presentation to dante alighieri society · dante alighieri society surveyor rober survey l072a...

9
Presentation to Dante Alighieri Society 9 March 2019 Pisani + Associates Architects

Upload: others

Post on 29-May-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction

Presentation to Dante Alighieri Society9 March 2019

Pisani + Associates Architects

Page 2: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction

03.09.2019 PISANI + ASSOCIATES ARCHITECTSDante Alighieri Cultural Center - Cambridge MA

Page 3: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction

03.09.2019 PISANI + ASSOCIATES ARCHITECTSDante Alighieri Cultural Center - Cambridge MA

Page 4: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction

03.09.2019 PISANI + ASSOCIATES ARCHITECTSDante Alighieri Cultural Center - Cambridge MA

Page 5: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction

03.09.2019 PISANI + ASSOCIATES ARCHITECTSDante Alighieri Cultural Center - Cambridge MA

Page 6: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction

03.09.2019 PISANI + ASSOCIATES ARCHITECTSDante Alighieri Cultural Center - Cambridge MA

Page 7: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction
Page 8: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction
Page 9: Presentation to Dante Alighieri Society · dante alighieri society surveyor rober survey l072a massachusetts avenue arlington, ma 02129 progress print not for filing not for construction

/ , ,

I , ,

,

/ ,

I , ,

----

--------

PIAZZA BELOW

-----

-----

-----

-----

-

�e /Qo

PROPOSED

PROPOSED SECOND

FLOOR 5,700 SF

PARKING AT GRADE BELOW

"===�=�=�=t=

Nf=z=6L

=

O

=

O

=

R9I

----�_a:-___ ±=::::!l---::U:------::U:------;'lmi;;

1

:;:

r

:;:

1

-=-=-::a11==::::n:11 t====::n:=======-=-=--==-=-c:11

CARDINAL MEDEIROS AVENUE

CONCEPTUAL 2nd FLOOR PLAN

ORIGINAL SCALE l /16" = l '-0"

EXISTING SITE INFORMATION TAKEN FROM:

"TOPOGRAPHIC PLAN" BY ROBER SURVEY, INC. DATED NOVEMBER 22, 2018.

NOTE: ELEVATIONS ON NORTH AMERICAN VERTICAL DATUM OF 1988

PISANI + ASSOCIATES A R C H T E C T S

374 CONGRESS STREET BOSTON, MA 02210-1807TEL: (617) 423-1022FAX: (617) 426-0939 e-mail: apisaniOpisoni.com

IARCHITECT'S PROIECT N0.17-324 This document Is recorded on or can be- transmitted on electronic media. It is therefore subject to undetectable alteration or erasure, intentional or unintentional, due to causes Including, without llmltatlorc transmission, conversion, translation, media degradation, software error, human error or alteration. Accordingly, Pisani + Associates Architects shall not be held liable for claims, losses, damages or costs arising out of any such alterations or unauthorized re-use or modification of this document or any part thereof.

OWNER DANTE ALIGHIERI SOCIETY

SURVEYOR ROBER SURVEY l 072A MASSACHUSETTS AVENUE

ARLINGTON, MA 02129

PROGRESS PRINT NOT FOR FILING NOT FOR CONSTRUCTION JAN 25, 2019

STAMP

ISSUE / REVISION NO. DATE DESCRIPTION

DANTE ALIGH!ERI SOCIETY 41 HAMPSHIRE STREETCAMBRIDGE, MA 02139

PROJECT 17-324 AMP

DATE DRAWN CHECKED

CONCEPTUAL 2nd FLOOR PLAN

DRAWING

Al .2 DWG. NO.

©THIS DXlM:NT IS JrN INSTRLtENT CF SBWICE ANJ REMANS TIE EXCWSIVE PRCFERTY CF PISANI • ASSO::IATES. AN] MAY tar BE IEPAD..IE) Wlll·DJT WRITIEN �ISSICN.