Activity #2 6.11.2014 SESAR2020 RPAS C2

Upload: others

Post on 25-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

Activity #2 6.11.2014

SESAR2020 RPAS C2

Page 2: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

A#2 C2 Contents

• Initial Work split

• Participants

• RPAS C2 Objectives

• Work plan

• Meetings

• Deliverables

• A#2 DOW view

• Next steps

2

ATC

RPA

A/C

RPS

ATC Transaction

C2 Transaction

RPA <-> RPS ATC <-> RPA

RPIL

ATC <-> RPIL

Terminology note: C2 datalink (C3 stands for application level)- as defined in ICAO RPAS manual

Page 3: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

3 3

Initial work split i1 i2 i3 i4 i5 i6 i7 i8

Petr Kanovsky-Honeywell PK

Francesco Fusco-CIRA FF

Rita Rinaldo-ESA RR

Patrick de Prevaux - ASD PP

Dominique Colin-ECTL DC

Laurence Duquerroy -ESA LD

Aurora Sanchez -ENAIRE AS

Juan Ponce-Cassidian JP

Francois Rivet-ASD FR

Erwan Le-Ho-TASF EL

This allocation was done around the 1st meeting, all items are covered, even there are more contributors to one item

i1 – C2 requirements – RCP

i2 – RCP to RPAS segmentation/categorization

i3 – GNSS services impact on C2

i4 – SDR role

i5 – C2 for formation flight

i6 – Safety & Security

i7 - Modeling, prototyping and demonstration

i8 - Spectrum issues, including RF interference

Items taken from the ‘RPAS Activities_Project work plan v1.0’ document

Page 4: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

C2 – Objectives, dependences and deliverables

4

Assumed is tight cooperation with other activities (A#1-6) and RPAS actors (EUROCAE, JARUS, … ) – in order to not start again from beginning, but do the work effectively.

O1: Environment

definition

O3: Safety impact

O2: RCP

O5: Avionics &

Architecture

O6: Simulation &

Testing

System/performance specifications (SPS)

Spectrum requirements,

including spectrum management

issues.

Models and prototypes

Interoperability requirements

(INTEROP)

Safety and Performance Requirements

(SPR)

Operational Services and Environment Description

(OSED)

Objective

Deliverable

Legend:

Dependency

Note: Deliverable is not complete standard (e.g. SPR), but significant and leading contribution to the EUROCAE work.

A#1 D&A

A#3 Airspc

A#4 Conting.

A#5 HF

A#6 Secur.

O4: Feasibility

&Spectrum & RFI

Page 5: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

RPAS C2 objectives

O1: RPAS Environment & operations definition – common work across all Activities- includes airspaces, D&A, GNSS, formation flight, formulation of stepwise approach …

O2: Operational RCP figures identification – parameters (latency…) for defined environment & operations

O3: Safety RCP figures formulation – safety parameters O4: Existing Technology status analyses-feasibility to fulfill

RCP figures by state-of-the-art systems – including RF Interferences and Business cases

O5: Requirements for Avionics architectures and avionics&architectures proposal

O6: Simulation and demonstration of all above defined work

Page 6: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

A2/C2 work plan

6

• A2/C2 meeting (T0)- 25.9.2014 – start of items identifications and definition- initial allocation

• Meeting (T1=T0+1week) – initial contribution

• Meeting (T2=13.10.2014) –contribution discussion – format still TBC

• Internal Milestone #1 date (T3=16.10.2014) – Initial release for external comments (before that email exchange of drafts)-in proper format

• External Milestone #2 date (T4=23.10.2014) – handover to ML

• 2nd Working Session and A#2 presentation –T5 = 27.11.2014

• Meeting T6=5.11.2014 – comments integration

• RPAS Definition Phase Workshop 02 – T7=6.11.2014

T0

T1

T4

T2

T3

T7 T6

T5

Page 7: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

Petr Francesco

Rita Patrick Dominique Laurence Aurora Juan Francois -Yoann

Erwan Derek

25.9.

2.10.

13.10.

5.11.

Meetings attendance log

7

Page 8: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

Assumed standardization contributions & dependences

8

Important note: Based on latest realistic, but not yet approved EUROCAE WG73 Terms of references

Standard Relation Assumed release

Date Description

OSED Input 2015 Operational Services and Environment Definitions (OSED) shall be available prior the SESAR2020 RPAS activities start

SPR & INTEROP Major contribution

2016

The Operational and Safety Performance Requirements (SPR) and Interoperability (INTEROP) analyses will deliver requirements directly relevant to the subjects of Command and Control

RPAS C2 MASPS stage One

Major contribution

2016 Minimum Aviation System Performance Standards – C2 system oriented - Content definition and initial figures – draft version

RPAS C2 MASPS stage Two

Major contribution

2017 This version shall be final MASPS for official release

RPAS C2 RLOS MOPS

Major contribution

2018 Minimum Operational Performance Specification – C2 equipment oriented, focusing on RLOS operations

RPAS C2 BRLOS MOPS

Major contribution

2018 Minimum Operational Performance Specification – C2 equipment oriented, focusing on BRLOS operations

SARPS Partial contribution

2018 C2 related Standards and Recommended Practices (SARPS - ICAO)

Page 9: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

A#2 DOW view

•9

Description of work Nature and description of work •Define the RPAS C2 exchanges at application level (messages type and size, associated traffic model…), integrating especially the level of automation, the flight phase and the area of operation. Evaluate STANAG 4586 suitability for this activity. •Reference architecture identification ( components of the C2 chain, external and internal interfaces). •Determine RPAS C2 requirements for RLOS and BRLOS starting from JARUS-RPAS C2 link RCP concept (Ed 1.0) and DeSIRE and CERES projects outcomes related to RCP definition and allocation (DeSIRE and CERES Final Report):

•Refinement of stepwise methodology for allocating RCP figures based on operation types (e.g. airspace class, population density, RPA types). This includes the assessment of the severity level associated to C2 related hazards in cooperation with Activities #1, #3 and #4; •Definition of C2 Data link Operational and Safety Performances Requirements, i.e. assignment of RCP figures (availability, continuity, communication transaction time, integrity) per operation types, down to an apportionment to data link systems (RLOS and BRLOS), ensuring both safe operations as well as technical feasibility; •Definition of the approach to verify and demonstrate compliancy with the performances requirements in accordance with Activity #5 (e.g. need of unambiguous measurable metrics); •Exploring the effect and efficiency on Comms C2 data link of multiple collaborative RPAS flight. Swarming and distributed tasks; •Cross check and liaison with GNSS services (related to gap 2.2). and identification of GNSS augmentation services impact on C2 operational and functional requirements during all RPAS flight phases;

•Strategic vision that addresses potential impacts to C2 link due to increasing demand, rapidly evolving technologies, and new uses;

•Formulate requirements for RPAS C2 Avionics •Definition of needed assurance level (DAL) for C2 system; •Security SW development assurance level definition (Activity #6 cooperation), attending to operational scenario; •Mapping of all required RPAS radio systems from the points of safety, simultaneous operation and RF parameters in order to analyze SDR approach benefits for RPAS; •Safety analysis for point-to-multipoint (aircraft formation and swarm) C2 architecture, e.g. common point of failure if ground C2 data link (RLOS or BLOS) is shared by several RPAs;

•Identification of parameters for link quality monitoring and identification of corresponding threshold values triggering contingency procedures; •C2 Security aspects addressing requirements from Activity #6::

•Resilience to attacks to data link systems (e.g. jamming and hijacking by Radio and SW means); •Identification of requirements for domains segregation in avionics architecture for CNS functions; •Use of multi-lateration for surveillance based on C2 data link signals in RLOS

Page 10: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

• Modelling, prototyping and demonstration. All the above should be demonstrated by stepped approach from modelling and simulation to in- flight demonstration of selected cases;

• Assessment of existing/planned RPAS performances (via analysis and simulation) and their impact on required C2 performance;

• Proposal of COM avionics architecture that reflects Activity #6 results and fulfils required domains segregation;

• Test bed simulating/emulating the complete C2 system of systems, i.e. integrating the application layer, the backup ground network, the emulation of radio data links. Such a test bed would make it possible to emulate C2 exchanges and test contingency procedures, handover procedures, multilink procedures etc.

• Trade-off for C2 data link (multilink) architectures and link requirements for RPAS operations – including, but not primarily, formation and swarm flight.

• Reference designs, adaptable to different aircraft environments (small, medium, large, dominant carrier, no dominant carrier, and other tenant mix), including basic security requirements for all stakeholders;

• Spectrum issues, including RF interference.

• Quantification of the extent and magnitude of the interference problems for the purpose of RPAS Command and control ;;

• Techniques for identifying and resolving interference issues outside reference designs;

• Band planning issues, including sharing between RLOS and BRLOS

SESAR

• This activity has impact on SESAR through:

• Communications requirements on aviation

• Spectrum requirements;

• RCP Latency definition and requirements;

• C2 architecture and integration with ATC communications and data link.

• Operational navigation capabilities depending on the Command and control design and data link performance, in particular for separation and during the landing phase (DA/DH)

• Surveillance through the use of multi-lateration using C2 datalink in RLOS

A#2 DOW view

10

Page 11: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

• Define Operational Improvements

– As defined in roadmap? =VLL (VLOS, E-VLOS, B-VLOS) + VFR/IFR (RLOS/BRLOS)? = 5 items?

• Identify and propose list of C2 related enablers

– TBD- RLOS C2 datalink, BRLOS C2 datalink, RPAS C2 avionics, …

• Analyze required outputs (alignment with EUROCAE WG73) – what must be done in order to realize C2 enablers and achieve OI’s (MOPS, MASPS…) and formulate Deliverables

• Address dependences with other activities & Identify required inputs

• Formulate waves and solutions in order to follow ‘Detailed Description of Work’ template (=WBS leading to deliverables)

• Running SESAR RPAS projects outputs incorporation. Data available?

Next steps

11

Co

mm

on

wo

rk

Page 12: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

Backup - Other RPAS activities -

12

Activity 1 – IFR/VFR & BVLOS – D&A Activity 2 – IFR/VFR & BVLOS – Comms C2 Data Link Activity 3 – IFR/VFR & BVLOS – Airspace Access and Airport Operations Activity 4 – IFR/VFR & (B)VLOS - Contingency Activity 5 – IFR/VFR & BVLOS – Human Factors Activity 6 - Security Activity 7 – Demonstrations of best practices

Page 13: PowerPoint Presentation - SESAR Joint Undertaking...RCP figures by state-of-the-art systems – including RF Interferences and Business cases O5: Requirements for Avionics architectures

Thanks for your attention

13