indonesia: well intervention...

19
Indonesia: Well Intervention Activity The Updates Afriandi Eka Prasetya Head of Workover and Well Service I Survey and Drilling Division SKK Migas [email protected]

Upload: vokhuong

Post on 07-Mar-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

Indonesia:

Well

Intervention

Activity

The Updates

Afriandi Eka Prasetya

Head of Workover and Well Service I

Survey and Drilling Division

SKK Migas

[email protected]

1. SKK Migas overview

2. Indonesia well intervention activity updates

3. Well integrity management

4. Production enhancement works

5. Reactivation of suspended well

6. Well abandonment activity

7. Conclusions

Agenda

© 2016 SKK Migas - All rights reserved. The information consist in this document designed and prepared for SKK Migas purposes only. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means, electronic or otherwise without the prior permission of SKK Migas.

SKK Migas Profile

Presidential Regulation No. 9/2013

Manage the upstream oil and gas business activities

Exploit oil and gas to generate maximum benefits and revenue

As a proactive and reliable partner

Supervision and control of the Contract

Working Areas and Contract

Signing the Contracts

Plan of Development

Work Program and Budget

Monitoring and Reporting

Appoint the Sellers

• http://www.skkmigas.go.id

• http://youtu.be/1waTxwK5P8k

Indonesia petroleum work areas - 2015

© 2015 SKK Migas

139 Exploration; 55 Unconventional; 41 Terminated; 63 Production; 18 Development.

National oil and gas production profile (Mboepd)

SKK Migas Annual Report 2014 http://www.skkmigas.go.id

Indonesia well intervention activities

80 Work Areas

producing 800k bopd

and 8k mmscfd

Wellworkactivities as backbone to compensate production

decline

> 30k jobs annually to contribute

50k bopd and 450 mmscfd

2016:

35k jobs to target 50k bopd and

500 mmscfdcontribution

© Pictures are taken from Google and author’s work

Indonesia well intervention statistics

1. Work over and well services data are compiled from SKK Migas Annual Report 2013, 2014, 2015 http://www.skkmigas.go.id

2. Average Indonesian Crude Price (ICP) year 2013-2014 are compiled from Ministry of Energy and Mineral Resources, http://www.esdm.go.id/publikasi/harga-energi/harga-minyak-mentah-indonesia-icp.html

3. Average ICP year 2015 is calculated from monthly ICP January to December 2015, http://katadata.co.id/berita/2016/01/05/harga-minyak-indonesia-tahun-lalu-anjlok-terendah-sejak-2004

4. Average ICP year 2016 is assumed

105.84

96.51

49.21 50

0

20

40

60

80

100

120

0

5

10

15

20

25

30

35

40

2013 2014 2015 2016 forecast

Tho

usa

nd

s

Wellwork jobs and Crude Price

workover well services Avg. ICP ($/bbl)

-

100

200

300

400

500

600

700

800

900

2013 2014 2015 2016 forecast

Tho

usa

nd

s

Oil Production, bopd

Existing Drilling Workover Wellservice Facility Opt

Indonesia well intervention updates

© 2016 SKK Migas

0.12%

0.29%

0.81%

1.21%

1.44%

1.67%

2.13%

3.28%

3.63%

5.24%

7.20%

7.66%

8.18%

9.04%

9.62%

38.48%

Fishing

Cementing

Artificial Lift Repair/change

Change of lift system

Fracturing

Logging

Well conversion

EOR

Others

Water shut off

Downhole Eqp. Install/repair

Well test

Acidizing /Cleanout

Change layer

Recompletion

Additional perforation

0.09%

0.24%

0.32%

0.38%

1.00%

1.40%

1.99%

2.21%

2.91%

3.35%

4.08%

5.39%

6.39%

7.03%

8.27%

12.39%

42.57%

SSD opening/closing

Cementing

String fishing and repair/replacement

Well conversion

Surface equipment installation and repair

Tubing repair/replacement

Downhole repair

Zone Isolation

Chemical, N2, Stimulation

Pressure & temperature measurement

Production logging

Add Perforation

Routine maintenance

Well Test

Acidizing/cleanout

Others

Pump changes/repair

Well integrity management

Well PlanningDetailed

Well DesignWell

Construction

Well Handover

Well Handover

Well Handover

WellIntervention

Well P&A

Well Operational

Phase

ISO/TS 16530-2:2014

Well Life Cycle

• Design

• Construct

• Operate

• Maintain

• Abandon

Production enhancement works

Production enhancement

worksLog review

Logging

Well problem identification

Surface facility availability

Economic review

Production enhancement works

Smart gas lift orificeSlickline perforationSmart coiled tubing Snubbing operation

Thru-tubing perforationMulti Phase Flow Meter

Tractor

Velocity stringCapillary stringMatrix acidizing

ESP worksMilling

Seal bondFoam Stick

Less cost $

High decline rate

Inter zone communication

Well integrity

High saturated water

Production Performance Evaluation

Suspended well reactivation

Regain the productivity

Suspended well reactivation potential

7590

Sumatra

71

Natuna

608

Kalimantan

235

Papua

266

Jawa

Active wells : 28.000Suspended wells : 09.000

Suspended well reactivation: A story

IPA16-111-E

Another story

5 wells operated by a PSC : 0500 bopdHundreds of wells by villagers : 2000 bopd

Well abandonment activities

2015: 62 wells

2016: 217 wells 2017: more 2018: more

5

142

2015 2016 2017 2018

Sumatera

3

4

2015 2016 2017 2018

Natuna

53

71

2015 2016 2017 2018

East Kalimantan

1

0

2015 2016 2017 2018

Java

62

217 more more

2015 2016 2017 2018

Indonesia

Onshore : US$ 150k/wellOffshore Platform : US$1500k/wellOffshore Subsea : US$4000k/well

Well abandonment standards

Primary Barrier

2nd Barrier

Surface Plug

Others

SNI

13-6910-2002

100ft above and 100ft below perf

100ft above and 100ft below stub

Within top 150ft of mudline

Clearance, annular cmt

NORSOK D-10

Isolate source of inflow

As back up of the primary

Formation integrity

Clearance, annular cmt

Operator Technical Plan

Across perf up to 150ft above perf

As back up of the primary

Within 150ft inclannulus

Clearance, annular cmt

Offshore abandonment approaches

Lift Boat

Jack-up rig

Drilling Barge

Multi-purpose Drilling Vessel

RLWI Unit

Conclusions

1. Well intervention activities as backbone to compensate

production decline.

2. Well integrity management should be the concern of all line

functions to achieve the shared goal.

3. Production enhancement works should apply the concepts

and appropriate technologies that are economically viable.

4. Suspended well reactivation as an alternative to maintain the

production decline rate.

5. Well abandonment activities should consider safety and

economical factors.

Thank You

aeprasetya@skkmiga s.g o. idAnoa platform