piping design basis (6724-700-50-43-db-0016)_rev.a
DESCRIPTION
piping design basisTRANSCRIPT
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:2of56
Rev.A
INDEXSHEET
PAGENO. TITLE REVA
1 COVERSHEET 70613
2 INDEXSHEET 70613
3 REVISIONRECORDSHEET 70613
4 TABLEOFCONTENTS 70613
556 PIPINGDESIGNPHILOSOPHY 70613
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:3of56
Rev.A
REVISIONRECORDSHEET
REV.NO. PURPOSE LISTOFPAGESUPDATED/MODIFIEDSECTIONS,IFANY
A ISSUEDFORREVIEW
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:4of56
Rev.A
TABLEOFCONTENTS
1.0SCOPE........................................................................................................5 2.0DESIGNPHILOSOPHY/CRITERIAGENERAL..............................................................52.1EQUIPMENTLAYOUT.............................................................................................................52.2UNITPIPING............................................................................................................................112.3OFFSITE&YARDPIPING.....................................................................................................172.4FLAREPIPING..........................................................................................................................182.5UNDERGROUNDPIPING....................................................................................................182.6FLEXIBILITYANALYSIS&SUPPORTING.......................................................................192.7MATERIALS..............................................................................................................................232.8THERMALINSULATIONOFPIPING,EQUIPMENTANDVESSELS.......................332.9PAINTING................................................................................................................................332.10WELDING................................................................................................................................332.11MISCELLANEOUS................................................................................................................343.0REFERENCEDPUBLICATION..................................................................................................364.0ATTACHMENTS:..............................................................................................................................ANNEXUREATABLEOFBASICSPAN................................................................................37ANNEXUREBACCESSIBILITYFORVALVES&INSTRUMENTS................................39ANNEXURECVERTICALANDHORIZONTALGUIDESSPACING............................41ANNEXUREDTECHNICALREQUIREMENTSOFPIPINGMATERIAL......................42ANNEXUREECLEARANCES..................................................................................................54
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:5of56
Rev.A
1.0 SCOPE
ThisDesignBasisbrieflycoversthebasicrequirementsforthedesignofpipingsystemsCoveredbyASMEB31.3.TheseshallbeadheredtobyLSTKContractor(s)orhissubcontractor(s)duringthecourseofengineering,procurement&construction.
2.0DESIGNPHILOSOPHY/CRITERIA:GENERAL 2.1EQUIPMENTLAYOUT 2.1.1BASISOFEQUIPMENTLAYOUT
Equipmentlayoutshallbedevelopedbasedonthefollowingdata:
P&IDs.OverallPlotPlan.Winddirection.EquipmentDataSheets.IndicativeEquipmentLayoutfromBasicEngineering,ifany.Processpackage.
2.1.2DEVELOPMENTOFEQUIPMENTLAYOUT
Thefollowingaspectsshallbeconsideredduringdevelopmentofequipmentlayout:
ProcessRequirementi.e.properinterconnectionbetweenequipmentasperP&IDstoachievetheintendedprocessparameters.EconomyofPipingmaterialMinimizethequantityofcostlypiping.Erection&ConstructionrequirementErectionschemeandscheduleofallequipmentmustbeconsideredduringequipmentlayouttohavesmootherection,approachroadforcranes/derricketc.SafetyRequirementsAsaminimum,OISDStd.118shallbefollowed.FirefightingfacilitiesshallbeprovidedasperTAC&OISDnorms.Safetyshowerlocationshallbemarkedinequipmentlayout.FordetailedguidelinesreferGeneralCivilDesignbasisforfireprotection.Constructability,OperationandMaintenanceRequirement:
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:6of56
Rev.A
OverheadandsideclearancesforcompressorsandpumpsHorizontal&overheadclearancesforeasymovementofworkingpersonnelCraneapproachesforaircoolers/firedheaters.ProvisionofmonorailforpumpsProvisionofEOT/HOTcraneforcompressorsProvisionofoperatorscabin
SimilarequipmentgroupingAllcolumns,exchangers,pumpsetc.shouldbegroupedtogetherforconvenienceofmaintenanceandsafetywhereverfeasible.Thetechnologicalstructuresshouldbeinterconnectedforeasymovementofoperationalpersonnel.U/Gpipingcorridorsformainheadersshouldbemarkedinequipmentlayoutforallundergroundpiping.Allareasrequiringcraneaccessforerectionorspecificmaintenancepurposee.g.catalystloadingetc.shallbemarkedontheequipmentlayout.
2.1.3PIPERACK
Ingeneral,equipmentlayoutshallbepreparedconsideringstraightpiperack,howeverothershapeslikeL/T/U/H/Zetccanalsobeconsideredbasedonareaavailable.Thetotalwidthofpiperackshallinclude25%extraspaceforfutureexpansion/modificationsinunitforrackwidthsupto16Mand10%forrackwidthsabove16M.Thewidthoftherackshallbe6M,8Mor10Mforsinglebayand12M,16Mor20Mfordoublebayhaving4tiersmaximum.Thespacingbetweenpiperackportalsshallbetakenas6Mingeneral.Howeveritcanbeincreasedto8Mdependingonthesizeofthepumpstobehousedbelowpiperack,inwhichcaseanintermediatestructuralmembershallbeprovidedinpiperackfortier.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:7of56
Rev.A
ForUnits,clearancebeneathpiperackshallbe4.0Mminimumbothinlongitudinalandtransversedirections.ForOffsites,clearancebeneathpiperackshallbe2.2Mminimumbothinlongitudinalandtransversedirections.Roadclearanceshallbe7Mminimumformainroadand5Mforsecondaryroad.Waterlinesmorethan30shallnotberoutedoverpiperack,theseshallberoutedunderground.
2.1.4TOWERSANDVERTICALVESSELS(ASAPPLICABLE)
Towersandverticalvesselsshallbearrangedinarowwithcommoncentreline,decidedbythelargestvessels,placingO.D.oftheequipmentminimum4Mawayfromthepiperack.Aminimumclearanceof3Mshallbeallowedbetweentowershells,butinanycaseplatformsofadjacenttowersshallnotoverlap(minimum100mmhorizontalgapshallbeprovidedbetweenplatformofadjacenttowers)andthataminimum900mmisleftbetweentowerplinths.Thegapbetweenverticalvesselsshallallowfullopeningofmanholecoverswithoutrestriction.Effortsshallbemadetoprovideinterconnectingplatformsatsuitablelevelsforadjacenttowersand/oradjacenttechnologicalstructures&rackwalkwaysetc.Interconnections,whereverfeasibleshallbedoneaftertakingthermalexpansionsoftowersintoconsiderationsAlllevelswitches,LGsetcincludingtheirisolationvalvesshallbeaccessiblefromladdersorplatforms.Tohandleheavyitems(likereliefvalves,blindsetc.)adavitshallbeprovided.Thedavitshallbeonthesideofthevesselawayfromthepiperack.Theareaatgradeshallbekeptclearforadropout.
2.1.5HORIZONTALVESSELS
The horizontal vessels shall be laid perpendicular to pipe rack and shall be placedminimum4Mawayfromthepiperack.Theclearancebetweenadjacenthorizontalvesselshellsshallbeminimum2Mor900mmclearaislewhicheverishigher.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:8of56
Rev.A
2.1.6PUMPS(ASAPPLICABLE)
Whereverpracticablepumpsshallbearrangedinrowswiththecentrelineofthedischargenozzleonacommonstraightline.Pumpsshallbekeptoutsidethepiperackwithpumpdischargenozzlekeptatadistanceof1metrefrompiperackandmotortowardsrack.Gapbetweeneachpumpfoundation/andfoundationoftechnicalstructureshouldbesufficientforeasyremovalofequipmentafterpiping.Clearancebetweentwoadjacentpumpsshallbesuchthatclear900mmaisleisavailable.Allpumpsnotopentoskywithmotorrating>=75KWshallbeprovidedwithmonorail.Nomonorailshouldnormallybeprovidedforpumpsopentoskyandsufficientspacebelowrackshallbeavailableforpumpmaintenance.
2.1.7AIRCOOLERS(ASAPPLICABLE)
Aircoolersshallbelocatedoverthemainpiperackorontechnologicalstructure.Foraircoolerslocatedontechnologicalstructure/rack,blindfloorshallbeprovided.Blindfloorisgenerallynotrequiredifpumpshandlinghydrocarbonsorequipmentarenotplacedbelowthem.ThewidthofthestructurefromwhereAircoolerassemblyissupportedshallbeabout2.0mmorethantheAircoolertubebundlelengthsothatpropersupportingofinlet/outletpipingmanifoldscanbedonefromthemainmembersofpiperack/technologicalstructuretotransferpipingloadtomainstructuralmembers.Davitshallbeprovidedforloweringthegearboxesetc.alongwithmobiletrolleywithretractablejackingarrangementofsuitableloadcarryingcapacity.
2.1.8COMPRESSORSANDTHEIRPRIMEMOVERS(ASAPPLICABLE)
Followingtypesofcompressorsareusedinprocessplants:
a.Centrifugalcompressors
b.Reciprocatingcompressors.
c.Liquidringcompressors
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:9of56
Rev.A
d.Screwcompressors
e.Diaphragmcompressors
Compressors shall be located to keep suction lines as short as possible. The gascompressors shall be located downwind side of furnace so that leaks are not blowntowardsfurnace.Ingeneralcompressorsaretobelocatedundershed.Whencompressorsare locatedunder shed, sides tobekept fullyopen for the low shedorpartially closedfrom top forhighshed toavoidaccumulationofheaviergases in theshed,however, incase of hydrogen compressors located under the sheds provision for top venting fromcompressorshedsshallbeprovided.In case of a turbine driven compressor, if exhaust steam is condensed, turbine andcompressor need to be located at an elevated level and condenser tobe located belowturbine.Amajorconsiderationincentrifugalcompressorlocationisthelubeandsealoilconsole. Itmustbeaccessible froma road,mustbe lower than thecompressor toallowgravitydrainofoil to the consolesoil tank. Intercoolers&Knockoutpotsmaybekeptwithin/outsidetheCompressorhouseshed,but,shallbekeptnearcompressorhouse.ForcompressorsElectricallyOperatedTravellingCranetohandleheaviestremovablepieceshallbeprovidedforeachcompressorhouse.Maintenancebayforcompressorsshallbeprovided.Maintenancebayshallbeaccessiblefromroadtofacilitateunloading&loadingontotrucketc.Forremovalofbundlesofexchangerslocatedwithinbuildingmonorailarrangementshallbeprovided.Compressormanufacturermaybeconsultedforrecommendedlayoutandadditionalrequirementformaintenance.Licensorsrequirement,ifany,shallalsobetakenintoconsideration.
2.1.9CLEARANCEANDACCESSIBILITY
2.1.9.1CraneAccess
Equipment,structuresshallbearrangedtopermitcraneaccesstoserviceaircoolers,compressors.Dropoutbaymaybeconsideredforexchangers&coolersatelevatedstructures.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:10of56
Rev.A
2.1.9.2AccesstoPumps
Clearaccessof4.0Mverticallyand3Mhorizontallyshallbeprovidedcentrallyundermainpipewaysforsmallmobileequipmenttoservicepumps/motors,wherevertheseareinstalledunderpipewayswithpriorspecificapproval.Pumpsoutsiderackshallbeapproachablebymobileequipmentsetc.fromunderthepiperack.
2.1.9.3Accesstoloweritemstograde(LoweringArea)
Clearaccessshallbeprovidedatgradeontheaccesssideforloweringexternal&internalfittings,PSVs,Controlvalvesetcfromelevatedequipment(columns,towersetc)byprovidingpipedavits.
2.1.9.4Layout&AccessRequirementsForPlatforms(LaddersAndStairs)
Forprovidingplatformladder&staircasefollowingguidelinesshallbefollowed:Twomeansofaccess(i.e.twoladdersoroneladderandonestaircase)shallbeprovidedforanyelevatedplatform,whichservesthreeormorevessels&forbatterylimitvalvesoperatingplatforms.Platforms,ladders&stairwaysshallbeconsistentwithaccess&safetyrequirements.Stairwayfortankstobeprovidedonupstreamofpredominantwinddirection.
(i)Platformatelevatedstructure
Dualaccess(i.e.onestaircaseandoneladder)shallbeprovidedatlargeelevatedstructureifanypartofplatformhasmorethan22.65M(75ft)oftravel.Aircoolersshallhaveplatformswithinterconnectedwalkwaysprovidedtoservicevalving,fanmotorsandinstruments.AccessrequirementsshallbeDualaccess(i.e.onestaircaseandoneladder).
(ii)Platformswithstairaccessshallbeprovidedonlyfor:
Locationatwhichnormalmonitoring(onceadayormore)isrequiredorwheresamplesaretaken.
Locationswherevesselsorequipmentitemshaveoperatorattentionsuchascompressorsetc.
Mainpiperackatbatterylimits
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:11of56
Rev.A
(iii)Platformswithladderaccessshallbeprovidedfor
Itemsthatrequireoccasionaloperatingaccessincludingvalves,spectacleblindandmotoroperatedvalves,heaterstacksamplingpoints.Manwaysabovegradeonequipment.
(iv)LadderLocation
Whereverpracticable,laddershallbesoarrangedthatusersfaceequipmentorplatformratherthanfacingopenspace.Landingsshallbestaggered.Noladdershallbemorethan6Minoneflight.
2.1.9.5CLEARANCES
MinimumclearancesshallbeasindicatedinAnnexureE.2.2UNITPIPING 2.2.1BASISOFUNITPIPING
Piping&InstrumentDiagramEquipmentlayoutEquipmentDatasheet&SettingplanLinelistInstrumentDatasheetStructural&buildingdrawingsTopographyoftheplantPipingmaterialspecificationOverallplotplan
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:12of56
Rev.A
Thefollowingobjectiveshallbeachievedduringpipinglayout:
Properaccesstoalloperatingpointsincludingvalvesandforallorificetappingpoints,instrumentsinparticular(referAnnexureB).Properaccesstointerrelatedoperatingpointsforspecificpurposeandformaintenance.
2.2.2PIPEWAYS/RACKPIPING
Racks shallbedesigned togive thepiping shortestpossible run and toprovideclearheadroomsovermainwalkways,secondarywalkwaysandplatforms.
Predominantlyprocesslinesaretobekeptatlowertierand,utility&hotprocesslinesonuppertier.
Generally the top tier is to be kept forElectrical cable trays (if not provided inunderground trench) and Instrument cable ducts/trays. Cable tray laying to takecareofnecessaryclearancesforthefireproofingofstructure.
Generallythehot linesandcold linesshallbekeptapart indifferentgroupsonatier.
Generallythebiggersizelinesshallbekeptnearertotherackcolumn.
MinimumspacingbetweenadjacentlinesshallbedecidedbasedonO.D.ofbiggersize flange (minimum rating 300# to be considered), O.D. of the smaller pipe,individualinsulationthicknessandadditional25mmclearance.Evenifflangeisnotappearingthemin.spacingshallbebasedonabovebasisonly.
Actual line spacing, especially at L bend and loop locations, shall take care ofthermal expansion / thermal contraction / nonexpansion of adjacent line. Nonexpansion/thermalcontractionmaystopthefreeexpansionoftheadjacentlineatLbendlocation.
Anchorsontheracksaretobeprovidedontheanchorbayiftheconceptofanchorbayisadopted.Otherwiseanchorsshallbedistributedovertwotothreeconsecutivebays.
Anchorsshallbeprovidedwithinunitonallhotlinesleavingtheunit.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:13of56
Rev.A
Processlinescrossingunits(withinunitsorfromunittomainpipeway)arenormallyprovidedwithablockvalve,spectacleblindanddrainvalve.Blockvalvesaretobegroupedandlocationsofblockvalvesinverticalrunofpipearepreferred.Iftheblockvalveshavetobelocatedinanoverheadpipeway,staircaseaccesstoaplatformabovethelinesshallbeprovided.Stubsinseawatershallbefromtopofmainheader.
2.2.3VESSELPIPING/CONTROLVALVES
Pipingfromvesselshalldroporriseimmediatelyuponleavingthenozzleandrunparallelandcloseaspracticabletovessel.
Pipingshallbegroupedasfaraspossiblefortheeaseofsupportsandshallrunontheracksideofthecolumn.
Manholesshallbekeptontheroadsideoftheequipmentandshallbeapproachablefromtheplatform.Platformwidthshallbesuchthatminimum1Mspaceisavailablebeyondmanholeformovement.
Pipingshallbesupportedfromcleatsweldedonthevesselasfaraspossible.
Properguidesatrecommendedintervalsshallbeprovidedforlongverticallines.
Accessplatforms/laddersshalltobeprovidedalongthecolumnforvalvesandinstruments.Minimumclearwidthofplatformshallbe750mm.
Foreaseofoperationandmaintenance,columnandvesselswhicharegroupedtogether,shallhavetheirplatformsatthesameelevationandshouldbeInterconnectedbywalkways.Howevereachcolumn/vesselshallhaveanindependentaccessalso.
Column/vesselplatformsshouldbedesignedinsuchawaysothatallthenozzlesshouldbeapproachablefromplatforms.
Pipingatcolumns/vesselnozzlesshallbearrangedsothatblankscanbeeasilyinstalledforhydrotesting.
UnlessspecificallyindicatedinP&IDscontrolvalvesshallpreferablybekeptatgrade.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:14of56
Rev.A
Pipingintendedforvacuumservicesshallberoutedasshortaspossiblewithminimumbendsandflangedjoints.Pipingsupportcleatsforsafetyvalvesshallbeindependentmeantforsafetyvalvesonly&shallbedesignedconsideringimpactloadingduringpoppingoff.UtilityConnectionnozzlesshallbefromside/top.
2.2.4PUMPPIPING
Pumpdrivesshallhaveclearaccess.
Pumpsuctionpipingshallbeasshortaspossibleandshallbearrangedtoavoidvapourpockets.
Reducersimmediatelyconnectedtothepumpsuctionshallbeeccentrictypewithflatsideuptoavoidtheaccumulationofgaspocket.
Forendsuctionpumpselbowsshallnotbedirectlyconnectedtothesuctionflange.Astraightpieceminimum3timesthelinesizeshallbeprovidedatthesuctionnozzle.
Pumpdischargecheckvalveifinstalledinverticallinesshallbefittedwithadrainconnectionascloseaspossibledownstreamofthevalve.
Unlessotherwisespecified,Ttypestrainersshallbeusedonpumpsuctionpipingforsizes2andabove.
Ytypestrainersshallbeusedforallsizesinsteamservicesandforpumpsuctionlinesbelow2.
Allsmallborepipingconnectedtopump(draintoOWS&CBD,seatandglandleakdrain)shallhavebreakupflangesforremovalofpumps.PipingshallbesoarrangedthattheforcesandmomentsimposedonthepumpnozzledonotexceeddoubletheallowablevaluesofAPI610.Pumpdischargeshouldbepreferablyroutedawayfromthepumpratherthantowardsthemotorside.Pumpcoolingwaterconnectionshallbetakenfromthetopofcirculatingcoolingwaterheader.Suction&dischargevalvesshallbelocatedatoperableheight.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:15of56
Rev.A
2.2.5COMPRESSORPIPING
Suctionlinesshallbeasshortaspossible.
Suctionpipingshallhaveadequateflangedjointsforeaseoferectionandmaintenance.
Where the line between knockout drum and the compressor cannot be routedwithoutpocket,lowpointdrainshallbeprovidedtoremoveaccumulationofliquid.Thesystemshouldbeapprovedbyprocess.
Aminimumstraightlengthofsuctionpipeshallbeprovidedaspermanufacturersrecommendation.
Lube oil cooler space shallbeprovided in away so as to facilitate tube bundleremoval.
Alloperatingvalvesonmainsuctionanddischargepipingshallbe linedononesideasfaraspossible.
Pipingshallbedesignedso that forcesandmoments imposedon thecompressordonotexceedthemanufacturersrecommendation.
Lowpointsinthedischargelinefromanaircompressorshallbeavoidedbecauseit ispossible for lubeoil tobe trappedandsubsequently ignited. If lowpointsareunavoidable,theyshallbeprovidedwithdrains.
Incaseofreciprocatingcompressor,pipingshallbesuitablysupportedtoavoidvibrationsduetopulsatingflow.Unlessrequirementsofnopocketsarespecifiedbythelicensor,allthepipingshallrunat500mmabovegradelevelsothatpropersupportscanbeprovidedtominimizevibrations.Analogstudyshallbecarriedoutforcompletecompressorpipingincludingsuction/dischargepipingasperP&IDsandthestudyrecommendationsifany,shallbeimplemented.Reciprocatingcompressorpipingshallbeprovidedindependentsupportsfromgradeandshallnotbesupportedfromcompressorplatformstructure.Thesmallborebranchesshallbecheckedforrequirementofbracedsupports.
2.2.9RELIEFSYSTEM/BLOWDOWNSYSTEMPIPING
Wherevertheinletlinesizeishigherthanthesafetyvalveinletsize,reducershallbeinstalledadjacenttoinletofsafetyvalve.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:16of56
Rev.A
Reliefvalvedischargingsteam,airorothernonflammablevapourorgasdirectlytoatmosphereshallbeequippedwithdrainandshallbesuitablypiped topreventaccumulationofliquidatvalveoutlet.
Liquidphaseblowdownsystempipingconnectedtoaclosedsystemshallbeselfdrainingtotheblowdowndrum.ClosedblowdownheadershallbeslopedtowardstheCBDdrumtoensurefreedrainage.
Liquidvapourphasereliefvalvesshalldischargeintotheflareheaderatanangle45degrees in thedirectionofheader flow, tominimize theeffectofkineticenergyandtoavoidaccumulationofliquid.
Pocketsintheflareheaderandblowdownsystemshallbeprohibited.Reliefvalvedischargepipingshallbetakentosafelocationasperfollowing:
3MAbovetopplatformofcolumnorstructure,within6Mradius
forsteamand8Mforhydrocarbon/toxicdischarge.
25MHorizontallyawayfromfurnace.
50MHorizontallyawayfromfurnace,ifmorethanonerelief
systemofdifferentsetpressuresisdischargingintoone
commonriserofventstack.
Inlet andoutletpipingofpressure reliefvalve shallbe adequately supported totakecareofthethrustinducedbythereliefvalveduringpopping.
Reaction forces including bothmomentum& static pressure effects due to safetyvalvepoppingshallbeascertainedintheconnectedpipingaccordingtoAPIRP520for systems discharging to atmosphere. The effect of these forces on the pipingsupportsand theanchorsof thepipingsystemshallbecalculated toascertain thatthe allowable limits at these locations arenot exceeded.The supporting structurealsoshallbeadequatelydesignedsothatwhensubjectedtothesereactionforcesthesupportingelementsconnected topipingaswellas thebasic supporting structurei.e.platformmembersetc.arecapableofwithstandingthem.Systemstressesintheinlet and outlet piping portions at safety valves also shall be kept within theallowable limits, inclusiveof thedistributionbranchingpoints in the inletportion.Thesereactiveforcesshallnotleadtoanyleakageattheflangedjointspresentinthesystem. To ascertain this the necessary calculations for checking leakage at theflangedjointsshallbeperformed.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:17of56
Rev.A
2.2.10UTILITYSTATIONS
Requisitenumberofutilitystationsshallbeprovidedthroughouttheunittocatertotheutility requirement. Utility stations shall have three connections [one for LP steam(SL),oneforPlantAir(AP)andoneforServiceWater(WS)]eachof1NBunlessotherwisespecified inP&ID.Airandwater linesshallhavequick typehoseconnectionandsteamline shall have flanged type hose connection and shall be directed downward. Allconnectionsshallhaveglobevalve for isolationpurpose. Inertgashose,whenrequired,shallhavebuiltinnonreturnvalveandquickconnectioncouplingatpipingend.
Numberofutilitystationsshallbesuchthatallequipmentsshallbeapproachablefromatleastoneutilitystation.Theapproachofutilitystationshallbeconsidered15Mallaroundthestationlocation.TheUtilitystationsshallgenerallybelocatedadjacenttopiperackcolumn.Theutilitystationsshallalsobeprovidedonelevatedstructuresliketechnologicalstructure,operatingplatformsofverticalequipmentsetc.Operatingplatformshavingmanholesmustbeaccessiblefromutilitystation.
2.2.11FIREFIGHTING
AllfirefightingfacilitiesshallbeasperTAC&OISDnorms.SprinklersystemshallbeprovidedforallhotpumpsasperOISD/TACnorms.FordetailedguidelinesreferGeneralCivildesignbasisforfireprotection.
2.3OFFSITE&YARDPIPING
Ingeneral,offsitespiping,electricalcableandinstrumentationcableshallbelaideitheronpipe rack or on pipe sleepers. Wherever piping is laid on pipe sleepers, hardsurfacing/gravel isprovidedbelow it,hardsurfacing/gravelshouldbecompletedbeforestartofpipelaying.Widthofhardsurfacing/gravelshallbeabout1metermorethanthepipingcorridoroneitherside.Thisextrahardsurfacing/gravelshallbeformovementofoperatingpersonnelalongthepipingcorridor.Thismovementareashallbeapproachablefromtheroadatadistanceofevery500meters.
Overheadpipebridgesshallbeusedforpipesatroadcrossings.Culverts,ifrequired,maybeprovidedbut tobeminimized.Pipebridges/culvertsshallbeadequatelydesigned totakecareoffuturerequirements.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:18of56
Rev.A
ClearancesbetweenlinesshallbeminimumCasgivenbelow.
C=(do+Df)/2+25mm+Insulationthickness(es)
where,dooutsidediameterofsmallerpipe(mm)
Dfoutsidediameterofflange(min300#)ofbiggerpipe(mm)
However this Cspacingbetween theoffsitepipingon the rack/sleepercanbesuitablyincreasedsothatthe linesshouldnottoucheachotherafter insulation/lateralexpansion.Adequateclearance shallbeprovided forevery long&high temperature lines toavoidclashingatthebends.See2.2.2alsoforlinespacingatLbendsandlooplocations.
Expansionloopsforalllinesshallgenerallybekeptatthesamelocation.Ventsshallbeprovidedonallhighpoints&drainsshallbeprovidedatalllowpoints.Drainvalvesatsleeperpipingshallbekeptoutsidethesleeperwayifthesameisnotaccessibleandvalvesshallbeputinhorizontalonly.Atallsuchplaceswherepipingisextendedtomakedrainvalvesaccessible2nos.ofstiffeners,irrespectiveofpiperating,shallbeprovidedasper2.7.1.Spacingofguidesoneachlineonapipebayshallnotexceedthevaluegiveninclause2.7.1.
2.4FLAREPIPING
Flare header shall be sloped towards flare knockout drum. Expansion loop shall beprovidedinhorizontalplaneasperrequirementtoaccommodatethermalexpansion.Thedesired slope shall be ensured throughout including flat loop. Flare header shall besupportedonshoeofheightrangingfrom100mmto300mm.
Proper thermal analysis temperature shall be established including the possibility oftemperature gradient along the line before providing expansion loops. Efforts shall bemadetominimizethenumberofloops.
Flarelinebetweenknockoutdrumandwatersealdrumshallbedesignedforpressurefluctuationsandadequatelysupportedtoavoidvibrations.
2.5UNDERGROUNDPIPING
FordesignofundergroundpipingsystemGeneralCivilDesignBasisshallbefollowed.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:19of56
Rev.A
2.6FLEXIBILITYANALYSISANDSUPPORTING
2.6.1PIPESUPPORTINGCRITERIA&GENERALGUIDELINES.
Pipingsystemshallbeproperlysupportedtakingintoaccountthefollowingpoints:
a.SUSTAINEDLOADS
WeightofPiping(Barepipe,servicefluid,valves,flanges,jackettingetc)WeightofInsulation(ifany)Weightofsnow(ifany)Weightofonlineequipments(ifany)Weightofinstruments(ifany)PressurereliefloadsduetosafetyvalveoperationDynamicloadsduetopulsatingflow/twophasewithslugflowPressureThrustloadsincaseofexpansionjoints
b.OCCASIONALlOADS
Wind/Seismicloads(asandwhenrequired)
c.THERMALLOADS
Thermal loads due to operating/design/steam out/decoking or any other possibleabnormalcondition.
PipesupportingshallpreferablyfollowthebasicspanasgiveninAnnexureAexceptforflarelineinoffsiteontrestlesinwhichcasethebasicspanshallberestrictedtomax.18.0meters. For sizes not covered inAnnexureA, basic span shall be established based onproject requirement. For piping on rack or sleeper, as a minimum, providing restingsupport on every grid ofpipe rack/sleeper ismandatory.Guides shall beprovided onstraightrunofpipesat intervalsasspecified inAnnexureC,unlessspecificallybecomesnonviableduetoflexibilityproblems.
Additional supports, guides, anchors, special supports like spring supports and swaybraces shall be provided based upon detailed analysis of piping system to restrict theforcesonnozzlesofcriticalequipmentslikepumps,compressors,Aircoolersetc.
Apermanentsupport,eitherrestingorspringsupportshallbeprovidedfor lineswhichdonotneedanysupportingotherwisebutrequiresupportingduringmaintenance.
Barepipesofsizeabove12shallbesupportedwithpadorshoe.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:20of56
Rev.A
Adequate care shallbe taken for smallbore (11/2andbelow)branch frompiping.Asarule, forall lines in600#&aboveclasses, lineshaving twophase flowand lineshavingPulsatingflowsuchasdischargeofreciprocatingcompressors&reciprocatingpumps,allsmallborebranches,e.g.vents,drain,orificetaps,pressuretapings,temperaturetapings,sampleconnections,PSVinlet,TSVinletetc.shallbeprovidedwith2numberstiffenersat90toeachotherfromthemainpipetoimpartadequatestiffnesstothebranchconnection.Thestiffenersshallbemadeof6mmthickflatsofmaterialequivalenttothepipematerial.Further, irrespectiveof linerating, thestiffenersshallbeprovidedforallorifice taps,allsmallbore tapings fromPSV inlet /outlet linesandallsmallbore tapings fromControlValvemanifolds.
Forpulsatingflowlines,detailedthermalandvibrationanalysisbyanalogstudyshallbedonetodecideonlocationofanchorsupportsandguidesetc.
Wherevertwophasewithslugflow inpiping isexpectedandforTransferLines,pipingdesignshallbecheckedbydynamicstressanalysistopreventvibrations.
Pipesupportdesignshallbesuchthatdeflectioninpipingsystemsduetosustainedloadsshallnotexceed15mm,betweentwoadjacentsupports.
Asfaraspossiblelongtrunniontypesofsupports(morethan0.5mtr.)aretobeavoided.Incaselongtrunnionsupportisunavoidableinstraightlengthofpipe,trunnionheighttoberestrictedto0.5mandbalanceheighttobemadeupbyprovidingextendedstructure.
In theheaterswheresteamairdecokingprovision is there, themain linesanddecokinglines should be supported in such away that either of the lines should not be in thehangingpositionwhennotinoperation.
Pipingpassingthroughthetechnologystructureorpassingneartheconcretecolumnetc.should have adequate space to avoid restriction of line movement during thermalexpansion. The gap should take care the thermal expansion along with insulationthickness.
HighdensityPUFblocks shallbe considered for coldpiping supports.Woodenblocksmaybeusedforloadtakingsupportsonverticallinesorasanchorsupports.
Allpipessupportsshallbesodesignedthatthereisnounduetensiononequipmentflanges.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:21of56
Rev.A
2.6.2FLEXIBILITYANALYSISCRITERIA&GENERALGUIDELINES.
Pipingshallbeanalyzedforexpansion,contraction,differentialsettlement,reliefvalvereactionandeffectsmentionedinpara2.7.1.
Thedesignofpipingsystemsshalltakeintoaccountthedifferentconditionsexpectedduringoperation,startup,shutdown,coldbranchincaseofstandbypump,tracing,etc.Hydrocarbonlinesshallbedesignedforsteamoutconditions,ifsospecifiedinProcessdocument.Systemwherecombinationofdifferentoperatingconditionsareenvisaged,suchsystemshallbeanalyzedforallpossiblecombinations.Theuseofexpansionjointsshallbeconsideredonlywhenspaceorpressuredroplimitationdoesnotpermitpipebends.Expansionjointofaxialtypeshallgenerallybeavoided.Forcesandmomentsduetoweight,thermalloadsandotherimposedloadsontheequipmentnozzlemustnotexceedtheallowedloadsfortheequipment.Incasethesameisexceeded,categoricalwrittenconfirmationofacceptanceofthehigherloadsshallbeobtainedfromtheequipmentsupplier.
2.6.3METHODOFANALYSIS
Followinglinesshallbeconsideredcriticalandfortheseformalanalysisismandatory.Otherlinesmayalsoneedanalysis,ifrequired:
Allprocesslinestoandfromfiredheatersandsteamgenerators
Allprocesslinestoandfromcentrifugalcompressorandblower
Alllinestoandfromturbines
Allpumplines(6&aboveandanalysistemp>120C&lessthan60C)&aircoolerlines.
Reboilerpiping,Flareheader/subheaders,Jacketedlines,NonmetallicPiping
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:22of56
Rev.A
Allotherlinesasbelow:6to8analysistempabove300C&lessthan100C10to14analysistempabove150C&lessthan80C16&aboveanalysistempabove100C&lessthan80C
Linesrequiringcompositestressanalysis(PipingalongwithStructureandEquipments),Dynamic/Wind/SeismicanalysisLinesrequiringFlangeleakagecheck,i.e.26&aboveexceptair&waterlines(upto600rating)4&aboveforhydrogenlines(900ratingandabove)8&above,otherlines(900ratingandabove)Allothercriticallines(connectingtosensitiveequipments).SuchasPlatefinexchangers,Coldboxes(sizes6andaboveandanalysistemp.>120C&lessthan60C)OnlyCAESARIIsoftwarepackageshallbeused.
Alllinesshallbeanalyzedatanalysistemperature.Intheabsenceofanalysistemperature,linesshallbeanalyzedatoperatingtemperatureifdifferencebetweenoperating&designtemperaturesislessthanorequalto30degC,otherwiseitshallbeanalyzedatdesigntemperature.However,analysisofflareline&calculationofthermalgrowthoftallequipmentsshallbedoneasperProcessinput.
Forlinesinvolvingpulsatingflowsuchasthoseconnectedtoreciprocatingpumps&compressors,inadditiontothermalanalysis,analogstudyforacoustic&mechanicalvibrationsshallbedonealongwithequipments,byapprovedvendor/Agency.
DynamicanalysisshallbeperformedwherevertwophasewithslugflowinpipingisexpectedaspertheprocessrequirementandforTransferLines.Thefundamentalfrequencyofthepipingsystemshallbewellabovetheimposedfrequencies,ifany,toavoidresonance.Theminimumacceptablefrequencyfortransferlinesshallbe7Hzandforremaininglineswithslugflow,itshallbe6Hz.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:23of56
Rev.A
SeismicandwindforcesshallbebasedonrecommendationsofSeismicdesignbasisandWinddesignbasisrespectivelyofPNCPcoveredelsewhere.
2.7MATERIALS
Basicmaterialselectionofparticularlinedependingonitsservice,temperatureandCorrosivityshallbeasspeltoutinprocesspackage.Detailedmaterialspecificationshallfollowtherequirementsstatedherewith,exceptwhereverspecifiedasperLicensorsrequirement.
2.7.1PIPE
2.7.1.1WALLTHICKNESS
CalculationofpipethicknessandbranchreinforcementshallbebasedonrequirementsofASMEB31.3/IBRasapplicable.Propercorrosionallowanceandmilltoleranceshallbeconsideredwhileselectingnominalthickness.
Forcarbonsteelandlowalloysteelpipesminimumpipethicknessshallbeasfollows:
S160upto0.75NB(forotherthansteamtracing),
XSupto0.75NB(forsteamtracing),
XSfor1to2NB,
STDforabove2NB.
Forstainlesspipesminimumpipethicknessshallbeasfollows:
80Supto0.75NB,
40Sfor1NBto2NB,
10Sforabove2NB
Thephilosophyofminimumthickness/scheduleisapplicableforbothseamlessandweldedpipes
The abovementionedminimum thickness/schedule criteria is not applicable tocategoryDclasses(forservicesinA3A,A3Yspecsetc),firewaterservice(A33A)andA10AspecificationwhereISpipesorweldedAPI5Lpipesarebeingused.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:24of56
Rev.A
All pipes (seamless & welded) shall have uniform negative wall thicknesstoleranceof12.5%forwallthicknesscalculationspurpose.
Forthicknessesexceedingminimumthickness/schedulecriteria,scheduleXSshallbeselectedforCS&ASclasses(for2&above).IntermediateschedulesbetweenSTD&XSshallbeignored.SimilarlyforSSclasses(2&above)S10,S20,S30&40Smaybeselectedbeyondminimumthickness/schedulecriteria.If,thethicknessesexceedXSinCS&ASclassesand40SinSSclasses,onlythen,thethicknessshallbecalculatedbasedonactualserviceconditionssubjecttoaminimumof80%classrating.Maximum10%ofcorrosionallowancemaybereducedinspecialcases,tooptimizethepipeschedules.Ingeneral,thepressuretemperaturecombinationtocalculatewallthicknessshallbeasfollows:
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:25of56
Rev.A
Material Class Size Design condition
C.S. (A106 GR.B, API-5L GR.B, A672)
LTCS (A333 GR.6),
Low Alloys,
1.25% Cr-0.5% Mo, 2.25% Cr- 1.0% Mo,
5%Cr-0.5% Mo, 9%Cr- 1.0% Mo
150
upto 24" Class condition above 24" Line condition (#)
300
upto 14" Class condition above 14" Line condition (#)
600
upto 8" Class condition
above 8" Line condition (#)
900 upto 8" Class condition
above 8" Line condition
1500 & 2500 upto 4" Class condition above 4" Line condition
SS
(A312 TP304, 304L, 316L, 321,347) OR
(A358 TP304, 304L, 316, 316L, 321, 347)
150
up to 24" Class condition
above 24" Line condition ($)
300
upto 14" Class condition
above 14" Line condition ($)
Material Class Size Design Condition 600 upto 6" Class condition
900,1500
above 6" Line condition ($)
upto 4" Class condition
above 4" Line condition
2500
upto 2" Class condition
above 2" Line condition
Higher Alloys
150
upto 6" Class condition
above 6" Line condition 300-2500 all sizes Line condition
#OnlyIfthethickness/scheduleasperclassconditionexceedsXS.$OnlyIfthethickness/scheduleasperclassconditionexceeds40S.ForCatDclasses,forabovegroundapplications,D/tratioshallbetakenas120(max.).ForotherthanCatDservices,D/tratioshallbegenerallyrestrictedto100.Disnominaldia.andtisnominalthickness.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:26of56
Rev.A
2.7.1.2PIPESIZE
Pipesizesshallnormallybe0.5,0.75,1.0,1.5,2.0,3,4,6,8,10,12,14,16,18,20,
2.7.1.3PIPETYPE
Material Size Type CS, LTCS, AS (except for Cat D fluids & LP hydrocarbons in offsites)
Upto 14"
Seamless
16" and Above
E.F.S.W.
SS (Process lines)
Upto 8"
Seamless
10" and Above
E.F.S.W.
SS (Non process lines)
Upto 1.50"
Seamless
2" & Above
Welded
CS (Cat D fluids & Fire water service)
ALL
Welded*
CS (LP hydrocarbons offsites)
Upto 6"
Seamless
Above 6" Welded
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:27of56
Rev.A
*LimitedtoCatDservices&Firewaterserviceswithfollowingexceptions:
ForU/Gpipesincoolingwater&Firewaterservices:6&belowA106GrBSeamless8&aboveIS3589Gr330Welded/ASTMA53Gr.BWelded/API5LGr.BWelded(Forcoolingwaterservices)8&above IS3589Gr410Welded/A53Gr.BWelded/API5LGr.BWelded (Forfirewaterservices)
2.7.2FITTINGS
Typeoffittingsshallbeequivalenttopipetype.
ThicknessoffittingsatendstomatchpipethicknessforBWfittings.
SWfittingsshallbe3000#,6000#or9000#dependingonthepipethicknessesS80,S160andaboveS160respectively.
Upto600#allbranchconnectionsshallbeasfollows,unlessspecificallymentionedotherwiseinPMS:
Upto11/2NBHalfcouplings/Tee
2andaboveTees/Pipetopipewithorwithoutreinforcementpad
Forbranchconnectionsabove600#rating,equaltee/unequalteeshallbeusedforall sizes. Incaseofnonavailabilityofunequal tees,oletsmaybeused. Usageofsweepoletshallbeavoidedduetopooravailabilityglobally.
MitresshallbeusedinCategoryDserviceabove6NB.Elbows(seamless/welded)are acceptable inplace ofmitres, however, thickness of elbows shall be same asmitres.Seamlesselbowsareacceptableinplaceofweldedelbows.
Forother thanCategory D fluid in150#and300#Classmitrescanbepermittedfor sizes above 48.Mitres to be designed as perASME B31.3.However, use ofmitresshallbeminimum.
UnionshallnottobeusedinlinesotherthanCatDwaterlines.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:28of56
Rev.A
2.7.3.FLANGES
Flangesshallbeasfollows:
Rating
Size
Type
Remarks
150
Up to 1.50"
SW RF
If used with non metallic gasket
Up to 1.50"
WN RF
If metallic/spiral wound gasket is used
2" & above
WN RF
For CS (Other than Cat-D), AS & SS(Cryo)
2" & above
LJ FF+Stub ends
For SS (Other than Cryo)
2" & above
SO FF
For CAT-D service
300,600
Up to 1.50"
SW RF
2" & above
WN RF
900
All
WN RTJ
Allflangejointsonpipingsystemincludingflangesontheequipment,manholes,etcshallbetightenedusingHydraulicbolttensioneraspertherequirementgiveninthefollowingtable&thestudboltlengthshallbelongerbyonediametertofacilitatebolttensioning:
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:29of56
Rev.A
Notes:1) Hydrogen service is defined as service in contact with hydrogen or gaseousmixturescontaininghydrogen inwhich thepartialpressureofhydrogen is5barormore.2)Jointswithleakagepotentialshallincludea)Jointsinvolvingtappedholesb)Itemsnotsubjectedtohydrotesteg.Jointsforequipmentmanholes,equipment
mounted temp, pressure& level instruments, linemounted temp connections,onlineinstrumentjointslikecontrolvalvesandsafetyvalves,compressorvolumebottles.c)Itemsinvolvingtwosetsofgasketswithonesetofboltegorificeflangejoint,joints with spectacle blind, spacer, flangeless wafer check valve, wafer typebutterflyvalves.d)TieinjointswithotherContractors&packagevendorse)Hightemperature(above370degC)jointsinhydrocarbonservice.
Nominal Bolt Diameter
Condition
Remarks
All
When specified by Process licensor/ Vendor/Project Specifications
50 mm & over
All Joints
Except under Cat-D service, as defined in ASME B31.3
38 mm & above & below 50mm
a) Class 600 & above b) Hydrogen service (Note-1) c) Cat-M service as per ASME B31.3 d) Joints with leakage potential (Note-2) e) Critical joints with equipments (Note-3
25 mm & above & below 38mm
a) Joints with leakage potential (Note-2) b) Critical joints with equipments (Note-3)
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:30of56
Rev.A
3)Criticaljointswithequipmentsshallincludeinlet&outletflangesofpumps,compressors&turbinesForflangeassembliesnotcoveredundertherequirementsofhydraulicbolt
tensioning,butfallinginthefollowingcategoriesBoltTorquingusingprespecified
torquevalueshallbeemployed:
Service Classes (as per ASME B16.5)
Hydrogen Service All
Category-M services as per ASME B31.3
All
Other Services 600# & above
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:31of56
Rev.A
2.7.4GASKETSGasketsshallbeasfollows: Rating
Material /service
Temperature (0C)
Type
Gasket or Strip material + Filler material/RTJ Gasket Material
150
CS & SS (utilities)
up to 371 0C
PLAIN
CAF
150
CS & LTCS (other than utilities)
up to 371 0C
Spiral wound
SS316+CAF
150
AS (all services)
up to 371 0C
Spiral wound
SS316+CAF
300 & 600
CS
up to 427 0C
Spiral wound
SS316+CAF
300 & 600
AS
All
Spiral wound
SS316+Grafoil
150, 300, 600
SS (other than utilities
All
Spiral wound
SS316+Grafoil (where trim material is SS304/316) SS316L+Grafoil (where trim material is SS304L/316L
300(*), 600(*),900, 1500,2500
CS
All
Octagonal RTJ
Soft Iron
300(*), 600(*), 900, 1500,2500
AS
All
Octagonal RTJ
5Cr-Alloy steel
300(*), 600(*), 900, 1500,2500
SS
All
Octagonal RTJ
SS
OnlyifRTJisspeciallymentionedinPMS.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:32of56
Rev.A
2.7.5VALVES
SWvalvesUpto1inch,for150#,300#,600#(exceptball&plugvalves).Ball&Plugvalvesshallbeflangedforallsizes.FlangedvalveAbove1inchfor150#,300#,600#.BWvalves900#andabove2.7.5Overandabovetherequirementsspecifiedinclause2.7.1through2.7.5,othertechnicalrequirementprescribedinAnnexureDshallalsobeadheredto.
2.7.7NDERequirements(IfnotspecifiedinPMS)
Dependingupontheseverityofapplication,extentofNDEshallbedecided.Asarule,allhydrogen,oxygen,NACEandanyotherlethalserviceshallhave100%radiographyonweldjointsinallclassratings.Forhighpressureapplications,ie.,900#andupward100%radiographyonbuttweldjointsshallbeemployed.In100%radiographyclassesanyfilletweldsemployedshallhave100%DP/MPtestinCS/ASclassesand100%DPtestinSSclasses.Cat.DserviceasperASMEB31.3doesnotrequireradiography.ButtweldsforClassin150#fornormalhydrocarbonserviceshallbesubjectedto10%radiographyandfilletweldsto10%DP/MPtestforCS&ASand10%DPtestforSS.ButtweldsforClasses300#&600#fornormalhydrocarbonserviceshallbesubjectedto20%radiographyandfilletweldsto20%DP/MPtestforCS&ASand20%DPtestforSS.Forfirewaterservice,IBRetc.,radiographyshallbeasperstatutoryrequirement.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:33of56
Rev.A
2.8THERMALINSULATIONOFPIPING,EQUIPMENT&VESSELS
2.8.1HOTINSULATION
Insulationmaterials,applicationetc.shallbebasedonrecommendationsofStandardspecificationforhotinsulationofvessels,pipingandequipments(Doc.No.6440002).InsulationthicknessonpipingshallbeasperProcessdesignbasis.
2.8.2COLDINSULATION
Insulationmaterials,applicationetc.shallbebasedonrecommendationsofStandardspecificationforcoldinsulationofvessels,pipingandequipment(Doc.No.6440003).InsulationthicknessonpipingshallbeasperProcessdesignbasis.
2.9PAINTING
Paintingmaterials,applicationetc.shallbebasedonrecommendationsofJobspecificationforshop&fieldpaintingforPNCP(Doc.No.6556642PTA05).
2.10WELDING
2.10.1APPLICABLECODES&STANDARDS
Allweldingwork, equipment forwelding,heat treatment, other auxiliary functions and theweldingpersonnelshallmeettherequirementsofthe latesteditionsofthefollowingacceptedstandardsandprocedures:
a)ProcessPipingASME:B31.3
b)TheIndianBoilerRegulationsI.B.R.
Inaddition, the followingcodesandspecificationsreferred in thecodeof fabricationshallbefollowed for the welding specifications, consumable qualifications and non destructive testprocedures.
WeldingandBrazingQualificationsASMEBPVSec.IX.
NondestructiveexaminationASMEBPVSec.V.
Materialspecifications:Weldingrods,electrodesandfillermetalsASMEBPVSecIIPartC.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:34of56
Rev.A
Theadditionalrequirementsmentionedinthisspecification,overandabovethoseobligatoryaspercodes,shallbefollowedwhereverspecified.
2.10.2WELDINGPROCESSES
2.10.2.1 Welding of various materials shall be carried out using one or more of thefollowingprocesseswiththeapprovaloftheEngineerincharge.
ShieldedMetalArcWeldingprocess(SMAW)GasTungstenArcWeldingprocess(GTAW).
2.10.2.2Automaticandsemiautomaticweldingprocessesshallbeemployedonlywiththeexpress approval of the Engineerincharge. The welding procedure adopted andconsumablesusedshallbespecificiallyapproved.2.10.2.3Acombinationofdifferentweldingprocessescouldbeemployedforaparticularjointonlyafterdulyqualifying theweldingprocedure tobeadoptedandobtaining theapprovalofengineerinCharge.2.10.2.4ForadditionaldetailsWeldingSpecificationforFabricationofPiping6770001shallbereferred.
2.11MISCELLANEOUS
2.11.1Positivematerial identification(PMI) testat construction site shallbedoneasperStandardSpecification forpositivematerial identificationPMIatconstructionsite,6820002.
2.11.2Potablewater shallbeused for testingofCarbon steel&Alloy steelpiping.FortestingofStainlessSteelpipingmaximumchlorinecontentinwatershallbe1520ppm.
2.11.3Itemcodesforsurplus&sparematerialsshallbeasperOwnercodesatthetimeofhandingoveroftheProject.
2.11.4Allsmallborepipingandsteamtracerlines,sizeandbelowshallbeweldedbyTIGprocessforalltypeofjoints,e.g.ButtWeld,SocketWeld,teeetc.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:35of56
Rev.A
2.11.5Preheating/PostheatingismandatoryforalltypeofAlloysteelpipingweldingjoints.
2.11.6Alllowhydrogenelectrodesshallbebakedat350deg.Cinsuitablefurnaceatsitebythecontractor.2.11.7WeldingofAlloysteelbuttjointsshouldnotbeleftincompleteforlonghours;atleastonethirdoftheweldjointshallbecompletedincontinuity.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:36of56
Rev.A
3.0REFERENCEDPUBLICATIONS
Thefollowingcodesandstandardsshallbefollowedunlessotherwisespecified:ASMESEC.IRulesforConstructionofPowerBoilers.ASMESEC.II,PartCMaterialSpecifications:WeldingRods,ElectrodesandfillermetalsASMESEC.VIIIRulesforConstructionofPressureVessels.ASMESEC.IXWeldingandBrazingqualificationsASMEB31.1PowerPipingASMEB31.3ProcessPipingAPIRP520Sizing,Selection&InstallationofPressureRelievingDevicesinRefineriesAPIStd.610CentrifugalPumpsforPetroleum,HeavyDutyChemicalandGasIndustryServiceANSI/NEMASM23SteamTurbinesforMechanicalDriveServiceAPIStd.617CentrifugalCompressorsforPetroleum,ChemicalandGasIndustryServiceAPIStd.661AirCooledHeatExchangerAPIStd.560FiredHeaterEJMAExpansionJointsManufacturersAssociationTEMATubularExchangersManufacturersAssociationOISD118LayoutsforOilandGasInstallationsIBRIndianBoilerRegulationsNACEMR0103MaterialsResistanttoSulfideStressCrackinginCorrosivePetroleumRefiningEnvironmentsResistantMetallicMaterialsforOilfieldEquipmentNACEMR0175/ISO15156MaterialsforuseinH2ScontainingEnvironmentsinOil&GasProductionNACEMR0284EvaluationofPipelineandPressureVesselSteelforResistancetoHydrogenInducedCrackingNACETM0177LaboratoryTestingofMetalsforResistancetoSulfideStressCrackinginH2SEnvironments
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:37of56
Rev.A
AnnexureATABLEOFBASICSPAN
Pipe Size NB (inch)
SCH/ THK (in)
PIPE VAPOR-INSULATION
PIPE-LIQUID-INSULATION
BARE PIPE EMPTY
BARE PIPE WATER FILLED
Pipe Size NB (inch)
BASIC SPAN (L) M BASIC SPAN (L) M Upto 175 0C
176 0C To 315 0C
316 0C To 400 0C
Upto 175 0C
176 0C To 315 0C
316 0C To 400 0C
SPAN (L)M
Weig ht KG/M
SPA N (L) M
Weig ht KG/M
3/4" SCH 40 3.5 3.5 2.5 3.5 3.0 2.0 4.5 1.68 4.0 2.04 3/4"1" SCH 40 4.5 4.0 3.0 4.5 3.5 3.0 5.0 2.52 4.5 3.07 1"
1-1/2" SCH 40 5.0 5.0 4.5 5.0 4.5 3.5 6.0 4.08 5.0 5.4 1-1/2"2" SCH 40 5.5 5.0 4.5 5.0 4.5 3.5 6.5 5.47 5.5 7.65 2"
2- 1/2" SCH 40 6.5 6.0 5.0 6.0 5.5 4.5 7.5 8.7 6.5 11.79 2-1/2"3" SCH 40 7.5 6.5 5.5 6.5 6.0 5.0 8.0 11.35 6.5 16.5 3"4" SCH 40 8.0 7.5 6.5 7.5 7.0 6.0 9.0 16.2 7.5 24.45 4"6" SCH 40 10.0 9.5 8.5 9.0 8.0 7.5 10.5 28.3 9.0 46.7 6"8" SCH 40 12.0 11.0 10.0 10.0 10.0 9.0 12.0 42.84 10.0 75.22 8"10" SCH 40 13.5 13.0 12.0 11.5 10.5 10.5 14.0 60.74 11.5 111.9 10"12" 3/8" w 14.5 13.5 13.0 12.0 11.5 11.0 15.0 74.40 12.0 147.5 12"14" 3/8" w 15.0 14.5 13.5 12.0 12.0 11.5 16.0 82.5 12.5 172.05 14"16" 3/8" w 16.0 15.5 14.5 13.0 12.5 12.0 17.0 94.5 13.0 213.15 16"18" 3/8" w 17.0 16.5 15.0 13.5 13.0 12.0 18.0 106.5 13.5 258.3 18"20" 3/8" w 18.0 17.5 16.0 14.0 13.5 12.5 19.0 118.5 14.0 307.5 20"24" 3/8" w 20.0 19.0 17.5 14.5 14.5 13.0 21.0 142.5 15.0 418.2 24"3/4" SCH 80 3.5 3.5 2.5 3.5 3.0 2.0 4.5 2.20 4.0 2.49 3/4"1" SCH 80 4.5 4.0 3.0 4.5 3.5 3.0 5.0 3.25 4.5 3.72 1"
1-1/2" SCH 80 5.0 5.0 4.5 5.0 4.5 4.0 6.0 5.45 5.0 6.60 1-1/2"2" SCH 80 6.0 5.0 4.5 5.5 5.0 4.0 6.5 7.53 6.0 9.45 2"
2-1/2" SCH 80 6.5 6.0 5.5 6.0 6.0 5.0 7.5 11.49 6.5 14.25 2-1/2"3" SCH 80 7.5 6.5 6.0 6.5 6.5 6.0 8.0 15.37 7.0 19.66 3"4" SCH 80 8.0 8.0 7.0 7.5 7.5 6.5 9.0 22.47 8.0 29.94 4"6" SCH 80 10.5 10.0 9.0 9.5 9.0 8.5 10.5 42.90 9.5 59.85 6"8" 1/2" w 12.0 11.5 10.5 10.5 10.0 10.0 12.0 65.10 11.0 94.8 8"10" 1/2" w 13.5 13.0 12.0 11.5 11.5 10.5 14.0 82.20 12.0 130.69 10"12" 1/2" w 14.5 13.5 13.0 12.5 12.0 11.5 15.0 98.13 13.0 168.64 12"14" 1/2" w 15.0 14.5 13.5 13.0 12.5 12.0 16.0 108.15 13.5 194.4 14"16" 1/2" w 16.0 15.5 15.0 13.5 13.0 13.0 17.0 124.2 14.0 240.0 16"18" 1/2" w 17.5 17.0 16.0 14.5 13.5 13.5 18.0 140.25 14.5 286.64 18"20" 1/2" w 18.0 17.5 17.0 15.0 14.5 14.0 19.0 157.5 15.0 341.8 20"24" 1/2" w 20.0 19.0 18.5 16.0 15.0 15.0 21.0 188.25 16.0 458.44 24"1" 10 S 4.0 3.5 3.0 4.0 3.0 2.5 4.5 2.08 4.0 2.7 1"
1-1/2" 10 S 5.0 4.5 3.5 4.5 4.0 3.0 5.5 3.12 5.0 4.57 1-1/2"2" 10 S 5.0 4.5 3.5 4.5 4.0 3.0 6.0 3.94 5.5 6.33 2"
2-1/2" 10 S 6.5 5.5 4.5 5.5 5.0 4.5 7.0 5.26 6.0 8.85 2-1/2"
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:38of56
Rev.A
3" 10 S 7.0 6.0 5.0 6.0 5.5 5.0 7.5 6.45 6.0 11.91 3"4" 10 S 7.5 7.0 6.0 6.5 6.0 6.0 8.0 8.34 7.0 17.67 4"6" 10 S 9.5 9.0 8.0 8.0 7.5 7.5 10.0 13.82 8.5 34.54 6" 8" 10 S 11.0 10.5 10.0 9.5 9.5 8.5 11.5 19.94 10.0 55.5 8"10" 10 S 12.5 12.0 11.0 10.5 10.0 9.5 13.0 27.83 11.0 83.4 10"12" 10 S 14.0 13.0 12.0 11.0 11.0 10.0 14.5 36.00 11.5 114.6 12"14" 10 S 14.5 14.0 13.0 11.5 11.0 11.0 15.5 41.18 11.5 132.6 14"16" 10 S 16.5 14.5 14.0 12.0 11.5 11.5 16.5 47.33 12.5 172.2 16"18" 10 S 16.5 15.5 14.5 12.5 12.5 11.5 17.5 53.18 13.0 212.1 18"20" 10 S 17.5 16.5 15.5 13.0 13.0 12.0 18.5 68.50 13.0 264.5 20"24" 10 S 19.0 18.0 17.0 14.0 13.5 12.5 20.5 94.37 14.0 376.8 24"
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:39of56
Rev.A
AnnexureBAccessibilityforValves&Instruments VALVES,INSTRUMENTS,CENTRELINEOFITEMTOBEOPERATED,CENTRELINEOFITEMTOBEEQUIPMENTTOBEOPERATEDLOCATEDLESSTHAN3.6mABOVEOPERATED,LOCATEDGRADE,2.75mABOVEFLOORORMORETHAN3.6mABOVEPLATFORMOR1.8mABOVEWINGGRADE,2.75mABOVEPLATFORMFLOORORPLATFORMOR1.8mABOVEWINGPLATFORM
EXCHANGERHEADSNILPLATFORMOPER.VALVES2&SMALLERFIXEDLADDERFIXEDLADDEROPER.VALVES3&ABOVEPLATFORMPLATFORMMOTOROPERATEDVALVESPLATFORMPLATFORMCONTROLVALVESPLATFORMPLATFORMRELIEFVALVES2&SMALLERFIXEDLADDERFIXEDLADDERRELIEFVALVES3&ABOVEPLATFORMPLATFORMBLOCKVALVES2&SMALLERPORTABLELADDERPLATFORMBLOCKVALVES3&ABOVEPLATFORM(NOTE1)PLATFORM(NOTE1)BATTERYLIMITVALVESPLATFORMPLATFORMPRESSUREINSTRUMENTFIXEDLADDERIFABOVE2.2mHEIGHTFIXEDLADDERTEMPERATUREINSTRUMENTFIXEDLADDERIFABOVE2.2mHEIGHTFIXEDLADDERSAMPLEPOINTSPLATFORMPLATFORMGAUGEGLASSESFIXEDLADDERFIXEDLADDERLEVELCONTROLLERSPLATFORMPLATFORMPROCESSBLINDSANDSPACERSPORTABLELADDER/PLATFORMPLATFORM2&SMALLERPROCESSBLINDSANDSPACERSPLATFORMPLATFORM3&ABOVEMANWAYS/MANHOLESPLATFORMPLATFORMHANDHOLES/INSPECTIONHOLESPLATFORMPLATFORM
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:40of56
Rev.A
NOZZLESNOACCESSREQD.(NOTE2)NOACCESSREQD.(NOTE2)VESSELVENTSPORTABLELADDERFIXEDLADDERLINEDRAINS&VENTSPORTABLELADDERPORTABLELADDERORIFICEFLANGESPORTABLELADDERPORTABLELADDER
NOTE1:BLOCKVALVESWITHCENTRELINESLOCATEDABOVE2.0mFROMTHEOPERATINGFLOOR,WHICHAREREQUIREDFORNORMALOPERATIONSHALLBEPROVIDEDWITHPORTABLEPLATFORMORCHAINFOROPERATIONOFVALVES.NOTE2:TEMPORARYARRANGEMENTFORACCESSSHOULDBEFEASIBLE.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:41of56
Rev.A
AnnexureCVerticalandHorizontalGuidesSpacing NOM PIPE SIZE IN INCHES
VERTICAL SPACING METRES
HORIZONTAL SPACING METRES(NOTE-1)
1 6.0 6.0 1 6.0 6.0
2 6.0 6.0 3 8.0 12.0 4 8.0 12.0 6 8.0 12.0 8 8.0 12.0 10 12.0 18.0 12 12.0 18.0 14 12.0 18.0 16 12.0 18.0 18 12.0 18.0 20 16.0 18.0 24 16.0 18.0
26 and above 16.0 18.0 Notes:
1.Thesespacingsmaybevariedtosuitcolumnspacingofrack.Theabovespacingisforstraightrunsofpipe&doesnotincludeguideswhichareusedforcontrolofthermalmovements,asdecidedbystressgroup.2.Theguidespacingsgivenintheabovetableareindicativeonly.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:42of56
Rev.A
`AnnexureDTechnicalRequirementsforPipingMaterial 1.0General1.1Ends
Unlessotherwisespecified,theendsshallbetothefollowingstandard:SW/SCRD:ASMEB16.11BW:ASMEB16.25FLANGED:ASMEB16.5andASMEB16.47SERIESBTHREADING:ASME/ANSIB1.20.1(NPT,Taperthreads)
1.2FaceFinish
ThisshallbetoMSSSP6/ASMEB46.1/ASMEB16.5/B16.47.Theinterpretationshallbeasfollows:StockFinish:2501000inAARHSerratedFinish/SmoothFinish/125AARH:125250inAARHExtraSmoothFinish/63AARH:3263inAARH
1.3AusteniticStainlessSteel
Allitems/partsshallbesuppliedinsolutionannealedcondition.
ForallAusteniticStainlesssteels,IntergranularCorrosion(IGC)Testshallbeconductedasperfollowing:
ASTMA262PracticeBwithacceptancecriteriaof60mils/year(max.)forcasting.
ASTM A262 Practice E with acceptance criteria of No cracks as observed from20Xmagnificationµscopicstructure tobeobserved from250Xmagnification forotherthancasting.
For IGC test, two sets shall be drawn from each solution annealing lot; one setcorresponding to highest carbon content and other set corresponding to the highestrating/thickness.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:43of56
Rev.A
ForallitemsofstabilizedSSgrades(SS321,SS347),stabilizingheattreatmentshallalsobedone. It shall be carried out subsequent to normal solution annealing. Soakingtemperatureandholdingtimeshallbe900Cand4hrsrespectively.
1.4Threads
ThreadsforthreadedPipes,Fittings,Flanges,ValvesetcshallbeinaccordancewithB1.20.1taperthreads,unlessotherwisespecified.Allthreadedjoints,irrespectiveofpressureandtemperature,forcriticalservicesincludingtoxicfluid,hydrogenetcshallbesealweldedwithafullstrengthfilletweld.
2.0ITEMSPECIFICNOTES: 2.1Pipes
Unlessspecificallyexempted,weldedpipesshallbeacceptableonlywithlongitudinalweldmadeemployingautomaticwelding.Unlessmentionedotherwiseinthematerialcode,doubleseam180deg.apartisallowedforsizes36andlargeronly.GalvanizedPipesshallbeonlyHotDipgalv.toASTMA53.
2.2Fittings
Allfittingsshallbeseamlessinconstructionunlessotherwisespecified.
ForreducingBWfittingshavingdifferentwallthicknessateachend,thegreateroneshallbeemployedandtheendsshallbematchedtosuitrespectivethickness.
Allweldedfittingsshallhavemaximumnegativetoleranceequivalenttopipeselected.
All welded fittings shall be double welded. Inside weld projection shall not exceed1.6mm,andtheweldsshallbegroundsmoothatleast25mmfromtheends.
For fittingsmade out ofwelded pipe, the pipe itself shall be of doublewelded type,manufacturedwiththeadditionoffillermaterialandmadeemployingautomaticweldingonly.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:44of56
Rev.A
AllweldedfittingsshallbenormalizedforCS,normalized&temperedforAS;and100%radiographedbyXrayforallweldsmadebyfittingmanufactureraswellasforweldsontheparentmaterial.
BevelendsofallBWfittingsshallundergo100%MP/DPtest.
Thoseusedinfirefightingfacilitiesshallbemarked.
2.3Flanges
ForRingJointFlanges,BlindsandSpacers,thehardnessshallbeasfollows:FlangeMaterialMin.HardnessofGroove(BHN)CarbonSteel1401%Crto5%Cr,1/2Mo150Type304,316,347,321160Type304L.316L140ForRTJflanges,blinds&spacers,thehardnessofthegrooveshallbespecifiedonthetestreport.Boreofweldneckflangeshallcorrespondtotheinsidediameterofpipeforspecifiedschedule/thickness.Endsshallbebevelledtosuitthespecifiedschedule/thickness.ForRTJflanges,onlyoctagonalsectionringjointflangesshallbeused.
2.4Valves
2.4.1General
Valves ofClass 900& above shall bepressureseal type.Threaded and sealwelded orweldedbonnetmaybeemployeduptosizes11/2.
Allflangedvalves(exceptforged)shallhaveflangesintegralwiththevalvebody.Weldonflangesshallbemadebyfullpenetrationjointsand100%radiographed.
Valve Castings/Forgings purchased from India or Indian vendors shall be from EILapprovedfoundries/forgingshop.
Yokematerialshallbeatleastequaltobodymaterial.
ForgingsareacceptableinplaceofCastingsbutnotviceversa.
Nocastironvalvestobeusedinfirewateroranyotherserviceexcept indrinkingwaterservice.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:45of56
Rev.A
2.4.2Dimensions
FacetoFace/EndtoEnddimensionshallbeasperANSIB16.10.IncasethesameisnotcoveredunderB16.10,thedimensionshallbeasperBS2080/ManufacturersStd.Valveundercryogenicservice(temp.below45C)shallmeettherequirementsofBS6364andshallbeprocuredfromprequalifiedvendor.
2.4.3Operation
Generallythevalvesarehandwheelorleveroperated.However,suitablegearoperatorinenclosedgearboxshallbeprovidedforvalvesasfollows:ValveTypeClassForSizesGate/Globe150123001260012Gate/Globe/YGlobe/9006StopCheck1500325003Ball/Plug(otherthan1506PressurebalancedPlug)30066004900315003Butterfly15063006
Handwheeldiametershallnotexceed750mmandleverlengthshallnotexceed500mmoneachside.Efforttooperateshallnotexceed35kgfathandwheelperiphery.However,failingtomeettheaboverequirement,vendorshalloffergearoperation.Quarterturnvalvesshallhaveopenpositionindicatorswithlimitstops.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:46of56
Rev.A
2.4.4ByPass
Aglobetypevalve(sizeasperASME/ANSIB16.34)shallbeprovidedasbypassforthefollowingsizesofgatevalves:
ClassSize15026&above30016&above6006&above9004&above15004&above25003&aboveBypassPiping,FittingandValvesshallbeofcompatiblematerialanddesign.CompletefilletweldsforbypassinstallationshallbeDP/MPtested.NDTofbypassvalveshallbeinlinewithmainvalve.
2.4.5RadiographyofCastValves
Allcastingshallbeofradiographicquality.Thisrequirementtobeensuredbysampleradiographybeforeproceedingwiththeactualproduction.Radiographyprocedure,areasofcastingtoberadiographed,andtheacceptancecriteriashallbeasperASME/ANSIB16.34.a)Radiographyrequirementforcastingofsizesforspecial/criticalpipingclassesshallbeasfollows:i)Forhydrogen/hydrogenbearinghydrocarbons,oxygen,NACEservices&stressrelievedPipingclasses:ClassSizeqty150upto2450%300upto1650%
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:47of56
Rev.A
ii)ForLT/CRYOservices:
ClassSizeqty150upto2420%300upto1620%b)Radiographyrequirementforcastingsforcategoriesnotmentionedina)aboveshallbeasfollows:ClassSizeqty150upto245%ForCarbonSteelmaterial(ExceptCatD&FirewaterservicesforwhichitisNIL)150upto2410%ForAlloysteels&StainlessSteels15026&above100%Forallmaterials(NilforCat.D&Firewaterservice)300upto1610%Forallmaterials30018&above100%Forallmaterials600&aboveAll100%ForallmaterialsNote1NoradiographyisrequiredforcastingsforDemineralisedWaterservice(CatD)A3KSpec.Note2ForstabilizedgradesofSS100%radiographyisrequiredforcastingsirrespectiveofthecategoryorratingthesebelongto.
2.4.6Ball/Plug/ButterflyValves
Eachvalveshallbesuppliedwithalever/wrenchexceptforgearoperated/motoroperatedvalves.
SoftseatedBall,Plug&Butterflyvalvesshallbesuppliedwithantistaticdevices.
TheballofBallvalvesshallnotprotrudeoutsidetheendflanges.
Ballvalvesshallbefloatingballtype/trunionmountedtypeasperfollowing:
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:48of56
Rev.A
ClassFloatingBallTrunionMounted1508&below10&above3004&below6&above600&above11/2&below2&aboveUseofsoftseatedball/plug/butterflyvalvesshallbesuitablyselectedbasedontemperatureshandled.Butterflyvalvesshallbesuitableforthrottlingapplication.UseofFiresafevalvesshallbeasperProcessrequirement.ForProcess(Hydrocarbon)servicesbutterflyvalveshallbetripleoffset,highperformancetype.
2.5Strainer
Allowablepressuredropwhenspecifiedshallbecertifiedalongwith theoffer. Ifaskedspecifically,pressuredropcalculationsshallbefurnished.
All2&highersizedYtypestrainersshallbeprovidedwith3/4threadedtapandsolidthreaded plug as drain connection on the blind flange. For less than 2, this shall be1/2size.
BottomflangeofYtypestrainershallnothavetappedhole.Fulllengthstandardsizestudsshallbeusedforjoiningblindflange.Forfabricatedstrainers,allBWjointsshallbefullyradiographedandfilletweldsshallbe100%DP/MPchecked.Allthestrainersshallbehydrostaticallytestedattwicethedesignpressure.
2.6Traps
Vendor shall furnish the performance curve indicating the capacity in mass/hour atvariousdifferentialpressuresacrossthetrap.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:49of56
Rev.A
Partssubjecttowearandtearshallbesuitablyhardened.Trapsshallfunctioninhorizontalaswellasinverticalinstallation.Trapsshallhaveintegralstrainers.Alltrapsshallbehydrostaticallytestedtotwicethedesignpressure.
2.7Hoses
Suitabilityofhosesshallbeguaranteedfortheserviceandworkingconditionsspecifiedintherequisition,evenifthematerialisnotspecifiedintheMaterialRequisitionforanyparticularservice.Allhosesshallbeclearlymarkedwithserviceandworkingpressureatbothends.Hosesshallberesistanttoageing,abrasionandsuitableforoutdoorinstallations.CompleteHoseassemblyshallbetestedattwotimesthedesignpressure.Steamhosesshallbesubjecttosteamresistancetest.
2.8ExpansionJoints
The applicable codes are ASME B31.3 and EJMA (Expansion Joint ManufacturersAssociation).
Bellows shall be formed from solution annealed sheet conforming to the latestASTMSpec.Anylongitudinalweldshallbe100%radiographed.Thefinishedlongitudinalweldmust be of the same thickness and same surface finish as the parent material.Circumferential welds are not permitted. Bellows are to be hydraulically orexpansion(punched)formed.Rolledformedbellowsarenotacceptable.Noticeablepunchordiemarksresultingfromexpansionoperationarenotacceptable.
Norepairsofanykindareallowedonthebellowsafterforming.Deepscratchesanddentsarenotacceptable.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:50of56
Rev.A
Theoutofroundnessshallbe limited to3mm.This is themax.deviationbetween themax.&min.diameter.
The actual circumference of the welding end shall be maintained to 3mm of thetheoreticalcircumference.
Apartfromtheusualrequirements,thevendorshallalsofurnish:
Designcalculationstojustifystiffnessandfatiguelife.Axial,lateralstiffness,angularstiffness,effectivepressurethrustarea.Installation/maintenancemanual.Moments&forcesduetostiffness&pressurethrustduetoexpansionjoint
2.9Supports&SpringAssemblies
TheMaterial,Design,ManufactureandFabricationshallbegenerallyasperMSSSP58/MSSSP89and/orBS3974.TestingofspringsshallbeasperBS1726.
2.10Gaskets
Asbestosfillerforspiralwoundgasketshallnothaveanycolourordye
Fullfacegasketsshallhaveboltholespunchedout.
NonmetallicringgasketsasperASME/ANSIB16.21shallmatchflangestoASME/ANSI
B16.5 upto 24, and ASME/ANSI B16.47 or AWWA for sizes > 24 unless otherwisespecified.
SpiralwoundgasketsasperASMEB16.20shallmatchflangestoASME/ANSIB16.5upto24,andASMEB16.47seriesBforsizes>24unlessotherwisespecified.
InnerandouterringsrequirementforspiralwoundgasketsshallbeasperPMSGeneralnotes.
Innerringshallbeprovidedforthefollowing:
a)Aspercode(B16.20)requirement.
b)Forsizes26&aboveinallclasses.
c)Forvacuum,cryoandhydrogenservice.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:51of56
Rev.A
d)ForSS321,SS347andHgradeSSclasses.
e)Forclasseswheretemperatureishigherthan427C.
f)For900#ratingandaboveclasses.(IfPMSspecifiesspiralwoundgasket)
IncaseofRTJgaskets,onlyoctagonalsectionringgasketsshallbeused&shallhavepropermarkingstamped.Materialcertificateshallbeavailableforthegasket.HardnessofRTJgasketsshallbe20BHN(min)lessthanthecorrespondingflangegroovehardness.
2.11Stud,Bolts,NutsandJackScrews
AllboltingshallbeasperASME/ANSIB18.2.1forStuds,M/CBoltsandJackscrews,andASME/ANSIB18.2.2fornuts.
Threadsshallbeunified(UNCfor1diaand8UNfor>1dia)asperANSIB1.1withclass2AfitforStuds,M/CBoltsandjackscrews,andclass2Bfitfornuts.
Studboltsshallbethreadedfulllengthwithtwoheavyhexnuts.LengthtoleranceshallbeinaccordancewiththerequirementoftableF2ofAnnexureFofASMEB16.5
Thenuts shall bedouble chamfered, semifinished,heavyhexagonal type and shall bemadebythehotforgedprocess.
Thelengthofthestuds/boltsshouldbesuchthatminimumtwothreadsshouldbeoutofthenutoneitherside.
Allthestud/boltshouldhavemetallurgicalcertificatesincaseofalloy/SSmetallurgywithidentifiedcolourmarkingatthestudends/boltsideface.
HeadsofjackscrewsandM/Cboltsshallbeheavyhexagonaltype.Jackscrewendshallberounded.
Whereverbolttensioningisspecifiedstudboltlengthshallbelongerbyminimumonediametertosuitbolttensioner.Excessthreadsshallbeprotectedbyathreadednut.
2.0 Inspection&testingAllitemsandtheirpartsshallbesubjectedtoallmandatoryaswellassupplementary(whereverspecified)testsandcheckscalledforintherespectivecodes/standards/datasheets.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:52of56
Rev.A
Theexaminingpersonnelshallhavetherequisitequalificationandexperience.Clientanditsauthorizedrepresentativereservetherighttovetandsuggestchangesinvendorsprocedures.VendorsworksandfacilitiesshallbeaccessibletotheClient/Representativeatallreasonabletimes.Testreportsforallmandatoryaswellassupplementarytestswhereverspecifiedshallbefurnished.PositivematerialidentificationtestatvendorsworksshallbedoneasperStandardspecificationforpositivematerialidentificationPMIatvendorsworks,6810001.
4.0Marking
Allitemsshallbemarked(stamped/etched)inaccordancewiththeapplicablecode/standard/specification.Inaddition,theitemcode,ifavailable,shallalsobemarked.Foreaseofidentification,thecolourofpaintedstrip(whereverrequired)shallbeaspertheapplicablestandard.Paintorinkformarkingshallnotcontainanyharmfulmetalormetalsaltswhichcancausecorrosiveattackeitherordinarilyorinservice.Specialitems/smalleritemsshallhaveattachedcorrosionresistanttagprovidingsalientfeatures.
5.0Despatch
Allitemsshallbedry,cleanandfreefrommoisture,dirtandlooseforeignmaterialofallkinds.
Allitemsshallbeprotectedfromrust,corrosion,andmechanicaldamageduringtransportation,shipmentandstorage.
Rustpreventiveonmachinedsurfacestobeweldedshallnotbeharmfultoweldingandshallbeeasilyremovablewithapetroleumsolvent.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:53of56
Rev.A
Endsshallbesuitablyprotected,andtheprotectorsshallbesecurelyandtightly
attached. Eachvarietyandsizeofitemshallbesuppliedinseparatepackagingmarked
withthepurchaseorderno.,itemcode(ifavailable),andthesalientspecifications.
Carbonsteel,LTCSandlowalloysteelvalvesshallbepaintedwithonecoatofinorganiczincsilicateprimer.
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:54of56
Rev.A
AnnexureECLEARANCESOVERHEADCLEARANCES
Equipment,structure,platforms,piping&itssupportsshallbearrangedtoprovidethefollowingclearancesoverhead:Overrailroads,topofrailtobottomofanyobstruction.7mOverplantroadsformajormobileequipment.7mOversecondaryroads(bottomofpipe)andaccess5mwaysformobileequipment.Overgrade&bottomofpipe(insidebatterylimit)3.5matpumprowaccessway.Overwalkways,passways&platformstonearest2.2mobstructionandinsidebuilding.Overexchangersatgrade,shellcoverchannelend.1.5mHORIZONTALCLEARANCES:Betweenexchangers(aislesbetweenpiping).0.9mAroundpumps(aislesbetweenpiping).0.9mFiredheaterstopumpshandlingflammablestock.15mFiredheaterstootherflammablecontaining15mequipmentnotcloselyassociatedwithheaters.Atdriverendofpumps,wheretruckaccessreqd3.0m
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:55of56
Rev.A
Atdriverendofpumps,wheretruckaccessnotreqd1.8mAtshellcoverendofexchangersatgrade,1.3mforaccessway.Betweenshellsofadjacenthorizontalvessels.1.2m PIPEBERTHING: Underground300mmminimumcleargapbetweenpipesAbovegroundNormalFlangetobarepipe(orinsulation)plus25mmEQUIPMENTSPACING: SmallpumpsMountedoncommonfoundationswith(3.7kw&less)suitablecentretocentredistance.Mediumpumps900mmclearaisle(22.5kw&less)Largerpumps900mmclearaisle(above22.5kw)Exchangers&900mmminimumclearaisleotherequipmentonstructures PLATFORMS:Towers,vertical&horizontalvessels:Distanceofplatformbelowcentrelineof9001050mmmanholeflangesideplatformWidthofmanholeplatformfrommanhole900mm
-
Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG
DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED
ProjectNo.:6724 SheetNo.:56of56
Rev.A
covertooutsideedgeofplatformPlatformextensionbeyondcentrelineofmanhole900mmsideplatformDistanceofplatformbelowundersideofflange175mmheadplatformWidthofplatformfromthreesidesofmanhole750mmheadplatform