  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:2of56

    Rev.A

    INDEXSHEET

    PAGENO. TITLE REVA

    1 COVERSHEET 70613

    2 INDEXSHEET 70613

    3 REVISIONRECORDSHEET 70613

    4 TABLEOFCONTENTS 70613

    556 PIPINGDESIGNPHILOSOPHY 70613

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:3of56

    Rev.A

    REVISIONRECORDSHEET

    REV.NO. PURPOSE LISTOFPAGESUPDATED/MODIFIEDSECTIONS,IFANY

    A ISSUEDFORREVIEW

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:4of56

    Rev.A

    TABLEOFCONTENTS

    1.0SCOPE........................................................................................................5 2.0DESIGNPHILOSOPHY/CRITERIAGENERAL..............................................................52.1EQUIPMENTLAYOUT.............................................................................................................52.2UNITPIPING............................................................................................................................112.3OFFSITE&YARDPIPING.....................................................................................................172.4FLAREPIPING..........................................................................................................................182.5UNDERGROUNDPIPING....................................................................................................182.6FLEXIBILITYANALYSIS&SUPPORTING.......................................................................192.7MATERIALS..............................................................................................................................232.8THERMALINSULATIONOFPIPING,EQUIPMENTANDVESSELS.......................332.9PAINTING................................................................................................................................332.10WELDING................................................................................................................................332.11MISCELLANEOUS................................................................................................................343.0REFERENCEDPUBLICATION..................................................................................................364.0ATTACHMENTS:..............................................................................................................................ANNEXUREATABLEOFBASICSPAN................................................................................37ANNEXUREBACCESSIBILITYFORVALVES&INSTRUMENTS................................39ANNEXURECVERTICALANDHORIZONTALGUIDESSPACING............................41ANNEXUREDTECHNICALREQUIREMENTSOFPIPINGMATERIAL......................42ANNEXUREECLEARANCES..................................................................................................54

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:5of56

    Rev.A

    1.0 SCOPE

    ThisDesignBasisbrieflycoversthebasicrequirementsforthedesignofpipingsystemsCoveredbyASMEB31.3.TheseshallbeadheredtobyLSTKContractor(s)orhissubcontractor(s)duringthecourseofengineering,procurement&construction.

    2.0DESIGNPHILOSOPHY/CRITERIA:GENERAL 2.1EQUIPMENTLAYOUT 2.1.1BASISOFEQUIPMENTLAYOUT

    Equipmentlayoutshallbedevelopedbasedonthefollowingdata:

    P&IDs.OverallPlotPlan.Winddirection.EquipmentDataSheets.IndicativeEquipmentLayoutfromBasicEngineering,ifany.Processpackage.

    2.1.2DEVELOPMENTOFEQUIPMENTLAYOUT

    Thefollowingaspectsshallbeconsideredduringdevelopmentofequipmentlayout:

    ProcessRequirementi.e.properinterconnectionbetweenequipmentasperP&IDstoachievetheintendedprocessparameters.EconomyofPipingmaterialMinimizethequantityofcostlypiping.Erection&ConstructionrequirementErectionschemeandscheduleofallequipmentmustbeconsideredduringequipmentlayouttohavesmootherection,approachroadforcranes/derricketc.SafetyRequirementsAsaminimum,OISDStd.118shallbefollowed.FirefightingfacilitiesshallbeprovidedasperTAC&OISDnorms.Safetyshowerlocationshallbemarkedinequipmentlayout.FordetailedguidelinesreferGeneralCivilDesignbasisforfireprotection.Constructability,OperationandMaintenanceRequirement:

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:6of56

    Rev.A

    OverheadandsideclearancesforcompressorsandpumpsHorizontal&overheadclearancesforeasymovementofworkingpersonnelCraneapproachesforaircoolers/firedheaters.ProvisionofmonorailforpumpsProvisionofEOT/HOTcraneforcompressorsProvisionofoperatorscabin

    SimilarequipmentgroupingAllcolumns,exchangers,pumpsetc.shouldbegroupedtogetherforconvenienceofmaintenanceandsafetywhereverfeasible.Thetechnologicalstructuresshouldbeinterconnectedforeasymovementofoperationalpersonnel.U/Gpipingcorridorsformainheadersshouldbemarkedinequipmentlayoutforallundergroundpiping.Allareasrequiringcraneaccessforerectionorspecificmaintenancepurposee.g.catalystloadingetc.shallbemarkedontheequipmentlayout.

    2.1.3PIPERACK

    Ingeneral,equipmentlayoutshallbepreparedconsideringstraightpiperack,howeverothershapeslikeL/T/U/H/Zetccanalsobeconsideredbasedonareaavailable.Thetotalwidthofpiperackshallinclude25%extraspaceforfutureexpansion/modificationsinunitforrackwidthsupto16Mand10%forrackwidthsabove16M.Thewidthoftherackshallbe6M,8Mor10Mforsinglebayand12M,16Mor20Mfordoublebayhaving4tiersmaximum.Thespacingbetweenpiperackportalsshallbetakenas6Mingeneral.Howeveritcanbeincreasedto8Mdependingonthesizeofthepumpstobehousedbelowpiperack,inwhichcaseanintermediatestructuralmembershallbeprovidedinpiperackfortier.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:7of56

    Rev.A

    ForUnits,clearancebeneathpiperackshallbe4.0Mminimumbothinlongitudinalandtransversedirections.ForOffsites,clearancebeneathpiperackshallbe2.2Mminimumbothinlongitudinalandtransversedirections.Roadclearanceshallbe7Mminimumformainroadand5Mforsecondaryroad.Waterlinesmorethan30shallnotberoutedoverpiperack,theseshallberoutedunderground.

    2.1.4TOWERSANDVERTICALVESSELS(ASAPPLICABLE)

    Towersandverticalvesselsshallbearrangedinarowwithcommoncentreline,decidedbythelargestvessels,placingO.D.oftheequipmentminimum4Mawayfromthepiperack.Aminimumclearanceof3Mshallbeallowedbetweentowershells,butinanycaseplatformsofadjacenttowersshallnotoverlap(minimum100mmhorizontalgapshallbeprovidedbetweenplatformofadjacenttowers)andthataminimum900mmisleftbetweentowerplinths.Thegapbetweenverticalvesselsshallallowfullopeningofmanholecoverswithoutrestriction.Effortsshallbemadetoprovideinterconnectingplatformsatsuitablelevelsforadjacenttowersand/oradjacenttechnologicalstructures&rackwalkwaysetc.Interconnections,whereverfeasibleshallbedoneaftertakingthermalexpansionsoftowersintoconsiderationsAlllevelswitches,LGsetcincludingtheirisolationvalvesshallbeaccessiblefromladdersorplatforms.Tohandleheavyitems(likereliefvalves,blindsetc.)adavitshallbeprovided.Thedavitshallbeonthesideofthevesselawayfromthepiperack.Theareaatgradeshallbekeptclearforadropout.

    2.1.5HORIZONTALVESSELS

    The horizontal vessels shall be laid perpendicular to pipe rack and shall be placedminimum4Mawayfromthepiperack.Theclearancebetweenadjacenthorizontalvesselshellsshallbeminimum2Mor900mmclearaislewhicheverishigher.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:8of56

    Rev.A

    2.1.6PUMPS(ASAPPLICABLE)

    Whereverpracticablepumpsshallbearrangedinrowswiththecentrelineofthedischargenozzleonacommonstraightline.Pumpsshallbekeptoutsidethepiperackwithpumpdischargenozzlekeptatadistanceof1metrefrompiperackandmotortowardsrack.Gapbetweeneachpumpfoundation/andfoundationoftechnicalstructureshouldbesufficientforeasyremovalofequipmentafterpiping.Clearancebetweentwoadjacentpumpsshallbesuchthatclear900mmaisleisavailable.Allpumpsnotopentoskywithmotorrating>=75KWshallbeprovidedwithmonorail.Nomonorailshouldnormallybeprovidedforpumpsopentoskyandsufficientspacebelowrackshallbeavailableforpumpmaintenance.

    2.1.7AIRCOOLERS(ASAPPLICABLE)

    Aircoolersshallbelocatedoverthemainpiperackorontechnologicalstructure.Foraircoolerslocatedontechnologicalstructure/rack,blindfloorshallbeprovided.Blindfloorisgenerallynotrequiredifpumpshandlinghydrocarbonsorequipmentarenotplacedbelowthem.ThewidthofthestructurefromwhereAircoolerassemblyissupportedshallbeabout2.0mmorethantheAircoolertubebundlelengthsothatpropersupportingofinlet/outletpipingmanifoldscanbedonefromthemainmembersofpiperack/technologicalstructuretotransferpipingloadtomainstructuralmembers.Davitshallbeprovidedforloweringthegearboxesetc.alongwithmobiletrolleywithretractablejackingarrangementofsuitableloadcarryingcapacity.

    2.1.8COMPRESSORSANDTHEIRPRIMEMOVERS(ASAPPLICABLE)

    Followingtypesofcompressorsareusedinprocessplants:

    a.Centrifugalcompressors

    b.Reciprocatingcompressors.

    c.Liquidringcompressors

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:9of56

    Rev.A

    d.Screwcompressors

    e.Diaphragmcompressors

    Compressors shall be located to keep suction lines as short as possible. The gascompressors shall be located downwind side of furnace so that leaks are not blowntowardsfurnace.Ingeneralcompressorsaretobelocatedundershed.Whencompressorsare locatedunder shed, sides tobekept fullyopen for the low shedorpartially closedfrom top forhighshed toavoidaccumulationofheaviergases in theshed,however, incase of hydrogen compressors located under the sheds provision for top venting fromcompressorshedsshallbeprovided.In case of a turbine driven compressor, if exhaust steam is condensed, turbine andcompressor need to be located at an elevated level and condenser tobe located belowturbine.Amajorconsiderationincentrifugalcompressorlocationisthelubeandsealoilconsole. Itmustbeaccessible froma road,mustbe lower than thecompressor toallowgravitydrainofoil to the consolesoil tank. Intercoolers&Knockoutpotsmaybekeptwithin/outsidetheCompressorhouseshed,but,shallbekeptnearcompressorhouse.ForcompressorsElectricallyOperatedTravellingCranetohandleheaviestremovablepieceshallbeprovidedforeachcompressorhouse.Maintenancebayforcompressorsshallbeprovided.Maintenancebayshallbeaccessiblefromroadtofacilitateunloading&loadingontotrucketc.Forremovalofbundlesofexchangerslocatedwithinbuildingmonorailarrangementshallbeprovided.Compressormanufacturermaybeconsultedforrecommendedlayoutandadditionalrequirementformaintenance.Licensorsrequirement,ifany,shallalsobetakenintoconsideration.

    2.1.9CLEARANCEANDACCESSIBILITY

    2.1.9.1CraneAccess

    Equipment,structuresshallbearrangedtopermitcraneaccesstoserviceaircoolers,compressors.Dropoutbaymaybeconsideredforexchangers&coolersatelevatedstructures.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:10of56

    Rev.A

    2.1.9.2AccesstoPumps

    Clearaccessof4.0Mverticallyand3Mhorizontallyshallbeprovidedcentrallyundermainpipewaysforsmallmobileequipmenttoservicepumps/motors,wherevertheseareinstalledunderpipewayswithpriorspecificapproval.Pumpsoutsiderackshallbeapproachablebymobileequipmentsetc.fromunderthepiperack.

    2.1.9.3Accesstoloweritemstograde(LoweringArea)

    Clearaccessshallbeprovidedatgradeontheaccesssideforloweringexternal&internalfittings,PSVs,Controlvalvesetcfromelevatedequipment(columns,towersetc)byprovidingpipedavits.

    2.1.9.4Layout&AccessRequirementsForPlatforms(LaddersAndStairs)

    Forprovidingplatformladder&staircasefollowingguidelinesshallbefollowed:Twomeansofaccess(i.e.twoladdersoroneladderandonestaircase)shallbeprovidedforanyelevatedplatform,whichservesthreeormorevessels&forbatterylimitvalvesoperatingplatforms.Platforms,ladders&stairwaysshallbeconsistentwithaccess&safetyrequirements.Stairwayfortankstobeprovidedonupstreamofpredominantwinddirection.

    (i)Platformatelevatedstructure

    Dualaccess(i.e.onestaircaseandoneladder)shallbeprovidedatlargeelevatedstructureifanypartofplatformhasmorethan22.65M(75ft)oftravel.Aircoolersshallhaveplatformswithinterconnectedwalkwaysprovidedtoservicevalving,fanmotorsandinstruments.AccessrequirementsshallbeDualaccess(i.e.onestaircaseandoneladder).

    (ii)Platformswithstairaccessshallbeprovidedonlyfor:

    Locationatwhichnormalmonitoring(onceadayormore)isrequiredorwheresamplesaretaken.

    Locationswherevesselsorequipmentitemshaveoperatorattentionsuchascompressorsetc.

    Mainpiperackatbatterylimits

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:11of56

    Rev.A

    (iii)Platformswithladderaccessshallbeprovidedfor

    Itemsthatrequireoccasionaloperatingaccessincludingvalves,spectacleblindandmotoroperatedvalves,heaterstacksamplingpoints.Manwaysabovegradeonequipment.

    (iv)LadderLocation

    Whereverpracticable,laddershallbesoarrangedthatusersfaceequipmentorplatformratherthanfacingopenspace.Landingsshallbestaggered.Noladdershallbemorethan6Minoneflight.

    2.1.9.5CLEARANCES

    MinimumclearancesshallbeasindicatedinAnnexureE.2.2UNITPIPING 2.2.1BASISOFUNITPIPING

    Piping&InstrumentDiagramEquipmentlayoutEquipmentDatasheet&SettingplanLinelistInstrumentDatasheetStructural&buildingdrawingsTopographyoftheplantPipingmaterialspecificationOverallplotplan

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:12of56

    Rev.A

    Thefollowingobjectiveshallbeachievedduringpipinglayout:

    Properaccesstoalloperatingpointsincludingvalvesandforallorificetappingpoints,instrumentsinparticular(referAnnexureB).Properaccesstointerrelatedoperatingpointsforspecificpurposeandformaintenance.

    2.2.2PIPEWAYS/RACKPIPING

    Racks shallbedesigned togive thepiping shortestpossible run and toprovideclearheadroomsovermainwalkways,secondarywalkwaysandplatforms.

    Predominantlyprocesslinesaretobekeptatlowertierand,utility&hotprocesslinesonuppertier.

    Generally the top tier is to be kept forElectrical cable trays (if not provided inunderground trench) and Instrument cable ducts/trays. Cable tray laying to takecareofnecessaryclearancesforthefireproofingofstructure.

    Generallythehot linesandcold linesshallbekeptapart indifferentgroupsonatier.

    Generallythebiggersizelinesshallbekeptnearertotherackcolumn.

    MinimumspacingbetweenadjacentlinesshallbedecidedbasedonO.D.ofbiggersize flange (minimum rating 300# to be considered), O.D. of the smaller pipe,individualinsulationthicknessandadditional25mmclearance.Evenifflangeisnotappearingthemin.spacingshallbebasedonabovebasisonly.

    Actual line spacing, especially at L bend and loop locations, shall take care ofthermal expansion / thermal contraction / nonexpansion of adjacent line. Nonexpansion/thermalcontractionmaystopthefreeexpansionoftheadjacentlineatLbendlocation.

    Anchorsontheracksaretobeprovidedontheanchorbayiftheconceptofanchorbayisadopted.Otherwiseanchorsshallbedistributedovertwotothreeconsecutivebays.

    Anchorsshallbeprovidedwithinunitonallhotlinesleavingtheunit.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:13of56

    Rev.A

    Processlinescrossingunits(withinunitsorfromunittomainpipeway)arenormallyprovidedwithablockvalve,spectacleblindanddrainvalve.Blockvalvesaretobegroupedandlocationsofblockvalvesinverticalrunofpipearepreferred.Iftheblockvalveshavetobelocatedinanoverheadpipeway,staircaseaccesstoaplatformabovethelinesshallbeprovided.Stubsinseawatershallbefromtopofmainheader.

    2.2.3VESSELPIPING/CONTROLVALVES

    Pipingfromvesselshalldroporriseimmediatelyuponleavingthenozzleandrunparallelandcloseaspracticabletovessel.

    Pipingshallbegroupedasfaraspossiblefortheeaseofsupportsandshallrunontheracksideofthecolumn.

    Manholesshallbekeptontheroadsideoftheequipmentandshallbeapproachablefromtheplatform.Platformwidthshallbesuchthatminimum1Mspaceisavailablebeyondmanholeformovement.

    Pipingshallbesupportedfromcleatsweldedonthevesselasfaraspossible.

    Properguidesatrecommendedintervalsshallbeprovidedforlongverticallines.

    Accessplatforms/laddersshalltobeprovidedalongthecolumnforvalvesandinstruments.Minimumclearwidthofplatformshallbe750mm.

    Foreaseofoperationandmaintenance,columnandvesselswhicharegroupedtogether,shallhavetheirplatformsatthesameelevationandshouldbeInterconnectedbywalkways.Howevereachcolumn/vesselshallhaveanindependentaccessalso.

    Column/vesselplatformsshouldbedesignedinsuchawaysothatallthenozzlesshouldbeapproachablefromplatforms.

    Pipingatcolumns/vesselnozzlesshallbearrangedsothatblankscanbeeasilyinstalledforhydrotesting.

    UnlessspecificallyindicatedinP&IDscontrolvalvesshallpreferablybekeptatgrade.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:14of56

    Rev.A

    Pipingintendedforvacuumservicesshallberoutedasshortaspossiblewithminimumbendsandflangedjoints.Pipingsupportcleatsforsafetyvalvesshallbeindependentmeantforsafetyvalvesonly&shallbedesignedconsideringimpactloadingduringpoppingoff.UtilityConnectionnozzlesshallbefromside/top.

    2.2.4PUMPPIPING

    Pumpdrivesshallhaveclearaccess.

    Pumpsuctionpipingshallbeasshortaspossibleandshallbearrangedtoavoidvapourpockets.

    Reducersimmediatelyconnectedtothepumpsuctionshallbeeccentrictypewithflatsideuptoavoidtheaccumulationofgaspocket.

    Forendsuctionpumpselbowsshallnotbedirectlyconnectedtothesuctionflange.Astraightpieceminimum3timesthelinesizeshallbeprovidedatthesuctionnozzle.

    Pumpdischargecheckvalveifinstalledinverticallinesshallbefittedwithadrainconnectionascloseaspossibledownstreamofthevalve.

    Unlessotherwisespecified,Ttypestrainersshallbeusedonpumpsuctionpipingforsizes2andabove.

    Ytypestrainersshallbeusedforallsizesinsteamservicesandforpumpsuctionlinesbelow2.

    Allsmallborepipingconnectedtopump(draintoOWS&CBD,seatandglandleakdrain)shallhavebreakupflangesforremovalofpumps.PipingshallbesoarrangedthattheforcesandmomentsimposedonthepumpnozzledonotexceeddoubletheallowablevaluesofAPI610.Pumpdischargeshouldbepreferablyroutedawayfromthepumpratherthantowardsthemotorside.Pumpcoolingwaterconnectionshallbetakenfromthetopofcirculatingcoolingwaterheader.Suction&dischargevalvesshallbelocatedatoperableheight.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:15of56

    Rev.A

    2.2.5COMPRESSORPIPING

    Suctionlinesshallbeasshortaspossible.

    Suctionpipingshallhaveadequateflangedjointsforeaseoferectionandmaintenance.

    Where the line between knockout drum and the compressor cannot be routedwithoutpocket,lowpointdrainshallbeprovidedtoremoveaccumulationofliquid.Thesystemshouldbeapprovedbyprocess.

    Aminimumstraightlengthofsuctionpipeshallbeprovidedaspermanufacturersrecommendation.

    Lube oil cooler space shallbeprovided in away so as to facilitate tube bundleremoval.

    Alloperatingvalvesonmainsuctionanddischargepipingshallbe linedononesideasfaraspossible.

    Pipingshallbedesignedso that forcesandmoments imposedon thecompressordonotexceedthemanufacturersrecommendation.

    Lowpointsinthedischargelinefromanaircompressorshallbeavoidedbecauseit ispossible for lubeoil tobe trappedandsubsequently ignited. If lowpointsareunavoidable,theyshallbeprovidedwithdrains.

    Incaseofreciprocatingcompressor,pipingshallbesuitablysupportedtoavoidvibrationsduetopulsatingflow.Unlessrequirementsofnopocketsarespecifiedbythelicensor,allthepipingshallrunat500mmabovegradelevelsothatpropersupportscanbeprovidedtominimizevibrations.Analogstudyshallbecarriedoutforcompletecompressorpipingincludingsuction/dischargepipingasperP&IDsandthestudyrecommendationsifany,shallbeimplemented.Reciprocatingcompressorpipingshallbeprovidedindependentsupportsfromgradeandshallnotbesupportedfromcompressorplatformstructure.Thesmallborebranchesshallbecheckedforrequirementofbracedsupports.

    2.2.9RELIEFSYSTEM/BLOWDOWNSYSTEMPIPING

    Wherevertheinletlinesizeishigherthanthesafetyvalveinletsize,reducershallbeinstalledadjacenttoinletofsafetyvalve.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:16of56

    Rev.A

    Reliefvalvedischargingsteam,airorothernonflammablevapourorgasdirectlytoatmosphereshallbeequippedwithdrainandshallbesuitablypiped topreventaccumulationofliquidatvalveoutlet.

    Liquidphaseblowdownsystempipingconnectedtoaclosedsystemshallbeselfdrainingtotheblowdowndrum.ClosedblowdownheadershallbeslopedtowardstheCBDdrumtoensurefreedrainage.

    Liquidvapourphasereliefvalvesshalldischargeintotheflareheaderatanangle45degrees in thedirectionofheader flow, tominimize theeffectofkineticenergyandtoavoidaccumulationofliquid.

    Pocketsintheflareheaderandblowdownsystemshallbeprohibited.Reliefvalvedischargepipingshallbetakentosafelocationasperfollowing:

    3MAbovetopplatformofcolumnorstructure,within6Mradius

    forsteamand8Mforhydrocarbon/toxicdischarge.

    25MHorizontallyawayfromfurnace.

    50MHorizontallyawayfromfurnace,ifmorethanonerelief

    systemofdifferentsetpressuresisdischargingintoone

    commonriserofventstack.

    Inlet andoutletpipingofpressure reliefvalve shallbe adequately supported totakecareofthethrustinducedbythereliefvalveduringpopping.

    Reaction forces including bothmomentum& static pressure effects due to safetyvalvepoppingshallbeascertainedintheconnectedpipingaccordingtoAPIRP520for systems discharging to atmosphere. The effect of these forces on the pipingsupportsand theanchorsof thepipingsystemshallbecalculated toascertain thatthe allowable limits at these locations arenot exceeded.The supporting structurealsoshallbeadequatelydesignedsothatwhensubjectedtothesereactionforcesthesupportingelementsconnected topipingaswellas thebasic supporting structurei.e.platformmembersetc.arecapableofwithstandingthem.Systemstressesintheinlet and outlet piping portions at safety valves also shall be kept within theallowable limits, inclusiveof thedistributionbranchingpoints in the inletportion.Thesereactiveforcesshallnotleadtoanyleakageattheflangedjointspresentinthesystem. To ascertain this the necessary calculations for checking leakage at theflangedjointsshallbeperformed.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:17of56

    Rev.A

    2.2.10UTILITYSTATIONS

    Requisitenumberofutilitystationsshallbeprovidedthroughouttheunittocatertotheutility requirement. Utility stations shall have three connections [one for LP steam(SL),oneforPlantAir(AP)andoneforServiceWater(WS)]eachof1NBunlessotherwisespecified inP&ID.Airandwater linesshallhavequick typehoseconnectionandsteamline shall have flanged type hose connection and shall be directed downward. Allconnectionsshallhaveglobevalve for isolationpurpose. Inertgashose,whenrequired,shallhavebuiltinnonreturnvalveandquickconnectioncouplingatpipingend.

    Numberofutilitystationsshallbesuchthatallequipmentsshallbeapproachablefromatleastoneutilitystation.Theapproachofutilitystationshallbeconsidered15Mallaroundthestationlocation.TheUtilitystationsshallgenerallybelocatedadjacenttopiperackcolumn.Theutilitystationsshallalsobeprovidedonelevatedstructuresliketechnologicalstructure,operatingplatformsofverticalequipmentsetc.Operatingplatformshavingmanholesmustbeaccessiblefromutilitystation.

    2.2.11FIREFIGHTING

    AllfirefightingfacilitiesshallbeasperTAC&OISDnorms.SprinklersystemshallbeprovidedforallhotpumpsasperOISD/TACnorms.FordetailedguidelinesreferGeneralCivildesignbasisforfireprotection.

    2.3OFFSITE&YARDPIPING

    Ingeneral,offsitespiping,electricalcableandinstrumentationcableshallbelaideitheronpipe rack or on pipe sleepers. Wherever piping is laid on pipe sleepers, hardsurfacing/gravel isprovidedbelow it,hardsurfacing/gravelshouldbecompletedbeforestartofpipelaying.Widthofhardsurfacing/gravelshallbeabout1metermorethanthepipingcorridoroneitherside.Thisextrahardsurfacing/gravelshallbeformovementofoperatingpersonnelalongthepipingcorridor.Thismovementareashallbeapproachablefromtheroadatadistanceofevery500meters.

    Overheadpipebridgesshallbeusedforpipesatroadcrossings.Culverts,ifrequired,maybeprovidedbut tobeminimized.Pipebridges/culvertsshallbeadequatelydesigned totakecareoffuturerequirements.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:18of56

    Rev.A

    ClearancesbetweenlinesshallbeminimumCasgivenbelow.

    C=(do+Df)/2+25mm+Insulationthickness(es)

    where,dooutsidediameterofsmallerpipe(mm)

    Dfoutsidediameterofflange(min300#)ofbiggerpipe(mm)

    However this Cspacingbetween theoffsitepipingon the rack/sleepercanbesuitablyincreasedsothatthe linesshouldnottoucheachotherafter insulation/lateralexpansion.Adequateclearance shallbeprovided forevery long&high temperature lines toavoidclashingatthebends.See2.2.2alsoforlinespacingatLbendsandlooplocations.

    Expansionloopsforalllinesshallgenerallybekeptatthesamelocation.Ventsshallbeprovidedonallhighpoints&drainsshallbeprovidedatalllowpoints.Drainvalvesatsleeperpipingshallbekeptoutsidethesleeperwayifthesameisnotaccessibleandvalvesshallbeputinhorizontalonly.Atallsuchplaceswherepipingisextendedtomakedrainvalvesaccessible2nos.ofstiffeners,irrespectiveofpiperating,shallbeprovidedasper2.7.1.Spacingofguidesoneachlineonapipebayshallnotexceedthevaluegiveninclause2.7.1.

    2.4FLAREPIPING

    Flare header shall be sloped towards flare knockout drum. Expansion loop shall beprovidedinhorizontalplaneasperrequirementtoaccommodatethermalexpansion.Thedesired slope shall be ensured throughout including flat loop. Flare header shall besupportedonshoeofheightrangingfrom100mmto300mm.

    Proper thermal analysis temperature shall be established including the possibility oftemperature gradient along the line before providing expansion loops. Efforts shall bemadetominimizethenumberofloops.

    Flarelinebetweenknockoutdrumandwatersealdrumshallbedesignedforpressurefluctuationsandadequatelysupportedtoavoidvibrations.

    2.5UNDERGROUNDPIPING

    FordesignofundergroundpipingsystemGeneralCivilDesignBasisshallbefollowed.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:19of56

    Rev.A

    2.6FLEXIBILITYANALYSISANDSUPPORTING

    2.6.1PIPESUPPORTINGCRITERIA&GENERALGUIDELINES.

    Pipingsystemshallbeproperlysupportedtakingintoaccountthefollowingpoints:

    a.SUSTAINEDLOADS

    WeightofPiping(Barepipe,servicefluid,valves,flanges,jackettingetc)WeightofInsulation(ifany)Weightofsnow(ifany)Weightofonlineequipments(ifany)Weightofinstruments(ifany)PressurereliefloadsduetosafetyvalveoperationDynamicloadsduetopulsatingflow/twophasewithslugflowPressureThrustloadsincaseofexpansionjoints

    b.OCCASIONALlOADS

    Wind/Seismicloads(asandwhenrequired)

    c.THERMALLOADS

    Thermal loads due to operating/design/steam out/decoking or any other possibleabnormalcondition.

    PipesupportingshallpreferablyfollowthebasicspanasgiveninAnnexureAexceptforflarelineinoffsiteontrestlesinwhichcasethebasicspanshallberestrictedtomax.18.0meters. For sizes not covered inAnnexureA, basic span shall be established based onproject requirement. For piping on rack or sleeper, as a minimum, providing restingsupport on every grid ofpipe rack/sleeper ismandatory.Guides shall beprovided onstraightrunofpipesat intervalsasspecified inAnnexureC,unlessspecificallybecomesnonviableduetoflexibilityproblems.

    Additional supports, guides, anchors, special supports like spring supports and swaybraces shall be provided based upon detailed analysis of piping system to restrict theforcesonnozzlesofcriticalequipmentslikepumps,compressors,Aircoolersetc.

    Apermanentsupport,eitherrestingorspringsupportshallbeprovidedfor lineswhichdonotneedanysupportingotherwisebutrequiresupportingduringmaintenance.

    Barepipesofsizeabove12shallbesupportedwithpadorshoe.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:20of56

    Rev.A

    Adequate care shallbe taken for smallbore (11/2andbelow)branch frompiping.Asarule, forall lines in600#&aboveclasses, lineshaving twophase flowand lineshavingPulsatingflowsuchasdischargeofreciprocatingcompressors&reciprocatingpumps,allsmallborebranches,e.g.vents,drain,orificetaps,pressuretapings,temperaturetapings,sampleconnections,PSVinlet,TSVinletetc.shallbeprovidedwith2numberstiffenersat90toeachotherfromthemainpipetoimpartadequatestiffnesstothebranchconnection.Thestiffenersshallbemadeof6mmthickflatsofmaterialequivalenttothepipematerial.Further, irrespectiveof linerating, thestiffenersshallbeprovidedforallorifice taps,allsmallbore tapings fromPSV inlet /outlet linesandallsmallbore tapings fromControlValvemanifolds.

    Forpulsatingflowlines,detailedthermalandvibrationanalysisbyanalogstudyshallbedonetodecideonlocationofanchorsupportsandguidesetc.

    Wherevertwophasewithslugflow inpiping isexpectedandforTransferLines,pipingdesignshallbecheckedbydynamicstressanalysistopreventvibrations.

    Pipesupportdesignshallbesuchthatdeflectioninpipingsystemsduetosustainedloadsshallnotexceed15mm,betweentwoadjacentsupports.

    Asfaraspossiblelongtrunniontypesofsupports(morethan0.5mtr.)aretobeavoided.Incaselongtrunnionsupportisunavoidableinstraightlengthofpipe,trunnionheighttoberestrictedto0.5mandbalanceheighttobemadeupbyprovidingextendedstructure.

    In theheaterswheresteamairdecokingprovision is there, themain linesanddecokinglines should be supported in such away that either of the lines should not be in thehangingpositionwhennotinoperation.

    Pipingpassingthroughthetechnologystructureorpassingneartheconcretecolumnetc.should have adequate space to avoid restriction of line movement during thermalexpansion. The gap should take care the thermal expansion along with insulationthickness.

    HighdensityPUFblocks shallbe considered for coldpiping supports.Woodenblocksmaybeusedforloadtakingsupportsonverticallinesorasanchorsupports.

    Allpipessupportsshallbesodesignedthatthereisnounduetensiononequipmentflanges.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:21of56

    Rev.A

    2.6.2FLEXIBILITYANALYSISCRITERIA&GENERALGUIDELINES.

    Pipingshallbeanalyzedforexpansion,contraction,differentialsettlement,reliefvalvereactionandeffectsmentionedinpara2.7.1.

    Thedesignofpipingsystemsshalltakeintoaccountthedifferentconditionsexpectedduringoperation,startup,shutdown,coldbranchincaseofstandbypump,tracing,etc.Hydrocarbonlinesshallbedesignedforsteamoutconditions,ifsospecifiedinProcessdocument.Systemwherecombinationofdifferentoperatingconditionsareenvisaged,suchsystemshallbeanalyzedforallpossiblecombinations.Theuseofexpansionjointsshallbeconsideredonlywhenspaceorpressuredroplimitationdoesnotpermitpipebends.Expansionjointofaxialtypeshallgenerallybeavoided.Forcesandmomentsduetoweight,thermalloadsandotherimposedloadsontheequipmentnozzlemustnotexceedtheallowedloadsfortheequipment.Incasethesameisexceeded,categoricalwrittenconfirmationofacceptanceofthehigherloadsshallbeobtainedfromtheequipmentsupplier.

    2.6.3METHODOFANALYSIS

    Followinglinesshallbeconsideredcriticalandfortheseformalanalysisismandatory.Otherlinesmayalsoneedanalysis,ifrequired:

    Allprocesslinestoandfromfiredheatersandsteamgenerators

    Allprocesslinestoandfromcentrifugalcompressorandblower

    Alllinestoandfromturbines

    Allpumplines(6&aboveandanalysistemp>120C&lessthan60C)&aircoolerlines.

    Reboilerpiping,Flareheader/subheaders,Jacketedlines,NonmetallicPiping

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:22of56

    Rev.A

    Allotherlinesasbelow:6to8analysistempabove300C&lessthan100C10to14analysistempabove150C&lessthan80C16&aboveanalysistempabove100C&lessthan80C

    Linesrequiringcompositestressanalysis(PipingalongwithStructureandEquipments),Dynamic/Wind/SeismicanalysisLinesrequiringFlangeleakagecheck,i.e.26&aboveexceptair&waterlines(upto600rating)4&aboveforhydrogenlines(900ratingandabove)8&above,otherlines(900ratingandabove)Allothercriticallines(connectingtosensitiveequipments).SuchasPlatefinexchangers,Coldboxes(sizes6andaboveandanalysistemp.>120C&lessthan60C)OnlyCAESARIIsoftwarepackageshallbeused.

    Alllinesshallbeanalyzedatanalysistemperature.Intheabsenceofanalysistemperature,linesshallbeanalyzedatoperatingtemperatureifdifferencebetweenoperating&designtemperaturesislessthanorequalto30degC,otherwiseitshallbeanalyzedatdesigntemperature.However,analysisofflareline&calculationofthermalgrowthoftallequipmentsshallbedoneasperProcessinput.

    Forlinesinvolvingpulsatingflowsuchasthoseconnectedtoreciprocatingpumps&compressors,inadditiontothermalanalysis,analogstudyforacoustic&mechanicalvibrationsshallbedonealongwithequipments,byapprovedvendor/Agency.

    DynamicanalysisshallbeperformedwherevertwophasewithslugflowinpipingisexpectedaspertheprocessrequirementandforTransferLines.Thefundamentalfrequencyofthepipingsystemshallbewellabovetheimposedfrequencies,ifany,toavoidresonance.Theminimumacceptablefrequencyfortransferlinesshallbe7Hzandforremaininglineswithslugflow,itshallbe6Hz.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:23of56

    Rev.A

    SeismicandwindforcesshallbebasedonrecommendationsofSeismicdesignbasisandWinddesignbasisrespectivelyofPNCPcoveredelsewhere.

    2.7MATERIALS

    Basicmaterialselectionofparticularlinedependingonitsservice,temperatureandCorrosivityshallbeasspeltoutinprocesspackage.Detailedmaterialspecificationshallfollowtherequirementsstatedherewith,exceptwhereverspecifiedasperLicensorsrequirement.

    2.7.1PIPE

    2.7.1.1WALLTHICKNESS

    CalculationofpipethicknessandbranchreinforcementshallbebasedonrequirementsofASMEB31.3/IBRasapplicable.Propercorrosionallowanceandmilltoleranceshallbeconsideredwhileselectingnominalthickness.

    Forcarbonsteelandlowalloysteelpipesminimumpipethicknessshallbeasfollows:

    S160upto0.75NB(forotherthansteamtracing),

    XSupto0.75NB(forsteamtracing),

    XSfor1to2NB,

    STDforabove2NB.

    Forstainlesspipesminimumpipethicknessshallbeasfollows:

    80Supto0.75NB,

    40Sfor1NBto2NB,

    10Sforabove2NB

    Thephilosophyofminimumthickness/scheduleisapplicableforbothseamlessandweldedpipes

    The abovementionedminimum thickness/schedule criteria is not applicable tocategoryDclasses(forservicesinA3A,A3Yspecsetc),firewaterservice(A33A)andA10AspecificationwhereISpipesorweldedAPI5Lpipesarebeingused.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:24of56

    Rev.A

    All pipes (seamless & welded) shall have uniform negative wall thicknesstoleranceof12.5%forwallthicknesscalculationspurpose.

    Forthicknessesexceedingminimumthickness/schedulecriteria,scheduleXSshallbeselectedforCS&ASclasses(for2&above).IntermediateschedulesbetweenSTD&XSshallbeignored.SimilarlyforSSclasses(2&above)S10,S20,S30&40Smaybeselectedbeyondminimumthickness/schedulecriteria.If,thethicknessesexceedXSinCS&ASclassesand40SinSSclasses,onlythen,thethicknessshallbecalculatedbasedonactualserviceconditionssubjecttoaminimumof80%classrating.Maximum10%ofcorrosionallowancemaybereducedinspecialcases,tooptimizethepipeschedules.Ingeneral,thepressuretemperaturecombinationtocalculatewallthicknessshallbeasfollows:

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:25of56

    Rev.A

    Material Class Size Design condition

    C.S. (A106 GR.B, API-5L GR.B, A672)

    LTCS (A333 GR.6),

    Low Alloys,

    1.25% Cr-0.5% Mo, 2.25% Cr- 1.0% Mo,

    5%Cr-0.5% Mo, 9%Cr- 1.0% Mo

    150

    upto 24" Class condition above 24" Line condition (#)

    300

    upto 14" Class condition above 14" Line condition (#)

    600

    upto 8" Class condition

    above 8" Line condition (#)

    900 upto 8" Class condition

    above 8" Line condition

    1500 & 2500 upto 4" Class condition above 4" Line condition

    SS

    (A312 TP304, 304L, 316L, 321,347) OR

    (A358 TP304, 304L, 316, 316L, 321, 347)

    150

    up to 24" Class condition

    above 24" Line condition ($)

    300

    upto 14" Class condition

    above 14" Line condition ($)

    Material Class Size Design Condition 600 upto 6" Class condition

    900,1500

    above 6" Line condition ($)

    upto 4" Class condition

    above 4" Line condition

    2500

    upto 2" Class condition

    above 2" Line condition

    Higher Alloys

    150

    upto 6" Class condition

    above 6" Line condition 300-2500 all sizes Line condition

    #OnlyIfthethickness/scheduleasperclassconditionexceedsXS.$OnlyIfthethickness/scheduleasperclassconditionexceeds40S.ForCatDclasses,forabovegroundapplications,D/tratioshallbetakenas120(max.).ForotherthanCatDservices,D/tratioshallbegenerallyrestrictedto100.Disnominaldia.andtisnominalthickness.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:26of56

    Rev.A

    2.7.1.2PIPESIZE

    Pipesizesshallnormallybe0.5,0.75,1.0,1.5,2.0,3,4,6,8,10,12,14,16,18,20,

    2.7.1.3PIPETYPE

    Material Size Type CS, LTCS, AS (except for Cat D fluids & LP hydrocarbons in offsites)

    Upto 14"

    Seamless

    16" and Above

    E.F.S.W.

    SS (Process lines)

    Upto 8"

    Seamless

    10" and Above

    E.F.S.W.

    SS (Non process lines)

    Upto 1.50"

    Seamless

    2" & Above

    Welded

    CS (Cat D fluids & Fire water service)

    ALL

    Welded*

    CS (LP hydrocarbons offsites)

    Upto 6"

    Seamless

    Above 6" Welded

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:27of56

    Rev.A

    *LimitedtoCatDservices&Firewaterserviceswithfollowingexceptions:

    ForU/Gpipesincoolingwater&Firewaterservices:6&belowA106GrBSeamless8&aboveIS3589Gr330Welded/ASTMA53Gr.BWelded/API5LGr.BWelded(Forcoolingwaterservices)8&above IS3589Gr410Welded/A53Gr.BWelded/API5LGr.BWelded (Forfirewaterservices)

    2.7.2FITTINGS

    Typeoffittingsshallbeequivalenttopipetype.

    ThicknessoffittingsatendstomatchpipethicknessforBWfittings.

    SWfittingsshallbe3000#,6000#or9000#dependingonthepipethicknessesS80,S160andaboveS160respectively.

    Upto600#allbranchconnectionsshallbeasfollows,unlessspecificallymentionedotherwiseinPMS:

    Upto11/2NBHalfcouplings/Tee

    2andaboveTees/Pipetopipewithorwithoutreinforcementpad

    Forbranchconnectionsabove600#rating,equaltee/unequalteeshallbeusedforall sizes. Incaseofnonavailabilityofunequal tees,oletsmaybeused. Usageofsweepoletshallbeavoidedduetopooravailabilityglobally.

    MitresshallbeusedinCategoryDserviceabove6NB.Elbows(seamless/welded)are acceptable inplace ofmitres, however, thickness of elbows shall be same asmitres.Seamlesselbowsareacceptableinplaceofweldedelbows.

    Forother thanCategory D fluid in150#and300#Classmitrescanbepermittedfor sizes above 48.Mitres to be designed as perASME B31.3.However, use ofmitresshallbeminimum.

    UnionshallnottobeusedinlinesotherthanCatDwaterlines.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:28of56

    Rev.A

    2.7.3.FLANGES

    Flangesshallbeasfollows:

    Rating

    Size

    Type

    Remarks

    150

    Up to 1.50"

    SW RF

    If used with non metallic gasket

    Up to 1.50"

    WN RF

    If metallic/spiral wound gasket is used

    2" & above

    WN RF

    For CS (Other than Cat-D), AS & SS(Cryo)

    2" & above

    LJ FF+Stub ends

    For SS (Other than Cryo)

    2" & above

    SO FF

    For CAT-D service

    300,600

    Up to 1.50"

    SW RF

    2" & above

    WN RF

    900

    All

    WN RTJ

    Allflangejointsonpipingsystemincludingflangesontheequipment,manholes,etcshallbetightenedusingHydraulicbolttensioneraspertherequirementgiveninthefollowingtable&thestudboltlengthshallbelongerbyonediametertofacilitatebolttensioning:

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:29of56

    Rev.A

    Notes:1) Hydrogen service is defined as service in contact with hydrogen or gaseousmixturescontaininghydrogen inwhich thepartialpressureofhydrogen is5barormore.2)Jointswithleakagepotentialshallincludea)Jointsinvolvingtappedholesb)Itemsnotsubjectedtohydrotesteg.Jointsforequipmentmanholes,equipment

    mounted temp, pressure& level instruments, linemounted temp connections,onlineinstrumentjointslikecontrolvalvesandsafetyvalves,compressorvolumebottles.c)Itemsinvolvingtwosetsofgasketswithonesetofboltegorificeflangejoint,joints with spectacle blind, spacer, flangeless wafer check valve, wafer typebutterflyvalves.d)TieinjointswithotherContractors&packagevendorse)Hightemperature(above370degC)jointsinhydrocarbonservice.

    Nominal Bolt Diameter

    Condition

    Remarks

    All

    When specified by Process licensor/ Vendor/Project Specifications

    50 mm & over

    All Joints

    Except under Cat-D service, as defined in ASME B31.3

    38 mm & above & below 50mm

    a) Class 600 & above b) Hydrogen service (Note-1) c) Cat-M service as per ASME B31.3 d) Joints with leakage potential (Note-2) e) Critical joints with equipments (Note-3

    25 mm & above & below 38mm

    a) Joints with leakage potential (Note-2) b) Critical joints with equipments (Note-3)

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:30of56

    Rev.A

    3)Criticaljointswithequipmentsshallincludeinlet&outletflangesofpumps,compressors&turbinesForflangeassembliesnotcoveredundertherequirementsofhydraulicbolt

    tensioning,butfallinginthefollowingcategoriesBoltTorquingusingprespecified

    torquevalueshallbeemployed:

    Service Classes (as per ASME B16.5)

    Hydrogen Service All

    Category-M services as per ASME B31.3

    All

    Other Services 600# & above

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:31of56

    Rev.A

    2.7.4GASKETSGasketsshallbeasfollows: Rating

    Material /service

    Temperature (0C)

    Type

    Gasket or Strip material + Filler material/RTJ Gasket Material

    150

    CS & SS (utilities)

    up to 371 0C

    PLAIN

    CAF

    150

    CS & LTCS (other than utilities)

    up to 371 0C

    Spiral wound

    SS316+CAF

    150

    AS (all services)

    up to 371 0C

    Spiral wound

    SS316+CAF

    300 & 600

    CS

    up to 427 0C

    Spiral wound

    SS316+CAF

    300 & 600

    AS

    All

    Spiral wound

    SS316+Grafoil

    150, 300, 600

    SS (other than utilities

    All

    Spiral wound

    SS316+Grafoil (where trim material is SS304/316) SS316L+Grafoil (where trim material is SS304L/316L

    300(*), 600(*),900, 1500,2500

    CS

    All

    Octagonal RTJ

    Soft Iron

    300(*), 600(*), 900, 1500,2500

    AS

    All

    Octagonal RTJ

    5Cr-Alloy steel

    300(*), 600(*), 900, 1500,2500

    SS

    All

    Octagonal RTJ

    SS

    OnlyifRTJisspeciallymentionedinPMS.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:32of56

    Rev.A

    2.7.5VALVES

    SWvalvesUpto1inch,for150#,300#,600#(exceptball&plugvalves).Ball&Plugvalvesshallbeflangedforallsizes.FlangedvalveAbove1inchfor150#,300#,600#.BWvalves900#andabove2.7.5Overandabovetherequirementsspecifiedinclause2.7.1through2.7.5,othertechnicalrequirementprescribedinAnnexureDshallalsobeadheredto.

    2.7.7NDERequirements(IfnotspecifiedinPMS)

    Dependingupontheseverityofapplication,extentofNDEshallbedecided.Asarule,allhydrogen,oxygen,NACEandanyotherlethalserviceshallhave100%radiographyonweldjointsinallclassratings.Forhighpressureapplications,ie.,900#andupward100%radiographyonbuttweldjointsshallbeemployed.In100%radiographyclassesanyfilletweldsemployedshallhave100%DP/MPtestinCS/ASclassesand100%DPtestinSSclasses.Cat.DserviceasperASMEB31.3doesnotrequireradiography.ButtweldsforClassin150#fornormalhydrocarbonserviceshallbesubjectedto10%radiographyandfilletweldsto10%DP/MPtestforCS&ASand10%DPtestforSS.ButtweldsforClasses300#&600#fornormalhydrocarbonserviceshallbesubjectedto20%radiographyandfilletweldsto20%DP/MPtestforCS&ASand20%DPtestforSS.Forfirewaterservice,IBRetc.,radiographyshallbeasperstatutoryrequirement.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:33of56

    Rev.A

    2.8THERMALINSULATIONOFPIPING,EQUIPMENT&VESSELS

    2.8.1HOTINSULATION

    Insulationmaterials,applicationetc.shallbebasedonrecommendationsofStandardspecificationforhotinsulationofvessels,pipingandequipments(Doc.No.6440002).InsulationthicknessonpipingshallbeasperProcessdesignbasis.

    2.8.2COLDINSULATION

    Insulationmaterials,applicationetc.shallbebasedonrecommendationsofStandardspecificationforcoldinsulationofvessels,pipingandequipment(Doc.No.6440003).InsulationthicknessonpipingshallbeasperProcessdesignbasis.

    2.9PAINTING

    Paintingmaterials,applicationetc.shallbebasedonrecommendationsofJobspecificationforshop&fieldpaintingforPNCP(Doc.No.6556642PTA05).

    2.10WELDING

    2.10.1APPLICABLECODES&STANDARDS

    Allweldingwork, equipment forwelding,heat treatment, other auxiliary functions and theweldingpersonnelshallmeettherequirementsofthe latesteditionsofthefollowingacceptedstandardsandprocedures:

    a)ProcessPipingASME:B31.3

    b)TheIndianBoilerRegulationsI.B.R.

    Inaddition, the followingcodesandspecificationsreferred in thecodeof fabricationshallbefollowed for the welding specifications, consumable qualifications and non destructive testprocedures.

    WeldingandBrazingQualificationsASMEBPVSec.IX.

    NondestructiveexaminationASMEBPVSec.V.

    Materialspecifications:Weldingrods,electrodesandfillermetalsASMEBPVSecIIPartC.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:34of56

    Rev.A

    Theadditionalrequirementsmentionedinthisspecification,overandabovethoseobligatoryaspercodes,shallbefollowedwhereverspecified.

    2.10.2WELDINGPROCESSES

    2.10.2.1 Welding of various materials shall be carried out using one or more of thefollowingprocesseswiththeapprovaloftheEngineerincharge.

    ShieldedMetalArcWeldingprocess(SMAW)GasTungstenArcWeldingprocess(GTAW).

    2.10.2.2Automaticandsemiautomaticweldingprocessesshallbeemployedonlywiththeexpress approval of the Engineerincharge. The welding procedure adopted andconsumablesusedshallbespecificiallyapproved.2.10.2.3Acombinationofdifferentweldingprocessescouldbeemployedforaparticularjointonlyafterdulyqualifying theweldingprocedure tobeadoptedandobtaining theapprovalofengineerinCharge.2.10.2.4ForadditionaldetailsWeldingSpecificationforFabricationofPiping6770001shallbereferred.

    2.11MISCELLANEOUS

    2.11.1Positivematerial identification(PMI) testat construction site shallbedoneasperStandardSpecification forpositivematerial identificationPMIatconstructionsite,6820002.

    2.11.2Potablewater shallbeused for testingofCarbon steel&Alloy steelpiping.FortestingofStainlessSteelpipingmaximumchlorinecontentinwatershallbe1520ppm.

    2.11.3Itemcodesforsurplus&sparematerialsshallbeasperOwnercodesatthetimeofhandingoveroftheProject.

    2.11.4Allsmallborepipingandsteamtracerlines,sizeandbelowshallbeweldedbyTIGprocessforalltypeofjoints,e.g.ButtWeld,SocketWeld,teeetc.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:35of56

    Rev.A

    2.11.5Preheating/PostheatingismandatoryforalltypeofAlloysteelpipingweldingjoints.

    2.11.6Alllowhydrogenelectrodesshallbebakedat350deg.Cinsuitablefurnaceatsitebythecontractor.2.11.7WeldingofAlloysteelbuttjointsshouldnotbeleftincompleteforlonghours;atleastonethirdoftheweldjointshallbecompletedincontinuity.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:36of56

    Rev.A

    3.0REFERENCEDPUBLICATIONS

    Thefollowingcodesandstandardsshallbefollowedunlessotherwisespecified:ASMESEC.IRulesforConstructionofPowerBoilers.ASMESEC.II,PartCMaterialSpecifications:WeldingRods,ElectrodesandfillermetalsASMESEC.VIIIRulesforConstructionofPressureVessels.ASMESEC.IXWeldingandBrazingqualificationsASMEB31.1PowerPipingASMEB31.3ProcessPipingAPIRP520Sizing,Selection&InstallationofPressureRelievingDevicesinRefineriesAPIStd.610CentrifugalPumpsforPetroleum,HeavyDutyChemicalandGasIndustryServiceANSI/NEMASM23SteamTurbinesforMechanicalDriveServiceAPIStd.617CentrifugalCompressorsforPetroleum,ChemicalandGasIndustryServiceAPIStd.661AirCooledHeatExchangerAPIStd.560FiredHeaterEJMAExpansionJointsManufacturersAssociationTEMATubularExchangersManufacturersAssociationOISD118LayoutsforOilandGasInstallationsIBRIndianBoilerRegulationsNACEMR0103MaterialsResistanttoSulfideStressCrackinginCorrosivePetroleumRefiningEnvironmentsResistantMetallicMaterialsforOilfieldEquipmentNACEMR0175/ISO15156MaterialsforuseinH2ScontainingEnvironmentsinOil&GasProductionNACEMR0284EvaluationofPipelineandPressureVesselSteelforResistancetoHydrogenInducedCrackingNACETM0177LaboratoryTestingofMetalsforResistancetoSulfideStressCrackinginH2SEnvironments

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:37of56

    Rev.A

    AnnexureATABLEOFBASICSPAN

    Pipe Size NB (inch)

    SCH/ THK (in)

    PIPE VAPOR-INSULATION

    PIPE-LIQUID-INSULATION

    BARE PIPE EMPTY

    BARE PIPE WATER FILLED

    Pipe Size NB (inch)

    BASIC SPAN (L) M BASIC SPAN (L) M Upto 175 0C

    176 0C To 315 0C

    316 0C To 400 0C

    Upto 175 0C

    176 0C To 315 0C

    316 0C To 400 0C

    SPAN (L)M

    Weig ht KG/M

    SPA N (L) M

    Weig ht KG/M

    3/4" SCH 40 3.5 3.5 2.5 3.5 3.0 2.0 4.5 1.68 4.0 2.04 3/4"1" SCH 40 4.5 4.0 3.0 4.5 3.5 3.0 5.0 2.52 4.5 3.07 1"

    1-1/2" SCH 40 5.0 5.0 4.5 5.0 4.5 3.5 6.0 4.08 5.0 5.4 1-1/2"2" SCH 40 5.5 5.0 4.5 5.0 4.5 3.5 6.5 5.47 5.5 7.65 2"

    2- 1/2" SCH 40 6.5 6.0 5.0 6.0 5.5 4.5 7.5 8.7 6.5 11.79 2-1/2"3" SCH 40 7.5 6.5 5.5 6.5 6.0 5.0 8.0 11.35 6.5 16.5 3"4" SCH 40 8.0 7.5 6.5 7.5 7.0 6.0 9.0 16.2 7.5 24.45 4"6" SCH 40 10.0 9.5 8.5 9.0 8.0 7.5 10.5 28.3 9.0 46.7 6"8" SCH 40 12.0 11.0 10.0 10.0 10.0 9.0 12.0 42.84 10.0 75.22 8"10" SCH 40 13.5 13.0 12.0 11.5 10.5 10.5 14.0 60.74 11.5 111.9 10"12" 3/8" w 14.5 13.5 13.0 12.0 11.5 11.0 15.0 74.40 12.0 147.5 12"14" 3/8" w 15.0 14.5 13.5 12.0 12.0 11.5 16.0 82.5 12.5 172.05 14"16" 3/8" w 16.0 15.5 14.5 13.0 12.5 12.0 17.0 94.5 13.0 213.15 16"18" 3/8" w 17.0 16.5 15.0 13.5 13.0 12.0 18.0 106.5 13.5 258.3 18"20" 3/8" w 18.0 17.5 16.0 14.0 13.5 12.5 19.0 118.5 14.0 307.5 20"24" 3/8" w 20.0 19.0 17.5 14.5 14.5 13.0 21.0 142.5 15.0 418.2 24"3/4" SCH 80 3.5 3.5 2.5 3.5 3.0 2.0 4.5 2.20 4.0 2.49 3/4"1" SCH 80 4.5 4.0 3.0 4.5 3.5 3.0 5.0 3.25 4.5 3.72 1"

    1-1/2" SCH 80 5.0 5.0 4.5 5.0 4.5 4.0 6.0 5.45 5.0 6.60 1-1/2"2" SCH 80 6.0 5.0 4.5 5.5 5.0 4.0 6.5 7.53 6.0 9.45 2"

    2-1/2" SCH 80 6.5 6.0 5.5 6.0 6.0 5.0 7.5 11.49 6.5 14.25 2-1/2"3" SCH 80 7.5 6.5 6.0 6.5 6.5 6.0 8.0 15.37 7.0 19.66 3"4" SCH 80 8.0 8.0 7.0 7.5 7.5 6.5 9.0 22.47 8.0 29.94 4"6" SCH 80 10.5 10.0 9.0 9.5 9.0 8.5 10.5 42.90 9.5 59.85 6"8" 1/2" w 12.0 11.5 10.5 10.5 10.0 10.0 12.0 65.10 11.0 94.8 8"10" 1/2" w 13.5 13.0 12.0 11.5 11.5 10.5 14.0 82.20 12.0 130.69 10"12" 1/2" w 14.5 13.5 13.0 12.5 12.0 11.5 15.0 98.13 13.0 168.64 12"14" 1/2" w 15.0 14.5 13.5 13.0 12.5 12.0 16.0 108.15 13.5 194.4 14"16" 1/2" w 16.0 15.5 15.0 13.5 13.0 13.0 17.0 124.2 14.0 240.0 16"18" 1/2" w 17.5 17.0 16.0 14.5 13.5 13.5 18.0 140.25 14.5 286.64 18"20" 1/2" w 18.0 17.5 17.0 15.0 14.5 14.0 19.0 157.5 15.0 341.8 20"24" 1/2" w 20.0 19.0 18.5 16.0 15.0 15.0 21.0 188.25 16.0 458.44 24"1" 10 S 4.0 3.5 3.0 4.0 3.0 2.5 4.5 2.08 4.0 2.7 1"

    1-1/2" 10 S 5.0 4.5 3.5 4.5 4.0 3.0 5.5 3.12 5.0 4.57 1-1/2"2" 10 S 5.0 4.5 3.5 4.5 4.0 3.0 6.0 3.94 5.5 6.33 2"

    2-1/2" 10 S 6.5 5.5 4.5 5.5 5.0 4.5 7.0 5.26 6.0 8.85 2-1/2"

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:38of56

    Rev.A

    3" 10 S 7.0 6.0 5.0 6.0 5.5 5.0 7.5 6.45 6.0 11.91 3"4" 10 S 7.5 7.0 6.0 6.5 6.0 6.0 8.0 8.34 7.0 17.67 4"6" 10 S 9.5 9.0 8.0 8.0 7.5 7.5 10.0 13.82 8.5 34.54 6" 8" 10 S 11.0 10.5 10.0 9.5 9.5 8.5 11.5 19.94 10.0 55.5 8"10" 10 S 12.5 12.0 11.0 10.5 10.0 9.5 13.0 27.83 11.0 83.4 10"12" 10 S 14.0 13.0 12.0 11.0 11.0 10.0 14.5 36.00 11.5 114.6 12"14" 10 S 14.5 14.0 13.0 11.5 11.0 11.0 15.5 41.18 11.5 132.6 14"16" 10 S 16.5 14.5 14.0 12.0 11.5 11.5 16.5 47.33 12.5 172.2 16"18" 10 S 16.5 15.5 14.5 12.5 12.5 11.5 17.5 53.18 13.0 212.1 18"20" 10 S 17.5 16.5 15.5 13.0 13.0 12.0 18.5 68.50 13.0 264.5 20"24" 10 S 19.0 18.0 17.0 14.0 13.5 12.5 20.5 94.37 14.0 376.8 24"

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:39of56

    Rev.A

    AnnexureBAccessibilityforValves&Instruments VALVES,INSTRUMENTS,CENTRELINEOFITEMTOBEOPERATED,CENTRELINEOFITEMTOBEEQUIPMENTTOBEOPERATEDLOCATEDLESSTHAN3.6mABOVEOPERATED,LOCATEDGRADE,2.75mABOVEFLOORORMORETHAN3.6mABOVEPLATFORMOR1.8mABOVEWINGGRADE,2.75mABOVEPLATFORMFLOORORPLATFORMOR1.8mABOVEWINGPLATFORM

    EXCHANGERHEADSNILPLATFORMOPER.VALVES2&SMALLERFIXEDLADDERFIXEDLADDEROPER.VALVES3&ABOVEPLATFORMPLATFORMMOTOROPERATEDVALVESPLATFORMPLATFORMCONTROLVALVESPLATFORMPLATFORMRELIEFVALVES2&SMALLERFIXEDLADDERFIXEDLADDERRELIEFVALVES3&ABOVEPLATFORMPLATFORMBLOCKVALVES2&SMALLERPORTABLELADDERPLATFORMBLOCKVALVES3&ABOVEPLATFORM(NOTE1)PLATFORM(NOTE1)BATTERYLIMITVALVESPLATFORMPLATFORMPRESSUREINSTRUMENTFIXEDLADDERIFABOVE2.2mHEIGHTFIXEDLADDERTEMPERATUREINSTRUMENTFIXEDLADDERIFABOVE2.2mHEIGHTFIXEDLADDERSAMPLEPOINTSPLATFORMPLATFORMGAUGEGLASSESFIXEDLADDERFIXEDLADDERLEVELCONTROLLERSPLATFORMPLATFORMPROCESSBLINDSANDSPACERSPORTABLELADDER/PLATFORMPLATFORM2&SMALLERPROCESSBLINDSANDSPACERSPLATFORMPLATFORM3&ABOVEMANWAYS/MANHOLESPLATFORMPLATFORMHANDHOLES/INSPECTIONHOLESPLATFORMPLATFORM

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:40of56

    Rev.A

    NOZZLESNOACCESSREQD.(NOTE2)NOACCESSREQD.(NOTE2)VESSELVENTSPORTABLELADDERFIXEDLADDERLINEDRAINS&VENTSPORTABLELADDERPORTABLELADDERORIFICEFLANGESPORTABLELADDERPORTABLELADDER

    NOTE1:BLOCKVALVESWITHCENTRELINESLOCATEDABOVE2.0mFROMTHEOPERATINGFLOOR,WHICHAREREQUIREDFORNORMALOPERATIONSHALLBEPROVIDEDWITHPORTABLEPLATFORMORCHAINFOROPERATIONOFVALVES.NOTE2:TEMPORARYARRANGEMENTFORACCESSSHOULDBEFEASIBLE.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:41of56

    Rev.A

    AnnexureCVerticalandHorizontalGuidesSpacing NOM PIPE SIZE IN INCHES

    VERTICAL SPACING METRES

    HORIZONTAL SPACING METRES(NOTE-1)

    1 6.0 6.0 1 6.0 6.0

    2 6.0 6.0 3 8.0 12.0 4 8.0 12.0 6 8.0 12.0 8 8.0 12.0 10 12.0 18.0 12 12.0 18.0 14 12.0 18.0 16 12.0 18.0 18 12.0 18.0 20 16.0 18.0 24 16.0 18.0

    26 and above 16.0 18.0 Notes:

    1.Thesespacingsmaybevariedtosuitcolumnspacingofrack.Theabovespacingisforstraightrunsofpipe&doesnotincludeguideswhichareusedforcontrolofthermalmovements,asdecidedbystressgroup.2.Theguidespacingsgivenintheabovetableareindicativeonly.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:42of56

    Rev.A

    `AnnexureDTechnicalRequirementsforPipingMaterial 1.0General1.1Ends

    Unlessotherwisespecified,theendsshallbetothefollowingstandard:SW/SCRD:ASMEB16.11BW:ASMEB16.25FLANGED:ASMEB16.5andASMEB16.47SERIESBTHREADING:ASME/ANSIB1.20.1(NPT,Taperthreads)

    1.2FaceFinish

    ThisshallbetoMSSSP6/ASMEB46.1/ASMEB16.5/B16.47.Theinterpretationshallbeasfollows:StockFinish:2501000inAARHSerratedFinish/SmoothFinish/125AARH:125250inAARHExtraSmoothFinish/63AARH:3263inAARH

    1.3AusteniticStainlessSteel

    Allitems/partsshallbesuppliedinsolutionannealedcondition.

    ForallAusteniticStainlesssteels,IntergranularCorrosion(IGC)Testshallbeconductedasperfollowing:

    ASTMA262PracticeBwithacceptancecriteriaof60mils/year(max.)forcasting.

    ASTM A262 Practice E with acceptance criteria of No cracks as observed from20Xmagnification&microscopicstructure tobeobserved from250Xmagnification forotherthancasting.

    For IGC test, two sets shall be drawn from each solution annealing lot; one setcorresponding to highest carbon content and other set corresponding to the highestrating/thickness.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:43of56

    Rev.A

    ForallitemsofstabilizedSSgrades(SS321,SS347),stabilizingheattreatmentshallalsobedone. It shall be carried out subsequent to normal solution annealing. Soakingtemperatureandholdingtimeshallbe900Cand4hrsrespectively.

    1.4Threads

    ThreadsforthreadedPipes,Fittings,Flanges,ValvesetcshallbeinaccordancewithB1.20.1taperthreads,unlessotherwisespecified.Allthreadedjoints,irrespectiveofpressureandtemperature,forcriticalservicesincludingtoxicfluid,hydrogenetcshallbesealweldedwithafullstrengthfilletweld.

    2.0ITEMSPECIFICNOTES: 2.1Pipes

    Unlessspecificallyexempted,weldedpipesshallbeacceptableonlywithlongitudinalweldmadeemployingautomaticwelding.Unlessmentionedotherwiseinthematerialcode,doubleseam180deg.apartisallowedforsizes36andlargeronly.GalvanizedPipesshallbeonlyHotDipgalv.toASTMA53.

    2.2Fittings

    Allfittingsshallbeseamlessinconstructionunlessotherwisespecified.

    ForreducingBWfittingshavingdifferentwallthicknessateachend,thegreateroneshallbeemployedandtheendsshallbematchedtosuitrespectivethickness.

    Allweldedfittingsshallhavemaximumnegativetoleranceequivalenttopipeselected.

    All welded fittings shall be double welded. Inside weld projection shall not exceed1.6mm,andtheweldsshallbegroundsmoothatleast25mmfromtheends.

    For fittingsmade out ofwelded pipe, the pipe itself shall be of doublewelded type,manufacturedwiththeadditionoffillermaterialandmadeemployingautomaticweldingonly.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:44of56

    Rev.A

    AllweldedfittingsshallbenormalizedforCS,normalized&temperedforAS;and100%radiographedbyXrayforallweldsmadebyfittingmanufactureraswellasforweldsontheparentmaterial.

    BevelendsofallBWfittingsshallundergo100%MP/DPtest.

    Thoseusedinfirefightingfacilitiesshallbemarked.

    2.3Flanges

    ForRingJointFlanges,BlindsandSpacers,thehardnessshallbeasfollows:FlangeMaterialMin.HardnessofGroove(BHN)CarbonSteel1401%Crto5%Cr,1/2Mo150Type304,316,347,321160Type304L.316L140ForRTJflanges,blinds&spacers,thehardnessofthegrooveshallbespecifiedonthetestreport.Boreofweldneckflangeshallcorrespondtotheinsidediameterofpipeforspecifiedschedule/thickness.Endsshallbebevelledtosuitthespecifiedschedule/thickness.ForRTJflanges,onlyoctagonalsectionringjointflangesshallbeused.

    2.4Valves

    2.4.1General

    Valves ofClass 900& above shall bepressureseal type.Threaded and sealwelded orweldedbonnetmaybeemployeduptosizes11/2.

    Allflangedvalves(exceptforged)shallhaveflangesintegralwiththevalvebody.Weldonflangesshallbemadebyfullpenetrationjointsand100%radiographed.

    Valve Castings/Forgings purchased from India or Indian vendors shall be from EILapprovedfoundries/forgingshop.

    Yokematerialshallbeatleastequaltobodymaterial.

    ForgingsareacceptableinplaceofCastingsbutnotviceversa.

    Nocastironvalvestobeusedinfirewateroranyotherserviceexcept indrinkingwaterservice.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:45of56

    Rev.A

    2.4.2Dimensions

    FacetoFace/EndtoEnddimensionshallbeasperANSIB16.10.IncasethesameisnotcoveredunderB16.10,thedimensionshallbeasperBS2080/ManufacturersStd.Valveundercryogenicservice(temp.below45C)shallmeettherequirementsofBS6364andshallbeprocuredfromprequalifiedvendor.

    2.4.3Operation

    Generallythevalvesarehandwheelorleveroperated.However,suitablegearoperatorinenclosedgearboxshallbeprovidedforvalvesasfollows:ValveTypeClassForSizesGate/Globe150123001260012Gate/Globe/YGlobe/9006StopCheck1500325003Ball/Plug(otherthan1506PressurebalancedPlug)30066004900315003Butterfly15063006

    Handwheeldiametershallnotexceed750mmandleverlengthshallnotexceed500mmoneachside.Efforttooperateshallnotexceed35kgfathandwheelperiphery.However,failingtomeettheaboverequirement,vendorshalloffergearoperation.Quarterturnvalvesshallhaveopenpositionindicatorswithlimitstops.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:46of56

    Rev.A

    2.4.4ByPass

    Aglobetypevalve(sizeasperASME/ANSIB16.34)shallbeprovidedasbypassforthefollowingsizesofgatevalves:

    ClassSize15026&above30016&above6006&above9004&above15004&above25003&aboveBypassPiping,FittingandValvesshallbeofcompatiblematerialanddesign.CompletefilletweldsforbypassinstallationshallbeDP/MPtested.NDTofbypassvalveshallbeinlinewithmainvalve.

    2.4.5RadiographyofCastValves

    Allcastingshallbeofradiographicquality.Thisrequirementtobeensuredbysampleradiographybeforeproceedingwiththeactualproduction.Radiographyprocedure,areasofcastingtoberadiographed,andtheacceptancecriteriashallbeasperASME/ANSIB16.34.a)Radiographyrequirementforcastingofsizesforspecial/criticalpipingclassesshallbeasfollows:i)Forhydrogen/hydrogenbearinghydrocarbons,oxygen,NACEservices&stressrelievedPipingclasses:ClassSizeqty150upto2450%300upto1650%

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:47of56

    Rev.A

    ii)ForLT/CRYOservices:

    ClassSizeqty150upto2420%300upto1620%b)Radiographyrequirementforcastingsforcategoriesnotmentionedina)aboveshallbeasfollows:ClassSizeqty150upto245%ForCarbonSteelmaterial(ExceptCatD&FirewaterservicesforwhichitisNIL)150upto2410%ForAlloysteels&StainlessSteels15026&above100%Forallmaterials(NilforCat.D&Firewaterservice)300upto1610%Forallmaterials30018&above100%Forallmaterials600&aboveAll100%ForallmaterialsNote1NoradiographyisrequiredforcastingsforDemineralisedWaterservice(CatD)A3KSpec.Note2ForstabilizedgradesofSS100%radiographyisrequiredforcastingsirrespectiveofthecategoryorratingthesebelongto.

    2.4.6Ball/Plug/ButterflyValves

    Eachvalveshallbesuppliedwithalever/wrenchexceptforgearoperated/motoroperatedvalves.

    SoftseatedBall,Plug&Butterflyvalvesshallbesuppliedwithantistaticdevices.

    TheballofBallvalvesshallnotprotrudeoutsidetheendflanges.

    Ballvalvesshallbefloatingballtype/trunionmountedtypeasperfollowing:

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:48of56

    Rev.A

    ClassFloatingBallTrunionMounted1508&below10&above3004&below6&above600&above11/2&below2&aboveUseofsoftseatedball/plug/butterflyvalvesshallbesuitablyselectedbasedontemperatureshandled.Butterflyvalvesshallbesuitableforthrottlingapplication.UseofFiresafevalvesshallbeasperProcessrequirement.ForProcess(Hydrocarbon)servicesbutterflyvalveshallbetripleoffset,highperformancetype.

    2.5Strainer

    Allowablepressuredropwhenspecifiedshallbecertifiedalongwith theoffer. Ifaskedspecifically,pressuredropcalculationsshallbefurnished.

    All2&highersizedYtypestrainersshallbeprovidedwith3/4threadedtapandsolidthreaded plug as drain connection on the blind flange. For less than 2, this shall be1/2size.

    BottomflangeofYtypestrainershallnothavetappedhole.Fulllengthstandardsizestudsshallbeusedforjoiningblindflange.Forfabricatedstrainers,allBWjointsshallbefullyradiographedandfilletweldsshallbe100%DP/MPchecked.Allthestrainersshallbehydrostaticallytestedattwicethedesignpressure.

    2.6Traps

    Vendor shall furnish the performance curve indicating the capacity in mass/hour atvariousdifferentialpressuresacrossthetrap.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:49of56

    Rev.A

    Partssubjecttowearandtearshallbesuitablyhardened.Trapsshallfunctioninhorizontalaswellasinverticalinstallation.Trapsshallhaveintegralstrainers.Alltrapsshallbehydrostaticallytestedtotwicethedesignpressure.

    2.7Hoses

    Suitabilityofhosesshallbeguaranteedfortheserviceandworkingconditionsspecifiedintherequisition,evenifthematerialisnotspecifiedintheMaterialRequisitionforanyparticularservice.Allhosesshallbeclearlymarkedwithserviceandworkingpressureatbothends.Hosesshallberesistanttoageing,abrasionandsuitableforoutdoorinstallations.CompleteHoseassemblyshallbetestedattwotimesthedesignpressure.Steamhosesshallbesubjecttosteamresistancetest.

    2.8ExpansionJoints

    The applicable codes are ASME B31.3 and EJMA (Expansion Joint ManufacturersAssociation).

    Bellows shall be formed from solution annealed sheet conforming to the latestASTMSpec.Anylongitudinalweldshallbe100%radiographed.Thefinishedlongitudinalweldmust be of the same thickness and same surface finish as the parent material.Circumferential welds are not permitted. Bellows are to be hydraulically orexpansion(punched)formed.Rolledformedbellowsarenotacceptable.Noticeablepunchordiemarksresultingfromexpansionoperationarenotacceptable.

    Norepairsofanykindareallowedonthebellowsafterforming.Deepscratchesanddentsarenotacceptable.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:50of56

    Rev.A

    Theoutofroundnessshallbe limited to3mm.This is themax.deviationbetween themax.&min.diameter.

    The actual circumference of the welding end shall be maintained to 3mm of thetheoreticalcircumference.

    Apartfromtheusualrequirements,thevendorshallalsofurnish:

    Designcalculationstojustifystiffnessandfatiguelife.Axial,lateralstiffness,angularstiffness,effectivepressurethrustarea.Installation/maintenancemanual.Moments&forcesduetostiffness&pressurethrustduetoexpansionjoint

    2.9Supports&SpringAssemblies

    TheMaterial,Design,ManufactureandFabricationshallbegenerallyasperMSSSP58/MSSSP89and/orBS3974.TestingofspringsshallbeasperBS1726.

    2.10Gaskets

    Asbestosfillerforspiralwoundgasketshallnothaveanycolourordye

    Fullfacegasketsshallhaveboltholespunchedout.

    NonmetallicringgasketsasperASME/ANSIB16.21shallmatchflangestoASME/ANSI

    B16.5 upto 24, and ASME/ANSI B16.47 or AWWA for sizes > 24 unless otherwisespecified.

    SpiralwoundgasketsasperASMEB16.20shallmatchflangestoASME/ANSIB16.5upto24,andASMEB16.47seriesBforsizes>24unlessotherwisespecified.

    InnerandouterringsrequirementforspiralwoundgasketsshallbeasperPMSGeneralnotes.

    Innerringshallbeprovidedforthefollowing:

    a)Aspercode(B16.20)requirement.

    b)Forsizes26&aboveinallclasses.

    c)Forvacuum,cryoandhydrogenservice.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:51of56

    Rev.A

    d)ForSS321,SS347andHgradeSSclasses.

    e)Forclasseswheretemperatureishigherthan427C.

    f)For900#ratingandaboveclasses.(IfPMSspecifiesspiralwoundgasket)

    IncaseofRTJgaskets,onlyoctagonalsectionringgasketsshallbeused&shallhavepropermarkingstamped.Materialcertificateshallbeavailableforthegasket.HardnessofRTJgasketsshallbe20BHN(min)lessthanthecorrespondingflangegroovehardness.

    2.11Stud,Bolts,NutsandJackScrews

    AllboltingshallbeasperASME/ANSIB18.2.1forStuds,M/CBoltsandJackscrews,andASME/ANSIB18.2.2fornuts.

    Threadsshallbeunified(UNCfor1diaand8UNfor>1dia)asperANSIB1.1withclass2AfitforStuds,M/CBoltsandjackscrews,andclass2Bfitfornuts.

    Studboltsshallbethreadedfulllengthwithtwoheavyhexnuts.LengthtoleranceshallbeinaccordancewiththerequirementoftableF2ofAnnexureFofASMEB16.5

    Thenuts shall bedouble chamfered, semifinished,heavyhexagonal type and shall bemadebythehotforgedprocess.

    Thelengthofthestuds/boltsshouldbesuchthatminimumtwothreadsshouldbeoutofthenutoneitherside.

    Allthestud/boltshouldhavemetallurgicalcertificatesincaseofalloy/SSmetallurgywithidentifiedcolourmarkingatthestudends/boltsideface.

    HeadsofjackscrewsandM/Cboltsshallbeheavyhexagonaltype.Jackscrewendshallberounded.

    Whereverbolttensioningisspecifiedstudboltlengthshallbelongerbyminimumonediametertosuitbolttensioner.Excessthreadsshallbeprotectedbyathreadednut.

    2.0 Inspection&testingAllitemsandtheirpartsshallbesubjectedtoallmandatoryaswellassupplementary(whereverspecified)testsandcheckscalledforintherespectivecodes/standards/datasheets.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:52of56

    Rev.A

    Theexaminingpersonnelshallhavetherequisitequalificationandexperience.Clientanditsauthorizedrepresentativereservetherighttovetandsuggestchangesinvendorsprocedures.VendorsworksandfacilitiesshallbeaccessibletotheClient/Representativeatallreasonabletimes.Testreportsforallmandatoryaswellassupplementarytestswhereverspecifiedshallbefurnished.PositivematerialidentificationtestatvendorsworksshallbedoneasperStandardspecificationforpositivematerialidentificationPMIatvendorsworks,6810001.

    4.0Marking

    Allitemsshallbemarked(stamped/etched)inaccordancewiththeapplicablecode/standard/specification.Inaddition,theitemcode,ifavailable,shallalsobemarked.Foreaseofidentification,thecolourofpaintedstrip(whereverrequired)shallbeaspertheapplicablestandard.Paintorinkformarkingshallnotcontainanyharmfulmetalormetalsaltswhichcancausecorrosiveattackeitherordinarilyorinservice.Specialitems/smalleritemsshallhaveattachedcorrosionresistanttagprovidingsalientfeatures.

    5.0Despatch

    Allitemsshallbedry,cleanandfreefrommoisture,dirtandlooseforeignmaterialofallkinds.

    Allitemsshallbeprotectedfromrust,corrosion,andmechanicaldamageduringtransportation,shipmentandstorage.

    Rustpreventiveonmachinedsurfacestobeweldedshallnotbeharmfultoweldingandshallbeeasilyremovablewithapetroleumsolvent.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:53of56

    Rev.A

    Endsshallbesuitablyprotected,andtheprotectorsshallbesecurelyandtightly

    attached. Eachvarietyandsizeofitemshallbesuppliedinseparatepackagingmarked

    withthepurchaseorderno.,itemcode(ifavailable),andthesalientspecifications.

    Carbonsteel,LTCSandlowalloysteelvalvesshallbepaintedwithonecoatofinorganiczincsilicateprimer.

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:54of56

    Rev.A

    AnnexureECLEARANCESOVERHEADCLEARANCES

    Equipment,structure,platforms,piping&itssupportsshallbearrangedtoprovidethefollowingclearancesoverhead:Overrailroads,topofrailtobottomofanyobstruction.7mOverplantroadsformajormobileequipment.7mOversecondaryroads(bottomofpipe)andaccess5mwaysformobileequipment.Overgrade&bottomofpipe(insidebatterylimit)3.5matpumprowaccessway.Overwalkways,passways&platformstonearest2.2mobstructionandinsidebuilding.Overexchangersatgrade,shellcoverchannelend.1.5mHORIZONTALCLEARANCES:Betweenexchangers(aislesbetweenpiping).0.9mAroundpumps(aislesbetweenpiping).0.9mFiredheaterstopumpshandlingflammablestock.15mFiredheaterstootherflammablecontaining15mequipmentnotcloselyassociatedwithheaters.Atdriverendofpumps,wheretruckaccessreqd3.0m

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:55of56

    Rev.A

    Atdriverendofpumps,wheretruckaccessnotreqd1.8mAtshellcoverendofexchangersatgrade,1.3mforaccessway.Betweenshellsofadjacenthorizontalvessels.1.2m PIPEBERTHING: Underground300mmminimumcleargapbetweenpipesAbovegroundNormalFlangetobarepipe(orinsulation)plus25mmEQUIPMENTSPACING: SmallpumpsMountedoncommonfoundationswith(3.7kw&less)suitablecentretocentredistance.Mediumpumps900mmclearaisle(22.5kw&less)Largerpumps900mmclearaisle(above22.5kw)Exchangers&900mmminimumclearaisleotherequipmentonstructures PLATFORMS:Towers,vertical&horizontalvessels:Distanceofplatformbelowcentrelineof9001050mmmanholeflangesideplatformWidthofmanholeplatformfrommanhole900mm

  • Title:PIPINGDESIGNPHILOSOPHY Doc.No.:67247005002DB0001Project:ADDITIONALBOGBOOSTERCOMPRESSORLNG

    DABHOLTERMINALFORRATNAGIRIGASANDPOWERPRIVATELIMITED

    ProjectNo.:6724 SheetNo.:56of56

    Rev.A

    covertooutsideedgeofplatformPlatformextensionbeyondcentrelineofmanhole900mmsideplatformDistanceofplatformbelowundersideofflange175mmheadplatformWidthofplatformfromthreesidesofmanhole750mmheadplatform