ph0349-8 remote operation of gas-lifted wells shell technology john stewart

14
PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

Upload: laurel-mason

Post on 28-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

Remote Operation ofGas-lifted Wells

Shell Technology

John Stewart

Page 2: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

Smart Electronic Gas Lift

Gasmer Prototype Laboratory

The Conch Works

Cable-less Downhole Monitoring and Flow Control for Remote Operation of Gas-lifted Wells:

Page 3: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

• Power and comms via tubing; current return via casing (Pseudo-wire).

• Well head is isolated by means of electrical choke.

• Lift gas injection sub contains:Electrically operated gas lift valveCasing and tubing pressure gaugeGas flow meter.

• Gas lift valve (SepTAR/Masterflo development):

• Unloading valves are remotely controllable

• Non-conducting centralisers

~

Downhole control of lift gas injection using Shell’s cable-less technology

Page 4: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

Electrical Choke: Attenuation of power signal;Voltage difference across choke drives P&C module

P&C module: electronics housingand gauges

Electric gas lift valve: Masterflominiature choke

Check valve

Page 5: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

Valve body, including motor, gearbox and choke

Gas inlet ports

Check valve

Page 6: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

Electrical Choke

Electric gas lift valve

Electronics andsensor module

Page 7: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

Value aspectsof

WirelessWell technology

Page 8: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

Value Aspects

– Remote monitoring and control.– On-line data availability allows instant well optimisation.

– Permanent downhole p&T gauges included.

– Possibility to automate process on field-wide basis.

– Lift point no longer restricted by wireline capabilities.

– Downhole control of lift gas injection.– Reduced lift gas surface infrastructure.

– Reduction in completion running time.– Modular design.– Cable-less: no cables and clamps to be installed.

– Dual Completions and Auto Gas Lift.

Page 9: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

OTHER APPLICATIONS

GAS LIFT FROM DUAL COMPLETIONS

Optimise and monitor both strings individually.

Status:

• Equipment design finalised.

• Construction and testing awaiting release of funds.

Page 10: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

OTHER APPLICATIONS

CABLE-LESS AUTO GAS LIFT

Use gas from gas cap or gas reservoir to lift oil.

• No surface gas lift facilities required.

• Significant cost savings on surface facilities.

• Full, real-time control.

• Ability to quickly respond to gas market demands by switching from oil to gas production.

Page 11: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

0

50

100

150

200

250

300

350

400

0 10 20 30 40 50 60 70 80 90 100

VALVE POSITION, % OPEN

PRES

SUR

E PS

IG

0

5

10

15

20

25

30

35

GA

S FL

OW

BOTTOM HOLE PRESSURE GAS FLOW kSCMD

Gas Flow & Bottom Hole Pressure vs Valve Position

Page 12: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

Middle Eastern Deployment

-800

-700

-600

-500

-400

-300

-200

-100

0

-20 80 180 280 380 480 580 680 780 880

7” shoe Open hole

150m

TVD

Controlled unloading

and monitoring

Controlled lift gas injection and monitoring

150 m deeper than conventional.

Conventional

gas lift mandrel

Page 13: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8

E ffect o f G LV port s ize on stab ility

450

500

550

600

650

700

750

13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30

tim e

pres

sure

(psi

)

0

10

20

30

40

50

60

70

80

90

100

GLV

%op

en

P tub ing

P annulus

G L V %o p en

Wellbore as coaxial cable:

Tubing is center conductor & casing is ground return.

Electrical isolation Choke and insulating centralizers provide electrical separation.

Power is picked off using magnetic chokes (impedance).

Communication signals ride on power using digital multiplexed encoding.

Power available downhole to operate sophisticated electric gas lift valve.

Future work: Auto Lift, Dual String Common Annulus Gas Lift

Wireless Power & Comms – Smart Wells

Page 14: PH0349-8 Remote Operation of Gas-lifted Wells Shell Technology John Stewart

PH0349-8