creeks Watersheds define area that flows to each stream
Watersheds that drain from outside Dallas: Mountain Creek Elm Fork Trinity River West Fork Trinity River White Rock Creek Hickory Creek
10
Watersheds with flow entirely within Dallas: Prairie Creek Five Mile Creek Turtle Creek/Knights
Branch Cedar Creek,
Coombs Creek Mill Creek/Peaks
Branch Interior Drainage
11
Major Watersheds in Dallas
Trinity River West Fork Trinity River
Elm Fork Trinity River
12
Mountain Creek Watershed Flow from Joe Pool Lake and Cedar Hill
13
Elm Fork Trinity Watershed Flow from Denton and Cooke Counties to Elm Fork Trinity
14
White Rock Creek Watershed Flow from Collin County, Plano, Allen
15
Hickory Creek Watershed Flow from Balch Springs
16
Prairie/Elam Creek Watersheds Flow within Dallas
17
Five Mile Creek Watershed Flow within Dallas
18
Turtle Creek and Knights Branch Watersheds Flow within Dallas
19
Cedar Creek, Coombs Creek and West Levee Sumps Flow within Dallas
20
Mill Creek /Peaks Branch Basins Flow within Dallas
Interior Drainage and Sumps Flow to Levees and
Pump Stations
Pump Station
21
Drainage Systems 1,800 miles of
storm drainage
7 levee pump stations
22
Pump Stations
23
Dallas Floodplain 39,000 acres of floodplain* of 220,000 acres in Dallas
White Rock Creek
Mountain Creek
Trinity River
Five Mile Creek
Prairie Creek
Bachman Creek
* Floodplain refers to the 100-year floodplain
24
What is flooded? Buildings affected by floodplains in Dallas
25
Enclosed Streams Mill Creek and Peaks Branch were enclosed in the 1920s State Thomas also enclosed
26
Floodplain management began in earnest after the record flood on the Trinity River, which occurred on May 25, 1908 ◦ The flood extensively damaged the City's downtown and
industrial areas ◦ The flood dramatized the need for protective planning and
construction, which have continued to the present
Evolution of the City’s Drainage Design Standards ◦ Pre 1970s: No standards to 5 year standards ◦ Early 1970s: FEMA began mapping100-yr floodplains ◦ Dallas began comprehensive standards in early 1970s
27
28 History of Urbanization in Dallas
The majority of the needs in the City are associated with areas developed with inadequate standards
Studies ◦ Drainage Studies – Identified flood risks All 100-year floodplains in Dallas have been
mapped ◦ Floodplain Management Plans – Developed
solutions
Bond Programs ◦ Funded flood studies and plans ◦ Funded projects to reduce flood risk
29
30
Floodplain Management Plans in Dallas •Identify solutions for flooding problems
Note: Floodplain Management Plan (FPM) is not necessary for the Mountain Creek area because the 100-year floodplain was identified prior to development. Also, the FPM plan for the Hickory Creek area will be developed once the City of Balch Springs has completed their portion.
31
Floodplain Management Plans are adopted by Council and identify solutions to mitigate flood problems. Examples of solutions include: ◦ Structural Alternatives Pump Stations Diversion (Including tunneling) Bridge/Culvert Improvements Channelization Detention
◦ Non-Structural Alternatives Voluntary Purchase Flood Warning Systems No Action
32
13.4%
86.6%
Drainage Expenditures
Total Bond Program Expenditures
Drainage Expenditures vs. Other Bond Program Expenditures for Bond Programs from 1958-2006
Other Bond Program Expenditures
34
1982: Lower Peaks Branch Channel and Relief System ($13.4M)
1989: Cole Park Detention Vault ($28M)
1989: Rochester Levee ($8.5M)
1989: Middle Fivemile Creek Channel ($8.5M)
1995: Woody Branch Erosion Control ($2.6M)
1985: Hatfield Branch Detention Basin ($2M)
1998 & 2003: Elam Creek Detention Basin and Channel ($1.3M & $4.9M)
2006: Rush Creek Relief ($8.6M)
2006: Pavaho & Baker Pump Stations ($37.8M & 48M) 2006: Elam
Creek Phase II ($5.1M)
35
1982:$13.4M
1989: $28M
1989: $8.5M
1989:$8.5M
1995: $2.6M 1985: $2M
1998 & 2003: $1.3M & $4.9M
2006: $8.6M
2006: $37.8M & $48M
2006: $5.1M
36
Currently –$1.5 Billion (See Appendices B and C)
Categories include: ◦ Erosion Control – Projects related to creek erosion
affecting structures ◦ Flood Management – Projects related to creeks,
channels, pump stations and bridges ◦ Storm Drainage Relief Systems – Projects related to
inlets, storm sewer pipes, and relief tunnels
37
38
Priority Projects - $323 Million: ◦ Mill I&II/Peaks I&II/State Thomas (one-
phased construction saves $70M) - $217M ◦ Able Pump Station and sumps connectivity
- $91M ◦ Erosion Control Projects - $15M Goal is to fund at least half of the
projects in the Needs Inventory
39
40
Flood Protection Needs in Dallas Priority Project
Mill Creek/ Peaks Branch/ State Thomas
41
Mill/Peaks/State Thomas Mill Creek and Peaks Branch were enclosed in the 1920s State Thomas also enclosed
100-Year Flood Depths (feet)
1 – 2 2 – 3 3 – 4 4 – 5 5 – 6 6 – 7 7 – 8 8 – 9
9 –10
42
Peaks Branch Basin – Baylor Hospital Area
March 19, 2006
Mill I&II/Peaks I&II /State Thomas
March 19, 2006
43
Flood Protection Needs in Dallas Priority Project Able Sump
44
Able Sump May 1995 Flooding
Mill Creek Overflow to Able
Sump Area Able Sump
45
Flood Protection Needs in Dallas Priority Project Able Sump
Erosion Control Projects
46
Charlie Pump Station ($45M)
Hampton Pump Station ($81M)
Trinity Portland Pump Station ($60M)
Dixon Branch Relief System ($100M)
Mill Creek Phase III & Upper Peaks Branch Additional ($250M) Lower Five Mile
Creek ($28M)
Lamar Levee – depending on federal funding
Continue updating stream studies and floodplain mapping through FEMA’s Cooperating Technical Partner Program
Continue implementation of the flood and drainage components in future Bond Programs
Look to expand the use of voluntary purchase for repetitive flood loss structures (those with multiple flood insurance claims)
47
Appendix A – Technical Critetia
49
Erosion Control – this category would provide armoring of natural creek banks to protect soil against further erosion loss ◦ Ratio of distance from top of bank to threatened area or
depth of creek ◦ Rate of creek bank loss ◦ Cost per number of structures protected ◦ Weight given to type of structure threatened: Type 1 – Houses, garages, streets, alleys and bridges Type 2 – Pools and other permanent structures not
included in Type 1 Type 3 – Fences, yard, and privately owned retaining walls
50
Flood Management – this category includes sites for which channel improvements, levees, detention basins, or bridge or culvert replacements are necessary to reduce flooding and also voluntary purchase of homes in the floodplain when no other viable alternative exists ◦ Frequency of flooding ◦ Depth of flooding ◦ Depth times the velocity of flow over bridges ◦ Number of structures affected ◦ Ratio of project cost per protected structure
51
◦ Storm Drainage Relief Systems – this category includes additional drainage inlets and storm sewer pipe systems to optimize existing inadequate drainage systems in developed areas Type or effect of flooding (single or multiple
structures flooding, streets flooding) Frequency of flooding Depth of flooding Number of affected structures Ratio of project cost per protected structure
52
Appendix B – Needs Inventory by Council District
Needs Inventory by Council District
CategoryProject Name Description Score EstimateCouncil District CW
Flood ManagementLevee Drainage System - Sump A (Phase II)
Second phase of Sump A improvements: complete the connectivity of sumps via culverts to each pond; dredging of certain sump ponds; construction of retaining walls and sump enhancements
60 $54,000,000
Flood ManagementLevee Drainage System - Westmoreland-Hampton Sump
Rehab existing Delta Pump Station 53 $5,000,000
Flood ManagementLevee Drainage System - Francis Street Sump
Add two 6'X5' gated box culverts - preliminary - cost estimate includes contingencies which may result from detailed analysis of west levee (Interior Drainage Phase 2)
44 $1,100,000
Flood ManagementLevee Drainage System - Charlie Sump
Construct new 231,000 GPM pump station; rehab existing station
34 $45,000,000
Flood ManagementDallas Floodway Levee Remediation City's cost share for raising and widening the levees to safely pass the Standard Project Flood (SPF, approx. 800-year)
336 $64,000,000
Flood ManagementLevee Drainage System - Nobles Branch Sump
Construct three new 60-inch gated culverts at Empire Central
31 $1,500,000
Flood ManagementLevee Drainage System - Trinity-Portland Sump
Construct new 256,000 GPM pump station for Trinity-Portland Sump; this runoff is currently pumped by Delta Pump Station; includes purchase of portion of property bounded by Bernal, Norwich, existing development, and Mican Channel for excavation of additional sump storage
28 $60,000,000
Flood ManagementLevee Drainage System - Record Crossing Sump
Construct new 710,000 GPM pump station at Hampton plant, rehab existing pump station, extend pump station outfalls 300 feet
28 $81,000,000
Flood ManagementDallas Floodway Extension - Multiple Projects
Includes the city's cost share for the Cadillac Heights Levee, Lamar Levee, Rochester Levee, and Upper Chain of Wetlands
186 $132,000,000
Flood ManagementRepetitive Loss Properties - Voluntary Purchase
Voluntary purchase of 36 repetitive flood loss residential properties, identified in the Community Rating System Repetitive Loss Plan
146 $10,800,000
Flood ManagementLevee Drainage System - Sump A (Phase I)
New pump station and minimum sump connectivity to ensure full flow to the pump station
141 $91,000,000
Storm DrainageMill Creek Drainage Relief System - Phase III
Engineering and construction for remainder of creek area ROW, creek restoration, upper basin relief systems, and re-routing of existing system trunk lines that are on private property or crossing mid-block - completes full relief for Mill Creek
96 $150,000,000
Friday, February 24, 2012 Page 1 of 37
CategoryProject Name Description Score EstimateCouncil District CW
Storm DrainageWest Dallas - Frances Street Sump Basin
100-year upgrade for storm sewers outfalling into the Frances Street sump, design and construction
68 $3,250,000
Storm DrainageWest Dallas - Trinity Portland Sump Basin
100-year upgrade to storm sewers outfalling into the Trinity-Portland sump, design and construction
65 $3,736,447
Storm DrainageMill Creek/Middle Peaks Branch/State-Thomas Woodall Rogers Drainage Relief System
Construction of Mill Creek Phases I and II pressure sewer and start of purchase of ROW for creek restoration; Middle Peaks Branch Phases I and II pressure sewer; full relief from flooding in Deep Ellum and Baylor Hospital, partial relief north of Exall Park, Fair Park, and Alcalde/Victor area near Buckner Park; includes diversion from Woodall Rogers outfall to support State-Thomas drainage (Single-phase construction)
530 $217,000,000
Storm DrainageWest Dallas - Pavaho Sump Basin 100-year upgrade to storm sewers outfalling into the Pavaho sump, design and construction
46 $21,785,801
Storm DrainagePeaks Branch Upper Basin Relief System (RL Area 13)
Drainage relief system for Peaks Branch watershed from Buckner Park north to M Streets; this is a continuation of Middle Peaks Branch Phases I & II, which is currently planned for design and construction with Mill Creek Phases I & II and State-Thomas Woodall Rogers Outfall
251 $100,000,000
Summary for 'CDnum' = (17 detail records)
Sum 1,041,172,248
Friday, February 24, 2012 Page 2 of 37
CategoryProject Name Description Score Estimate
1Council District Erosion ControlClarendon 3435 Erosion ~10' from home, advanced 5' in
8 years, good rock in creek bank, slow rate, Type I - design and construction
67.39 $97,322
Erosion ControlRavinia (S) 326 and 406 Type I, two houses threatened, 35' from bank, 120 LF 18' gabion wall
53.23 $133,000
Erosion ControlElmwood 2227 Type I, house threatened, 20' from bank, 75 LF of 8' gabion wall
52.68 $45,000
Flood ManagementCedar Creek Culvert @ Polk Add culvert, FREQ. 10 YR.,DEPTH 4.1, VEL. 5.8, RATING = 23.78, design and construction - Add 2-10'X10', ~100' length
79.9 $712,000
Flood ManagementCedar Creek Bridge @ Tyler Replace bridge, design and construction 78.04 $2,532,000
Flood ManagementCoombs Creek Bridge @ Brooklyndell
Install bridge, FREQ. 100 YR., DEPTH 3.1' , VEL. 10.6, RATING = 34.1, design and construction
78 $253,000
Flood ManagementRavinia South, 123 Voluntary purchase 75.5 $174,000
Flood ManagementElmwood Branch Culvert @ Edgefield
Add culvert, FREQ. 10 YR., DEPTH 3.7, VEL. 5.8, RATING = 21.46, design and construction
73 $301,000
Flood ManagementCedar Creek Culvert @ Winnetka Add culvert, FREQ. 10 YR.,DEPTH 2.8, VEL. 5.6, RATING =15.68, design and construction - 200' 3-12'X12'
71.68 $1,345,000
Flood ManagementLake Cliff @ Colorado Blvd Analysis to consider elevating Colorado Blvd. (spillway) 4.5' to increase storage and reduce overtopping of Colorado
71 $56,000
Flood ManagementKidd Springs Branch @ Colorado Analyze flow through private lake; Improve outlet structure, culverts under Kessler Lake Dr., culverts under Colorado as required to to protect 2 homes, 2 roadways
68.92 $603,673
Flood ManagementKidd Springs Branch Detention Study Analyze feasibility of adding detention at Kidd Springs Lake as alternative to culvert improvements at Colorado
68.92 $84,725
Flood ManagementElmwood Branch Culvert @ Tyler & Vernon
Add culvert, FREQ. 50 YR., DEPTH 3.1', VEL. 5 , RATING = 15.5, design and construction
66.5 $237,330
Flood ManagementCoombs Creek Bridge @ Barnett Install bridge, FREQ. 5 YR., DEPTH 2.5', VEL. 7, RATING = 17.78, design and construction
62.7 $279,929
Flood ManagementElmwood Branch Bridge @ Melbourne
Install bridge, FREQ. 2 YR., DEPTH 1.6', VEL. 5, RATING = 8, ELIMINATES FLOODING OF FOUR HOMES, design and construction
60 $206,903
Flood ManagementCoombs Creek Culvert @ Jefferson-Westmoreland
Add culverts, design and construction - 4-10'X8' add'l culverts, ~700'
59 $3,407,834
Flood ManagementCoombs Creek Bridge @ 9th Install bridge, FREQ. 5 YR., DEPTH 2, VEL. 6.4, RATING = 13.06, design and construction
58 $334,697
Flood ManagementElmwood Branch Culvert @ Clarendon
Add culvert, FREQ. 25 YR., DEPTH 2.7', VEL. 6.1, RATING = 16.47, design and construction
55.45 $194,733
Friday, February 24, 2012 Page 3 of 37
CategoryProject Name Description Score Estimate
1Council District Flood ManagementRugged Branch Culvert
Improvement @ BerkleyAdd culvert, FREQ. 50 YR., DEPTH 1.1, VEL. 3.8, RATING = 8.64, design and construction
51.64 $73,024
Flood ManagementCoombs Creek Bridge @ Ivandell Install bridge, FREQ. 100 YR., DEPTH 1.8', VEL. 7.3, RATING = 13.36, design and construction
48.35 $212,989
Flood ManagementCoombs Creek Bridge @ Burlingdell Install bridge, FREQ. 100 YR., DEPTH 1.8', VEL. 6.5, RATING = 11.7, design and construction
46.7 $146,050
Flood ManagementCoombs Creek Bridge @ Gibsondell Install bridge, FREQ. 100 YR., DEPTH 1.8, VEL. 6.5, RATING 11.7, design and construction
46.37 $152,135
Storm DrainageVan Buren (N) - Cedar Hill Area 100-year upgrade to existing system, 1 house and excessive street flooding, design and construction
69 $506,000
Storm DrainageSage Valley - Wisteria Area 2936 Sage Valley and homes to south may be impacted by drainage coming off alley - investigate, design, construct improvements
66 $176,477
Storm DrainageBarnett (S) 702 and 706 Barnett-Eli Area, Phase 1 ( short term only) , 2 houses, street flooding, design and construction
61 $75,459
Storm DrainageTyler (S) - Berkley 100-year upgrade to existing system, 1 house and area street flooding, design and construction
59 $611,998
Storm Drainage5th Street Drainage Relief System Design and construct 100-year drainage system for area bounded by 5th, Lake Cliff Dr., N. Lancaster, and E. Jefferson.
59 $1,063,000
Storm DrainageCliffdale, 322 Design and construct relief system for flooding, 1 house, street
58 $105,155
Storm DrainageFalls 2509 Falls-Franklin Area, Phase 1 (short term only), one house and streets flood, design and construction
58 $158,221
Storm DrainageBarnett, Eli, Irwindell, Ravinia Area Existing system upgrade - excessive street flooding. At least two houses flood, design and construction
56 $791,104
Storm DrainageFalls-Franklin (S) Area Relief Provide 100 year upgrade to existing system. One structure, excessive street flooding, design and construction
54 $547,687
Storm DrainageCedar Creek (Upper) Drainage Relief System
Large area relief system, Hampton/Clarendon area and south, MAPSCO 53L, M, Q, R, 54J
54 $1,825,626
Storm DrainageCavender @ Jefferson 2 houses, excessive street flooding, design and construction
48 $164,306
Storm DrainageVirginia Blvd 3541 and 3545 Relief system to connect old private drainage system to adequate outfall to correct lot-to-lot drainage problem; will require drainage easement dedication/condemnation
48 $118,800
Storm DrainageSunnyside 1226/Pampas 4117 Outfall upgrade, participate w/City of Cockrell Hill, design and construction
48 $60,854
Friday, February 24, 2012 Page 4 of 37
CategoryProject Name Description Score Estimate
1Council District Storm DrainageN. Oak Cliff Relief System - Ph 2 -
Davis@Zang to W.Complete construction as designed with Phase 1, relief systems in Davis, 8th, and 9th Streets - Zang to Llewellyn, local drainage systems Bishop to Adams
46 $5,476,878
Storm DrainageLaRue @ Wisteria One house and area streets flood, design and construction
44 $736,335
Storm DrainageTwelfth @ Marsalis Intersection flooding, design and construction
38 $292,099
Storm DrainageRavinia South, 503 1 house floods from behind, would have to enclose small creek, can fix w/paving petition
33 $70,898
Storm DrainageGinger - Moler Area 3 houses flood - outfall extension, design and construction
30 $133,879
Summary for 'CDnum' = 1 (40 detail records)
Sum $24,497,120
Friday, February 24, 2012 Page 5 of 37
CategoryProject Name Description Score Estimate
2Council District Erosion ControlCedar Springs 5910 Type I, cathedral threatened, 15' from
creek bank, about 180 LF of 16' gabion wall
67.28 $162,000
Flood ManagementDallas Floodway System - ATSF Removal
Removes wooden trestles, concrete bridge section, and earthen embankments to improve flood conveyance. Assumes USACE cost share of 65%.
75 $1,081,358
Flood ManagementWhite Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 $12,500
Flood ManagementKnights Branch @ Denton Dr. Add culvert, raise road, FREQ. 2 YR. DEPTH 8.1, design and construction
73.3 $1,709,000
Flood ManagementCedar Springs Branch @ Denton Raise road, FREQ. 100 YR., DEPTH 3', design and construction
63.4 $608,541
Flood ManagementBrookhollow Bridge Construct bridge, channel improvements, and downstream headwall modifications at outfall of Gilford-Roanoke system; prevents flooding of Texas Specialty Hospital at Dallas, a long-term acute care facility subject to 1-2' flooding; requires agreement with Brookhollow Country Club for positive overflow and headwall modifications.
62 $267,204
Flood ManagementCedar Springs Branch @ Production Raise road 1,000', FREQ. 100 YR., DEPTH 3', design and construction
59 $456,406
Flood ManagementMockingbird-Maple Flood Management
Construction of culverts beneath Mockingbird between Forest Park and Maple, extension of culverts upstream of Mockingbird, raising pavement grade on Mockingbird - road floods approx. 3 feet in depth
59 $7,210,000
Flood ManagementCedar Springs Branch Culvert @ Harry Hines
Raise road, add culvert, channel improvement, FREQ. 100 YR., DEPTH 2.1', design and construction
40 $1,460,500
Flood ManagementDallas Floodway System - Wetlands and River Habitat Improvements (BVP Expanded Phase I)
Stormwater Wetlands at Pavaho sump; approximately 2000 feet of Boardwalks; and additional trees and habitat in floodway (not related to lakes) as recommended in the Trinity River Balanced Vision Plan (Expanded Phase I)
30 $1,115,596
Flood ManagementDallas Floodway System - Wetlands and River Habitat Improvement (BVP Ultimate Plan)
Design and Construction of Headwaters Wetlands; Stormwater Wetlands at Baker, Hampton and Delta sumps; Boardwalks; Bank restoration and vegetation and meandering river as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan)
30 $8,976,812
Friday, February 24, 2012 Page 6 of 37
CategoryProject Name Description Score Estimate
2Council District Storm DrainageKnights Branch Upper Relief
System - Inwood/MockingbirdMajor relief system of enclosed portion of upper Knights Branch watershed from Lowe's culvert extension (downstream of Inwood/Lemon) north on Inwood to about Wateka, using 2-12X10 box culverts, with smaller systems as necessary to provide full relief - requires detailed analysis
74 $807,300
Storm DrainageKnight Street 2426 & 2428 Duplex-type unit built in sag, lower than street, new construction, local system not adequate.
69 $534,000
Storm DrainageWinslow-Henderson-Beeman Area Relief
Design and construction of a drainage relief system for area around old Ford plant - 5200 E. Grand Ave.
69 $10,443,000
Storm DrainageThrockmorton-Reagan Drainage Improvements
Additional drainage relief systems not funded with 1995 BP project. Construct lines B, C and additional inlets on Reagan.
68 $422,000
Storm DrainageGilford - Roanoke Area Relief System - Phase II
Excessive street flooding, Phase II - complete relief system in Anson and Grauwyler Park, between Gilford and Mohawk, replace Brookhollow bridge, enlarge channel between Harry Hines and Brookhollow, gabion lining
60 $1,367,198
Storm DrainageMunger (N) 1300 Short term - Part of Peaks Branch. One structure and area streets flood, design and construction
58 $13,517
Storm DrainagePacific Avenue Relief @ Elm Street CBD relief system to the Trinity River, design and construction
58 $5,476,877
Storm DrainageHarry Hines 5323 UT Southwestern Basement flooded, design and construction
53 $60,854
Storm DrainageBriar Cliff 1600 One house, street flooding, design and construction - add one 10' inlet, 30 LF 21" RCP
45 $15,139
Summary for 'CDnum' = 2 (20 detail records)
Sum $42,199,802
Friday, February 24, 2012 Page 7 of 37
CategoryProject Name Description Score Estimate
3Council District Erosion ControlColorado (W) 705 Type I, house threatened, 4' from bank,
80LF of 12' gabion wall - small creek northwest corner of property
76.33 $68,000
Erosion ControlHampton Road (S) 3817 Type I, house threatened, 12' from bank, about 100 LF of 20' gabion wall
72.02 $200,000
Erosion ControlDeep HIll Circle 2671, 2675, 2679, 2683
~320 LF gabion wall, 25' tall. 15' at 2675, greenhouse threatened 2679, driveway/carport threatened 2671, 2683.
71.06 $484,448
Erosion ControlKiesthill Drive 3431 Remove ex. ret. walls, replace w/100 LF gabion wall, 25' height, stable vegetated slope at this time, Type I, long-term threat garage
68.02 $194,644
Erosion ControlBlue Ridge 3721 Erosion 7.5 feet from house, type I - design and construction
67.78 $108,136
Erosion ControlOhio W. 412, 416 412 - rock channel with soil upper 8', surface erosion, Type I; 416 - Type II, driveway undercut, founded on rock, protected by brick wall
67.47 $81,101
Erosion ControlPyka 3918 Type II, pool threatened - design and construction
67.32 $164,366
Erosion ControlHolliday 3445 & 3449 125 LF gabion wall, 25' height, detached garage threatened
67.22 $162,000
Erosion ControlBoulder Drive 4120 Type II erosion, drive threatened 58.85 $36,766
Erosion ControlGuadalupe 3033 Type 1, slight threat to townhouse, erosion over gas pipeline, possibly short gabion wall - nearest home 30' from erosion, requires 50 LF of 16' gabion wall on creek bank, or combination flowable fill and lower wall near pipeline cut
53.30 $70,000
Erosion ControlHolliday 3621 Type I, house threatened, 35' from bank, 80 LF 18' gabion wall
53.23 $96,000
Erosion ControlHolliday 3605 Type I, house threatened, 35' from bank, 120 LF 18' gabion wall
53.23 $110,000
Erosion ControlLockridge Circle 3216, 3222, 3226 Type I, three houses threatened, 20' from bank, 250 LF of 10' gabion wall
53.18 $200,000
Erosion ControlCripple Creek 3744, 3750, 3758 Type I, three houses threatened, 30' from bank, 300 LF of 15' gabion wall
53.18 $240,000
Erosion ControlStevens Wood Court 914 Slight threat to home; 80 LF gabion wall, 10' height
50.7 $72,000
Erosion ControlStevens Wood Court 902 Slight threat to home; 75 LF gabion wall, 7' height
49.1 $60,000
Erosion ControlCripple Creek 3750 Slight threat to home; 80 LF gabion wall, 15' height
48.2 $64,000
Erosion ControlBoulder 4207 Slight threat to home; 75 LF gabion wall, 15' height
47.8 $60,000
Erosion ControlStevens Wood Court 906 Slight threat to home; 100 LF gabion wall, 7' height
40.7 $80,000
Friday, February 24, 2012 Page 8 of 37
CategoryProject Name Description Score Estimate
3Council District Erosion ControlDeep Hill Circle 2625, 2641, 2663,
2667, 2687, 2691Remainder of Deep Hill sites, some vacant, no imminent threats, construct approx. 550 LF gabion wall at 4 sites, ~30' height
30.38 $773,171
Flood ManagementCoombs Creek Bridge @ Plymouth Raise road, install bridge, FREQ. 2 YR., DEPTH 3.4', VEL. 6.4,RATING = 27.28, design and construction, and voluntary purchase of apartment site
79 $1,471,000
Flood ManagementSouth Branch Culvert Improvement @ Louisiana
Add culvert, raise road, FREQ. 2 YR., DEPTH 3.4', VEL. 6.9, RATING = 21.76, design and construction
76.76 $158,000
Flood ManagementCoombs Creek Bridge @ Colorado Raise road, install bridge, FREQ. 5 YR., DEPTH 3.2, VEL. 7.5, RATING = 23.93, design and construction
69 $486,833
Flood ManagementKidd Springs Branch @ Colorado Analyze flow through private lake; Improve outlet structure, culverts under Kessler Lake Dr., culverts under Colorado as required to to protect 2 homes, 2 roadways
68.92 $369,993
Flood ManagementChalk Hill Branch Bridge @ N. Counts
Raise road, install bridge, design and construction
68 $365,124
Flood ManagementChalk Hill Branch Culvert @ Jefferson
Add culverts, FREQ. 2 YR., DEPTH 3.2, VEL. 4.88,RATING = 15.52, design and construction
64 $304,271
Flood ManagementChalk Hill Branch Bridge @ S. Counts
Raise road, install bridge, FREQ. 100 YR., DEPTH 3.6, VEL. 5.54, RATING = 19.78, design and construction
62.3 $365,124
Flood ManagementCoombs Creek Culvert @ Hampton Add 2-10'X11.5' culverts, FREQ. 5 YR., DEPTH 2.1, VEL. 5.9, RATING = 12.63, design and construction
58.01 $365,124
Flood ManagementChalk Hill Tributary - Culvert @ Clarendon
Add culvert, FREQ. 100 YR., DEPTH 1.9', VEL. 3.42, RATING= 6.46 , ELIMINATES FLOODING OF ONE STRUCTURE, design and construction
52.4 $97,366
Flood ManagementCoombs Creek Culvert @ Sylvan Add 4-12'X10' culverts, FREQ. 100 YR., DEPTH ~1.5, VEL. 4.9, RATING = 7.35, supplement TxDOT construction of 2-20X12 culverts, add culverts to south, remove & reconstruct gabion channel lining, requires hydraulic analysis to optimize configuration.
41.35 $919,154
Flood ManagementDallas Floodway System - Wetlands and River Habitat Improvements (BVP Expanded Phase I)
Stormwater Wetlands at Pavaho sump; approximately 2000 feet of Boardwalks; and additional trees and habitat in floodway (not related to lakes) as recommended in the Trinity River Balanced Vision Plan (Expanded Phase I)
30 $1,115,596
Flood ManagementDallas Floodway System - Wetlands and River Habitat Improvement (BVP Ultimate Plan)
Design and Construction of Headwaters Wetlands; Stormwater Wetlands at Baker, Hampton and Delta sumps; Boardwalks; Bank restoration and vegetation and meandering river as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan)
30 $8,976,812
Friday, February 24, 2012 Page 9 of 37
CategoryProject Name Description Score Estimate
3Council District Flood ManagementLedbetter Branch Drainage
Improvements - Phase IIContinuation of channel and culvert improvements at Ledbetter and Duncanville Road
21 $1,095,375
Flood ManagementLedbetter Branch Detention Basin Flood retarding basin at confluence with Five Mile Creek at Pecan Grove Park, design and construction - protects 47 or more structures from 100-year flooding - requires updated analysis
154 $4,259,793
Storm DrainageMapleleaf Circle/Mapleleaf Lane Area
Structure and street flooding at 3212 Mapleleaf Cir. and 3129 Mapleleaf Lane, design and construction
69 $791,000
Storm DrainageTyler (S) 2016 Tyler-Berkley, Phase 1 (short term only), one house, design and construction
69 $166,000
Storm DrainageConrad - Louisiana Area Relief Provide 100 year upgrade to existing system. 4 structures, excessive street flooding, design and construction
67 $1,709,000
Storm DrainageBahama Drive Relief System Relief system for Bahama Dr. south of Fort Worth Ave. - approx. 1,100 LF 8X6 box culvert, drainage area approx. 88 ac. - relieves flooding of street and structures at Wedglea Creek Garden Homes
66 $577,000
Storm DrainageTyler (S) - Berkley 100-year upgrade to existing system, 1 house and area street flooding, design and construction
59 $564,922
Storm DrainageSouthwood - Franklin (S) Area Provide 100-year upgrade to existing system. One known garage floods, street flooding, design and construction
53 $492,918
Storm DrainageSouthwood 2602 Southwood- Franklin, Phase 1 (short term only), one garage and excessive street flooding, design and construction
53 $91,281
Storm DrainageWinnetka (N) - Colorado to Stewart 100-year upgrade to existing system, design and construction
51 $1,308,365
Storm DrainageMontana (W) 419 One house and streets flood, design and construction
48 $107,103
Storm DrainageMonte Carlo 1600 and 3400 block (Repetitive Loss Area 37)
3 houses flood, design and construction 48 $200,000
Storm DrainageMontana - Brookhaven Area 100 year relief for area street flooding, design and construction
45 $736,335
Storm DrainageTurnpike Distribution IV - IH30 to Commerce
Design and construction of connection of the improved channel in the Turnpike Distribution Center
45 $214,207
Storm DrainageMontclair N. 1111 ~400 LF 36" pipe, ~50 LF 21" pipe, 2-10' inlets, to relieve street flooding due to inadequate existing system
43 $131,760
Storm DrainageLedbetter - Altoona to Westmoreland System Upgrade to 100 year capacity; street flooding, design and construction
43 $819,341
Storm DrainageSorcey Rd. @ White Ash Enlarge culvert under Sorcey Rd. to relieve intersection flooding, design and construction
40 $64,881
Friday, February 24, 2012 Page 10 of 37
CategoryProject Name Description Score Estimate
3Council District Storm DrainageEnglewood - Oakenwald Drainage Design and construct storm drainage
relief system from Englewood/Oakenwald intersection to existing system on Plowman.
38 $547,687
Storm DrainageGibbs Williams @ Deerfield 2 houses and area streets flood, design and construction
35 $499,004
Storm DrainageHearne Ave. @ Commerce Property flooding, design and construction of minor relief system
31 $243,416
Storm DrainageFort Worth @ Vilbig Provide outfall upgrade, design and construction
25 $47,466
Summary for 'CDnum' = 3 (53 detail records)
Sum $32,985,882
Friday, February 24, 2012 Page 11 of 37
CategoryProject Name Description Score Estimate
4Council District Erosion ControlCavender 445 Type I, house threatened, 4' from creek
bank, 80 LF 12' gabion wall80.93 $64,000
Erosion ControlFive Mile Pkwy W. 922 150 LF gabion wall, 30' height, w/decorative concrete parapet wall, Type I, street threatened
67.8 $194,644
Erosion ControlGlen Oaks 816 Type I, house threatened, 25' from creek bank, 90 LF of 18' gabion wall
62.48 $120,000
Erosion ControlHunters View 5935 Type I, house threatened, 35' from bank, 130 LF 18' gabion wall
53.23 $143,000
Erosion ControlEdgemont 1631 Type I, house threatened, 30' from bank, 75LF of 15' gabion wall
53.18 $60,000
Erosion ControlUrban 3100 Type I, house threatened, 30' from bank, 100 LF 15' gabion wall
53.18 $80,000
Erosion ControlDanube 1715 Remote threat to home; 60 LF gabion wall, 12' height
51.8 $48,000
Flood ManagementHoney Springs Br Detention Basins Design & construction of three detention basins upstream of Seaton, Linfield & Prosperity to eliminate flooding of 7 homes - A voluntary buy out should also be considered as an option
92 $4,737,000
Flood ManagementWhite Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 $7,500
Flood ManagementKings Branch Culvert @ Georgia Add culvert. FREQ. 10 YR., DEPTH 2.4, VEL. 5.5, RATING = 11.4, design and construction
69.2 $97,366
Flood ManagementKings Branch Culvert @ Edgemont Add culvert, raise road, FREQ. 2 YR., DEPTH 2.1, VEL. 7.2, RATING = 15.12, design and construction
68.12 $85,195
Flood ManagementKings Branch Culvert @ Woodin Add culvert, FREQ. 2 YR., DEPTH 2.5, VEL. 4.9, RATING = 12.25, 1 HOME AFFECTED, design and construction
67.25 $103,452
Flood ManagementKings Branch Culvert @ Stella Add culvert, raise road, FREQ. 2 YR., DEPTH 2.2, VEL. 5.2, RATING = 11.44, design and construction
66.44 $87,630
Flood ManagementKings Branch Culvert @ Louisiana Add culvert, FREQ. 2 YR., DEPTH 2.1, VEL. 5.5, RATING = 10.29, design and construction
65.29 $104,669
Flood ManagementKings Branch Culvert @ Denley Add culvert, FREQ. 25 YR., DEPTH 2.1, VEL. 6.2, RATING = 18.48, design and construction
63.48 $197,167
Flood ManagementOak Creek Circle 3504 & 3508 Voluntary Purchase
Voluntary purchase of one frequently flooded home and adjacent lot, as an alternative to a costly drainage relief system
58 $170,000
Flood ManagementBeckley Club Branch @ Missouri Culvert improvements in lieu of closing crossing; FREQ. 5 YR., DEPTH 1.6,VEL. 6.4, RATING= 10.24, design and construction
55.24 $340,783
Flood ManagementKings Branch Culvert @ Genoa Add culvert, raise road, FREQ. 10 YR., DEPTH 1.9, VEL. 6, RATING = 11.4, design and construction
54.4 $111,971
Friday, February 24, 2012 Page 12 of 37
CategoryProject Name Description Score Estimate
4Council District Flood ManagementBeckley Club Branch Culvert -
Illinois to OhioAdd culvert, FREQ. 2 YR.,DEPTH 3.6, VEL. 1.8, RATING =6.48, design and construction
52 $924,983
Flood ManagementCedar Crest Bridge Culvert @ Southerland
Add culvert, FREQ. 1 YR., DEPTH 1.2, VEL. 5, RATING = 6, design and construction
51 $219,075
Flood ManagementKings Branch @ Stirling Close crossing, FREQ. 50 YR., DEPTH 1.8, VEL. 6, RATING = 10.78, design and construction
49 $54,769
Flood ManagementBeckley Club Branch Culvert @ Iowa Add 2 - 84" PIPES, FREQ.10 YR.,DEPTH 2.3,VEL. 5.7, RATING = 13.11, design and construction
47.07 $182,562
Flood ManagementBeckley Club Bridge @ Georgia Replace ex. pipe with box, raise road, FREQ. 10 YR., VEL. 6.3,RATING = 17.01, design and construction
47 $304,271
Flood ManagementKings Branch Culvert @ Lynn Haven Add culvert, FREQ. 50 YR.,DEPTH 1.4, VEL. 5.7, RATING = 7.98, design and construction
45.98 $107,103
Storm DrainageGlen Oaks 700 One house and area streets flood, design and construction
76 $396,000
Storm DrainageLisbon Area C - Overton, Leacrest E. of Garrison
Relief system to protect homes east of Garrison on Overton and Leacrest
69 $1,766,000
Storm DrainageKushla 3800 @ Grinnell 2 houses and streets flood, design and construction
66 $435,000
Storm DrainageHarlandale - Strickland Area Apartment building floods, design and construction
56 $851,958
Storm DrainageSun Valley - Charlemagne One house and street flooding, design and construction
53 $248,284
Storm DrainageMisty Glen Area 100 year upgrade for street flooding, design and construction
49 $803,274
Storm DrainageBrookwood Dr 918 Construct 2-10' inlets and approx. 4-ft high retaining wall about 150 LF behind two homes to prevent flooding from inadequate drainage on Ledbetter
49 $551,880
Storm DrainageHollow Ridge 4804 One house - garage floods from street, design and construction
48 $139,964
Storm DrainageLoganwood 3602 One house and area streets flood, design and construction
48 $255,587
Storm DrainageLisbon Area E - Kiest @ Garrison Street flooding - Kiest @ Garrison 45 $425,979
Storm DrainageDenley (S) 1243 Street/Property flooding, design and construction
43 $132,661
Storm DrainageLouisiana W. 214 Replace existing damaged storm sewer from Woodin to Louisiana
43 $60,854
Storm DrainageLisbon Area D - Fordham, Garrison to Bonnieview
Street flooding - Fordham Road - Garrison to Bonnie View
41 $2,129,896
Storm DrainageLisbon Branch - Mentor to Fordham Continuation of relief system to upgrade area to 100-year level of protection
41 $3,042,710
Storm DrainagePaloduro - Rand Area Street flooding, design and construction. 41 $2,677,585
Friday, February 24, 2012 Page 13 of 37
CategoryProject Name Description Score Estimate
4Council District Storm DrainageMarsalis - Five Mile Pkwy to Ann
Arbor100 year upgrade of existing systems - excessive street flooding, design and construction
38 $486,833
Storm DrainageIdaho Creek - Brookmere to Grinnell Enclose creek from Brookmere to Grinnell, design and construction - requires 404 Permit, may not be approved by USACE
36 $651,140
Storm DrainagePentagon - Marsalis to Yewpon 100-year upgrade to existing systems - excessive street flooding, design and construction
30 $1,825,626
Summary for 'CDnum' = 4 (42 detail records)
Sum $25,426,371
Friday, February 24, 2012 Page 14 of 37
CategoryProject Name Description Score Estimate
5Council District Erosion ControlRosemont Rd. 7322 Type I, house threatened, 20' from
bank, 125 LF of 15' gabion wall58.19 $100,000
Erosion ControlCaracas 5410 and 5416 Type I, two houses threatened, 25' from creek bank, 125 LF of 16' gabion wall
53.61 $150,000
Erosion ControlKildare 4927 Type I, one house threatened - recommend voluntary purchase - cost of wall exceeds property value - 20' from creek bank, would require 75 LF of 12' gabion wall
53.51 $75,000
Erosion ControlPutting Green 6521 Type I, house threatened, 40' from bank, 100 LF of 20' gabion wall
53.18 $100,000
Erosion ControlPuttting Green 6629 and 6637 Type I, two houses threatened, 75' from bank, 50 LF of 15' gabion wall
50.18 $40,000
Erosion ControlPoplar Springs Lane Design and construction of ~700 LF gabion mattress at 3:1 slope w/conc. toe wall to protect 12 homes adjacent to filled-in channel - 3300 and 3400 block
49.82 $235,736
Erosion ControlRosemont 7433 Remote threat to home; 185 LF gabion wall, 15' height
42.8 $148,000
Erosion ControlPutting Green 6637 Type III, no imminent threat to structure, normal bank erosion
36.03 $168,691
Flood ManagementEstes Branch Bridge @ Bluffcreek Install bridge, channel improvement, FREQ. 2 YR., design and construction
71 $1,361,000
Flood ManagementPleasant Branch - Tonawanda to Bruton
Channel improvements Station 29+00 to Tonawanda, add 4-8X5, raise and construct 3-8X5 at Belfast, raise and construct 3-10X7 at Bruton
54.81 $1,996,017
Flood ManagementLisbon Branch Voluntary Purchase 3 homes - voluntary purchase 50 $219,075
Flood ManagementLake June @ St. Augustine Raise road, channel improvement, FREQ. 100 YR., DEPTH 1.8', design and construction
43.24 $279,929
Flood ManagementElam Creek Voluntary Purchase (1 home)
1 home for voluntary purchase - 7330 Lake June Rd.
42 $146,050
Flood ManagementLower Five Mile Creek Management Plan
Channel restoration downstream of Bonnie View, mitigation, landscaping and trails. floodplain reclamation
41. $14,000,000
Flood ManagementLake June Branch Culvert @ Glencliff
Add culvert, raise road, FREQ. 50 YR., DEPTH 1.1, design and construction
38.3 $273,844
Flood ManagementHoney Springs Culvert @ Fordham Remove pipe, redirect headwall, FREQ. 100 YR., DEPTH 1, VEL. 2.4, RATING = 2.4, design and construction
35.4 $425,979
Flood ManagementCypress Branch Culvert @ Jennie Lee
Culvert improvements, raise road, FREQ 100 YR., DEPTH 1.5', design and construction
35.2 $182,562
Flood ManagementElam Creek Culvert @ Rosemont Rd Add culvert, design and construction 33.2 $328,612
Flood ManagementPrairie Creek Bridge Improvement @ Military Pkwy
Install bridge, FREQ. 100 YR., DEPTH 1.1', design and construction
32.96 $1,217,083
Flood ManagementPrairie Creek Channel Imprv - T&P RR to Forney Rd
Channel improvements, FREQ. 50 YR., eliminates flooding of animal shelter, design and construction
31 $608,541
Friday, February 24, 2012 Page 15 of 37
CategoryProject Name Description Score Estimate
5Council District Flood ManagementElam Creek @ Ledbetter Raise roadway, FREQ. 50 YR., DEPTH
.7, design and construction29 $650,652
Flood ManagementElam Creek @ Elam Rd. Bridge replacement, design and construction
29 $657,226
Flood ManagementPrairie Creek Trib 271 + 36 Culvert @ Haverhill
Add culvert and headwall, FREQ. 100 YR., DEPTH .3, design and construction
26 $21,627
Flood ManagementPrairie Creek Trib 313 + 59 Culvert @ Glencliff
Add culvert, raise road, FREQ. 100 YR., DEPTH .6, VEL. .9, RATING = .54, design and construction
26 $133,879
Storm DrainageWoodlark Trail, 306 Design and construction of overflow flumes on Woodlark and Glen Forest
68 $51,000
Storm DrainageGreendale 1721 Replace existing inadequate system with 100-year system to relieve flooding from street
63 $71,153
Storm DrainageCalcutta 616 (RL Area 40) One house floods, area street and alley flooding, design and construction - west of Marsalis, area excluded from Palo Duro/Rand study - relief system to Five Mile Creek
54 $1,622,037
Storm DrainageAnn Arbor (E) 2943 Design and build parallel relief system from Ledbetter, up Cranfill, up Ann Arbor, to Linda Ree.
53 $438,150
Storm DrainageMilverton @ Palisade System upgrade for 100 year capacity, excessive street flooding, design and construction
49 $870,215
Storm DrainageEastgate 4975 Street/yard flooding, design and construction
30 $121,707
Summary for 'CDnum' = 5 (30 detail records)
Sum $26,693,765
Friday, February 24, 2012 Page 16 of 37
CategoryProject Name Description Score Estimate
6Council District Flood ManagementChalk Hill Branch Bridge @ Hale Raise road, install bridge, FREQ. 100,
DEPTH 2.2,VEL., 3.81,RATING = 8.34, design and construction
56.3 $304,271
Flood ManagementJoes Creek Channel - W Fork to Willowbrook
Channel improvement, FREQ. 10 YR., DEPTH 2, design and construction
48 $791,104
Flood ManagementJoes Creek - W Fork Bridge Imprv @ Walnut Hill
Install bridge, FREQ. 100 YR., DEPTH 3.7, design and construction
46 $462,491
Flood ManagementJoes Creek Chnl Impr - Chapel Creek to Webb Chapel
Concrete channel bottom, FREQ. 10 YR., DEPTH 3.6', design and construction
39 $900,642
Flood ManagementDallas Floodway System - Wetlands and River Habitat Improvements (BVP Expanded Phase I)
Stormwater Wetlands at Pavaho sump; approximately 2000 feet of Boardwalks; and additional trees and habitat in floodway (not related to lakes) as recommended in the Trinity River Balanced Vision Plan (Expanded Phase I)
30 $1,115,596
Flood ManagementDallas Floodway System - Wetlands and River Habitat Improvement (BVP Ultimate Plan)
Design and Construction of Headwaters Wetlands; Stormwater Wetlands at Baker, Hampton and Delta sumps; Boardwalks; Bank restoration and vegetation and meandering river as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan)
30 $8,976,812
Flood ManagementChalk Hill Branch IH30 & Loop 12 Interchange
Raise dike, add culvert, FREQ. 100 YR., DEPTH .3', VEL. 5.6, RATING = 1.62, design and construction
21.6 $219,075
Flood ManagementJoes Creek - W Fork Channel Imprv to Walnut Hill
Channel improvements, design and construction - relieves flooding of approximately 38 structures
166 $3,042,710
Flood ManagementRichards Branch Channel Improvements
Study, design and construction of channel improvements from Joe Field upstream - channel is partially improved, inadequate, and difficult to maintain
113 $4,001,024
Storm DrainagePensive Drive Channel/Walnut Hill Relief System
Design and construction of a storm drainage relief system in Walnut Hill to prevent flooding of about 14 homes on Pensive, Goodyear, Ponder, and Timberview - about 7,000 LF of box culvert, from Pensive west along Walnut Hill to the West Fork of Joes Creek
90 $8,400,000
Storm DrainageLively Lane 3808 Relief system w/inlets & pipe through cul-de-sac to channel to intercept flow upstream - 2 houses affected, street & yard flooding
59. $67,584
Storm DrainageNavaro - Fort Worth Avenue Area One house and surrounding streets flood, design and construction
49 $615,844
Storm DrainageRhome - Tantor Area Street flooding, design and construction 30 $535,516
Storm DrainageFort Worth @ Vilbig Provide outfall upgrade, design and construction
25 $135,096
Friday, February 24, 2012 Page 17 of 37
CategoryProject Name Description Score Estimate
6Council District Summary for 'CDnum' = 6 (14 detail records)
Sum $29,567,765
Friday, February 24, 2012 Page 18 of 37
CategoryProject Name Description Score Estimate
7Council District Erosion ControlLakeland 2224 (Repetitive Loss
Area 22)Home threatened; 100 LF gabion wall, 17' height; creek bank is gunite-lined, beginning to deterioriate; this home is a FEMA flood repetitive-loss structure - retaining wall cost is $110,000, close to tax value of home ($138,000) - recommend purchase in lieu of retaining wall construction; estimated cost includes relocation and demolition
68.1 $200,000
Erosion ControlEl Cerrito 2460 60 LF gabion wall, 15' height, detached garage/workshop threatened
67.2 $52,000
Erosion ControlLeeshire 2921 ~100 LF gabion wall, 20' height, low Type I at this time, bank well-vegetated but some undercutting present at bottom
62.87 $129,763
Erosion ControlHunnicut 8171 100 LF gabion wall, 15' height, Type II, detached garage threatened
58.32 $86,509
Erosion ControlEl Cerrito 2522 ~ 100 LF gabion wall, 20' height, Type I, 1 home threatened
58.2 $100,000
Erosion ControlAvenue Q 7512 and 7506 Type I, 2 houses threatened - recommend voluntary purchase of both - cost of wall exceeds property values - 25' from creek bank, would require 150 LF of 15' gabion wall
58.14 $120,000
Erosion ControlWildoak 2488 Slight threat to home; 135 LF gabion wall, 15' height
58.1 $108,000
Erosion ControlEl Cerrito 2420 70 LF gabion wall, 12' height, Type I, vertical bank, slight undercut
58.02 $61,000
Erosion ControlHighland Rd. 2447 Type I, one house threatened, 30' from bank, 75 LF of 15' gabion wall
57.52 $67,500
Erosion ControlParkdale Bridge @ White Rock Creek Trib
Type I, channel scour - needs grout injection, grouted riprap
55.17 $75,695
Erosion ControlCoolgreene 8208 Type I, house threatened, 23' from creek bank, 100 LF of 12' gabion wall
53.26 $60,000
Erosion ControlRipplewood 2712 and 2716 Type I, two houses threatened, 35' from bank, 150 LF of 12' gabion wall
52.26 $90,000
Erosion ControlClaremont 8023 Type II, storage building threatened 44.70 $48,661
Erosion ControlHollis 6740 Private retaining wall threatened, Type III - design and construction
44.69 $54,068
Flood ManagementCedar Creek Bridge @ Clarendon (Sta 111+68)
Channel improvement, FREQ. 100 YR., DEPTH 7.2, VEL. 10.1, RATING = 72.72, design and construction - may combine with Ewing to enclose channel between bridges
90.65 $2,215,000
Flood ManagementAsh Creek - S Fork Channel Imprv at John West
Channel improvements, FREQ 5 YR., DEPTH 4.8, design and construction
90 $475,000
Flood ManagementCedar Creek Bridge @ Moore Replace bridge, FREQ. 25 YR.,DEPTH 4', VEL. 10.5, RATING = 42, design and construction
83 $1,266,000
Flood ManagementCedar Creek Channel - ATSF RR to Ewing
Channel improvement, design and construction
78 $1,740,000
Friday, February 24, 2012 Page 19 of 37
CategoryProject Name Description Score Estimate
7Council District Flood ManagementDallas Floodway System - ATSF
RemovalRemoves wooden trestles, concrete bridge section, and earthen embankments to improve flood conveyance. Assumes USACE cost share of 65%.
75 $1,081,358
Flood ManagementWhite Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 $40,000
Flood ManagementCedar Creek Bridge @ Clarendon (Sta 149+13)
Replace bridge, channel improvements, FREQ. 100 YR., DEPTH 7.8, VEL. 15, RATING = 117, design and construction
58 $1,703,917
Flood ManagementAsh Creek - S Fork Culvert Improvement at Peavy
Add culverts, FREQ. 100, DEPTH 2', VEL. 4.96, RATING = 9.92, design and construction
50 $1,156,229
Flood ManagementAsh Creek - S Fork Bridge Improvement at Ferguson
Bridge improvement, FREQ. 5 YR., DEPTH 1.7', VEL. 5.36, RATING = 9, design and construction
45.7 $2,434,168
Flood ManagementAsh Creek - Bridge at Highland Road Replacement of Highland Bridge over Ash Creek to improve flood flows through bridge; preliminary engineering will include hydrologic and hydraulic analysis to ensure criteria are met
41 $2,919,666
Flood ManagementAsh Creek Channel - KCS RR @ Lakeland
Close Culvert under RR, interior drainage -100 YR, design and construction
40 $1,156,229
Flood ManagementDallas Floodway System - Wetlands and River Habitat Improvements (BVP Expanded Phase I)
Stormwater Wetlands at Pavaho sump; approximately 2000 feet of Boardwalks; and additional trees and habitat in floodway (not related to lakes) as recommended in the Trinity River Balanced Vision Plan (Expanded Phase I)
30 $1,115,596
Flood ManagementDallas Floodway System - Wetlands and River Habitat Improvement (BVP Ultimate Plan)
Design and Construction of Headwaters Wetlands; Stormwater Wetlands at Baker, Hampton and Delta sumps; Boardwalks; Bank restoration and vegetation and meandering river as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan)
30 $8,976,812
Storm DrainageEl Cerrito 2470 4 houses and surrounding streets, design and construction
67 $122,000
Storm DrainageAbshire Lane 1916 Multiple homes flood from alley - study, design, construction
54 $162,204
Storm DrainageBoone Ave @ Fire Training Center Street flooding, design and construction 50 $322,526
Storm DrainageSouth Lamar Ph. 2 - Pear, Mooney, Bannock Area
Additional improvements for Lamar-Pear to Bannock, Mooney Street, channel along R.R
48 $1,217,083
Storm DrainageKiest (E) 2700 - Magna Vista 100 year upgrade for existing system 46 $903,076
Storm DrainageFerguson - IH30 to Buckner System upgrade to 100 year capacity; street flooding, design and construction
31 $1,381,634
Summary for 'CDnum' = 7 (33 detail records)
Sum $31,641,694
Friday, February 24, 2012 Page 20 of 37
CategoryProject Name Description Score Estimate
8Council District Erosion ControlBonnie View over Five Mile Creek Approx. 150'X100'X2' gabion mattress;
reinforcement 12 exposed drilled shafts; remove 8 drilled shaft remnants
62.87 $540,679
Erosion ControlWixom Lane 835 Type I, 1 home threatened - design and construction
58.44 $43,254
Erosion ControlRichwood 6814 Slight threat to home; 150 LF gabion wall, 15' height
58.2 $120,000
Erosion ControlRichwood 6906 Slight threat to home; 175 LF gabion wall, 15' height
58.2 $140,000
Erosion ControlPaul Quinn College 3837 Simpson Stuart Rd
~150 LF gabion retaining wall, 12' height, to protect student union building and nearby walkways; Stream 5A1 (Trib to Fivemile Creek); private property, will require drainage easement dedication
53.93 $129,600
Erosion ControlGlencairn 460 70 LF gabion wall, 15' height, Type I, house threatened, difficult access
53.88 $69,207
Erosion ControlRichwood 7014 Slight threat to home; 150 LF gabion wall, 14' height
53.2 $120,000
Erosion ControlBrooklawn 6718 Slight threat to home; 175 LF gabion wall, 15' height
53.2 $140,000
Erosion ControlWixom Lane 861 Type I, 1 home threatened - design and construction
49.33 $43,254
Erosion ControlRichwood 6806 Slight threat to home; 175 LF gabion wall, 12' height
48.7 $140,000
Erosion ControlBlackstone 2709 Slight threat to home; non-permanent storage buildings built over creek bank on pilings, pilings are now being undermined; 100 LF gabion wall, 12' height
48.7 $80,000
Erosion ControlBlackstone 2729 Slight threat to home; 100 LF gabion wall, 11' height
48.6 $80,000
Erosion ControlBlackstone 2745 Slight threat to home; 100 LF gabion wall, 12' height
48.3 $80,000
Erosion ControlMatland Dr 2552 ~70 LF 15' high gabion retaining wall to protect single family home; distance from home to creek bank ~40 feet
48.16 $68,040
Erosion ControlBlackstone 2625 Slight threat to home; 125 LF gabion wall, 16' height
47.7 $138,000
Erosion ControlRichwood 6822 Slight threat to home; 125 LF gabion wall, 14' height
44 $100,000
Erosion ControlBainbridge 2733 Home not threatened, 60' from creek; 175 LF gabion wall, 16' height
38.4 $193,000
Erosion ControlOld Mill 286 Type III, private retaining wall slightly threatened - design and construction
36.45 $38,928
Erosion ControlMorningview 3810 and 3816 Approx. 16' Gabion gravity wall to protect 3810 and 3816; Type III (fence threatened)
34.78 $108,459
Flood ManagementPrairie Creek Bridge Improvement @ Fireside
Install bridge, FREQ. 100 YR., DEPTH 4.2, design and construction
71.2 $2,848,000
Friday, February 24, 2012 Page 21 of 37
CategoryProject Name Description Score Estimate
8Council District Flood ManagementHickory Creek Floodplain
Management StudyComprehensive floodplain management study with updated flood mapping and recommendations for improvements
70 $220,000
Flood ManagementBelt Line Road S. 2327 Voluntary purchase of flood-prone property - Hickory Creek floodplain - about 4' depth
56 $151,390
Flood ManagementPrairie Creek Channel & Bridge Improvement US175
FREQ. 100 YR., DEPTH 1.1', build levee across NB service road
52.5 $1,217,083
Flood ManagementPruitt Branch Tributary Culvert Imprv @ Kingsfield
Culvert improvements, FREQ. 100 YR., DEPTH 1.1, 1 home voluntary purchase
48.25 $334,697
Flood ManagementHatfield Branch Culvert @ Fireside Add culvert, raise road, FREQ. 100 YR., DEPTH 3', design and construction
46 $1,034,521
Flood ManagementParrish Branch Culvert @ Wheatland Rd.
Culvert improvements, FREQ. 100 YR., design and construction
42.8 $438,150
Flood ManagementLower Five Mile Creek Management Plan
Channel restoration downstream of Bonnie View, mitigation, landscaping and trails. floodplain reclamation
41. $14,000,000
Flood ManagementJan Creek Culvert @ Wheatland Add culvert, raise road, FREQ. 100 YR., DEPTH 1.3, design and construction
40 $304,271
Flood ManagementHatfield Branch Channel @ Seagoville
Channel improvement, FREQ. 100 YR., DEPTH 1.3, design and construction
32.69 $486,833
Flood ManagementHatfield Branch Channel & Culvert @ St. Augustine
Channel improvement, add culvert, raise road, FREQ. 100 YR.,DEPTH 1.7', design and construction
30 $1,217,083
Flood ManagementGoff's Branch - Belt Line to Seagoville
Enclose about 1000 LF of natural creek in box culverts. One garage threatened. Plans to channel creek stopped by refusal to grant esmts. Will require 404 Permit, may not be justifiable.
29 $3,961,607
Flood ManagementElam Creek @ Ledbetter Raise roadway, FREQ. 50 YR., DEPTH .7, design and construction
29 $152,622
Flood ManagementRylie Creek @ St Augustine Raise roadway, FREQ. 100 YR., DEPTH .1, design and construction
25 $243,416
Flood ManagementSheppard Branch Culvert Improvement @ Langdon
Add culvert, FREQ. 100 YR., DEPTH .1, design and construction
25 $121,707
Flood ManagementPrairie Creek Bridge Improvement @ Dowdy Ferry
Levee, bridge, channel 100.7 $12,779,381
Storm DrainageNandina - Pine Trail Area Design and construction of outfall, 2 to 3 homes flood
52 $870,215
Storm DrainageLedbetter - Altoona to Westmoreland System Upgrade to 100 year capacity; street flooding, design and construction
43 $318,632
Storm DrainageGreenspan - Kirnwood Area One house and street flooding, design and construction
42 $492,918
Storm DrainageGlencairn 216 One home floods - inadequate drainage system at low point in street
41 $66,939
Storm DrainageHidden Valley 1286 Inadequate drainage system causing street flooding, resulting in additional creekbank erosion
35 $438,150
Friday, February 24, 2012 Page 22 of 37
CategoryProject Name Description Score Estimate
8Council District Summary for 'CDnum' = 8 (40 detail records)
Sum $44,070,037
Friday, February 24, 2012 Page 23 of 37
CategoryProject Name Description Score Estimate
9Council District Erosion ControlTamarack 1745, 1739, 1751 Construct one or more gabion retaining
walls approximately 200 LF maximum, 15' to 20' in height, to protect three homes - evaluate soundness of existing retaining walls, remove as necessary
81.1 $270,000
Erosion ControlBeechmont Dr. 2507 Type I, house threatened (secondary structure), 8' from creek bank, about 60 LF of 12' gabion wall
76.25 $48,000
Erosion ControlHealey 2116 and Kingsman 9869 Type I, two homes threatened, one within 12' and deeply undercut, one 15' from bank, about 100 LF of 12-14' gabion wall (about 50 LF each of creek)
73.64 $120,000
Erosion ControlTranquilla Dr. 1251 Type II, pool threatened, 15' from creek bank, about 80 LF of 20' gabion wall
67.28 $96,000
Erosion ControlTwin Creek 9726 Extend pipe and backfill on small tributary; construct about 40 LF gabion wall, 25' height, on main creek; Type II - detached garage threatened
63.71 $108,136
Erosion ControlSperry St. 3220 Type I, 1 home threatened - design and construction
63.2 $73,532
Erosion ControlDixon Branch at Easton Road Type I, concrete riprap beneath bridge undermined and damaged by erosion, about 125 LF combination gabion wall and matress
62.74 $130,000
Erosion ControlMercedes 6607, 6615, 6621 Type I, three houses threatened, 50' from creek bank, 125 LF of 12' gabion wall
57.52 $100,000
Erosion ControlLyre Lane 6909 and Chantilly Court 6916
Type I and II, house and low water dam potentially threatened, vertical cut creek bank, house is 25' from bank, 75 LF of 12' gabion wall - erosion may continue to attack bank threatening home and causing failure of one corner of the small dam
54.29 $60,000
Erosion ControlKiltartan 1511 ~120 LF gabion wall, 25' height, Type III at this time, potential Type I, vertical bank
53.98 $155,715
Erosion ControlFerguson Rd. 11511 Type I, condominium unit threatened, 20' from creek bank, 125 LF of 15' gabion wall
53.84 $100,000
Erosion ControlSperry St. 3124 and 3130 Type I, two houses threatened, 25' from bank, 150 LF of 17' gabion wall
53.71 $135,000
Erosion ControlLake Highlands (E.) 10684, 10688, 10692
Type I, three homes threatened, 40' from creek bank, 350 LF of 25' gabion wall
53.58 $420,000
Erosion ControlSpringhill 2304, 2310, 2314 Two gabion walls, ~75 LF (15' high) and ~100 LF (12' high) to protect single family residences; 2304 is 30' from creek, 2314 is 45' from creek; wall will be designed to remove erosion threat, and will include protection at 2310 if needed
50.13 $162,000
Erosion ControlPeavy Culvert @ Vinemont Channel Type I, downstream channel scour - needs riprap
44.97 $27,034
Friday, February 24, 2012 Page 24 of 37
CategoryProject Name Description Score Estimate
9Council District Erosion ControlPeavy Place 2344 Type I, 1 home threatened - design and
construction (normal bank erosion, 19' from house)
44.90 $64,881
Erosion ControlGreentree 7111 & 7045 Type I, houses each ~55' from bank, 25' depth, ~150 LF gabion wall
44.3 $194,644
Erosion ControlPatrick Dr 6722 ~100 LF 10' high gabion retaining wall to protect single family residence; distance from home to creek bank ~100 feet
40.83 $64,800
Erosion ControlPeavy Road 2015 75 LF gabion wall, 12' height, very slow erosion rate, Type III at this time
40.46 $48,661
Flood ManagementAsh Creek Trib 5B7 Bridge Improvement @ Province
Install bridge, FREQ. 100 YR., DEPTH 3.7, VEL. 4.84, RATING = 17.91, raise road, displaces estimated 3 homes
77.76 $1,503,000
Flood ManagementWhite Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 $40,000
Flood ManagementAsh Creek Trib 5B7 Bridge Improvement @ Peavy
Install bridge, FREQ. 100 YR., DEPTH 3.3, VEL. 6.69, RATING = 22.08, design and construction
69.8 $632,883
Flood ManagementRheinhart Branch Bridges - Peavy to El Patio
Combined w/El Patio bridge, install bridges, FREQ. 100, DEPTH 2.8, VEL. 2.14, RATING = 5.95, FREQ. 100 YR., DEPTH 1.9, VEL. 3.92, RATING = 7.37, and 360' channel impr.
61.9 $912,813
Flood ManagementAsh Creek Branch @ Mercer Bridge Replacement, 100 YR. FREQ.,DEP. 2.8, VEL. 3.64, design and construction
54 $1,095,375
Flood ManagementRheinhart Branch Culvert Improvement @ Garland
Add culverts, FREQ. 100, DEPTH 1.2, VEL. 3.21, RATING = 3.85, design and construction
42.85 $328,612
Flood ManagementRheinhart Branch Culvert Improvement @ Tranquilla
Add culverts, design and construction 42.21 $102,235
Flood ManagementAsh Creek Culvert @ Ash Creek Dr. Culvert Improvement, FREQ. 100 YR., DEPTH 1.2', VEL.3.3, design and construction
38.5 $912,813
Flood ManagementAsh Creek Culvert @ Peavy Rd. Culvert Improvement;FREQ.,2YR, DEPTH 0.9,VEL. 4.53, RATING = 4.08, design and construction
34.07 $1,192,742
Flood ManagementCreel Creek Culvert @ Mercer Add culvert, FREQ. 100 YR., DEPTH 1, VEL. 5.04, RATING = 4.79, design and construction
25 $212,989
Flood ManagementLippitt Branch Culvert @ Sunland Add culverts, FREQ. 100 YR., DEPTH .8, VEL. 3.18, RATING = 2.54, design and construction
23 $365,124
Flood ManagementLongbranch Channel - Phase 3 (RL Area 20)
Bridge improvement, culvert improvement, channel improvement, construction - requires 404 Permit, may not have positive cost-benefit ratio
16 $486,833
Storm DrainageYosemite 6664 Garage floods, design and construction 68 $42,000
Friday, February 24, 2012 Page 25 of 37
CategoryProject Name Description Score Estimate
9Council District Storm DrainageParkhurst - Brookhurst (Lake
Highlands Baptist) Relief SystemDesign and construction of a drainage relief system to relieve the existing undersized 42" pipe that runs under Lake Highlands Baptist Church; relief system 1,600 LF 72" pipe from Parkhurst to Northcliff to Peavy, discharge into open channel
66 $847,800
Storm DrainageSan Leandro, 8600 Block Design and construction of a parallel relief system along Sanford Drive from Diceman to Eustis
66 $973,666
Storm DrainageMaylee - Ruth Ann to Ferguson 100 year system upgrade - street flooding, design and construction
65 $2,312,459
Storm DrainageLoree 1742 One house and streets flood, design and construction
58 $200,908
Storm DrainageNewcombe 10123 2 homes and street flooding, design and construction
58 $359,040
Storm DrainageHighland Road at Waterside Court Analyze, design and construct relief system for off-site drainage into Highland on the Creek subdivision - Highland Road floods, one residence has flooded.
54 $156,796
Storm DrainageMockingbird/Skillman Area Drainage Analyze existing systems from Hillside upstream, determine whether storm sewer capacity can be increased, design and construct inlets and laterals to fully utilize system.
51 $182,562
Storm DrainageWood Dale 10600 Street flooding, design and construction 50 $133,879
Storm DrainageHeatherwood 2623 One house floods/ 4-5 additional yards and streets, design and construction
48 $79,110
Storm DrainageEl Patio 1334 Yard flooding from Peavy Rd, design and construction
48 $60,854
Storm DrainageGroveland 8920 Enclose portion of creek, design and construction
48 $58,420
Storm DrainageLake Gardens 10415 Design and construction of a relief system for Lake Gardens at Easton
48 $136,313
Storm DrainageLovers (E) 6503 One house and streets flood, design and construction
48 $30,427
Storm DrainageCovey 8931 One house floods, street flooding, design and construction
40 $60,854
Storm DrainageLawther Dr. 4500 Street flooding within park, culvert inadequate, relief system needed to capture and convey surface flows, design and construction
40 $334,697
Storm DrainageDixon Branch Relief System (RL Areas 18 & 19)
97 homes in flood plain; homes flood at 10-year flood levels; average 100-year depth 3.84'; proposed relief system consists of a deep diversion tunnel from Lake Highlands/Eastland west to White Rock Lake; This project replaces the channel improvements previously recommended; about 50 homes flooded 3/19/06
360 $75,000,000
Friday, February 24, 2012 Page 26 of 37
CategoryProject Name Description Score Estimate
9Council District Storm DrainageMeadow Lake Avenue 7102 Approx. 1,600 LF 36" RCP, 4 10-foot
inlets; requires detailed engineering analysis and design.
36 $243,305
Storm DrainageFarola 1916 Yard flooding, design and construction 35 $94,932
Storm DrainageBerwyn & Annapolis Inadequate low point system, street flooding, design and construction
33 $194,733
Storm DrainageFerguson - IH30 to Buckner System upgrade to 100 year capacity; street flooding, design and construction
31 $224,917
Storm DrainageGaston 6900 Blk Re-route storm sewer into street ROW where it currently crosses private properties - add 8 10-foot inlets, approx. 750 LF of 48-inch pipe
25 $101,671
Summary for 'CDnum' = 9 (53 detail records)
Sum $91,993,165
Friday, February 24, 2012 Page 27 of 37
CategoryProject Name Description Score Estimate
10Council District Erosion ControlFair Oaks Crossing 8849 Type I, Apartment bldg threatened,
about 160 LF 25' gabion wall, should be designed and constructed jointly with work at Whitehurst 7930 directly across creek
85.23 $250,000
Erosion ControlSkillman 8109 - Limited Scope Project
Apartment building threatened; 75 LF gabion wall, 25' height - this addresses a smaller portion of the project Skillman 8109 (Jackson Branch - E Bank Upstream of Skillman Bridge)
80.7 $143,000
Erosion ControlRoyal Lane 9750 (Jackson Branch - E. Bank downstream of Royal Bridge)
Type I, threat to apartment bldg, The Landing Apts. (9750 Royal) ~150 LF gabion wall, 30' height
76.69 $227,085
Erosion ControlWhitehurst 9730 (Audelia Branch - W. Bank dwnstrm of Whitehurst)
Creekside Collection Condos, 9730 Whitehurst - 2 sites, ~300 total LF gabion wall, 20' height - design and build jointly with Fair Oaks Crossing 8849
76.67 $389,289
Erosion ControlLangdale 8668 Type I, 1 home threatened - design and construction
76.6 $129,763
Erosion ControlChurch Road 9233 Type I, Apartment buildings threatened, 10' from creek bank, about 100 LF 16' gabion wall
76.29 $140,000
Erosion ControlWhitehurst 9727 (Jackson Branch - E. Bank upstream of Whitehurst Br)
Type I, threat to Condo units, Town Creek Condos 9727,9737,9747 Whitehurst, ~200 LF gabion wall, 30' height
72.27 $302,780
Erosion ControlAudelia 11601 (Audelia Branch - E. Bank downstream of Audelia Bridge)
One Orleans Place Condos, 11655 Audelia, is threatened by erosion from Audelia Branch, and Jackson Creek Apts., 11601 Audelia is threatened by erosion from a small unnamed tributary - ~500 LF gabion wall, 20' height
72.17 $540,679
Erosion ControlSkillman 7920 (Jackson Branch - E. Bank downstream of Skillman Br)
Type I, Condo bldg threatened, Skillman Oakwood Creek Condos ~350 LF gabion wall, 25' height
71.37 $454,170
Erosion ControlSkillman 8109 (Jackson Branch - E. Bank upstream of Skillman Bridge)
Type I, condo bldg threatened, Oakhollow Condos, 8109 Skillman ~300 LF gabion wall, 18' height
67.37 $389,289
Erosion ControlGreenville Avenue 9320/Vista View 8915
Type I, apartment/townhome bldg threatened - combined with 8915 Vista View across creek slightly downstream - Type II, pool & fence threatened; ~200 LF gabion wall 12' height
62.46 $173,017
Erosion ControlRocky Branch @ Middle Downs Sites 1, 2, 3, 4
Continuation of gabion wall erosion control funded in 2006 Bond Program to protect concrete trail in Floodway Management Area; Site 1 (length, height, rating, cost): 110 LF 25' 68.0 $165,000; Site 2: 150LF 16' 67.6 $135,000; Site 3: 120 LF 30' 72.4 $180,000; Site 4: 100 LF 10' 32.8 $60,000; overall rating is averaged
60.20 $583,200
Friday, February 24, 2012 Page 28 of 37
CategoryProject Name Description Score Estimate
10Council District Erosion ControlFair Oaks Crossing 8201 Type I, apartment building threatened,
20' from bank, 125 LF of 15' gabion wall58.19 $100,000
Erosion ControlGreen Oaks Circle 9032 Type I, house threatened, 30' from creek bank, 100 LF 18' gabion wall
58.02 $120,000
Erosion ControlMediterranean Circle 8567 Type I, house threatened, 40' from creek bank, 110 LF of 20' gabion wall
53.18 $121,000
Erosion ControlCoppertowne 8439 2 condos, erosion 35 feet from structure, type I - gabion matress 100'X15'X2', repair headwall
53.12 $58,718
Erosion ControlWhitehurst Branch Phase 2 Sidewalk/jogging path slightly threatened, Type II - design and construction
50.58 $233,573
Erosion ControlSummer Glen 9042 Type I, slight threat to street, across from 9042 & 9046 Summer Glen - design and construction
49.5 $47,580
Erosion ControlChurch Rd. 9222 (Jackson Branch - E. Bank below Church Rd.)
Type I, Apartment bldg slightly threatened (Tree Tops II, 9222 Church Rd.) ~280 LF gabion wall, 12' height
30.44 $242,224
Flood ManagementWhite Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 $55,000
Flood ManagementJackson Branch - Church Road Bridge
Improvements of Church Rd Bridge - Raise bridge and widen span, design and construction
61 $1,217,083
Flood ManagementDixon Branch - E Prong Culvert @ Mediterranean
Add culvert, FREQ. 100 YR., DEPTH 2.5, VEL. 5.74, RATING = 12.54, design and construction
59.12 $170,392
Flood ManagementJackson Branch Chl. Improvs. - Kingsley to Church
Channel Improvements - widening cross-section and providing either concrete or gabion or geotextile lining, design and construction
45.29 $730,250
Flood ManagementDixon Branch - West Prong Voluntary Purchase
1 commercial building - voluntary purchase
38.85 $389,467
Flood ManagementDixon Branch - E Prong Culvert @ Rolling Rock
Add double barrel culvert, FREQ. 100 YR., DEPTH 1.5, VEL. 5.74, RATING = 14.25, design and construction
38.3 $219,075
Flood ManagementDixon Branch - W Prong Improvement @ Plano Rd
Install bridge, FREQ. 100 YR., DEPTH 1.1', VEL. 4.37, RATING = 5.85, design and construction
36 $608,541
Flood ManagementRichardson Branch Culv. Whitehurst-Green Oaks
Add culverts at Green Oaks and Whitehurst, limited channelization, FREQ. 100 YR., DEPTH .8', design and construction
20 $949,325
Storm DrainageForestridge 9700 Block ~650 LF 60" pipe to relieve flooding of one home and area streets
75 $389,000
Storm DrainagePlano Pky. 8800 2 houses and street flooding, design and construction
69 $272,000
Storm DrainageDunmore 9155 One house floods, street flooding, design and construction
56 $188,648
Friday, February 24, 2012 Page 29 of 37
CategoryProject Name Description Score Estimate
10Council District Storm DrainageRidgehaven Dr 9809 Construct 2-10' inlets and about 400 LF
of pipe in alley, connect to ex. system in Audelia, remove and replace about 160 SY alley pavement, deepen invert to increase capacity, 2 homes flood from alley
54 $118,949
Storm DrainageFairglen Dr 8928 ~200 LF 21" pipe, 1-10' inlet, to relieve street flooding
53 $47,520
Storm DrainageKingsley Creek Circle 9129 1 house and street floods due to lack of system capacity, add 10' inlet and lateral/culvert pipe
51 $43,254
Storm DrainageLangdale 8622 One house floods, design and construction
48 $115,623
Storm DrainageDixon Branch Relief System (RL Areas 18 & 19)
97 homes in flood plain; homes flood at 10-year flood levels; average 100-year depth 3.84'; proposed relief system consists of a deep diversion tunnel from Lake Highlands/Eastland west to White Rock Lake; This project replaces the channel improvements previously recommended; about 50 homes flooded 3/19/06
360 $25,000,000
Storm DrainageHill Point @ Royal Lane One house and street flooding, design and construction
30 $267,758
Storm DrainageLemmonwood 7704 Yard flooding, design and construction 25 $21,907
Summary for 'CDnum' = 10 (37 detail records)
Sum $35,449,159
Friday, February 24, 2012 Page 30 of 37
CategoryProject Name Description Score Estimate
11Council District Erosion ControlSpring Valley 8444 Type I, apartment complex threatened,
15' from creek bank, about 260 LF of 20' gabion wall
75.92 $260,000
Erosion ControlBurninglog 13156 Type I, alley threatened (behind Woodbend and Burninglog), 10' from alley, 75 LF 10' gabion wall
75.92 $60,000
Erosion ControlRoyal Lane 7832 and 7920 Type I, two condominium buildings and one maintenance building threatened at adjacent complexes, requires two walls, maintenance bldg 3' from bank, one condo bldg 7', the other 10' from bank, height of wall variable from 10' to 15', approx. 450 LF gabion wall, total creek frontage about 900 LF
69.19 $432,000
Erosion ControlKalani 6323 80 LF 15' gabion wall, house threatened, 19 feet from creek bank
62.61 $69,207
Erosion ControlClubhouse Circle 6523 and 6527 Type I, two houses threatened, 20' from creek bank, two 12 ' gabion structures, total length about 125 LF
62.3 $100,000
Erosion ControlPagewood 10553 Type I, 1 home threatened - design and construction
53.60 $25,952
Erosion ControlSpring Grove 13316 Type III erosion threatens driveway/parking slab, 4' from top of bank, as alternative to retaining wall, additional slab could be constructed away from creek bank to accomodate parking area lost as erosion progresses
52.7 $64,800
Erosion ControlStone Forest 6900 block Screening wall threatened; 75 LF gabion wall, 10' height; owned by Lake Forest Community
50.3 $60,000
Erosion ControlStonehill Drive 6312 Pool threatened, approximately 16' from creek bank, 6' from wrought iron fence, creek is 11' deep, pool deck has shifted and settled, and pipe under driveway may have slipped joint - design and construction of retaining wall
49.4 $60,000
Erosion ControlNorthcreek 6700 blk 150 LF gabion wall, 15' height, fences threatened, house remotely threatened, Type II at this time, trib to WRC
48.7 $194,644
Flood ManagementWhite Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 $55,000
Storm DrainageBirchridge 14721 One house and street flood, extend drainage system from Village Trail around cul-de-sac to Dentcrest, add inlets
71 $190,000
Storm DrainageGreenhollow/Sapling Way/Clearsprings Area Relief (RL Area 4)
100 year upgrade to existing system. 2 houses and excessive street flooding, design and construction
67 $1,424,000
Storm DrainageGreenhollow, 8051 (RL Area 4) Provides short term relief for Greenhollow - Sapling Way, Phase 1, one structure, design and construction
63 $40,164
Friday, February 24, 2012 Page 31 of 37
CategoryProject Name Description Score Estimate
11Council District Storm DrainageSpring Grove 13300 Block ~3,500 LF combination 6X5 box
culverts and 36" pipe to relieve system inadequate by current standards
63 $2,907,360
Storm DrainagePreston Creek Place 6166 Replace existing pipe culvert with box culvert - pipe is continually submerged, inadequate, and subject to blockage causing road to flood
58 $74,613
Storm DrainageAlpha at Peyton (RL Area 3) Upgrade area drainage system to relieve excessive street flooding
39 $1,643,063
Storm DrainageAzalea Lane 6625 Add minor drainage relief system at low point - 1 garage floods
35 $146,050
Storm DrainageRoyal Circle 7343 Property flooding, design and construction
30 $60,854
Storm DrainageHughes Lane @ Kalani Place Structural flooding and excessive street flooding, design and construction
30 $547,687
Storm DrainageHughes 13228 Property flooding, design and construction
25 $60,854
Storm DrainageShady Cliff 6121 Property flooding, design and construction
25 $12,170
Summary for 'CDnum' = 11 (22 detail records)
Sum $8,488,418
Friday, February 24, 2012 Page 32 of 37
CategoryProject Name Description Score Estimate
12Council District Erosion ControlSquaw Valley 17628 Home threatened; 100 LF gabion wall,
15' height58.2 $80,000
Erosion ControlNedra Way 15821 and 15827 Type 1, 2 homes threatened 53.18 $118,949
Erosion ControlBaymar Lane 6201 Type I, house threatened, 25' from bank, 80 LF of 12' gabion wall
53.09 $64,000
Erosion ControlBrushy Creek Trail 5719 ~120 LF 15' high gabion retaining wall to protect pool; pool is ~22 feet from creek; home is ~50 feet from creek; deck encroaches into Floodway Management Area and will be removed with project if funded
49.36 $116,640
Flood ManagementUpper McKamy By-pass Swale - Additional engineering and construction for the by-pass swale at Upper McKamy Creek between Mapleshade and Villa Road to remove 8 homes and 4 vacant lots on east bank out of 100-year floodplain
85 $950,000
Flood ManagementWhite Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 $40,000
Flood ManagementRenner Creek (Voluntary Purchase) Voluntary purchase of 5 homes on Renner Creek between Davenport and Frankford: 7020 and 7028 Creek Bend, and 7129, 7133, and 7229 Winding Creek. 7125 Winding Creek purchased 1998 BP. 7133 refused offer.
51 $1,825,626
Storm DrainageTree Shadow Tr. 5910 One house floods, excessive street flooding, design and construction
66 $870,215
Storm DrainageLa Bolsa - Dale Port Area One structure and area streets flood, design and construction
49 $1,156,229
Storm DrainageCreek Bend Road 7028 Relief system on unimproved street to convey runoff to creek - significant lot flooding
48. $77,857
Storm DrainageMeandering Way 16209 ~200 LF 21" storm drainage pipe, 2-10' inlets, to relieve excessive gutter flow that spills down drive approach
48 $54,000
Summary for 'CDnum' = 12 (11 detail records)
Sum $5,353,516
Friday, February 24, 2012 Page 33 of 37
CategoryProject Name Description Score Estimate
13Council District Erosion ControlTimber Trail Dr. 10245 Type I, one house threatened, 50' from
bank, 125 LF of 15' gabion wall, remove existing undermined concrete retaining wall
51.84 $100,000
Erosion ControlBetty Jane 10225 Garage threatened, Joes Creek, Type I - design and construction
49.2 $64,881
Erosion ControlJoes Creek - East Fork to Rosser Construct channel lining and walls for erosion control - continuation of Joes Creek - Cox Lane - Peter Pan project - cost based on add'l 800' channel bottom and wall replacement
44.18 $1,221,934
Flood ManagementSlaughter Branch Culvert Improvement @ NW Hwy
Add culvert, raise road, FREQ., 100 YR, DEPTH 4', design and construction
69.8 $499,004
Flood ManagementWest Fork Joe's Creek - Webb Chapel to Silverton - Channel Reconstruction
Reconstruction of about 900 LF of concrete-lined channel in disrepair. Enlarge as practicable, replace with concrete bottom and gabion sides. Requires H&H to size and ensure no adverse impact.
65 $1,200,000
Flood ManagementSlaughter Branch Flood Gates @ Radbrook
Flood warning device, FREQ. 100 YR., DEPTH 5.6', design and construction
64 $12,170
Flood ManagementBrowning Bridge @ Holloway Raise road, add culverts. FREQ. 100 YR., DEPTH 2.5', design and construction
56 $1,338,792
Flood ManagementSlaughter Branch Culvert Improvement @ Holloway
Culvert improvement, raise road, FREQ. 100 YR., DEPTH 2.5', design and construction
55.5 $340,783
Flood ManagementBrowning Branch Bridge & Channel @ Inwood
Bridge Replacement with channel improvements, FREQ. 10 YR., DEPTH 3.6, 2 HOMES FLOOD, design and construction - Flood Control reports complaints about plnd FW signs - water covered roadway in June 2000 (11/9/00)
55 $2,190,751
Flood ManagementBrowning Branch Bridge @ Park Ln. Bridge replacement, raise road, FREQ. 10 YR., DEPTH 1.5', design and construction
38.5 $1,034,521
Flood ManagementBrowning Branch Culvert @ Lakehill Court
Add culverts, FREQ. 10 YR., DEPTH 1.5', design and construction
38 $219,075
Flood ManagementSlaughter Branch Tributary Culvert Imprv @ NW Hwy
Near Meadowbrook, add culvert, FREQ. 100 YR., DEPTH 1', design and construction
36 $188,648
Flood ManagementSlaughter Branch Culvert @ Devonshire & Farquhar
Add culverts, raise road, design and construction
33.15 $255,587
Flood ManagementBrowning Branch Culvert @ Walnut Hill
Raise road, add culverts, FREQ. 100 YR., DEPTH 2.3', design and construction
31.3 $1,460,500
Storm DrainagePensive Drive Channel/Walnut Hill Relief System
Design and construction of a storm drainage relief system in Walnut Hill to prevent flooding of about 14 homes on Pensive, Goodyear, Ponder, and Timberview - about 7,000 LF of box culvert, from Pensive west along Walnut Hill to the West Fork of Joes Creek
90 $2,100,000
Friday, February 24, 2012 Page 34 of 37
CategoryProject Name Description Score Estimate
13Council District Storm DrainageLane Park - 7100 to 7300 Block 2 houses and surrounding streets flood,
design and construction66 $957,000
Storm DrainageWelch 11811 Garage flooding from alley, reconstruct 200 LF alley w/invert, Drainage Analysis of Misc. Flooding Sites 1995.
63 $30,427
Storm DrainageAberdeen-Tulane - Phase 2 Second phase of project to alleviate street flooding, construction.
55 $3,042,710
Storm DrainageDesco 7108 One house floods, streets flood, design and construction
53 $54,769
Storm DrainageWentwood 7314 Property flooding, design and construction
50 $60,854
Storm DrainageAverill Way 6040 Apartment building flooding, design and construction
48 $334,697
Storm DrainagePreston Hollow Channel - Ph 1 Edgemere to Desco
Culvert and channel improvements along channel east of Edgemere, from Edgemere to Desco, design and construction
44 $608,541
Storm DrainagePreston Hollow Channel - Ph 2 Desco to Joyce
Culvert and channel improvements along channel east of Edgemere, from Edgemere to Desco - continuation of Phase 1, construction based on design with Phase 1
44 $450,320
Storm DrainageRockbrook Drive 9400 5 inlets, laterals, 30" main line from Rockbrook to Bachman Creek to protect Frank Lloyd Wright home from excess overland flow from unimproved streets.
43 $109,537
Storm DrainageEnfield 4307 and 4309 Yard flooding, design and construction 33 $92,498
Summary for 'CDnum' = 13 (25 detail records)
Sum $17,967,999
Friday, February 24, 2012 Page 35 of 37
CategoryProject Name Description Score Estimate
14Council District Flood ManagementTurtle Creek @ Stonebridge Rebuild bridge, replace dam, FREQ. 2
YR., DEPTH 4.9, VEL. 5.4, RATING = 26.46, design and construction
75.46 $2,535,000
Flood ManagementTurtle Creek @ Hall Replace bridge, FREQ. 100 YR., DEPTH 2.2', VEL. 17, RATING = 37.4, design and construction
73.4 $2,373,000
Flood ManagementTurtle Creek @ Blackburn Raise road, replace ex. dam upstream with a 7' collapsable dam, FREQ. 50 YR., DEPTH 5.6,VEL. 5.3, RATING =29.7, 2 HOMES FLOOD, design and construction
70.68 $3,164,000
Flood ManagementTurtle Creek @ Cedar Springs Bridge improvement, design and construction
62 $3,164,417
Flood ManagementTurtle Creek @ Bowen Bridge replacement, raise road, FREQ. 50YR., DEPTH 3.6, VEL. 5.7, RATING = 20.5, design and construction
56.52 $1,703,917
Flood ManagementCedar Springs Branch - Culvert & Channel @ Raleigh
Add culvert, 375' of channel improvement, FREQ. 2 YR., DEPTH 3.4', design and construction
51.2 $973,666
Flood ManagementCedar Springs Branch @ Cedar Springs Rd.
Raise road, add culvert, FREQ. 100 YR., DEPTH 1.3', design and construction
33 $973,666
Storm DrainageKnights Branch Upper Relief System - Inwood/Mockingbird
Major relief system of enclosed portion of upper Knights Branch watershed from Lowe's culvert extension (downstream of Inwood/Lemon) north on Inwood to about Wateka, using 2-12X10 box culverts, with smaller systems as necessary to provide full relief - requires detailed analysis
74 $15,338,700
Storm DrainageMunger (N) 1300 Short term - Part of Peaks Branch. One structure and area streets flood, design and construction
58 $13,517
Storm DrainagePacific Avenue Relief @ Elm Street CBD relief system to the Trinity River, design and construction
58 $5,476,877
Storm DrainageCrutchfield Branch - DART Track to Lindsley Dr.
Street flooding, SP R.R. (DART) to Lindsley, design and construction
54 $2,434,168
Storm DrainageState-Thomas - Hallsville/Worthington
Includes, systems in Hallsville, Worthington, Boll, and Thomas
54 $605,560
Storm DrainageUniversity (E) 5757 Apartment property floods, design and construction
50 $60,854
Storm DrainageLovers (E) 6503 One house and streets flood, design and construction
48 $30,427
Storm DrainageAlderson 3700 Upgrade drainage system from 3700 blk Alderson to 3800 block Skillman
44 $1,131,887
Storm DrainageState-Thomas - Flora/Boll to Fairmount
Includes "Field of Dreams" systems 43 $467,146
Storm DrainageVersailles Ave N 3500 Construct 6-10' inlets, approx. 700 LF pipe, connect to ex. System in Lemmon, relieves street flooding to 2' depth on Versailles
43 $206,280
Storm DrainageLemmon @ University 100 year area relief system, design and construction
40 $1,137,973
Friday, February 24, 2012 Page 36 of 37
CategoryProject Name Description Score Estimate
14Council District Storm DrainageGaston 6900 Blk Re-route storm sewer into street ROW
where it currently crosses private properties - add 8 10-foot inlets, approx. 750 LF of 48-inch pipe
25 $101,671
Summary for 'CDnum' = 14 (19 detail records)
Sum $41,892,726
$1,499,399,667Grand Total
Friday, February 24, 2012 Page 37 of 37
Appendix C – Needs Inventory by Category in Priority Order
Needs Inventory - Flood Protection Program
Category Project Name Description Score CD EstimateErosion Control
Fair Oaks Crossing 8849 Type I, Apartment bldg threatened, about 160 LF 25' gabion wall, should be designed and constructed jointly with work at Whitehurst 7930 directly across creek
85.23 10 $250,000
Tamarack 1745, 1739, 1751 Construct one or more gabion retaining walls approximately 200 LF maximum, 15' to 20' in height, to protect three homes - evaluate soundness of existing retaining walls, remove as necessary
81.1 9 $270,000
Cavender 445 Type I, house threatened, 4' from creek bank, 80 LF 12' gabion wall
80.93 4 $64,000
Skillman 8109 - Limited Scope Project Apartment building threatened; 75 LF gabion wall, 25' height - this addresses a smaller portion of the project Skillman 8109 (Jackson Branch - E Bank Upstream of Skillman Bridge)
80.7 10 $143,000
Royal Lane 9750 (Jackson Branch - E. Bank downstream of Royal Bridge)
Type I, threat to apartment bldg, The Landing Apts. (9750 Royal) ~150 LF gabion wall, 30' height
76.69 10 $227,085
Whitehurst 9730 (Audelia Branch - W. Bank dwnstrm of Whitehurst)
Creekside Collection Condos, 9730 Whitehurst - 2 sites, ~300 total LF gabion wall, 20' height - design and build jointly with Fair Oaks Crossing 8849
76.67 10 $389,289
Langdale 8668 Type I, 1 home threatened - design and construction
76.6 10 $129,763
Colorado (W) 705 Type I, house threatened, 4' from bank, 80LF of 12' gabion wall - small creek northwest corner of property
76.33 3 $68,000
Church Road 9233 Type I, Apartment buildings threatened, 10' from creek bank, about 100 LF 16' gabion wall
76.29 10 $140,000
Beechmont Dr. 2507 Type I, house threatened (secondary structure), 8' from creek bank, about 60 LF of 12' gabion wall
76.25 9 $48,000
Spring Valley 8444 Type I, apartment complex threatened, 15' from creek bank, about 260 LF of 20' gabion wall
75.92 11 $260,000
Burninglog 13156 Type I, alley threatened (behind Woodbend and Burninglog), 10' from alley, 75 LF 10' gabion wall
75.92 11 $60,000
Healey 2116 and Kingsman 9869 Type I, two homes threatened, one within 12' and deeply undercut, one 15' from bank, about 100 LF of 12-14' gabion wall (about 50 LF each of creek)
73.64 9 $120,000
Whitehurst 9727 (Jackson Branch - E. Bank upstream of Whitehurst Br)
Type I, threat to Condo units, Town Creek Condos 9727,9737,9747 Whitehurst, ~200 LF gabion wall, 30' height
72.27 10 $302,780
Monday, February 27, 2012 Page 1 of 29
Category Project Name Description Score CD EstimateErosion Control
Audelia 11601 (Audelia Branch - E. Bank downstream of Audelia Bridge)
One Orleans Place Condos, 11655 Audelia, is threatened by erosion from Audelia Branch, and Jackson Creek Apts., 11601 Audelia is threatened by erosion from a small unnamed tributary - ~500 LF gabion wall, 20' height
72.17 10 $540,679
Hampton Road (S) 3817 Type I, house threatened, 12' from bank, about 100 LF of 20' gabion wall
72.02 3 $200,000
Skillman 7920 (Jackson Branch - E. Bank downstream of Skillman Br)
Type I, Condo bldg threatened, Skillman Oakwood Creek Condos ~350 LF gabion wall, 25' height
71.37 10 $454,170
Deep HIll Circle 2671, 2675, 2679, 2683 ~320 LF gabion wall, 25' tall. 15' at 2675, greenhouse threatened 2679, driveway/carport threatened 2671, 2683.
71.06 3 $484,448
Royal Lane 7832 and 7920 Type I, two condominium buildings and one maintenance building threatened at adjacent complexes, requires two walls, maintenance bldg 3' from bank, one condo bldg 7', the other 10' from bank, height of wall variable from 10' to 15', approx. 450 LF gabion wall, total creek frontage about 900 LF
69.19 11 $432,000
Lakeland 2224 (Repetitive Loss Area 22) Home threatened; 100 LF gabion wall, 17' height; creek bank is gunite-lined, beginning to deterioriate; this home is a FEMA flood repetitive-loss structure - retaining wall cost is $110,000, close to tax value of home ($138,000) - recommend purchase in lieu of retaining wall construction; estimated cost includes relocation and demolition
68.1 7 $200,000
Kiesthill Drive 3431 Remove ex. ret. walls, replace w/100 LF gabion wall, 25' height, stable vegetated slope at this time, Type I, long-term threat garage
68.02 3 $194,644
Five Mile Pkwy W. 922 150 LF gabion wall, 30' height, w/decorative concrete parapet wall, Type I, street threatened
67.8 4 $194,644
Blue Ridge 3721 Erosion 7.5 feet from house, type I - design and construction
67.78 3 $108,136
Ohio W. 412, 416 412 - rock channel with soil upper 8', surface erosion, Type I; 416 - Type II, driveway undercut, founded on rock, protected by brick wall
67.47 3 $81,101
Clarendon 3435 Erosion ~10' from home, advanced 5' in 8 years, good rock in creek bank, slow rate, Type I - design and construction
67.39 1 $97,322
Skillman 8109 (Jackson Branch - E. Bank upstream of Skillman Bridge)
Type I, condo bldg threatened, Oakhollow Condos, 8109 Skillman ~300 LF gabion wall, 18' height
67.37 10 $389,289
Pyka 3918 Type II, pool threatened - design and construction
67.32 3 $164,366
Monday, February 27, 2012 Page 2 of 29
Category Project Name Description Score CD EstimateErosion Control
Cedar Springs 5910 Type I, cathedral threatened, 15' from creek bank, about 180 LF of 16' gabion wall
67.28 2 $162,000
Tranquilla Dr. 1251 Type II, pool threatened, 15' from creek bank, about 80 LF of 20' gabion wall
67.28 9 $96,000
Holliday 3445 & 3449 125 LF gabion wall, 25' height, detached garage threatened
67.22 3 $162,000
El Cerrito 2460 60 LF gabion wall, 15' height, detached garage/workshop threatened
67.2 7 $52,000
Twin Creek 9726 Extend pipe and backfill on small tributary; construct about 40 LF gabion wall, 25' height, on main creek; Type II - detached garage threatened
63.71 9 $108,136
Sperry St. 3220 Type I, 1 home threatened - design and construction
63.2 9 $73,532
Leeshire 2921 ~100 LF gabion wall, 20' height, low Type I at this time, bank well-vegetated but some undercutting present at bottom
62.87 7 $129,763
Bonnie View over Five Mile Creek Approx. 150'X100'X2' gabion mattress; reinforcement 12 exposed drilled shafts; remove 8 drilled shaft remnants
62.87 8 $540,679
Dixon Branch at Easton Road Type I, concrete riprap beneath bridge undermined and damaged by erosion, about 125 LF combination gabion wall and matress
62.74 9 $130,000
Kalani 6323 80 LF 15' gabion wall, house threatened, 19 feet from creek bank
62.61 11 $69,207
Glen Oaks 816 Type I, house threatened, 25' from creek bank, 90 LF of 18' gabion wall
62.48 4 $120,000
Greenville Avenue 9320/Vista View 8915 Type I, apartment/townhome bldg threatened - combined with 8915 Vista View across creek slightly downstream - Type II, pool & fence threatened; ~200 LF gabion wall 12' height
62.46 10 $173,017
Clubhouse Circle 6523 and 6527 Type I, two houses threatened, 20' from creek bank, two 12 ' gabion structures, total length about 125 LF
62.3 11 $100,000
Rocky Branch @ Middle Downs Sites 1, 2, 3, 4 Continuation of gabion wall erosion control funded in 2006 Bond Program to protect concrete trail in Floodway Management Area; Site 1 (length, height, rating, cost): 110 LF 25' 68.0 $165,000; Site 2: 150LF 16' 67.6 $135,000; Site 3: 120 LF 30' 72.4 $180,000; Site 4: 100 LF 10' 32.8 $60,000; overall rating is averaged
60.20 10 $583,200
Boulder Drive 4120 Type II erosion, drive threatened 58.85 3 $36,766
Wixom Lane 835 Type I, 1 home threatened - design and construction
58.44 8 $43,254
Hunnicut 8171 100 LF gabion wall, 15' height, Type II, detached garage threatened
58.32 7 $86,509
Monday, February 27, 2012 Page 3 of 29
Category Project Name Description Score CD EstimateErosion Control
El Cerrito 2522 ~ 100 LF gabion wall, 20' height, Type I, 1 home threatened
58.2 7 $100,000
Richwood 6814 Slight threat to home; 150 LF gabion wall, 15' height
58.2 8 $120,000
Richwood 6906 Slight threat to home; 175 LF gabion wall, 15' height
58.2 8 $140,000
Squaw Valley 17628 Home threatened; 100 LF gabion wall, 15' height
58.2 12 $80,000
Rosemont Rd. 7322 Type I, house threatened, 20' from bank, 125 LF of 15' gabion wall
58.19 5 $100,000
Fair Oaks Crossing 8201 Type I, apartment building threatened, 20' from bank, 125 LF of 15' gabion wall
58.19 10 $100,000
Avenue Q 7512 and 7506 Type I, 2 houses threatened - recommend voluntary purchase of both - cost of wall exceeds property values - 25' from creek bank, would require 150 LF of 15' gabion wall
58.14 7 $120,000
Wildoak 2488 Slight threat to home; 135 LF gabion wall, 15' height
58.1 7 $108,000
El Cerrito 2420 70 LF gabion wall, 12' height, Type I, vertical bank, slight undercut
58.02 7 $61,000
Green Oaks Circle 9032 Type I, house threatened, 30' from creek bank, 100 LF 18' gabion wall
58.02 10 $120,000
Highland Rd. 2447 Type I, one house threatened, 30' from bank, 75 LF of 15' gabion wall
57.52 7 $67,500
Mercedes 6607, 6615, 6621 Type I, three houses threatened, 50' from creek bank, 125 LF of 12' gabion wall
57.52 9 $100,000
Parkdale Bridge @ White Rock Creek Trib Type I, channel scour - needs grout injection, grouted riprap
55.17 7 $75,695
Lyre Lane 6909 and Chantilly Court 6916 Type I and II, house and low water dam potentially threatened, vertical cut creek bank, house is 25' from bank, 75 LF of 12' gabion wall - erosion may continue to attack bank threatening home and causing failure of one corner of the small dam
54.29 9 $60,000
Kiltartan 1511 ~120 LF gabion wall, 25' height, Type III at this time, potential Type I, vertical bank
53.98 9 $155,715
Paul Quinn College 3837 Simpson Stuart Rd ~150 LF gabion retaining wall, 12' height, to protect student union building and nearby walkways; Stream 5A1 (Trib to Fivemile Creek); private property, will require drainage easement dedication
53.93 8 $129,600
Glencairn 460 70 LF gabion wall, 15' height, Type I, house threatened, difficult access
53.88 8 $69,207
Ferguson Rd. 11511 Type I, condominium unit threatened, 20' from creek bank, 125 LF of 15' gabion wall
53.84 9 $100,000
Sperry St. 3124 and 3130 Type I, two houses threatened, 25' from bank, 150 LF of 17' gabion wall
53.71 9 $135,000
Caracas 5410 and 5416 Type I, two houses threatened, 25' from creek bank, 125 LF of 16' gabion wall
53.61 5 $150,000
Monday, February 27, 2012 Page 4 of 29
Category Project Name Description Score CD EstimateErosion Control
Pagewood 10553 Type I, 1 home threatened - design and construction
53.60 11 $25,952
Lake Highlands (E.) 10684, 10688, 10692 Type I, three homes threatened, 40' from creek bank, 350 LF of 25' gabion wall
53.58 9 $420,000
Kildare 4927 Type I, one house threatened - recommend voluntary purchase - cost of wall exceeds property value - 20' from creek bank, would require 75 LF of 12' gabion wall
53.51 5 $75,000
Guadalupe 3033 Type 1, slight threat to townhouse, erosion over gas pipeline, possibly short gabion wall - nearest home 30' from erosion, requires 50 LF of 16' gabion wall on creek bank, or combination flowable fill and lower wall near pipeline cut
53.30 3 $70,000
Coolgreene 8208 Type I, house threatened, 23' from creek bank, 100 LF of 12' gabion wall
53.26 7 $60,000
Ravinia (S) 326 and 406 Type I, two houses threatened, 35' from bank, 120 LF 18' gabion wall
53.23 1 $133,000
Holliday 3621 Type I, house threatened, 35' from bank, 80 LF 18' gabion wall
53.23 3 $96,000
Holliday 3605 Type I, house threatened, 35' from bank, 120 LF 18' gabion wall
53.23 3 $110,000
Hunters View 5935 Type I, house threatened, 35' from bank, 130 LF 18' gabion wall
53.23 4 $143,000
Richwood 7014 Slight threat to home; 150 LF gabion wall, 14' height
53.2 8 $120,000
Brooklawn 6718 Slight threat to home; 175 LF gabion wall, 15' height
53.2 8 $140,000
Lockridge Circle 3216, 3222, 3226 Type I, three houses threatened, 20' from bank, 250 LF of 10' gabion wall
53.18 3 $200,000
Cripple Creek 3744, 3750, 3758 Type I, three houses threatened, 30' from bank, 300 LF of 15' gabion wall
53.18 3 $240,000
Edgemont 1631 Type I, house threatened, 30' from bank, 75LF of 15' gabion wall
53.18 4 $60,000
Urban 3100 Type I, house threatened, 30' from bank, 100 LF 15' gabion wall
53.18 4 $80,000
Putting Green 6521 Type I, house threatened, 40' from bank, 100 LF of 20' gabion wall
53.18 5 $100,000
Mediterranean Circle 8567 Type I, house threatened, 40' from creek bank, 110 LF of 20' gabion wall
53.18 10 $121,000
Nedra Way 15821 and 15827 Type 1, 2 homes threatened 53.18 12 $118,949
Coppertowne 8439 2 condos, erosion 35 feet from structure, type I - gabion matress 100'X15'X2', repair headwall
53.12 10 $58,718
Baymar Lane 6201 Type I, house threatened, 25' from bank, 80 LF of 12' gabion wall
53.09 12 $64,000
Monday, February 27, 2012 Page 5 of 29
Category Project Name Description Score CD EstimateErosion Control
Spring Grove 13316 Type III erosion threatens driveway/parking slab, 4' from top of bank, as alternative to retaining wall, additional slab could be constructed away from creek bank to accomodate parking area lost as erosion progresses
52.7 11 $64,800
Elmwood 2227 Type I, house threatened, 20' from bank, 75 LF of 8' gabion wall
52.68 1 $45,000
Ripplewood 2712 and 2716 Type I, two houses threatened, 35' from bank, 150 LF of 12' gabion wall
52.26 7 $90,000
Timber Trail Dr. 10245 Type I, one house threatened, 50' from bank, 125 LF of 15' gabion wall, remove existing undermined concrete retaining wall
51.84 13 $100,000
Danube 1715 Remote threat to home; 60 LF gabion wall, 12' height
51.8 4 $48,000
Stevens Wood Court 914 Slight threat to home; 80 LF gabion wall, 10' height
50.7 3 $72,000
Whitehurst Branch Phase 2 Sidewalk/jogging path slightly threatened, Type II - design and construction
50.58 10 $233,573
Stone Forest 6900 block Screening wall threatened; 75 LF gabion wall, 10' height; owned by Lake Forest Community
50.3 11 $60,000
Puttting Green 6629 and 6637 Type I, two houses threatened, 75' from bank, 50 LF of 15' gabion wall
50.18 5 $40,000
Springhill 2304, 2310, 2314 Two gabion walls, ~75 LF (15' high) and ~100 LF (12' high) to protect single family residences; 2304 is 30' from creek, 2314 is 45' from creek; wall will be designed to remove erosion threat, and will include protection at 2310 if needed
50.13 9 $162,000
Poplar Springs Lane Design and construction of ~700 LF gabion mattress at 3:1 slope w/conc. toe wall to protect 12 homes adjacent to filled-in channel - 3300 and 3400 block
49.82 5 $235,736
Summer Glen 9042 Type I, slight threat to street, across from 9042 & 9046 Summer Glen - design and construction
49.5 10 $47,580
Stonehill Drive 6312 Pool threatened, approximately 16' from creek bank, 6' from wrought iron fence, creek is 11' deep, pool deck has shifted and settled, and pipe under driveway may have slipped joint - design and construction of retaining wall
49.4 11 $60,000
Brushy Creek Trail 5719 ~120 LF 15' high gabion retaining wall to protect pool; pool is ~22 feet from creek; home is ~50 feet from creek; deck encroaches into Floodway Management Area and will be removed with project if funded
49.36 12 $116,640
Wixom Lane 861 Type I, 1 home threatened - design and construction
49.33 8 $43,254
Monday, February 27, 2012 Page 6 of 29
Category Project Name Description Score CD EstimateErosion Control
Betty Jane 10225 Garage threatened, Joes Creek, Type I - design and construction
49.2 13 $64,881
Stevens Wood Court 902 Slight threat to home; 75 LF gabion wall, 7' height
49.1 3 $60,000
Richwood 6806 Slight threat to home; 175 LF gabion wall, 12' height
48.7 8 $140,000
Blackstone 2709 Slight threat to home; non-permanent storage buildings built over creek bank on pilings, pilings are now being undermined; 100 LF gabion wall, 12' height
48.7 8 $80,000
Northcreek 6700 blk 150 LF gabion wall, 15' height, fences threatened, house remotely threatened, Type II at this time, trib to WRC
48.7 11 $194,644
Blackstone 2729 Slight threat to home; 100 LF gabion wall, 11' height
48.6 8 $80,000
Blackstone 2745 Slight threat to home; 100 LF gabion wall, 12' height
48.3 8 $80,000
Cripple Creek 3750 Slight threat to home; 80 LF gabion wall, 15' height
48.2 3 $64,000
Matland Dr 2552 ~70 LF 15' high gabion retaining wall to protect single family home; distance from home to creek bank ~40 feet
48.16 8 $68,040
Boulder 4207 Slight threat to home; 75 LF gabion wall, 15' height
47.8 3 $60,000
Blackstone 2625 Slight threat to home; 125 LF gabion wall, 16' height
47.7 8 $138,000
Peavy Culvert @ Vinemont Channel Type I, downstream channel scour - needs riprap
44.97 9 $27,034
Peavy Place 2344 Type I, 1 home threatened - design and construction (normal bank erosion, 19' from house)
44.90 9 $64,881
Claremont 8023 Type II, storage building threatened 44.70 7 $48,661
Hollis 6740 Private retaining wall threatened, Type III - design and construction
44.69 7 $54,068
Greentree 7111 & 7045 Type I, houses each ~55' from bank, 25' depth, ~150 LF gabion wall
44.3 9 $194,644
Joes Creek - East Fork to Rosser Construct channel lining and walls for erosion control - continuation of Joes Creek - Cox Lane - Peter Pan project - cost based on add'l 800' channel bottom and wall replacement
44.18 13 $1,221,934
Richwood 6822 Slight threat to home; 125 LF gabion wall, 14' height
44 8 $100,000
Rosemont 7433 Remote threat to home; 185 LF gabion wall, 15' height
42.8 5 $148,000
Patrick Dr 6722 ~100 LF 10' high gabion retaining wall to protect single family residence; distance from home to creek bank ~100 feet
40.83 9 $64,800
Stevens Wood Court 906 Slight threat to home; 100 LF gabion wall, 7' height
40.7 3 $80,000
Monday, February 27, 2012 Page 7 of 29
Category Project Name Description Score CD EstimateErosion Control
Peavy Road 2015 75 LF gabion wall, 12' height, very slow erosion rate, Type III at this time
40.46 9 $48,661
Bainbridge 2733 Home not threatened, 60' from creek; 175 LF gabion wall, 16' height
38.4 8 $193,000
Old Mill 286 Type III, private retaining wall slightly threatened - design and construction
36.45 8 $38,928
Putting Green 6637 Type III, no imminent threat to structure, normal bank erosion
36.03 5 $168,691
Morningview 3810 and 3816 Approx. 16' Gabion gravity wall to protect 3810 and 3816; Type III (fence threatened)
34.78 8 $108,459
Church Rd. 9222 (Jackson Branch - E. Bank below Church Rd.)
Type I, Apartment bldg slightly threatened (Tree Tops II, 9222 Church Rd.) ~280 LF gabion wall, 12' height
30.44 10 $242,224
Deep Hill Circle 2625, 2641, 2663, 2667, 2687, 2691
Remainder of Deep Hill sites, some vacant, no imminent threats, construct approx. 550 LF gabion wall at 4 sites, ~30' height
30.38 3 $773,171
$19,231,419Sub total
Monday, February 27, 2012 Page 8 of 29
Category Project Name Description Score CD EstimateFlood Management
Honey Springs Br Detention Basins Design & construction of three detention basins upstream of Seaton, Linfield & Prosperity to eliminate flooding of 7 homes - A voluntary buy out should also be considered as an option
92 4 $4,737,000
Cedar Creek Bridge @ Clarendon (Sta 111+68) Channel improvement, FREQ. 100 YR., DEPTH 7.2, VEL. 10.1, RATING = 72.72, design and construction - may combine with Ewing to enclose channel between bridges
90.65 7 $2,215,000
Ash Creek - S Fork Channel Imprv at John West Channel improvements, FREQ 5 YR., DEPTH 4.8, design and construction
90 7 $475,000
Upper McKamy By-pass Swale - Additional engineering and construction for the by-pass swale at Upper McKamy Creek between Mapleshade and Villa Road to remove 8 homes and 4 vacant lots on east bank out of 100-year floodplain
85 12 $950,000
Cedar Creek Bridge @ Moore Replace bridge, FREQ. 25 YR.,DEPTH 4', VEL. 10.5, RATING = 42, design and construction
83 7 $1,266,000
Cedar Creek Culvert @ Polk Add culvert, FREQ. 10 YR.,DEPTH 4.1, VEL. 5.8, RATING = 23.78, design and construction - Add 2-10'X10', ~100' length
79.9 1 $712,000
Coombs Creek Bridge @ Plymouth Raise road, install bridge, FREQ. 2 YR., DEPTH 3.4', VEL. 6.4,RATING = 27.28, design and construction, and voluntary purchase of apartment site
79 3 $1,471,000
Cedar Creek Bridge @ Tyler Replace bridge, design and construction 78.04 1 $2,532,000
Coombs Creek Bridge @ Brooklyndell Install bridge, FREQ. 100 YR., DEPTH 3.1' , VEL. 10.6, RATING = 34.1, design and construction
78 1 $253,000
Cedar Creek Channel - ATSF RR to Ewing Channel improvement, design and construction
78 7 $1,740,000
Ash Creek Trib 5B7 Bridge Improvement @ Province
Install bridge, FREQ. 100 YR., DEPTH 3.7, VEL. 4.84, RATING = 17.91, raise road, displaces estimated 3 homes
77.76 9 $1,503,000
South Branch Culvert Improvement @ Louisiana Add culvert, raise road, FREQ. 2 YR., DEPTH 3.4', VEL. 6.9, RATING = 21.76, design and construction
76.76 3 $158,000
Ravinia South, 123 Voluntary purchase 75.5 1 $174,000
Turtle Creek @ Stonebridge Rebuild bridge, replace dam, FREQ. 2 YR., DEPTH 4.9, VEL. 5.4, RATING = 26.46, design and construction
75.46 14 $2,535,000
Dallas Floodway System - ATSF Removal Removes wooden trestles, concrete bridge section, and earthen embankments to improve flood conveyance. Assumes USACE cost share of 65%.
75 2 $1,081,358
White Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 2 $12,500
Monday, February 27, 2012 Page 9 of 29
Category Project Name Description Score CD EstimateFlood Management
White Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 4 $7,500
Dallas Floodway System - ATSF Removal Removes wooden trestles, concrete bridge section, and earthen embankments to improve flood conveyance. Assumes USACE cost share of 65%.
75 7 $1,081,358
White Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 7 $40,000
White Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 9 $40,000
White Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 11 $55,000
White Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 10 $55,000
White Rock Creek Floodplain Management Study Update
Update of the 1989 FPMS, extended to entire WRC watershed, to study flood control options
75 12 $40,000
Turtle Creek @ Hall Replace bridge, FREQ. 100 YR., DEPTH 2.2', VEL. 17, RATING = 37.4, design and construction
73.4 14 $2,373,000
Knights Branch @ Denton Dr. Add culvert, raise road, FREQ. 2 YR. DEPTH 8.1, design and construction
73.3 2 $1,709,000
Elmwood Branch Culvert @ Edgefield Add culvert, FREQ. 10 YR., DEPTH 3.7, VEL. 5.8, RATING = 21.46, design and construction
73 1 $301,000
Cedar Creek Culvert @ Winnetka Add culvert, FREQ. 10 YR.,DEPTH 2.8, VEL. 5.6, RATING =15.68, design and construction - 200' 3-12'X12'
71.68 1 $1,345,000
Prairie Creek Bridge Improvement @ Fireside Install bridge, FREQ. 100 YR., DEPTH 4.2, design and construction
71.2 8 $2,848,000
Lake Cliff @ Colorado Blvd Analysis to consider elevating Colorado Blvd. (spillway) 4.5' to increase storage and reduce overtopping of Colorado
71 1 $56,000
Estes Branch Bridge @ Bluffcreek Install bridge, channel improvement, FREQ. 2 YR., design and construction
71 5 $1,361,000
Turtle Creek @ Blackburn Raise road, replace ex. dam upstream with a 7' collapsable dam, FREQ. 50 YR., DEPTH 5.6,VEL. 5.3, RATING =29.7, 2 HOMES FLOOD, design and construction
70.68 14 $3,164,000
Hickory Creek Floodplain Management Study Comprehensive floodplain management study with updated flood mapping and recommendations for improvements
70 8 $220,000
Ash Creek Trib 5B7 Bridge Improvement @ Peavy
Install bridge, FREQ. 100 YR., DEPTH 3.3, VEL. 6.69, RATING = 22.08, design and construction
69.8 9 $632,883
Monday, February 27, 2012 Page 10 of 29
Category Project Name Description Score CD EstimateFlood Management
Slaughter Branch Culvert Improvement @ NW Hwy
Add culvert, raise road, FREQ., 100 YR, DEPTH 4', design and construction
69.8 13 $499,004
Kings Branch Culvert @ Georgia Add culvert. FREQ. 10 YR., DEPTH 2.4, VEL. 5.5, RATING = 11.4, design and construction
69.2 4 $97,366
Coombs Creek Bridge @ Colorado Raise road, install bridge, FREQ. 5 YR., DEPTH 3.2, VEL. 7.5, RATING = 23.93, design and construction
69 3 $486,833
Kidd Springs Branch @ Colorado Analyze flow through private lake; Improve outlet structure, culverts under Kessler Lake Dr., culverts under Colorado as required to to protect 2 homes, 2 roadways
68.92 1 $603,673
Kidd Springs Branch Detention Study Analyze feasibility of adding detention at Kidd Springs Lake as alternative to culvert improvements at Colorado
68.92 1 $84,725
Kidd Springs Branch @ Colorado Analyze flow through private lake; Improve outlet structure, culverts under Kessler Lake Dr., culverts under Colorado as required to to protect 2 homes, 2 roadways
68.92 3 $369,993
Kings Branch Culvert @ Edgemont Add culvert, raise road, FREQ. 2 YR., DEPTH 2.1, VEL. 7.2, RATING = 15.12, design and construction
68.12 4 $85,195
Chalk Hill Branch Bridge @ N. Counts Raise road, install bridge, design and construction
68 3 $365,124
Kings Branch Culvert @ Woodin Add culvert, FREQ. 2 YR., DEPTH 2.5, VEL. 4.9, RATING = 12.25, 1 HOME AFFECTED, design and construction
67.25 4 $103,452
Elmwood Branch Culvert @ Tyler & Vernon Add culvert, FREQ. 50 YR., DEPTH 3.1', VEL. 5 , RATING = 15.5, design and construction
66.5 1 $237,330
Kings Branch Culvert @ Stella Add culvert, raise road, FREQ. 2 YR., DEPTH 2.2, VEL. 5.2, RATING = 11.44, design and construction
66.44 4 $87,630
Kings Branch Culvert @ Louisiana Add culvert, FREQ. 2 YR., DEPTH 2.1, VEL. 5.5, RATING = 10.29, design and construction
65.29 4 $104,669
West Fork Joe's Creek - Webb Chapel to Silverton - Channel Reconstruction
Reconstruction of about 900 LF of concrete-lined channel in disrepair. Enlarge as practicable, replace with concrete bottom and gabion sides. Requires H&H to size and ensure no adverse impact.
65 13 $1,200,000
Chalk Hill Branch Culvert @ Jefferson Add culverts, FREQ. 2 YR., DEPTH 3.2, VEL. 4.88,RATING = 15.52, design and construction
64 3 $304,271
Slaughter Branch Flood Gates @ Radbrook Flood warning device, FREQ. 100 YR., DEPTH 5.6', design and construction
64 13 $12,170
Kings Branch Culvert @ Denley Add culvert, FREQ. 25 YR., DEPTH 2.1, VEL. 6.2, RATING = 18.48, design and construction
63.48 4 $197,167
Monday, February 27, 2012 Page 11 of 29
Category Project Name Description Score CD EstimateFlood Management
Cedar Springs Branch @ Denton Raise road, FREQ. 100 YR., DEPTH 3', design and construction
63.4 2 $608,541
Coombs Creek Bridge @ Barnett Install bridge, FREQ. 5 YR., DEPTH 2.5', VEL. 7, RATING = 17.78, design and construction
62.7 1 $279,929
Chalk Hill Branch Bridge @ S. Counts Raise road, install bridge, FREQ. 100 YR., DEPTH 3.6, VEL. 5.54, RATING = 19.78, design and construction
62.3 3 $365,124
Brookhollow Bridge Construct bridge, channel improvements, and downstream headwall modifications at outfall of Gilford-Roanoke system; prevents flooding of Texas Specialty Hospital at Dallas, a long-term acute care facility subject to 1-2' flooding; requires agreement with Brookhollow Country Club for positive overflow and headwall modifications.
62 2 $267,204
Turtle Creek @ Cedar Springs Bridge improvement, design and construction
62 14 $3,164,417
Rheinhart Branch Bridges - Peavy to El Patio Combined w/El Patio bridge, install bridges, FREQ. 100, DEPTH 2.8, VEL. 2.14, RATING = 5.95, FREQ. 100 YR., DEPTH 1.9, VEL. 3.92, RATING = 7.37, and 360' channel impr.
61.9 9 $912,813
Jackson Branch - Church Road Bridge Improvements of Church Rd Bridge - Raise bridge and widen span, design and construction
61 10 $1,217,083
Elmwood Branch Bridge @ Melbourne Install bridge, FREQ. 2 YR., DEPTH 1.6', VEL. 5, RATING = 8, ELIMINATES FLOODING OF FOUR HOMES, design and construction
60 1 $206,903
Levee Drainage System - Sump A (Phase II) Second phase of Sump A improvements: complete the connectivity of sumps via culverts to each pond; dredging of certain sump ponds; construction of retaining walls and sump enhancements
60 $54,000,000CW
Dixon Branch - E Prong Culvert @ Mediterranean
Add culvert, FREQ. 100 YR., DEPTH 2.5, VEL. 5.74, RATING = 12.54, design and construction
59.12 10 $170,392
Coombs Creek Culvert @ Jefferson-Westmoreland
Add culverts, design and construction - 4-10'X8' add'l culverts, ~700'
59 1 $3,407,834
Cedar Springs Branch @ Production Raise road 1,000', FREQ. 100 YR., DEPTH 3', design and construction
59 2 $456,406
Mockingbird-Maple Flood Management Construction of culverts beneath Mockingbird between Forest Park and Maple, extension of culverts upstream of Mockingbird, raising pavement grade on Mockingbird - road floods approx. 3 feet in depth
59 2 $7,210,000
Coombs Creek Culvert @ Hampton Add 2-10'X11.5' culverts, FREQ. 5 YR., DEPTH 2.1, VEL. 5.9, RATING = 12.63, design and construction
58.01 3 $365,124
Monday, February 27, 2012 Page 12 of 29
Category Project Name Description Score CD EstimateFlood Management
Coombs Creek Bridge @ 9th Install bridge, FREQ. 5 YR., DEPTH 2, VEL. 6.4, RATING = 13.06, design and construction
58 1 $334,697
Oak Creek Circle 3504 & 3508 Voluntary Purchase
Voluntary purchase of one frequently flooded home and adjacent lot, as an alternative to a costly drainage relief system
58 4 $170,000
Cedar Creek Bridge @ Clarendon (Sta 149+13) Replace bridge, channel improvements, FREQ. 100 YR., DEPTH 7.8, VEL. 15, RATING = 117, design and construction
58 7 $1,703,917
Turtle Creek @ Bowen Bridge replacement, raise road, FREQ. 50YR., DEPTH 3.6, VEL. 5.7, RATING = 20.5, design and construction
56.52 14 $1,703,917
Chalk Hill Branch Bridge @ Hale Raise road, install bridge, FREQ. 100, DEPTH 2.2,VEL., 3.81,RATING = 8.34, design and construction
56.3 6 $304,271
Belt Line Road S. 2327 Voluntary purchase of flood-prone property - Hickory Creek floodplain - about 4' depth
56 8 $151,390
Browning Bridge @ Holloway Raise road, add culverts. FREQ. 100 YR., DEPTH 2.5', design and construction
56 13 $1,338,792
Slaughter Branch Culvert Improvement @ Holloway
Culvert improvement, raise road, FREQ. 100 YR., DEPTH 2.5', design and construction
55.5 13 $340,783
Elmwood Branch Culvert @ Clarendon Add culvert, FREQ. 25 YR., DEPTH 2.7', VEL. 6.1, RATING = 16.47, design and construction
55.45 1 $194,733
Beckley Club Branch @ Missouri Culvert improvements in lieu of closing crossing; FREQ. 5 YR., DEPTH 1.6,VEL. 6.4, RATING= 10.24, design and construction
55.24 4 $340,783
Browning Branch Bridge & Channel @ Inwood Bridge Replacement with channel improvements, FREQ. 10 YR., DEPTH 3.6, 2 HOMES FLOOD, design and construction - Flood Control reports complaints about plnd FW signs - water covered roadway in June 2000 (11/9/00)
55 13 $2,190,751
Pleasant Branch - Tonawanda to Bruton Channel improvements Station 29+00 to Tonawanda, add 4-8X5, raise and construct 3-8X5 at Belfast, raise and construct 3-10X7 at Bruton
54.81 5 $1,996,017
Kings Branch Culvert @ Genoa Add culvert, raise road, FREQ. 10 YR., DEPTH 1.9, VEL. 6, RATING = 11.4, design and construction
54.4 4 $111,971
Ash Creek Branch @ Mercer Bridge Replacement, 100 YR. FREQ.,DEP. 2.8, VEL. 3.64, design and construction
54 9 $1,095,375
Levee Drainage System - Westmoreland-Hampton Sump
Rehab existing Delta Pump Station 53 $5,000,000CW
Prairie Creek Channel & Bridge Improvement US175
FREQ. 100 YR., DEPTH 1.1', build levee across NB service road
52.5 8 $1,217,083
Monday, February 27, 2012 Page 13 of 29
Category Project Name Description Score CD EstimateFlood Management
Chalk Hill Tributary - Culvert @ Clarendon Add culvert, FREQ. 100 YR., DEPTH 1.9', VEL. 3.42, RATING= 6.46 , ELIMINATES FLOODING OF ONE STRUCTURE, design and construction
52.4 3 $97,366
Beckley Club Branch Culvert - Illinois to Ohio Add culvert, FREQ. 2 YR.,DEPTH 3.6, VEL. 1.8, RATING =6.48, design and construction
52 4 $924,983
Rugged Branch Culvert Improvement @ Berkley Add culvert, FREQ. 50 YR., DEPTH 1.1, VEL. 3.8, RATING = 8.64, design and construction
51.64 1 $73,024
Cedar Springs Branch - Culvert & Channel @ Raleigh
Add culvert, 375' of channel improvement, FREQ. 2 YR., DEPTH 3.4', design and construction
51.2 14 $973,666
Cedar Crest Bridge Culvert @ Southerland Add culvert, FREQ. 1 YR., DEPTH 1.2, VEL. 5, RATING = 6, design and construction
51 4 $219,075
Renner Creek (Voluntary Purchase) Voluntary purchase of 5 homes on Renner Creek between Davenport and Frankford: 7020 and 7028 Creek Bend, and 7129, 7133, and 7229 Winding Creek. 7125 Winding Creek purchased 1998 BP. 7133 refused offer.
51 12 $1,825,626
Lisbon Branch Voluntary Purchase 3 homes - voluntary purchase 50 5 $219,075
Ash Creek - S Fork Culvert Improvement at Peavy
Add culverts, FREQ. 100, DEPTH 2', VEL. 4.96, RATING = 9.92, design and construction
50 7 $1,156,229
Kings Branch @ Stirling Close crossing, FREQ. 50 YR., DEPTH 1.8, VEL. 6, RATING = 10.78, design and construction
49 4 $54,769
Coombs Creek Bridge @ Ivandell Install bridge, FREQ. 100 YR., DEPTH 1.8', VEL. 7.3, RATING = 13.36, design and construction
48.35 1 $212,989
Pruitt Branch Tributary Culvert Imprv @ Kingsfield
Culvert improvements, FREQ. 100 YR., DEPTH 1.1, 1 home voluntary purchase
48.25 8 $334,697
Joes Creek Channel - W Fork to Willowbrook Channel improvement, FREQ. 10 YR., DEPTH 2, design and construction
48 6 $791,104
Beckley Club Branch Culvert @ Iowa Add 2 - 84" PIPES, FREQ.10 YR.,DEPTH 2.3,VEL. 5.7, RATING = 13.11, design and construction
47.07 4 $182,562
Beckley Club Bridge @ Georgia Replace ex. pipe with box, raise road, FREQ. 10 YR., VEL. 6.3,RATING = 17.01, design and construction
47 4 $304,271
Coombs Creek Bridge @ Burlingdell Install bridge, FREQ. 100 YR., DEPTH 1.8', VEL. 6.5, RATING = 11.7, design and construction
46.7 1 $146,050
Coombs Creek Bridge @ Gibsondell Install bridge, FREQ. 100 YR., DEPTH 1.8, VEL. 6.5, RATING 11.7, design and construction
46.37 1 $152,135
Joes Creek - W Fork Bridge Imprv @ Walnut Hill Install bridge, FREQ. 100 YR., DEPTH 3.7, design and construction
46 6 $462,491
Hatfield Branch Culvert @ Fireside Add culvert, raise road, FREQ. 100 YR., DEPTH 3', design and construction
46 8 $1,034,521
Monday, February 27, 2012 Page 14 of 29
Category Project Name Description Score CD EstimateFlood Management
Kings Branch Culvert @ Lynn Haven Add culvert, FREQ. 50 YR.,DEPTH 1.4, VEL. 5.7, RATING = 7.98, design and construction
45.98 4 $107,103
Ash Creek - S Fork Bridge Improvement at Ferguson
Bridge improvement, FREQ. 5 YR., DEPTH 1.7', VEL. 5.36, RATING = 9, design and construction
45.7 7 $2,434,168
Jackson Branch Chl. Improvs. - Kingsley to Church
Channel Improvements - widening cross-section and providing either concrete or gabion or geotextile lining, design and construction
45.29 10 $730,250
Levee Drainage System - Francis Street Sump Add two 6'X5' gated box culverts - preliminary - cost estimate includes contingencies which may result from detailed analysis of west levee (Interior Drainage Phase 2)
44 $1,100,000CW
Lake June @ St. Augustine Raise road, channel improvement, FREQ. 100 YR., DEPTH 1.8', design and construction
43.24 5 $279,929
Rheinhart Branch Culvert Improvement @ Garland
Add culverts, FREQ. 100, DEPTH 1.2, VEL. 3.21, RATING = 3.85, design and construction
42.85 9 $328,612
Parrish Branch Culvert @ Wheatland Rd. Culvert improvements, FREQ. 100 YR., design and construction
42.8 8 $438,150
Rheinhart Branch Culvert Improvement @ Tranquilla
Add culverts, design and construction 42.21 9 $102,235
Elam Creek Voluntary Purchase (1 home) 1 home for voluntary purchase - 7330 Lake June Rd.
42 5 $146,050
Coombs Creek Culvert @ Sylvan Add 4-12'X10' culverts, FREQ. 100 YR., DEPTH ~1.5, VEL. 4.9, RATING = 7.35, supplement TxDOT construction of 2-20X12 culverts, add culverts to south, remove & reconstruct gabion channel lining, requires hydraulic analysis to optimize configuration.
41.35 3 $919,154
Lower Five Mile Creek Management Plan Channel restoration downstream of Bonnie View, mitigation, landscaping and trails. floodplain reclamation
41. 5 $14,000,000
Lower Five Mile Creek Management Plan Channel restoration downstream of Bonnie View, mitigation, landscaping and trails. floodplain reclamation
41. 8 $14,000,000
Ash Creek - Bridge at Highland Road Replacement of Highland Bridge over Ash Creek to improve flood flows through bridge; preliminary engineering will include hydrologic and hydraulic analysis to ensure criteria are met
41 7 $2,919,666
Cedar Springs Branch Culvert @ Harry Hines Raise road, add culvert, channel improvement, FREQ. 100 YR., DEPTH 2.1', design and construction
40 2 $1,460,500
Ash Creek Channel - KCS RR @ Lakeland Close Culvert under RR, interior drainage -100 YR, design and construction
40 7 $1,156,229
Jan Creek Culvert @ Wheatland Add culvert, raise road, FREQ. 100 YR., DEPTH 1.3, design and construction
40 8 $304,271
Monday, February 27, 2012 Page 15 of 29
Category Project Name Description Score CD EstimateFlood Management
Joes Creek Chnl Impr - Chapel Creek to Webb Chapel
Concrete channel bottom, FREQ. 10 YR., DEPTH 3.6', design and construction
39 6 $900,642
Dixon Branch - West Prong Voluntary Purchase 1 commercial building - voluntary purchase
38.85 10 $389,467
Ash Creek Culvert @ Ash Creek Dr. Culvert Improvement, FREQ. 100 YR., DEPTH 1.2', VEL.3.3, design and construction
38.5 9 $912,813
Browning Branch Bridge @ Park Ln. Bridge replacement, raise road, FREQ. 10 YR., DEPTH 1.5', design and construction
38.5 13 $1,034,521
Lake June Branch Culvert @ Glencliff Add culvert, raise road, FREQ. 50 YR., DEPTH 1.1, design and construction
38.3 5 $273,844
Dixon Branch - E Prong Culvert @ Rolling Rock Add double barrel culvert, FREQ. 100 YR., DEPTH 1.5, VEL. 5.74, RATING = 14.25, design and construction
38.3 10 $219,075
Browning Branch Culvert @ Lakehill Court Add culverts, FREQ. 10 YR., DEPTH 1.5', design and construction
38 13 $219,075
Dixon Branch - W Prong Improvement @ Plano Rd
Install bridge, FREQ. 100 YR., DEPTH 1.1', VEL. 4.37, RATING = 5.85, design and construction
36 10 $608,541
Slaughter Branch Tributary Culvert Imprv @ NW Hwy
Near Meadowbrook, add culvert, FREQ. 100 YR., DEPTH 1', design and construction
36 13 $188,648
Honey Springs Culvert @ Fordham Remove pipe, redirect headwall, FREQ. 100 YR., DEPTH 1, VEL. 2.4, RATING = 2.4, design and construction
35.4 5 $425,979
Cypress Branch Culvert @ Jennie Lee Culvert improvements, raise road, FREQ 100 YR., DEPTH 1.5', design and construction
35.2 5 $182,562
Ash Creek Culvert @ Peavy Rd. Culvert Improvement;FREQ.,2YR, DEPTH 0.9,VEL. 4.53, RATING = 4.08, design and construction
34.07 9 $1,192,742
Levee Drainage System - Charlie Sump Construct new 231,000 GPM pump station; rehab existing station
34 $45,000,000CW
Dallas Floodway Levee Remediation City's cost share for raising and widening the levees to safely pass the Standard Project Flood (SPF, approx. 800-year)
336 $64,000,000CW
Elam Creek Culvert @ Rosemont Rd Add culvert, design and construction 33.2 5 $328,612
Slaughter Branch Culvert @ Devonshire & Farquhar
Add culverts, raise road, design and construction
33.15 13 $255,587
Cedar Springs Branch @ Cedar Springs Rd. Raise road, add culvert, FREQ. 100 YR., DEPTH 1.3', design and construction
33 14 $973,666
Prairie Creek Bridge Improvement @ Military Pkwy
Install bridge, FREQ. 100 YR., DEPTH 1.1', design and construction
32.96 5 $1,217,083
Hatfield Branch Channel @ Seagoville Channel improvement, FREQ. 100 YR., DEPTH 1.3, design and construction
32.69 8 $486,833
Browning Branch Culvert @ Walnut Hill Raise road, add culverts, FREQ. 100 YR., DEPTH 2.3', design and construction
31.3 13 $1,460,500
Monday, February 27, 2012 Page 16 of 29
Category Project Name Description Score CD EstimateFlood Management
Prairie Creek Channel Imprv - T&P RR to Forney Rd
Channel improvements, FREQ. 50 YR., eliminates flooding of animal shelter, design and construction
31 5 $608,541
Levee Drainage System - Nobles Branch Sump Construct three new 60-inch gated culverts at Empire Central
31 $1,500,000CW
Dallas Floodway System - Wetlands and River Habitat Improvements (BVP Expanded Phase I)
Stormwater Wetlands at Pavaho sump; approximately 2000 feet of Boardwalks; and additional trees and habitat in floodway (not related to lakes) as recommended in the Trinity River Balanced Vision Plan (Expanded Phase I)
30 2 $1,115,596
Dallas Floodway System - Wetlands and River Habitat Improvement (BVP Ultimate Plan)
Design and Construction of Headwaters Wetlands; Stormwater Wetlands at Baker, Hampton and Delta sumps; Boardwalks; Bank restoration and vegetation and meandering river as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan)
30 2 $8,976,812
Dallas Floodway System - Wetlands and River Habitat Improvements (BVP Expanded Phase I)
Stormwater Wetlands at Pavaho sump; approximately 2000 feet of Boardwalks; and additional trees and habitat in floodway (not related to lakes) as recommended in the Trinity River Balanced Vision Plan (Expanded Phase I)
30 3 $1,115,596
Dallas Floodway System - Wetlands and River Habitat Improvement (BVP Ultimate Plan)
Design and Construction of Headwaters Wetlands; Stormwater Wetlands at Baker, Hampton and Delta sumps; Boardwalks; Bank restoration and vegetation and meandering river as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan)
30 3 $8,976,812
Dallas Floodway System - Wetlands and River Habitat Improvements (BVP Expanded Phase I)
Stormwater Wetlands at Pavaho sump; approximately 2000 feet of Boardwalks; and additional trees and habitat in floodway (not related to lakes) as recommended in the Trinity River Balanced Vision Plan (Expanded Phase I)
30 6 $1,115,596
Dallas Floodway System - Wetlands and River Habitat Improvement (BVP Ultimate Plan)
Design and Construction of Headwaters Wetlands; Stormwater Wetlands at Baker, Hampton and Delta sumps; Boardwalks; Bank restoration and vegetation and meandering river as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan)
30 6 $8,976,812
Dallas Floodway System - Wetlands and River Habitat Improvement (BVP Ultimate Plan)
Design and Construction of Headwaters Wetlands; Stormwater Wetlands at Baker, Hampton and Delta sumps; Boardwalks; Bank restoration and vegetation and meandering river as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan)
30 7 $8,976,812
Dallas Floodway System - Wetlands and River Habitat Improvements (BVP Expanded Phase I)
Stormwater Wetlands at Pavaho sump; approximately 2000 feet of Boardwalks; and additional trees and habitat in floodway (not related to lakes) as recommended in the Trinity River Balanced Vision Plan (Expanded Phase I)
30 7 $1,115,596
Monday, February 27, 2012 Page 17 of 29
Category Project Name Description Score CD EstimateFlood Management
Hatfield Branch Channel & Culvert @ St. Augustine
Channel improvement, add culvert, raise road, FREQ. 100 YR.,DEPTH 1.7', design and construction
30 8 $1,217,083
Elam Creek @ Ledbetter Raise roadway, FREQ. 50 YR., DEPTH .7, design and construction
29 5 $650,652
Elam Creek @ Elam Rd. Bridge replacement, design and construction
29 5 $657,226
Goff's Branch - Belt Line to Seagoville Enclose about 1000 LF of natural creek in box culverts. One garage threatened. Plans to channel creek stopped by refusal to grant esmts. Will require 404 Permit, may not be justifiable.
29 8 $3,961,607
Elam Creek @ Ledbetter Raise roadway, FREQ. 50 YR., DEPTH .7, design and construction
29 8 $152,622
Levee Drainage System - Trinity-Portland Sump Construct new 256,000 GPM pump station for Trinity-Portland Sump; this runoff is currently pumped by Delta Pump Station; includes purchase of portion of property bounded by Bernal, Norwich, existing development, and Mican Channel for excavation of additional sump storage
28 $60,000,000CW
Levee Drainage System - Record Crossing Sump
Construct new 710,000 GPM pump station at Hampton plant, rehab existing pump station, extend pump station outfalls 300 feet
28 $81,000,000CW
Prairie Creek Trib 271 + 36 Culvert @ Haverhill Add culvert and headwall, FREQ. 100 YR., DEPTH .3, design and construction
26 5 $21,627
Prairie Creek Trib 313 + 59 Culvert @ Glencliff Add culvert, raise road, FREQ. 100 YR., DEPTH .6, VEL. .9, RATING = .54, design and construction
26 5 $133,879
Rylie Creek @ St Augustine Raise roadway, FREQ. 100 YR., DEPTH .1, design and construction
25 8 $243,416
Sheppard Branch Culvert Improvement @ Langdon
Add culvert, FREQ. 100 YR., DEPTH .1, design and construction
25 8 $121,707
Creel Creek Culvert @ Mercer Add culvert, FREQ. 100 YR., DEPTH 1, VEL. 5.04, RATING = 4.79, design and construction
25 9 $212,989
Lippitt Branch Culvert @ Sunland Add culverts, FREQ. 100 YR., DEPTH .8, VEL. 3.18, RATING = 2.54, design and construction
23 9 $365,124
Chalk Hill Branch IH30 & Loop 12 Interchange Raise dike, add culvert, FREQ. 100 YR., DEPTH .3', VEL. 5.6, RATING = 1.62, design and construction
21.6 6 $219,075
Ledbetter Branch Drainage Improvements - Phase II
Continuation of channel and culvert improvements at Ledbetter and Duncanville Road
21 3 $1,095,375
Richardson Branch Culv. Whitehurst-Green Oaks
Add culverts at Green Oaks and Whitehurst, limited channelization, FREQ. 100 YR., DEPTH .8', design and construction
20 10 $949,325
Monday, February 27, 2012 Page 18 of 29
Category Project Name Description Score CD EstimateFlood Management
Dallas Floodway Extension - Multiple Projects Includes the city's cost share for the Cadillac Heights Levee, Lamar Levee, Rochester Levee, and Upper Chain of Wetlands
186 $132,000,000CW
Joes Creek - W Fork Channel Imprv to Walnut Hill
Channel improvements, design and construction - relieves flooding of approximately 38 structures
166 6 $3,042,710
Longbranch Channel - Phase 3 (RL Area 20) Bridge improvement, culvert improvement, channel improvement, construction - requires 404 Permit, may not have positive cost-benefit ratio
16 9 $486,833
Ledbetter Branch Detention Basin Flood retarding basin at confluence with Five Mile Creek at Pecan Grove Park, design and construction - protects 47 or more structures from 100-year flooding - requires updated analysis
154 3 $4,259,793
Repetitive Loss Properties - Voluntary Purchase Voluntary purchase of 36 repetitive flood loss residential properties, identified in the Community Rating System Repetitive Loss Plan
146 $10,800,000CW
Levee Drainage System - Sump A (Phase I) New pump station and minimum sump connectivity to ensure full flow to the pump station
141 $91,000,000CW
Richards Branch Channel Improvements Study, design and construction of channel improvements from Joe Field upstream - channel is partially improved, inadequate, and difficult to maintain
113 6 $4,001,024
Prairie Creek Bridge Improvement @ Dowdy Ferry
Levee, bridge, channel 100.7 8 $12,779,381
$754,519,212Sub total
Monday, February 27, 2012 Page 19 of 29
Category Project Name Description Score CD EstimateStorm Drainage
Mill Creek Drainage Relief System - Phase III Engineering and construction for remainder of creek area ROW, creek restoration, upper basin relief systems, and re-routing of existing system trunk lines that are on private property or crossing mid-block - completes full relief for Mill Creek
96 $150,000,000CW
Pensive Drive Channel/Walnut Hill Relief System
Design and construction of a storm drainage relief system in Walnut Hill to prevent flooding of about 14 homes on Pensive, Goodyear, Ponder, and Timberview - about 7,000 LF of box culvert, from Pensive west along Walnut Hill to the West Fork of Joes Creek
90 6 $8,400,000
Pensive Drive Channel/Walnut Hill Relief System
Design and construction of a storm drainage relief system in Walnut Hill to prevent flooding of about 14 homes on Pensive, Goodyear, Ponder, and Timberview - about 7,000 LF of box culvert, from Pensive west along Walnut Hill to the West Fork of Joes Creek
90 13 $2,100,000
Glen Oaks 700 One house and area streets flood, design and construction
76 4 $396,000
Forestridge 9700 Block ~650 LF 60" pipe to relieve flooding of one home and area streets
75 10 $389,000
Knights Branch Upper Relief System - Inwood/Mockingbird
Major relief system of enclosed portion of upper Knights Branch watershed from Lowe's culvert extension (downstream of Inwood/Lemon) north on Inwood to about Wateka, using 2-12X10 box culverts, with smaller systems as necessary to provide full relief - requires detailed analysis
74 2 $807,300
Knights Branch Upper Relief System - Inwood/Mockingbird
Major relief system of enclosed portion of upper Knights Branch watershed from Lowe's culvert extension (downstream of Inwood/Lemon) north on Inwood to about Wateka, using 2-12X10 box culverts, with smaller systems as necessary to provide full relief - requires detailed analysis
74 14 $15,338,700
Birchridge 14721 One house and street flood, extend drainage system from Village Trail around cul-de-sac to Dentcrest, add inlets
71 11 $190,000
Van Buren (N) - Cedar Hill Area 100-year upgrade to existing system, 1 house and excessive street flooding, design and construction
69 1 $506,000
Knight Street 2426 & 2428 Duplex-type unit built in sag, lower than street, new construction, local system not adequate.
69 2 $534,000
Winslow-Henderson-Beeman Area Relief Design and construction of a drainage relief system for area around old Ford plant - 5200 E. Grand Ave.
69 2 $10,443,000
Lisbon Area C - Overton, Leacrest E. of Garrison
Relief system to protect homes east of Garrison on Overton and Leacrest
69 4 $1,766,000
Monday, February 27, 2012 Page 20 of 29
Category Project Name Description Score CD EstimateStorm Drainage
Mapleleaf Circle/Mapleleaf Lane Area Structure and street flooding at 3212 Mapleleaf Cir. and 3129 Mapleleaf Lane, design and construction
69 3 $791,000
Tyler (S) 2016 Tyler-Berkley, Phase 1 (short term only), one house, design and construction
69 3 $166,000
Plano Pky. 8800 2 houses and street flooding, design and construction
69 10 $272,000
Throckmorton-Reagan Drainage Improvements Additional drainage relief systems not funded with 1995 BP project. Construct lines B, C and additional inlets on Reagan.
68 2 $422,000
Woodlark Trail, 306 Design and construction of overflow flumes on Woodlark and Glen Forest
68 5 $51,000
Yosemite 6664 Garage floods, design and construction 68 9 $42,000
West Dallas - Frances Street Sump Basin 100-year upgrade for storm sewers outfalling into the Frances Street sump, design and construction
68 $3,250,000CW
Conrad - Louisiana Area Relief Provide 100 year upgrade to existing system. 4 structures, excessive street flooding, design and construction
67 3 $1,709,000
El Cerrito 2470 4 houses and surrounding streets, design and construction
67 7 $122,000
Greenhollow/Sapling Way/Clearsprings Area Relief (RL Area 4)
100 year upgrade to existing system. 2 houses and excessive street flooding, design and construction
67 11 $1,424,000
Sage Valley - Wisteria Area 2936 Sage Valley and homes to south may be impacted by drainage coming off alley - investigate, design, construct improvements
66 1 $176,477
Bahama Drive Relief System Relief system for Bahama Dr. south of Fort Worth Ave. - approx. 1,100 LF 8X6 box culvert, drainage area approx. 88 ac. - relieves flooding of street and structures at Wedglea Creek Garden Homes
66 3 $577,000
Kushla 3800 @ Grinnell 2 houses and streets flood, design and construction
66 4 $435,000
Parkhurst - Brookhurst (Lake Highlands Baptist) Relief System
Design and construction of a drainage relief system to relieve the existing undersized 42" pipe that runs under Lake Highlands Baptist Church; relief system 1,600 LF 72" pipe from Parkhurst to Northcliff to Peavy, discharge into open channel
66 9 $847,800
San Leandro, 8600 Block Design and construction of a parallel relief system along Sanford Drive from Diceman to Eustis
66 9 $973,666
Tree Shadow Tr. 5910 One house floods, excessive street flooding, design and construction
66 12 $870,215
Lane Park - 7100 to 7300 Block 2 houses and surrounding streets flood, design and construction
66 13 $957,000
Maylee - Ruth Ann to Ferguson 100 year system upgrade - street flooding, design and construction
65 9 $2,312,459
Monday, February 27, 2012 Page 21 of 29
Category Project Name Description Score CD EstimateStorm Drainage
West Dallas - Trinity Portland Sump Basin 100-year upgrade to storm sewers outfalling into the Trinity-Portland sump, design and construction
65 $3,736,447CW
Greendale 1721 Replace existing inadequate system with 100-year system to relieve flooding from street
63 5 $71,153
Greenhollow, 8051 (RL Area 4) Provides short term relief for Greenhollow - Sapling Way, Phase 1, one structure, design and construction
63 11 $40,164
Spring Grove 13300 Block ~3,500 LF combination 6X5 box culverts and 36" pipe to relieve system inadequate by current standards
63 11 $2,907,360
Welch 11811 Garage flooding from alley, reconstruct 200 LF alley w/invert, Drainage Analysis of Misc. Flooding Sites 1995.
63 13 $30,427
Barnett (S) 702 and 706 Barnett-Eli Area, Phase 1 ( short term only) , 2 houses, street flooding, design and construction
61 1 $75,459
Gilford - Roanoke Area Relief System - Phase II Excessive street flooding, Phase II - complete relief system in Anson and Grauwyler Park, between Gilford and Mohawk, replace Brookhollow bridge, enlarge channel between Harry Hines and Brookhollow, gabion lining
60 2 $1,367,198
Lively Lane 3808 Relief system w/inlets & pipe through cul-de-sac to channel to intercept flow upstream - 2 houses affected, street & yard flooding
59. 6 $67,584
Tyler (S) - Berkley 100-year upgrade to existing system, 1 house and area street flooding, design and construction
59 1 $611,998
5th Street Drainage Relief System Design and construct 100-year drainage system for area bounded by 5th, Lake Cliff Dr., N. Lancaster, and E. Jefferson.
59 1 $1,063,000
Tyler (S) - Berkley 100-year upgrade to existing system, 1 house and area street flooding, design and construction
59 3 $564,922
Cliffdale, 322 Design and construct relief system for flooding, 1 house, street
58 1 $105,155
Falls 2509 Falls-Franklin Area, Phase 1 (short term only), one house and streets flood, design and construction
58 1 $158,221
Munger (N) 1300 Short term - Part of Peaks Branch. One structure and area streets flood, design and construction
58 2 $13,517
Pacific Avenue Relief @ Elm Street CBD relief system to the Trinity River, design and construction
58 2 $5,476,877
Loree 1742 One house and streets flood, design and construction
58 9 $200,908
Newcombe 10123 2 homes and street flooding, design and construction
58 9 $359,040
Monday, February 27, 2012 Page 22 of 29
Category Project Name Description Score CD EstimateStorm Drainage
Preston Creek Place 6166 Replace existing pipe culvert with box culvert - pipe is continually submerged, inadequate, and subject to blockage causing road to flood
58 11 $74,613
Munger (N) 1300 Short term - Part of Peaks Branch. One structure and area streets flood, design and construction
58 14 $13,517
Pacific Avenue Relief @ Elm Street CBD relief system to the Trinity River, design and construction
58 14 $5,476,877
Barnett, Eli, Irwindell, Ravinia Area Existing system upgrade - excessive street flooding. At least two houses flood, design and construction
56 1 $791,104
Harlandale - Strickland Area Apartment building floods, design and construction
56 4 $851,958
Dunmore 9155 One house floods, street flooding, design and construction
56 10 $188,648
Aberdeen-Tulane - Phase 2 Second phase of project to alleviate street flooding, construction.
55 13 $3,042,710
Falls-Franklin (S) Area Relief Provide 100 year upgrade to existing system. One structure, excessive street flooding, design and construction
54 1 $547,687
Cedar Creek (Upper) Drainage Relief System Large area relief system, Hampton/Clarendon area and south, MAPSCO 53L, M, Q, R, 54J
54 1 $1,825,626
Calcutta 616 (RL Area 40) One house floods, area street and alley flooding, design and construction - west of Marsalis, area excluded from Palo Duro/Rand study - relief system to Five Mile Creek
54 5 $1,622,037
Highland Road at Waterside Court Analyze, design and construct relief system for off-site drainage into Highland on the Creek subdivision - Highland Road floods, one residence has flooded.
54 9 $156,796
Abshire Lane 1916 Multiple homes flood from alley - study, design, construction
54 7 $162,204
Ridgehaven Dr 9809 Construct 2-10' inlets and about 400 LF of pipe in alley, connect to ex. system in Audelia, remove and replace about 160 SY alley pavement, deepen invert to increase capacity, 2 homes flood from alley
54 10 $118,949
Crutchfield Branch - DART Track to Lindsley Dr. Street flooding, SP R.R. (DART) to Lindsley, design and construction
54 14 $2,434,168
State-Thomas - Hallsville/Worthington Includes, systems in Hallsville, Worthington, Boll, and Thomas
54 14 $605,560
Monday, February 27, 2012 Page 23 of 29
Category Project Name Description Score CD EstimateStorm Drainage
Mill Creek/Middle Peaks Branch/State-Thomas Woodall Rogers Drainage Relief System
Construction of Mill Creek Phases I and II pressure sewer and start of purchase of ROW for creek restoration; Middle Peaks Branch Phases I and II pressure sewer; full relief from flooding in Deep Ellum and Baylor Hospital, partial relief north of Exall Park, Fair Park, and Alcalde/Victor area near Buckner Park; includes diversion from Woodall Rogers outfall to support State-Thomas drainage (Single-phase construction)
530 $217,000,000CW
Harry Hines 5323 UT Southwestern Basement flooded, design and construction
53 2 $60,854
Southwood - Franklin (S) Area Provide 100-year upgrade to existing system. One known garage floods, street flooding, design and construction
53 3 $492,918
Southwood 2602 Southwood- Franklin, Phase 1 (short term only), one garage and excessive street flooding, design and construction
53 3 $91,281
Sun Valley - Charlemagne One house and street flooding, design and construction
53 4 $248,284
Ann Arbor (E) 2943 Design and build parallel relief system from Ledbetter, up Cranfill, up Ann Arbor, to Linda Ree.
53 5 $438,150
Fairglen Dr 8928 ~200 LF 21" pipe, 1-10' inlet, to relieve street flooding
53 10 $47,520
Desco 7108 One house floods, streets flood, design and construction
53 13 $54,769
Nandina - Pine Trail Area Design and construction of outfall, 2 to 3 homes flood
52 8 $870,215
Winnetka (N) - Colorado to Stewart 100-year upgrade to existing system, design and construction
51 3 $1,308,365
Mockingbird/Skillman Area Drainage Analyze existing systems from Hillside upstream, determine whether storm sewer capacity can be increased, design and construct inlets and laterals to fully utilize system.
51 9 $182,562
Kingsley Creek Circle 9129 1 house and street floods due to lack of system capacity, add 10' inlet and lateral/culvert pipe
51 10 $43,254
Boone Ave @ Fire Training Center Street flooding, design and construction 50 7 $322,526
Wood Dale 10600 Street flooding, design and construction 50 9 $133,879
Wentwood 7314 Property flooding, design and construction 50 13 $60,854
University (E) 5757 Apartment property floods, design and construction
50 14 $60,854
Misty Glen Area 100 year upgrade for street flooding, design and construction
49 4 $803,274
Brookwood Dr 918 Construct 2-10' inlets and approx. 4-ft high retaining wall about 150 LF behind two homes to prevent flooding from inadequate drainage on Ledbetter
49 4 $551,880
Monday, February 27, 2012 Page 24 of 29
Category Project Name Description Score CD EstimateStorm Drainage
Navaro - Fort Worth Avenue Area One house and surrounding streets flood, design and construction
49 6 $615,844
Milverton @ Palisade System upgrade for 100 year capacity, excessive street flooding, design and construction
49 5 $870,215
La Bolsa - Dale Port Area One structure and area streets flood, design and construction
49 12 $1,156,229
Creek Bend Road 7028 Relief system on unimproved street to convey runoff to creek - significant lot flooding
48. 12 $77,857
Cavender @ Jefferson 2 houses, excessive street flooding, design and construction
48 1 $164,306
Virginia Blvd 3541 and 3545 Relief system to connect old private drainage system to adequate outfall to correct lot-to-lot drainage problem; will require drainage easement dedication/condemnation
48 1 $118,800
Sunnyside 1226/Pampas 4117 Outfall upgrade, participate w/City of Cockrell Hill, design and construction
48 1 $60,854
Loganwood 3602 One house and area streets flood, design and construction
48 4 $255,587
Montana (W) 419 One house and streets flood, design and construction
48 3 $107,103
Monte Carlo 1600 and 3400 block (Repetitive Loss Area 37)
3 houses flood, design and construction 48 3 $200,000
Hollow Ridge 4804 One house - garage floods from street, design and construction
48 4 $139,964
El Patio 1334 Yard flooding from Peavy Rd, design and construction
48 9 $60,854
Groveland 8920 Enclose portion of creek, design and construction
48 9 $58,420
Lake Gardens 10415 Design and construction of a relief system for Lake Gardens at Easton
48 9 $136,313
Lovers (E) 6503 One house and streets flood, design and construction
48 9 $30,427
South Lamar Ph. 2 - Pear, Mooney, Bannock Area
Additional improvements for Lamar-Pear to Bannock, Mooney Street, channel along R.R
48 7 $1,217,083
Heatherwood 2623 One house floods/ 4-5 additional yards and streets, design and construction
48 9 $79,110
Meandering Way 16209 ~200 LF 21" storm drainage pipe, 2-10' inlets, to relieve excessive gutter flow that spills down drive approach
48 12 $54,000
Langdale 8622 One house floods, design and construction
48 10 $115,623
Averill Way 6040 Apartment building flooding, design and construction
48 13 $334,697
Lovers (E) 6503 One house and streets flood, design and construction
48 14 $30,427
Monday, February 27, 2012 Page 25 of 29
Category Project Name Description Score CD EstimateStorm Drainage
N. Oak Cliff Relief System - Ph 2 - Davis@Zang to W.
Complete construction as designed with Phase 1, relief systems in Davis, 8th, and 9th Streets - Zang to Llewellyn, local drainage systems Bishop to Adams
46 1 $5,476,878
Kiest (E) 2700 - Magna Vista 100 year upgrade for existing system 46 7 $903,076
West Dallas - Pavaho Sump Basin 100-year upgrade to storm sewers outfalling into the Pavaho sump, design and construction
46 $21,785,801CW
Briar Cliff 1600 One house, street flooding, design and construction - add one 10' inlet, 30 LF 21" RCP
45 2 $15,139
Lisbon Area E - Kiest @ Garrison Street flooding - Kiest @ Garrison 45 4 $425,979
Montana - Brookhaven Area 100 year relief for area street flooding, design and construction
45 3 $736,335
Turnpike Distribution IV - IH30 to Commerce Design and construction of connection of the improved channel in the Turnpike Distribution Center
45 3 $214,207
LaRue @ Wisteria One house and area streets flood, design and construction
44 1 $736,335
Preston Hollow Channel - Ph 1 Edgemere to Desco
Culvert and channel improvements along channel east of Edgemere, from Edgemere to Desco, design and construction
44 13 $608,541
Preston Hollow Channel - Ph 2 Desco to Joyce Culvert and channel improvements along channel east of Edgemere, from Edgemere to Desco - continuation of Phase 1, construction based on design with Phase 1
44 13 $450,320
Alderson 3700 Upgrade drainage system from 3700 blk Alderson to 3800 block Skillman
44 14 $1,131,887
Montclair N. 1111 ~400 LF 36" pipe, ~50 LF 21" pipe, 2-10' inlets, to relieve street flooding due to inadequate existing system
43 3 $131,760
Louisiana W. 214 Replace existing damaged storm sewer from Woodin to Louisiana
43 4 $60,854
Ledbetter - Altoona to Westmoreland System Upgrade to 100 year capacity; street flooding, design and construction
43 3 $819,341
Denley (S) 1243 Street/Property flooding, design and construction
43 4 $132,661
Ledbetter - Altoona to Westmoreland System Upgrade to 100 year capacity; street flooding, design and construction
43 8 $318,632
Rockbrook Drive 9400 5 inlets, laterals, 30" main line from Rockbrook to Bachman Creek to protect Frank Lloyd Wright home from excess overland flow from unimproved streets.
43 13 $109,537
State-Thomas - Flora/Boll to Fairmount Includes "Field of Dreams" systems 43 14 $467,146
Versailles Ave N 3500 Construct 6-10' inlets, approx. 700 LF pipe, connect to ex. System in Lemmon, relieves street flooding to 2' depth on Versailles
43 14 $206,280
Monday, February 27, 2012 Page 26 of 29
Category Project Name Description Score CD EstimateStorm Drainage
Greenspan - Kirnwood Area One house and street flooding, design and construction
42 8 $492,918
Lisbon Area D - Fordham, Garrison to Bonnieview
Street flooding - Fordham Road - Garrison to Bonnie View
41 4 $2,129,896
Lisbon Branch - Mentor to Fordham Continuation of relief system to upgrade area to 100-year level of protection
41 4 $3,042,710
Paloduro - Rand Area Street flooding, design and construction. 41 4 $2,677,585
Glencairn 216 One home floods - inadequate drainage system at low point in street
41 8 $66,939
Sorcey Rd. @ White Ash Enlarge culvert under Sorcey Rd. to relieve intersection flooding, design and construction
40 3 $64,881
Lawther Dr. 4500 Street flooding within park, culvert inadequate, relief system needed to capture and convey surface flows, design and construction
40 9 $334,697
Covey 8931 One house floods, street flooding, design and construction
40 9 $60,854
Lemmon @ University 100 year area relief system, design and construction
40 14 $1,137,973
Alpha at Peyton (RL Area 3) Upgrade area drainage system to relieve excessive street flooding
39 11 $1,643,063
Twelfth @ Marsalis Intersection flooding, design and construction
38 1 $292,099
Marsalis - Five Mile Pkwy to Ann Arbor 100 year upgrade of existing systems - excessive street flooding, design and construction
38 4 $486,833
Englewood - Oakenwald Drainage Design and construct storm drainage relief system from Englewood/Oakenwald intersection to existing system on Plowman.
38 3 $547,687
Dixon Branch Relief System (RL Areas 18 & 19) 97 homes in flood plain; homes flood at 10-year flood levels; average 100-year depth 3.84'; proposed relief system consists of a deep diversion tunnel from Lake Highlands/Eastland west to White Rock Lake; This project replaces the channel improvements previously recommended; about 50 homes flooded 3/19/06
360 9 $75,000,000
Dixon Branch Relief System (RL Areas 18 & 19) 97 homes in flood plain; homes flood at 10-year flood levels; average 100-year depth 3.84'; proposed relief system consists of a deep diversion tunnel from Lake Highlands/Eastland west to White Rock Lake; This project replaces the channel improvements previously recommended; about 50 homes flooded 3/19/06
360 10 $25,000,000
Idaho Creek - Brookmere to Grinnell Enclose creek from Brookmere to Grinnell, design and construction - requires 404 Permit, may not be approved by USACE
36 4 $651,140
Monday, February 27, 2012 Page 27 of 29
Category Project Name Description Score CD EstimateStorm Drainage
Meadow Lake Avenue 7102 Approx. 1,600 LF 36" RCP, 4 10-foot inlets; requires detailed engineering analysis and design.
36 9 $243,305
Gibbs Williams @ Deerfield 2 houses and area streets flood, design and construction
35 3 $499,004
Farola 1916 Yard flooding, design and construction 35 9 $94,932
Hidden Valley 1286 Inadequate drainage system causing street flooding, resulting in additional creekbank erosion
35 8 $438,150
Azalea Lane 6625 Add minor drainage relief system at low point - 1 garage floods
35 11 $146,050
Ravinia South, 503 1 house floods from behind, would have to enclose small creek, can fix w/paving petition
33 1 $70,898
Berwyn & Annapolis Inadequate low point system, street flooding, design and construction
33 9 $194,733
Enfield 4307 and 4309 Yard flooding, design and construction 33 13 $92,498
Hearne Ave. @ Commerce Property flooding, design and construction of minor relief system
31 3 $243,416
Ferguson - IH30 to Buckner System upgrade to 100 year capacity; street flooding, design and construction
31 9 $224,917
Ferguson - IH30 to Buckner System upgrade to 100 year capacity; street flooding, design and construction
31 7 $1,381,634
Ginger - Moler Area 3 houses flood - outfall extension, design and construction
30 1 $133,879
Pentagon - Marsalis to Yewpon 100-year upgrade to existing systems - excessive street flooding, design and construction
30 4 $1,825,626
Rhome - Tantor Area Street flooding, design and construction 30 6 $535,516
Eastgate 4975 Street/yard flooding, design and construction
30 5 $121,707
Hill Point @ Royal Lane One house and street flooding, design and construction
30 10 $267,758
Royal Circle 7343 Property flooding, design and construction 30 11 $60,854
Hughes Lane @ Kalani Place Structural flooding and excessive street flooding, design and construction
30 11 $547,687
Peaks Branch Upper Basin Relief System (RL Area 13)
Drainage relief system for Peaks Branch watershed from Buckner Park north to M Streets; this is a continuation of Middle Peaks Branch Phases I & II, which is currently planned for design and construction with Mill Creek Phases I & II and State-Thomas Woodall Rogers Outfall
251 $100,000,000CW
Fort Worth @ Vilbig Provide outfall upgrade, design and construction
25 3 $47,466
Fort Worth @ Vilbig Provide outfall upgrade, design and construction
25 6 $135,096
Monday, February 27, 2012 Page 28 of 29
Category Project Name Description Score CD EstimateStorm Drainage
Gaston 6900 Blk Re-route storm sewer into street ROW where it currently crosses private properties - add 8 10-foot inlets, approx. 750 LF of 48-inch pipe
25 9 $101,671
Shady Cliff 6121 Property flooding, design and construction 25 11 $12,170
Lemmonwood 7704 Yard flooding, design and construction 25 10 $21,907
Hughes 13228 Property flooding, design and construction 25 11 $60,854
Gaston 6900 Blk Re-route storm sewer into street ROW where it currently crosses private properties - add 8 10-foot inlets, approx. 750 LF of 48-inch pipe
25 14 $101,671
$725,649,036Sub total
$1,499,399,667Grand total
Monday, February 27, 2012 Page 29 of 29