preliminary project report (ppr) - jswm.nic.injswm.nic.in/file/top_box/ppr/nabard ppr...

30
PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT (NABARD) (NABARD) (NABARD) (NABARD) BLOCK: BLOCK: BLOCK: BLOCK: DALTONGANJ & LESLIGANJ DALTONGANJ & LESLIGANJ DALTONGANJ & LESLIGANJ DALTONGANJ & LESLIGANJ DISTRICT: DISTRICT: DISTRICT: DISTRICT: PALAMU PALAMU PALAMU PALAMU PIA PIA PIA PIA SOIL CONSERVATION DEPARTMENT SOIL CONSERVATION DEPARTMENT SOIL CONSERVATION DEPARTMENT SOIL CONSERVATION DEPARTMENT PALAMU PALAMU PALAMU PALAMU, JHARKHAND , JHARKHAND , JHARKHAND , JHARKHAND NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: PALAMAU PALAMAU PALAMAU PALAMAU- - -NABARD NABARD NABARD NABARD- - -3 3 3/ / /2015 2015 2015 2015- - -16 16 16 16 SUBMIT SUBMIT SUBMIT SUBMITTED TO TED TO TED TO TED TO NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT RANCHI RANCHI RANCHI RANCHI STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY- - - JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT 4 4 4 TH TH TH TH FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI- - - 834004 834004 834004 834004 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 - - - 651 651 651 651- - -2401974 2401974 2401974 2401974, , , , 24 24 24 2446217 46217 46217 46217, , , 244601 244601 244601 2446019 9 9 E E E- - -MAIL : MAIL : MAIL : MAIL : [email protected], Website Website Website Website : www.jswm.nic.in

Upload: duongnhi

Post on 19-Jul-2018

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)

NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT

(NABARD)(NABARD)(NABARD)(NABARD)

BLOCK: BLOCK: BLOCK: BLOCK: DALTONGANJ & LESLIGANJDALTONGANJ & LESLIGANJDALTONGANJ & LESLIGANJDALTONGANJ & LESLIGANJ

DISTRICT: DISTRICT: DISTRICT: DISTRICT: PALAMUPALAMUPALAMUPALAMU

PIAPIAPIAPIA

SOIL CONSERVATION DEPARTMENTSOIL CONSERVATION DEPARTMENTSOIL CONSERVATION DEPARTMENTSOIL CONSERVATION DEPARTMENT

PALAMUPALAMUPALAMUPALAMU, JHARKHAND, JHARKHAND, JHARKHAND, JHARKHAND

NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: PALAMAUPALAMAUPALAMAUPALAMAU----NABARDNABARDNABARDNABARD----3333////2015201520152015----16161616

SUBMITSUBMITSUBMITSUBMITTED TOTED TOTED TOTED TO

NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTNATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTNATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTNATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT

RANCHIRANCHIRANCHIRANCHI

STATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCY---- JHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSION

DEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENT

4444THTHTHTH FLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHI---- 834004834004834004834004

TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 ---- 651651651651----2401974240197424019742401974, , , , 2424242446217462174621746217,,,, 2446012446012446012446019999

EEEE----MAIL : MAIL : MAIL : MAIL : [email protected], Website Website Website Website : www.jswm.nic.in

Page 2: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

1

PROPOSED PROJECT PALAMU-NABARD-3/2015-16

Page 3: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

2

Format for Preliminary Project Report (PPR)

I. Institutional Structures.

I. A. State Level Nodal Agencies

I. B. District Level Watershed Units

II. Selection of Watershed Projects

III. Profile of the each selected watershed project

IV. Agro-climatic condition of project area.

V. Demography & land distribution

VI. Livelihoods

VII. Expected project out comes

VIII. Mandatory certificates

IX. Status of on-going projects

X. Abstract of project proposed for sanction

Page 4: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

3

I. Institutional Structures

I. A. State Level Nodal Agencies (SLNAs):

Table-PPR 1: Details of SLNA

1 2 3 4 5 6

Sl.No. State Type of SLNA# Date of Notification Date of MoU with

DoLR Total no. of members of SLNA

1 Jharkhand

Jharkhand state Watershed Mission (No.

103/2009-10 dated 17/7/2009, Registered

Under society registration Act 21 of 1860, )

4673 Dated 20-06-09

Under Process 19 including (CEO)

Whether it is a Department /Mission/ Society/Authority/Others (pl. specify) Society (contd.)

Table-PPR 1: Details of SLNA (Contd.)

7 8

Chairperson CEO

Name Designation Name Designation Date of

Appointment Nature of

appointment Tenure (No.

of Years) Contact Ph. No./Fax/E-

Mail

Governing Body: Mr. SUDHIR

PRASAD, IAS

Development Commissioner

Mr B Nijalingappa, IFS

Chief Executive Officer State Level Nodal

Agency-Jharkhand State Watershed Mission Rural Development

Department Govt. of Jharkhand

Vide notification

no. 887 dated 22-02-2010

On deputation 3 Years

0651-2401974

[email protected],

[email protected]

Executive Committee-

Mr. ARUN, IAS

Secretary, Rural

Development # APC/ ACS/ Dev. Commissioner/ Others (pl. specify) $ Deputation/ Contract

Page 5: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

4

Table - PPR 2: Details of functionaries in the JSWM-SLNA

Details of the persons engaged in the SLNA- Jharkhand State Watershed Mission funded by DoLR

Sl.No Name &

Designation

Monthly

remuneration

Date of

Appointment

Nature of

appointment

Tenure

(No. of years)

Contract Ph. No. /

E-mail

Subject of

Expertise

Qualification Experience Role

1.

Shri Madan

Sengupta

Administrative Officer

40,000 26-05-2010 On Contract 1 Yr. 9431114862

[email protected] Law &

Administration

M.Sc.

(Geology), LLB.

About 32

Years experience.

Administration, Supervision,

EC /GB Meetings

organisations

etc.

2.

Shri. Narayan

Kumar Mishra Technical Expert

(Agriculture /Agril. Engineering)

50,000 29

th May,

2010 On contract 1 Yr.

9431574367, [email protected]

Watershed

Management, Soil and Water Conservation, GIS & Remote

Sensing

Master of Engineering

(Ag), B Tech (Agril.

Engineering). PGDRD, NET,

GATE

13 years of relevant

experiences in

watershed mgt. and

development, agriculture

dev., rural and social

dev.,

To give the technical

assistance &

Monitoring & evaluation of the projects.

3.

Shri. Anupam

Bharti

Technical Expert (Livelihood)

50,000 29.05.10 On Contract 1 Yr. 9308351370

[email protected]

om,

Horticulture, Rural

development

M Sc

(horticulture)

11 years of relevant

experience in agriculture,

rural dev., horticulture, marketing,

retail

To give the technical

assistance & Monitoring &

evaluation of the projects.

4.

Shri. Kaushlendra Kumar

Techninical Expert in Capacity Building

(Water Management)

50,000 29.05.2010 On contract 1 Yr. 9431071292

[email protected]

Soil & Water Conservation and

Watershed managemrnt

B Tech (Agricultural Engineering ),

M Tech in Agricultural Engineering

(Soil and

Water Conservation) and PGDRD

13 years of working

experiences in

watershed management, soil and water conservation,

rural development

and GIS

To give the technical

assistance &

Monitoring & evaluation of the projects

5.

Shri. Lakhan Lal

Mahato GIS Expert

40,000 29-05-2010 On Contract 1 Yr. 9470335956

[email protected] GIS & Remote

Sensing

M.Sc

(Env.Sc), M.Tech (Remote

Sensing)

12 years

In the field of GIS and Remote

Sensing

GIS, RS and Geodatabase management

6. Smt. Jyoti Pushpa

Finance Officer 40,000 24.08.2010 On Contract 1 Yr.

9905582591 [email protected]

Accountancy CA 13 Years Finance Management

7.

Smt. Pratibha

Kumari Accounts Officer

35,000 15.09.2010 On Contract 1 Yr. [email protected] Finance M Com, MBA

in Finance 6 Yrs 6 Months

Accounts

Management

8. Smt. Shyama,

Account Assistant 25,000 1

st June 2010 On Contract 1 Yr. 9472018349 Finance

M Com, MBA

in Finance 6 years

Accounting

Page 6: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

5

Details of the persons engaged in the SLNA- Jharkhand State Watershed Mission funded by DoLR

Sl.No Name &

Designation

Monthly

remuneration

Date of

Appointment

Nature of

appointment

Tenure

(No. of years)

Contract Ph. No. /

E-mail

Subject of

Expertise

Qualification Experience Role

9.

Shri. Ajeet Kumar

Ravi Account Assistant

25,000 26

th May,

2010 On Contract 1 Yr.

9471764888/

[email protected] Accounts

M.com (Finance),

B Com (Account

Hons)

7 years

Accounting,

Auditing, Taxation etc

10. Shri. Vipul Akash

Programmer 25,000 25-02-2014 On Contract 1 Yr.

9472741901 /

[email protected] MIS Entry MCA About 7 Years

MIS Expert,

Data Entry & Assistant

11.

Shri. Amrendra

Kumar

DEO-cum-Assistant 15,000 1

st June, 2010 On Contract 1 Yr.

9431184303 / [email protected]

computer operator

MCA 2 years File dispatch and receipt

12. Tulsi Ram

DEO-cum-Assistant 15,000

13th June,

2012 On Contract 1 Yr. [email protected]

computer operator

BCA 8 years Data Entry &

Assistant

13. Promod Rajak

DEO-cum-Assistant 15,000 8

th June, 2012 On Contract 1 Yr.

8539809046

[email protected]

computer

operator MCA 6 years

Data Entry & Website

maintance

14. Md. M.H.Imam

DEO-cum-Assistant 15,000 6

th June, 2012 On Contract 1 Yr.

9304334055

[email protected]

computer

operator

M.Sc (IT),

MBA 9 Years

Data Entry &

Assistant

Note: 1. Total outlay per Month for 12 SLNA-JSWM staffs under IWMP is Rs. 4.40 Lakhs

R – Recurring; NR- Non-recurring

* From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.

Page 7: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

6

Table PPR-3: Details of State Level Data Cell (SLDC) functionaries

1 2 3 4 5 6 7 8 9

S.

No

Total no.

of the

persons

working

in the

SLNA for

IWMP

Name & Designation Qualification Experienc

e

Work allocation Monthly

remuner

ation

(Rs.)

Total budget of

SLDC

(Rs. In Lakh)

Funding expected

from DoLR

(Rs. In Lakh)

R NR R NR

1 1 Shri. Vinod Kumar. V. H, Project Co-ordinator

M Tech (Water Resources)

6 years Creation and updation of Geodatabase under IWMP Project using satellite data

30,000.00

2 1 Shri. Anuj Shankar, MIS State Coordinator

MCA 4 years Updation of all the thematic layer using MIS Software development

15000.00

3 3 Shri. Abdul Saqoor, Field Supervisor

M Sc (IT) 5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

4 Vishal Kumar Field Supervisor

B Sc (Fisheries), MBA, Rural Management

5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

5 Ratnesh Kumar Sharma Field Supervisor

M Sc (Math), Advance Diploma in Computer Application

6 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

Total 5 65,000.00

Note- 1. Payment of above experts / staffs is being paid by state budget of JSAC 2. SLDC has been established at JSAC. However it is planning to establish SLDC in the office of JSWM. R – Recurring; NR- Non-recurring

* From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.

Page 8: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

7

I. B. District Level Watershed Units Table-PPR 4: Details of functionaries in the DRDA Watershed Cell*

S. No.

Name of the

District

Name of the

executing Agency#

Status of Chairman

@

Date of signing of MoU

with SLNA

Total no. of persons

working for Watershed programme

Names & Designation

Qualification Experience Work allocation

24

IWMP Districts

WCDC D.C NA 3 ( in each

district)

1. Technical Expert

Bachelor degree in the fields of agriculture/ horticulture/hydrology/soil engineering and animal husbandry with goog academic records

The candidate should have at least 5 years field / research experience in the fields of soil and water conservation/ forestry/ dry land agriculture/horticulture/ watershed management or related fields like assessment, management and mitigation of drought climatic and other associated risks, crop husbandry, crop specific technology, horticultural practices, livelihoods, animal husbandry etc

Remarks: 1. The committee will advice the district data cell for monitoring and evaluation. 2. The committee will facilitate for preparing of prospective plan 3. The committee will identify voluntary organization

2. Accountant

A serving govt. officer on deputation or a retd. Govt. officer from a finance/ accounts service

5 years experience in related work at reputed firm/organization

3. Data Entry Operator

BSc Hons (Computer Science) or BCA or PGDCA or MCA will be preferred.

2 years experience in field of MIS

(contd.)

11 12

Monthly remuneration/year in each district (in Rs.)

Total Annual budget of Watershed Cell in each district (Rs. In Lakh)

R NR

1. Technical Expert - 25000 / 3 Lakh 2. Accountant - 10000/1.20 Lakh 3. DEO - 7500/0.9 Lakh

5.10 lakh 4.00 lakh

R – Recurring; NR- Non-recurring

*From column no. 2, no. of districts; from column no. 3, no. of executive agencies; from column no. 6, no. of persons working in the executive agencies of watershed programme; from column no.7, total no. of personnel engaged in the watershed cells, from column no. 11 to 13, totals for the State may be indicated at the end of the table. WCDC/ DRDA/Zilla Parishad (ZP)/ State Department (please specify)/ Any other (Please specify) @collector/CEO ZP/ CDO/ DDO/ PD/ Any other (please specify)

Page 9: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

8

II. SELECTION OF WATERSHED PROJECTS

Table-PPR 5: Status of District-wise area covered under the watershed programme* (MIS Table-M (SP) 2)

S. No.

Names of Districts

Total micro-watersheds in the District

Micro-watersheds covered so far Net watersheds to be covered

Dept. of Land Resources Other Ministries/ Depts. Total watersheds covered

Pre-IWMP projects (DPAP +

DDP + IWDP) Any other watershed project

No. Area (Ha.) No. Area (Ha.) No. Area (Ha.) No. Area (Ha.) No. Area (Ha.)

1 PALAMAU 445 4,32,782 42 36,037 0 0 42 36,037 253 3,05,897

Note: As per State Specific Perspective Plan (SPSP) 150 Micro-Watersheds ( Area: 90,848.00 Ha) is not available for treatment due to Urban areas, Habitations,

Mining areas, Water bodies etc.

STATUS OF IWMP PROJECTS SANCTIONED OF PALAMU DISTRICT

S.No District Block Name of Project No. of

Cluster No. of MWS

Treatable Area ( in Ha)

1.

PALAMU

Patan, Bishrampur, Chhatarpur,

Chainpur

PALAMAU-IWMP-

1/2009-10 1 7 5284.34

2. Bisharampur,

Chainpur Palamu-IWMP-2/2010-

11 1 2 4035.40

3. Bisharampur,

Chainpur Palamu-IWMP-3/2010-

11 1 1 3606.70

4 Chhatarpur Palamu-IWMP-4/2011-

12 1 4 6435.23

5 Hussainabad &

Chhatarpur

Palamu-IWMP-5/2013-14

1 6 5446.1339

Grand Total 5 20 24,807.8039

Page 10: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

9

Table-PPR 6: Prioritized list of projects proposed for sanction during the financial year 2015-16

S. No.

District Name of

the project

No. of micro-watersheds proposed to

covered

Proposed project area

(ha)

Type of project

(Hilly/Desert/Others)

Proposed cost (Rs. In

lakh)

Weight age under the criteria

i ii iii iv v vi vii viii ix x xi xii xiii Total

1 PALAMU NABARD 6 5674.4705 OTHERS 1134.8941 7.5 5 5 10 10 0 15 7.5 5 10 5 10 - 90

# Criteria and weight age for selection of watershed

S

No. Criteria Maximum

score Ranges & scores

i Poverty index(%of poor to population)

10 Above 80% (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20% (2.5)

ii % of SC/ST population 10 More than 40% (10) 20 to 40 % (5) Less than 20% (3)

iii Actual wages 5 Actual wages are significantly lower than minimum wages (5)

Actual wages are equal to or higher than minimum wages (0)

iv % of small and marginal farmers 10 More than 80% (10) 50 to 80% (5) Less than 50 (3)

v Ground water status 15 Over exploited (15) Critical (10) Sub critical (5) Safe (0)

vi Moisture index/ DPAP/DDP Block

10 -66.7 & below (10) DDP Block -33.3 to -66.6 (5) DPAP Block 0 to -33.2 (0) Non DPAP/DDP Block

vii Area under assured irrigation 15 Less than 10% (15) 10 to 20% (10) 20 to 30% (5) Above 30% (Reject)

viii Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5) Fully covered (0)

ix Degraded land 15 High – above 20% (15) Medium – 10 to 20 % (10) Low – less than 10 % of TGA (5)

x Productivity potential of the land

10 Lands with low production & where productivity can be significantly enhanced with reasonable efforts (10)

Land with moderate production & where productivity can be enhanced with reasonable efforts (5)

Lands with high production & where productivity can be marginally enhanced with reasonable efforts (0)

xi Contiguity to another watershed that has already been developed/treated

10 Contiguous to previously treated watershed & contiguity within the micro watersheds in the project (10)

Contiguity with in the micro watersheds in the project but non contiguous to previously treated watershed (5)

Neither contiguous to previously treated watershed nor contiguity within the micro watersheds in the project (0)

xii Cluster approach in the plains (more than one contiguous micro-watersheds in the project)

15 Above 6 micro-watersheds in cluster (15)

4 to 6 micro watersheds in cluster (10)

2 to 4 micro watersheds in cluster (5)

xiii Cluster approach in the hills (More than one contiguous micro- watersheds in the project)

15 Above 5 micro-watersheds in cluster (15)

3 to 5 micro watersheds in cluster (10)

2 to 3 micro watersheds in cluster (5)

Total 150 150 90 41 2.5

Page 11: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

10

III. PROJECT WISE PROFILE OF THE SELECTED WATERSHED PROJECT Table – PPR 7: Project at a Glance

1 Name of the State JHARKHAND

2 Name & type# (Hilly/ Desert/ Others) of project OTHERS

3 Name of the District PALAMU

4 Name of the Blocks DALTONGANJ & LESLIGANJ

5 Name of Gram Panchayats AWSANE BASRIA KALA CHANDO CHIANKI JHABER KANKARI KAURIA

LAHLAHE POLPOL KALAN PURNADIH SARJA SOUTH RERMA SOUTH SHAHPUR SUA

6 Names & Census Code of Villages covered SL. NO. VILLAGE NAME CENSUS CODE SL. NO. VILLAGE NAME CENSUS CODE

1 Ausane 00289400 19 Kaleyanpur 00282600

2 Babunebhi 00270400 20 Kauria 00266300

3 Bakhari 00266100 21 Kechki 00289600

4 Bakoia 00268800 22 Kewatbar 00268500

5 Banua alias sala 00268700 23 Kundelwa 00269700

6 Barkinebhi 00269300 24 Madhunebhi 00270300

7 Basaria Kalan 00283600 25 Nauadhonrha 00269600

8 Chak Barewa 00269200 26 Nawadih 00269100

9 Chando 00289200 27 Pirhia 00269500

10 Chianki 00268200 28 Polpol Kalan 00270800

11 Chukru 00266200 29 Polpol Khurd 00270700

12 Duba 00289500 30 Purnadih 00258800

13 Ganke 00268300 31 Rerma 00266600

14 Gorho 00266500 32 Sarja 00269000

15 Hansgara 00283500 33 Shahpur 00282500

16 Hisra alias Pokhraha 00268600 34 Sonpurwa 00268900

17 Hutar 00269400 35 Sua 00266400

18 Jorkat 00268400

7 Names & Census Code of micro- watersheds Sl. No.

Micro-Watershed Code

Geographical Area of the Micro Watershed

Proposed Area to be

treated

Budget (Proposed Area X 0.20) (Rs.in Lakh)

Remarks

1. 2A6B4e2b 840.2188 682.2506 136.45012 Proposed Area to be treated = RF + PF/Other

+Rainfed +Permanent

Pasture +Cultivable Wasteland

2. 2A6B4e2d 1418.9915 1354.0637 270.81274

3. 2A6B4e3a 1218.5658 1037.5917 207.51834

4. 2A6B4e3b 820.1045 662.4299 132.48598

5. 2A6B4e3c 1819.6245 1439.6911 287.93822

6. 2A6B6a1a 560.0321 498.4434 99.68868

GRAND TOTAL 6677.5373 5674.4705 1134.8941

Page 12: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

11

8 Four major reasons for selection of watershed • IAP District ( District is affected by Left Wing Extremist (LWE)

• Lands are un-bonded, un-terraced and undulated topography.

• The area is mostly populated with S.C & S.T

• Non availability of assured irrigation. 9 Area of the Project (ha.) 6677.5373 10 Area proposed to be treated (ha.) 5674.4705 11 Project cost (Rs. In Lakhs) 1134.8941 12 Name & Address of proposed PIA SOIL CONSERVATION DEPARTMENTSOIL CONSERVATION DEPARTMENTSOIL CONSERVATION DEPARTMENTSOIL CONSERVATION DEPARTMENT

PALAMU, JHARKHANDPALAMU, JHARKHANDPALAMU, JHARKHANDPALAMU, JHARKHAND

13 Any other (please specify)

Page 13: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

12

Table – PPR 8: Details of previously identified DPAP /DDP areas proposed under IWMP (ha.) during the financial year 2015-16

Data Source: Jharkhand Space Application Center, Department of IT, Govt. of Jharkhand

1 2 3 4 5 6 7 8 9 10 11 12

S. No.

Names of Districts

Name of the project

proposed Name of Block(s)

Type of District (DPAP/

DDP /IWDP/IAP)

Area of District (ha.)

No. of IWMP projects

sanctioned in the

District

Area of sanctioned

Projects

Net area to be covered

Area of the proposed project

Area proposed to be covered by schemes other than

DoLR

Net balance area

1 PALAMU NABARD DALTONGANJ & LESLIGANJ

IWDP 4,32,782 05 24,807.8039 2,70,150.47 5674.4705 NA 2,64,476.00

Page 14: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

13

Table – PPR 9: Land Use pattern to the project

DISTRICT: PALAMU, BLOCK: DALTONGANJ & LESLIGANJ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro Watershed

Code

Area of the Micro

Watershed

Village Name

Geographical

Area of the

Village

(Full/Part)

Forest

Area (7+8) RF

PF/

Others

Agricultural Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

1 2A6B4e2b 840.2188 Babunebhi 8.7736 0.0000 0.0000 0.0000 8.7736 7.7629 1.0107 0.0000 0.0000 0.0000 7.7629 1.5526

Bakoia 52.9185 6.9352 0.0000 6.9352 34.2414 30.2968 3.9446 0.0000 0.0000 11.7419 37.2320 7.4464

Banua alias sala 7.0924 1.8477 0.0000 1.8477 3.2279 2.8561 0.3719 0.0000 0.0000 2.0167 4.7038 0.7056

Barkinebhi 139.5413 8.4171 0.0000 8.4171 128.2339 116.0004 12.2335 1.1298 1.7605 0.0000 127.3078 25.4616

Chak Barewa 6.3201 0.0000 0.0000 0.0000 3.5399 3.1321 0.4078 0.0000 0.0000 2.7802 3.1321 0.6264

Hisra alias Pokhraha 135.1810 16.8053 0.0000 16.8053 94.1678 84.2519 9.9159 0.0000 0.0000 24.2080 101.0572 15.1586

Hutar 2.1777 0.0984 0.0000 0.0984 2.0794 1.8398 0.2395 0.0000 0.0000 0.0000 1.9382 0.3876

Kewatbar 123.7480 71.8590 0.0000 71.8590 43.9312 38.8703 5.0609 0.0000 0.0000 7.9578 110.7293 22.1459

Madhunebhi 32.2586 0.0000 0.0000 0.0000 32.2586 28.5424 3.7162 0.0000 0.0000 0.0000 28.5424 5.7085

Nauadhonrha 8.9981 0.0000 0.0000 0.0000 8.9981 7.9615 1.0366 0.0000 0.0000 0.0000 7.9615 1.5923

Nawadih 24.3311 0.0000 0.0000 0.0000 22.6148 20.0095 2.6052 0.0000 0.0000 1.7163 20.0095 4.0019

Polpol Kalan 139.7810 27.1832 0.0000 27.1832 98.9331 88.5154 10.4177 0.0000 0.0000 13.6648 115.6986 23.1397

Polpol Khurd 0.1847 0.0000 0.0000 0.0000 0.1847 0.1634 0.0213 0.0000 0.0000 0.0000 0.1634 0.0327

Sarja 131.0353 0.0000 0.0000 0.0000 102.0993 92.3590 9.7403 1.1032 0.0000 27.8328 93.4622 18.6924

Sonpurwa 27.8774 0.0000 0.0000 0.0000 25.4855 22.5496 2.9359 0.0000 0.0000 2.3919 22.5496 4.5099

Total 840.2188 133.1459 0.0000 133.1459 608.7691 545.1112 63.6579 2.2330 1.7605 94.3103 682.2506 136.4501

2 2A6B4e2d 1418.9915 Ganke 224.9035 224.9035 0.0000 224.9035 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 224.9035 44.9807

Hisra alias Pokhraha 6.3100 6.3100 0.0000 6.3100 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.3100 0.9465

Jorkat 6.9389 6.9389 0.0000 6.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.9389 1.3878

Kewatbar 466.8336 455.8378 0.0000 455.8378 2.8042 2.4811 0.3230 0.0000 0.6182 7.5734 458.9371 91.7874

Kundelwa 122.0277 115.7176 0.0000 115.7176 0.0000 0.0000 0.0000 0.0000 3.8820 2.4281 119.5996 23.9199

Pirhia 63.1702 8.3190 0.0000 8.3190 38.8896 34.4095 4.4801 0.0000 3.5012 12.4603 46.2298 9.2460

Purnadih 528.8076 335.5995 0.0000 335.5995 161.7596 146.3277 15.4319 1.1624 8.0552 22.2310 491.1448 98.2290

Total 1418.9915 1153.6262 0.0000 1153.6262 203.4534 183.2184 20.2350 1.1624 16.0567 44.6928 1354.0637 270.8127

3 2A6B4e3a 1218.5658 Ausane 5.1001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1001 0.0000 0.0000

Bakhari 195.1248 36.0148 0.0000 36.0148 108.7418 98.3678 10.3740 1.1098 0.0000 49.2585 135.4924 27.0985

Banua alias sala

34.3203 34.3203 0.0000 34.3203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 34.3203 6.8641

Chando 8.4811 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 8.4811 0.0000 0.0000

Page 15: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

14

DISTRICT: PALAMU, BLOCK: DALTONGANJ & LESLIGANJ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village Name

Geographical

Area of the

Village

(Full/Part)

Forest

Area (7+8) RF

PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

Chukru 157.1298 73.3121 0.0000 73.3121 79.6291 71.2442 8.3849 0.0000 0.0000 4.1885 144.5563 28.9113

Duba 0.2739 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.2739 0.0000 0.0000

Hisra alias Pokhraha 664.8077 396.1700 0.0000 396.1700 232.1265 212.2797 19.8468 2.2345 0.0000 34.2767 610.6842 91.6026

Jorkat 19.6559 16.3107 0.0000 16.3107 3.3452 2.9598 0.3854 0.0000 0.0000 0.0000 19.2705 3.8541

Kauria 105.7574 0.0000 0.0000 0.0000 73.2458 65.5330 7.7128 0.0000 0.0000 32.5116 65.5330 13.1066

Kewatbar 5.9304 5.9304 0.0000 5.9304 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.9304 1.1861

Polpol Kalan 21.9844 20.4237 0.0000 20.4237 1.5607 1.3809 0.1798 0.0000 0.0000 0.0000 21.8046 4.3609

Total 1218.5658 582.4820 0.0000 582.4820 498.6491 451.7654 46.8837 3.3443 0.0000 134.0904 1037.5917 207.5183

4 2A6B4e3b 820.1045 Basaria Kalan 0.2818 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.2818 0.0000 0.0000

Chando 0.1505 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.1505 0.0000 0.0000

Chukru 85.4889 1.1979 0.0000 1.1979 74.1781 66.3672 7.8110 0.0000 0.0000 10.1129 67.5650 13.5130

Hisra alias Pokhraha 4.9904 4.9904 0.0000 4.9904 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.9904 0.7486

Jorkat 185.1634 88.9504 0.0000 88.9504 91.0093 81.4260 9.5833 0.0000 0.0000 5.2037 170.3765 34.0753

Kauria 433.3790 7.2816 0.0000 7.2816 338.5577 309.6110 28.9467 2.9876 11.4703 73.0817 331.3505 66.2701

Kewatbar 60.7912 60.7912 0.0000 60.7912 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 60.7912 12.1582

Sua 49.8594 0.0000 0.0000 0.0000 30.9181 27.3563 3.5618 0.0000 0.0000 18.9413 27.3563 5.4713

Total 820.1045 163.2115 0.0000 163.2115 534.6632 484.7606 49.9027 2.9876 11.4703 107.7719 662.4299 132.4860

5 2A6B4e3c 1819.6245 Basaria Kalan 0.2920 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.2920 0.0000 0.0000

Chianki 425.4026 3.5942 0.0000 3.5942 408.0390 373.1517 34.8873 2.9876 0.0000 10.7817 379.7335 75.9467

Ganke 150.9810 115.3916 0.0000 115.3916 35.5894 31.4895 4.0999 0.0000 0.0000 0.0000 146.8811 29.3762

Gorho 124.2975 0.0000 0.0000 0.0000 65.4327 58.5426 6.8901 0.0000 0.0000 58.8648 58.5426 11.7085

Hansgara 0.0273 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0273 0.0000 0.0000

Jorkat 217.7611 151.9711 0.0000 151.9711 65.7900 58.8623 6.9277 0.0000 0.0000 0.0000 210.8334 42.1667

Kaleyanpur 1.6830 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.6830 0.0000 0.0000

Kauria 80.6273 0.0000 0.0000 0.0000 76.8129 68.7245 8.0884 0.0000 0.0000 3.8145 68.7245 13.7449

Kewatbar 21.5809 21.5809 0.0000 21.5809 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 21.5809 4.3162

Rerma 161.1326 0.0000 0.0000 0.0000 122.7812 111.0679 11.7133 1.1234 0.0000 37.2280 112.1913 22.4383

Shahpur 3.5234 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3.5234 0.0000 0.0000

Sua 632.3159 0.0000 0.0000 0.0000 479.1867 438.2162 40.9705 2.9876 0.0000 150.1416 441.2038 88.2408

Total 1819.6245 292.5379 0.0000 292.5379 1253.6318 1140.0547 113.5772 7.0986 0.0000 266.3562 1439.6911 287.9382

Page 16: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

15

DISTRICT: PALAMU, BLOCK: DALTONGANJ & LESLIGANJ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village Name

Geographical

Area of the

Village

(Full/Part)

Forest

Area (7+8) RF

PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

6 2A6B6a1a 560.0321 Ausane 4.6396 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.6396 0.0000 0.0000

Bakoia 2.9120 2.9120 0.0000 2.9120 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.9120 0.5824

Banua alias sala 120.4664 50.5305 7.2437 43.2868 65.7136 58.7940 6.9196 0.0000 0.0000 4.2223 109.3245 16.3987

Hisra alias Pokhraha 11.3654 6.1986 0.0000 6.1986 3.2930 2.9137 0.3794 0.0000 0.0000 1.8737 9.1123 1.3668

Kechki 2.3225 0.0014 0.0000 0.0014 0.0000 0.0000 0.0000 0.0000 0.0000 2.3210 0.0014 0.0003

Polpol Kalan 418.3263 348.1930 0.0000 348.1930 32.6629 28.9001 3.7628 0.0000 0.0000 37.4704 377.0931 75.4186

Total 560.0321 407.8356 7.2437 400.5918 101.6696 90.6078 11.0618 0.0000 0.0000 50.5270 498.4434 99.6887

Grand Total 6677.5373 2732.8391 7.2437 2725.5954 3200.8362 2895.5180 305.3182 16.8259 29.2875 697.7486 5674.4705 1134.8941

Data Source: Jharkhand Space Application Center, Department of IT, Govt. of Jharkhand

Page 17: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

16

IV. AGRO–CLIMATIC CONDITION Briefly describe the agro- climatic condition of project area including the Agro-climatic zone of project area, soil types, rainfall, major crops, etc.

Table – PPR 10: Details of Agro – climatic condition

1 2 3 4 5 6 7 8 9

S. No.

Name of the Project

Name of the Agro-climatic zone

covers project area Area in ha

Names of the villages

Major soil types Topography

Average rainfall in mm (preceding 5

years average)

Major crops

a) Type b) Area in ha a) Name b) Area in

ha

1 NABARD

Central and North Eastern Platue (Sub-

Zone IV)

6677.5373 Detailed

enclosed in Table-PPR-7

Sandy, Sandy loam Red

laterite soil

6677.5373 Undulating moderate to steep Slope

1035

Paddy 2300

Wheat 275

Pulses 125

Vegetables 120

TOTAL 2820

Table-PPR 11: Details of flood and drought in the project area

1 2 3 4 5

Sl. No. Particulars Villages Periodicity

Not affected Annual Any other (please specify)

1 Flood No. of villages NA NA NA

Name(s) of villages

2 Drought No. of villages 35

Name(s) of villages Detailed enclosed in

Table-PPR 7 Drought prone Area affected by severe

scarcity in rain fall annually Rain shadow area

Page 18: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

17

Table-PPR 12: Details of soil erosion in the project area

1 2 3 4 5

Cause Type of erosion Area affected (ha) Run off

(mm/ year) Average soil loss (Tones/ ha/ year)

Water erosion a Sheet 875

1025 48.25 b Rill 190 c Gully 105

Sub-Total 1170

Wind erosion

Total 1170 1025

Page 19: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

18

V. DEMOGRAPHY AND LAND DISTRIBUTION

Growth in population during the last three census’, per capita availability of land, sex ratio, population age group in the project area, literacy level, migration, workforce available in different sectors of the economy, demography of SC, ST, BPL and landless families in the project area in the last ten years, etc.

Demography and Land Distribution

Population

Sl. No.

Name of Village No. of HH

Total Male Female SC ST Others Sex Ratio Total Male Female Total Male Female

1. Ausane 552 3573 1845 1728 674 349 325 897 444 453 2002

929

2. Babunebhi 0 0 0 0 0 0 0 0 0 0 0

3. Bakhari 142 897 474 423 366 190 176 426 226 200 105

4. Bakoia 64 339 178 161 201 104 97 11 6 5 127

5. Banua alias sala 98 512 262 250 122 61 61 207 106 101 183

6. Barkinebhi 145 680 353 327 571 297 274 20 11 9 89

7. Basaria Kalan 317 1763 900 863 613 302 311 750 390 360 400

8. Chak Barewa 89 462 240 222 145 77 68 28 19 9 289

9. Chando 854 4967 2525 2442 914 464 450 2016 1023 993 2037

10. Chianki 1113 7055 3584 3471 1799 873 926 3022 1548 1474 2234

11. Chukru 115 600 305 295 27 14 13 489 245 244 84

12. Duba 88 667 358 309 0 0 0 0 0 0 667

13. Ganke 72 400 209 191 7 4 3 343 177 166 50

14. Gorho 31 161 80 81 55 29 26 41 16 25 65

15. Hansgara 0 0 0 0 0 0 0 0 0 0 0

16. Hisra alias Pokhraha 247 1313 677 636 336 168 168 406 219 187 571

17. Hutar 32 210 115 95 80 46 34 7 5 2 123

18. Jorkat 120 709 364 345 0 0 0 556 291 265 153

19. Kaleyanpur 205 1066 521 545 0 0 0 0 0 0 1066

20. Kauria 260 1680 885 795 487 259 228 155 78 77 1038

21. Kechki 0 0 0 0 0 0 0 0 0 0 0

22. Kewatbar 106 532 302 230 222 131 91 48 31 17 262

23. Kundelwa 402 2255 1153 1102 74 39 35 1775 906 869 406

24. Madhunebhi 26 143 74 69 6 2 4 18 9 9 119

25. Nauadhonrha 79 501 245 256 101 56 45 221 98 123 179

26. Nawadih 86 643 342 301 70 38 32 0 0 0 573

27. Pirhia 93 584 294 290 6 2 4 530 260 270 48

28. Polpol Kalan 456 2632 1354 1278 168 90 78 726 374 352 1738

29. Polpol Khurd 28 153 81 72 41 24 17 4 2 2 108

30. Purnadih 23 107 56 51 107 56 51 0 0 0 0

Page 20: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

19

Demography and Land Distribution

Population

Sl. No.

Name of Village No. of HH

Total Male Female SC ST Others Sex Ratio Total Male Female Total Male Female

31. Rerma 1521 9330 4901 4429 1314 680 634 231 75 156 7785

32. Sarja 352 1964 971 993 685 339 346 69 35 34 1210

33. Shahpur 645 4081 2071 2010 1055 554 501 196 93 103 2830

34. Sonpurwa 270 1769 907 862 281 151 130 0 0 0 1488

35. Sua 941 5568 2883 2685 590 300 290 2785 1438 1347 2193

GRAND TOTAL 9572 57316 29509 27807 11117 5699 5418 15977 8125 7852 30222 929

Source: Census of India

Page 21: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

20

VI. LIVELIHOODS Briefly describe the existing livelihoods, raw material available, possible livelihood interventions, scope for capacity building etc. in the project area

1 2 3 4 5 6

S. No.

Names of the villages

Existing livelihood activities Possible livelihood interventions under the

project

Current status of migration (No. of

people) Main reasons for migration

1. Detailed

enclosed in PPR-7

• Agriculture: Kharif and Rabi

• Wage labour

• Non- Timber Forest Produce (NTFP)

• Agriculture (High Value cash crop & increase in productivity of Food crop)

• Lac

• Entrepreneur development

• Horticulture

• Wage generation in INRM infrastructure creation.

1100

Acute poverty in the area and rain-fed agriculture, mono-crop pattern of agriculture which ensure just 5-6 months average food sufficiency forced the villagers to migrate from their villages in off agriculture seasons to the near by places in cement factories, rice mills, brick

factories and

Page 22: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

21

VII. EXPECTED PROJECT OUTCOMES

VII. (i). Expected employment related outcomes:

Table – PPR 14: Employment Generation

Sl. No.

Name of Village

Man days Wage employment Self employment

No. of man days No. of Beneficiaries No. of Beneficiaries

SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total

1 Ausane 1685 2243 5005 4320 13253 270 359 801 691 2120 236 314 701 605 1855

2 Babunebhi 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Bakhari 915 1065 263 1058 3300 146 170 42 169 528 128 149 37 148 462

4 Bakoia 503 28 318 403 1250 80 4 51 64 200 70 4 44 56 175

5 Banua alias sala 305 518 458 625 1905 49 83 73 100 305 43 72 64 88 267

6 Barkinebhi 1428 50 223 818 2518 228 8 36 131 403 200 7 31 114 352

7 Basaria Kalan 1533 1875 1000 2158 6565 245 300 160 345 1050 215 263 140 302 919

8 Chak Barewa 363 70 723 555 1710 58 11 116 89 274 51 10 101 78 239

9 Chando 2285 5040 5093 6105 18523 366 806 815 977 2964 320 706 713 855 2593

10 Chianki 4498 7555 5585 8678 26315 720 1209 894 1388 4210 630 1058 782 1215 3684

11 Chukru 68 1223 210 738 2238 11 196 34 118 358 9 171 29 103 313

12 Duba 0 0 1668 773 2440 0 0 267 124 390 0 0 233 108 342

13 Ganke 18 858 125 478 1478 3 137 20 76 236 2 120 18 67 207

14 Gorho 138 103 163 203 605 22 16 26 32 97 19 14 23 28 85

15 Hansgara 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 Hisra alias Pokhraha

840 1015 1428 1590 4873 134 162 228 254 780 118 142 200 223 682

17 Hutar 200 18 308 238 763 32 3 49 38 122 28 2 43 33 107

18 Jorkat 0 1390 383 863 2635 0 222 61 138 422 0 195 54 121 369

19 Kaleyanpur 0 0 2665 1363 4028 0 0 426 218 644 0 0 373 191 564

20 Kauria 1218 388 2595 1988 6188 195 62 415 318 990 170 54 363 278 866

21 Kechki 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

22 Kewatbar 555 120 655 575 1905 89 19 105 92 305 78 17 92 81 267

23 Kundelwa 185 4438 1015 2755 8393 30 710 162 441 1343 26 621 142 386 1175

24 Madhunebhi 15 45 298 173 530 2 7 48 28 85 2 6 42 24 74

25 Nauadhonrha 253 553 448 640 1893 40 88 72 102 303 35 77 63 90 265

26 Nawadih 175 0 1433 753 2360 28 0 229 120 378 25 0 201 105 330

27 Pirhia 15 1325 120 725 2185 2 212 19 116 350 2 186 17 102 306

28 Polpol Kalan 420 1815 4345 3195 9775 67 290 695 511 1564 59 254 608 447 1369

29 Polpol Khurd 103 10 270 180 563 16 2 43 29 90 14 1 38 25 79

Page 23: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

22

Sl. No.

Name of Village

Man days Wage employment Self employment

No. of man days No. of Beneficiaries No. of Beneficiaries

SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total

30 Purnadih 268 0 0 128 395 43 0 0 20 63 37 0 0 18 55

31 Rerma 3285 578 19463 11073 34398 526 92 3114 1772 5504 460 81 2725 1550 4816

32 Sarja 1713 173 3025 2483 7393 274 28 484 397 1183 240 24 424 348 1035

33 Shahpur 2638 490 7075 5025 15228 422 78 1132 804 2436 369 69 991 704 2132

34 Sonpurwa 703 0 3720 2155 6578 112 0 595 345 1052 98 0 521 302 921

35 Sua 1475 6963 5483 6713 20633 236 1114 877 1074 3301 207 975 768 940 2889

27800 39949 75563 69527 212816 4446 6388 12089 11121 34050 3891 5592 10581 9735 29794

Page 24: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

23

Table – PPR 15: Details of migration from project area

SI.

No Name of Village No of persons migrating

No of days per year of

Migration Major reason(s) for Migrating

Expected reduction no of

person in Migration

1 2 3 4 5

6

1 Detailed enclosed in

PPR-7 1100 70 days -125 days

Acute poverty in the area and rain-fed agriculture, mono-crop

pattern of agriculture which ensure just 5-6 months average

food sufficiency forced the villagers to migrate from their

villages in off agriculture seasons to the near by places in

cement factories, rice mills, brick factories and

900

Page 25: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

24

VII. (ii). Water related outcomes: Table – PPR 16: Details of average ground water table depth in the project areas (in meters)

1 2 3 4 5 6

Sl. No. Names of villages Sources Pre – Project level Expected post – project level Remarks

1. Detailed

enclosed in Table PPR-7

Open wells 16-18 M 12-14 M Over

exploitation of

ground water

resources

Bore wells 75-95 M 65-75 M

Others (Pond+ Check Dam) - -

Table – PPR 17: Status of Drinking water*

1 2 3 4 5

S. No. Names of the Villages Availability of drinking water (no. of months in a year) Quality of drinking water

Comments Pre- project Expected Post - Project Pre- project Expected Post - Project

1. Detailed enclosed in

Table PPR-7 9

Months 12 Months

Contaminated water .

.

Fresh drinking water

Filtered drinking water by

using bleaching

powder, mini filtration devices

attached with bore wells

Page 26: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

25

VII. (i). Expected employment related outcomes:

Table-PPR 18: Major crops grown and their productivity in the project area

1 2 3 4

S. No. Name of the Crop Current status Expected post project status

Area (ha.) Productivity (kg/ ha.) Area (ha.) Productivity (kg/ ha.)

Kharif Paddy

2300 2200 2500 2600

Rabi

Wheat

Pulses Vegetables

275

125 120

1800

1500 1000

320

165 155

2200

2500 1500

Zaid / other season Potato

85

1800 135 2600

Page 27: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

26

VIII: MANDATORY CERTIFICATION “It is certified that the State Government of Jharkhand will abide by the following mandatory conditions laid down by DoLR”

1 The area of the proposed projects are not covered under assured irrigation

2 The area of the proposed project is not covered or overlapping with any other watershed projects sanctioned by the central govt./ state govt./ autonomous bodies & others

3 The State must sign all the mandatory MoUs before implementing the project

4 The timeframes and milestones of the projects will be followed

5 The Budget requested for must follow the criteria laid down in the Common Guidelines, 2008

6 The State must release matching State Share within 15 days from release of each installment of central funds

7 Purchase of vehicles and other equipments are not permitted and nor is construction of buildings allowed. Only purchase of computers and related software is permitted

8 Savings, if any, in each component of the project cost can be utilized only for activities in the Watershed works

9 The WCDC will have one Member exclusively responsible for monitoring

10 All works will be evaluated after each phase of completion. Fund release will depend on favourable reports received from evaluators

11 Evaluators must include only institutions and agencies and not individuals

12 The State and DRDA cell will furnish monitoring reports and periodical reports as desired by DoLR

13 Composition of the WDT must be clearly spelt out and the team Members must be fully in place at the time of signing of the MoU of contract between the PIA and DRDA Cell

14 That DRDA shall release the funds to the PIAs and the watershed committees within 15 days of receipt of the funds

15 The Watershed Committee must be a registered society under the Societies Registration Act, 1860

16 At least one of the WDT Members must be a woman

17 The Gram Sabhas of the proposed project areas have passed resolutions for people’s contribution towards WDF

18 Resource-use agreements on the principles of equity and sustainability must be worked out among the User Groups prior to the concerned work being undertaken

19 The DPR must give detailed justification for the proposed project duration

20 No works on private lands will be repaired/ maintained from the WDF 21 The PIA will start project work within three months of the receipt of first installment by DWDU/agency or else

it can come under the purview of foreclosure

Page 28: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

27

22 The State will not undertake unnecessary foreclosure of the projects. In the event of foreclosure, the State will refund the amount and furnish all necessary documents as desired by DoLR. The State shall also take administrative and legal action against any defalcation, misappropriation, mis-utilization, deliberate negligence and laxity which has caused foreclosure of the project.

Date:

Signature of officer authorized by State Govt.* NAME OF OFFICER (IN CAPITAL LETTERS)

DESIGNATION

Page 29: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

28

IX. STATUS OF ON-GOING PROJECTS (DPAP/ DDP/ IWDP) Table- PPR 19: Details of pending UCs: Statewise

1 2 3 4 5 6 7 8 9 10 11

S. No. District Project Instal-

ment no.

Financial year of

release of fund

Amount released (Rs. in lakh)

Amount utilized (Rs.in lakhs)

Submission of UC Date of submission of

UC Reasons for not submitting/ delayed submission of UC

Pending UCs

Due date

Amount (Rs. in lakhs)

Date Amount (Rs.

in lakhs) Period

Amount (Rs. in lakhs)

1 PALAMU IWMP NA

Table- PPR 20: Details of Unspent balance as on

1 2 3 4 5 6

S. No. District Name of the

Project Total cost (Rs. in lakh)

Total funds released (Rs. in lakh) Unspent balance

(Rs. in lakhs) DoLR State

1 PALAMU IWMP NA

Page 30: PRELIMINARY PROJECT REPORT (PPR) - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/PALAMU-NABAR… · PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT ... rural

29

X. ABSTRACT OF PROJECTS PROPOSED FOR SANCTION DURING FINANCIAL YEAR 2015-16

1 Number of districts to be covered under the present proposal

1

2 No. of Watersheds projects proposed to be taken up under NABARD

Hilly/Desert Others 4

3 Total area to be covered under proposed projects (in ha) (a) Hilly & Desert

areas#

(b) Others Total

6677.5373

4 Area to be treated (in ha) 5674.4705

5 Total cost of the proposed Watershed projects (Rs. in lakhs)

(a) Hilly & Desert areas#

(c) Others Total

1134.8941 Lakhs

6 First installment required from central funds for the proposed watershed projects

226.9788 Lakhs