11/22/2009 1 PEMANFAATAN TEKNOLOGI PANAS BUMI DI INDONESIA Disampaikan oleh: I MADE RO SAKYA – Deputi Direktur Teknologi PT PLN (Persero) Pada Seminar : Geotermal dan Biofuel sebagai sumber Energi Masa Depan Terbarukan dan Ramah Lingkungan Universitas Gunadarma – 23 Nopember 2009 KWH PER CAPITA DI BERBAGAI NEGARA 12,924.22 15,210.95 15,938.44 24,011.23 31,147.29 Si USA Kuw ait Qatar Norw egia Islandia 9 9 6 5 2 1 1,275.91 1,914.27 2,175.03 3,226.55 3,724.98 5,748.14 5,773.62 6,621.44 7,328.28 7,671.30 8,176.26 Vi Mesir Thailand China Suriname Malaysia Hongkong Inggris Saudi Arabia Prancis Brunei Si ngapura 1 12410191 74 67 45 44 36 27 23 19 Weighted average : 3,240.3 kWh/capita 8.85 148.05 466.03 496.32 556.10 602.26 Chad Bangladesh India Indonesia Philipina Vietnam 217171160158155151 Sumber: www.nationmaster.com , data 2006 Posisi 158

Upload: hanhi

Post on 08-Jun-2019

222 views

Category:

Documents


0 download

TRANSCRIPT

11/22/2009

1

PEMANFAATAN TEKNOLOGI PANAS BUMI DI INDONESIA

Disampaikan oleh:I MADE RO SAKYA – Deputi Direktur Teknologi ‐ PT PLN (Persero)

Pada Seminar :Geotermal dan Biofuel sebagai sumber Energi Masa DepanTerbarukan dan Ramah Lingkungan

Universitas Gunadarma – 23 Nopember 2009

KWH PER CAPITA DI BERBAGAI NEGARA

8 176 26

12,924.2215,210.95

15,938.4424,011.23

31,147.29

Si

USAKuw ait

Qatar

Norw egiaIslandia

99

65

21

602 261,275.91

1,914.272,175.03

3,226.55

3,724.985,748.14

5,773.626,621.44

7,328.287,671.30

8,176.26

ViMesir

Thailand

ChinaSuriname

MalaysiaHongkong

InggrisSaudi Arabia

Prancis

BruneiSingapura

1124

101

9174

6745

4436

2723

19

Weighted average : 3,240.3 kWh/capita

8.85148.05

466.03496.32

556.10

602.26

ChadBangladesh

India

IndonesiaPhilipina

Vietnam

2171

7116

0158

1551

51

Sumber: www.nationmaster.com, data 2006

Posisi 158

11/22/2009

2

Malaysia

Brasil

ThailandChina

Amerika Serikat

Jepang

Eropa100

Electrification Ratio vs. GDP

Brasil

Afrika Selatan

India

Philipina

Bolivia

INDONESIA

G

Asia

Rusia

60

80

ec

trif

ica

tio

n R

ati

o [

% ]

Nigeria

Ghana

40

100 1.000 10.000 100.000

El

GDP per Kapita [ US$ ]

Source : IEA, World Energy Outlook 2006

Installed Capacity vs. Population

Amerika Serikat1.000

10.000

MalaysiaINDONESIAThailandArgentina

BrasilIndia

RusiaJepang

China

Philipine

Inggris

VietnamNigeria

Perancis

Korsel

Pakistan

10

100

ns

talle

d C

ap

ac

ity

[G

W]

Kenya

Myanmar

Nigeria

1

10 100 1.000 10.000

In

Population [Million]

Source: IAEA, US DOE

11/22/2009

3

CO2 Emission per Capita

North America r1

14.00

16.00

18.00

Europe r3

China CH

Japan JA

Malaysia MY

4.00

6.00

8.00

10.00

12.00

CO2 emissionper capita [tCO2/cap

ita]

Indonesia ID

India IN0.00

2.00

Bangkok

Phnom Penh

Ban Mabtapud

Ho Chi Minh City

CAMBODIA

VIETNAM

THAILAND LAOS Manila

Philipines

South

China

Sea

TOTAL • Install Cap  : 29.987 MW• Trans Lines :‐ 500 KV  :   4.983 kms‐ 150 KV  : 23.106 kms

Generation And Transmission

Pacific Ocean

Khanon

Songkhla

Erawan

Bangkot

LawitJerneh

WESTMALAYSIA

Penang

Kerteh

Kuala Lumpur

NatunaAlpha

Kota KinibaluBRUNEI

Bandara Seri Begawan

BintuluEAST

MALAYSIA

Kuching

Banda Aceh

Lhokseumawe

Medan

Duri

Padang

BintanSINGAPORE

Samarinda

Balikpapan

Bontang

AttakaTunu

BekapaiKALIMANTAN

Manado

Ternate HALMAHERA

Sorong

Duyong

West Natuna

Port Dickson

Port Klang

Mogpu

Dumai

Batam

Guntong

‐ 70 KV    :   5.052 kms

Kalimantan :• Gen : 1.000 MW• 150 kV: 1.264 kms• 70 kV: 123 kms JayapurMaluku :

Grissik Palembang

Semarang

AUSTRALIA

Indian Ocean

Jambi

Balikpapan

Banjarmasin

SULAWESI

Ujung Pandang

BURU SERAM

IRIAN JAYA

JakartaJ A V A

SurabayaBangkalan

BALI SUMBAWA

Pagerungan

LOMBOK

FLORES

SUMBATIMOR

I N D O N E S I AMADURA

Jamali :• Gen : 22.302 MW• 500 kV:   4.983 kms• 150 kV: 11.552 kms• 70 kV:   3.657 kms

Sumatera :• Gen : 4.634 MW• 150 kV: 8.521 kms• 70 kV:    310 kms

• 70 kV:    123 kms

Sulawesi :• Gen : 1.130 MW• 150 kV: 1.769 kms• 70 kV:    962 kms

y pa

Merauke

Nusa Tenggara:• Gen : 273 MW

Maluku : • Gen : 197 MW

Papua :• Gen : 170 MW

11/22/2009

4

Hydro15%

CCPP Nat Gas20%

Geothermal2%

Gas Turbine5% Diesel

12%

KAPASITAS TERPASANG PEMBANGKIT PLN

20%2%

Jawa, Madura & Bali (JAMALI) Region  (18.371 MW)

77

CCPP Fuel Oil13%

SPP Nat Gas4%

SPP Fuel Oil5%

SPP Coal23%

Indonesia (25,340 MW)OUTSIDE OF JAMALI (6,969 

MW)Sourcee: PLN (2008)

7

ELECTRICITY DEMAND PROJECTION

11,000

13,000

15,000

17,000

19,000

MW

50

60

70

80

90

100

TWh

INDONESIA

OUTER JAWA BALI

60,000

65,000

70,000

MW

350

400

TWh

Beban puncak

Penjualan Energi

5,000

7,000

9,000

2008 2010 2012 2014 2016 2018 2020

20

30

40

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

MW

150

200

250

300

350

TWhJAWA BALI

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

100

150

200

250

300

Peak Load

Energy Demand 

8

10,000

15,000

2008 2010 2012 2014 2016 2018 2020

100

20,000

2008 2010 2012 2014 2016 2018 2020

100

Notes : Asumption : Annual Economic Growth 6.2%/thn, elasticity = 1.56 Projection :

Electricity demand grow at 9.69% annually. Demand in 2008 was 128.9 TWh, and demand projection in 2018 is expected 325.2 TWh, and 381.3 TWh in 2020

Electrification Ratio 95.5%in 2018 , and 100% in 2020

11/22/2009

5

Additional Capacity 2009 - 2018

70 

173 

122 

Micro HEPP

Diesel PP

17,753 

3,934 

8,494 

1,015 

3,835 

16,487 

438 

220 

3,991 

905 

Coal STPP

GTPP

CCPP

Geothermal

HEPP

IPP

PLN

35,274 22,168 

‐ 5,000  10,000  15,000  20,000  25,000  30,000  35,000  40,000 

Total

MW

Apakah Geothermal atau Panas Bumi ?

• Geo‐thermal ‐ Geothermal power (from the Greek roots geo meaning earth andGreek roots geo, meaning earth, and thermos, meaning heat) is power extracted from heat stored in the earth. ‐Wikipedia

• … of or relating to the heat in the interior of the earth ‐ wordnetweb.princeton.edu

E f i i th E th’• Energy from reservoirs in the Earth’s surface, such as geysers or ground water that is ‘heat energy’ ‐ www.greenenergy360.org

11/22/2009

6

GEOTHERMAL SYSTEM MODEL

A‐B = normal temperature gradient (fluid inflow and water pressure increase)B‐C = very high temperature gradient and permeable (reservoir)C‐D = ascending of hot fluid  at relatively constant temperatureD = location where hot water begins to boil, as water pressure decrease

11Sumber : Mary H. Dickson and Mario Fanelli, What is Geothermal Energy?

Maluku

DISTRIBUTION OF GEOTHERMAL IN INDONESIA

Kalimantan

Sulawesi

JawaBali Flores

Irian Jaya

Alor

Total Location : 256 SchemesTotal Potential : 27 GWe

Timor

Non Volcanic

Location :  53 SchemesPotential :1. 15 GWe

11/22/2009

7

BENTUK SUMBER GEOTHERMAL DI PERMUKAAN BUMI

Air/Uap panas Fumarol

Geyser Lumpur Panas

SEULAWAH AGAM 160 MW

SIBAYAK12 MW

SARULA330 MW

Ready for ExploitationProduction StageUnder Tender

GEOTHERMAL DI INDONESIA

KARAHA400 MW

KAMOJANG150 MW

DIENG60 MW

LUMUTBALAI(UNOCAL)

ULUBELU110 MW

LUMUT BALAI110 MW

ULUMBU10 MW

LAHENDONG I, II,III60 MW

BEDUGUL175 MW

UNGARAN50 MW

TAMPOMAS50 MW

JAILOLO75 MW

CISOLOK45 MW

DARAJAT255 MW

WAY. WINDU I110 MW

PATUHA400 MW

MATALOKO2.5 MW

NGEBEL120 MW

WAY. WINDU II2 x 110 MW

Total Installed Capacity January 2009 : 1182 MW

Tangkuban Parahu 55 MW

SALAK375 MW

14

11/22/2009

8

Fuel mix will be changed  as the followings:

• Coal 46% in year 2008 to become 63% in year 2018.

• Fuel oil 25% in year 2008 to become 1% in year 2018

• Geothermal 5% in year 2008 to become 12% in year 2018

INDONESIAN FUEL MIX

y y

• Gas and LNG 17% in year 2008 to become 17% in year 2018

2008

BATUBARA 46%

HYDRO 7%

PUMPED STORAGE

0%

GEOTHERMAL

2018

HYDRO 6%

PUMPED STORAGE

1%

GEOTHERMAL 12%

Coal

HSD 16%

MFO 9%

GAS17%

LNG0%

5%

NUCLEAR0%

HSD 1%

MFO 0%

GAS15%

LNG2%

BATUBARA 63%

NUCLEAR0%

**)Sources: Long‐term Development Plan of PLN

Coal

15

PENGEMBANGAN

11/22/2009

9

Temperatur :1. At 30‐69ºC : thermoculture (Hot Spa, Pemandian

TEKNOLOGI GEOTHERMAL

( p ,Air Panas, Memasak dll)

2. At 70‐140ºC : Pemanas air & ruangan, Pengering

3. At 140‐220ºC:  Pengering, Process Heat, binary PP

4. At 220+ºC: Steam turbine, binary PP or process steam 

17

a) Flashed Plant

TEKNOLOGI GEOTHERMAL

b) Binary Plant

c) Combined Cycle PP

18

11/22/2009

10

Proses Pemanfaatan Panasbumi

CYCLONE ELECTRICAL

Geothermal Power Plant Cycle Resource development

Steam gathering

t (SAGS)U

P T

O 4

KM

CYCLONE SEPARATOR

CONDENSER

PSI

v v v v v v

V V V V V V

GENERATOR

PUMP

STEAMTURBINE COOLING

TOWER

PUMP

CYCLONESCRUBBERSTEAM

STEAM

TURBINE STEAM EXHAUST

CONDENSATE

COLD CONDENSATE

system (SAGS) Power

generation Facilities

FLASHING TOSTEAM-BRINE MIXTUREIN BOREHOLE

RESERVOIR BRINEBRINEINJECTIONWELL

CONDENSATEINJECTION

WELL

GEOTHERMAL POWER PLANT

www.eas.asu.edu

Example : 1. Kawerau Geothermal PP – New Zealand2. Ngawha Geothermal PP – New Zealand3. Raser’s Geothermal PP – Utah ‐ USA 20

11/22/2009

11

Combine Cycle OrmatARSEP

E 2009

Example : Leyte – Philippine

21

Teknologi1. Proven Technology2. Tidak tegantung dengan musim

KEUNTUNGAN & MANFAAT

2. Tidak tegantung dengan musim3. Berperan sebagai base load ( CF > 90% ).4. Dapat dikembangkan secara bertahap ( 250 kW –

110 MW )

22

11/22/2009

12

Ekonomi1. Biaya O & M rendah.2. Biaya bahan bakar tidak ada

KEUNTUNGAN & MANFAAT

3. Meningkatkan tingkat sekuriti energi nasional4. Menggunakan energi setempat5. Menggerakkan perekonomian setempat

23

Lingkungan1. Emisi sangat rendah dibandingkan dengan

pembengkit berbahan bakar fosil

KEUNTUNGAN & MANFAAT

pembengkit berbahan bakar fosil.2. Menggunakan tanah yang tidak luas dibandingkan

dengan pembangkit lain.

24

11/22/2009

13

KEBUTUHAN LAHAN

101214

sands

Land Usage

02468

10

Thous

Geothermal Flash Plant

Geothermal Binary Plant

Geothermal Flash Plant

Coal PlantNuclear Plant

Hydroelectric Plant

Solar Thermal Plant

Solar PV Plant

Wind Farm

Land Usage (m2/GWh) 160  170  290  5,700  1,200  250,000  3,200  7,500  1,305 

Land Usage (m2/MW) 1,260  1,415  2,290  400,003  10,000  1,200,000 28,000  66,000  3,140 

(from Geothermal Power Plant, Ronald DiPippo, Second edition)

25

LINGKUNGAN

1000

CO2 (kg/MWh)(from Geothermal Power Plant, Ronald DiPippo, Second edition)

Geothermal PP emits CO2 at < 10 % to 

300

400

500

600

700

800

900 that of CO2 emitted by other PP Types

0

100

200

Coal‐Fired Steam Plant

Oil‐Fired Steam Plant

Gas Turbine

Flash‐steam Geo PP

The Geysers dry‐steam Geo PP

Closed loop binary Geo PP

EPA average, all US Plants

CO2 (kg/MWh) 994 758 550 27.2 40.3 0 631.626

11/22/2009

14

Resiko dan Tahapan Pengembangan Panasbumi

Pre‐feasibility Exploration Feasibility

(Geology, surface geochemistry, engineering & environ. Impact pipeline routes, weather &

Discharge testing Studies & tests Reserves

Confirmation

Exploration drilling (resource identification)

Resiko tertinggi berada di hulu

Catatan hasil Pemboran ,

hydrology, preparation of exploration budget

Confirmation Environmental

impact assessment Feasibility study of

power plant, etc

Construction DesignCommissioning & production

Environmental impact report

Preliminary design Bid d

Construction & plan installation

Contract management supervis

Development drilling (resource delineation & quantification)

Pemboran Indonesia: rata-rata < 10 Mwe per sumur (SKM, 2007)

Lama Pengembangan sampai operasi 5-7 tahun

Bid document preparation

Contract award (plant & civil)

Pipeline routing & design

Production & injection wells

Final design

management, supervision of construction, inspection

Field management & long term testing

Fase dengan resiko tertinggi

Investasi Panasbumi (greenfield dev.)

1. Lead time yang panjang;• Pre Feasibility Study : 1 tahun• Exploration : 2 – 3 tahun• Development / Construction : 2 – 3 tahun

Total lead time : 5 7 tahunTotal lead time : 5 – 7 tahun

2. Risks• Resources (Exploration & Exploitation) Risks• Construction Risk• Perceived Buyer (PLN) Risk• Country Risk.

3. IRR = Riskless Rate + Risk Premium(government bond)

11/22/2009

15

Estimasi Investasi Panasbumi

Jenis BiayaTotal Biaya(dalam jutaUSD/MW)

G&G Studies, Exploration & 1 1 1 2

Resource characteristics

Site specifics Market parameters

G&G Studies, Exploration & Development Drilling

1,1 – 1,2

Pipelines – Steam Above Ground System (SAGS)

0.4

Power Plant , inc. Engineering& Project Management

1,3 – 1,4

Total Biaya Pengembangan 2 8 – 3 0

Diperlukan investasi lebih dari USD 13 Milyar untuk membangun 4,733 MW PLTP

Total Biaya Pengembangan 2,8 3,0

Geothermal ProjectGeothermal ProjectGeothermal ProjectGeothermal Project

Resource FeasibilityResource FeasibilityStudy ApprovedStudy Approved

Submit Notice of Submit Notice of Intention To DevelopIntention To Develop

Commercial Commercial OperationsOperations

EPC BidsEPC Bids

Concession acquisition Concession acquisition and initial explorationand initial exploration

EPC BidsEPC BidsFinancingFinancingPlansPlans

ProjectProjectConstructionConstruction

Finalizing CostsFinalizing Costs•• Confirm ResourceConfirm Resource•• Financing PlansFinancing Plans

Complete ConstructionComplete Construction•• Close Financing Close Financing On Final Phase On Final Phase ‐‐ PGF PGF 

Commercial Commercial SignSign

~ 2 Yrs~ 2 Yrs

Close Close 

At least 3 YrsAt least 3 Yrs

Resource Resource DevelopmentDevelopment

Construction StartsConstruction Starts•• RoadsRoads•• Land PurchaseLand Purchase•• Drill WellsDrill Wells

CommercialCommercialOperationsOperations

EPC BidsEPC BidsFinancingFinancingPlansPlans

ProjectProjectConstructionConstruction

Coal/Gas Power Coal/Gas Power ProjectProject

Construction StartsConstruction Starts

Sign Sign PPAPPA

CloseCloseFinancingFinancing

Conditions PrecedentConditions Precedent

30

11/22/2009

16

GOVERNMENT

RISK DISTRIBUTION of GEOTHERMAL PROJECT

DEVELOPER LENDERPROJECT

OFF TAKER(PLN)

31

INVESTOR OFF TAKER GOVERNMENT LENDER

‐ Reservoir Capacity ‐ Pricing Energy ‐ Regulation ‐ Pricing Energy

MAJOR RISK COMPONENTS

‐ Drilling Success Ratio ‐ AF Power Plant ‐ Pricing Energy ‐ Capital Cost

‐Well Capacity ‐ CF Power Plant ‐ Investment Security ‐ Energy Production

‐Well Decline ‐ System Capacity ‐ Force majeure ‐ off taker Capability

‐ Steam Quality ‐ Financing ‐ COD ‐ Gov. Guarantee 

‐ AF Power Plant ‐ Quality Supply ‐ Environmental

‐ CF Power Plant ‐ Force Majeure ‐ Equipment Quality

‐ Capital Cost ‐ Fluctuation USD ‐ Force MajeureCapital Cost Fluctuation USExchange Rate

Force Majeure

‐ Financing ‐ COD ‐ COD

‐ Pricing Energy

‐ Force Majeure

‐ COD

32

11/22/2009

17

KESIMPULAN

• Potensi Geothermal di Indonesia sangat besar• Teknologi geothermal sudah proven dan ramah• Teknologi geothermal sudah proven dan ramahlingkungan

• Diperlukan lead times yang panjang serta initial cost yang tinngi dalam pengembangangeothermal

• Pemanfaatan Geothermal di Indonesia l k k j t tmemerlukan kerjasama yang erat antara

pengembang, pemakai, Pemerintah dan Lender.