presentase uts kel 4.pptx

38
PERENCANAAN KEAIRAN Presented by Kelompok 4 Hendy Mario (12 511 211) Tengku Hardiansyah (12 511 201) Halimi Jamalan (12 511 291)

Upload: pienka-yulienda-pienka

Post on 13-Jul-2016

228 views

Category:

Documents


1 download

DESCRIPTION

PERSENTASI PERANCANGAN KEAIRAN

TRANSCRIPT

Page 1: Presentase UTS kel 4.pptx

PERENCANAAN KEAIRAN Presented by Kelompok 4

Hendy Mario (12 511 211)Tengku Hardiansyah (12 511 201)Halimi Jamalan(12 511 291)

Page 2: Presentase UTS kel 4.pptx

Lokasi pekerjaan Sungai Opak di Kabupaten Bantul Provinsi D.I.Y

LOKASI PEKERJAAN

Page 3: Presentase UTS kel 4.pptx

No. Tahun Hujan (mm)1 1995 1382 1996 1213 1997 1064 1998 1055 1999 826 2000 767 2001 808 2002 719 2003 72

10 2004 65

DATA CURAH HUJAN MAKSIMUM

No. Tahun Hujan (mm)11 2005 8812 2006 8913 2007 9914 2008 7215 2009 7616 2010 10217 2011 11218 2012 9819 2013 8420 2014 88

Page 4: Presentase UTS kel 4.pptx

PARAMETER STATISTIKTahun ke- Tahun R(X) X-xrt (X-xrt)^2 (X- xrt)^3 (X- xrt)^4

1 1995 138 46.8 2190.24 102503.232 4797151.2582 1996 121 29.8 888.04 26463.592 788615.04163 1997 106 14.8 219.04 3241.792 47978.52164 1998 105 13.8 190.44 2628.072 36267.39365 1999 82 -9.2 84.64 -778.688 7163.92966 2000 76 -15.2 231.04 -3511.808 53379.48167 2001 80 -11.2 125.44 -1404.928 15735.19368 2002 71 -20.2 408.04 -8242.408 166496.64169 2003 72 -19.2 368.64 -7077.888 135895.4496

10 2004 65 -26.2 686.44 -17984.728 471199.873611 2005 88 -3.2 10.24 -32.768 104.857612 2006 89 -2.2 4.84 -10.648 23.425613 2007 99 7.8 60.84 474.552 3701.505614 2008 72 -19.2 368.64 -7077.888 135895.449615 2009 76 -15.2 231.04 -3511.808 53379.481616 2010 102 10.8 116.64 1259.712 13604.889617 2011 112 20.8 432.64 8998.912 187177.369618 2012 98 6.8 46.24 314.432 2138.137619 2013 84 -7.2 51.84 -373.248 2687.385620 2014 88 -3.2 10.24 -32.768 104.8576  1824 0.00 6725.20 95844.72 6918700.14

Page 5: Presentase UTS kel 4.pptx

1. Standar Deviasi (S)Perhitungan standar deviasi menggunakan rumus sebagai berikut :S = (3.1)di mana :S = Standar Deviasi Xi = Nilai varian ke iXRT = Nilai rata-rata varian n = Jumlah dataSehingga diperoleh nilai standar deviasi sebagai berikut :S = S = 18,8137 mm 2. Koefisien Skewness (Cs)Perhitungan koefisien skewnees menggunakan rumus sebagai berikut :Cs = (3.2)di mana :S = Standar Deviasi Xi = Nilai varian ke iXRT = Nilai rata-rata varian n = Jumlah data Sehingga diperoleh nilai koefisien skewness (Cs) sebagai berikut :Cs = Cs = Cs = 0,8417

PARAMETER STATISTIK

Page 6: Presentase UTS kel 4.pptx

3. Pengukuran Koefisien Kurtosis (Ck)Perhitungan koefisien kurtosis menggunakan rumus sebagai berikut :Ck = (3.3)di mana :

S = Standar Deviasi Xi = Nilai varian ke iXRT = Nilai rata-rata varian n = Jumlah data

 Sehingga diperoleh nilai koefisien kurtosis sebagai berikut :Ck = Ck = Ck = 3,7993

 4. Koefisien variasi (Cv)Perhitungan koefisien variasi menggunakan rumus sebagai berikut :Cv = (3.4)di mana :

S = Standar DeviasiXRT = Nilai rata-rata varian

 Sehingga diperoleh nilai koefisien kurtosis sebagai berikut :Cv = Cv = Cv = 0,206

Page 7: Presentase UTS kel 4.pptx

Fungsi grafik ini untuk memilih jenis sebaran yang digunakan untuk mencari nilai ‘k’ (faktor frekuensi) dengan didasarkan pada koefisien variasi (cv), koefisien kemencengan (cs), dan koofisien kurtosis (ck).

Dari grafik Kurva CV vs Cs, didapatkan metode Log Normal 2 Parameter untuk mencari R Rasional.

Page 8: Presentase UTS kel 4.pptx

T P Z KT RT

2 0.5 0 -0.0999661 89.36960985 0.8 0.84 0.7881258 105.630668

10 0.9 1.28 1.3177738 115.32857925 0.95 1.76 1.9525008 126.95049750 0.98 2.06 2.3819761 134.814236

100 0.99 2.33 2.7916477 142.315366500 0.998 2.88 3.6993808 158.9360561000 0.999 3.1 4.0919900 166.1247722000 0.9995 3.3 4.464536 172.9461297000 0.9998 3.49 4.8328253 179.689546

𝑃=1− 1𝑇

Sementara itu, untuk mendapatkan nilai Z, dapat dilihat pada tabel hubungan antara Z dan standar deviasi

𝑅𝑇=𝑋𝑅𝑇+𝐾 𝑡×𝑆

Page 9: Presentase UTS kel 4.pptx

T RT (mm) tc I (mm/jam)2 88.61309 1.53055 23.131035 101.3088 1.53055 26.44506

10 110.7423 1.53055 28.907525 123.7638 1.53055 32.3065750 133.9765 1.53055 34.97242

100 145.0341 1.53055 37.85884

I24 =

INTENSITAS HUJAN

38,076,0 ATc

Page 10: Presentase UTS kel 4.pptx

Diketahui : c = 0.7 A = 107 (km2) tc = 0.76 x (A)0.38 = 4.487241 (jam) I = (Rt /24) x (24/tc)0.67 (mm/jam) Q = 0.278 x C.I.A (m3/s)

Kala Ulang 2 Tahun (T=2)Rt = 89.3696098I2 = (Rt /24) x (24/tc)0.67 = (89.3696098/24) x (24/4.487241) 0.67 = 10.890479 mm/jam Q2 = 226.5825 m3/s

Kala Ulang 5 Tahun (T=5)Rt = 105.6307I5 = (Rt /24) x (24/tc)0.67 = (105.6307/24) x (24/4.487241) 0.67 = 12.872033 mm/jam

Q5 = 267.8098 m3/s

METODE RASIONAL

Page 11: Presentase UTS kel 4.pptx

METODE RASIONALKala Ulang 10 Tahun (T=10)Rt = 115.3286I10 = (Rt /24) x (24/tc)0.67 = (115.3286/24) x (24/4.487241) 0.67 = 14.053809 mm/jam

Q10 = 292.3973 m3/s

Kala Ulang 20 Tahun (T=20)Rt = 126.9505I20 = (Rt /24) x (24/tc)0.67 = (126.9505/24) x (24/4.487241) 0.67 = 15.470043 mm/jam

Q20= 321.8628 m3/s

Kala Ulang 50 Tahun (T=50)Rt = 134.8142I50 = (Rt /24) x (24/tc)0.67 = (134.8142/24) x (24/4.487241) 0.67 = 16.428309 mm/jam

Q50= 341.8001 m3/s

Kala Ulang 100 Tahun (T=100)Rt= 142.3154I100= (Rt /24) x (24/tc)0.67 = (142.3154/24) x (24/4.487241) 0.67 = 17.342389 mm/jam

Q100= 360.818 m3/s

Page 12: Presentase UTS kel 4.pptx

METODE RASIONALKala Ulang 500 Tahun (T=500)Rt= 158.9361I500= (Rt /24) x (24/tc)0.67 = (158.9361/24) x (24/4.487241) 0.67 = 19.367767 mm/jam

Q500= 402.9572 m3/s

Kala Ulang 1000 Tahun (T=1000)Rt = 166.1284I1000 = (Rt /24) x (24/tc)0.67 = (166.1284/24) x (24/4.487241) 0.67 = 20.243776 mm/jam

Q1000= 421.183 m3/s

Kala Ulang 2000 Tahun (T=2000)Rt = 172.9461I2000 = (Rt /24) x (24/tc)0.67 = (172.9461/24) x (24/4.487241) 0.67 = 21.075019 mm/jam

Q2000 = 438.4775 m3/s

Page 13: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 14: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 15: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 16: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 17: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 18: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 19: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 20: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 21: Presentase UTS kel 4.pptx

Perhitungan Distribusi Hujan (Metode ABM)

Page 22: Presentase UTS kel 4.pptx

Hidrograf Satuan Sintetik(Metode HSS GAMA 1)

Page 23: Presentase UTS kel 4.pptx

Hidrograf Satuan Sintetik(Metode HSS GAMA 1)

Perhitungan Hasil SatuanTr (waktuPuncak) 1.469478 JamQp (Debit Puncak) 2.904318 m³/detikTb (WaktuDasar) 30.87738 jam

K (KoefisienResesi) 3.143295

 

Qb (AliranDasar) 5.019364 m³/detikɸ-indeks 10.44619 mm/jamPerhitungan Satuan GAMA1 (HSS GAMA 1)

Page 24: Presentase UTS kel 4.pptx

Hidrograf Satuan Sintetik(Metode HSS GAMA 1)

t(jam) Unit HidrografHidrograf Terkoreksi

0 0 01 1.976 6.7812 2.904 9.9653 1.118 3.8374 0.814 2.7915 0.592 2.0316 0.431 1.4777 0.313 1.0758 0.228 0.7829 0.166 0.56910 0.121 0.414

Volume 31185.139 107000.000TLL (mm) 0.291 1.000

Perhitungan Satuan GAMA1 (HSS GAMA 1)

Page 25: Presentase UTS kel 4.pptx

Hidrograf Satuan Sintetik(Metode HSS GAMA 1)

Nilai Distrib

usi Hujan

P phi index PeffPeff

Akhir

P13.780824 10.44619

-6.6653643

36 0

P25.635163 10.44619

-4.8110259

76 0

P3 31.31267 10.4461920.866484

9920.866484

99

P48.047776 10.44619

-2.3984127

5 0P5 4.480999 10.44619 -5.9651894 0

Nilai Peffektif Kala Ulang 2 Tahun

Page 26: Presentase UTS kel 4.pptx

Hidrograf Satuan Sintetik(Metode HSS GAMA 1)

t (jam)

Hidrograf

p1 p2 p3 p4 p5 HLL Hid. Banjir

0 020.866

48 0 0 m3/det m3/det

0 0 -         05.0193635

31 6.7813

64 0 - -     05.0193635

32 9.9650

68 0 0 - -   05.0193635

33 3.8369

33 0 0141.50

32 - -141.50322

92146.52259

274 2.7913

79 0 0207.93

59 0 -207.93594

79212.95531

145 2.0307

36 0 080.063

3 0 080.063301

0485.082664

576 1.4773

66 0 058.246

27 0 058.246271

5963.265635

127 1.0747

88 0 042.374

32 0 042.374322

6947.393686

228 0.7819

11 0 030.827

44 0 030.827436

2435.846799

779 0.5688

42 0 022.427

04 0 022.427044

627.446408

1310 0.4138

34 0 016.315

74 0 016.315736

621.335100

13

Perhitungan Banjir Rancang 2 Tahunan

Page 27: Presentase UTS kel 4.pptx

T Qp2 212.95531145 269.730602110 303.59074320 350.853357250 383.1116216

100 413.8824037500 482.0630221000 511.66250132000 541.2950844

Banjir Rancangan Yang Dipakai

Page 28: Presentase UTS kel 4.pptx

ANALISIS HIDRAULIKA SUNGAI

Page 29: Presentase UTS kel 4.pptx

Analisis Data Tampang Melintang Sungai

Data ProfileProfil

e Tinggi Terendah A p R I n V Qt Qr Kondisi

P91 137.022 153.5828 37.9299 4.049122 0.005080.0

4 4.547824 698.4676 541.2951 AMAN

P90 136.895 81.7648 35.7831 2.285012 0.012560.0

4 4.874051 398.5258 541.2951 BANJIR

P89 136.581 163.2796 39.3963 4.144541 0.002320.0

4 3.121715 509.7124 541.2951 BANJIR

P88 136.639 167.5133 41.1342 4.072361 0.010440.0

4 6.544662 1096.318 541.2951 AMAN

P87 136.9 154.6697 40.6681 3.803219 0.019560.0

4 8.557085 1323.522 541.2951 AMAN

P86 136.411 150.7289 41.1343 3.664312 0.004440.0

4 3.97655 599.381 541.2951 AMAN

P85 136.3 148.3488 42.5569 3.485893 0.009920.0

4 5.74839 852.7668 541.2951 AMAN

P84 136.052 132.5613 37.6391 3.521904 0.007880.0

4 5.158745 683.8499 541.2951 AMAN

P83 135.855 130.1277 39.2229 3.317646 0.003480.0

4 3.293713 428.6033 541.2951 BANJIR

P82 135.768 126.507 36.5135 3.464664 0.0117890.0

4 6.241086 789.541 541.2951 AMAN

P81 135.544 185.5482 42.6452 4.350975 0.0117890.0

4 7.270097 1348.953 541.2951 AMAN

Page 30: Presentase UTS kel 4.pptx

ANALISIS HEC-RAS

Di bawah ini adalah langkah – langkah menggunakan program HEC-RAS :

1. Klik program HEC-RAS

2. Untuk membuat project baru, klik file, lalu rename project.

3. Pilih unit system yang akan dipakai, missal klik option-unit system-system international-ok.

4. Input data geometri atau layout system sungai. Klik menu - geometric data - river reach.

5. Input data lintang. Klik cross section-option-add a new cross section - ok.

6. Input data steady flow. Klik steady flow data. Isi pada bagian edit number of profiles, lalu isi besaran debit,

selanjutnya klik reach boundary condition.

7. Setelah semua data masuk, klik file-save data.

8. Running model pada aliran steady flow. Klik perform a steady flow simulation, setelah nama plan diisi dan

option flow regime dipilih, lalu klik compute. Jika compute berhasil, maka hasil dalam berbagai bentuk akan

dapat dilihat dalam bentuk table maupun grafis.

Maka kita dapat menghitung kapasitas sungai menggunakan Program HEC-RAS, hasilnya adalah sebagai berikut :

Page 31: Presentase UTS kel 4.pptx

P91 pada Q4000

Hasil He-cras lainnya

Page 32: Presentase UTS kel 4.pptx

Potongan memanjang P91- P81

0 50 100 150 200 250134

136

138

140

142

144

hec-ras kel 4. 1 P lan: Plan 03 10/31/2015

Main Channel Distance (m)

Ele

vatio

n (m

)

Legend

EG PF 10

Crit PF 10

WS PF 10

Ground

sungai 1

Page 33: Presentase UTS kel 4.pptx

Output table hec-ras rancangan

Page 34: Presentase UTS kel 4.pptx

TANGGUL SUNGAI

Tanggul sungai adalah salah suatu bangunan yang paling utama dan paling penting dalam usaha melindungi kehidupan dan harta benda masyarakat terhadap genangan-genangan yang disebabkan oleh banjir dan badai (gelombang pasang). Tanggul dibangun terutama dengan konstruksi urugan tanah, karena tanggul merupakan bangunan menerus yang sangat panjang serta membutuhkan bahan urugan yang volumenya sangat besar, karena tanah merupakan bahan urugan yang volumenya sangat besar karena tanah merupakan bahan yang sangat mudah penggarapannya dan setelah menjadi tanggul sangat mudah pula menyesuaikan diri dengan lapisan tanah pondasi yang mendukungnya serta mudah pula menyesuaikan dengan kemungkinan penurunan yang tidak rata, sehingga perbaikan yang disebabkan oleh penurunan tersebut mudah dikerjakan.

Page 35: Presentase UTS kel 4.pptx

BANGUNAN PENGENDALI SEDIMEN

Usaha untuk memperlambat proses sedimentasi adalah dengan mengadakan pekerjaan teknik sipil untuk mengendalikan gerakannya menuju bagian sungai di sebelah hilir.

Contoh Bangunan Pengendali Sedimen (Sabo Dam)

Page 36: Presentase UTS kel 4.pptx

REVETMENT

Perkuatan lereng (revetment) adalah bangunan yang ditempatkan pada permukaan suatu lereng guna melindungi suatu tebing alam sungai atau permukaan lereng tanggul dan secara keseluruhan berperan meningkatkan stabilitas alur sungai atau tubuh tanggul yang dilindunginya.

Page 37: Presentase UTS kel 4.pptx

PINTU AIR

Pintu air merupakan bangunan penunjang pada komponen bangunan sungai dan bendungan pengendali banjir. Umumnya pintu air digunakan untuk mengontrol aliran air di reservoir, sungai dan pada sistem tanggul. pintu yang dapat diatur  yang digunakan untuk mengatur air di bendungan, sungai, maupun tanggul sungai

Page 38: Presentase UTS kel 4.pptx

PINTU AIR

Jalan Inspeksi adalah jalan yang digunakan untuk keperluan operasi dan pemeliharaan jaringan Irigasi.