padre dam mwd staffing workshop

145
1 Padre Dam MWD Staffing Workshop May 17, 2010 Presented by: The Management Team

Upload: others

Post on 14-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Padre Dam MWD Staffing Workshop

1

Padre Dam MWD Staffing Workshop

May 17, 2010

Presented by:

The Management Team

Page 2: Padre Dam MWD Staffing Workshop

2

1.Workshop Goals

2.Introduction & Historical Data

3.Department Services and Organization- Operations- Engineering - Finance- Communications- Human Resources- Administration

4.Questions & Answers

Agenda

Page 3: Padre Dam MWD Staffing Workshop

3

1. Clearly define the services that Padre Dam MWD provides;

2. Identify the staff positions that provide our services;

3. Provide a historical perspective in terms of District service area changes and how they relate to staffing levels;

4. Examine efficiencies currently deployed in the District.

Workshop Goals

Page 4: Padre Dam MWD Staffing Workshop

4

“Organizations in every industry are becoming more and more aware that high-performing employees are the most critical source of their strategic success.”

Dan BoccabellaSenior Director at SumTotal Systems, Inc.

Page 5: Padre Dam MWD Staffing Workshop

5

“…to provide quality water, recycled water, park & recreational facilities, and wastewater management services to our customers. We accomplish this Mission in the most cost-effective manner possible, earning the Customer and Community Respect”

Mission

Page 6: Padre Dam MWD Staffing Workshop

6

AGE 45

AGE 55

2000/01 2009/10

On average, actual staffing levels have

been 3.6FTE lower than budget.

Historical Data

2007/085-Year Plan

Actual123

130136

131139 139 140

155 155 155

Budget133 131

142147

142 142 140

150155 156

Page 7: Padre Dam MWD Staffing Workshop

7

AGE 45

AGE 55

2000/01 2009/10

Historical Data

2007/085-Year Plan

Actual123

130136

131139 139 140

155 155 155

Population

126051126759

127467128161

127562 127894 128103

130458

132509

136424

Page 8: Padre Dam MWD Staffing Workshop

8

AGE 45

AGE 55

2000/01 2009/10

Historical Data

2007/085-Year Plan

Actual123

130136

131139 139 140

155 155 155

486496

505

544550 552

557566

584 588

Pipeline (mi)

102 miles of additional pipeline to maintain

Page 9: Padre Dam MWD Staffing Workshop

9

AGE 45

AGE 55

2000/01 2009/10

Historical Data

2007/085-Year Plan

Actual123

130136

131139 139 140

155 155 155

106.3 106.3 106.3 106.3 106.3 106.3 106.3

107.8108.8 108.8

Gallons of water (mil)

2 million gallon increase in water storage, protection and quality management.

Page 10: Padre Dam MWD Staffing Workshop

10

AGE 45

AGE 55

2000/01 2009/10

Historical Data

2007/085-Year Plan

Actual123

130136

131139 139 140

155 155 155

4

20 2119

27

21

45

49 50

Line Breaks

Line break frequency directly relates to the age of our District’s infrastructure.

Page 11: Padre Dam MWD Staffing Workshop

11

AGE 45

AGE 55

2000/01 2009/10

Historical Data

2007/085-Year Plan

Actual123

130136

131139 139 140

155 155 15590

137

207

118106

184163

144156

Valves Replaced

Page 12: Padre Dam MWD Staffing Workshop

12

AGE 45

AGE 55

2000/01 2009/10

Historical Data

2007/085-Year Plan

Actual123

130136

131139 139 140

155 155 155

129,250 132,599 125,189

226,990

CCTV Footage

Page 13: Padre Dam MWD Staffing Workshop

13

- Padre Dam has $250 million in existing infrastructure.

- 136,000 people rely on Padre Dam for 24/7 water and wastewater services.

- A direct correlation exists between:

Backdrop

Staffing Levels

Appropriate Infrastructure Maintenance & Improvement

&

Page 14: Padre Dam MWD Staffing Workshop

14

According to the “2009 Report Card for America’s Infrastructure”through the American Society of Civil Engineers:

“America’s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply with existing and future federal water regulations.”www.infrastructurereportcard.org

Backdrop

Page 15: Padre Dam MWD Staffing Workshop

15

- Our District is 55 years old (pre–WWII pipes in some areas)

- The Five-Year Business Plan has increased our efforts to appropriate levels in terms of preventative & predictive maintenance & infrastructure improvements.

- Years from now, the Board and Management of Padre Dam will be judged based on the work we did to maintain and improve the infrastructure placed under our supervision and care.

Backdrop

Page 16: Padre Dam MWD Staffing Workshop

16

- Efficiency in our deployment of services is a requirement... A mandate from our customers.

- We are committed to efficiency with regard to the allocation of human resources.

- We recognize the need to continually examine our functions and organizational structure to realize the greatest efficiencies possible.

Backdrop

Page 17: Padre Dam MWD Staffing Workshop

17

Operations Department

Page 18: Padre Dam MWD Staffing Workshop

18

Operations24/7/365

Providing Safe Drinking Waterand

Wastewater Collections/Recycled Water

• Water Quality and Fire Flow Management• Emergency Response• After Normal Working Hours• Meet or Exceed all Compliance Issues with Regulatory Agencies

Page 19: Padre Dam MWD Staffing Workshop

19

Operations

• Operations is the Largest Department at Padre Dam MWD• 85 Employees = 82.5 FTE• 16 Cost Centers• Water Supply Permit / Licensed Operators• Staff Increase for 5-Year Business Plan• Maintenance Programs Created that were Never Being Done

Page 20: Padre Dam MWD Staffing Workshop

20

Page 21: Padre Dam MWD Staffing Workshop

21

Water DeliveryDistribution/SCADA Department

• Shift work 24-Hour Coverage/Dynamic Hydraulics/ Potable Water Distribution

• Water Sample Compliance• California Department of Public Health (CDPH) Compliance• Site Security/Alarms• Operate 387 Miles of Potable Water Pipelines• 33 Miles of Recycled Water Pipelines• 27 Reservoirs • 17 Pump Stations• 17 Pressure Reducing Stations• 7 Flow Control Facilities

Page 22: Padre Dam MWD Staffing Workshop

22

Cross Training

• Operations Takes Full Advantage of Cross Training• Pump Techs / AMR / Distribution Operators/ and Electricians as

Examples• Current Economic Cycle / Developer Work• Org Charts May Not Reflect Where Employees are at a Certain Time

Page 23: Padre Dam MWD Staffing Workshop

23

Page 24: Padre Dam MWD Staffing Workshop

24

Distribution System Maintenance (14 Employees),

SCADA (1 Employee) & Electrical (3 Employees)

• Main Flushing/Dead Ends• Valve Exercising• Fire Hydrant Maintenance• Sample Collections for Construction Projects• SCADA Maintenance• Cathodic Protection/Coatings Maintenance and Repairs • Valve Replacement Program• Pump Replacements• Chloramination Station Operation & Maintenance• Electrical Department-Electricians• Reservoir Inspections• Pump & Motor Reconditions • Calibration Program

Page 25: Padre Dam MWD Staffing Workshop

25

Page 26: Padre Dam MWD Staffing Workshop

26

Page 27: Padre Dam MWD Staffing Workshop

27

Page 28: Padre Dam MWD Staffing Workshop

28

Compliance/Backflow DepartmentRecycled Water Distribution System

2 Employees

• Backflow Device Tracking/Yearly Testing & Compliance of 2,351 Backflow Units

• Cross-Connection Shut-Down Tests (32) Per Year, 300 Turn-offs• CDPH Annual Compliance• Backflow Incidents are the Number 1 Threat to Public Health • Coordination with Recycled Water Customers

Page 29: Padre Dam MWD Staffing Workshop

29

Page 30: Padre Dam MWD Staffing Workshop

30

Meter Technician Department6 Employees

• Automated Meter Reading (AMR) System Installed• 22,282 Meters Installed• Software Deployment/Customer Interface Beginning• Tracking New/Unknown Issues from AMR Going Forward• Assessing New Workload Issues and Staff Realignment • Meter Re-reads; Field Check Errors • Duties Interface and Assist Customer Service Department • First Line of Customer Service Interface in the Field

Page 31: Padre Dam MWD Staffing Workshop

31

Other Duties

• New & Discontinuance of Service • Leak Checks; Water Use Violations • Shut-Off Notifies (570 per month average) • Non-payment Shut-offs (45 per month average) • High & Low Pressure Calls • Meter Box Maintenance • Rebuild & Test Meters • Install New Meters - Replace Dead Meters • Construction Meter Sets • Construction Meter Repairs• Sequence New and Existing Routes • Replace Damaged Meter Boxes • Return to Sewer Audits

Page 32: Padre Dam MWD Staffing Workshop

32

Page 33: Padre Dam MWD Staffing Workshop

33

20 Employees

Page 34: Padre Dam MWD Staffing Workshop

34

• 160 Miles of Sewer Collection Lines• 4 Lift Stations• Influent Pump Station (IPS)• Odor Control Facilities• Vactor Crews for Line Maintenance• Mandatory Compliance for Sewer Overflows/ Full System Assessment

with CCTV by 2012• Industrial Waste Compliance & Monitoring• Grease Trap Program• Sewer Strength Monitoring • CCTV Collection Lines 50-75 Miles Per Year• After Hours Emergency Response• Complete System Cleaning Turn Around Every Two Years • (SSO)-Sanitary Sewer Overflow & (WDR) Waste Discharge Requirements

Wastewater Collection System Department (10 Employees)and Industrial Compliance (1 Employee)

Page 35: Padre Dam MWD Staffing Workshop

35

Page 36: Padre Dam MWD Staffing Workshop

36

Page 37: Padre Dam MWD Staffing Workshop

37

Construction and Maintenance Department(23 Full-Time Employees, 1 Temporary Full-time Employee)

Warehouse Operations (2 Full-time Employees)

• Water Main & Service Lateral Break Repairs• Sewer Break Repairs• Valve Replacement Program• Heavy Equipment Operation• General Construction• Heavy Maintenance Work Orders• Water Service Installations• Sewer Lateral and Main Installations• Fire Hydrants/Fire Services• Inventory Control/Purchasing• Supplies - In stock for Emergencies

Page 38: Padre Dam MWD Staffing Workshop

38

Page 39: Padre Dam MWD Staffing Workshop

39

Page 40: Padre Dam MWD Staffing Workshop

40

Page 41: Padre Dam MWD Staffing Workshop

41

Page 42: Padre Dam MWD Staffing Workshop

42

Page 43: Padre Dam MWD Staffing Workshop

43

Page 44: Padre Dam MWD Staffing Workshop

44

Page 45: Padre Dam MWD Staffing Workshop

45

Page 46: Padre Dam MWD Staffing Workshop

46

Mechanics2 Employees

• Fleet Maintenance of 93 Road Compliant Vehicles and 60 Pieces ofHeavy Equipment

• DOT / CHP Transportation Compliance Programs• Fleet Software Tracking Program • Welding and Fabrication• Sewage Lift Stations• Assist with Pump Station Repairs• Department Use to have 4 Mechanics, Now 2

Page 47: Padre Dam MWD Staffing Workshop

47

Page 48: Padre Dam MWD Staffing Workshop

48

Facilities Maintenance6 Full-Time Employees

1 Temporary Full-Time Employee

• General Maintenance of all 78 off-site District Facilities• Reservoir Site Maintenance• Janitorial• Management of Outsourced Contracts• Emergency Response• Tree Maintenance• Landscaping Issues

Page 49: Padre Dam MWD Staffing Workshop

49

Page 50: Padre Dam MWD Staffing Workshop

50

Page 51: Padre Dam MWD Staffing Workshop

51

44 Employees

Page 52: Padre Dam MWD Staffing Workshop

52

Water Recycling Facility/Laboratory Operations (WRF)6 Plant Employees

3 Laboratory Employees

• Produces 2 MGD of Recycled Water to the Community (Purple Pipe) • Water Flow Support for Padre Dam’s Santee Lakes• Compliance Sampling Programs• Regional Water Quality Control Board (RWQCB) Permit Compliance• National Pollutant Discharge Elimination Permit (NPDES) Compliance• WRF Laboratory Supports Internal Sampling for Operations Environmental

Laboratory Accreditation Program (ELAP) through CDPH • Biological Testing of the San Diego River Basin (Compliance)• Monitoring and Record Keeping

Page 53: Padre Dam MWD Staffing Workshop

53

Page 54: Padre Dam MWD Staffing Workshop

54

Page 55: Padre Dam MWD Staffing Workshop

55

Page 56: Padre Dam MWD Staffing Workshop

56

Laboratory (3 employees) fall under the supervision of the Director of Operations and Water Quality.

6 Employees

Page 57: Padre Dam MWD Staffing Workshop

57

Operations Administration

• Administrative and Organizational Oversight of 85 Employees in 16 Cost Centers

• Operating Budget Oversight• CIP Evaluations• Fleet Management and Purchasing• Rate and TOU Management• Project Design & Oversight• We Do Not Hire Staff for any Positions We Do Not Need in Operations

Page 58: Padre Dam MWD Staffing Workshop

58

Regulatory Agencies

Jurisdiction Agency Regulates or OverseesFederal Environmental Protection Agency (EPA)

Risk Management Plan, Vulnerability Assessments, Hazard MitigationDepartment of Transportation (DOT)Commercial Drivers LicenseVehicle Inspections, Random Drug and Alcohol ScreeningEqual Employment Opportunity Commission (EEOC) Americans with Disabilities Act (ADA)Federal Emergency Management Agency (FEMA)National Incident Management System Compliance (NIMS) Incident Command System ICS)

Page 59: Padre Dam MWD Staffing Workshop

59

Jurisdiction Agency Regulates or OverseesState Department of Public Health (DPH)

Water Supply PermitOperator CertificationSanitary SurveyAnnual Water Quality ReportDepartment of Toxic Substance Control (DTSC)Hazardous Waste DisposalDepartment of Motor Vehicles (DMV)Commercial Drivers License, Vehicle RegistrationsSmog Inspection ComplianceCalifornia Highway Patrol (CHP)BIT Inspections

Page 60: Padre Dam MWD Staffing Workshop

60

Jurisdiction Agency Regulates or OverseesState California Air Resources Board (CARB)

Diesel Engine Regulations Diesel Engine Smog ChecksDiesel Generator EnginesRegional Water Quality Control Board (RWQCB)WRF Permit to Operate Sewer Spill Compliance Storm Water Compliance Operator Certification

Page 61: Padre Dam MWD Staffing Workshop

61

Jurisdiction Agency Regulates or OverseesState Office of Emergency Services (OES)

Hazard MitigationDisaster PreparednessEmergency ManagementCalifornia Occupational Safety and Health (CAL-OSHA) Construction Activities, Trenching/Shoring, Inspections of FacilitiesPressure VesselsAsbestosGeneral Industry Safety OrdersInjury and Illness Prevention Plan (IIPP)California Department of Industrial Relations (DIR) Workers CompensationDepartment of Water ResourcesDam Safety

Page 62: Padre Dam MWD Staffing Workshop

62

Jurisdiction Agency Regulates or OverseesCounty Air Pollution Control District (APCD)

Diesel GeneratorsFuel Filling Stations Odor Control SystemsOffice of Emergency Services (OES)Disaster Preparedness Emergency ManagementDepartment of Environmental HealthHazmat Business PlansRecycled WaterSewer SpillsStorm Water DischargeUnderground/Aboveground Fuel Storage Tanks Universal Waste DisposalHazardous Materials Disposal

Page 63: Padre Dam MWD Staffing Workshop

63

Page 64: Padre Dam MWD Staffing Workshop

64

Questions?

Questions?

Page 65: Padre Dam MWD Staffing Workshop

65

Engineering Department

Page 66: Padre Dam MWD Staffing Workshop

66

Engineering Department

27 Employees

Page 67: Padre Dam MWD Staffing Workshop

67

Infrastructure• Replacement

• Expansion

Page 68: Padre Dam MWD Staffing Workshop

68

CORE FUNCTIONS• Feasibility

• Design

• Environmental

• Right of Way

• Agency Coordination

• Construction Management

• Utility Location

• Developer Services 

• Customer Service

• Plan Checking

• Mapping/GIS

• Easement Acquisition

• Inspection

• Post Construction

• Cathodic Protection

Page 69: Padre Dam MWD Staffing Workshop

69

Engineering Department

27 Employees

Page 70: Padre Dam MWD Staffing Workshop

70

Engineering Department

27 Employees

Page 71: Padre Dam MWD Staffing Workshop

71

Planning and Design• Master Planning

• Studies

• Project Feasibility

• Design

• Agency Coordination

• Specifications

• Construction Documents

Page 72: Padre Dam MWD Staffing Workshop

72

• Water

• Wastewater

• Recycled Water

• Park

• WRF

• As‐Builts

• Project Management

• Billing Credits

Page 73: Padre Dam MWD Staffing Workshop

73

Page 74: Padre Dam MWD Staffing Workshop

74

Engineering Department

27 Employees

Page 75: Padre Dam MWD Staffing Workshop

75

Development Services

• Customer Service

• Plan Checking

• Agency Coordination

• Construction Monitoring

• Master Plan Implementation

• Recycled Water Coord.

• Special Projects

Page 76: Padre Dam MWD Staffing Workshop

76

• Developer Conditions & Studies

• Additional Work– County/City Street Improvements/Drainage

– CALTrans

– School Districts

– Forrester Creek

– Fanita Ranch

Page 77: Padre Dam MWD Staffing Workshop

77

Page 78: Padre Dam MWD Staffing Workshop

78

Engineering Department

27 Employees

Page 79: Padre Dam MWD Staffing Workshop

79

Field Engineering

• Construction Management

• Inspection– CIP

– Development

• Utility Locations

• Cathodic Protection

Page 80: Padre Dam MWD Staffing Workshop

80

Engineering Department

27 Employees

Page 81: Padre Dam MWD Staffing Workshop

81

Right of Way/Environmental• Encroachments• Quit Claims• Easements• Property Acquisition• CEQA• Mitigation• NCCP• Cell Sites• Special Projects

Page 82: Padre Dam MWD Staffing Workshop

82

Engineering Department

27 Employees

Page 83: Padre Dam MWD Staffing Workshop

83

GIS• Mapping

• Asset Management

• Applications

• Predictive & Preventative Maint.

• GPS

• Special Projects– Drought

– AMR

– Detachment

• District Wide Support

Page 84: Padre Dam MWD Staffing Workshop

84

Cathodic Protection

4%

Page 85: Padre Dam MWD Staffing Workshop

85

Page 86: Padre Dam MWD Staffing Workshop

86

Questions?

Page 87: Padre Dam MWD Staffing Workshop

87

Finance Department

Page 88: Padre Dam MWD Staffing Workshop

88

FINANCE DEPARTMENTFINANCE DEPARTMENT

Chief Financial Officer/Director of Finance(12 Employees)

Accounting Manager(6 Employees)

Accountant

Accounting Spec.

Accounting Spec.

PT Accounting Spec.

Account Spec./Tech Sup.

Interim Info. Systems Manager(5 Employees)

Info. Sys. Tech Spec.Vacant

Info Sys. Tech Spec.

Programmer/Analyst

Programmer/Analyst

Page 89: Padre Dam MWD Staffing Workshop

89

ACCOUNTINGACCOUNTING

Chief Financial Officer/Director of Finance(12 Employees)

Accounting Manager(6 Employees)

Accountant

Accounting Spec.

Accounting Spec.

PT Accounting Spec.

Account Spec./Tech Sup.

Interim Info. Systems Manager(5 Employees)

Info. Sys. Tech Spec.Vacant

Info Sys. Tech Spec.

Programmer/Analyst

Programmer/Analyst

Page 90: Padre Dam MWD Staffing Workshop

90

Staff (>150 Employees)

Vendors (>1,000 Active)

Board of Directors

Padre Dam Customers

External Entities

Compliance Requirements

ACCOUNTINGACCOUNTING

SERVICE

Page 91: Padre Dam MWD Staffing Workshop

91

ACCOUNTINGACCOUNTINGMAJOR FUNCTIONS

Accounts PayablePayroll

General LedgerBudget

Financial ReportingInvesting

Financing

Page 92: Padre Dam MWD Staffing Workshop

92

Payment ManagementAssist Purchasing ProcessorsReview InvoicesVendor MaintenanceVerify Proper AuthorizationsVendor DiscountsCash Management

Weekly & On Demand

> 100 Checks / >$1M Week

Compliance / Reporting1099s, W9s, DE542

ACCOUNTINGACCOUNTING

ACCOUNTS PAYABLE

Page 93: Padre Dam MWD Staffing Workshop

93

155 employees, 5 Board Members

Bi-Weekly, On Demand & Board

Employee IssuesDeductions, Benefits, Accruals, Leave

ComplianceFederal & State Labor CodesWage & Hour LawsExempt & Non Exempt

Reporting W2s, PERS, IRS, State

ACCOUNTINGACCOUNTING

PAYROLL

Page 94: Padre Dam MWD Staffing Workshop

94

ACCOUNTINGACCOUNTING

BUDGET

Capital, CIP & Operating

Track Performance

Historical Perspective

Projections

Financial Analysis

Work with Departments

Page 95: Padre Dam MWD Staffing Workshop

95

ACCOUNTINGACCOUNTING

FINANCIAL MANAGEMENTRate Setting

Water, Sewer, Pumping, Pass-Through

Investing & Monitoring

Financing: Debt / GrantsAMR, COP, Cabins’ Project, WRF

CovenantsBank, ’04 & ’09 COPs, Rating Agencies

Policies & Procedures

Strategic Planning

Page 96: Padre Dam MWD Staffing Workshop

96

ACCOUNTINGACCOUNTINGFINANCIAL REPORTING

Financial Statements

Program ReportingRetail & Wholesale WaterRecycled WaterSewerPark

IRS/State Reporting

Periodic & Ad Hoc Reporting

Board Projects

Rating Agencies / Bondholders

Annual Audit

Page 97: Padre Dam MWD Staffing Workshop

97

ACCOUNTINGACCOUNTINGCOMPLIANCE

“GAAP” Generally Accepted Accounting Principals

“FASB” Financial Accounting Standards Board

“GASB” Governmental Accounting Standards Board

IRS / State of California

Internal Policies

Government Code

Other LawsProp 218 / AB 3030 / Labor Law

Page 98: Padre Dam MWD Staffing Workshop

98

ACCOUNTINGACCOUNTING

OTHER TASKS

Leases / Other Income

Developer Projects

District Wide Requests

Purchasing Training

General Ledger

Fixed Assets

Bank Reconciliations

Page 99: Padre Dam MWD Staffing Workshop

99

INFORMATION SYSTEMSINFORMATION SYSTEMS

Chief Financial Officer/Director of Finance(12 Employees)

Accounting Manager(6 Employees)

Accountant

Accounting Spec.

Accounting Spec.

PT Accounting Spec.

Account Spec./Tech Sup.

Interim Info. Systems Manager(5 Employees)

Info. Sys. Tech Spec.Vacant

Info Sys. Tech Spec.

Programmer/Analyst

Programmer/Analyst

Page 100: Padre Dam MWD Staffing Workshop

100

Technical Support

Network Support

Hardware & Software Support

Project Support

Programming

Reporting

INFORMATION SYSTEMSINFORMATION SYSTEMS

MAJOR FUNCTIONS

Page 101: Padre Dam MWD Staffing Workshop

101

161 Desktop Computers

44 Laptop Computers

10 Physical & 19 Virtual Servers

70 Applications SupportedJDE, Utility Billing, AMR, Microsoft

5 LocationsCSC, Ops, WRF, Alpine, Park

INFORMATION SYSTEMSINFORMATION SYSTEMS

STATISTICS

>200

Page 102: Padre Dam MWD Staffing Workshop

102

INFORMATION SYSTEMSINFORMATION SYSTEMS

TELECOMMUNICATIONSTelephone

Voicemail

Call Distribution Centers

Paging System

Blackberry Integration

Park

Page 103: Padre Dam MWD Staffing Workshop

103

INFORMATION SYSTEMSINFORMATION SYSTEMS

NETWORK MANAGEMENTLocal Area NetworkWide Area NetworkPrintingVirtualizationRemote AccessHardwareSystem UpgradesSCADA

Page 104: Padre Dam MWD Staffing Workshop

104

INFORMATION SYSTEMSINFORMATION SYSTEMS

SECURITYCYBER

FirewallsVirus ProtectionSpam & Web Filtering

SITEGate AccessSecurity Cameras

DISASTERBackups

Page 105: Padre Dam MWD Staffing Workshop

105

INFORMATION SYSTEMSINFORMATION SYSTEMS

INFORMATION MANAGMENT

E-Mail

Database Administration

Document Management

Website Support

Help Desk

User Training

Page 106: Padre Dam MWD Staffing Workshop

106

INFORMATION SYSTEMSINFORMATION SYSTEMSSOFTWARE

Utility BillingCustomer DatabaseOn-Line Bill PayOnline Account AccessAMR

JDE WorldFinancialHRPayrollWarehousePurchasingGeneral LedgerBudgeting

Office Productivity SuitesWordExcelAccessPowerPointOutlookPublisher

OtherSCADAGISPark Reservation……… Over 70 different Programs

Software Deployment

Updates

Licensing

Support Contracts

Page 107: Padre Dam MWD Staffing Workshop

107

INFORMATION SYSTEMSINFORMATION SYSTEMS

CURRENT PROJECTSAMR

Radio UpdatesDuplicate Read MitigationImproper Radio-to-Meter Installation Mitigation

Information Reporting E-Billing, On-Line Bill Pay AutomationOn-Line Bill CalculatorLock Box TransfersThin ComputingFile Server ReplacementMS Configuration Manager File Server Replacement

Page 108: Padre Dam MWD Staffing Workshop

108

INFORMATION SYSTEMSINFORMATION SYSTEMSPROJECTS IN QUE

Monthly BillingFile Serve ReplacementPayroll Check PrinterDocument Management UpgradeWRF Network UpgradeTax Software (Vertex)IBM I-5 Operating System UpgradeJDE A.92 UpgradeCustomer Service Point-of–Sale RegisterEmployee Self Service Over 200 Requests in Track-ItSecurity Camera InfrastructureRemote Reservoir Security Cameras

Page 109: Padre Dam MWD Staffing Workshop

109

INFORMATION SYSTEMSINFORMATION SYSTEMSHIGHLY SPECIALIZED

Programming languagesRPG III, RPG IV, ILE, C++, JAVA, Java Script

Web ProgrammingJava, XML, HTML, XHTML

Operating SystemsWindows XP, 7, Windows 2003, 2008, IBM V5r3, V5r4, V6.1

DatabaseDB2, SQL Server

Network SupportRouting, Switching, LAN, WAN

Network ProtocolsOSI Model, TCP/IP, DNS, DHCP, IPv4, IPv6, 802.11

Network SecurityCisco IOS, IP SEC, SSL

Page 110: Padre Dam MWD Staffing Workshop

110

Questions?

Page 111: Padre Dam MWD Staffing Workshop

111

Communications Department

Page 112: Padre Dam MWD Staffing Workshop

112

CommunicationsDirector of Communications

(12 Employees)

Communications Coord.

PT Staff Support

Cust. Serv. Manager

Lead Cust. Service Rep. Cust. Serv. Rep.

Cust. Serv. Rep. Cust. Serv. Rep.

Cust. Serv. Rep. Cust. Serv. Rep.

Cust. Serv. Rep. PT Staff Support

PT Staff Support

Page 113: Padre Dam MWD Staffing Workshop

113

Staffing Levels

Communications Customer Service

.5.25‐1PTEs

21‐2FTEs

Current2000‐2009

2.5‐2PTEs

87‐8FTEs

Current1983‐2009

Page 114: Padre Dam MWD Staffing Workshop

114

CUSTOMERCOMMUNICATIONSBrandingPrint and OnlineClassroom ActivitiesSpecial EventsPublic SpeakingMedia Relations

CUSTOMER SERVICECustomer AccountsCustomer BillingPayment ProcessingCustomer SupportCollections

WATER EFFICIENCYMulti‐Agency InitiativesCustomer OutreachIncentivesLandscape ClassesCSC Garden 

Responsibilities

DEMAND MANAGEMENTDrought ResponseWater BudgetsWater Use RestrictionsEnforcement

COMMUNICATIONSSUPPORTBoardGeneral ManagerDepartments

SUPPLY CHAINMANAGEMENTLegislative Advocacy

Page 115: Padre Dam MWD Staffing Workshop

115

Communications WorkloadBMPsBMP 1:   Residential SurveysBMP 2:   Residential RetrofitsBMP 3:   System Water AuditsBMP 4:   MeteringBMP 5:   LandscapeBMP 6:   Clothes WashersBMP 7:   Public InfoBMP 8:   School EducationBMP 9:   CIIBMP 10: WholesalerBMP 11: RatesBMP 12: Conservation CoordinatorBMP 13: Waste ProhibitionsBMP 14: ULFTs

AB 1420Effective January 2009 

SB 7Effective November 2009

AB 1881Effective January 2010

Mandatory ConservationEffective June 2008

Water BudgetsEffective July 2009

CSC GardenOpening June 2010

Page 116: Padre Dam MWD Staffing Workshop

116

Customer Service Workload2005‐2009

2005 Outsourced billing2009 New vendor for billing

Process Improvement2008 Level billing cycles

Improved Customer Service2005 Credit card option2009 E‐billing2009 Online bill calculator

Increased Workload2008 Ag rates2009 Water budgets

Prior to 2005

Manual Billing• Printing• Folding• Inserting• Sorting

Manual Payments• Opening envelopes• Stubs & checks• Data entry• Bank deposit• Filing

2010

Outsourced payments

AMR

est. 12 hours/week fortransition to monthly billing

Page 117: Padre Dam MWD Staffing Workshop

117

Outsourced BillingInfoSendFSSIIn‐House

73,0920.42796,9900.5346296,1400.427Total

1,3680.00766,2700.0348316,9400.094Staff Time

6,0600.16833n/an/an/an/aE‐Billing Cost

19,0080.13228,4400.153812,6000.07Per Piece Cost

$46,656$0.324$62,280$0.346$66,000$0.37Postage

AnnualPer pieceAnnualPer pieceAnnualPer piece

Efficiencies

RT LawrenceIn‐House

$20,836$21,935Annual Estimate

$1,736.77$1,827.92Monthly Estimate

Outsourced Payments

Page 118: Padre Dam MWD Staffing Workshop

118

Questions?

Page 119: Padre Dam MWD Staffing Workshop

119

Human Resources Department

Page 120: Padre Dam MWD Staffing Workshop

120

Director of Human Resources(3 Employees)

Human Resources Specialist Safety & Risk Manager

Human Resources Department3 Employees

Page 121: Padre Dam MWD Staffing Workshop

121

• Essential Functions:• Recruitments• Compensation• Benefits• Labor Relations• Training• Supervisory coaching• Employment issues

Human Resources, Safety and Risk Management

Page 122: Padre Dam MWD Staffing Workshop

122

• Essential Functions Continued:• Health & safety• Risk management• Loss Control• Security • Emergency preparedness.

Human Resources, Safety and Risk Management

Page 123: Padre Dam MWD Staffing Workshop

123

• Currently 155 employees, 31 volunteers and 81 retirees or widow(er)s retirees• Employees include both full and part-time

and temporaries

• Since 2007, average 23 recruitments per year• Recruitments include temps, interns and

volunteers• Reduced cost and turnaround time on

recruitments with technology

Human Resources, Safety and Risk Management

Page 124: Padre Dam MWD Staffing Workshop

124

• Since 2007, average 13 retirements/resignations per year• Resignations include exiting temporaries and

seasonal workers• Retirees move from one benefit plan to

another

Human Resources, Safety and Risk Management

Page 125: Padre Dam MWD Staffing Workshop

125

• Mandatory requirements affecting employee relations: • Training (harassment awareness)• Postings (i.e., minimum wage)• Insurance (i.e., dependent coverage)• ICE (I-9)• Dept. of Fair Employment & Housing• Equal Employment Opportunity Commission• Employment Development Department• Americans with Disabilities Act

Human Resources, Safety and Risk Management

Page 126: Padre Dam MWD Staffing Workshop

126

• Responsible for Safety & Health Compliance: • Training• Injury/Illness Prevention Program• Workers’ Compensation claims liaison

• Average 12 claims per year• 296 modified duty days per year• 50 lost time days per year

Human Resources, Safety and Risk Management

Page 127: Padre Dam MWD Staffing Workshop

127

• DOT Regulations for Commercial Drivers• 48 Commercial Drivers• 50% randomly tested for drugs every year• 10% randomly tested for alcohol every year

• Annual Safety Physicals

Human Resources, Safety and Risk Management

Page 128: Padre Dam MWD Staffing Workshop

128

• Responsible to the following regulatory agencies for Safety & Health Compliance:

• OSHA and CalOSHA

• California Dept. of Industrial Relations

• Federal Dept. of Transportation

Human Resources, Safety and Risk Management

Page 129: Padre Dam MWD Staffing Workshop

129

• Responsible for Loss Control and Risk Financing:

• Local Hazard Mitigation Plan

• Risk Management Plan

• Liability Claims Management• Average 15 claims per year

• Purchase all Insurance programs

Human Resources, Safety and Risk Management

Page 130: Padre Dam MWD Staffing Workshop

130

• Responsible to the following regulatory agencies for loss control and risk financing:

• U.S. and State EPA

• California Dept. of Public Health

• California Dept. of Environmental Health

Human Resources, Safety and Risk Management

Page 131: Padre Dam MWD Staffing Workshop

131

• Responsible for Emergency Preparedness:

• Emergency Response Plan amendments

• Training & Emergency Exercises

Human Resources, Safety and Risk Management

Page 132: Padre Dam MWD Staffing Workshop

132

• Responsible to the following regulatory agencies for Emergency Preparedness:• FEMA• Cal-EMA• County of San Diego• Department of Homeland Security

Human Resources, Safety and Risk Management

Page 133: Padre Dam MWD Staffing Workshop

133

• Responsible for Site and Employee Security from Threat Situations:

• Vulnerability Assessment

• Installation of security devices and programs

• Monitoring of security devices and programs

Human Resources, Safety and Risk Management

Page 134: Padre Dam MWD Staffing Workshop

134

• Responsible to the following regulatory agencies for Site and Employee Security:

• U.S. EPA

• U.S. Dept. of Homeland Security

Human Resources, Safety and Risk Management

Page 135: Padre Dam MWD Staffing Workshop

135

Questions?

Page 136: Padre Dam MWD Staffing Workshop

136

Administration Department

Page 137: Padre Dam MWD Staffing Workshop

137

Administration Staffing ATTACHMENT 2

Number of Employees represents both full and part-time employees; FTE is 155

Customers

Board of Directors(Elected)

Best, Best & KriegerGeneral Counsel

Chief Executive Officer/General Manager(155 Employees)

Board Secretary

PT Admin Asst.

Dir. of Ops & Water Quality(85 Employees)

Dir. of Eng. and Planing(28 Employees)

Chief Financial Officer/Dir. of Finance(12 Employees)

Dir. of Human Resources(3 Employees)

Dir. of Park & Recreation(20 Employees, 31 Volunteers)

Dir. of Communications(12 Employees)

Page 138: Padre Dam MWD Staffing Workshop

138

1. General Manager 1

2. Board Secretary/Executive 1

3. ½ time Administrative Assistant ½

• Total Staff positions 2 ½• Prior staff positions 4

Administration Staffing

Page 139: Padre Dam MWD Staffing Workshop

139

• Leadership

• Board Interaction and Support

• Policy implementation

• Strategic Planning – 5 Year Business Plan & Budget

• Manage Daily Operations thru Mgmt Team

• Oversee all Operations for water/sewer/park services for customers

• Workforce Partnership & Employee motivation

• High level Organization Performance

Administration Functions

Page 140: Padre Dam MWD Staffing Workshop

140

• Long Term Planning

• Vision & Planning

• Develop a Plan-Water/Sewer system reliability

• Aging infrastructure

• Increase preventative/predictive maintenance

• 5-yr Business Plan & Budget

• Increase in staffing levels

• Increase in CIP projects

• Flexible-changing conditions

• Request Board Approval

Administration Functions

Page 141: Padre Dam MWD Staffing Workshop

141

• Board of Directors Support

• Board and Committee meetings

• Agendas, minutes, resolutions, ordinances, public hearing notices, ensuring compliance with legal requirements

• Coordinate with legal counsel

• Activities related to elections, Board Member appointments, and division boundary changes

• District Website – Board of Directors information and meeting materials

• Annual Filings (FPPC, County Registrar, and State)

• Various meetings, conferences, travel

• Facilitate communications among Board, Management, Legal Counsel, and Customers

Administration Services

Page 142: Padre Dam MWD Staffing Workshop

142

• Implementation Services

• Rules and Regulations

• Standard Practices & Policies

• Conflict of Interest Code

• Documentation and Record Retention

• Public Records Requests

Administration Services

Page 143: Padre Dam MWD Staffing Workshop

143

• Budget Oversight

• Board and General Manager budgets

• District-wide expenditure and budget reviews

• Supply Chain Oversight

• SDCWA, Metro JPA, SD County, City of San Diego, City of Santee, State Gov’t

• Relationship Management

• Customers, employees, interagency relations, press, public media, management, Board

• Highest ethical & professional standards

• Highly regulated industry-compliance

Administration Services

Page 144: Padre Dam MWD Staffing Workshop

144

• Provide stable & reliable Customer water/sewer/park services

• Provide stable financial condition-balanced budget-money for emergencies

• Live within the “household budget” concept

• Provide stable & reasonable water/sewer rates

• Control operating expenses

Administration Services

Page 145: Padre Dam MWD Staffing Workshop

145

Questions?