    Sr. No. Equipemen Specification Qty Unit

    1 Hypo Dosing System 3500 LPH @ 6 bar 2 Nos

    2 Fecl3 Dosing system 3500 LPH @ 6 bar 2 Nos

    3 UF Feed Pump with motor 800 m3/Hr @ 20 m H; SS 8 Nos

    4 Pre UF Cartridge Filter 10 30" L 2300 Nos

    5 Cartridge Filter Housing SS housing 575 Nos

    6 UF Membrane 8" Dia X 40" Long, Terga 8 3200 Nos

    7 UF Membrane Housing E-codeline 6 elt long 534 Nos

    8 PT & Membrane Accessories As required 1 Lot9 CIP System for UF Hypo, Caustic & Hcl 1 Set

    10 MCF for CIP system As required 575 Nos

    11 RO I Feed Pump 900 m3/Hr @ 35 m H; SS 6 Nos

    12 Pre RO cartridge Filter 5 , 40" long 2060 Nos

    13 Cartridge Filter Housing SS housing 515 Nos

    14 Antiscalant Dosing System 360 LPH 2 Nos

    15 SMBS Dosing System 360 LPH 2 Nos

    16 High Pressure Pump 900m3/hr @ 60 bar 6 Nos

    17 ORP meter with dump valve As required 1 Nos

    18 RO Membrane 8" Dia X 40" Long, Dow 1008 nos

    19 Membrane Housing E-codeline 6 elt long 168 nos

    20 ERD system As Required 1 No

    21 RO II feed pump 406 m3/Hr @ 35 m Head 2 Nos

    22 HPP 406 m3/Hr @ 18 bar 2 nos

    23 RO Membrane 8" Dia X 40" Long, Dow 324 nos

    24 Membrane Housing E-codeline 6 elt long 54 nos

    25 EDI System 375 m3/hr 1 no

    TOTAL MECHANICAL COSTING

    26 Interconnecting pipework As requiored 1 set27 Control & Instrumentation As Required 1 Set

    28 Electrical Work As Required 1 Set29 Automation programming As Required 1 Set

    TOTAL COSTING

  • 8/4/2019 Pay Back Estimation

    2/9

    Unit Cost Total Cost P&F ED CST/VAT Insurance Freight

    240000 480000 9600 40343.04 10598.861 9600 27507.09504

    240000 480000 9600 40343.04 10598.861 9600 27507.09504

    795000 6360000 127200 534545.28 140434.91 127200 364469.0093

    240 552000 11040 46394.496 12188.69 11040 31633.1593

    30000 17250000 345000 1449828 380896.56 345000 988536.228

    32000 102400000 2048000 8606515.2 2261090.3 2048000 5868180.275

    42000 22428000 448560 1885028.5 495231.77 448560 1285269.016

    124828 124828 2496.56 10491.544 2756.3221 2496.56 7153.4492911120000 1120000 22400 94133.76 24730.675 22400 64183.22176

    360 207000 4140 17397.936 4570.7587 4140 11862.43474

    850000 5100000 102000 428644.8 112612.9 102000 292262.8848

    320 659200 13184 55404.442 14555.769 13184 37776.41052

    30000 15450000 309000 1298541.6 341150.83 309000 885384.6216

    150000 300000 6000 25214.4 6624.288 6000 17191.9344

    150000 300000 6000 25214.4 6624.288 6000 17191.9344

    800000 4800000 96000 403430.4 105988.61 96000 275070.9504

    700000 700000 14000 58833.6 15456.672 14000 40114.5136

    30000 30240000 604800 2541611.5 667728.23 604800 1732946.988

    35000 5880000 117600 494202.24 129836.04 117600 336961.9142

    20000000 20000000 400000 1680960 441619.2 400000 1146128.96

    420000 840000 16800 70600.32 18548.006 16800 48137.41632

    350000 700000 14000 58833.6 15456.672 14000 40114.5136

    30000 9720000 194400 816946.56 214626.93 194400 557018.6746

    35000 1890000 37800 158850.72 41733.014 37800 108309.1867

    25000000 25000000 500000 2101200 552024 500000 1432661.2

    272981028

    40947154.2 818943.08 3441526.4 904152.47 818943.08 2346535.96321838482.2 436769.64 1835480.8 482214.65 436769.64 1251485.845

    13649051.4 272981.03 1147175.5 301384.16 272981.03 782178.654320000000 400000 1680960 441619.2 400000 1146128.96

  • 8/4/2019 Pay Back Estimation

    3/9

    Overall Cost

    577649

    577649

    7653849

    664296

    20759261

    123231786

    26990649

    1502221347848

    249111

    6137521

    793305

    18593077

    361031

    361031

    5776490

    842405

    24068708

    1010886

    842405

    11697392

    2274493

    30085885

    4927725526281203

    1642575224068708

    401099867

  • 8/4/2019 Pay Back Estimation

    4/9

    RATE OF PRODUCTION( M3/Hr)

    Expected Margin Rs.

    PRICE FIXED / MINIMUM BILLING PER MONTH 11302294 11302294.00MAXIMUM BILLING/MONTH 14321923.83 14321924.00

    RATE Rs./M 16 16.00

    MAXIMUM M/DAY 30240 30240.00

    PROFITABILITY STATEMENT

    a. CONSUMABLE 8028900.00 8028900.00 4,014,450.00 50.00% 3,412,282.50

    b. CLEANING CHEMICALS 129600000.00 129600000.00 64,800,000.00 50.00% 55,080,000.00

    c. OPERATING CHEMICALS 664848.00 664848.00 332,424.00 50.00% 282,560.40

    d. SPARES 8021997.00 8021997.00 4,010,998.50 50.00% 3,409,348.73

    e. PORTABLE LABORATORY COST 96350.00 96350.00 - 0.00% -

    j. MANPOWER 6562533.00 6562533.00 2,165,635.89 33.00% 2,165,635.89

    O&M Cost Amountn in ( Rs) 171,863,086.00 171,863,086.00 75,323,508.39 64,349,827.52

    l. MONTHLY BILLING ON FULL CAPACITY RUN ( 58400) 14321923.83 14321924.00 Minimum

    m. TOTAL MARGINS ON FULL CAPACITY RUN / MONTH 6276959.03 6233208.82

    n. MINIMUM BILLING / MONTH for 49,600M3 11302294 11302294.00

    o. MARGINS ON MINIMUM BILLING for 49600m3 5,362,485.63 5362485.63 (Minimum Billing )(Full Capacity Run

    43.83% 55.54%

    Expected Margine in Rs for full

    capacity production M3/ Year

    Expected Margine in Rs

    for Minimum production

    M3/ Month

    AS per Costin

    SheetQuoted Price

    Full Capacity

  • 8/4/2019 Pay Back Estimation

    5/9

    AQUACARE RESTRICTED (Confidential)

    M Type Comprehensive [Manpower; Maintenance coordination; Materials; Consumables; Tools & Tackles in -------- Scope]

    24 Hours operation

    UF Feed Flow

    RO I Feed Flow 3600 M3/Hr RO Permeate Flow 1260 M3/HrProduction /Day by RO-I 30240

    Production /Month 919800

    Production /year 11037600 `

    ract Duration System recovery 35.00 %

    RATE OF PRODUCTION( M3/Hr) M3/HR

    Head Of Expenses Amount ( Rs) Costing By %Expected

    Profitability/Mark Up (%) Expected Profit in ( Rs)

    1.00 Consumables 8,028,900 4.67 0.75 50% 4,014,450.00

    2.00 Portable Laboratory cost 96,350 0.06 0.01 0% -

    3.00 Manpower Cost 6,562,533 3.82 0.61 33% 1,640,633.33

    4.00 Operating Chemicals 664,848 0.39 0.06 50% 332,424.00

    5.00 CIP Chemicals 129,600,000 75.41 12.07 50% 64,800,000.00

    6.00 Misc Expenses On Chemicals 9,118,539 5.31 0.85 0% -7.00 Spares 8,021,997 4.67 0.75 50% 4,010,998.50

    8.00

    Membrane & Capital Equipment

    Insurance Premium 9,000,000 5.24 0.84 0.00% -

    Gross Expenses /Annumn 171,093,167 99.55 15.93 -

    Penalty @ 5 % 0 - - 0% -

    TPC @ 5 % 0 - - 0% -Cost of Finance 769,919 0.45 0.07 0% -

    O&M Cost /Anum 171,863,086 100.02 16.01 Money in Vallet 74,798,505.83

    O&M Cost /Month 14,321,924Profit/Month

    ( Rs) 6,233,208.82

    FIX COST (Rs) /Month 11,302,294 78.92% 43.52%

    PRODUCTION CELLING LIMIT

    ( M3/MONTH) 689,850 16

    Operating Cost /m3 on full capacity 16 Variable Cost 16.00

    Cost /Ltr ( Ps/Ltr) 1.614,716,800.00Daily Production( M3) 30,240

    Monthly Production in M3 919,800

    Approved ByEstimated By

    PROFITABILITY OVER VIEW

    Average profit in (%) on full billing

    Checked by

    Operating Cost per M3 on Fix Billing

    EXECUTIVE SUMMARY OF ESTIMATION VS PROFITABILITY

    Project Name

    Unit / Phase

    Operating Hrs

    Plant Scheme Desalination System Sea Water Collection Tank -->Chlorination --> Ferric Chloride --> UF System --> RO System --> EDI

    Feed Flow 4000 m3/hr

    Costing By (Rs./M3)

    1260

    Maximum Billing ON Full Production (Fixed Cost +Variable )

  • 8/4/2019 Pay Back Estimation

    6/9

    AQUACARE RESTRICTED (Confidential)

    Sr.No Head of Expense Technical Input /Infor

    Quantity Assumed (

    Yearly ) Unit Rate Cost /Annum ( Rs) REMARK

    1 Consumable

    Micron Cartridge Filter

    Once in Three Months

    if SDI

  • 8/4/2019 Pay Back Estimation

    7/9

    AQUACARE RESTRICTED (Confidential)

    2 Spares

    Project Cost ( Approximately)

    Selling Price of Project

    to be considered 401,099,867 Rs 2.00% 8021997.34

    The Capital Equipments & components

    like Membrane, EDI , UF membrane Etc..

    Will be in client scope.

    3 Membrane Insurance

    a RO Memembrane Insurance @1%10 Pv X Six element = 180

    BW-30-365 900 No 30,000 9000000.00

    Capital Equipment Cost to be

    born By Customer

    b UF Membrane insurance @1% Model No X 42 , SFP 2860 - No 56,000 0.00

    Capital Equipment Cost to be

    born By Customer0.0 0.0 0.00

    9000000.00

    4 CIP CHEMICALS

    a RO CIP Chemicals

    Eight Sets perCleaning for Each

    stream 432,000 Kgs 300 129,600,000 The CIP assumed once in three months

    b

    HCL Consumption For UF CEB @1000

    ppm for 0.33 Minutes 1.44 Kg/Day as

    100% 4.4 Kgs As 30% 3212.0 Kgs 0.0 Client Scope with 10% safety

    c

    Hypo Consumption @ 1000 ppm , Flow

    262 M3/Hr , Consumption /Day 7.2 Kg

    As 100% 12 0Kgs as 10% 73000.0 Kgs 0.0 0.00 Client Scope with 10% safety

    d

    NaOH Consumption For UFCEB @500

    PPM , Flow -262 M3/Hr , Consumption

    /Day 5.24 Kgs as 100% 6 Kgs /Day as 100% 2190.0 Kgs 0.0 0.00 Client Scope with 10% safety

    129600000.00

    5

    a Chlorination Chemical

    14.2 Kgs/Day as 100%(

    142 Kg/'Day as 10 %) @

    5 PPM 7,776 Kgs 9 69984.00

    RO Operating Chemicals

    Total Capital Equipment Insurance Premium

    Total CIP Chemical Price

    9 70402310.xls.ms_office

  • 8/4/2019 Pay Back Estimation

    8/9

    AQUACARE RESTRICTED (Confidential)

    b Coagulation Chemical

    120 Kg/Day as 100%(

    129 Kg/'Day as 93%)

    for Pre Treatment - Kgs 0.0 0.00

    c Lime Dosing

    720 Kg/Day as 100% (

    900 Kgs as 870%) @ 300

    PPM - Kgs 0.0 0.00

    dSoda Ash Dosing

    2880 Kgs /Day as

    100%( 3388 Kgs /Day as

    85%) @ 1200 PPM - Kgs0.0

    0.00

    e Acid Dosing pump ( H2So4)

    168 Kgs as 100% ( 168

    Kgs as 98%) - Kgs 0.0 0.00

    f NaOH for PH correction 5.76 Kgs /Day as 100% - Kgs 0.0 0.00

    g Poly Electrolyte Chemical 2.4 Kgs /Day at 1 PPM - Kgs 385 0.00

    h Special Antiscalent

    12 Kgs /Day as 100%

    @5 PPM 1,458 Kgs 360 524880.00

    i De -chlorination

    7.2 Kgs as 100%( 11

    Kgs As 64%)@3 PPM 1,458 Kgs 48 69984.00

    664848.00

    6 Miscellaneous ExpensesTaxes Duties & Levies 5% 5.00% 6513242.40

    Packing & Forwarding 2% 2.00% 2605296.96Freight 40000/Month - 12 0.00

    9118539.36Misc Expenses on Chemicals

    Chemical Consumption is

    considered as per Design

    Philosophy /Document

    with 10% safety .

    Chlorination coagulation ,

    Lime , Soda Ash chemical

    will be in client scope.

    Basic Chemical

    Chlorination and FerricChloride considered in

    client scope

    Total Operating Chemical Price

    9 70402310.xls.ms_office

  • 8/4/2019 Pay Back Estimation

    9/9

    AQUACARE RESTRICTED (Confidential)

    6 Quantity /AnnumSalary / Month (

    CTC) No Of Salary

    Assumed Salary

    /Year

    Man Power Cost

    1 Site Manager/Site Incharge 1 60,000.00 Rs 1 60,000

    2 Proces Controller 1 45,000.00 Rs 1 45,000

    3 Plant Operator ( Shift Duty ) 9 15,000.00 Rs 9 1,215,000

    4 Plant Chemist ( Shift Duty ) 4 15,000.00 Rs 4 240,000

    5 DCS Enginner /Shift Engineer 4 14,000.00 Rs 4 224,000

    5 Electrical engineer ( General Shift ) 1 15,000.00 Rs 1 15,000

    6 Instrument Engineer ( General Shift ) 1 15,000.00 Rs 1 15,000

    7 Mechanical Engineer ( General Shift ) 1 15,000.00 Rs 1 15,000

    9 Mechanical Technician (General Shift ) 1 12,000.00 Rs 1 12,000

    10 Electrical Technician ( General Shift ) 1 12,000.00 Rs 1 12,000

    11 Inst. Technician ( General Shift ) 1 12,000.00 Rs 1 12,000

    12 Fitters ( General Shift ) - 11,000.00 Rs - -

    13

    Co-Coordinator /Stor incharge

    ( General Shift ) 1 12,000.00 Rs - -

    14 Helpers ( General Shift ) - 9,000.00 Rs - -

    15 Helpers ( Shift Duty) 15 9,000.00 Rs 15 2,025,000

    TOTAL 41 3,890,000

    ESI , PF & Insurance @3% 3% 116700.00Overhead @18% 18% 700200.00

    Tools &tackles Rs.10000 Per Annum 10,000 10000.00

    Accommodation 20,000 Rs./Month - 0.00

    Stationary Rs.3000/Anum 10,000 10000.00Safety& Uniform Rs. 3000 /Person 3,000 123000.00

    Mobilization charge - 0.00

    Conveyance Rs. 30000/Month - 0.00

    Communication facility Rs.4000 per Month 12,000 12000.00

    HO Expert Visit 12 5,000 60000.00

    Price For Manpower 4921900.00

    6562533.33

    1 Total hardness Kit - 500 0.00

    2 SDI Twice In a Day 365 Test 40 14600.00

    3 SDI Kit 1 15,000 15000.00

    3 TDS Scan 2 4,000 8000.00

    4 Chlorotax Bottle 365 150 54750.00

    5 PH Scan 1 4,000 4000.00

    96350.00

    Manpower Cost with Mark Up

    Lab facility to be provide by Chemplast

    Sanmar.

    POTABLE LABORATORY & TESTING KITS :

    Cost Expected towards Portable Lab.

    9 70402310.xls.ms_office