p00.1 legend, schedules, detail & general notes m00.1

12
Seal for Civil Drawings Seal for Architectural Drawings Seal for Electrical Drawings Seal for Mechanical Drawings Seal for Plumbing Drawings Seal for Structural Drawings 46 Harriman Drive Auburn, ME 04210 207.784.5100 123 Middle Street Portland, ME 04101 207.775.0053 LIST OF DRAWINGS Seal for Fire Protection Drawings NOT USED NOT USED NOT USED NOT USED Harriman Project No. Harriman Associates c 33 Jewell Court, Suite 101 Portsmouth, NH 03801 603.626.1242 170 Milk Street, Suite 5 Boston, MA 02109‐3438 617.426.5050 PRELIMINARY NOT FOR CONSTRUCTION FINAL REVIEW 05-31-18 DURHAM, NEW HAMPSHIRE 16642 G00.1 2018 COVER SHEET UNH NEC BOILER UPGRADES PROJECT ID: 2016-0402 G00.1 COVER SHEET PLUMBING DRAWINGS P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES P20.1 SUPPLY PLANS MECHANICAL DRAWINGS M00.1 LEGEND & GENERAL NOTES M05.1 MECHANICAL DEMOLITION M10.1 MECHANICAL M30.1 DETAILS M30.2 DETAILS M40.1 SCHEDULES ELECTRICAL DRAWINGS E00.1 ELECTRICAL LEGEND, NOTES AND SCHEDULES E05.1 BASEMENT FLOOR PART PLAN EXISTING CONDITIONS E20.1 BASEMENT FLOOR PART PLAN POWER AND SYSTEMS RFX# 100299 NEC Drawings

Upload: others

Post on 23-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

Seal for Civil Drawings

Seal for Architectural Drawings

Seal for Electrical Drawings

Seal for Mechanical Drawings

Seal for Plumbing Drawings

Seal for Structural Drawings

46  Harriman DriveAuburn, ME 04210

207.784.5100

123 Middle StreetPortland, ME 04101

207.775.0053

LIST OF DRAWINGS

Seal for Fire Protection Drawings

NOT USED

NOT USED

NOT USED

NOT USED

Harriman Project No.

Harriman Associatesc

33 Jewell Court, Suite 101Portsmouth, NH 03801

603.626.1242

170 Milk Street, Suite 5Boston, MA 02109‐3438

617.426.5050

PRELIMINARY NOT FOR CONSTRUCTION

FINAL REVIEW05-31-18

DURHAM, NEW HAMPSHIRE

16642

G00.1

2018

COVER SHEET

UNH NECBOILER UPGRADESPROJECT ID: 2016-0402

G00.1 COVER SHEET

PLUMBING DRAWINGSP00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTESP20.1 SUPPLY PLANS

MECHANICAL DRAWINGSM00.1 LEGEND & GENERAL NOTESM05.1 MECHANICAL DEMOLITIONM10.1 MECHANICALM30.1 DETAILSM30.2 DETAILSM40.1 SCHEDULES

ELECTRICAL DRAWINGSE00.1 ELECTRICAL LEGEND, NOTES AND SCHEDULESE05.1 BASEMENT FLOOR PART PLAN EXISTING CONDITIONSE20.1 BASEMENT FLOOR PART PLAN POWER AND SYSTEMS

RFX# 100299NEC Drawings

Page 2: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

LEGEND

CHECK VALVE

SHUT-OFF VALVE

CAP

DN DOWN

AFF ABOVE FINISHED FLOOR

BFF BELOW FINISHED FLOOR

TYP. TYPICAL

TRANSITION

CIRCULATING PUMP

THERMOMETER

DCP-X DOMESTIC CIRCULATING PUMP

ET-X EXPANSION TANK

FD-X FLOOR DRAIN

COLD WATER PIPING ABOVE FINISHED FLOORCW

EXISTING COLD WATER PIPING ABOVE FINISHED FLOORXCW

EXISTING HOT WATER PIPING ABOVE FINISHED FLOORXHW

HOT WATER PIPING ABOVE FINISHED FLOORHW

EXISTING HOT WATER RETURN PIPING ABOVE FINISHED FLOORXHWR

HOT WATER RETURN PIPING ABOVE FINISHED FLOORHWR

HOT WATER HOSE BIBB

FREEZE PROOF WALL HYDRANT

PIPE DROP

PIPE RISE

EXISTING ABOVE FINISHED FLOOR PIPING TO BE DEMOLISHED

NATURAL GAS PIPING ABOVE FINISHED FLOORG

FINISHED FLOOR

3/4" CW

WHTR-1 MOUNTED IN CABINET. SET TO DELIVER 120°F

3/4" HW

HW TO SERVE EXISTING UTILITY SINK SEE P20.1

FOR ROUTING

TV-1 SET TO DELIVER 110°F

Graphic Scale

PRELIMINARYNOT FOR

CONSTRUCTION

AUBURN PORTLAND PORTSMOUTH BOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By: Harriman Associatesc

Proj North

Issues and Revisions

DescriptionDate

Plo

t Dat

e:5/

31/2

018

8:30

:33

AM

DURHAM, NEW HAMPSHIRE

16642

P00.1

CG

MAM

UNH NECBOILER UPGRADES

PROJECT ID: 2016-0402

LEGEND, SCHEDULES,DETAIL & GENERAL

NOTES

2018

WATER HEATER SCHEDULEBASIS OF DESIGN WATER HEATER SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS AND DETAILED DESCRIPTIONS

TAG MANUFACTURER MODEL FUEL TYPERECOVERY

(GPH)BRANCH SIZE ELECTRICAL

NOTESCW HW VOLTS PHASEWHTR-3 BOSCH TRONIC

MODEL ES4ELECTRIC 6.8 @ 90°F RISE 1/2" 1/2" 120 V 1

TEMPERING VALVE SCHEDULEBASIS OF DESIGN TEMPERING VALVE SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED

EQUALS AND DETAILED DESCRIPTIONSTAG MANUFACTURER MODEL CW HW TW NOTESTV-1 APOLLO 34ALF213PR 1/2" 1/2" 1/2" SET TO DELIVER 110 °F HW

GENERAL NOTES

1 DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK.REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTSTHAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTIONDOCUMENTS. NOTIFY THE ARCHITECT OF ANY CONFLICTS ORDISCREPANCIES PRIOR TO SUBMISSION OF BID.

2 VERIFY LOCATION AND DEPTH OF UTILITIES AT ALL POINTS OF CONNECTION INDICATED ONDRAWINGS BEFORE START OF PROJECT.

3 COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS. COORDINATE PIPINGINSTALLATION WITH STRUCTURAL GRADE BEAMS, FOOTINGS, COLUMN PIERS, ETC. SLEEVEPIPING THROUGH GRADE BEAMS, FOOTING, ETC. WHERE REQUIRED AND AS NOTED ONPLANS. COORDINATE SLEEVE INSTALLATIONS WITH THE ARCHITECT, STRUCTURAL ENGINEER,STRUCTURAL CONTRACTOR AND GENERAL CONTRACTOR BEFORE CONCRETE IS INSTALLED.PIPING INVERTS AND SLOPE SHALL BE CLOSELY COORDINATED TO AVOID CONFLICTS WITHALL OTHER TRADES BELOW SLAB WORK.

4 COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DO NOT ROUTE PIPING OVERELECTRICAL PANELS.

5 PIPING IN FINISHED AREAS SHALL BE ROUTED CONCEALED; EXPOSED PIPING, WHERENECESSARY, SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO WALLS.

6 REFER TO INSTALLATION SCHEDULE DATA FOR THE SIZE OF PIPING CONNECTIONS ANDMOUNTING HEIGHTS OF EACH FIXTURE.

7 ALL PLUMBING FIXTURE SHUT-OFF AND/OR BALANCING VALVES INSTALLED IN PIPE CHASESSHALL BE ACCESSIBLE FROM JUST ABOVE THE CEILING LINE OR ACCESS DOORS PROVIDEDLOW IN CHASE WALL.

8 VENT AND WATER PIPING SHALL PITCH TO DRAIN.9 CLEAN FAUCET AERATORS AND PIPE STRAINERS PRIOR TO TURNING BUILDING OVER TO THE

OWNER.10 VALVES SHALL BE LINE SIZE UNLESS OTHERWISE NOTED.11 THE TERM "PROVIDE" SHALL MEAN "TO FURNISH, INSTALL AND CONNECT COMPLETELY".12 ENTIRE PLUMBING INSTALLATION SHALL BE IN COMPLIANCE WITH ALL CURRENT LOCAL, STATE

AND FEDERALCODES AND STANDARDS.

13 OSHA RULES, REGULATIONS AND REQUIREMENTS, AND ANY STATE AND LOCALREQUIREMENTS FOR SAFETY SHALL BE FOLLOWED BY THE CONTRACTOR

05-26-17 DESIGN DEVELOPMENT08-18-17 50% REVIEW05-31-18 FINAL REVIEW

NO SCALE1 WATER HEATER PIPING DETAIL

Page 3: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

87 9 10 11

12

13

E

D

C

B

F

G

654

REMOVE 4" HW& 2" HWR DOMESTIC

PIPING TO ADAMS TOWER

EXISTING 4" CW TO ADAMS TOWER SHALL REMAIN

REMOVE EXISTINGHW DN TO SINK. SINK

SHALL REMAIN

REMOVE EXISTINGAJAX SEMI-INSTANTANEOUS WATER HEATER WITH ASSOCIATED PUMPS, PIPING & ACCESSORIES.(TYP OF 2)

REMOVE EXISTINGHW PIPING & ASSOCIATED ACCESSORIES

EXISTING HW & HWR PIPING& ASSOCIATED ACCESSORIES

REMOVE EXISTINGHW PIPING UP TO DECK& CAP. PROVIDE LOW POINT DRAIN VALVE AT DECK

EXISTING DOMESTIC CW TO REMAIN

REMOVE EXISTINGCW BACK TO VALVE

REMOVE EXISTINGCIRCULATING PUMP& ASSOCIATED ACCESSORIES

87 9 10 11

12

13

E

D

C

B

F

G

654XC

W- 4

"

XCW- 1/2"

WHTR-3

MAKE FINAL CONNECTIONS TO SINK FROM WATER HEATER

CONNECT 1/2" CW TO EXISTING CWTV-1

Graphic Scale

PRELIMINARYNOT FOR

CONSTRUCTION

AUBURN PORTLAND PORTSMOUTH BOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Key Plan

Harriman Project No.

PA / PE:

Drawn By: Harriman Associatesc

Proj North

Issues and Revisions

DescriptionDate

Plo

t Dat

e:5/

31/2

018

8:30

:41

AM

DURHAM, NEW HAMPSHIRE

16642

P20.1

CG

MAM

UNH NECBOILER UPGRADES

PROJECT ID: 2016-0402

SUPPLY PLANS

2018

SCALE: 1/8" = 1'-0"1 DEMOLITION SUPPLY PLANSCALE: 1/8" = 1'-0"2 SUPPLY PLAN

05-26-17 DESIGN DEVELOPMENT08-18-17 50% REVIEW05-31-18 FINAL REVIEW

Page 4: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

AMS

TIGHT SHUT-OFF VALVE

FD (3 HR) FIRE DAMPER (3 HOUR RATED)

S2 4400

SUPPLY DIFFUSER ( TYPE 2 )

400 CFM EA

DIFFUSER DESCRIPTION

QUANTITY

FIRE DAMPER (1 1/2 HOUR RATED)

( SEE REG., GRILLES & DIFF SCHEDULE )

BDD

H

HS

V

DN

10'-0" FL10.0 gpm

T

VD

ACOUSTICALLY LINED DUCT

LENGTH, 10,000 BTU/HR) WITHOUT DAMPER

RADIATION I.D. ( TYPE A, 10'-0" FINNED110'-0" FL/D10.0 GPM LENGTH, 10,000 BTU/HR) WITH DAMPER

AM10.1

ACV 2 - WAY

ACV 3 - WAY

BALANCE VALVE

BACKDRAFT DAMPER

CAP - PIPE

CHECK VALVE

COMBINATION BALANCING, FLOW MEASURING &

DUCT SECTION - SUPPLY/OUTDOOR AIR

DUCT SECTION - RETURN AIR

DUCT TURNING VANES

FLEXIBLE DUCT

FLOAT & THERMOSTATIC TRAP

ISOLATION VALVE

GLOBE VALVE

HUMIDISTAT

HUMIDITY SENSOR

LOCKSHIELD GATE VALVE

LOUVER

MANUAL AIR VENT

MOTORIZED DAMPER

OS&Y GATE VALVE

PETCOCK FOR GAUGE CONNECTION

PIPE ANCHOR

PIPE GUIDE

PITCH DOWN

PLUG VALVE

PRESSURE GAUGE

PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

PRESSURE RELIEF DAMPER

RADIATION I.D. ( TYPE A, 10'-0" FINNED

REDUCER - CONCENTRIC

REDUCER - ECCENTRIC

RETURN AIR

SECTION I.D. ( SECTION A SHOWN ON DWG. M10.1)

SMOKE DAMPER

STRAINER

SUPPLY AIR

TAKE - OFF FROM BOTTOM OF PIPE

TAKE - OFF FROM TOP OF PIPE

TEMPERATURE SENSOR

THERMOMETER

THERMOMETER WELL

THERMOSTAT

THERMOSTAT COOLING

THERMOSTAT HEATING

THERMOSTAT - NIGHT

THERMOSTAT - HEATING/COOLING

THERMOSTATIC TRAP

UNION

VOLUME DAMPER

DUCT DIAMETER

CBD COUNTERBALANCED DAMPER

1

S (SUPPLY) R (RETURN)E (EXHAUST) T (TRANSFER)

DESCRIPTIONSYMBOL

SD

PRD

MD

FD

AIRFLOW MEASURING STATION

DUCT MOUNTED SMOKE DETECTOR

T

TS

TC

H

N

H/C

T

T

T

DESCRIPTIONSYMBOL

EXISTING EQUIPMENT TO REMAIN

NEW EQUIPMENT

SD

EXISTING SUPPLY PIPING TO REMAIN

EXISTING RETURN PIPING TO REMAIN

NEW SUPPLY PIPING

NEW RETURN PIPING

EXISTING DUCTWORK TO REMAIN

NEW DUCTWORK

PIPE DOWN

PIPE UP

DUCT SECTION - EXHAUST AIR

DIFFERENTIAL PRESSURE SENSORDPS

INVERTED BUCKET TRAPIB

STATIC PRESSURE SENSORSPS

Graphic Scale

PRELIMINARYNOT FOR

CONSTRUCTION

AUBURN PORTLAND PORTSMOUTH BOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By: Harriman Associatesc

Proj North

Issues and Revisions

DescriptionDate

Plo

t Dat

e:

UNH NECBOILER UPGRADES

PROJECT ID: 2016-0402

6/18

/201

8 11

:10:

07 A

M

DURHAM, NEW HAMPSHIRE

16642

M00.1

CG

BPH

LEGEND & GENERALNOTES

2018

ABBREV DESCRIPTIONLAT LEAVING AIR TEMPERATURELPCR LOW PRESSURE CONDENSATE

RETURN (LESS THAN 15 PSI)LPS LOW PRESSURE STEAM(LESS THAN

15 PSI)LRA LOCKED ROTOR AMPSLSGV LOCK & SHIELD GATE VALVELWT LEAVING WATER TEMPERATURE

MAX MAXIMUMMBH 1000 BRITISH THERMAL UNITSMCA MINIMUM CIRCUIT AMPSMD MOTORIZED DAMPERMIN MINIMUMMOPD MAXIMUM OVERCURRENT

PROTECTIVE DEVICEMPCR MEDIUM PRESSURE CONDENSATE

RETURN(16-30 PSIG)MPS MEDIUM PRESSURE STEAM (16-30

PSIG)

NA NOT APPLICABLENC NOISE CRITERIANIC NOT IN CONTRACTNO NORMALLY OPENNTS NOT TO SCALE

OA OUTSIDE AIROC ON CENTEROED OPEN END DUCTOS&Y OUTSIDE SCREW & YOKE GATE

VALVE

PD PRESSURE DROPPRD PRESSURE RELIEF DAMPERPRV PRESSURE REDUCING VALVEPSI POUNDS PER SQUARE INCH

RET RETURNRET RETURNRL REFRIGERANT LIQUIDRLA RATED LOAD AMPERESRPM REVOLUTIONS PER MINUTERS REFRIGERANT SUCTION

SD SMOKE DAMPERSD/FD SMOKE AND FIRE COMBINATION

DAMPERSP STATIC PRESSURESS STAINLESS STEELSUP SUPPLY

TEMP TEMPERATURETT THERMOSTATIC TRAPTYP TYPICAL

VD VOLUME DAMPERVFD VARIABLE FREQUENCY DRIVE

W/ WITHW/O WITHOUTWC WATER COLUMNWG WATER GAUGEWPD WATER PRESSURE DROPWWMS WELDED WIRE MESH SCREEN

ZD ZONE DAMPER

PREFIX OF X EXISTING

ABBREV DESCRIPTIONACV AUTOMATIC CONTROL VALVEAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEALD ACOUSTICAL LINED DUCTAMS AIRFLOW MEASURING STATIONAPD AIR PRESSURE DROPATC AUTOMATIC TEMPERATURE

CONTROL

BD BAROMETRIC DAMPERBDD BACKDRAFT DAMPERBHP BRAKE HORSEPOWERBPD BYPASS DAMPERBTU BRITISH THERMAL UNITS

CBD COUNTERBALANCED BACKDRAFTDAMPER

CFM CUBIC FEET PER MINUTECHWR CHILLED WATER RETURNCHWS CHILLED WATER SUPPLYCO CLEANOUTCTE CONNECT TO EXISTINGCWR CONDENSER WATER RETURNCWS CONDENSER WATER SUPPLY

DCW DOMESTIC COLD WATERDEG.F DEGREES FAHRENHEITDHW DOMESTIC HOT WATERDIA DIAMETERDN DOWN

EAT ENTERING AIR TEMPERATUREESP EXTERNAL STATIC PRESSUREEWT ENTERING WATER TEMPERATUREEXG EXISTINGEXH EXHAUST

F&T FLOAT & THERMOSTATIC TRAPFD FIRE DAMPERFL FINNED LENGTH OF RADIATIONFM FLOW METERFOR FUEL OIL RETURNFOS FUEL OIL SUPPLYFPF FINS PER FOOTFPI FINS PER/INCHFPM FEET PER MINUTEFT FEETFT-HD FEET OF HEADFT-WG FEET WATER GAUGEFTR FIN TUBE RADIATOR

GAL GALLONSGPM GALLONS PER MINUTE

HP HORSEPOWERHPCR HIGH PRESSURE CONDENSATE

RETURN (OVER 30 PSIG)HPS HIGH PRESSURE STEAM (OVER

30PSIG)HRR HEAT RECOVERY RETURNHRS HEAT RECOVERY SUPPLYHWR HOT WATER RETURNHWS HOT WATER SUPPLY

IN INCHES

GENERAL NOTES1 VISIT THE BUILDING SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH EXISTING CONDITIONS, AND TO

TAKE MEASUREMENTS AS NECESSARY FOR COMPLETION OF THE WORK ASSOCIATED WITH THE DESIGNINTENT OF THE CONTRACT DOCUMENTS.

2 COORDINATE WORK OF MECHANICAL SUBCONTRACTOR WITH WORK OF OTHER TRADES.3 DUCTWORK, PIPING AND EQUIPMENT ARE INDICATED DIAGRAMMATICALLY. FIELD-VERIFY LOCATIONS.4 PRIOR TO FABRICATING DUCTWORK, COORDINATE WITH OTHER TRADES TO ENSURE THAT THE DUCTWORK

CAN BE INSTALLED WITH THE INDICATED SIZES AND LOCATIONS.FIELD-VERIFY EXISTING DUCT SIZES ANDCONDITIONS.SUBMIT ANY DISCREPANCIES OR PROPOSED CHANGES.

5 REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATIONS OF CEILING DIFFUSERS ANDREGISTERS.PROVIDE VOLUME DAMPERS SO THAT EVERY REGISTER, GRILLE AND DIFFUSER (SUPPLY,RETURN, AND EXHAUST) CAN BE INDIVIDUALLY BALANCED.

6 VERIFY INSTALLATION OF EXISTING VOLUME DAMPERS AT EACH BRANCH IN EXISTING SUPPLY DUCT.PROVIDE ADDITIONAL VOLUME DAMPERS WHERE REQUIRED.

7 LOCATE VOLUME DAMPERS AS FAR AWAY FROM REGISTERS, GRILLES AND DIFFUSERS AS POSSIBLE TOMINIMIZE NOISE. LOCATE TO BE UNOBSTRUCTED AND EASILY ACCESSIBLE FOR TESTING AND BALANCING.LOCATE POSSIBLE. WHERE VOLUME DAMPERS MUST BE LOCATED ABOVE HARD CEILINGS SUCH ASGYPSUM WALLBOARD, PROVIDE ACCESS PANELS AS SPECIFIED, AND NOTIFY THE ARCHITECT OF SUCHLOCATIONS VERBALLY AND IN WRITING. OBTAIN PERMISSION FROM THE ARCHITECT BEFORE INSTALLINGACCESS PANELS.

8 DUCT ELBOWS SHALL BE LONG-RADIUS TYPE (THROAT RADIUS EQUAL TO OR GREATER THAN DUCT WIDTHIN THE PLANE OF THE TURN) WHEREVER SPACE ALLOWS. IF SPACE IS NOT ADEQUATE, PROVIDE MITEREDELBOWS WITH TURNING VANES.

9 PROVIDE 16 GAUGE SINGLE-THICKNESS TURNING VANES AT MITERED DUCT ELBOWS. VANE EDGES(LEADING AND TRAILING) SHALL BE TANGENTIAL TO AIRFLOW.

10 FLEXIBLE DUCT LENGTHS SHALL NOT EXCEED 5'-0"11 PAINT DUCTWORK VISIBLE THRU CEILING OPENINGS, DUCT OPENINGS, AND REGISTERS, GRILLES, AND

DIFFUSERS WITH BLACK PAINT IN ACCORDANCE WITH DIVISION 09 SECTION "PAINTING."12 MOUNT THERMOSTATS AND TEMPERATURE AND HUMIDITY SENSORS AT 48 INCHES AFF TO TOP OF ITEM.

PROVIDE ELECTRICAL WALL BOX ATTACHED TO FRAMING.13 WHERE THERMOSTATS/TEMPERATURE SENSORS ARE LOCATED NEAR LIGHT SWITCHES, INSTALL SO THAT

LIGHT SWITCHES ARE NEARER TO THE DOOR JAMBS. THE INTENT IS TO LOCATE THERMOSTATS/TEMPERATURE SENSORS SO THEY WILL NOT INTERFERE WITH ACCESSIBILITY OF LIGHT SWITCHES.

14 PIPING INDICATED IN OUTSIDE WALLS SHALL BE RUN ON THE WARM SIDE OF BUILDING INSULATION ANDVAPOR BARRIER. BUILDING INSULATION BEHIND SUCH PIPING SHALL BE CONTINUOUS, WITHOUT JOINTS ORGAPS.

15 PIPING SHALL BE CONCEALED EXCEPT IN MECHANICAL ROOMS AND AS INDICATED. WHERE PIPES DROP INBLOCK WALLS, PROVIDE 1/2" THICK INSULATION MINIMUM.

16 SEAL DUCTWORK AND PIPING THRU MECHANICAL ROOM FLOORS AND PARTITIONS, AND THRU FIRE-RATEDASSEMBLIES, WITH FIRESTOP MATERIAL AS SPECIFIED.

05-26-17 DESIGN DEVELOPMENT08-18-17 50% REVIEW05-31-18 FINAL REVIEW

Page 5: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

COMPLETELY REMOVE AIR SEPERATOR AND ASSOCIATED PIPING

COMPLETELY REMOVE EXPANSION TANK AND ASSOCIATED PIPING

COMPLETELY REMOVE HEAT EXCHANGER AND ASSOCIATED PIPING

COMPLETELY REMOVE BOILER 1 AND ASSOCIATED PIPING

COMPLETELY REMOVE CHEMICAL FEED STATION FOR STEAMAND ASSOCIATED PIPING

COMPLETELY REMOVE CHEMICAL FEED FOR CONDENSATE AND ASSOCIATED PIPING

COMPLETELY REMOVE FLASH TANK AND ASSOCIATED PIPING

COMPLETELY REMOVE FEEDWATER TANK AND ASSOCIATED PIPING

COMPLETELY REMOVE BOILER 2 AND ASSOCIATED PIPING

COMPLETELY REMOVE PUMP & POWER SET AND ASSOCIATED PIPING

COMPLETELY REMOVE PUMP SET AND ASSOCIATED PIPING

COMPLETELY REMOVE HEAT EXCHANGER AND ASSOCIATED PIPING

HWR- 6"HWS- 6"

COMPLETELY REMOVE CONDENSATE PUMPS, ASSOCIATED PIPING, POWER AND CONTROLS

PREPARE FOR NEW HWS&R 4" CONNECTION

PREPARE TO BE CAPPED(TYP)

COMPLETELY REMOVE PUMP SET AND ASSOCIATED PIPING

TO ADAMS TOWERS

PREPARE FOR NEW HWS&R 4" CONNECTION

UP TO NEC CONFERENCE CENTER

Graphic Scale

PRELIMINARYNOT FOR

CONSTRUCTION

AUBURN PORTLAND PORTSMOUTH BOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Key Plan

Harriman Project No.

PA / PE:

Drawn By: Harriman Associatesc

Proj North

Issues and Revisions

DescriptionDate

Plo

t Dat

e:

UNH NECBOILER UPGRADES

PROJECT ID: 2016-0402

6/18

/201

8 11

:10:

17 A

M

DURHAM, NEW HAMPSHIRE

16642

M05.1

CG

BPH

MECHANICALDEMOLITION

2018

SCALE: 1/8" = 1'-0"1 DEMOLITION N.E.C. CONFERENCE CENTER

COMPLETELY REMOVE BLOWDOWN TANK AND ASSOCIATED PIPING

05-26-17 DESIGN DEVELOPMENT08-18-17 50% REVIEW05-31-18 FINAL REVIEW

Page 6: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

CONNECT TO EXISITNG HWS&R 4" PIPES TO SERVE THE NEW ENGLAND CENTER

CONNECT TO EXISITNG 4" HWS&R TO SERVE THE LEARNING CENTER

CAP PIPES AT WALL

AS-1

P-4

P-3

P-6

P-5

12"ø 2M10.1

HWR 4"

HWS 4"

HWS- 5"

HWS- 5"

HWS- 5"

HWS- 4"

HWR- 4"

HWS- 4"

HWR- 4"

HWS- 5"

ET-1

P-1

P-2

12"ø

TERMINATE FLUE'S 6'-0"ABOVE ROOF. PROVIDE RAIN CAP.

8"ø

8"ø

B-2

B-1

8"ø

PROVIDE WIRE MESH

Graphic Scale

PRELIMINARYNOT FOR

CONSTRUCTION

AUBURN PORTLAND PORTSMOUTH BOSTON

Graphic Scale

Graphic ScaleGraphic Scale

0 2' 4' 6'

1/4" = 1'-0"

0 4' 8' 12'

1/8" = 1'-0"

Key Plan

Harriman Project No.

PA / PE:

Drawn By: Harriman Associatesc

Proj North

Issues and Revisions

DescriptionDate

Plo

t Dat

e:

UNH NECBOILER UPGRADES

PROJECT ID: 2016-0402

6/18

/201

8 11

:10:

28 A

M

DURHAM, NEW HAMPSHIRE

16642

M10.1

CG

BPH

MECHANICAL

2018

SCALE: 1/8" = 1'-0"1 N.E.C. CONFERENCE CENTERSCALE: 1/4" = 1'-0"2 COMBUSTION AIR INLET

WALL

AIR INLET

05-26-17 DESIGN DEVELOPMENT08-18-17 50% REVIEW05-31-18 FINAL REVIEW

PATCH WALL AS NEEDEDMATCH EXISITNG

Page 7: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

PROBE-TYPE LWCO

CHECK VALVE

BALL VALVE

LINE SIZE ACV

FLOW MEASURING

BOILER B-1BOILER B-2

AIR VENT

THERMOMETER

PRV

EXPANSION TANK

LOCKABLE VALVE

HOT WATER SUPPLY

COLD WATER MAKEUP (SEE

PLUMBING)

1" FAST FILL

VIBRATION ISOLATOR

AUTOMATIC AIR VENT. PIPE 3/8" TO FLOOR

DRAIN WITH AIR GAP.

AIR/DIRT SEPARATOR

3/4"

PRESSURE GAUGE

THERMOMETER

THE NEW ENGLAND CENTERTHE LEARNING CENTER

3/4" DRAIN

CH

EMIC

AL

FEED

ER

TSTS

DPS DPS

CLOSELY SPACED TEES

CONDENSATE DRAIN

HOUSE KEEPING PAD (TYP)

CLOSELY SPACED TEES

TS TS

PROVIDE ACID NEUTRILIZATION TANK

FROM MANUFACTURER

V V

DPS

SEE DETAIL M30.2.3

SEE DETAIL M30.2.3 SEE DETAIL M30.2.3

Graphic Scale

PRELIMINARYNOT FOR

CONSTRUCTION

AUBURN PORTLAND PORTSMOUTH BOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By: Harriman Associatesc

Proj North

Issues and Revisions

DescriptionDate

Plo

t Dat

e:

UNH NECBOILER UPGRADES

PROJECT ID: 2016-0402

6/18

/201

8 11

:10:

38 A

M

DURHAM, NEW HAMPSHIRE

16642

M30.1

CG

BPH

DETAILS

2018

NO SCALE1 NEW ENGLAND CENTER PIPING DETAIL

05-26-17 DESIGN DEVELOPMENT08-18-17 50% REVIEW05-31-18 FINAL REVIEW

Page 8: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

ONE SHOTFEEDER

3/4" DRAIN

AIR VENTVALVE

PIPING MAIN

QUICK-CLOSINGWIDEMOUTH CAP

SUPPORT LEGS,TYPICAL

BRANCH SIZE,TYP. OF 2

MAIN SIZE

NOTES:BRANCH PIPING SHALL BE THE LARGER OFFEEDER CONNECTION SIZE OR 1-1/4"MOUNT FEEDER TO BE REACHABLE FROM FLOOR.INSTALL UPSTREAM OF PUMPS.SUPPORT FEEDER INDEPENDENT OF PIPING.INSULATE BRANCH PIPING. HOT WATER FEEDERMAY BE UNINSULATED.

1.

2.3.4.5.

NEOPRENE ISOLATION PAD

PIPE SUPPORT

SUCTION DIFFUSER

STRAINERSEE SPECIFICATIONS

FOR TYPE

ISOLATION VALVESEE SPECIFICATIONS

FOR TYPE (TYP)

SPLIT COUPLER

DRAIN CONNECTION

FLUSH LINE

PET COCK(TYP)

24" T

O 3

6" A

FF

HANGERS SHALL BE SIZED TO SUPPORT WEIGHT OF FILLED PIPING, PUMPS &

FITTINGS

HANGERS SHALL BE SIZED TO SUPPORT WEIGHT OF FILLED PIPING, PUMPS &

FITTINGS

SILENT CHECKVALVE

FOR FLOW MEASURING ONLY,DO NOT USE FOR THROTTLINGFLOW. SIZE TO ALLOW 2 TO 5FT WG PRESSURE DROP READING."TRIPLE-DUTY" VALVES NOTALLOWED

PUMP

PRESSURE GAGE & PIPING

4" HOUSE KEEPING PAD WITH 1" CHAMFERED

EDGES

PROVIDE STRAIGHT LENGTH OF PIPE AT BALANCE VALVE

INLET AS REQUIRED BY VALVE MANUFACTURER

DPS

1/2" TYPICAL

HWS OR CHWSSUPPLY MAIN

HWS OR CHWSRETURN MAIN

SHUNT VALVE, CLOSED DURINGNORMAL OPERATION, OPEN DURINGAIR BLEEDING AT STARTUP ANDFOR EQUALIZING PRESSURE BEFOREREMOVING THE DPS FOR SERVICE

SHUTOFF VALVE, OPEN DURINGNORMAL OPERATION, TYP OF 2

NORMAL OPERATION, TYP. OF 2

SETRA MODEL 230 WET-TO-WETPRESSURE TRANSDUCER. SELECTRANGE BASED ON ANTICIPATED ORMEASURED DIFFERENTIAL PRESSURESMALLER RANGE INCREASES ACCURACY

1/2" TYPICAL

SEE PLAN DRAWINGSFOR MAIN SIZES

Graphic Scale

PRELIMINARYNOT FOR

CONSTRUCTION

AUBURN PORTLAND PORTSMOUTH BOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By: Harriman Associatesc

Proj North

Issues and Revisions

DescriptionDate

Plo

t Dat

e:

UNH NECBOILER UPGRADES

PROJECT ID: 2016-0402

6/18

/201

8 11

:10:

45 A

M

DURHAM, NEW HAMPSHIRE

16642

M30.2

CG

BPH

DETAILS

2018

NO SCALE1 ONE SHOT CHEMICAL FEEDER

05-26-17 DESIGN DEVELOPMENT08-18-17 50% REVIEW05-31-18 FINAL REVIEW

NO SCALE3 IN LINE PUMP

NO SCALE2 CONDENSATE RECIEVER/PUMPSET PIPING

Page 9: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

Graphic Scale

PRELIMINARYNOT FOR

CONSTRUCTION

AUBURN PORTLAND PORTSMOUTH BOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By: Harriman Associatesc

Proj North

Issues and Revisions

DescriptionDate

Plo

t Dat

e:

UNH NECBOILER UPGRADES

PROJECT ID: 2016-0402

6/18

/201

8 11

:10:

51 A

M

DURHAM, NEW HAMPSHIRE

16642

M40.1

CG

BPH

SCHEDULES

2018

BOILER SCHEDULETAG MANUFACTURER MODEL

FUELTYPE

INPUT(MBH)

OUTPUT(MBH)

FLOW(GPM) EWT LWT VOLTS PHASE

WEIGHT(LBS) NOTES

B-1 CLEAVER BROOKS CFC-2500-125 NG 2500 2200 250 200 180 115 1 4685B-2 CLEAVER BROOKS CFC-2500-125 NG 2500 2200 250 200 180 115 1 4685

AIR SEPARATOR SCHEDULETAG MANUFACTURER MODEL SERVICE PIPE SIZE

FLOW(GPM)

WPD(FT WG)

DIAMETER(IN)

HEIGHT(IN) NOTES

AS-1 SPIROTHERM VDT600 B1&B2 5" 500 3 13 19

EXPANSION TANK SCHEDULE

TAG MANUFACTURER MODEL SERVICEVOLUME

(GAL.)

ESTIMATEDSYSTEM VOL.

(GAL)MIN TEMP.

(DEG. F)MAX TEMP

(DEG .F)DIAMETER

(IN)HEIGHT

(IN)WEIGHT

(LBS) NOTESET-1 TACO CA1000-125 HOT WATER 264.0 4714.0 40 240 30 79 2260

PUMP SCHEDULETAG MANUFACTURER MODEL SERVICE

FLOW(GPM)

HEAD(FT.WG)

EFF'Y(%)

SPEED(RPM)

ELECTRIC MOTORCONTROL NOTESHP PHASE VOLTS

P-1 GRUNDFOS VLSE NEC LEARNING CENTER 500 GPM 25 72.6 1780 10 3 460 VFDP-2 GRUNDFOS VLSE NEC LEARNING CENTER 500 GPM 25 72.6 1780 10 3 460 VFDP-3 GRUNDFOS VLSE NEC CONFERENCE CENTER 330 GPM 50 76 1775 7.5 3 460 VFDP-4 GRUNDFOS VLSE NEC CONFERENCE CENTER 330 GPM 50 76 1775 7.5 3 460 VFDP-5 GRUNDFOS CRE-DP NEC LEARNING CENTER 55 GPM 95 71 3599 7.5 3 460 VFDP-6 GRUNDFOS CRE-DP NEC LEARNING CENTER 55 GPM 95 71 3599 7.5 3 460 VFD

05-26-17 DESIGN DEVELOPMENT08-18-17 50% REVIEW05-31-18 FINAL REVIEW

Page 10: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

REF:A1

--

1.

2.

3.

4.

5.

6.

7.

8.

UNLESS OTHERWISE NOTED, WIRING SHALL BE 2#12 AWG

CONDUCTORS & #12 GND. HOMERUNS FED FROM 20A, SINGLE

POLE CIRCUITS IN EXCESS OF 100 FEET SHALL BE #10 AWG

UNLESS INDICATED OTHERWISE. INSULATION TYPE SHALL BE

THHN/TWHN, 75 DEG. C, AND 600V CLASS UNLESS SPECIFIED

OTHERWISE.

FLEXIBLE CONNECTIONS TO MOTORS SHALL BE

FLEXIBLE LIQUID TIGHT CONDUIT.

9.

10.

11.

12.

13.

14.

15.

16.

17.

UNLESS OTHERWISE NOTED, ALL WIRING SHALL

BE 600V, COPPER WITH THHN-THWN INSULATION.

WHERE A DISCREPANCY OCCURS BETWEEN THE

DRAWINGS AND THE SPECIFICATIONS, THE

SPECIFICATIONS SHALL PREVAIL. CONTACT THE

ENGINEER FOR CLARIFICAION WHEN SUCH A

SITUATION OCCURS.

WHERE IT IS INDICATED THAT EXISTING WIRING

IS TO BE REUSED, THE ELECTRICAL SUBCONTRACTOR

SHALL VERIFY THAT THE INTEGRITY OF THE INSULATION

IS ADEQUATE FOR REUSE. ALL SUSPECT WIRING SHALL

BE REPLACED BY THE SUBCONTRACTOR.

NOTES

DOTTED INDICATES EXISTING EQUIPMENT

(REFER TO LEGEND FOR TYPE)

EXISTING TO REMAIN(E)

(R)

(RL)

(ER)EXISTING IN NEW LOCATION

(XN)

FIRE ALARM RED

BLUE

SIGNAL (NURSE CALL, PA)

AUDIO VISUAL

480V

277V

120V

208V

PURPLE

WHITE

BROWN

ORANGE

BLACK

GENERAL NOTES GENERAL NOTES (CON'T) EXISTING

EQUIPMENT LEGEND

JUNCTION BOX IDENTIFICATION

COLOR CODE CHART

EXISTING TO BE DISCONNECTED AND REMOVED

EXISTING TO BE DISCONNECTED AND RELOCATED

ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH

THE LATEST EDITION OF NFPA 70, NATIONAL ELECTRICAL

CODE (NEC), OSHA REGULATIONS, AS WELL AS APPLICABLE

REGULATIONS OF THE PERTINENT FEDERAL, STATE, COUNTY,

AND CITY AGENCIES. PROVIDE MATERIALS AND EQUIPMENT

THAT COMPLY WITH ANSI, IEEE, IES, AND NEMA STANDARDS.

WHERE APPLICABLE, PROVIDE ONLY MATERIALS THAT ARE

U.L. LISTED AND LABELED.

THE ELECTRICAL SUBCONTRACTOR SHALL VISIT THE SITE

AND INSPECT EXISTING CONDITIONS, SERVICES, CONDUITS,

SPATIAL CONSIDERATIONS AND ALL OTHER PERTINENT

CONDITIONS TO FULLY FAMILIARIZE HIMSELF WITH

CONDITIONS TO BE ENCOUNTERED IN THE PERFORMANCE

OF THIS WORK. THE ELECTRICAL SUBCONTRACTOR SHALL

COORDINATE THIS WORK WITH THE GENERAL CONTRACTOR

DURING CONSTRUCTION. FAILURE TO DO SO WILL NOT

RELIEVE THE ELECTRICAL SUBCONTRACTOR OF THE

RESPONSIBILITY FOR FULL COMPLETION OF THE WORK

IN ACCORDANCE WITH APPLICABLE DRAWINGS AND

SPECIFICATIONS. VERIFY EXISTING SYSTEMS THAT WILL BE

UTILIZED FOR CONNECTION TO THE NEW SYSTEM. IF

DISCREPANCIES EXIST BETWEEN THE CONTRACT DRAWINGS

AND THE ACTUAL EXISTING CONDITIONS, THE ELECTRICAL

SUBCONTRACTOR SHALL NOTIFY THE ENGINEER/OWNER

PRIOR TO PROCEEDING WITH THE INSTALLATION.

CONDUIT RUNS ARE SHOWN DIAGRAMATICALLY. INSTALL

CONDUIT WITH A MINIMUM OF BENDS IN THE SHORTEST

PRACTICAL DISTANCE CONSIDERING THE BUILDINGS

CONSTRUCTION AND OBSTRUCTIONS, EXCEPT WHERE

OTHERWISE NOTED.

ALL MOTOR SAFETY SWITCHES, DISCONNECTS AND MOTOR

STARTERS THAT ARE NOT PROVIDED BY OTHER DIVISIONS,

SHALL BE PROVIDED BY DIVISION 26, UNLESS SPECIFICALLY

NOTED OTHERWISE.

ALL PENETRATIONS THROUGH FIRE-RATED FLOORS, WALLS

AND PARTITIONS SHALL BE SEALED WITH UL APPROVED

FIRE SEALANT MATERIAL TO MAINTAIN THE RATING

OF THE SEPARATION.

WHERE MATERIAL IS CALLED OUT IN THE LEGEND BY

MANUFACTURER, TYPE OR CATALOG NUMBER, SUCH

DESIGNATIONS ARE TO ESTABLISH STANDARDS OR

DESIRED QUALITY. ACCEPTANCE OR REJECTION OF

THE PROPOSED SUBSTITUTIONS SHALL BE SUBJECT

TO THE APPROVAL OF THE OWNER.

REFER TO ARCHITECTURAL DRAWINGS FOR EXACT

LOCATION OF EQUIPMENT, DEVICES, AND FURNITURE

REQUIREMENTS, PRIOR TO ROUGHING IN FOR SAME.

ALL GENERAL NOTES, SYMBOLS, LISTS, ABBREVIATIONS

AND DETAILS ARE TO BE CONSIDERED APPLICABLE TO

ALL ELECTRICAL DRAWINGS FOR THIS PROJECT.

IN AREAS AFFECTED BY THIS RENOVATION, THE

ELECTRICAL SUBCONTRACTOR SHALL MAINTAIN

CONTINUITY OF EXISTING ELECTRICAL SERVICE.

PRIOR TO REMOVAL OF EQUIPMENT, THE OWNER WILL

INDICATE WHICH EXISTING DEVICES OR MATERIALS

SHALL BE SALVAGED AND TURNED OVER FOR STORAGE.

WHERE EXISTING EQUIPMENT AND DEVICES ARE TO BE

RELOCATED, ALL ASSOCIATED WIRING, CONDUIT AND

ACCESSORIES SHALL BE EXTENDED, RELOCATED OR

REPLACED WHERE REQUIRED.

ALL VARIABLE FREQUENCY DRIVES (VFD) SHALL BE

PROVIDED BY MECHANICAL CONTRACTOR AND

INSTALLED BY ELECTRICAL CONTRACTOR. ELECTRICAL

CONTRACTOR SHALL CIRCUIT ALL VFDS AND PROVIDE

ALL MOTOR RATED SWITCHES AND DISCONENCT SWITCHES.

18.NEW DEVICES SHALL BE RECESSED. SURFACE MOUNTED

DEVICES SHALL ONLY BE USED WHEN SPECIFICALLY

APPROVED BY OWNER AND ARCHITECT. WHEN SURFACE

MOUNTED DEVICES ARE APPROVED THEY SHALL BE

INSTALLED IN A FINISHED WIREMOLD TYPE BOX AND

WIREMOLD WIREMANAGEMENT SYSTEM. SURFACE

MOUNTED CONDUIT AND JUNCTION BOXES WITH

KNOCKOUT LOCATIONS WILL NOT BE ACCEPTED.

REF:B1

--

E L E C T R I C A L L E G E N D

LP#1,3 HOMERUN TO PNLBRD - ARROWS INDICATE NUMBER OF CIRCUITS. CROSS LINES INDICATE NUMBER OF

CONDUCTORS OTHER THAN TWO (PROVIDE NUMBER OF WIRES REQUIRED TO ALLOW SWITCHING SHOWN - E10

SERIES LIGHTING DRAWINGS).

CIRCUIT NUMBER(S)

PANEL DESIGNATION

J JUNCTION BOX

DUPLEX CONVENIENCE RECEPTACLE - MOUNTED C/L UP 24" UNLESS NOTED OTHERWISE

GFI GFCI DUPLEX CONVENIENCE RECEPTACLE - MOUNTED C/L UP 48" UNLESS NOTED OTHERWISE

UNFUSED DISCONNECT SWITCH

## KEYNOTE TAG

CONTROL PANEL

PANELBOARD

1.

a.

2.

b.

FIRE ALARM

SYSTEM NOTES

REFER TO ELECTRICAL DRAWINGS FOR QUANTITIES

AND LOCATIONS OF ALL FIRE ALARM DEVICES

ASSOCIATED WITH FIRE PROTECTION SYSTEMS.

c. MAKE ALL CONNECTIONS AS REQUIRED.

d. PROVIDE ALL REQUIRED PROGRAMMING.

REF:B2

--

LEGEND LIGHTING FIXTURE SCHEDULE

PROVIDE NEW CARBON MONOXIDE

DETECTORS WHERE INDICATED.

PROVIDE NEW FIRE ALARM SMOKE

DETECTORS WHERE INDICATED.

COMBINATION STARTER DISCONNECT SWITCH

MOTOR RATED SWITCH WITH OVERCURRENT PROTECTION

COFIRE ALARM SYSTEM CARBON MONOXIDE DETECTOR

SINGLE POLE SWITCH - MOUNTED 48" AFF

THREE WAY SWITCH - MOUNTED 48" AFF

FOUR WAY POLE SWITCH - MOUNTED 48" AFF

NEW (N)

EXISTING TO BE REPLACED WITH NEW

CONTROL PANEL

FIRE ALARM SYSTEM SMOKE DETECTOR

SFIRE ALARM SYSTEM SPEAKER STROBE

LAMPS, HANGERS, FITTINGS, ETC. FOR A COMPLETE AND PROPER INSTALLATION

ALL FIXTURES SHALL BE FURNISHED COMPLETE WITH ALL HARDWARE

LIGHTING FIXTURE SCHEDULE

TYPE MANUFACTURER CATALOG NO. MTG. VOLTNO. WATT

LAMPS

TYPEREMARKS/BALLAST INFORMATION

72UNVA

LITHONIA

72UNVAE

LITHONIA

1LED120/277UE

LED

LQM-S-3-G-120/277-ELN-SDLITHONIA

UNIVERSAL MOUNTED SINGLE/DUAL FACE BLACK EXIT SIGN WITH GREEN LETTERS AND NICAD BATTERY

LED

LED

LED

LED

SAME AS TYPE A EXCEPT WITH EMERGENCY BATTERY PACK

S OR C

S OR C

IN FIELD TO AVOID DUCTWORK AND PIPING.COORDINATE LOCATION AND MOUNTING TYPE

IN FIELD TO AVOID DUCTWORK AND PIPING.COORDINATE LOCATION AND MOUNTING TYPE

4' LED SURFACE OR CHAIN MOUNTED GASKETED INDUSTRIAL LIGHT

FEM-L48-6000LM-MD-MVOLT-GZ10-35K-90CRI-MHCH36

FEM-L48-6000LM-MD-MVOLT-GZ10-35K-90CRI-BSL-520MHCH36

TIMER SWITCH - MOUNTED 48" AFF. - WATTSTOPPER MODEL #TS-400-G

MODIFY THE EXISTING NOTIFIER NFS2-640(E)

MAIN FIRE ALARM CONTROL PANEL TO

ACCOMMODATE THE NEW DEVICES INDICATED.

PROVIDE NEW ZONES(IDENTIFY AS REQUIRED).

NEW CONTACTS, ADDITIONAL POWER SUPPLIES

AND ALL OTHER ACCESSORIES FOR A COMPLETE

AND OPERATIONAL SYSTEM.

VARIABLE FREQUENCY DRIVE

EXIT SIGN

AUBURN PORTLAND PORTSMOUTH

Harriman Project No.

Drawing Scales

PA / PE:

Drawn By:Harriman Associates

c 2018

Proj North

DescriptionDate

Key Plan

Issues and Revisions

CONSTRUCTION

NOT FOR

PRELIMINARY

BOSTON

DURHAM, NEW HAMPSHIRE

16642

PROJECT ID: 2016-0402

BOILER UPGRADES

UNH NEC

JWT

APG

E00.1

ELECTRICAL LEGEND,

NOTES AND

SCHEDULES

05-26-17 DESIGN DEVELOPMENT

08-18-17 50% REVIEW

05-31-18 FINAL REVIEW

Page 11: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

1NEC BASEMENT PART PLANSCALE: 1/8" = 1'-0"

PUMP SET

BOILER 1

BOILER 2

CHEMICAL FEED PUMP

CHEMICAL FEED PUMP

CONDENSATE PUMPS

003003A MP1 PP1

F

PUMP SET

AUBURN PORTLAND PORTSMOUTH

Harriman Project No.

Drawing Scales

PA / PE:

Drawn By:Harriman Associates

c 2018

Proj North

DescriptionDate

Key Plan

Issues and Revisions

CONSTRUCTION

NOT FOR

PRELIMINARY

BOSTON

DURHAM, NEW HAMPSHIRE

16642

PROJECT ID: 2016-0402

BOILER UPGRADES

UNH NEC

JWT

APG

E05.1

1/8" = 1'-0"0 4' 8' 12'

BASEMENT FLOOR

EXISTING CONDITIONS

05-26-17 DESIGN DEVELOPMENT

08-18-17 50% REVIEW

PART PLAN

05-31-18 FINAL REVIEW

Page 12: P00.1 LEGEND, SCHEDULES, DETAIL & GENERAL NOTES M00.1

Room

B04

Room

B04A

Room

B04B

Room

B04C

003003A MP1 PP1

F

1NEC BASEMENT PART PLANSCALE: 1/8" = 1'-0"

CO

CO

CO

B-2

P-2P-1

P-3

P-4

P-5P-6

NEW 208/120V, 225A, 42 POLE PANEL PP2

4#4/0+1#4G IN 2 1/2"C

NEW 480V, 150A, 42 POLE PANEL 003B

A

A

A

A

A

AE

AE

AE

AE

AE

A

A

A

A

A

A

A

A

A

A

A

A

E

E

3#1/0+1#6G IN 1 1/2"C

003B#1,3,5003B#7,9,11

1,3,5

7,9,11

003B#13,15,17

003B#19,21,2313,15,17

19,21,23

003B#25,27,29

25,27,29

003B#31,33,35

31,33,35

B-1

P01 3#12+1#12G IN 3/4"C

P02 3#10+1#10G IN 3/4"C

P02

P02

P01 P01

P01

P01

P01

IN SPACE 4 TO SERVE NEW PANEL PP2

REUTILIZE EXISTING 225A, 3-POLE SPARE BREAKER

IN SPACE 11 TO SERVE NEW PANEL 003B

REUTILIZE EXISTING 150A, 3-POLE SPARE BREAKER

PP2#1 PP2#3

1 3

PP2#5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

A

5

5

5

ID ID

WATT LOADS

MOUNTING:

LOCATION:

LOAD DESCRIPTIONA

MP

PO

LE

CRKTDWG

NO. PO

LE

WATTSPH A PH B PH C

WATTS

PO

LE

CRKTDWG

NO. PO

LE

AM

P

LOAD DESCRIPTION

FEEDER:AIC RATING:MAIN BREAKER:VOLTAGE:

BUSES:PH & WIRES:

120/208

3P 4W

225

MLO

22K AIC

SURFACE

BASEMENT

SEE DRAWINGPP2

TUB 1 OF 1 - REMARKS:

BOILER B-1 20 1 1 1 500 500 --- --- 0 2 2 1 30 SPARE

BOILER B-2 20 1 3 3 500 --- 500 --- 4 - - -

BOILER RM B04 LIGHTING 20 1 5 5 1656 --- --- 1656 6 - - -

SPARE 20 1 7 7 0 0 --- --- 0 8 8 1 30 SPARE

SPARE 20 1 9 9 0 --- 0 --- 10 - - -

SPARE 20 1 11 11 0 --- --- 0 12 - - -

SPARE 20 1 13 13 0 0 --- --- 0 14 14 1 25 SPARE

SPARE 20 1 15 15 0 --- 0 --- 16 - - -

SPARE 20 1 17 17 0 --- --- 0 18 - - -

SPARE 20 1 19 19 0 0 --- --- 0 20 20 1 20 SPARE

SPARE 20 1 21 21 0 --- 0 --- 22 - - -

SPARE 20 1 23 23 0 --- --- 0 24 - - -

SPARE 20 1 25 25 0 0 --- --- 0 26 26 1 15 SPARE

SPARE 20 1 27 27 0 --- 0 --- 28 - - -

SPARE 20 1 29 29 0 --- --- 0 30 - - -

SPARE 20 1 31 31 0 0 --- --- 0 32 32 1 15 SPARE

SPARE 20 1 33 33 0 --- 0 --- 34 - - -

SPARE 20 1 35 35 0 --- --- 0 36 - - -

SPARE 20 1 37 37 0 0 --- --- 0 38 38 1 100 SPARE

SPARE 20 1 39 39 0 --- 0 --- 40 - - -

SPARE 20 1 41 41 0 --- --- 0 42 - - -

TOTAL AMPS: 7.4 500 500 1656 TOTAL WATTS: 2656

REMARKS:

05/31/2018

ID ID

WATT LOADS

MOUNTING:

LOCATION:

LOAD DESCRIPTION

AM

P

PO

LE

CRKTDWG

NO. PO

LE

WATTSPH A PH B PH C

WATTS

PO

LE

CRKTDWG

NO. PO

LE

AM

P

LOAD DESCRIPTION

FEEDER:AIC RATING:MAIN BREAKER:VOLTAGE:

BUSES:PH & WIRES:

/480

3P 4W

150

MLO

22K AIC

SURFACE

BASEMENT

SEE DRAWING003B

TUB 1 OF 1 - REMARKS:

PUMP P-1 25 1 1 1 11639 11639 --- --- 0 2 2 1 30 SPARE

- - - 3 --- 0 --- 4 - - -

- - - 5 --- --- 0 6 - - -

PUMP P-2 25 1 7 7 11639 11639 --- --- 0 8 8 1 30 SPARE

- - - 9 --- 0 --- 10 - - -

- - - 11 --- --- 0 12 - - -

PUMP P-3 20 1 13 13 9141 9141 --- --- 0 14 14 1 25 SPARE

- - - 15 --- 0 --- 16 - - -

- - - 17 --- --- 0 18 - - -

PUMP P-4 20 1 19 19 9141 9141 --- --- 0 20 20 1 25 SPARE

- - - 21 --- 0 --- 22 - - -

- - - 23 --- --- 0 24 - - -

PUMP P-5 15 1 25 25 6315 6315 --- --- 0 26 26 1 20 SPARE

- - - 27 --- 0 --- 28 - - -

- - - 29 --- --- 0 30 - - -

PUMP P-6 15 1 31 31 6315 6315 --- --- 0 32 32 1 20 SPARE

- - - 33 --- 0 --- 34 - - -

- - - 35 --- --- 0 36 - - -

SPARE 15 1 37 37 0 0 --- --- 0 38 38 1 15 SPARE

- - - 39 --- 0 --- 40 - - -

- - - 41 --- --- 0 42 - - -

TOTAL AMPS: 65.2 54190 0 0 TOTAL WATTS: 54190

REMARKS:

05/31/2018

AUBURN PORTLAND PORTSMOUTH

Harriman Project No.

Drawing Scales

PA / PE:

Drawn By:Harriman Associates

c 2018

Proj North

DescriptionDate

Key Plan

Issues and Revisions

CONSTRUCTION

NOT FOR

PRELIMINARY

BOSTON

DURHAM, NEW HAMPSHIRE

16642

PROJECT ID: 2016-0402

BOILER UPGRADES

UNH NEC

JWT

APG

E20.1

BASEMENT FLOOR

POWER AND SYSTEMS

05-26-17 DESIGN DEVELOPMENT

08-18-17 50% REVIEW

PART PLAN

1/8" = 1'-0"

0 4' 8' 12'

05-31-18 FINAL REVIEW