Pixel Support Tube and Related. November 9, 2001 Pixel Day E. Anderssen, LBNL. Overview. Status of Work, technical and other PST and Supports Pixel Supports Service/Beampipe Supports Immediate plans Prototyping in ‘02 Discrepancies All along the way…. +X. +Z. +Y Vertical. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Pixel Support Tube and Related

ATLAS Pixel Detector

Pixel Support Tube and Related

November 9, 2001Pixel Day

E. Anderssen, LBNL

Page 2: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorOverview

• Status of Work, technical and other– PST and Supports– Pixel Supports– Service/Beampipe Supports

• Immediate plans– Prototyping in ‘02

• Discrepancies– All along the way…

Page 3: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorChain of Support for PST to Cryostat

PIXEL SUPPORT TUBE

SCT

TRT

ID Vee Rail

ID Flat Rail

Side C Side A

View from top—allTube Supports are

Horizontal and Co-planar

Properties TBDConstraint TBD

Support Positions are shown,But constraint conditions areNot indicated here.

+Z

+X

+Y Vertical

Agreed Support Positions outside PST

PST Support Conditions Under Investigation

Page 4: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorSupport Conditions of Beampipe

• Beampipe Cruciform Supports align with Stiffest part of PST—the end flanges

• All support planes on frame are wires allowing longitudinal (axial) float

• One Z-Fixture is foreseen to take up ATLAS Access/Opening loads

Page 5: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorPixel Support Tube Mockup

• Mockup in three pieces to simulate independent parts of tube– Goal is for full length of entire tube to simulate all installation scenarios– Detector rails are removable, should modification be necessary– Intend to run ‘installation tests’ in ‘02

Page 6: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorRail Design in Support Tube

Vee and Flat rails were chosen to provide pseudo-kinematic support for the detector during delivery to the support pointsRails are used only for delivery, not support

mockup

Page 7: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel Detector

PST Important Features

Bolt flanges

Sct mount padsEnd Plugs (1 mm equiv. carbon sheet)

Hoop Hat Stiffeners(section view)

30

45 10

End Support

End Supports

Page 8: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel Detector

Flange Face (machined layup)

Flange base(Layup)

Stiffeners(layups)

Support Flange Bonded Assembly

T-nuts(bonded)

Old design - now gone forindependent thermal barrier

Page 9: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorSlider design - materials testing

• Friction Tester nearing completion– Applies variable pressure– Measures angular acceleration– Slides sample against interchangeable disk of given material

M

slider to be tested

turntable (carbon disk)

position is movable along arm

M

Mass provides normal force

Encoder on shaft measures acceleration

arm hinge

Page 10: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorGravity Sag Calculations

 Carbon Glass

Whole Tube Sags at ends during operation—it is intended to ‘remove’ this sag when Reattaching supports after installation of Forward ID Note: Sag is with Package in place—much less without

Page 11: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorReaction Loads On SCT

Model Material FX (N)

FY (N)

FZ (N)

MX (Nm)

MY (Nm)

MZ (Nm)

Carbon - 151 0 253 - -

Glass - 53 0 89 - -

Vertical Bending – Both Ends

Both Ends Bent – 1 Z ConstraintModel Material FX (N) FY (N) FZ (N) MX

(Nm)MY

(Nm)MZ

(Nm)Carbon 146 - - - 233 -

Glass 52 - - - 83 -Both Ends Bent – 2 Z Constraints

Model Material FX (N) FY (N) FZ (N) MX (Nm)

MY (Nm)

MZ (Nm)

Carbon 297 - 1870 - 536 -

Glass 108 - 468 - 110 -

One End Bent – 1 Z ConstraintModel Material FX (N) FY (N) FZ (N) MX

(Nm)MY

(Nm)MZ

(Nm)Carbon 390 - - - 623 -

Glass 137 - - - 218 -

Horizontal Bending

Page 12: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel Detector

Flexure Block interface to SCT Penetration

Fx

Fz

Fy

My

Mz

Mx

This interface must take same loads as applied to Flexure—Will know them well afterJoint Model is run

Will look at simple feasibility with current (infinite stiffness) loadsWill iterate size if indicated by ROM calculation

SCT Thermal Barrier

Penetration

Page 13: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorFlange Envelope

Pixel Support Tube (Barrel Region) Pixel Support Tube (forward)

240

261

242

260

Dimensions from 1:1 ID Layout May ‘01

775

780

765

785

792 796

800795

799

245246

257259.5248

811

251

May changeBy ~5mm to 806new structure added

700

SCT BARREL 3

Barrel Mount Flange

Interlink

SCT Forward Envelope

806

requestedChanges

244

Page 14: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorFlange Envelope

Pixel Support Tube (Barrel Region) Pixel Support Tube (forward)

240

261

242

260

New Proposed Envelopes—not yet agreed

780

765

792

800799

252

811

251

700

SCT BARREL 3

Barrel Mount Flange

Interlink

SCT Forward Envelope

806

244shim

shim255254

246

Page 15: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorZ-Flexure (Side A)

Support Tube Mount Pad M55J

ViewDirectio

n

Cut Plane

Insulator (G10) or Al203

Access holeThruService Rail

Gap filledAfterpicture

Dowel pins have line fit

Metal Insert Bonded in

Thermal Barrier squeezed in here

Page 16: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorPixel Supports

Page 17: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorPixel Package Assembly

Service and Beampipe Support

Service and Beampipe Support

Mockup Pixel Frame shown

Page 18: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorTension/Compression Transmission

through structures not services

Clips register to Buttons on Frame and Service/Beampipe support structureGaps allow ‘Phi’ offsets of up to +/- 1mm while only 0.25mm longitudinally

Page 19: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorWire Planes supported by Pulleys

Wires not modeled, beampipe not shown

Page 20: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorTubes route cables to Barrel

Separate blocks at Forward end

Page 21: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorServices Supported By Framework

Page 22: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorService quarter panels supported by framework

Page 23: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorNeed to adjust length of Tube or

Support Plane location of VI

Page 24: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorOutside view of patch Panel

Page 25: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorSection View of patch Panel

Page 26: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorBarrel End of Support Structure

Page 27: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel Detector

PST Prototyping Plans• Short Mandrel

– 1 foot long - 1 for glass, 1 for carbon – aluminum or steel– “Dry-run” in autoclave to determine thermal response– Determine final diameters from test layups

• Full Size Mandrel (forward length)– Quotes already received

• Approximately 14,000 to 20,000 USD• 8 Weeks delivery

– Plans to Fabricate forward prototype in glass• All flanges and rail features• Use for production forwards if diameters are correct

• Implications of Glass Forwards/Carbon Barrel on prototyping plans must be more fully assessed

• Insertion Testing

Page 28: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorPST Prototypes in ETC ‘02

• Includes– Friction Testing– Material Test Panels– “Foot Long” prototypes– End-Plug Prototype estimated as ½ production total

• Gray area– Calling first Forward Tube a prototype—Production monies all in

FY’03, but need to order tooling and start fab in ’02– Missing prototype flexure mounts (as noted in 1.1.1.1.3.5)– Prototype ‘End Plate’ buried in Frame estimate, but included Pixel

mounts (~$5k ’01, $10k ’02)– Monies for assembly testing of Insertion mockup spread over a few

efforts and called ‘testing’ hard to track if appropriate levels have been assigned

Page 29: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorService Support Prototypes ‘02

• Now includes Beam Vacuum Support Structure• Prototype in ’02 already includes bond fixture—need to

increase cost some to account for additional scope of VI support, but this saves overall by not having entire extra fixture for VI support

• Intention for ’02 to build 1 quarter panel support and 2 service panels—still valid

• Need to build Full VI support for both installation testing and to support services– Needs to be ‘real’ for use in case pixels are late– Needs to have ‘real’ rail interface (unless replaceable interface)

• Need to add cost to this section of WBS, or make new WBS for Beam pipe support

Page 30: Pixel Support Tube and Related

Nov 2001Pixel Day

E. Anderssen LBNL

ATLAS Pixel DetectorRecent Changes and Estimate of Impact

• Change of Forwards to Quartz fiber— +$30k– Additional Shell tool $14-20k– Additional Hat stiffeners ~120-160 Man hours M-tech

• Introduction of Independent SCT Thermal Barrier +$35k– Throw away ~3-4 man months LBL/Junior Eng Design time– Accrue additional 2-3 man months re-design of Flange/Flexures

• Increase in scope to include Beam Vacuum Supports +$110k– Design time not assessed– Attempt to use/re-use as much fixture costs as possible– Estimate ~$25k Material/200hr Shop/300hr M-tech (REAL) ‘03– Estimate ~$10k Material/200hr Shop/300hr M-tech (prototype) ’02– (Est. based on cost of End Plug and fixturing, using same tool as service panel support

structure• PST End Support (former Beam Vacuum Support) not included in cost

estimates yet.• PPI/Endplug Thermal barrier increase in Complexity

– Current Estimate based on segmented flat panel. Cost will increase if tool is needed to make other than a flat shape.