John Yagecic, P.E.
-
• In December 2003, EPA Regions 2 & 3 issued TMDLs for PCBs in the Delaware Estuary.
• Zones 2 through 5
• River Mile 133.4 at the head of tide at Trenton, NJ down to the head of Delaware Bay at River Mile 48.2.
-
Why?Why?Ambient Concentrations Vs. Criteria (Ambient Concentrations Vs. Criteria (Log Scale)Log Scale)
1
10
100
1,000
10,000
100,000
0 20 40 60 80 100 120
River Mile
Wat
er C
olum
n To
tal P
CB
Con
cent
ratio
n (p
g/L)
9/18/2001 3/15/2002 4/11/2002 5/6/200210/8/2002 3/19/2003 4/2/2003 8/19/20029/3/2002 9/23/2002 11/21/2002 Maximum ConcentrationMinimum Concentration Water Quality Criteria
44.4 pg/L44.8pg/L
7.9pg/L
Zone 2Zone 3Zone 4Zone 5Zone 6
Head of Tide
Mouth of B
ay
Ben Franklin Bridge
C&D
Canal
Ambient Concentrations exceed criteria by 2 to 3 orders of magnitude
-
Load Vs. FluxesLoad Vs. Fluxes
Contaminated Site Loads
Upstream Boundary LoadDelaware River at Trenton, NJ
SedimentFlux
AtmoshphericWet / Dry
Deposition
AtmoshphericGas phase
flux
Upstream Boundary LoadSchuylkill River
Non-Point Source LoadsTributary Loads
Point Discharge Loads
Sediment
C&D Canal(tidal boundary)
Ocean BoundaryMouth of Delaware Bay
CSOs
LEGEND
External Loads(forcing functions)
Fluxes and tidal boundaries
-
Estimated Loads by CategoryEstimated Loads by Categoryand Uncertaintyand Uncertainty
15.89
9.226.56
5.264.00 3.47
2.34 2.19
175.13
834.81
37.7027.98
34.3022.18
1.37
0.77
4.27
0.90 0.78
1.821.20
0.32
5.45
1.321.95
2.872.363.18
5.40
2.85
5.47
14.3017.38
2.992.693.985.10
6.937.31
23.59
0.10
1.00
10.00
100.00
1000.00
ContaminatedSites
Non-PointSources
PointDischarges
Delaware atTrenton
Schuylkill All otherTributaries
Atmosphericwet and drydeposition
CSOs
Source Category
Pent
a PC
B L
oad
(kg)
Max
Min
80th Percentile
20th Percentile
Calculated Load
Legend
-
Original Sources of PCBs not the same as Original Sources of PCBs not the same as Loading Source CategoriesLoading Source Categories
Transformer
Atmosphere
Wet & DryAtmospheric
Deposition
GasPhaseFlux
MS4 L
oad
CSO Load
WWTPPoint Load
Non-
Poin
t Sou
rce
Runo
ff Lo
ad
Cont
amin
ated
Site
Load
Tributary &Boundary Loads
WWTP
CSO
CombinedSewer
StormSewerI
ndus
trial
Disc
harg
e
-
WHY?WHY?PCB sources and pathways may be readily identified!PCB sources and pathways may be readily identified!
-
Long Long Duration Duration Problem
Total PCB concentrations with existing sediment condition as a sole source of PCBs
0.010.1
110
1001000
10000
2000 2010 2020 2030 2040 2050Year
Con
cent
ratio
n, p
g/L
RM122.6 RM99.4 RM84.8 RM68.1WQC WQC
Problem
• Modeling showed that even if all PCB loads could be instantaneously shut off, criteria wouldn’t be achieved for ~35 years due to sediment alone
-
Implementation of theImplementation of theStage 1 PCB TMDLsStage 1 PCB TMDLs
• Dischargers to receive non-numeric water quality-based effluent limits (WQBELs) consistent with their WLAs;– 40 CFR 122.44(k)allows non-numeric, BMP-based WQBELs
where appropriate
• DRBC may require other actions to implement TMDLs;• Typical permit will include discharge monitoring with
Method 1668A and Implementation of a PCB pollutant minimization program;
From“TOTAL MAXIMUM DAILY LOADS FOR POLYCHLORINATED BIPHENYLS
(PCBs) FOR ZONES 2 -5 OF THE TIDAL DELAWARE RIVER”December 15, 2003Executive Summary, Pages xii and xiii
-
2 Tracks in Developing the PMP Approach2 Tracks in Developing the PMP Approach
Outlines
• Developed by interagency workgroup
• To articulate a consistent recommended framework
• Communicates the elements we think are necessary for success
Rule
• Authorizes DRBC to require plans sooner rather than later
•• Adopted May 18, 2005Adopted May 18, 2005•• Can require PMPs from Can require PMPs from
nonnon--point sourcespoint sources•• Resolution expressed a Resolution expressed a
goal of achieving 50 goal of achieving 50 percent reduction in percent reduction in aggregate loads within aggregate loads within the next 5 years the next 5 years
-
Interagency WorkgroupInteragency WorkgroupPA Jenifer FieldsNJ Melisse Carasia-Auriti
Pilar PattersonDE John DeFrieceEPA II Maureen KrudnerEPA III Brian Trulear
Roberta RiccioDRBC John Yagecic
Bob TudorPam Bush
-
General Minimization Plan ComponentsGeneral Minimization Plan Components• Facility Description• Statement of Support and Identification of Team• Proposed Schedule• Actions for Known / Probable Sources• Actions to Find and Control unknown Sources• Previous Minimization Activities•• Measuring, Demonstrating, and Reporting Measuring, Demonstrating, and Reporting
ProgressProgress– Establishing a Baseline– Estimated Load Reduction
• Continuing Assessment
-
Guiding PrinciplesGuiding Principles
Dischargers know best how to reduce loadsDischargers know best how to reduce loads
– PMP requirement not prescriptive– Provides a consistent framework for communicating
the plan– Dischargers know their facilities better than regulators– Wide flexibility for achieving reductions
• Different facilities will have different approaches• What works for one may not work for another• Encourage creative solutions
-
Guiding Principles (continued)Guiding Principles (continued)
Plans need to articulate specific actionsPlans need to articulate specific actions
– Other examples (from outside the basin) we considered were insufficient.
• “We’ll look for the pollutant. If we find it, we’ll get rid of it.”
– Need a real plan of action• What, when, how, and what’s the impact
-
Guiding Principles (continued)Guiding Principles (continued)
Measuring and Demonstrating Progress is Measuring and Demonstrating Progress is the highest prioritythe highest priority
– Allows for an iterative Adaptive Management approach
– Pollutant minimization approach is a risk– Will succeed or fail depending on demonstration of
reducing loads to the estuary
-
Guiding Principles (continued)Guiding Principles (continued)Many ways to measure and demonstrate Many ways to measure and demonstrate
progressprogress
– For some sites, analytical uncertainties may mask effluent concentration reductions – consider other options
• Influent concentration reductions• PISCES effluent sampling• PCB mass removed from site / system• Demonstrate reductions in a surrogate parameter such as solids,
OC• Effluent volume reductions (if likely to reduce PCB mass)
• Ultimately need to compute an estimated PCB effluent load reduction
-
The RuleThe RuleDRBC Water Quality Regulations Section 4.30.9DRBC Water Quality Regulations Section 4.30.9
“Pollutant Minimization Plans for Toxic Pollutants”“Pollutant Minimization Plans for Toxic Pollutants”
• Adopted May 18, 2005• Authorizes Commission to require pollutant
minimization plans from both point and non-point discharges impacting water bodies where:– Commission determines that assimilative capacity for
toxic pollutant has been exceeded; or– TMDLs for toxic pollutants have been established.
-
PMP ProceduresPMP Procedures
• DRBC will notify facilities by letter that they must develop a PMP;
• Plans to be submitted within 90 days of notification by DRBC;
• Plans submitted to DRBC and state;• Completeness Review by DRBC;• Peer Review Advisory Committee to
evaluate PMPs in light of 50% / 5-year goal and circumstances of each site.
-
Will PMP Approach Work?Will PMP Approach Work?Early Signs of Success• Rail facility in Wilmington, DE demonstrated ~
90% reduction in PCBs in surface runoff via erosion control;
• Chemical manufacturer in Wilmington, DE demonstrated initial 22 to 32% load reduction through raw material change with a 90% goal by 2007 through raw material changes, process changes, settling, and sand filtration;
• Refinery in southeast PA eliminated PCB equipment years ago but identified contaminated sediments in a stormwater drainage ditch.
-
PCB Pollutant Minimization PlansPCB Pollutant Minimization Plans•• Rule and Guidance Rule and Guidance
available on DRBC web available on DRBC web sitesite
www.drbc.netwww.drbc.net
•• Contact John Yagecic at Contact John Yagecic at 609609--883883--9500 x2719500 x271
PCB Pollutant Minimization Plans: Background and GuidanceWhy?Ambient Concentrations Vs. Criteria (Log Scale)Load Vs. FluxesEstimated Loads by Categoryand UncertaintyOriginal Sources of PCBs not the same as Loading Source CategoriesWHY?PCB sources and pathways may be readily identified!Long Duration ProblemImplementation of theStage 1 PCB TMDLs2 Tracks in Developing the PMP ApproachInteragency WorkgroupGeneral Minimization Plan ComponentsGuiding PrinciplesGuiding Principles (continued)Guiding Principles (continued)Guiding Principles (continued)The RuleDRBC Water Quality Regulations Section 4.30.9 “Pollutant Minimization Plans for Toxic Pollutants”PMP ProceduresWill PMP Approach Work?PCB Pollutant Minimization Plans