California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for California’s three large investor- owned electric utilities over the ten year period, 2006-2015. Using the four annual reliability metrics adopted by the California Public Utilities Commission to measure system performance on a local and state-wide basis, this review presents a detailed summary of reliability performance for ten years by utility and region. The reliability metrics make evident that California’s electric system has had a high level of reliable service overall and reliability performance has improved over the past ten years. The metrics are also useful in identifying areas of the State that saw significant improvement in reliability performance and areas where improved performance has been formidable. 2016 Martin Kurtovich, Principal Author Policy and Planning Division Marzia Zafar, Director Policy and Planning Division California Public Utilities Commission 05/09/2016

Upload: others

Post on 11-Feb-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

CaliforniaElectricReliabilityInvestor-OwnedUtilitiesPerformanceReview2006-2015ThisreportreviewsthereliabilitymetricsdataforCalifornia’sthreelargeinvestor-ownedelectricutilitiesoverthetenyearperiod,2006-2015.UsingthefourannualreliabilitymetricsadoptedbytheCaliforniaPublicUtilitiesCommissiontomeasuresystemperformanceonalocalandstate-widebasis,thisreviewpresentsadetailedsummaryofreliabilityperformancefortenyearsbyutilityandregion.ThereliabilitymetricsmakeevidentthatCalifornia’selectricsystemhashadahighlevelofreliableserviceoverallandreliabilityperformancehasimprovedoverthepasttenyears.ThemetricsarealsousefulinidentifyingareasoftheStatethatsawsignificantimprovementinreliabilityperformanceandareaswhereimprovedperformancehasbeenformidable.

2016

MartinKurtovich,PrincipalAuthorPolicyandPlanningDivisionMarziaZafar,DirectorPolicyandPlanningDivision

CaliforniaPublicUtilitiesCommission05/09/2016

Page 2: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

i

Additionalinformationisavailableat

www.cpuc.gov/ppd

Page 3: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

ii

CaliforniaElectricReliability

Investor-OwnedUtilities

PerformanceReview

2006-2015

May9,2016

Page 4: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

iii

ExecutiveSummaryReliableelectricservicewithaminimalofoutagesandrapidrestorationtimeisessential.California’sthreelargeinvestor-ownedelectricutilities(IOUs)inCalifornia,PacificGas&ElectricCompany(PG&E),SouthernCaliforniaEdisonCompany(SCE),andSanDiegoGas&ElectricCompany(SDG&E)areresponsibleforprovidingahighlevelofreliabilityperformanceontheirelectricsystemsandtrackingandreportingthisperformancetotheCaliforniaPublicUtilitiesCommission(CPUC).RecentstatelegislationandCPUCrulemakinghasupdatedthereliabilityreportingprogramtoenablemoretransparencywithmoredetailedreportingrequirementsonanannualbasis.

Thisreviewexamines10yearsofdataforfourreliabilitymetricsrecentlyadoptedbytheCPUCthatmeasurereliabilityperformanceintermsof-1)outageduration,2)outagefrequency,3)averageoutagepercustomerand4)numberofmomentaryoutages.

ThisreportuseddataprovidedbytheIOUsregardingallgeneration,transmissionanddistributionoutages,excludingplannedandCaliforniaIndependentSystemOperator(CAISO)outages.Eachutility’ssystemwidereliabilitymetricsarecompiledstatewidetoidentifysystemperformanceoverthepastdecade.Additionally,thesemetricsarebrokendowninto60localjurisdictionsasdefinedbytheutilitiesformonitoringreliability.Theseutilitydistrictsordivisionsarethengroupedinto10separateregions.Byconductingadescriptiveanalyticreviewofthesemetrics,thisreportestablishesabenchmarkofCalifornia’sreliabilityperformance.Inthefuture,suchreviewswillincorporateadditionaldataprovidedfromtheIOUsthroughtheirannualreportandonlinedataoneachutility’swebsite.

Overall,Californiareliabilityhasimprovedoverthepastdecade.WhilereliabilityintheSDG&Eserviceterritoryhasmaintainedaconsistentlyhighlevelofreliability,bothPG&EandSCEhaveimprovedandareapproachingSDG&Eintermsoflevelofreliableservice.ParticularlyinPG&Eserviceterritory,markedimprovementinreliabilitymetricsareseeninthehistoricdata,withparticularimprovementobservedintheCentralValleyandBayArea.

Page 5: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

iv

TableofContents

ContentsExecutiveSummary...................................................................................................................................iii

Introduction................................................................................................................................................1

UtilityReliabilityData................................................................................................................................1

UtilityDivisionsandDistricts....................................................................................................................2

ElectricReliabilityMetrics.........................................................................................................................4

OutageDuration......................................................................................................................................4

OutageFrequency....................................................................................................................................6

AverageTimetoRestoreService............................................................................................................8

AverageFrequencyofMomentaryInterruptions...................................................................................8

StatewideOverviewofCaliforniaReliability............................................................................................9

SystemwideSAIDI.....................................................................................................................................9

SystemwideSAIFI...................................................................................................................................10

SystemwideCAIDI..................................................................................................................................11

SystemwideMAIFI..................................................................................................................................12

RegionalReliabilityReview2006-2015.................................................................................................14

ReliabilityDashboards...........................................................................................................................14

NorthernRegion....................................................................................................................................15

BayAreaRegion.....................................................................................................................................17

CentralValleyRegion............................................................................................................................20

CoastalRegion.......................................................................................................................................24

LosAngelesCounty(West)Region........................................................................................................27

LosAngelesCounty(East)Region.........................................................................................................30

OrangeCountyRegion...........................................................................................................................33

InlandEmpireRegion............................................................................................................................36

DesertRegion........................................................................................................................................39

SanDiegoRegion...................................................................................................................................42

Conclusion.................................................................................................................................................45

Page 6: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

v

ListofTables

Table1–ListofCaliforniaInvestor-OwnedLargeElectricUtilitiesDistrictsorDivisionsTable2–FivehighestSAIDIscoresTable3–FivelowestSAIDIscoresTable4–FivehighestSAIFIscoresTable5–FivelowestSAIDIscores

ListofFigures

Figure1-MapofCaliforniashowingIOUdistricts/divisionsFigure2-Rangeof2015SAIDIScoresFigure3-Rangeof2015SAIFIScoresFigure4-HistoricalIOUSystemwideAnnualSAIDIOutageDurationFigure5-HistoricalIOUSystemwideAnnualSAIFIOutageDurationFigure6–HistoricalIOUSystemwideAnnualCAIDIOutageDurationFigure7-HistoricalIOUSystemwideAnnualMAIFIOutageDurationFigure8-CaliforniaReliabilityDashboardExampleFigure9-MapofNorthernRegionFigure10-MapofBayAreaRegionFigure11-MapofCentralValleyRegionFigure12-MapofCoastalRegionFigure13-MapofLosAngelesCounty(West)RegionFigure14-MapofLosAngelesCounty(East)RegionFigure15-MapofOrangeCountyRegionFigure16-MapofInlandEmpireRegionFigure17-MapofDesertRegionFigure18-MapofSanDiegoRegion

Page 7: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

vi

AcronymsandAbbreviations

Avg.SAIDIYears1-5–AverageannualSAIDIforyears2006-2010

Avg.SAIDIYears6-10–AverageannualSAIDIforyears2011-2015

CAIDI–CustomerAverageInterruptionDurationIndex

CAISO–CaliforniaIndependentSystemOperator

CPUC–CaliforniaPublicUtilitiesCommission

MAIFI–MomentaryAverageInterruptionFrequencyIndex

IEEE–InstituteofElectricalandElectronicEngineers,Inc.

IOU–Investor-OwnedUtility

Ni–numberofinterruptedcustomersforeachsustainedinterruptioneventduringthereportingperiod

Nmi–Numberofinterruptedcustomersforeachmomentaryinterruptioneventduringthereportingperiod

NT–Totalnumberofcustomersservedforthearea

PG&E–PacificGasandElectricCompany

SAIDI–SystemAverageInterruptionDurationIndex

SAIFI–SystemAverageInterruptionFrequencyIndex

SCE–SouthernCaliforniaEdison

SDG&E–SanDiegoGas&Electric

Page 8: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

1

IntroductionSection364ofthePublicUtilitiesCodeascribestheCaliforniaPublicUtilitiesCommission(CPUC)withtheregulatoryauthoritytoascertainandadoptreasonablestandardsandregulationsforelectricutilitiesperformanceasameansofensuringhighquality,safe,andreliableservice.TheCPUCimplementedSection364overmanyyearstoprovidetheelectricutilitieswithstandardsandguidanceregardingwhatconstitutesareasonablelevelofreliableservice,primarilythroughtwoGeneralOrders(GOs)(GO165and166)thatspecifiedreliabilityreportingforelectricutilities.

In2011,theCPUCorderedtheinvestor-ownedutilities(IOUs),includingPacificGasandElectricCompany(PG&E),SouthernCaliforniaEdisonCompany(SCE)andSanDiegoGasandElectricCompany(SDG&E)toreportonreliabilityutilizingtheInstituteofElectricalandElectronicsEngineers(IEEE)1366reliabilitymetrics.In2013newlegislation,AssemblyBill66(Muratsuchi),addedSection2774.1tothePublicUtilitiesCodewhichdirectedtheCPUCtorequireanelectricalcorporationtoreportannuallyonfrequencyanddurationofelectricalserviceinterruptionsbylocalarea,andincludedarequirementtorankareasbythemostfrequencyanddurationofoutages.Thelegislationspecifiesthatthisinformationshouldbeusedtorequirecost-effectiveremediationofreliabilitydeficienciesifrepeateddeficienciesinthesamelocalareaareidentified.TheintentistoprovideCalifornianstransparencyregardingelectricreliability,withreadilyaccessibleinformationthatcanbeutilizedforbetterpublicaccountability,capitalplanning,andassetmanagement.

UtilityReliabilityDataThedatausedforthisreviewwasprovidedbythethreeutilities.ThereliabilitydataincludesalloutageswiththeexceptionofplannedorCaliforniaIndependentSystemOperator(CAISO)outages.Thedatafor2015maybeviewedastentativesincetheutilitieshavenotfiledformalreliabilityreportswithvettedresults.Final2015metricvalueswillbepublishedinJulywhentheutilitiesreleasetheirannualreliabilityreports.

ItshouldbenotedthatthemethodforcalculatingthesemetricsbytheCPUCdiffersfromtheIOUmethodology.IntheCPUCmethodology,localareametricsincludeallgeneration,transmission,anddistributionoutages,excludingplannedandCAISOoutages.Forlocalareas,utilitiesomitgenerationandtransmissionoutages.TheCPUCmethodologyattemptstogetanaccuratemeasureofhowoutagesimpactratepayersandsoalloutagesareincluded.

Onlineutilityreliabilitydataisanimportantmeansforimprovingtransparencyandunderstandingofutilityperformancetoutilitycustomers.CurrentlyeachIOUhasitsownapproach.TherecentrulemakingincludedarequirementthatallthreeutilitiesproducereliabilitywebresourcesmodeledafterSCE’smodel.Inthefuture,CPUCreliabilityreviewswillincorporatethesewebresourcestobetterprovideaccesstoinformationaboutannualreliabilityperformance.

Page 9: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

2

UtilityDivisionsandDistrictsReliabilitymetricsarereportedbyeachIOUonbothasystemwide(serviceterritory)basisandstartingin2016bydivisionordistrict.EachIOUsubdividesitsserviceterritoryintosubregions,calleddivisionsbyPG&EanddistrictsbySCEandSDG&E.PG&Ehas16withinitsserviceterritory.SCEandSDG&Ehave38and6districts,respectively.Forthisreview,thedivisionsordistrictsweregroupedinto10geographicregionsandarelistedinTable1.Intotalthereare60subregionsthataretrackedusingthefourreliabilitymetrics.Figure7showsthelocationsofthesesubregions.

Figure1

Page 10: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

3

Table1ListofCaliforniaInvestor-OwnedLargeElectricUtilitiesDistrictsorDivisions

NorthernRegion1)PG&EHumboldt2)PG&ESonoma3)PG&ESierraBayAreaRegion4)PG&ENorthBay5)PG&ESanFrancisco6)PG&EEastBay7)PG&EDiablo8)PG&EMission9)PG&EPeninsula10)PG&EDeAnza11)PG&ESanJoseCentralValleyRegion12)PG&ENorthValley13)PG&ESacramento14)PG&EStockton15)PG&EYosemite16)PG&EFresno17)PG&EKern18)SCEKernville19)SCESanJoaquin20)SCETehachapiCoastalRegion21)PG&ECentralCoast22)PG&ELosPadres23)SCESantaBarbara24)SCEThousandOaks25)SCEVenturaLosAngelesCounty(West)Region26)SCECatalina27)SCEDominguezHills28)SCELongBeach29)SCESantaMonica30)SCESouthBay

LosAngelesCounty(East)Region31)SCEAntelopeValley32)SCECovina33)SCEMonrovia34)SCEMontebello35)SCEValencia36)SCEWhittierOrangeCountyRegion37)SCEFullerton38)SCEHuntingtonBeach39)SCESaddleback40)SCESantaAna41)SDG&EOrangeCountyInlandEmpireRegion42)SCEArrowhead43)SCEMenifee44)SCEOntario45)SCEFoothill46)SCEPalmSprings47)SCERedlands48)SCEWildomarDesertRegion49)SCEBarstow50)SCEBishop51)SCEBlythe52)SCERidgecrest53)SCEVictorville54)SCEYuccaValley55)SCEShaverLake/BigCreekSanDiegoRegion56)SDG&EEastern57)SDG&ENortheast58)SDG&EBeachCities59)SDG&EConstructionMetro60)SDG&ENorthCoast

Page 11: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

4

ElectricReliabilityMetricsIn2016,theCPUCcompletedanewrulemaking(R.14-12-014),codifiedinDecision16-01-008,thatupdatedtheannualelectricreliabilityreportingrequirementsforCaliforniaelectricutilities.InrecentyearsreliabilityreportinghasimprovedwiththedevelopmentofnationalIEEEreliabilitymetrics,firstreleasedin2003.California’snewreliabilityreportingrequirementsspecifytheuseofthecurrentstandard,knownasIEEE1366-2012.ThefourspecificreliabilityparametersthatCaliforniaIOUsarerequiredtomeasureare

1) SystemAverageInterruptionDurationIndex(SAIDI)asagaugeforoutageduration2) SystemAverageInterruptionFrequencyIndex(SAIFI)asagaugeforoutagefrequency3) CustomerAverageInterruptionDurationIndex(CAIDI)asagaugeforaveragetimetorestore

service,and4) MomentaryAverageInterruptionFrequencyIndex(MAIFI)whichtrackthenumberofoutages

thatlastlessthanfiveminutes

OutageDurationOutagedurationistrackedthroughtheSystemAverageInterruptionDurationIndex(SAIDI)whichindicatesthetotalannualdurationofoutageinterruptionspercustomer.Itismeasuredinminutes.SystemAverageInterruptionDurationIndex(SAIDI)=

TotalminutescustomerswerewithoutpowerduetosustainedoutagesTotalnumberofcustomers

Itiscalculatedbymultiplyingtherestorationtimeforeachoutagebythenumberofinterruptedcustomersperoutage,summingupthetotalforthatyear,anddividingbythetotalnumberofcustomersserved.

Σ(restorationtimeforeachoutage)(Numberofinterruptedcustomersforeachevent)TotalNumberofCustomersServed

Page 12: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

5

Figure2

The60subregionsthattheIOUsusetotrackthefourindices,theabovechartshowstherangeofvaluesfortheSAIDImetricfor2015,rangingfromSCE’sCatalinadistricthavingtheleastnumberofoutageminutesin2015withaSAIDIof43,toPG&E’sHumboldtDivisionhavingthehighestnumberofoutageminuteswithaSAIDIof741.Theabovechartshowsthe2015SAIDIscoresforall60districtsordivisions,withPG&Edivisionsshowninblue,SCEdistrictsingreenandSDG&Edistrictsinred.Notethat50ofthe60sub-regionshadscoresbelow200.Tables2liststhedistrictsordivisionswiththefivehighestSAIDIscoresfor2015.Table3liststhosewiththefivelowestSAIDIscoresforlastyear.

Table2FiveHighest2015SAIDIScores

UtilityDistrict/Division Utility 2015SAIDIScore 10YearAverageSAIDIHumboldt PG&E 741 664NorthValley PG&E 506 541Blythe SCE 427 477BigCreek SCE 423 1134YuccaValley SCE 389 304

0.00

100.00

200.00

300.00

400.00

500.00

600.00

700.00

800.00

Catalin

aSanFran

cisco

Sadd

leba

ckOrang

eCo

unty

Eastern

Wild

omar

NorthCo

ast

EastBay

SantaAn

aCo

nstruc

tionMetro

BeachCitie

sVa

lenc

iaMiss

ion

Northe

ast

SantaMon

ica

Fulle

rton

DeAnza

Victorville

SanJose

Peninsula

Ontario

Mon

rovia

Diab

loHu

ntington

Bea

chPa

lmSp

rings

Covina

Antelope

Valley

Kern

Thou

sand

Oaks

Foothill

Men

ifee

Sacram

ento

Whittier

Fresno

Redlan

dsSanJoaq

uin

Domingu

ezHills

Yosemite

Stoc

kton

Sono

ma

LosP

adres

Ventura

Ridg

ecrest

Mon

tebe

lloSantaBa

rbara

NorthBa

ySo

uthBa

yLo

ngBea

chBa

rstow

Sierra

CentralC

oast

Kernville

Bishop

Teha

chap

iArrowhe

adYu

ccaVa

lley

BigCree

kBlythe

NorthVa

lley

Humbo

ldt

SAIDI

UtilityDistrictorDivision

Rangeof2015IOUDistrictSAIDIScores

Page 13: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

6

Table3FiveLowest2015SAIDIScores

UtilityDistrict/Division Utility 2015SAIDIScore 10YearAverageSAIDICatalina SCE 43 162SanFrancisco PG&E 45 89Saddleback SCE 46 100OrangeCounty SDG&E 48 125Eastern SDG&E 50 141

OutageFrequencyOutagefrequencyistrackedbytheSystemAverageInterruptionFrequencyIndex(SAIFI)whichindicateshowoftenacustomerexperiencesasustainedinterruptiononanannualbasis.

SystemAverageInterruptionFrequencyIndex(SAIFI)=

NumberofsustainedcustomeroutagesexperiencedbycustomersTotalnumberofcustomers

Itiscalculatedbytotalingthenumberofcustomersimpactedperoutageduringtheyear,dividedbythetotalnumberofcustomersserved.

Σ (NumberofCustomersInterruptedperoutageeventduringyear)TotalNumberofCustomersServed

Page 14: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

7

Figure3

AsshownaboveinFigure2,for2015theSAIFImetriconalocallevelrangedfromlessthan0.39to3.97.Atotalof53subregionshadscoreswerebelow1.50.

Table3FiveHighest2015SAIFIScores

UtilityDistrict/Division Utility 2015SAIDIScore 10YearAverageSAIDIArrowhead SCE 3.97 3.11BigCreek SCE 3.42 3.84Humboldt PG&E 2.38 2.29Catalina SCE 2.25 2.38Bishop SCE 2.22 1.28

Table4FiveLowest2015SAIFIScores

UtilityDistrict/Division Utility 2015SAIDIScore 10YearAverageSAIDISaddleback SCE 0.39 0.75Eastern SDG&E 0.46 0.72NorthCoast SDG&E 0.52 0.71SanFrancisco PG&E 0.58 0.797Wildomar SCE 0.60 0.88

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

Sadd

leba

ckEa

stern

NorthCo

ast

SanFran

cisco

Wild

omar

Construc

tionMetro

Valenc

iaSantaMon

ica

Orang

eCo

unty

BeachCitie

sMiss

ion

Fulle

rton

Antelope

Valley

DeAnza

SantaAn

aWhittier

Ontario

EastBay

Palm

Sprin

gsCo

vina

SanJose

Mon

rovia

Northe

ast

Long

Bea

chVictorville

Thou

sand

Oaks

LosP

adres

Peninsula

Foothill

Sono

ma

Huntington

Bea

chKe

rnville

Domingu

ezHills

Men

ifee

Sacram

ento

Ridg

ecrest

Redlan

dsKe

rnSanJoaq

uin

Diab

loStoc

kton

Yosemite

NorthBa

yBa

rstow

Mon

tebe

lloVe

ntura

Teha

chap

iFresno

SouthBa

yCe

ntralC

oast

Sierra

Blythe

SantaBa

rbara

YuccaVa

lley

NorthVa

lley

Bishop

Catalin

aHu

mbo

ldt

BigCree

kArrowhe

ad

SAIFI

UtilityDistrictorDivision

Rangeof2015SAIFIScores

Page 15: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

8

AverageTimetoRestoreServiceTheaveragetimetorestoreserviceisindicatedbytheCustomerAverageInterruptionDurationIndex(CAIDI)andrepresentstheaveragetimerequiredtorestoreservicetocustomerspersustainedinterruptions

CustomerAverageInterruptionDurationIndex(CAIDI)=

TotalminutesofoutagedurationTotalnumberofcustomerinterrupted

Thismetriciscalculatedbymultiplyingtherestorationtimeforeachoutagebythenumberofinterruptedcustomersforthatoutage,summingupthetotalforalloutageeventsfortheyearandthendividingbythesumofallcustomersinterruptedperoutageevent.

Σ(restorationtimeofeachoutage)(Numberofinterruptedcustomersforeachoutage)

Σ(Numberofinterruptedcustomersforeachoutage)

AndisequivalenttoSAIDIdividedbySAIFIorCAIDI=SAIDI÷SAIFIIn2015,theCAIDImetricrangedfrom19atSCE’sCatalinaDistrictto311atPG&E’sHumboldtDivision.Forthisreport,theCAIDIforthelocalareaswascalculatedbytheCPUCfromthesubmitteddataonSAIDIandSAIFI.

AverageFrequencyofMomentaryInterruptionsAmomentaryinterruptionisabrieflossofpowerdeliverytooneormorecustomers.TheaveragefrequencyofmomentaryinterruptionsthatacustomerexperiencesduringayearisindicatedbytheMomentaryAverageInterruptionFrequencyIndex(MAIFI).

MomentaryAverageInterruptionFrequencyIndex(MAIFI)=

NumberofcustomerswhoexperiencemomentaryinterruptionTotalnumberofcustomers

Thismetriciscalculatedbysummingthetotalofthenumberofmomentaryinterruptionsduringtheyearmultipliedbythenumberofinterruptedcustomersanddividingbythetotalnumberofcustomersserved.

Σ[(Numberofmomentaryinterruptions)(Numberofinterruptedcustomers)]Totalnumberofcustomers

For2015,valuesforthelocalMAIFImetricinthethreeIOUsrangedfrom0.239to9.298.

Page 16: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

9

StatewideReliabilityPerformance2006-2015SystemwideSAIDIBasedonthesystemwidereliabilitymetricsovertheyears2006-2015,overallstatewideelectricreliabilityhasshownmajorimprovement.WithregardtotheamountofoutagedurationsasmeasuredbytheSAIDIindex,Figure4showstheannualscoresand10-yearmovingaverageforeachofthethreeutilities.Forthe10-yearmovingaverage,SDG&EandSCEhavemaintainedlowaveragesinthe150range,withSDG&EholdingsteadyduringthattimeperiodandSCEreducingitsoutageduration,withits10-yearmovingoutagedroppingslightlybelowSDG&Ein2013.Since2012,SDG&ESAIDIscoreshavebeenconsistentlyaround80minutes,whileSCE’sscoreshavehoveredslightlyabove100.MorenotablehasbeenthesharpdeclineinoutagedurationinthePG&Esystem.The10-yearmovingaverageforPG&Ehasgonefromabove300towhereitnowisslightlyaboveSDG&EandSCEat150.Since2012,PG&E’ssystem-wideSAIDIscorehashoveredaround150minutes.Itisalsonotablethatin2011,theSouthernCaliforniaregion,particularlySDG&Eserviceterritory,wasimpactedbyamajortransmissionoutagewhichisreflectedinthespikeinSAIDIscoresforthatyear.ThisspikeisreflectedintheregionalscoresforSDG&Ewhicharediscussedlaterinthisreport.

Page 17: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

10

Figure4

SystemwideSAIFIThehistoricaldataforoutagefrequenciesasmeasuredbytheSAIFIindex,showninfigure5below,againdemonstratesoverallimprovementinthereliabilityofCalifornia’sinvestor-ownedelectricsystems.SDG&Ehasthelowest10-yearmovingaverage,thoughtithasslightlyincreasedduringthetimeperiodofinterest.Priorto2011,SDG&E’sSAIFIscorewasbelow0.6andsince2013ithasbeenslightlyoverthatmark,whichisstillthelowestofthethreeIOUs.SCEhasshownsteadyimprovementoverthepasttenyears,whereearlyinthatperiod,SCE’sSAIFIscoreshoverednear1.1,morerecentscoreshavebeeninthe0.9range.SimilartoitsSAIDIscores,PG&EhasasignificantdropinSAIFIscores.WhereithadbeenconsiderablyhigherthantheothertwolargeIOUelectricservicesearlyinthereviewedperiod,ithasdroppedsteadilyandisapproachingSCE,witha2015systemwideSAIFIscoreof1.05.

SCESAIDI

PG&ESAIDI

PG&ESAIDI10yearmovingaverage(bluedashedline)

SCESAIDI10-yearmovingaverage(greendashedline)

SDG&ESAIDI

SDG&ESAIDI10-yearmovingaverage(reddashedline)

2011SouthwestBlackout

Page 18: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

11

Figure5

SystemwideCAIDIForhistoricalsystemwideannualCAIDIscoresasshowninFigure6below,theresultsdiffersomewhatfromthepriortwometrics.ForCAIDI,historicallySCEhasbeenthelowestscorer,witharelativelyflat10-yearmovingaverageatapproximately130.SDG&EandPG&Ehavebothhadhigherscoresand10-yearmovingaverages,butbothutilities’averageshavedroppedsteadyandinthepastthreeyears,allthreeutilitieshavehadsimilarCAIDIscores,rangingfrom100-140lastyear.

SDG&E10-yearmovingaverage

SDG&ESAIFI

SCESAIFI

PG&ESAIFI

PG&ESAIFI10-yearmovingaverage

SCESAIFI10-yearmovingaverage

2011SouthwestBlackout

Page 19: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

12

Figure6

SystemwideMAIFIFigure7belowprovidesthehistoricsystemwideannualMAIFIscores.Theresultsforsystem-wideannualMAIFIscoresdiffersfromthepreviousmetricswithSDG&Ehavingscoresthatare25-33%ofSCEandPG&Escores.SDG&Ehasshownsteadyimprovementoverthepast10years.SCEhasalsoshownasteadydeclineinmomentaryoutages,withtheMAIFIscorestartingat1.75anddroppingtoaslowas1.25inrecentyears.PG&EMAIFIscoresstartedinthesamerangeasSCE,buthasonlyslightlydeclinedbasedonthe10yearmovingaverageandactuallyspikedin2012at1.9,thehighestfrequencyofmomentaryoutagesofanyCaliforniaIOUelectricsystemoverthepasttenyears.

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

HistoricalIOUSystemwideAnnualCAIDIMetrics

SCECAIDI

SDG&ECAIDISCECAIDI10-yearmovingaverage

PG&ECAIDI10-yearmovingaverage

SDG&ECAIDI10-yearmovingaverage

PG&ECAIDI

2011SouthwestBlackout

Page 20: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

13

Figure7

0

0.5

1

1.5

2

2.5

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

HistoricalIOUSystemwideAnnualMAIFIMetrics

PG&EMAIFI10-yearmovingaverage

SDG&EMAIFI

PG&EMAIFI

SCEMAIFI

Page 21: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

14

RegionalReliabilityReview2006-2015Inthissection,annualreliabilitymetricsaredescribedbyutilitydivisionordistrict.Thisinformationisgroupedbyregiontoprovideadistinctportraitofreliabilitywithmeaningfulinsightintoelectricserviceperformanceatalocallevel.

ReliabilityDashboardsThisreportpresentsreliabilitymetricsutilizingadashboardthatisdesignedtoconveyinformationonreliabilityforeachdivisionordistrictbasedonthedataprovidedbyeachutility.AnexampleofthereliabilitydashboardisshownbelowinFigure8.

Figure8

CaliforniaReliabilityDashboardExample

Thefourreliabilitymetricsarehighlightedinthedashboard.Themetricforthecurrentreportingyear,2015,islistedonthetopofeachmetricsquare;thecolorofthebannerisdependentontheutilitybeinghighlighted,blueforPG&E,greenforSCE,andredforSDG&E.Belowthemetricsarecoloredgraphsthatindicatethatmetricsperformanceoverthepasttenyears;theredlineisa10-yearmovingaverageforthatmetric.Amovingaveragethatslopesdownfromlefttorightindicatesthatreliabilityhasimprovedbasedonannualmetricscoresoverthepasttenyears.Aflatlineindicatesthatreliabilityhasbeenstableoverthoseyears.Alinethatslopesupwardfromlefttorightindicatesthatreliabilityhasdecreasedduringthattimeperiod.Thedarklineshowshowthatmetrichasperformedannuallyoverthetenyearhistoryandindicateswhetherthatindexhasbeenconsistentonayear-to-yearbasis,hasfrequentspikesanddipsorhadprioryearsofhigherorlowervaluesforthatindex.Intheaboveexample,theSAIDIgraphshowsthatSAIDIinthefirstfiveyearshadscoresupto600.Sincethattime,theSAIDIscorehasbeeninthe250to300rangeincludingthecurrentscoreof286.The10-yearmovingaverageshowsadeclineinSAIDIwhichindicatesfeweroutageminutesinrecentyearswhencomparedwiththeearlierperiod.Similarly,intheaboveexample,theSAIFIindexshowsanearlyspikeandthensomevariabilityinalowerrange,withthe2015valueof0.96beingonthelowerendofthatrange.Incontrast,theCAIDIindexshowsthe10-yearmovingaverageincreasingforthisindex.Finally,theMAIFIindexshowssignificantvariabilityoverthepast10years,trendingdownward,withthe2015scoreof1.630beingthelowestforthatperiod.

SCE Central Valley - Kernville District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

286 0.96 298 1.630

02468

0100200300400

012345

0100200300400500600

Page 22: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

15

NorthernRegion

Figure9NorthernRegion

RegionalSummary

TheNorthernRegionconsistsofPG&EdivisionsSierra,HumboldtandSonoma.Allthreedivisionshaveshownimprovementinreliability.In2015,Sonomahadthelowestscorefortheregionat140,indicatingthebestreliabilityperformanceintheregion,whileHumboldthadahighscoreof741for2015.Allthreedivisionsshowsignificantimprovementwithreducedoutageduration,withSAIDIscorestrendinglowerandasharpdropinSAIDIscoresbetween2012and2013.Thefrequencyofoutagesonanannualbasisalsodeclined,withSAIFIshowingimprovementandscorestrendingdownwardovertheperiod.However,momentaryoutagestrendedupwardslightlyinallthreedivisions.

Page 23: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

16

PG&E Northern Region - Sonoma Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

140 0.954 147 2.004

0100200300400500

0

1

2

0100200300400

0123

PG&E Northern Region - Sierra Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

197 1.401 141 3.240

0500

1,0001,500

0123

0200400600

01234

PG&E Northern Region - Humboldt Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

741 2.382 311 2.839

0500

1,0001,500

01234

0100200300400500

012345

Page 24: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

17

BayAreaRegion

Figure10

BayAreaRegion

RegionalSummary

TheBayAreaconsistsofeightPG&Edivisions,1)NorthBay,2)SanFrancisco,3)EastBay,4)Diablo,5)Mission,6)Peninsula,7)DeAnza,and8)SanJose.WithinPG&E’sserviceterritory,overalltheBayAreahasseensignificantimprovementinreliabilityoverthepasttenyears.Bothoutagedurationandfrequencytrendeddownwardoverthepasttenyears,withsomedivisionsshowingmarkedimprovementsince2012.Somedivisionshavealsoshownadeclineinmomentaryoutages.ThedivisiondashboardthatfollowshastheBayAreadivisionsrankedbytheirSAIDIscore,fromlowesttohighest.

Withregardtodivisionreliabilityperformance,alldivisionsshowedimprovedforthepasttenyearsexceptforSanFrancisco,whichhashadaspikeinoutagedurationin2014.

Page 25: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

18

PG&E Bay Area - San Francisco Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

45 0.575 78 0.544

050

100150200

0.00.51.01.5

050

100150200

0.00.51.01.5

PG&E Bay Area - East Bay Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

66 0.761 87 1.218

050

100150200

0.00.51.01.5

050

100150200

0.00.51.01.52.0

PG&E Bay Area - Mission Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

73 0.644 113 1.160

050

100150

0.00.51.01.5

050

100150

0.00.51.01.52.0

PG&E Bay Area - De Anza Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

81 0.683 118 1.303

0100200300400

0.00.51.01.52.0

0100200300

0.00.51.01.52.0

Page 26: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

19

PG&E Bay Area - San Jose Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

90 0.873 104 1.197

0100200300400

0.00.51.01.52.0

0100200300

0.00.51.01.5

PG&E Bay Area - Peninsula Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

91 0.939 96 1.841

0100200300400500

0.00.51.01.52.0

0100200300

0.01.02.03.0

PG&E Bay Area - North Bay Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

156 1.167 134 2.161

0250500750

0.00.51.01.52.0

0100200300400

0.01.02.03.0

PG&E Bay Area - Diablo Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

98 1.077 91 1.961

0100200300400

0.00.51.01.52.0

050

100150200

0123

Page 27: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

20

CentralValleyRegionFigure11

CentralValleyRegion

RegionalSummary

TheCentralValleyRegionisuniquebecauseitisacombinationofPG&EdivisionsandSCEdistricts.ItconsistsofsixPG&EdivisionsandthreeSCEdistricts.ThePG&EdivisionsintheCentralValleyregionare1)NorthValley,2)Sacramento,3)Stockton,4)Yosemite,5)Fresno,and6)Kern.TheSCEdistrictsareKernville,SanJoaquin,andTehachapi.Ingeneral,eightoftheninedivisionsordistrictsshowedpositiveimprovementinreliability.TheexceptionwasSCESanJoaquinDistrictwhichshowedanincreaseinSAIDIannualresultsoverthetenyearperiod.Theremainingeightdidshownotableimprovement,particularlythePG&E’sFresnoandSacramentodivisionsalongwithSCEKernvilleandTehachapidistricts.

Page 28: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

21

PG&E Central Valley - Kern Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

105 1.032 102 1.972

0123

050

100150

0.00.51.01.52.0

050

100150200250

PG&E Central Valley - Sacramento Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

112 1.009 111 1.843

0200400600800

1,000

0123

0100200300400500

0123

PG&E Central Valley - Fresno Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

116 1.269 91 2.132

0100200300400

0123

050

100150200

0123

SCE Central Valley - San Joaquin District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

128 1.05 121 1.414

0123

050

100150200

0.00.51.01.52.0

050

100150200250

Page 29: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

22

PG&E Central Valley - Yosemite Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

131 1.165 113 3.180

0400800

1,200

0.00.51.01.52.02.5

0200400600

012345

PG&E Central Valley - Stockton Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

135 1.112 121 2.285

0200400600

0123

0100200300

01234

SCE Central Valley - Kernville District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

286 0.96 298 1.630

02468

0100200300400

012345

0100200300400500600

SCE Central Valley - Tehachapi District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

299 1.21 246 3.960

02468

-5050

150250

01234

0200400600

Page 30: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

23

PG&E Central Valley - North Valley Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

506 1.922 263 2.595

0500

1,0001,5002,000

0123

0200400600800

012345

Page 31: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

24

CoastalRegion

Figure12CoastalRegion

RegionalSummary

TheCoastalregionisamixoftwoPG&EdivisionsandthreeSCEdistricts.ThePG&EdivisionsareCentralCoastandLosPadres;theSCEdistrictsare1)SantaBarbara,2)ThousandOaks,and3)Ventura.Allfiveshowedimprovementsinreliabilityinthepasttenyearswithnotablereductioninoutagedurationsandfrequency.Mostmetricsimprovedorheldsteady,withtheexceptionofVenturaDistrictwhereCAIDIscoresslightlytrendedupwards.

Page 32: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

25

SCE Coastal - Thousand Oaks District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

107 0.92 116 1.893

0123

050

100150200

0.00.51.01.52.0

050

100150200250

PG&E Coastal - Los Padres Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

149 0.928 160 1.869

01234

050

100150200

0123

0100200300400500

SCE Coastal SoCal - Ventura District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

149 1.19 125 1.447

0123

050

100150

0123

050

100150200

PG&E Coastal - Central Coast Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

270 1.375 196 2.279

012345

0100200300400

0123

0200400600800

1,000

Page 33: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

26

SCE Coastal - Santa Barbara District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

152 1.52 100 1.577

012345

050

100150200

02468

10

0200400600

Page 34: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

27

LosAngelesCounty(West)Region

Figure13LosAngelesCounty(West)Region

RegionalSummaryTheLosAngelesCounty(West)RegionconsistsoffiveSCEdistricts,1)Catalina,2)SantaMonica,3)DominguezHills,4)SouthBayand5)LongBeach.ThisregionhadamajorityofdistrictswherereliabilityhasdecreasedintheState.Inparticular,thereliabilitymetricsforSouthBay,LongBeachandSantaMonicaDistrictsindicateadeclineinperformance.Incontrast,CatalinaDistricthadnotableimprovementalthoughit,LongBeach,andDominguezHillshadincreasedMAIFIscores.

Page 35: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

28

SCE Los Angeles County West - Catalina District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

43 2.25 19 2.885

012345

050

100150200250

012345

0200400600800

1,0001,200

SCE Los Angeles County West - Santa Monica District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

75 0.62 121 1.069

0.00.51.01.52.0

050

100150200

0

1

2

050

100150

SCE Los Angeles County West - Dominguez Hills District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

131 0.97 135 2.049

0123

050

100150200

0.00

0.50

1.00

050

100150200

SCE Los Angeles County West - South Bay District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

164 1.31 126 1.660

0123

050

100150200

0.00.51.01.52.0

050

100150200

Page 36: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

29

SCE Los Angeles County West - Long Beach District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

164 0.89 184 1.185

0.00.51.01.5

050

100150200250

0.000.250.500.751.00

050

100150200

Page 37: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

30

LosAngelesCounty(East)Region

Figure14LosAngelesCounty(East)Region

RegionalSummary

LosAngelesCounty(East)consistsofsixSCEdistrictswherethemajorityofdistrictshadfailingreliabilityperformanceoverthepasttenyears.Thesedistrictsare1)AntelopeValley,2)Covina,3)Foothill,4)Monrovia,5)Montebello,6)Valencia,and7)Whittier.TheValenciadistrictshowednotableimprovement,theremainingfivedistrictseitherhadmarginalimprovementoradeclineinperformanceoverthepasttenyears.Thehistoricalmetricsindicatesthatthesetrendsreflecttheimpactofthe2011regionaltransmissionoutageonthesedistricts.

Page 38: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

31

SCE Los Angeles County East - Valencia District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

72 0.61 118 0.971

0.01.02.03.0

050

100150200

0123

050

100150200250

SCE Los Angeles County East - Monrovia District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

97 0.88 110 1.618

0123

0500

1,0001,500

0.00.51.01.52.0

01,0002,0003,000

SCE Los Angeles County East - Covina District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

100 0.81 123 1.164

0112

050

100150200250

0.000.250.500.751.00

050

100150200

SCE Los Angeles County East - Antelope Valley

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

104 0.68 154 1.838

0123

050

100150200

0.00.51.01.52.0

0100200300

Page 39: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

32

SCE Los Angeles County East - Whittier District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

115 0.73 156 1.084

0.00.51.01.5

050

100150200250

0.0

0.5

1.0

050

100150200

SCE Los Angeles County East - Montebello District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

150 1.18 127 2.213

0.01.02.03.0

0200400600

0.00.51.01.52.0

0100200300400500600700

Page 40: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

33

OrangeCountyRegion

Figure15OrangeCountyRegion

RegionalSummaryOrangeCountyconsistsoffourSCEdistrictsandoneSDG&Edistrict.TheSDG&EdistrictisOrangeCounty.ThefourSCEdistrictsare1)Fullerton,2)HuntingtonBeach,3)Saddleback,and4)SantaAna.ThefourSCEdistrictsshowedimprovementinreliabilitybuttheSCDG&EOrangeCountyDistrictdidshowadeclineinreliability,primarilyduetothe2011regionaltransmissionoutage.Itshouldbenotedthatithada2015SAIDIscoreof48,withtheregiontopscorebeing46fromtheSaddlebackDistrict.Alldistrictshavelowoutagedurationscomparedtootherpartsofthestate.

Page 41: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

34

SCE Orange County - Saddleback District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

46 0.39 120 0.379

0.000.250.500.751.00

050

100150200

0.00.51.01.5

050

100150200

SDG&E Orange County - Orange County District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

48 0.624 77 0.195

0123

0100200300400

0.00.51.01.52.0

0100200300400500

SCE Orange County - Santa Ana District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

67 0.71 96 1.130

0.00.51.01.5

050

100150

0.000.250.500.751.00

050

100150

SCE Orange County - Fullerton District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

77 0.67 114 1.014

0.00.51.01.5

050

100150200

0.00.51.01.5

050

100150

Page 42: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

35

SCE Orange County - Huntington Beach District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

98 0.95 103 1.217

0.00.51.01.52.0

050

100150

0.00.51.01.5

050

100150

Page 43: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

36

InlandEmpireRegion

Figure16InlandEmpireRegion

RegionalSummaryTheInlandEmpireRegionconsistsofsixSCEdistricts.Thesedistrictsare1)Arrowhead,2)Menifee,3)Ontario,4)PalmSprings,5)Redlands,and6)Wildomar.AlldistrictsshowednotableimprovementwiththeArrowheadDistrictshowingthelargestimprovementintheState.WhileArrowheadstillhasahigh2015SAIDIscoreof363,allreliabilitymetricsshowmarkedimprovementoverthatpasttenyears.Ingeneral,allmetricsdeclinedwiththeexceptionofRedlandsDistrictCAIDI.MenifeeDistricthadarecentspikeinoutageduration.

Page 44: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

37

SCE Inland Empire - Wildomar District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

53 0.60 88 1.255

0.00.51.01.52.0

050

100150200

0.00.51.01.52.0

050

100150

SCE Inland Empire - Ontario District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

94 0.74 126 0.926

0.00.51.01.52.0

050

100150200

0.000.250.500.751.00

050

100150200

SCE Inland Empire - Palm Springs District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

100 0.80 124 1.042

0123

050

100150200

0.00.51.01.52.0

050

100150200

SCE Inland Empire - Foothill District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

110 0.95 116 1.304

0123

050

100150200

0.00.51.01.5

050

100150200

Page 45: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

38

SCE Inland Empire - Menifee District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

111 0.98 114 1.302

0123

050

100150200

0.00.51.01.52.0

050

100150200

SCE Inland Empire - Redlands District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

125 1.01 123 1.467

01234

050

100150200

0.00.51.01.52.0

0100200300

SCE Inland Empire - Arrowhead District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

363 3.97 91 5.595

05

101520

0200400600800

1,000

0246

01,0002,0003,000

Page 46: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

39

DesertRegion

Figure17DesertRegion

RegionalSummaryTheDesertRegionconsistsofsevenSCEdistricts.Thesedistrictsare1)Barstow,2)Bishop,3)Blythe,4)Ridgecrest,5)BigCreek,6)Victorville,and7)YuccaValley.Threedistrictsshowedreasonableimprovementbuttwodistricts,YuccaValleyandBlythe,showedadeclineinreliabilityperformance.BarstowandBishopshowedstablemetricsforthe10-yearperiod.

Page 47: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

40

SCE Desert - Victorville District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

87 0.91 96 1.839

01234

050

100150200

0.00.51.01.5

050

100150200

SCE Desert - Ridgecrest District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

149 1.01 147 2.169

02468

050

100150200

01234

0100200300400500

SCE Desert - Barstow District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

187 1.17 159 2.859

02468

050

100150200

012345

0100200300400500

SCE Desert - Bishop District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

298 2.22 134 3.332

0246

0100200300400500

0123

0200400600800

Page 48: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

41

SCE Desert - Yucca Valley District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

389 1.80 216 3.922

05

101520

0100200300

01234

0100200300400500

SCE Desert - Big Creek District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

423 3.42 124 9.298

02468

10

0200400600800

05

1015

02,0004,0006,000

SCE Desert - Blythe District

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

427 1.52 282 1.396

0246

0200400600800

01234

0500

1,0001,500

Page 49: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

42

SanDiegoRegion

Figure18SanDiegoRegion

RegionalSummary

TheSanDiegoRegionconsistsoffiveSDG&EdistrictsthatconsistentlyhavethereliabilityperformanceintheState,withSAIDIscoresrangingfrom50-71.Thesedistrictsare1)Northeast,2)Eastern,3)NorthCoast,4)BeachCities,and5)ConstructionMetro.Whilereliabilitymetricsforthesedivisionsindicateadeclineinreliabilityperformance,itisaresultofthe2011regionaltransmissionoutage.Otherwisereliabilityinthisregioncontinuestofollowaconsistent,highlevelofreliabilityperformance.Momentaryoutageshaveshownsteadydeclineinthisregion.

Page 50: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

43

SDG&E San Diego - Eastern Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

50 0.461 109 0.239

0123

0100200300400500

0.00.51.01.52.0

0200400600800

SDG&E San Diego Region - North Coast Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

54 0.521 103 0.275

0123

0100200300400

0.00.51.01.52.0

0200400600800

SDG&E San Diego Region - Construction Metro Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

71 0.598 118 0.420

0123

0100200300400500

0112

0200400600

SDG&E San Diego Region - Beach Cities Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

71 0.627 114 0.343

0123

0100200300400500

0112

0200400600

Page 51: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

44

SDG&E San Diego - Northeast Division

SSAAIIDDII SSAAIIFFII CCAAIIDDII MMAAIIFFII

73 0.884 83 0.312

0123

0200400600800

1,000

0.00.51.01.52.0

0200400600800

Page 52: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

45

ConclusionAreviewofCaliforniainvestor-ownedutilities’reliabilitydatafortheyears2006-2015showthatoverallelectricreliabilityhasimprovedandisatasatisfactorylevelforallthreeutilitiesconsideredinthisstudy.Despiteamajorregionaltransmissionoutagein2011,SanDiegoreliabilitymetricsdemonstratedconsistentlysuperiorreliabilityperformance,withthelowestscoresintheStateforthreeofthefourreliabilitymetrics.SouthernCaliforniaEdisonsystemwideisaclosesecond,withimprovementoverthepast10years.PG&E,whichhadpreviouslyhadhighreliabilityscores,hasinthepast10yearshasdemonstratedsignificantimprovement,withasteepdeclineinreliabilityscorestowhereitisclosetoSCEandSDG&Eintermsofreliabilityperformance.Theexceptionisinthemetricmeasuringrestorationtime,CAIDI,whichshowsSCEtobethelowesttimetorestore,followedbySDG&EandPG&E.Forallthreeutilities,thetimetorestoreservicehasdeclinedoverthe10-yeartimeperiod.Similarly,anexaminationofthe60districtsanddivisionsintheIOUserviceterritoriesprovidedagranularviewofreliableelectricserviceinCalifornia,againshowingmarkedimprovementinreliableservice,particularlyinPG&EserviceterritoryandconsistentsuperiorreliableserviceinSDG&Eserviceterritory.ManyofSCEdistrictsshowedimprovementaswell,butwithsomeoutlierdistricts,particularlyinLosAngelesCounty,wherereliabilitymetricsindicatethatreliableelectricservicehasdeclinedoverthepasttenyears.

Page 53: PPD Reliability Review...2016/05/09  · California Electric Reliability Investor-Owned Utilities Performance Review 2006-2015 This report reviews the reliability metrics data for

46

References

CaliforniaPublicUtilitiesCommission,DecisionUpdatingtheAnnualElectricReliabilityReportingRequirementsforCaliforniaElectricUtilities,Decision16-01-008,January14,2016Chen,Po-Chenetal.,TexasA&MUniversity,TheUseofBigDataforOutageManagementDistributionSystems,CIREDRomeWorkshop,Paper0406,June2014

Chen,Po-Chenetal.,TexasA&MUniversity,PredictingWeather-AssociatedImpactsinOutageManagementUtilizingtheGISFramework,Proceedingsof2015IEEEPESInnovativeSmartGridTechnologiesLatinAmerica,2015

Choe,Tometal.,FreewayPerformanceMeasurementSystem(PeMS):AnOperationalAnalysisTool,Presentationtothe81stAnnualMeeting,TransportationResearchBoard,January2002

Dorr,DougandJaredGreen,ElectricPowerResearchInstitute,UtilityDataAnalyticsProjectMakesMolehillsOutofMountains,ElectricEnergyT&DMagazine,January/February2016

ESRI,StormVulnerabilityAssessment,ArcGISforUtilities,http://solutions.arcgis.com/utilities/electric/help/storm-vulnerability/

Eto,JosephH.etal.,LawrenceBerkeleyNationalLaboratory,TrackingtheReliabilityoftheU.S.ElectricPowerSystem:AnAssessmentofPubliclyAvailableInformationReportedtoStatePublicUtilityCommissions,October2008

Eto,Josephetal.,LawrenceBerkeleyNationalLaboratory,AnExaminationofTemporalTrendsinElectricityReliabilityBasedonReportsfromU.S.ElectricUtilities,January2012

Kezunovic,M.etal.,TheRoleofBigDatainImprovingPowerSystemOperationandProtection,Int.Inst.ForResearchandEducationinPowerSyst.DynamicsSymp.,Aug2013

Meehan,B.,ModelingElectricDistributionwithGIS,ESRIPress,2013

Parisi,CJ,etal.,UtilityIntegrationSolutions,Inc.,ActingontheDelugeofNewlyCreatedAutomationData:UsingBigDataTechnologyandAnalyticstoSolveRealProblems,ElectricEnergyT&DMagazine,January/February2013

Taylor,Jason,ElectricPowerResearchInstitute,BulkSystemReliabilityAssessmentandtheSmartGrid,ElectricEnergyT&DMagazine,January/February2013

Varaiya,Pravin,UCBerkeley,FreewayPerformanceMeasurementSystem:FinalReport,UCB-ITS-PWP-2001-1,January2001

Zietsman,Josiasetal.,AGuidebookforSustainabilityPerformanceMeasurementforTransportationAgencies,NationalCooperativeHighwayResearchProgram,Report708,TransportationResearchBoardoftheNationalAcademies,2011