planning & development request for quote dev opp...may request additional information if needed...

21
PLANNING & DEVELOPMENT REQUEST FOR QUOTE (THIS SECTION IS COMPLETED BY GDPM) Job Name: Contract #: Scope: Anticipated Project Term: Anticipated Start Date Prevailing Wage: Contractor: Please indicate if any of the following contract award preference apply: (for more information on whether your company is eligible for any of the following preference categories, please go to http://www.dmha.org/working-with-gdpm/doing-business-with-dmha/diversity.html . Check at least one of the following ( If checked, please attach documentation): Section 3 MBE/WBE Veteran None Apply Name of Business: Street Address: Street Address Line 2: City: State: Zip Code: Contact Number: E-mail: Contractor's Proposal & Price: By signing below, Contractor acknowledges that if selected for the Contract Award, Contractor will perform all work necessary to complete the task as specified above at Contractor's quoted price within the time period provided. Further, Contractor has reviewed and accepts all GDPM Small Construction General Terms and Conditions and, unless otherwise specified in writing by GDPM, no other contract documents will be necessary. A copy of all GDPM Required Contract Documents is available at http://www.dmha.org/ RAD/contract-documents.html or upon request by e-mailing at [email protected]. ______________________________________________ _________________________________ Contractor Signature of Acceptance Date Acceptance of Proposal: The above price, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. ______________________________________________ _________________________________ GDPM Signature of Acceptance Date ______________________________________________ Project Start Date

Upload: others

Post on 14-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

PLANNING & DEVELOPMENT REQUEST FOR QUOTE

(THIS SECTION IS COMPLETED BY GDPM)

Job Name:

Contract #:

Scope:

Anticipated Project Term: Anticipated Start Date

Prevailing Wage:

Contractor: Please indicate if any of the following contract award preference apply: (for more information on whether your company is eligible for any of the following preference categories, please go to http://www.dmha.org/working-with-gdpm/doing-business-with-dmha/diversity.html.

Check at least one of the following ( If checked, please attach documentation):

Section 3 MBE/WBE Veteran None Apply

Name of Business:

Street Address: Street Address Line 2:

City: State: Zip Code:

Contact Number: E-mail:

Contractor's Proposal & Price:

By signing below, Contractor acknowledges that if selected for the Contract Award, Contractor will perform all work necessary to complete the task as specified above at Contractor's quoted price within the time period provided. Further, Contractor has reviewed and accepts all GDPM Small Construction General Terms and Conditions and, unless otherwise specified in writing by GDPM, no other contract documents will be necessary. A copy of all GDPM Required Contract Documents is available at http://www.dmha.org/RAD/contract-documents.html or upon request by e-mailing at [email protected].

______________________________________________ _________________________________Contractor Signature of Acceptance Date

Acceptance of Proposal: The above price, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified.

______________________________________________ _________________________________ GDPM Signature of Acceptance Date

______________________________________________ Project Start Date

Page 2: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

Job Title: Revere Multi Family

Plumbing

GDPM is seeking quotes from qualified contractors for all work related to plumbing for its moderate rehab project of an eight unit two-story multi-family residential building in Dayton, Ohio. The project will be occurring in conjunction with several other construction related projects at the building and will be overseen by GDPM and architectural firm Berardi & Partners. The attached specifications provide all details. Detailed construction drawings are available at https://mrcrepro.com/repro.

PROJECT NAME: Revere Multi Family

LOCATION: 2531 Revere, Dayton, Ohio 45420

PROJECT #: 576-09

How to Quote: Proposals shall include the following:

• Signed and completed GDPM Request for Quote form – attach quote with detailedbreakdown of labor and materials

• For bids exceeding $100,000 a completed Bid, Payment, Performance Guarantee Packet

• If you have not yet registered, submit a completed registration packet with your bid

Important Dates:

Bid Deadline: September 25, 2020 by4:45 PM

Optional Site-Visit: September 18, 2020 10:00 AM [email protected]

Masks must be worn to the site visits.

Bids shall be submitted electronically to [email protected]

Please submit and questions electronically to [email protected]

Page 3: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

GDPM intends to award the contract to the lowest, best and most responsible bidder. GDPM may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor may be required to provide certificates of required insurance naming GDPM as an additional insured.

If you would like to submit a bid, you must complete the GDPM Quote Form. It must be signed. If you are interested in working with GDPM and haven’t already registered, please contact [email protected] and request a vendor registration packet. Once submitted you will be notified of all contracting opportunities related to the areas you select when registering.

Please read attached specifications carefully prior to bidding.

Page 4: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

DHMA – GDPM Revere Project

Summary 01 10 00-1

SECTION 01 10 00

SUMMARY

PLUMBING

1.1 DESCRIPTION / SUMMARY OF WORK

A. Project Identification: As follows: GDPM – Revere 2531 Revere Dayton, Ohio 45420

B. Owner: Greater Dayton Premier Management 400 Wayne Avenue Dayton Ohio P.O. Box 8750 Dayton, Ohio 45401-8750

C. The work includes but is not limited to plumbing at the aforementioned complex in accordance with the contract drawings and specifications.

D. The contractor shall verify and abide by all local, state and national codes that may affect this project. The contractor shall obtain all required permits necessary. All costs associated with permitting shall be included within the submitted bid as accepted. The contractor is responsible for all labor, supplies and materials to properly work this project through completion.

E. All work shall be performed in a professional manner, per acceptable industry standards and practices. Products shall be cared for and applied in accordance with the respective manufacturers’ recommendations and documentation.

F. Any surrounding surfaces inadvertently damaged during this project shall be repaired by the contractor at his/hers expense

G. The contractor shall warrant the work for a period of one year after acceptance by GDPM.

H. The contractor must visit the site to verify field conditions; a site visit can be scheduled with Angela Stearns, Her email is [email protected] and her phone contact # is 937-910-7625.

I. Quotes are due back by September 25, 2020 by 4:45 PM.

J. The building address is as follows and is highlighted on the contract drawings.

2531 Revere Dayton, OH 45420

Page 5: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

DHMA – GDPM Revere Project

Summary 01 10 00-2

SECTION 22000

PLUMBING

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Plumbing demolition per the contract drawings and associated notes.

B. Piping – Conceal wherever possible

C. Underground Piping

D. Sanitary and Cleanouts

E. Domestic Water

F. Domestic Water Heaters

G. Ice Maker

H. Access Panels

I. Kitchen and bathroom faucets

J. Shower controls and mixing valves

K. Toilet / Water Closet

L. Water Hammer Arrester

M. Shutoff Valves

N. TrueBro – Lav Guard Insulation Kit

O. TrueBro Basin-Guard ADA Barrier

1.2 REFERENCES A. Provide work in accordance with current version of applicable national, state, and

local codes as determined by the Authorities Having Jurisdiction (AHJs). Applicable codes shall include ANSI A117.1 (latest edition), UFAS (Uniform Federal Accessibility Standards)m, FHAG (Fair Housing Accessibility Guidelines), and codes listed on cover and interpretations . Contractor shall be responsible for obtaining and paying for permits and inspections. Contractor shall be familiar with applicable codes and local AHJ interpretations before bid and construction. All costs resulting from code interpretation shall be borne by the contractor.

Page 6: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

DHMA – GDPM Revere Project

Summary 01 10 00-3

1.3 SUBMITTALS

A. Submit under provisions of Section 01300.

B. Product Data: Provide distributor's printed information on material characteristics and application limitations.

C. Installation Instructions for all provided equipment.

D. Shop Drawings: Details for all provided equipment.

E. Warranty Information for all provided products.

F. MSDS Sheets for all provided materials.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: Company specializing in installing electrical systems.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver equipment to project site in distributor's unopened cartons, labeled with data indicating source.

Page 7: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

DHMA – GDPM Revere Project

Summary 01 10 00-4

PART 2 PRODUCTS (Per Plumbing Drawings / Specifications)

2.1 COUNTERTOP LAVATORY

A. Existing to remain – Provide popup drain with a flow rate of 1.2GPM @ 60 PSI

2.2 KITCHEN SINK – DOUBLE BOWL

A. Existing to remain – Provide aerator with flow rate = 1.5 GPM @ 60 PSI. Fixture to have drain location in rear, outside corner of bowl to maintain ADA clearance with garbage disposer.

2.3 TUB SHOWER

A. Existing to remain – Valve body must have integral water stops. Specify 15” apron, left or right drain. Provide shower head with flow rate less than or equal to 1.75 GPM.

2.4 WATER CLOSET – ELONGATED, HC HEIGHT

A. American Standard Cadet PRO 215AB.104 – 2.125” Glazed trap way. Specify flush lever on side furthest from obstruction, see details. Provide a closed front with white seat in dwellings with white lid. Coordinate with owner for which exact fixture is to be replaced. 1.28 GPF

2.5 WATER HAMMER ARRESTER

A. See figures 1,2,3 on P.401

2.6 SPARE / ATTIC STOCK A. Provide 2 spare of each type of sink, faucet, and water closet as part of the

contract. Verify storage location with ownership.

Page 8: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

DHMA – GDPM Revere Project

Summary 01 10 00-5

PART 3 EXECUTION

3.1 EXAMINATION A. Examine all existing piping connections to be reused and verify there are no leaks.

3.2 PREPARATION

A. Comply with equipment manufacturer's recommendations on preparation of HVAC systems.

3.3 INSTALLATION

A. Installation of all equipment to be installed per the manufacturers recommendations in accordance with the contract documents / specifications.

3.4 PROTECTION

A. Protect all work areas including existing finishes and adjacent trades.

END OF SECTION

Page 9: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #1:

Front Elevation Photo #2:

North Elevation

Photo #3:

South elevation Photo #4:

North Elevation

Photo #5:

Rear elevation, gable vent and siding Photo #6:

ADA parking sign at rear of building

Page 10: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #7:

Front sidewalk and gutter Photo #8:

Site sidewalk, side of building

Photo #9:

Parking paving ADA marking Photo #10:

Site drain

Photo #11:

Rear parking area Photo #12:

Landscaping

Page 11: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #13:

Side driveway Photo #14:

Site fence

Photo #15:

Shingled roof and gutters Photo #16:

Exterior wall and foundation, concrete stairs

Photo #17:

Siding Photo #18:

Site light

Page 12: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #19:

Entrance door, front Photo #20:

Interior stairs

Photo #21:

Aluminum windows Photo #22:

Rear steel door

Photo #23:

Radiant heating Photo #24:

Hot water boiler

Page 13: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #25:

Domestic hot water tank Photo #26:

Backflow preventer

Photo #27:

Building electrical service Photo #28:

Interior walls

Photo #29:

PVC shower walls Photo #30:

Carpeting

Page 14: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #31:

PVC tikes, wood finish Photo #32:

Ceramic tiled floor

Photo #33:

Electric range Photo #34:

Refrigerator

Photo #35:

Restroom Exhaust fan Photo #36:

Baseboard heater

Page 15: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #37:

Showerhead Photo #38:

Kitchen sink faucet

Photo #39:

Toilet Photo #40:

Vanity

Photo #41:

shower Photo #42:

Steel bathtub

Page 16: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #43:

Kitchen exhaust hood with light Photo #44:

Electrical panel

Photo #45:

Closet light Photo #46:

Ceiling light

Photo #47:

Interior wall mounted light Photo #48:

Interior doors

Page 17: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

EMG PHOTOGRAPHIC RECORD

Project No.: 125568.17R000-023.308 Project Name: Revere

www.EMGcorp.com p 800.733.0660

Photo #49:

Attic structure Photo #50:

Attic insulation

Page 18: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

  

 

        

 

To be completed for bids in excess of $100,000 

 

Any bid in excess of $100,000 requires a Bid Guaranty and a 

Payment and Performance Bond. 

 

 

 

Page 19: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

Combined Bid/Payment/Performance Bond May 4, 2018 

Greater Dayton Premier Management 

Bid Guaranty and Bond (Ohio revised Code Section 153.571) 

 KNOW  ALL  PERSONS  BY  THESE  PRESENTS,  that  we,  the  undersigned______________________ __________________________________________________________________________________________________________________________________________________________________________  

 as  PRINCIPAL,  and_____________________________________________________________________ _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________     

as SURETIES, are hereby held and firmly bound unto The Dayton Metropolitan Housing Authority d/b/a 

Greater Dayton Premier Management (GDPM), as Obligee, in the penal sum of the dollar amount of the bud submitted by the Principal to GDPM on the ____ day of _________________,20__ to undertake the Project known as:   

PROJECT NAME: ______________________________________________________________ 

Solicitation No.:_______________________________________________________________ 

The  penal  sum  referred  to  herein  shall  be  the  dollar  amount  of  the  Principal's  bid  to  GDPM, incorporating any additive or deductive alternate bids made by the Principal on the date referred to above to  GDPM,  which  are  accepted  by  GDPM.  In  no  case  shall  the  penal  sum  exceed  the  amount  of _______________________dollars. (If the foregoing blank is not filled in, the penal sum will be the full amount of the Principal's bid, including alternates. Alternatively, if the blank is filled in, the amount stated must not be less than the full amount of the bid including alternates, in dollars and cents. A percentage is not acceptable.) For  the payment of  the penal  sum well and  truly  to be made, we hereby  jointly and severally bind ourselves, our heirs, executors, administrators, successors, and assigns. 

SIGNED this __________ day of ______________________, 20___. 

THE  CONDITION  OF  THE  ABOVE  OBLIGATION  IS  SUCH,  that  whereas  the  above‐named  Principal  has submitted a bid for the above referenced Project. 

Page 20: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

      

Combined Bid/Payment/Performance Bond May 4, 2018 

NOW, THEREFORE, if GDPM accepts the bid of the Principal and the Principal fails to enter into a proper contract in accordance with the bid, plans, details, specifications, bills of material and all other solicitation documents; and in the event the Principal pays GDPM  the difference not to exceed ten per cent of the penalty hereof between the amount specified in the bid and such larger amount for which GDPM  may in good faith contract with the next lowest bidder to perform the work covered by the bid; or in the event GDPM does not award the contract to the next lowest bidder and resubmits the Project for bidding,  the  Principal  pays  to GDPM  the difference not  to  exceed  ten per  cent of  the penalty  hereof between the amount specified in the bid, or the costs, in connection with the resubmission, of printing new contract documents, required advertising, and printing and mailing notices to prospective bidders, whichever is less, then this obligation shall be null and void, otherwise to remain in full force and effect; if  GDPM accepts  the  bid  of  the  Principal  and  the  Principal within  ten  days  after  the  awarding  of  the Contract enters into a proper Contract in accordance with the bid, plans, details, specifications, bills of material and all other solicitation documents which said Contract is made a part of this bond the same as though set forth herein; 

AND FURTHER, if the said Principal shall well and faithfully do and perform the things agreed by GDPM to be done and performed according to the terms of said Contract; and shall pay all lawful claims of subcontractors, materials suppliers, and laborers, for labor performed and materials furnished in the carrying  forward,  performing,  or  completing  of  said  Contract;  we  agreeing  and  assenting  that  this undertaking shall be for the benefit of any materials suppliers or laborer having a just claim, as well as for the obligee herein; then this obligation shall be void; otherwise the same shall remain in full force and effect;  it  being expressly understood and agreed  that  the  liability of  the  surety  for  any and all  claims hereunder shall in no event exceed the penal amount of this obligation as herein stated. 

AND FURTHER, the Principal will correct or replace any defective work or materials discovered by GDPM within a period of one year from the date of acceptance of such work or material by GDPM, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

  THE SAID Surety hereby stipulates and agrees that no modifications, omissions, or additions, in or to the terms of the said Contract or in the Plans and Specifications therefor shall in any wise affect the obligations  of  said  Surety  on  its  bond,  and  it  does  hereby  waive  notice  of  any  such  modifications, omissions, or additions, in or to the terms of the Contract, the Work or the Contract Documents, including, without limitation the Plans and Specifications. 

 

< Remainder of page intentionally left blank> 

   

Page 21: PLANNING & DEVELOPMENT REQUEST FOR QUOTE Dev Opp...may request additional information if needed to confirm Contractors’ experience. Prior, to commencement of work, the selected contractor

Combined Bid/Payment/Performance Bond May 4, 2018 

PRINCIPAL: 

_____________________________ Principal Signature 

By:___________________________ 

Title:__________________________ 

 SURETY: 

_______________________________ Surety Signature 

By: ____________________________   Attorney‐in‐Fact 

Surety Agent’s Information: 

_____________________________ Agency Name 

_____________________________  Street 

_____________________________ City                            State          Zip 

_____________________________ Telephone No. 

(Attach hereto the current Power of Attorney of the person executing this bond for the Surety.)