pcb pollutant minimization plans: background and guidance“pollutant minimization plans for toxic...

20
PCB Pollutant Minimization Plans: PCB Pollutant Minimization Plans: Background and Guidance Background and Guidance New Jersey Water Environment Association PCB Pollutant Minimization Workshop July 28, 2005 Rutgers University EcoComplex Bordentown, NJ John Yagecic, P.E.

Upload: others

Post on 09-Feb-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

  • PCB Pollutant Minimization Plans: PCB Pollutant Minimization Plans: Background and GuidanceBackground and Guidance

    New JerseyWater Environment Association

    PCB Pollutant Minimization WorkshopJuly 28, 2005

    Rutgers University EcoComplexBordentown, NJ

    John Yagecic, P.E.

  • • In December 2003, EPA Regions 2 & 3 issued TMDLs for PCBs in the Delaware Estuary.

    • Zones 2 through 5

    • River Mile 133.4 at the head of tide at Trenton, NJ down to the head of Delaware Bay at River Mile 48.2.

  • Why?Why?Ambient Concentrations Vs. Criteria (Ambient Concentrations Vs. Criteria (Log Scale)Log Scale)

    1

    10

    100

    1,000

    10,000

    100,000

    0 20 40 60 80 100 120

    River Mile

    Wat

    er C

    olum

    n To

    tal P

    CB

    Con

    cent

    ratio

    n (p

    g/L)

    9/18/2001 3/15/2002 4/11/2002 5/6/200210/8/2002 3/19/2003 4/2/2003 8/19/20029/3/2002 9/23/2002 11/21/2002 Maximum ConcentrationMinimum Concentration Water Quality Criteria

    44.4 pg/L44.8pg/L

    7.9pg/L

    Zone 2Zone 3Zone 4Zone 5Zone 6

    Head of Tide

    Mouth of B

    ay

    Ben Franklin Bridge

    C&D

    Canal

    Ambient Concentrations exceed criteria by 2 to 3 orders of magnitude

  • Load Vs. FluxesLoad Vs. Fluxes

    Contaminated Site Loads

    Upstream Boundary LoadDelaware River at Trenton, NJ

    SedimentFlux

    AtmoshphericWet / Dry

    Deposition

    AtmoshphericGas phase

    flux

    Upstream Boundary LoadSchuylkill River

    Non-Point Source LoadsTributary Loads

    Point Discharge Loads

    Sediment

    C&D Canal(tidal boundary)

    Ocean BoundaryMouth of Delaware Bay

    CSOs

    LEGEND

    External Loads(forcing functions)

    Fluxes and tidal boundaries

  • Estimated Loads by CategoryEstimated Loads by Categoryand Uncertaintyand Uncertainty

    15.89

    9.226.56

    5.264.00 3.47

    2.34 2.19

    175.13

    834.81

    37.7027.98

    34.3022.18

    1.37

    0.77

    4.27

    0.90 0.78

    1.821.20

    0.32

    5.45

    1.321.95

    2.872.363.18

    5.40

    2.85

    5.47

    14.3017.38

    2.992.693.985.10

    6.937.31

    23.59

    0.10

    1.00

    10.00

    100.00

    1000.00

    ContaminatedSites

    Non-PointSources

    PointDischarges

    Delaware atTrenton

    Schuylkill All otherTributaries

    Atmosphericwet and drydeposition

    CSOs

    Source Category

    Pent

    a PC

    B L

    oad

    (kg)

    Max

    Min

    80th Percentile

    20th Percentile

    Calculated Load

    Legend

  • Original Sources of PCBs not the same as Original Sources of PCBs not the same as Loading Source CategoriesLoading Source Categories

    Transformer

    Atmosphere

    Wet & DryAtmospheric

    Deposition

    GasPhaseFlux

    MS4 L

    oad

    CSO Load

    WWTPPoint Load

    Non-

    Poin

    t Sou

    rce

    Runo

    ff Lo

    ad

    Cont

    amin

    ated

    Site

    Load

    Tributary &Boundary Loads

    WWTP

    CSO

    CombinedSewer

    StormSewerI

    ndus

    trial

    Disc

    harg

    e

  • WHY?WHY?PCB sources and pathways may be readily identified!PCB sources and pathways may be readily identified!

  • Long Long Duration Duration Problem

    Total PCB concentrations with existing sediment condition as a sole source of PCBs

    0.010.1

    110

    1001000

    10000

    2000 2010 2020 2030 2040 2050Year

    Con

    cent

    ratio

    n, p

    g/L

    RM122.6 RM99.4 RM84.8 RM68.1WQC WQC

    Problem

    • Modeling showed that even if all PCB loads could be instantaneously shut off, criteria wouldn’t be achieved for ~35 years due to sediment alone

  • Implementation of theImplementation of theStage 1 PCB TMDLsStage 1 PCB TMDLs

    • Dischargers to receive non-numeric water quality-based effluent limits (WQBELs) consistent with their WLAs;– 40 CFR 122.44(k)allows non-numeric, BMP-based WQBELs

    where appropriate

    • DRBC may require other actions to implement TMDLs;• Typical permit will include discharge monitoring with

    Method 1668A and Implementation of a PCB pollutant minimization program;

    From“TOTAL MAXIMUM DAILY LOADS FOR POLYCHLORINATED BIPHENYLS

    (PCBs) FOR ZONES 2 -5 OF THE TIDAL DELAWARE RIVER”December 15, 2003Executive Summary, Pages xii and xiii

  • 2 Tracks in Developing the PMP Approach2 Tracks in Developing the PMP Approach

    Outlines

    • Developed by interagency workgroup

    • To articulate a consistent recommended framework

    • Communicates the elements we think are necessary for success

    Rule

    • Authorizes DRBC to require plans sooner rather than later

    •• Adopted May 18, 2005Adopted May 18, 2005•• Can require PMPs from Can require PMPs from

    nonnon--point sourcespoint sources•• Resolution expressed a Resolution expressed a

    goal of achieving 50 goal of achieving 50 percent reduction in percent reduction in aggregate loads within aggregate loads within the next 5 years the next 5 years

  • Interagency WorkgroupInteragency WorkgroupPA Jenifer FieldsNJ Melisse Carasia-Auriti

    Pilar PattersonDE John DeFrieceEPA II Maureen KrudnerEPA III Brian Trulear

    Roberta RiccioDRBC John Yagecic

    Bob TudorPam Bush

  • General Minimization Plan ComponentsGeneral Minimization Plan Components• Facility Description• Statement of Support and Identification of Team• Proposed Schedule• Actions for Known / Probable Sources• Actions to Find and Control unknown Sources• Previous Minimization Activities•• Measuring, Demonstrating, and Reporting Measuring, Demonstrating, and Reporting

    ProgressProgress– Establishing a Baseline– Estimated Load Reduction

    • Continuing Assessment

  • Guiding PrinciplesGuiding Principles

    Dischargers know best how to reduce loadsDischargers know best how to reduce loads

    – PMP requirement not prescriptive– Provides a consistent framework for communicating

    the plan– Dischargers know their facilities better than regulators– Wide flexibility for achieving reductions

    • Different facilities will have different approaches• What works for one may not work for another• Encourage creative solutions

  • Guiding Principles (continued)Guiding Principles (continued)

    Plans need to articulate specific actionsPlans need to articulate specific actions

    – Other examples (from outside the basin) we considered were insufficient.

    • “We’ll look for the pollutant. If we find it, we’ll get rid of it.”

    – Need a real plan of action• What, when, how, and what’s the impact

  • Guiding Principles (continued)Guiding Principles (continued)

    Measuring and Demonstrating Progress is Measuring and Demonstrating Progress is the highest prioritythe highest priority

    – Allows for an iterative Adaptive Management approach

    – Pollutant minimization approach is a risk– Will succeed or fail depending on demonstration of

    reducing loads to the estuary

  • Guiding Principles (continued)Guiding Principles (continued)Many ways to measure and demonstrate Many ways to measure and demonstrate

    progressprogress

    – For some sites, analytical uncertainties may mask effluent concentration reductions – consider other options

    • Influent concentration reductions• PISCES effluent sampling• PCB mass removed from site / system• Demonstrate reductions in a surrogate parameter such as solids,

    OC• Effluent volume reductions (if likely to reduce PCB mass)

    • Ultimately need to compute an estimated PCB effluent load reduction

  • The RuleThe RuleDRBC Water Quality Regulations Section 4.30.9DRBC Water Quality Regulations Section 4.30.9

    “Pollutant Minimization Plans for Toxic Pollutants”“Pollutant Minimization Plans for Toxic Pollutants”

    • Adopted May 18, 2005• Authorizes Commission to require pollutant

    minimization plans from both point and non-point discharges impacting water bodies where:– Commission determines that assimilative capacity for

    toxic pollutant has been exceeded; or– TMDLs for toxic pollutants have been established.

  • PMP ProceduresPMP Procedures

    • DRBC will notify facilities by letter that they must develop a PMP;

    • Plans to be submitted within 90 days of notification by DRBC;

    • Plans submitted to DRBC and state;• Completeness Review by DRBC;• Peer Review Advisory Committee to

    evaluate PMPs in light of 50% / 5-year goal and circumstances of each site.

  • Will PMP Approach Work?Will PMP Approach Work?Early Signs of Success• Rail facility in Wilmington, DE demonstrated ~

    90% reduction in PCBs in surface runoff via erosion control;

    • Chemical manufacturer in Wilmington, DE demonstrated initial 22 to 32% load reduction through raw material change with a 90% goal by 2007 through raw material changes, process changes, settling, and sand filtration;

    • Refinery in southeast PA eliminated PCB equipment years ago but identified contaminated sediments in a stormwater drainage ditch.

  • PCB Pollutant Minimization PlansPCB Pollutant Minimization Plans•• Rule and Guidance Rule and Guidance

    available on DRBC web available on DRBC web sitesite

    www.drbc.netwww.drbc.net

    •• Contact John Yagecic at Contact John Yagecic at 609609--883883--9500 x2719500 x271

    PCB Pollutant Minimization Plans: Background and GuidanceWhy?Ambient Concentrations Vs. Criteria (Log Scale)Load Vs. FluxesEstimated Loads by Categoryand UncertaintyOriginal Sources of PCBs not the same as Loading Source CategoriesWHY?PCB sources and pathways may be readily identified!Long Duration ProblemImplementation of theStage 1 PCB TMDLs2 Tracks in Developing the PMP ApproachInteragency WorkgroupGeneral Minimization Plan ComponentsGuiding PrinciplesGuiding Principles (continued)Guiding Principles (continued)Guiding Principles (continued)The RuleDRBC Water Quality Regulations Section 4.30.9 “Pollutant Minimization Plans for Toxic Pollutants”PMP ProceduresWill PMP Approach Work?PCB Pollutant Minimization Plans