PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) NATIONAL BANK FOR AGRICULTURE AND RURAL NATIONAL BANK FOR AGRICULTURE AND RURAL NATIONAL BANK FOR AGRICULTURE AND RURAL NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT DEVELOPMENT DEVELOPMENT DEVELOPMENT (NABARD) (NABARD) (NABARD) (NABARD) BLOCK: BLOCK: BLOCK: BLOCK: DHALBHUMGARH DHALBHUMGARH DHALBHUMGARH DHALBHUMGARH & & & & CHAKULIYA CHAKULIYA CHAKULIYA CHAKULIYA DISTRICT: DISTRICT: DISTRICT: DISTRICT: EAST SINGHBHOOM EAST SINGHBHOOM EAST SINGHBHOOM EAST SINGHBHOOM PIA PIA PIA PIA KALAMANDIR KALAMANDIR KALAMANDIR KALAMANDIR PURBI PURBI PURBI PURBI SINGHBHOOM SINGHBHOOM SINGHBHOOM SINGHBHOOM, JHARKHAND , JHARKHAND , JHARKHAND , JHARKHAND NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: PURBI SINGHBHUM PURBI SINGHBHUM PURBI SINGHBHUM PURBI SINGHBHUM- - -NABARD NABARD NABARD NABARD- - -2 2 2/ / /201 201 201 2015 5 5- - -1 1 16 6 6 SUBMITTED TO SUBMITTED TO SUBMITTED TO SUBMITTED TO NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT, RANCHI , RANCHI , RANCHI , RANCHI STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY- - - JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT 4 4 4 TH TH TH TH FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI- - - 834004 834004 834004 834004 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 - - - 651 651 651 651- - -2401974, 244621 2401974, 244621 2401974, 244621 2401974, 2446217, 2446019 7, 2446019 7, 2446019 7, 2446019 E E E- - -MAIL : MAIL : MAIL : MAIL : [email protected], WEB SITE: WEB SITE: WEB SITE: WEB SITE: www.jswm.nic.in

Upload: ngothu

Post on 11-Feb-2017

283 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)

NATIONAL BANK FOR AGRICULTURE AND RURAL NATIONAL BANK FOR AGRICULTURE AND RURAL NATIONAL BANK FOR AGRICULTURE AND RURAL NATIONAL BANK FOR AGRICULTURE AND RURAL

DEVELOPMENTDEVELOPMENTDEVELOPMENTDEVELOPMENT (NABARD)(NABARD)(NABARD)(NABARD)

BLOCK: BLOCK: BLOCK: BLOCK: DHALBHUMGARHDHALBHUMGARHDHALBHUMGARHDHALBHUMGARH & & & & CHAKULIYACHAKULIYACHAKULIYACHAKULIYA

DISTRICT: DISTRICT: DISTRICT: DISTRICT: EAST SINGHBHOOMEAST SINGHBHOOMEAST SINGHBHOOMEAST SINGHBHOOM

PIAPIAPIAPIA

KALAMANDIRKALAMANDIRKALAMANDIRKALAMANDIR

PURBIPURBIPURBIPURBI SINGHBHOOMSINGHBHOOMSINGHBHOOMSINGHBHOOM, JHARKHAND, JHARKHAND, JHARKHAND, JHARKHAND

NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: PURBI SINGHBHUMPURBI SINGHBHUMPURBI SINGHBHUMPURBI SINGHBHUM----NABARDNABARDNABARDNABARD----2222////2012012012015555----11116666

SUBMITTED TOSUBMITTED TOSUBMITTED TOSUBMITTED TO

NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTNATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTNATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTNATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT, RANCHI, RANCHI, RANCHI, RANCHI

STATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCY---- JHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSION

DEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENT

4444THTHTHTH FLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHI---- 834004834004834004834004

TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 ---- 651651651651----2401974, 2446212401974, 2446212401974, 2446212401974, 2446217, 24460197, 24460197, 24460197, 2446019

EEEE----MAIL : MAIL : MAIL : MAIL : [email protected], WEB SITE:WEB SITE:WEB SITE:WEB SITE: www.jswm.nic.in

Page 2: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

1

PURBI SINGHBHOOM-NABARD-2/2015-16

Page 3: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

2

Format for Preliminary Project Report (PPR)

I. Institutional Structures.

I. A. State Level Nodal Agencies

I. B. District Level Watershed Units

II. Selection of Watershed Projects

III. Profile of the each selected watershed project

IV. Agro-climatic condition of project area.

V. Demography & land distribution

VI. Livelihoods

VII. Expected project out comes

VIII. Mandatory certificates

IX. Status of on-going projects

X. Abstract of project proposed for sanction

Page 4: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

3

I. Institutional Structures

I. A. State Level Nodal Agencies (SLNAs):

Table-PPR 1: Details of SLNA

1 2 3 4 5 6

Sl.No. State Type of SLNA# Date of Notification Date of MoU with

DoLR Total no. of members of SLNA

1 Jharkhand

Jharkhand state Watershed Mission (No. 103/2009-10 dated 17/7/2009, Registered Under society registration Act 21 of 1860, )

4673 Dated 20-06-09

Under Process 19 including (CEO)

Whether it is a Department /Mission/ Society/Authority/Others (pl. specify) Society (contd.)

Table-PPR 1: Details of SLNA (Contd.)

7 8

Chairperson CEO

Name Designation Name Designation Date of

Appointment

Nature of appointment

Tenure (No. of Years)

Contact Ph. No./Fax/E-Mail

Governing Body:

Mr. SUDHIR PRASAD, IAS

Development Commissioner Mr B

Nijalingappa, IFS

Chief Executive Officer

State Level Nodal Agency-Jharkhand State Watershed

Mission Rural Development Department

Govt. of Jharkhand

Vide notification no. 887 dated

22-02-2010

On deputation 3 Years

0651-2401974

[email protected],

[email protected]

Executive Committee-

Mr. ARUN, IAS

Secretary, Rural

Development # APC/ ACS/ Dev. Commissioner/ Others (pl. specify) $ Deputation/ Contract

Page 5: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

4

Table - PPR 2: Details of functionaries in the JSWM-SLNA

Details of the persons engaged in the SLNA- Jharkhand State Watershed Mission funded by DoLR

Sl.No Name &

Designation

Monthly

remuneration

Date of

Appointment

Nature of

appointment

Tenure

(No. of years)

Contract Ph. No. /

E-mail

Subject of

Expertise

Qualification Experience Role

1.

Shri Madan

Sengupta

Administrative Officer

40,000 26-05-2010 On Contract 1 Yr. 9431114862

[email protected]

Law &

Administration

M.Sc. (Geology),

LLB.

About 32 Years

experience.

Administration, Supervision, EC

/GB Meetings organisations etc.

2.

Shri. Narayan

Kumar Mishra Technical Expert

(Agriculture /Agril. Engineering)

50,000 29

th May,

2010 On contract 1 Yr.

9431574367,

[email protected]

Watershed Management, Soil

and Water

Conservation, GIS & Remote

Sensing

Master of

Engineering (Ag), B Tech

(Agril.

Engineering). PGDRD, NET,

GATE

12years of

relevant experiences in

watershed mgt. and

development, agriculture dev., rural and social

dev.,

To give the

technical assistance &

Monitoring & evaluation of the

projects.

3.

Shri. Anupam

Bharti Technical Expert

(Livelihood)

50,000 29.05.10 On Contract 1 Yr.

9308351370

[email protected],

Horticulture, Rural development

M Sc (horticulture)

10 years of

relevant

experience in agriculture, rural dev.,

horticulture,

marketing, retail

To give the

technical

assistance & Monitoring &

evaluation of the projects.

4.

Shri. Kaushlendra

Kumar

Techninical Expert in Capacity Building

(Water Management)

50,000 29.05.2010 On contract 1 Yr. 9431071292

[email protected]

Soil & Water Conservation and

Watershed managemrnt

B Tech (Agricultural

Engineering ), M Tech in

Agricultural

Engineering (Soil and

Water Conservation)

and PGDRD

12 years of working

experiences in watershed

management,

soil and water conservation,

rural development

and GIS

To give the

technical assistance &

Monitoring & evaluation of the

projects

5.

Shri. Lakhan Lal

Mahato GIS Expert

40,000 29-05-2010 On Contract 1 Yr. 9470335956

[email protected] GIS & Remote

Sensing

M.Tech (Remote

Sensing)

14 years In the field of

GIS and

Remote Sensing

GIS, RS and Geodatabase

management

6. Smt. Jyoti Pushpa

Finance Officer 40,000 24.08.2010 On Contract 1 Yr.

9905582591 [email protected]

Accountancy CA 13 Years Finance Management

7.

Smt. Pratibha

Kumari

Accounts Officer

35,000 15.09.2010 On Contract 1 Yr. [email protected]

m Finance

M Com, MBA in Finance

5 Yrs 6 Months

Accounts Management

8. Smt. Shyama,

Account Assistant 25,000 1

st June 2010 On Contract 1 Yr. 9472018349 Finance

M Com, MBA in Finance

8 years Accounting

9. Shri. Ajeet Kumar

Ravi 25,000

26th May,

2010 On Contract 1 Yr.

9471764888/ [email protected]

Accounts M.com

(Finance), 7 years

Accounting, Auditing,

Page 6: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

5

Details of the persons engaged in the SLNA- Jharkhand State Watershed Mission funded by DoLR

Sl.No Name &

Designation

Monthly

remuneration

Date of

Appointment

Nature of

appointment

Tenure

(No. of years)

Contract Ph. No. /

E-mail

Subject of

Expertise

Qualification Experience Role

Account Assistant B Com (Account

Hons)

Taxation etc

10. Shri. Vipul Akash

Programmer 25,000

25th February,

2014 On Contract 1 Yr.

9472741901 /

[email protected] MIS Expert MCA 5 years

MIS Expert, On

line MIS Entry

11.

Shri. Amrendra

Kumar DEO-cum-Assistant

15,000 29-05-2010 On Contract 1 Yr. 9431184303 /

[email protected] Database Admin. MCA About 7 Years

File dispatch and

receipt

12. Tulsi Ram

DEO-cum-Assistant 15,000

13th June,

2012 On Contract 1 Yr. [email protected] computer operator BCA 8 years

Data Entry & Assistant

13. Promod Rajak

DEO-cum-Assistant 15,000 8

th June, 2012 On Contract 1 Yr.

8539809046 [email protected]

computer operator MCA 6 years Data Entry &

Website

maintance

14. Md. M.H.Imam

DEO-cum-Assistant 15,000 6

th June, 2012 On Contract 1 Yr.

9304334055

[email protected] computer operator

M.Sc (IT),

MBA 9 Years

Data Entry &

Assistant

Note: 1. Total outlay per Month for 12 SLNA-JSWM staffs under IWMP is Rs. 4.40 Lakhs

R – Recurring; NR- Non-recurring

* From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.

Page 7: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

6

Table PPR-3: Details of State Level Data Cell (SLDC) functionaries

1 2 3 4 5 6 7 8 9

S.

No

Total no.

of the

persons

working

in the

SLNA for

IWMP

Name & Designation Qualification Experienc

e

Work allocation Monthly

remuner

ation

(Rs.)

Total budget of

SLDC

(Rs. In Lakh)

Funding expected

from DoLR

(Rs. In Lakh)

R NR R NR

1 1 Shri. Vinod Kumar. V. H, Project Co-ordinator

M Tech (Water Resources)

6 years Creation and updation of Geodatabase under IWMP Project using satellite data

30,000.00

2 1 Shri. Anuj Shankar, MIS State Coordinator

MCA 4 years Updation of all the thematic layer using MIS Software development

15000.00

3 3 Shri. Abdul Saqoor, Field Supervisor

M Sc (IT) 5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

4 Vishal Kumar Field Supervisor

B Sc (Fisheries), MBA, Rural Management

5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

5 Ratnesh Kumar Sharma Field Supervisor

M Sc (Math), Advance Diploma in Computer Application

6 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

Total 5 65,000.00

Note- 1. Payment of above experts / staffs is being paid by state budget of JSAC 2. SLDC has been established at JSAC. However it is planning to establish SLDC in the office of JSWM. R – Recurring; NR- Non-recurring

* From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.

Page 8: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

7

I. B. District Level Watershed Units Table-PPR 4: Details of functionaries in the DRDA Watershed Cell*

S. No.

Name of the

District

Name of the

executing Agency#

Status of Chairman

@

Date of signing of MoU

with SLNA

Total no. of persons

working for Watershed programme

Names & Designation

Qualification Experience Work allocation

24

IWMP Districts

WCDC D.C NA 3 ( in each

district)

1. Technical Expert

Bachelor degree in the fields of agriculture/ horticulture/hydrology/soil engineering and animal husbandry with goog academic records

The candidate should have at least 5 years field / research experience in the fields of soil and water conservation/ forestry/ dry land agriculture/horticulture/ watershed management or related fields like assessment, management and mitigation of drought climatic and other associated risks, crop husbandry, crop specific technology, horticultural practices, livelihoods, animal husbandry etc

Remarks: 1. The committee will advice the district data cell for monitoring and evaluation. 2. The committee will facilitate for preparing of prospective plan 3. The committee will identify voluntary organization

2. Accountant

A serving govt. officer on deputation or a retd. Govt. officer from a finance/ accounts service

5 years experience in related work at reputed firm/organization

3. Data Entry Operator

BSc Hons (Computer Science) or BCA or PGDCA or MCA will be preferred.

2 years experience in field of MIS

(contd.)

11 12

Monthly remuneration/year in each district (in Rs.)

Total Annual budget of Watershed Cell in each district (Rs. In Lakh)

R NR

1. Technical Expert - 25000 / 3 Lakh 2. Accountant - 10000/1.20 Lakh 3. DEO - 7500/0.9 Lakh

5.10 lakh 4.00 lakh

R – Recurring; NR- Non-recurring

*From column no. 2, no. of districts; from column no. 3, no. of executive agencies; from column no. 6, no. of persons working in the executive agencies of watershed programme; from column no.7, total no. of personnel engaged in the watershed cells, from column no. 11 to 13, totals for the State may be indicated at the end of the table. WCDC/ DRDA/Zilla Parishad (ZP)/ State Department (please specify)/ Any other (Please specify) @collector/CEO ZP/ CDO/ DDO/ PD/ Any other (please specify)

Page 9: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

8

II. SELECTION OF WATERSHED PROJECTS

Table-PPR 5: Status of District-wise area covered under the watershed programme* (MIS Table-M (SP) 2)

S. No.

Names of Districts Total micro-watersheds in the

District

Micro-watersheds covered so far Net watersheds to be covered

Dept. of Land Resources Other Ministries/ Depts. Total watersheds covered

Pre-IWMP projects (DPAP +

DDP + IWDP) Any other watershed project

No. Area (Ha.) No. Area (Ha.) No. Area (Ha.) No. Area (Ha.) No. Area (Ha.)

1 EAST

SINGHBHOOM

388 3,53,104 24 20280 11 8129 35 28409 335 315565

Note: As per State Specific Perspective Plan (SPSP) 18 Micro-Watersheds ( Area: 9130.00 Ha) is not available for treatment due to Urban areas, Habitations, Mining

areas, Water bodies etc.

STATUS OF IWMP PROJECTS SANCTIONED OF EAST SINGHBHOOM DISTRICT

S.No District Block Name of Project No. of

Cluster No. of MWS

Treatable Area ( in Ha)

1.

EAST SINGHBHOOM

Bahragora Purbi

Singhbhum-IWMP-1/2009-10

1 6 3955.29

2. Dumaria Purbi

Singhbhum-IWMP-2/2009-10

1 9 6331.21

3. Potka Purbi

Singhbhum-IWMP-3/2010-11

1 7 4963.79

4. Potka Purbi

Singhbhum-IWMP-4/2011-12

1 6 4277.01

5. Boram & Patamda

Purbi Singhbhum-

IWMP-5/2013-14

1 8 5675.5229

Grand Total 5 36 25,202.8229

Page 10: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

9

Table-PPR 6: Prioritized list of projects proposed for sanction during the financial year 2015-16

S. No.

District Name of

the project

No. of micro-watersheds proposed to

covered

Proposed project area

(ha)

Type of project

(Hilly/Desert/Others)

Proposed cost (Rs. In

lakh)

Weight age under the criteria

i ii iii iv v vi vii viii ix x xi xii xiii Total

1. E.SINGHB

HOOM NABARD 6 5513.3693 OTHERS 1102.6739 10 10 5 10 10 0 15 7.5 10 10 5 10 - 102.5

# Criteria and weight age for selection of watershed

S No.

Criteria Maximum score

Ranges & scores

i Poverty index(%of poor to population)

10 Above 80% (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20% (2.5)

ii % of SC/ST population 10 More than 40% (10) 20 to 40 % (5) Less than 20% (3)

iii Actual wages 5 Actual wages are significantly lower than minimum wages (5)

Actual wages are equal to or higher than minimum wages (0)

iv % of small and marginal farmers

10 More than 80% (10) 50 to 80% (5) Less than 50 (3)

v Ground water status 15 Over exploited (15) Critical (10) Sub critical (5) Safe (0)

vi Moisture index/ DPAP/DDP Block

10 -66.7 & below (10) DDP Block

-33.3 to -66.6 (5) DPAP Block 0 to -33.2 (0) Non DPAP/DDP Block

vii Area under assured irrigation

15 Less than 10% (15) 10 to 20% (10) 20 to 30% (5) Above 30% (Reject)

viii Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5) Fully covered (0)

ix Degraded land 15 High – above 20% (15) Medium – 10 to 20 % (10) Low – less than 10 % of TGA (5)

x Productivity potential of the land

10 Lands with low production & where productivity can be

significantly enhanced with reasonable efforts (10)

Land with moderate production & where productivity can be

enhanced with reasonable efforts (5)

Lands with high production & where productivity can be

marginally enhanced with reasonable efforts (0)

xi Contiguity to another watershed that has already been developed/treated

10 Contiguous to previously treated watershed & contiguity within the micro watersheds in the project (10)

Contiguity with in the micro watersheds in the project but non contiguous to previously treated watershed (5)

Neither contiguous to previously treated watershed nor contiguity within the micro watersheds in the project (0)

xii Cluster approach in the plains (more than one contiguous micro-watersheds in the project)

15 Above 6 micro-watersheds in cluster (15)

4 to 6 micro watersheds in cluster (10)

2 to 4 micro watersheds in cluster (5)

xiii Cluster approach in the 15 Above 5 micro-watersheds in 3 to 5 micro watersheds in 2 to 3 micro watersheds in

Page 11: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

10

hills (More than one contiguous micro- watersheds in the project)

cluster (15) cluster (10) cluster (5)

Total 150 150 90 41 2.5

Page 12: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

11

III. PROJECT WISE PROFILE OF THE SELECTED WATERSHED PROJECT

Table – PPR 7: Project at a Glance

1 Name of the State JHARKHAND

2 Name & type# (Hilly/ Desert/ Others) of project OTHERS

3 Name of the District EAST SINGHBHOOM

4 Name of the Blocks DHALBHUMGARH & CHAKULIYA

5 Name of Gram Panchayats BHALKI FOREST BLOCK JUGISHOAL KALIAYAAM

KOKPARA KOKPARA NARSIGHGARH MAALKUNDI MOHLISHOAL

PAWRA NARSIGHGARH SONAHATU KANAS NUTANGARH

Page 13: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

12

6 Names & Census Code of Villages covered

SL. NO.

VILLAGE NAME

CENSUS CODE

SL. NO.

VILLAGE NAME

CENSUS CODE

SL. NO.

VILLAGE NAME

CENSUS CODE

1 Agunkona 03202800 30 Ghoratoriya 03180700 59 Madhupur 03185200

2 Akhuya Para 03204600 31 Ghoshda 03178300 60 Maholishol 03178900

3 Amda 03178200 32 Goglo 03177400 61 Malkundi 03185300

4 Bainangla 03201900 33 Gohaldangra 03204100 62 Manikabera 03179600

5 Baliduma 03201600 34 Gorabari 03179000 63 Muktapur 03202100

6 Bandhgora 03203600 35 Jamdol 03200500 64 Murakati 03176500

7 Bangarkala 03177700 36 Jamshol 03201500 65 Noyadi 03180300

8 Banskatiya 03176600 37 Jamuya 03180200 66 Nuagaon 03201300

9 Baramchatti 03201200 38 Jorshol 03178000 67 Nutangarh 03180000

10 Barkala 03201800 39 Jugishol 03175500 68 Panijiya 03202400

11 Belbariya 03202500 40 Kadambera 03179800 69 Pattanayakshol 03176700

12 Betjhariya 03176800 41 Kakur Rama 03179700 70 Pinrrashol 03201100

13 Bihinda 03178800 42 Kalajhariya 03204800 71 Punda 03200900

14 Burudi 03176200 43 Kandra Para 03178400 72 Ramsholi 03177600

15 Burujbani 03205400 44 Kanimahuli 03176100 73 Samka 03175400

16 Charchaka 03176300 45 Kankrachak 03202900 74 Sandangri 03202700

17 Chatro 03180100 46 Kantabani 03200400 75 Sapuya 03204300

18 Chaulishol 03202300 47 Kantaliya 03203300 76 Sarangashol 03179900

19 Choira 03179500 48 Kenddangri 03200600 77 Satkatiya 03201400

20 Dangra 03179100 49 Khanrdeoli 03204400 78 Shirishbani 03177900

21 Deashol 03174800 50 Kharbanda 03179400 79 Sindurgauri 03200700

22 Derang 03177800 51 Kokpara 03180400 80 Sunrgi 03178500

23 Dhadka 03203200

52 Kokpara Narsingarh

03173000 81

Taldangra 03204700

24 Dhadkibani 03180500 53 Kutrapara 03202200 82 Taltentuliya 03203000

25 Dudhiyashol 03201000 54 Lakshmihira 03201700 83 Tikrapara 03177500

26 Duliya Para 03179200 55 Lakshmipur 03202000 84 Titiya 03202600

27 Ekghariya 03179300 56 Laldhuya 03180600 85 Ulda 03176400

28 Ektal 03178100 57 Lataghar 03204500 86 Upar Tentuliya 03203100

29 Ghasidi 03176000 58 Madhbhandar 03178600

7 Names & Census Code of micro- watersheds

Sl. No.

Micro-Watershed Code

Geographical Area of the Micro Watershed

Proposed Area to be treated

Budget (Proposed Area X 0.20) (Rs.in Lakh)

Remarks

1. 4H3A4c3a 924.7335 790.7992 158.15984 Proposed Area to be treated = RF + PF/Other

+Rainfed +Permanent Pasture

+Cultivable Wasteland

2. 4H3A4c3b 1032.6558 872.7188 174.54376

3. 4H3A4c3c 1078.9115 1001.1757 200.23514

4. 4H3A4c3d 1175.0812 1029.2999 205.85998

5. 4H3A4c3e 999.1654 848.7629 169.75258

6. 4H3A4c3f 1180.6145 970.6128 194.12256

GRAND TOTAL 6391.1618 5513.3693 1102.67386

8 Four major reasons for selection of watershed

• IAP District ( District is affected by Left Wing Extremist (LWE)

• Lands are un-bonded, un-terraced and undulated topography.

Page 14: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

13

• The area is mostly populated with S.C & S.T

• Non availability of assured irrigation. 9 Area of the Project (ha.) 6391.1618 10 Area proposed to be treated (ha.) 5513.3693 11 Project cost (Rs. In Lakhs) 1102.6739 12 Name & Address of proposed PIA KALAMANDIRKALAMANDIRKALAMANDIRKALAMANDIR

PURBI SINGHBHOOM, JHARKHANPURBI SINGHBHOOM, JHARKHANPURBI SINGHBHOOM, JHARKHANPURBI SINGHBHOOM, JHARKHANDDDD

13 Any other (please specify)

Page 15: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

14

Table – PPR 8: Details of previously identified DPAP /DDP areas proposed under IWMP (ha.) during the financial year 2015-16

Data Source: Jharkhand Space Application Center, Department of IT, Govt. of Jharkhand & SLNA-JSWM

1 2 3 4 5 6 7 8 9 10 11 12

S. No.

Names of Districts

Name of the project

proposed Name of Block(s)

Type of Block

(DPAP/ DDP

/IWDP)

Area of District

(ha.)

No. of IWMP projects

sanctioned in the Block

Area of sanctioned

Projects

Net area to be covered

Area of the proposed project

Area proposed to be covered by schemes other than

DoLR

Net balance area

1 EAST

SINGHBHOOM NABARD

DHALBHUMGARH

& CHAKULIYA IWDP 3,55,686.92 5 25,202.8229 2,96,037.70 5675.5229 NA 2,59,645.98

Page 16: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

15

Table – PPR 9: Land Use pattern to the project

DISTRICT: EAST SINGHBHUM, BLOCK: DHALBHUMGARH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro Watershed

Code

Area of the Micro

Watershed

Village

Name

Geographi

cal Area of the

Village

(Full/Part)

Forest Area

(7+8)

RF PF/

Others

Agricultural Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

1 4H3A4c3a 924.7335 Akhuya Para 73.0108 0.0000 0.0000 0.0000 73.0108 65.3227 7.6880 0.0000 0.0000 0.0000 65.3227 13.0645

Burujbani 11.4861 3.6742 0.0000 3.6742 5.8716 5.1952 0.6764 0.0000 0.0000 1.9402 8.8694 1.7739

Dhadkibani 38.6695 0.0000 0.0000 0.0000 37.1396 32.8612 4.2785 0.0000 0.0000 1.5299 32.8612 6.5722

Duliya Para 35.9001 0.0000 0.0000 0.0000 22.6834 20.0702 2.6131 0.0000 11.3042 1.9125 31.3745 6.2749

Ekghariya 1.7918 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.7918 0.0000 1.7918 0.3584

Ghoratoriya 42.1291 0.0000 0.0000 0.0000 42.1291 37.2758 4.8533 0.0000 0.0000 0.0000 37.2758 7.4552

Gohaldangra 8.3856 0.0000 0.0000 0.0000 8.3856 7.4196 0.9660 0.0000 0.0000 0.0000 7.4196 1.4839

Jamuya 37.7851 0.0000 0.0000 0.0000 25.5397 22.5975 2.9422 0.0000 12.2453 0.0000 34.8429 6.9686

Kalajhariya 25.2403 0.0000 0.0000 0.0000 25.2403 22.3326 2.9077 0.0000 0.0000 0.0000 22.3326 4.4665

Khanrdeoli 17.0902 0.0000 0.0000 0.0000 17.0902 15.1214 1.9688 0.0000 0.0000 0.0000 15.1214 3.0243

Kokpara 330.4513 0.0000 0.0000 0.0000 295.0334 269.8081 25.2254 2.2978 2.1005 31.0196 274.2064 54.8413

Laldhuya 253.1618 23.6121 0.0000 23.6121 207.2563 189.5359 17.7204 2.2098 0.0000 20.0835 215.3578 43.0716

Lataghar 7.8795 0.0000 0.0000 0.0000 7.8795 6.9718 0.9077 0.0000 0.0000 0.0000 6.9718 1.3944

Noyadi 21.4276 0.0000 0.0000 0.0000 20.4831 18.1234 2.3597 0.0000 0.9445 0.0000 19.0679 3.8136

Sapuya 5.3189 0.0000 0.0000 0.0000 5.3189 4.7062 0.6127 0.0000 0.0000 0.0000 4.7062 0.9412

Taldangra 14.7235 0.0000 0.0000 0.0000 14.7235 13.0273 1.6961 0.0000 0.0000 0.0000 13.0273 2.6055

Taltentuliya 0.2825 0.0000 0.0000 0.0000 0.2825 0.2500 0.0325 0.0000 0.0000 0.0000 0.2500 0.0500

Total 924.7335 27.2863 0.0000 27.2863 808.0675 730.6189 77.4486 4.5076 28.3863 56.4857 790.7992 158.1598

2 4H3A4c3b 1032.6558 Agunkona 29.5874 0.0000 0.0000 0.0000 29.5874 26.1790 3.4085 0.0000 0.0000 0.0000 26.1790 5.2358

Akhuya Para 4.9284 0.0000 0.0000 0.0000 4.9284 4.3607 0.5678 0.0000 0.0000 0.0000 4.3607 0.8721

Bainangla 53.4731 0.0000 0.0000 0.0000 47.9013 42.3831 5.5182 0.0000 5.5718 0.0000 47.9549 9.5910

Baliduma 79.2665 15.1831 0.0000 15.1831 25.5634 22.6185 2.9449 0.0000 28.6241 9.8959 66.4257 13.2851

Bandhgora 0.1534 0.0000 0.0000 0.0000 0.1534 0.1357 0.0177 0.0000 0.0000 0.0000 0.1357 0.0271

Barkala 103.6208 11.1433 0.0000 11.1433 55.9058 50.0190 5.8869 0.0000 24.0479 12.5238 85.2101 17.0420

Belbariya 22.9309 0.0000 0.0000 0.0000 22.9309 20.2892 2.6416 0.0000 0.0000 0.0000 20.2892 4.0578

Chatro 118.3189 0.0000 0.0000 0.0000 85.0418 76.0869 8.9549 0.0000 25.8760 7.4012 101.9629 20.3926

Chaulishol 6.8510 0.0000 0.0000 0.0000 6.8510 6.0618 0.7892 0.0000 0.0000 0.0000 6.0618 1.2124

Choira 21.5926 8.2193 0.0000 8.2193 7.6139 6.7368 0.8771 0.0000 5.7595 0.0000 20.7155 4.1431

Page 17: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

16

DISTRICT: EAST SINGHBHUM, BLOCK: DHALBHUMGARH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village

Name

Geographi

cal Area

of the

Village

(Full/Part)

Forest

Area

(7+8)

RF PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

Dhadka 21.4103 0.0000 0.0000 0.0000 21.4103 18.9439 2.4665 0.0000 0.0000 0.0000 18.9439 3.7888

Jamdol 72.7917 0.0000 0.0000 0.0000 38.3940 33.9710 4.4230 0.0000 33.7994 0.5982 67.7704 13.5541

Jamshol 19.1356 0.0000 0.0000 0.0000 19.0920 16.8926 2.1994 0.0000 0.0436 0.0000 16.9362 3.3872

Jamuya 22.0094 0.0000 0.0000 0.0000 0.0701 0.0620 0.0081 0.0000 21.9147 0.0246 21.9767 4.3953

Kankrachak 6.5346 0.0000 0.0000 0.0000 6.5346 5.7818 0.7528 0.0000 0.0000 0.0000 5.7818 1.1564

Kantabani 0.0382 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0382 0.0000 0.0382 0.0076

Kantaliya 2.5096 0.0000 0.0000 0.0000 2.5096 2.2205 0.2891 0.0000 0.0000 0.0000 2.2205 0.4441

Kenddangri 9.8895 0.0000 0.0000 0.0000 8.4304 7.4592 0.9712 0.0000 1.4582 0.0009 8.9174 1.7835

Khanrdeoli 17.5848 0.0000 0.0000 0.0000 15.7073 13.8978 1.8095 0.0000 0.0000 1.8775 13.8978 2.7796

Kokpara 0.1509 0.0000 0.0000 0.0000 0.1509 0.1335 0.0174 0.0000 0.0000 0.0000 0.1335 0.0267

Kutrapara 32.8195 0.0000 0.0000 0.0000 32.4376 28.7008 3.7368 0.0000 0.3819 0.0000 29.0827 5.8165

Lakshmihira 85.7012 12.8798 0.0000 12.8798 29.5537 26.1491 3.4046 0.0000 19.9148 23.3529 58.9437 11.7887

Lakshmipur 56.6237 0.0000 0.0000 0.0000 46.2931 40.9601 5.3330 0.0000 10.3306 0.0000 51.2908 10.2582

Lataghar 19.5983 0.0000 0.0000 0.0000 19.5983 17.3405 2.2577 0.0000 0.0000 0.0000 17.3405 3.4681

Muktapur 53.9058 0.0000 0.0000 0.0000 15.7584 13.9430 1.8154 0.0000 38.1475 0.0000 52.0905 10.4181

Noyadi 57.0397 0.0000 0.0000 0.0000 18.0146 15.9393 2.0753 0.0000 14.7864 24.2388 30.7257 6.1451

Panijiya 15.7611 0.0000 0.0000 0.0000 15.7611 13.9455 1.8157 0.0000 0.0000 0.0000 13.9455 2.7891

Sandangri 5.9089 0.0000 0.0000 0.0000 5.9010 5.2212 0.6798 0.0000 0.0000 0.0079 5.2212 1.0442

Sapuya 0.1370 0.0000 0.0000 0.0000 0.1370 0.1212 0.0158 0.0000 0.0000 0.0000 0.1212 0.0242

Sarangashol 4.1023 4.0995 0.0000 4.0995 0.0000 0.0000 0.0000 0.0000 0.0028 0.0000 4.1023 0.8205

Sindurgauri 6.2951 0.0000 0.0000 0.0000 2.3859 2.1111 0.2749 0.0000 3.9091 0.0000 6.0202 1.2040

Taltentuliya 32.7190 0.0000 0.0000 0.0000 32.6913 28.9253 3.7660 0.0000 0.0000 0.0277 28.9253 5.7851

Titiya 34.1135 0.0000 0.0000 0.0000 31.2108 27.6153 3.5955 0.0000 0.0000 2.9027 27.6153 5.5231

Upar Tentuliya 15.1530 0.0000 0.0000 0.0000 12.8640 11.3820 1.4819 0.0000 0.0000 2.2891 11.3820 1.7073

Total 1032.6558 51.5250 0.0000 51.5250 661.3833 586.5874 74.7960 0.0000 234.6064 85.1410 872.7188 174.5438

3 4H3A4c3c 1078.9115 Baliduma 32.6638 23.5115 0.0000 23.5115 2.9906 2.6461 0.3445 0.0000 1.0263 5.1353 27.1840 5.4368

Baramchatti 62.0237 27.4882 0.0000 27.4882 32.2052 28.4952 3.7100 0.0000 2.3302 0.0000 58.3136 11.6627

Dudhiyashol 164.1381 83.1952 0.0000 83.1952 70.0174 62.6445 7.3728 0.0000 2.9941 7.9314 148.8339 29.7668

Ghasidi 27.1930 27.1930 0.0000 27.1930 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 27.1930 5.4386

Jamdol 21.3605 0.0000 0.0000 0.0000 19.2077 16.9949 2.2127 0.0000 0.0000 2.1529 16.9949 3.3990

Page 18: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

17

DISTRICT: EAST SINGHBHUM, BLOCK: DHALBHUMGARH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village

Name

Geographi

cal Area

of the

Village

(Full/Part)

Forest

Area

(7+8)

RF PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

Jamshol 1.6557 0.0000 0.0000 0.0000 1.6557 1.4649 0.1907 0.0000 0.0000 0.0000 1.4649 0.2930

Jugishol 47.1415 47.1415 0.0000 47.1415 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 47.1415 9.4283

Kanimahuli 0.6690 0.6690 0.0000 0.6690 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.6690 0.1338

Kenddangri 18.0799 0.4763 0.0000 0.4763 14.4340 12.7712 1.6628 0.0000 0.0000 3.1696 13.2475 2.6495

Madhupur 7.2116 7.2116 0.0000 7.2116 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 7.2116 1.4423

Malkundi 126.8992 78.6312 0.0000 78.6312 44.2698 39.1699 5.0999 0.0000 1.3836 2.6146 119.1847 23.8369

Nuagaon 111.7888 56.5976 0.0000 56.5976 40.1932 35.5629 4.6303 0.0000 14.9980 0.0000 107.1586 21.4317

Pinrrashol 112.6861 94.6305 0.0000 94.6305 18.0555 15.9755 2.0800 0.0000 0.0000 0.0000 110.6061 22.1212

Punda 122.2242 29.7957 0.0000 29.7957 47.7327 42.2339 5.4988 0.0000 41.7053 2.9905 113.7349 22.7470

Sarangashol 2.7373 2.7373 0.0000 2.7373 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.7373 0.5475

Satkatiya 165.4883 83.8220 0.0000 83.8220 54.9416 49.1562 5.7853 0.0000 19.6295 7.0953 152.6077 30.5215

Sindurgauri 54.9509 28.1526 0.0000 28.1526 21.1798 18.7399 2.4399 0.0000 0.0000 5.6185 46.8926 9.3785

Total 1078.9115 591.2533 0.0000 591.2533 366.8831 325.8553 41.0278 0.0000 84.0671 36.7079 1001.1757 200.2351

4 4H3A4c3d 1175.0812 Banskatiya 48.0340 0.0000 0.0000 0.0000 48.0340 42.5005 5.5335 0.0000 0.0000 0.0000 42.5005 8.5001

Betjhariya 0.4309 0.0000 0.0000 0.0000 0.4309 0.3813 0.0496 0.0000 0.0000 0.0000 0.3813 0.0763

Burudi 193.6319 126.2902 0.0000 126.2902 59.0490 52.8311 6.2179 0.0000 0.0000 8.2927 179.1213 35.8243

Charchaka 195.6512 89.9722 0.0000 89.9722 73.1288 65.4283 7.7005 0.0000 0.0000 32.5502 155.4005 31.0801

Deashol 67.3434 61.1704 0.0000 61.1704 0.0000 0.0000 0.0000 0.0000 0.0000 6.1731 61.1704 12.2341

Derang 4.5561 0.0000 0.0000 0.0000 4.5561 4.0312 0.5249 0.0000 0.0000 0.0000 4.0312 0.8062

Ektal 0.4895 0.0000 0.0000 0.0000 0.2279 0.2016 0.0263 0.0000 0.0000 0.2617 0.2016 0.0403

Ghasidi 154.2320 108.4289 0.0000 108.4289 45.8031 40.5266 5.2765 0.0000 0.0000 0.0000 148.9555 29.7911

Jorshol 142.3582 0.0000 0.0000 0.0000 138.2944 125.1011 13.1933 1.1394 0.0000 2.9245 126.2405 25.2481

Jugishol 9.8559 9.8559 0.0000 9.8559 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9.8559 1.9712

Kanimahuli 57.6652 34.9166 0.0000 34.9166 15.7849 13.9665 1.8184 0.0000 0.0000 6.9637 48.8831 9.7766

Kokpara

Narsingarh 40.4018 13.1411 0.0000 13.1411 15.4520 13.6719 1.7801 0.0000 0.0000 11.8087 26.8131 5.3626

Murakati 24.8475 0.0000 0.0000 0.0000 15.7077 13.8982 1.8095 0.0000 0.0000 9.1398 13.8982 2.7796

Nutangarh 91.8180 51.0657 0.0000 51.0657 35.7832 31.6609 4.1222 0.0000 0.0000 4.9691 82.7266 16.5453

Pattanayakshol 9.7005 0.0000 0.0000 0.0000 9.7005 8.5830 1.1175 0.0000 0.0000 0.0000 8.5830 1.2875

Pinrrashol 1.6705 1.6705 0.0000 1.6705 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.6705 0.3341

Page 19: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

18

DISTRICT: EAST SINGHBHUM, BLOCK: DHALBHUMGARH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village

Name

Geographi

cal Area

of the

Village

(Full/Part)

Forest

Area

(7+8)

RF PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

Samka 73.4543 73.2396 0.0000 73.2396 0.2147 0.1900 0.0247 0.0000 0.0000 0.0000 73.4295 14.6859

Sarangashol 7.0282 0.0000 0.0000 0.0000 7.0282 6.2185 0.8096 0.0000 0.0000 0.0000 6.2185 1.2437

Satkatiya 2.8810 2.8810 0.0000 2.8810 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.8810 0.5762

Shirishbani 7.2613 0.6706 0.0000 0.6706 6.5907 5.8314 0.7592 0.0000 0.0000 0.0000 6.5020 1.3004

Ulda 41.7697 8.0096 0.0000 8.0096 24.6677 21.8260 2.8417 0.0000 0.0000 9.0924 29.8356 5.9671

Total 1175.0812 581.3122 0.0000 581.3122 500.4537 446.8483 53.6055 1.1394 0.0000 92.1758 1029.2999 205.8600

5 4H3A4c3e 999.1654 Amda 108.8227 0.0000 0.0000 0.0000 95.9430 85.8402 10.1028 0.0000 0.0000 12.8798 85.8402 17.1680

Bangarkala 98.3919 0.2056 0.0000 0.2056 94.1293 84.2175 9.9118 0.0000 0.0000 4.0570 84.4231 16.8846

Choira 12.1487 12.1487 0.0000 12.1487 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 12.1487 2.4297

Derang 4.3916 0.7591 0.0000 0.7591 3.2361 2.8633 0.3728 0.0000 0.0000 0.3964 3.6224 0.7245

Ektal 68.3258 0.0000 0.0000 0.0000 66.1283 59.1650 6.9633 0.0000 0.0000 2.1974 59.1650 11.8330

Ghoshda 89.4264 17.8245 0.0000 17.8245 71.6019 64.0622 7.5397 0.0000 0.0000 0.0000 81.8867 16.3773

Goglo 53.3433 0.0000 0.0000 0.0000 44.6721 39.5259 5.1462 0.0000 0.0000 8.6712 39.5259 7.9052

Gorabari 17.2261 5.3929 0.0000 5.3929 11.8332 10.4700 1.3632 0.0000 0.0000 0.0000 15.8629 3.1726

Jorshol 41.5856 0.0000 0.0000 0.0000 41.5856 36.7949 4.7907 0.0000 0.0000 0.0000 36.7949 7.3590

Kadambera 22.0282 6.0181 0.0000 6.0181 16.0101 14.1657 1.8444 0.0000 0.0000 0.0000 20.1838 4.0368

Kakur Rama 23.3382 5.6145 0.0000 5.6145 16.6118 14.6981 1.9137 0.0000 0.0000 1.1119 20.3127 4.0625

Kandra Para 135.4299 0.0000 0.0000 0.0000 114.5514 103.6232 10.9282 0.0000 0.0000 20.8785 103.6232 20.7246

Maholishol 18.3427 0.0000 0.0000 0.0000 14.6855 12.9937 1.6918 0.0000 0.0000 3.6572 12.9937 2.5987

Manikabera 116.5467 42.4037 0.0000 42.4037 68.0669 60.8995 7.1674 0.0000 3.9637 2.1124 107.2669 21.4534

Nutangarh 19.3652 17.5624 0.0000 17.5624 0.5598 0.4953 0.0645 0.0000 0.0000 1.2430 18.0577 3.6115

Ramsholi 1.2654 0.0000 0.0000 0.0000 1.2654 1.1196 0.1458 0.0000 0.0000 0.0000 1.1196 0.2239

Sarangashol 123.8321 81.1785 0.0000 81.1785 42.6536 37.7399 4.9137 0.0000 0.0000 0.0000 118.9184 23.7837

Satkatiya 0.6605 0.6605 0.0000 0.6605 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.6605 0.1321

Sunrgi 14.9061 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 14.9061 0.0000 0.0000

Tikrapara 29.7883 0.0000 0.0000 0.0000 29.7883 26.3566 3.4316 0.0000 0.0000 0.0000 26.3566 5.2713

Total 999.1654 189.7685 0.0000 189.7685 733.3222 655.0307 78.2915 0.0000 3.9637 72.1109 848.7629 169.7526

6 4H3A4c3f 1180.6145 Amda 9.2389 0.0000 0.0000 0.0000 9.2389 8.1746 1.0643 0.0000 0.0000 0.0000 8.1746 1.6349

Barkala 9.6972 7.0354 0.0000 7.0354 0.0000 0.0000 0.0000 0.0000 2.6619 0.0000 9.6972 1.9394

Bihinda 268.5871 0.0000 0.0000 0.0000 160.3944 145.0928 15.3016 1.1615 54.7945 52.2367 201.0488 40.2098

Page 20: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

19

DISTRICT: EAST SINGHBHUM, BLOCK: DHALBHUMGARH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village

Name

Geographi

cal Area

of the

Village

(Full/Part)

Forest

Area

(7+8)

RF PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

Choira 280.2358 41.9798 0.0000 41.9798 166.7411 150.8340 15.9071 1.1678 35.4423 34.9048 229.4238 45.8848

Dangra 32.2274 0.0000 0.0000 0.0000 12.6534 11.1958 1.4577 0.0000 12.8607 6.7132 24.0565 4.8113

Duliya Para 76.8396 0.0000 0.0000 0.0000 60.2821 53.9344 6.3477 0.0000 14.2172 2.3403 68.1516 13.6303

Ekghariya 15.9608 0.0000 0.0000 0.0000 11.5531 10.2222 1.3309 0.0000 4.4077 0.0000 14.6299 2.9260

Ghoshda 28.6205 10.2556 0.0000 10.2556 2.2081 1.9538 0.2544 0.0000 15.5967 0.5601 27.8061 5.5612

Gorabari 99.8936 6.3214 0.0000 6.3214 63.1612 56.5103 6.6509 0.0000 27.2114 3.1996 90.0431 18.0086

Jamuya 1.4098 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4098 0.0000 1.4098 0.2820

Kharbanda 127.5812 0.0000 0.0000 0.0000 101.7029 92.0005 9.7025 1.1024 16.9112 7.8647 110.0141 22.0028

Kokpara 48.6160 0.0000 0.0000 0.0000 43.4852 38.4757 5.0095 0.0000 0.0000 5.1308 38.4757 7.6951

Madhbhandar 1.7793 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.7793 0.0000 0.0000

Maholishol 169.7178 0.0000 0.0000 0.0000 77.4654 69.3083 8.1571 0.0000 69.1155 23.1368 138.4239 27.6848

Manikabera 9.7144 0.8066 0.0000 0.8066 3.9644 3.5077 0.4567 0.0000 4.9435 0.0000 9.2577 1.8515

Sunrgi 0.4951 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.4951 0.0000 0.0000

Total 1180.6145 66.3987 0.0000 66.3987 712.8503 641.2100 71.6404 3.4317 259.5724 138.3614 970.6128 194.1226

Grand Total 6391.1618 1507.5441 0.0000 1507.5441 3782.9602 3386.1505 396.8097 9.0787 610.5961 480.9828 5513.3693 1102.6739

Data Source: Jharkhand Space Application Center, Department of IT, Govt. of Jharkhand

Page 21: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

20

IV. AGRO–CLIMATIC CONDITION Briefly describe the agro- climatic condition of project area including the Agro-climatic zone of project area, soil types, rainfall,

major crops, etc.

Table – PPR 10: Details of Agro – climatic condition

1 2 3 4 5 6 7 8 9

S. No.

Name of the Project

Name of the Agro-climatic zone covers project area

Area in ha Names of the villages

Major soil types

Topography

Average rainfall in mm

(preceding 5 years average)

Major crops

a) Type b) Area in ha a) Name b) Area in ha

1 NABARD

Central and North Eastern

Platue (Sub-Zone IV)

6391.1618 Detailed enclosed in Table-PPR-7

Sandy, Sandy loam

Red laterite soil

6391.1618 Undulating

moderate to steep Slope

1310

Paddy 3350

Rabi 750

Pulses 250

Vegetables 200

TOTAL 4550

Table-PPR 11: Details of flood and drought in the project area

1 2 3 4 5

Sl. No. Particulars Villages Periodicity

Not affected Annual Any other (please specify)

1 Flood No. of villages NA NA NA

Name(s) of villages

2 Drought No. of villages ALL 86 VILLAGES

Name(s) of villages Detailed enclosed in

Table-PPR 7 Drought prone Area affected by severe

scarcity in rain fall annually Rain shadow area

Page 22: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

21

Table-PPR 12: Details of soil erosion in the project area

1 2 3 4 5

Cause Type of erosion Area affected (ha) Run off (mm/ year)

Average soil loss (Tones/ ha/ year)

Water erosion

a Sheet 1150

1250 47.85 b Rill 275

c Gully 55

Sub-Total 1480

Wind erosion

Total 1480 1250

Page 23: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

22

V. DEMOGRAPHY AND LAND DISTRIBUTION

Growth in population during the last three census’, per capita availability of land, sex ratio, population age group in the project area, literacy level, migration, workforce available in different sectors of the economy, demography of SC, ST, BPL and landless families in the project area in the last ten years, etc.

Demography and Land Distribution

Population

Sl.

No.

Name of Village No. of

HH

Total Male Female SC ST Others Sex

Ratio Total Male Female Total Male Female 1 Agunkona 20 89 48 41 0 0 0 89 48 41 0

949

2 Akhuya Para 40 160 90 70 0 0 0 160 90 70 0

3 Amda 148 645 327 318 76 38 38 458 229 229 111

4 Bainangla 8 42 23 19 0 0 0 0 0 0 42

5 Baliduma 116 563 273 290 0 0 0 0 0 0 563

6 Bandhgora 6 27 17 10 0 0 0 0 0 0 27

7 Bangarkala 78 388 194 194 0 0 0 381 191 190 7

8 Banskatiya 17 79 42 37 1 0 1 25 16 9 53

9 Baramchatti 20 98 49 49 0 0 0 32 15 17 66

10 Barkala 81 402 198 204 0 0 0 78 42 36 324

11 Belbariya 43 205 97 108 0 0 0 22 10 12 183

12 Betjhariya 5 19 9 10 0 0 0 19 9 10 0

13 Bihinda 227 1053 530 523 60 29 31 856 435 421 137

14 Burudi 19 143 74 69 0 0 0 96 49 47 47

15 Burujbani 59 318 163 155 0 0 0 318 163 155 0

16 Charchaka 182 883 458 425 38 17 21 233 118 115 612

17 Chatro 114 559 274 285 10 4 6 526 259 267 23

18 Chaulishol 0 0 0 0 0 0 0 0 0 0 0

19 Choira 173 916 490 426 70 31 39 730 393 337 116

20 Dangra 44 198 105 93 15 7 8 58 31 27 125

21 Deashol 95 545 262 283 0 0 0 509 241 268 36

22 Derang 193 909 445 464 12 4 8 677 327 350 220

23 Dhadka 30 157 80 77 0 0 0 0 0 0 157

24 Dhadkibani 22 119 68 51 0 0 0 119 68 51 0

25 Dudhiyashol 12 63 34 29 0 0 0 0 0 0 63

26 Duliya Para 46 178 87 91 38 19 19 35 19 16 105

27 Ekghariya 0 0 0 0 0 0 0 0 0 0 0

28 Ektal 25 170 85 85 0 0 0 124 61 63 46

29 Ghasidi 10 57 33 24 0 0 0 57 33 24 0

30 Ghoratoriya 42 210 103 107 0 0 0 195 96 99 15

31 Ghoshda 60 283 145 138 0 0 0 211 107 104 72

32 Goglo 98 489 242 247 0 0 0 155 78 77 334

33 Gohaldangra 76 316 158 158 94 46 48 70 29 41 152

34 Gorabari 0 0 0 0 0 0 0 0 0 0 0

Page 24: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

23

Demography and Land Distribution

Population

Sl.

No.

Name of Village No. of

HH

Total Male Female SC ST Others Sex

Ratio Total Male Female Total Male Female 35 Jamdol 39 209 104 105 0 0 0 33 18 15 176

949

36 Jamshol 39 214 112 102 46 21 25 168 91 77 0

37 Jamuya 36 172 92 80 0 0 0 69 35 34 103

38 Jorshol 120 656 331 325 1 0 1 587 300 287 68

39 Jugishol 174 989 502 487 0 0 0 163 75 88 826

40 Kadambera 1 2 2 0 0 0 0 0 0 0 2

41 Kakur Rama 13 66 37 29 0 0 0 0 0 0 66

42 Kalajhariya 91 451 232 219 3 2 1 431 221 210 17

43 Kandra Para 73 358 187 171 0 0 0 355 184 171 3

44 Kanimahuli 35 180 91 89 0 0 0 127 61 66 53

45 Kankrachak 3 17 7 10 0 0 0 17 7 10 0

46 Kantabani 103 479 224 255 0 0 0 69 35 34 410

47 Kantaliya 111 572 289 283 0 0 0 0 0 0 572

48 Kenddangri 103 588 314 274 32 14 18 139 67 72 417

49 Khanrdeoli 13 105 59 46 0 0 0 4 2 2 101

50 Kharbanda 110 486 242 244 11 7 4 44 15 29 431

51 Kokpara 672 2851 1433 1418 200 94 106 605 310 295 2046

52 Kokpara Narsingarh 718 3679 1985 1694 624 323 301 158 71 87 2897

53 Kutrapara 71 323 151 172 0 0 0 323 151 172 0

54 Lakshmihira 43 228 112 116 0 0 0 135 65 70 93

55 Lakshmipur 49 278 141 137 0 0 0 45 23 22 233

56 Laldhuya 130 661 345 316 0 0 0 661 345 316 0

57 Lataghar 40 171 85 86 0 0 0 171 85 86 0

58 Madhbhandar 209 1031 517 514 0 0 0 869 436 433 162

59 Madhupur 55 265 139 126 0 0 0 265 139 126 0

60 Maholishol 293 1394 738 656 98 45 53 156 85 71 1140

61 Malkundi 166 724 374 350 126 64 62 158 79 79 440

62 Manikabera 58 351 165 186 0 0 0 211 96 115 140

63 Muktapur 31 152 84 68 0 0 0 127 68 59 25

64 Murakati 79 402 208 194 0 0 0 68 33 35 334

65 Noyadi 59 259 137 122 230 123 107 5 2 3 24

66 Nuagaon 52 300 156 144 0 0 0 284 145 139 16

67 Nutangarh 156 763 388 375 201 104 97 179 89 90 383

68 Panijiya 186 916 481 435 0 0 0 155 80 75 761

69 Pattanayakshol 29 141 72 69 0 0 0 7 5 2 134

70 Pinrrashol 42 216 102 114 0 0 0 216 102 114 0

71 Punda 29 131 69 62 0 0 0 76 40 36 55

72 Ramsholi 120 694 351 343 0 0 0 567 292 275 127

Page 25: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

24

Demography and Land Distribution

Population

Sl.

No.

Name of Village No. of

HH

Total Male Female SC ST Others Sex

Ratio Total Male Female Total Male Female 73 Samka 97 465 225 240 0 0 0 349 167 182 116

74 Sandangri 25 123 57 66 0 0 0 0 0 0 123

949

75 Sapuya 7 44 20 24 0 0 0 0 0 0 44

76 Sarangashol 30 138 68 70 0 0 0 0 0 0 138

77 Satkatiya 54 243 123 120 0 0 0 52 24 28 191

78 Shirishbani 2 4 2 2 0 0 0 0 0 0 4

79 Sindurgauri 50 260 144 116 0 0 0 260 144 116 0

80 Sunrgi 216 955 488 467 0 0 0 622 319 303 333

81 Taldangra 8 42 21 21 8 5 3 34 16 18 0

82 Taltentuliya 50 237 124 113 0 0 0 42 21 21 195

83 Tikrapara 6 40 22 18 0 0 0 13 8 5 27

84 Titiya 60 301 160 141 0 0 0 277 146 131 24

85 Ulda 27 117 58 59 0 0 0 98 47 51 19

86 Upar Tentuliya 2 7 3 4 0 0 0 0 0 0 7

TOTAL 7094 34733 17776 16957 1994 997 997 15627 7901 7726 17112 949

Source: Census of India

Page 26: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

25

VI. LIVELIHOODS

Briefly describe the existing livelihoods, raw material available, possible livelihood interventions, scope for capacity building etc. in the project area

1 2 3 4 5 6

S. No.

Names of the villages

Existing livelihood activities Possible livelihood interventions under

the project

Current status of

migration (No. of people)

Main reasons for migration

1. Detailed enclosed in PPR-7

• Agriculture: Kharif and Rabi

• Wage labour

• Non- Timber Forest Produce (NTFP)

• Agriculture (High Value cash crop & increase in productivity

of Food crop)

• Lac

• Entrepreneur development

• Horticulture

• Wage generation in INRM infrastructure creation.

1350

Acute poverty in the area and rain-fed agriculture, mono-crop pattern of agriculture which ensure just 5-6 months average food sufficiency forced the villagers to migrate from their villages in off agriculture seasons to the near by places in cement factories, rice

mills, brick factories and

Page 27: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

26

VII. EXPECTED PROJECT OUTCOMES

VII. (i). Expected employment related outcomes: Table – PPR 14: Employment Generation

Sl. No.

Name of Village

Man days Wage employment Self employment

No. of man days No. of Beneficiaries No. of Beneficiaries

SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total

1 Agunkona 0 223 0 103 325 0 36 0 16 52 0 31 0 14 46

2 Akhuya Para 0 400 0 175 575 0 64 0 28 92 0 56 0 25 81

3 Amda 190 1145 278 795 2408 30 183 44 127 385 27 160 39 111 337

4 Bainangla 0 0 105 48 153 0 0 17 8 24 0 0 15 7 21

5 Baliduma 0 0 1408 725 2133 0 0 225 116 341 0 0 197 102 299

6 Bandhgora 0 0 68 25 93 0 0 11 4 15 0 0 9 4 13

7 Bangarkala 0 953 18 485 1455 0 152 3 78 233 0 133 2 68 204

8 Banskatiya 3 63 133 93 290 0 10 21 15 46 0 9 19 13 41

9 Baramchatti 0 80 165 123 368 0 13 26 20 59 0 11 23 17 51

10 Barkala 0 195 810 510 1515 0 31 130 82 242 0 27 113 71 212

11 Belbariya 0 55 458 270 783 0 9 73 43 125 0 8 64 38 110

12 Betjhariya 0 48 0 25 73 0 8 0 4 12 0 7 0 4 10

13 Bihinda 150 2140 343 1308 3940 24 342 55 209 630 21 300 48 183 552

14 Burudi 0 240 118 173 530 0 38 19 28 85 0 34 16 24 74

15 Burujbani 0 795 0 388 1183 0 127 0 62 189 0 111 0 54 166

16 Charchaka 95 583 1530 1063 3270 15 93 245 170 523 13 82 214 149 458

17 Chatro 25 1315 58 713 2110 4 210 9 114 338 4 184 8 100 295

18 Chaulishol 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

19 Choira 175 1825 290 1065 3355 28 292 46 170 537 25 256 41 149 470

20 Dangra 38 145 313 233 728 6 23 50 37 116 5 20 44 33 102

21 Deashol 0 1273 90 708 2070 0 204 14 113 331 0 178 13 99 290

22 Derang 30 1693 550 1160 3433 5 271 88 186 549 4 237 77 162 481

23 Dhadka 0 0 393 193 585 0 0 63 31 94 0 0 55 27 82

24 Dhadkibani 0 298 0 128 425 0 48 0 20 68 0 42 0 18 60

25 Dudhiyashol 0 0 158 73 230 0 0 25 12 37 0 0 22 10 32

26 Duliya Para 95 88 263 228 673 15 14 42 36 108 13 12 37 32 94

27 Ekghariya 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

28 Ektal 0 310 115 213 638 0 50 18 34 102 0 43 16 30 89

29 Ghasidi 0 143 0 60 203 0 23 0 10 32 0 20 0 8 28

30 Ghoratoriya 0 488 38 268 793 0 78 6 43 127 0 68 5 37 111

Page 28: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

27

Sl. No.

Name of Village

Man days Wage employment Self employment

No. of man days No. of Beneficiaries No. of Beneficiaries

SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total

31 Ghoshda 0 528 180 345 1053 0 84 29 55 168 0 74 25 48 147

32 Goglo 0 388 835 618 1840 0 62 134 99 294 0 54 117 86 258

33 Gohaldangra 235 175 380 395 1185 38 28 61 63 190 33 25 53 55 166

34 Gorabari 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

35 Jamdol 0 83 440 263 785 0 13 70 42 126 0 12 62 37 110

36 Jamshol 115 420 0 255 790 18 67 0 41 126 16 59 0 36 111

37 Jamuya 0 173 258 200 630 0 28 41 32 101 0 24 36 28 88

38 Jorshol 3 1468 170 813 2453 0 235 27 130 392 0 205 24 114 343

39 Jugishol 0 408 2065 1218 3690 0 65 330 195 590 0 57 289 170 517

40 Kadambera 0 0 5 0 5 0 0 1 0 1 0 0 1 0 1

41 Kakur Rama 0 0 165 73 238 0 0 26 12 38 0 0 23 10 33

42 Kalajhariya 8 1078 43 548 1675 1 172 7 88 268 1 151 6 77 235

43 Kandra Para 0 888 8 428 1323 0 142 1 68 212 0 124 1 60 185

44 Kanimahuli 0 318 133 223 673 0 51 21 36 108 0 44 19 31 94

45 Kankrachak 0 43 0 25 68 0 7 0 4 11 0 6 0 4 9

46 Kantabani 0 173 1025 638 1835 0 28 164 102 294 0 24 144 89 257

47 Kantaliya 0 0 1430 708 2138 0 0 229 113 342 0 0 200 99 299

48 Kenddangri 80 348 1043 685 2155 13 56 167 110 345 11 49 146 96 302

49 Khanrdeoli 0 10 253 115 378 0 2 40 18 60 0 1 35 16 53

50 Kharbanda 28 110 1078 610 1825 4 18 172 98 292 4 15 151 85 256

51 Kokpara 500 1513 5115 3545 10673 80 242 818 567 1708 70 212 716 496 1494

52 Kokpara Narsingarh 1560 395 7243 4235 13433 250 63 1159 678 2149 218 55 1014 593 1881

53 Kutrapara 0 808 0 430 1238 0 129 0 69 198 0 113 0 60 173

54 Lakshmihira 0 338 233 290 860 0 54 37 46 138 0 47 33 41 120

55 Lakshmipur 0 113 583 343 1038 0 18 93 55 166 0 16 82 48 145

56 Laldhuya 0 1653 0 790 2443 0 264 0 126 391 0 231 0 111 342

57 Lataghar 0 428 0 215 643 0 68 0 34 103 0 60 0 30 90

58 Madhbhandar 0 2173 405 1285 3863 0 348 65 206 618 0 304 57 180 541

59 Madhupur 0 663 0 315 978 0 106 0 50 156 0 93 0 44 137

60 Maholishol 245 390 2850 1640 5125 39 62 456 262 820 34 55 399 230 718

61 Malkundi 315 395 1100 875 2685 50 63 176 140 430 44 55 154 123 376

62 Manikabera 0 528 350 465 1343 0 84 56 74 215 0 74 49 65 188

63 Muktapur 0 318 63 170 550 0 51 10 27 88 0 44 9 24 77

64 Murakati 0 170 835 485 1490 0 27 134 78 238 0 24 117 68 209

65 Noyadi 575 13 60 305 953 92 2 10 49 152 81 2 8 43 133

66 Nuagaon 0 710 40 360 1110 0 114 6 58 178 0 99 6 50 155

67 Nutangarh 503 448 958 938 2845 80 72 153 150 455 70 63 134 131 398

Page 29: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

28

Sl. No.

Name of Village

Man days Wage employment Self employment

No. of man days No. of Beneficiaries No. of Beneficiaries

SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total

68 Panijiya 0 388 1903 1088 3378 0 62 304 174 540 0 54 266 152 473

69 Pattanayakshol 0 18 335 173 525 0 3 54 28 84 0 2 47 24 74

70 Pinrrashol 0 540 0 285 825 0 86 0 46 132 0 76 0 40 116

71 Punda 0 190 138 155 483 0 30 22 25 77 0 27 19 22 68

72 Ramsholi 0 1418 318 858 2593 0 227 51 137 415 0 198 44 120 363

73 Samka 0 873 290 600 1763 0 140 46 96 282 0 122 41 84 247

74 Sandangri 0 0 308 165 473 0 0 49 26 76 0 0 43 23 66

75 Sapuya 0 0 110 60 170 0 0 18 10 27 0 0 15 8 24

76 Sarangashol 0 0 345 175 520 0 0 55 28 83 0 0 48 25 73

77 Satkatiya 0 130 478 300 908 0 21 76 48 145 0 18 67 42 127

78 Shirishbani 0 0 10 5 15 0 0 2 1 2 0 0 1 1 2

79 Sindurgauri 0 650 0 290 940 0 104 0 46 150 0 91 0 41 132

80 Sunrgi 0 1555 833 1168 3555 0 249 133 187 569 0 218 117 163 498

81 Taldangra 20 85 0 53 158 3 14 0 8 25 3 12 0 7 22

82 Taltentuliya 0 105 488 283 875 0 17 78 45 140 0 15 68 40 123

83 Tikrapara 0 33 68 45 145 0 5 11 7 23 0 5 9 6 20

84 Titiya 0 693 60 353 1105 0 111 10 56 177 0 97 8 49 155

85 Ulda 0 245 48 148 440 0 39 8 24 70 0 34 7 21 62

86 Upar Tentuliya 0 0 18 10 28 0 0 3 2 4 0 0 2 1 4

TOTAL 4988 39088 42798 42411 129245 795 6252 6843 6785 20674 697 5469 5989 5936 18099

Page 30: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

29

Table – PPR 15: Details of migration from project area

SI. No

Name of Village No of persons

migrating No of days per year of

Migration Major reason(s) for Migrating

Expected reduction no of person in Migration

1 2 3 4 5

6

1 Detailed enclosed in

PPR-7 1350 70 days -125 days

Acute poverty in the area and rain-fed agriculture, mono-crop pattern of agriculture which ensure just 5-6 months average food sufficiency forced the villagers to migrate from their villages in off agriculture seasons to the near by places in cement factories, rice mills, brick

factories and

1075

Page 31: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

30

VII. (ii). Water related outcomes: Table – PPR 16: Details of average ground water table depth in the project areas (in meters)

1 2 3 4 5 6

Sl. No. Names of villages Sources Pre – Project level Expected post – project level Remarks

1. Detailed enclosed in

Table PPR-7

Open wells 6.37 – 7.85 M 2.25 - 3.54 M Over exploitation of

ground water

resources

Bore wells 65-75 M 55-65 M

Others (Pond+ Check Dam) - -

Table – PPR 17: Status of Drinking water*

1 2 3 4 5

S. No. Names of the Villages Availability of drinking water (no. of months in a year) Quality of drinking water

Comments Pre- project Expected Post - Project Pre- project Expected Post - Project

1. Detailed enclosed in Table PPR-7

9 Months 12 Months Contaminated water

.

.

Fresh drinking water

Filtered drinking water by using

bleaching powder, mini filtration

devices attached with bore wells

Page 32: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

31

VII. (i). Expected employment related outcomes:

Table-PPR 18: Major crops grown and their productivity in the project area

1 2 3 4

S. No. Name of the Crop Current status Expected post project status

Area (ha.) Productivity (kg/ ha.) Area (ha.) Productivity (kg/ ha.)

Kharif Paddy

3350 2500.00 3600 4000.00

Rabi

Rabi Pulses

Vegetables

750 250 200

2000.00 1500.00 1000.00

1000 350 300

3000.00 2500.00 1500.00

Zaid / other season Potato

90

1800 150 2600.00

Page 33: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

32

VIII: MANDATORY CERTIFICATION “It is certified that the State Government of Jharkhand will abide by the following mandatory conditions laid down by DoLR”

1 The area of the proposed projects are not covered under assured irrigation

2 The area of the proposed project is not covered or overlapping with any other watershed projects sanctioned by the central govt./ state govt./ autonomous bodies & others

3 The State must sign all the mandatory MoUs before implementing the project

4 The timeframes and milestones of the projects will be followed

5 The Budget requested for must follow the criteria laid down in the Common Guidelines, 2008

6 The State must release matching State Share within 15 days from release of each installment of central funds

7 Purchase of vehicles and other equipments are not permitted and nor is construction of buildings allowed. Only purchase of computers and related software is permitted

8 Savings, if any, in each component of the project cost can be utilized only for activities in the Watershed works

9 The WCDC will have one Member exclusively responsible for monitoring

10 All works will be evaluated after each phase of completion. Fund release will depend on favourable reports received from evaluators

11 Evaluators must include only institutions and agencies and not individuals

12 The State and DRDA cell will furnish monitoring reports and periodical reports as desired by DoLR

13 Composition of the WDT must be clearly spelt out and the team Members must be fully in place at the time of signing of the MoU of contract between the PIA and DRDA Cell

14 That DRDA shall release the funds to the PIAs and the watershed committees within 15 days of receipt of the funds

15 The Watershed Committee must be a registered society under the Societies Registration Act, 1860

16 At least one of the WDT Members must be a woman

17 The Gram Sabhas of the proposed project areas have passed resolutions for people’s contribution towards WDF

18 Resource-use agreements on the principles of equity and sustainability must be worked out among the User Groups prior to the concerned work being undertaken

19 The DPR must give detailed justification for the proposed project duration

20 No works on private lands will be repaired/ maintained from the WDF 21 The PIA will start project work within three months of the receipt of first installment by DWDU/agency or else

it can come under the purview of foreclosure

Page 34: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

33

22 The State will not undertake unnecessary foreclosure of the projects. In the event of foreclosure, the State will refund the amount and furnish all necessary documents as desired by DoLR. The State shall also take administrative and legal action against any defalcation, misappropriation, mis-utilization, deliberate negligence and laxity which has caused foreclosure of the project.

Date:

Signature of officer authorized by State Govt.* NAME OF OFFICER (IN CAPITAL LETTERS)

DESIGNATION

Page 35: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

34

IX. STATUS OF ON-GOING PROJECTS (DPAP/ DDP/ IWDP)

Table- PPR 19: Details of pending UCs: Statewise

1 2 3 4 5 6 7 8 9 10 11

S. No. District Project Instal-ment no.

Financial year of release of fund

Amount released (Rs. in lakh)

Amount utilized (Rs.in lakhs)

Submission of UC Date of submission of

UC Reasons for not submitting/ delayed

submission of UC

Pending UCs

Due date

Amount (Rs. in

lakhs)

Date Amount (Rs. in

lakhs)

Period Amount (Rs. in

lakhs)

1 E.

Singhbhoom IWMP NA

Table- PPR 20: Details of Unspent balance as on

1 2 3 4 5 6

S. No. District Name of the Project

Total cost (Rs. in lakh)

Total funds released (Rs. in lakh) Unspent balance

(Rs. in lakhs) DoLR State

1 E.

Singhbhoom IWMP NA

Page 36: PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY

35

X. ABSTRACT OF PROJECTS PROPOSED FOR SANCTION DURING FINANCIAL YEAR 2015-16

1 Number of districts to be covered under the present proposal

1

2 No. of Watersheds projects proposed to be taken up under NABARD

Hilly/Desert Others 2

3 Total area to be covered under proposed projects (in ha) (a) Hilly & Desert areas# (b) Others

Total

6391.1618

4 Area to be treated (in ha) 5513.3693

5 Total cost of the proposed Watershed projects (Rs. in lakhs)

(a) Hilly & Desert areas# (c) Others

Total

1102.6739 Lakhs

6 First installment required from central funds for the proposed watershed projects

220.5348 Lakhs