PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW
GENERATION” CORRECTIONAL FACILITY PROTOTYPES
Department of Correctional Services17 September 2002
![Page 2: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/2.jpg)
1. THE OBJECTIVES1. THE OBJECTIVES
1.1. STRATEGIC PLAN
1.2. OPERATIONAL OBJECTIVES
1.3. BUDGETARY OBJECTIVES
![Page 3: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/3.jpg)
INTRODUCTIONINTRODUCTION
* The concepts utilized in the development of the “New Generation” prototype correctional facility have included:
• Unit Management• Direct Supervision• Communal Cells
* The prototypes as developed were guided by the need to enhance the facility’s potential for rehabilitation while maintaining a high level of security by design
![Page 4: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/4.jpg)
* The concept as developed incorporate all the recognized standard for humane incarceration.
* The designs reflect detailed space norms and standards incorporating recognized standards and local conditions
* The design concepts have been developed:(a) To achieve low Life-Cycle-Costing(b) To permit a variety of procurement methods(c) To permit rapid & expeditious construction
(d) To maintain a high level of security by design
![Page 5: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/5.jpg)
1.1. THE OBJECTIVESTHE OBJECTIVES
1.1 STRATEGIC PLAN
1.1.1. Reduction of overcrowding
1.1.2. Introduction of Unit Management
1.1.3. Reduction of Life- Cycle- Costs
1.1.4. Enhancement of Rehabilitation Programmes
![Page 6: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/6.jpg)
1.1. THE OBJECTIVESTHE OBJECTIVES
1.2 OPERATIONAL OBJECTIVES
1.2.1. Development of Life-Cycle-Costing procedures
1.2.2. Revised Business & Procurement process which
reduce risks but enhance competition1.2.3. Revised criteria for prioritization of projects1.2.4. Revised criteria for creation of new facilities
maintaining a high level of security by design1.2.5. Development of Master Plan for new &
renovated facilities
![Page 7: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/7.jpg)
1.1. THE OBJECTIVESTHE OBJECTIVES
1.3 BUDGETARY OBJECTIVES
1.3.1. Reduction of Capital Costs
1.3.2. Reduction of Operating & Maintenance Costs
1.3.3. Modifications to MTEF Cycle Budget to reflect strategic objectives
1.3.4 Implementation of Life-Cycle-Costing methodology to achieve all of
the above and reduce risk associated with
construction
![Page 8: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/8.jpg)
2. 2. THE PROCUREMENT PROCESSTHE PROCUREMENT PROCESS
2.1. DEVELOPMENT OF PROTOTYPE DESIGN
2.2. UTILIZATION OF CONSTRUCTION MANAGEMENT
![Page 9: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/9.jpg)
2.2. THE PROCUREMENT PROCESS THE PROCUREMENT PROCESS
2.1. KEY FEATURES OF THE THE PROTOTYPE DESIGN
2.1.1. Standard designs with fee and construction cost savings through
repetition. 2.1.2. Establishing integrated and co- operative relationship with the
Department of Public Works. 2.1.3. Permitting the introduction of Construction Management to allow for
options other than conventional construction methodologies while
reducing risk
![Page 10: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/10.jpg)
2.2. THE PROCUREMENT PROCESSTHE PROCUREMENT PROCESS
2.2 UTILISATION OF CONSTRUCTION MANAGEMENT
2.2.1. Encouraging the participation by a wide variety of construction providers
2.2.2. Permitting the utilisation of prisoner labour and products
2.2.3. Significantly increase the purchasing power of current budget
allocations 2.2.4 Reducing the cost & time risks
associated with construction
![Page 11: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/11.jpg)
3.3. THE PRODUCTTHE PRODUCT
3.1. Design Philosophy
3.2. Design Layouts
3.3. Costing and Estimating
3.4. Partnership with the Department of Public Works
![Page 12: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/12.jpg)
3.3. THE PRODUCTTHE PRODUCT
3.1.6. Support rehabilitation
3.1.7. “Appropriate Technology”
3.1.8. Potential for phased construction & additions with minimum operational disturbances
3.1.9 “World Class” design quality
3.1.10 High level of security by design
![Page 13: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/13.jpg)
3.3. THE PRODUCTTHE PRODUCT
3.1 DESIGN PHILOSOPHY
3.1.1. Unit Management, “New Generation”
3.1.2. Direct Supervision
3.1.3. Communal Cell
3.1.4. “Kit-o-Parts” concept
3.1.5. Low-Life-Cycle cost
![Page 14: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/14.jpg)
3.3. THE PRODUCTTHE PRODUCT
3.2 PROTOTYPE DESIGN
3.2.1. The development of norms and standards
1. 3.2.2. The development of:
![Page 15: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/15.jpg)
The Communal CellThe Communal Cell
![Page 16: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/16.jpg)
The Unit Management ModuleThe Unit Management Module
![Page 17: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/17.jpg)
The Unit Management ClusterThe Unit Management Cluster
![Page 18: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/18.jpg)
The ZoneThe Zone
![Page 19: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/19.jpg)
The Typical 3000 Bed PrototypeThe Typical 3000 Bed Prototype
![Page 20: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/20.jpg)
““The Street”The Street”
![Page 21: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/21.jpg)
The “Street” and Functional CoreThe “Street” and Functional Core
![Page 22: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/22.jpg)
The Potential for Phased The Potential for Phased DevelopmentDevelopment
![Page 23: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/23.jpg)
The Potential for Multiple The Potential for Multiple Facilities Sharing a Common SiteFacilities Sharing a Common Site
![Page 24: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/24.jpg)
Overall View of a Typical Overall View of a Typical Prototype DesignPrototype Design
![Page 25: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/25.jpg)
Perspective of Typical Dayroom Perspective of Typical Dayroom at Housing Moduleat Housing Module
![Page 26: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/26.jpg)
3.2.3. The potential for phased development
3.2.4. The potential for multiple facilities sharing a common site
3.2.5. The overall view of a typical prototype design
3.2.6. Perspective of a typical communal cell
3.2.7. Perspective of typical dayroom at housing module
![Page 27: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/27.jpg)
3.3. THE PRODUCTTHE PRODUCT
3.3 COSTING AND ESTIMATING
3.3.1. Estimated project construction cost per prisoner is 1/3 cost of recent facilities.
3.3.2. Controlling construction cost through joint efforts with CSIR security & building
systems
groups to ensure the use of “Appropriate”
technology
![Page 28: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/28.jpg)
3.3.2. Comparison with new facility of comparable 3.3.2. Comparison with new facility of comparable level of servicelevel of service
BLOEMFONTEIN NIGEL PROTOTYPE
3000 beds 850 beds 3000 beds
Single and double beds 8 & 10 Communal cells 10 beds communal cell
Housing area (m²)
Support area (m²)
Total area (m²)
Cost of Project
Cost of square meter
Cost per prisoner
63, 990 m²
16, 323 m²
80, 313 m²
R 334, 466, 000.00
R 4,127.00
R 110, 488.00
*
*
24 450 m² (1)
R 102, 070, 354.00
R 4,174. 66
R 120, 082. 77
* Estimate 75/25% of 1
15, 000 m²
15, 000 m²
30, 000 m²
R 150, 000, 000.00
R 5,000.00
R 50, 000.00
![Page 29: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/29.jpg)
3.3. THE PRODUCTTHE PRODUCT
3.4 PARTNERSHIP WITH DEPARTMENT OF PUBLIC WORKS
3.4.1. Establishment of interdepartmental Task Team noting
• Roles and obligations• Service Level Agreement• Process Management• Performance Evaluations
![Page 30: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17](https://reader035.vdocuments.mx/reader035/viewer/2022081513/56649eff5503460f94c14723/html5/thumbnails/30.jpg)
3.3. THE PRODUCT THE PRODUCT
3.4.2. Status update of work accomplished to date by
Task Team:• Site selection is substantially complete at four
locations, Leeukop, Nigel, Tzaneen & Klerksdorp
• Appointment of professionals will be completed around 25 September 2002
• Three of the projects will be ready for construction by January 2003 with Tzaneen starting about a month sooner