outcome based report - future ready comprehensive planning ... · 6dvqr\pr=omarqeb`mbrtg...

35
RYNOLD M 605 W Walnut t CI chool Plan | 2020 - 2021 VIION FOR LARNING We are dedicated to providing students and their families a respectful, inclusive, student-led learning environment that develops college, career, and communit-read skills.

Upload: others

Post on 11-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • RYNOLD M

    605 W Walnut t

    CI chool Plan | 2020 - 2021

    VIION FOR LARNING

    We are dedicated to providing students and their families a respectful, inclusive, student-led learning

    environment that develops college, career, and communit-read skills.

  • TRING COMMITT

    Name Position uilding/Group

    Josh Keene Director of chools Office of Teaching &Learning

    Karen Wnn Director of Instructional Programs and ProfessionalDevelopment

    Office of Teaching &Learning

    Aaron winton Principal Renolds Middle chool

    Marie ler Assistant Principal Renolds Middle chool

    Angela Kerrick Assistant Principal Renolds Middle chool

    WendMoncak

    Instructional Coach Renolds Middle chool

    JassinaAlvarado

    Coordinator of chool Climate Office of tudentervices

    AigailDoughert

    Tiered upport Team Leader / MT upport Coach Renolds Middle chool

    AndrewCooradt

    IU 13

    Therese Lewis IU 13

  • vidence-ased trateg

    Provide a tiered sstem of instructional and ehavioral supports and interventions. (TRONG)

    Practice guides developed and availale through What Works Cleaninghouse suggest the

    e ectiveness of Response to Intervention approaches for elementar reading and math (Gerstron,

    2009). In addition, recent e ect sizes  John Hattie (2016) are high (1.07).

    Measurale Goals

    Goal Nickname Measurale Goal tatement (mart Goal)

    TALIHD PRIORITI

    Priorit tatement Outcome Categor

    If we foster a culture of high ehavioral expectations with a seamless sstem ofprevention, intentional implementation and ongoing proactive ehavioralsupport for all students, we will then effectivel identif and address individualstudent ehavioral needs.

    ssential Practices

    3: Provide

    tudent-Centered

    upport stems

    chool climate

    and culture

    ssential Practices

    3: Provide

    tudent-Centered

    upport stems

    If we explicitl implement tep Up to Writing, the qualit of student writing willincrease as demonstrated on the LA PA.

    nglish Language

    Arts

    chool climate

    and culture

    Career tandards

    enchmark

    If we implement targeted instruction specific to Modeling with Math andMaking ense of Prolems through the Numer stem, then students willdemonstrate an increase across all MATH PA reporting categories.

    Mathematics

    Career tandards

    enchmark

    Career tandards

    enchmark

    ACTION PLAN AND TP

  • Goal Nickname Measurale Goal tatement (mart Goal)

    PI  June 2021, 50% of students receiving PI Tier 1 supports willparticipate in the school’s PI sstem using PI language to self-regulate and engaged in classroom instruction as measured  CAT,walkthrough data, & PI rewards.

    Action tepAnticipatedtart/Completion

    LeadPerson/Position

    Materials/Resources/upportsNeeded

    Create an electronic walkthroughform with student "look fors"using iOservation

    2020-08-24 -2020-09-03

    Coordinator ofchoolClimate

    iOservation

    Create a walkthrough schedule 2020-08-24 -2020-09-30

    Coordinator ofchoolClimate Tieredupport/MT

    walkthrough form

    Create a schedule forinstructional staff walkthroughsusing the Classroom AssistanceTool

    2020-08-24 -2020-09-30

    TieredupportInstructionalCoach

    walkthrough form

    Conduct professionaldevelopment on the Tier 2screening and referral process

    2020-08-24 -2020-09-30

    Tieredupport/MTInstructionalCoachPrincipalAssistantPrincipal

    Host focus groups with studentsto receive feedack on studentcentered climate and culture

    2020-08-24 -2021-05-31

    Tieredupport/MTGuidance

    Create incentives for individualsand homerooms with estquarterl attendance

    2020-10-01 -2021-06-11

    Tieredupport/MTPI Team

    Conduct monthl classroomwalkthroughs

    2020-08-24 -2021-06-01

    Leadership iOservation

    Instructional staff will conductquarterl informal walkthroughsusing the CAT.

    - Instructionaltaff

    CAT

    Teacher will receive monthl PD 2020-09-01 - Leadership

  • Action tepAnticipatedtart/Completion

    LeadPerson/Position

    Materials/Resources/upportsNeeded

    on est practices for climate,ehavioral interventions, andstrengthening PIImplementation

    2021-05-15 Tieredupport/MTInstructionalCoach

    Teachers will utilize the ehaviorflowchart to address specificehaviors that are linked toschool-wide expectations andused across settings.

    2020-08-24 -2021-06-01

    ClassroomTeachers

    ehavior Flowchart

    chool will hold eginning of theear "PI Kick-Off" wherestudents will learn aout school-wide expectations andprocedures that promote apositive school climate.

    2020-08-24 -2020-09-30

    PI TeamTieredupport/MT

    Teachers will implement the Tier1 practices defined in items 1-11 ofthe elf-Assessment urve:Classroom stems.

    2020-08-24 -2020-09-30

    ClassroomTeachers

    Teachers will review schoolwidedata regularl and provide inputon universal foundations (e.g.,expectations,acknowledgements, definitions,consequences).

    2020-08-24 -2021-06-10

    Tieredupport/MT

    The student services team willtrack student progress andgrowth through towardsimprovement through nergdocumentation. Additionalsupports or referrals are made asneeded.

    2020-08-24 -2021-06-10

    tudentervices Team

    Conduct elf-Assessment urve 2020-08-24 -2020-10-30

    Coordinator ofchoolClimate

    Conduct quarterl informalwalkthroughs of Tier 1 stems

    2020-08-24 -2021-06-10

    Coordinator ofchoolClimate

  • Action tepAnticipatedtart/Completion

    LeadPerson/Position

    Materials/Resources/upportsNeeded

    Anticipated Outcome

    Decrease in classroom oservations (issues) and o ce referrals Increased classroom engagement

    Increased academic achievement

    Monitoring/valuation

    nerg (I) Classroom oservations/walkthroughs tudent achievement data (grades, CDTs, work

    samples, IXL)

    vidence-ased trateg

    ngage instructional teams in assessing and monitoring student master. (TRONG); Master

    learning and frequent assessment of student master through formative assessment approaches are

    wellsupported  research (Hattie & Timperle, 2007). Hattie’s e ect sizes also show strong e ects

    for master learning and frequent formative evaluation.

    Measurale Goals

    Goal Nickname Measurale Goal tatement (mart Goal)

    Writing  June 30, 2021, 85% of students will demonstrate growth in theirwriting performance, as demonstrated  an increase of at least onelevel on the LA PA Text-Dependent Analsis, compared to the FallWritten Response assessment (unless otaining a score of 3 or higheron the aseline assessment).

    Conduct Tiered Fidelit Inventor(TFI) (2) and Action Plan

    2020-08-24 -2021-02-01

    Coordinator ofchoolClimate

    TFI Action Plan

    Conduct PI famil surveduring Parent/TeacherConferences (Novemer &Feruar)

    2020-08-24 -2021-03-01

    PI Team PI urve

    Action tepAnticipatedtart/Completion

    LeadPerson/Position

    Materials/Resources/upportsNeeded

    District and chool LeadershipTeams will plan and provideongoing professionaldevelopment specific to

    2020-08-17 -2021-06-30

    Coordinator ofecondarLA andocial tudies

    tep Up to WritingFramework

  • Action tepAnticipatedtart/Completion

    LeadPerson/Position

    Materials/Resources/upportsNeeded

    strengthening student writingthrough the use of tep Up toWriting.

    PrincipalAssistantPrincipalInstructionalCoach

    tudents will take aseline tepUp to Writing Assessment.

    2020-08-24 -2020-09-30

    InstructionalCoachClassroomTeachers

    tep Up to WritingFramework

    Teachers will utilize tep Up toWriting scoring guides (rurics)and exemplars that identif whatstudents need to do to revisetheir writing to reach proficientand advanced levels.

    2020-08-24 -2021-06-30

    ClassroomTeacher

    tep Up to Writing coringGuide

    Teachers will teach studentscommon expectations andlanguage for writing instructionacross all LA and content areaclassrooms.

    2020-08-24 -2021-06-30

    ClassroomTeacher

    tep Up to WritingResources

    tudents will e provided withfrequent opportunities todemonstrate writing throughinformative/explanator,opinion/argument, and narrativewriting.

    2020-08-24 -2021-06-30

    ClassroomTeachers

    tep Up to WritingResources

    Teachers will engage in ongoingprogress monitoring examining student work. This willoccur during grade level andsuject specific team meetings.

    2020-08-24 -2021-06-30

    ClassroomTeachers

    tudent Work

    Teachers will conference withstudents specific to supportingwriting development.

    2020-08-24 -2021-06-30

    ClassroomTeachers

    tudent Work

    pecial ducation, L, andclassroom teachers will engagein ongoing collaoration onspecific student needs.

    2020-08-24 -2021-06-30

    ClassroomTeachersInstructionalCoach

    tudent writing samples

  • Action tepAnticipatedtart/Completion

    LeadPerson/Position

    Materials/Resources/upportsNeeded

    Anticipated Outcome

    Monitoring/valuation

    vidence-ased trateg

    Provide a tiered sstem of instructional and ehavioral supports and interventions. (TRONG)

    Practice guides developed and availale through What Works Cleaninghouse suggest the

    e ectiveness of Response to Intervention approaches for elementar reading and math (Gerstron,

    2009). In addition, recent e ect sizes  John Hattie (2016) are high (1.07).

    Measurale Goals

    Goal Nickname Measurale Goal tatement (mart Goal)

    PA Math  June 2021, 33.5% of students will e proficient or advanced on theMath PA.

    Teachers will e evaluated ontheir progress toward meetingthe standards for their teachingpractice ased on their personalinstructional planning andpractice and then given specificfeedack to ensure continuedprofessional growth.

    2020-09-01 -2021-06-30

    PrincipalAssistantPrincipal

    iOservation

    Teachers who are not meetingexpectations will receiveadditional intensive support fromthe Leadership Team and/orInstructional Coach.

    2020-09-30 -2021-06-30

    PrincipalAssistantPrincipalInstructionalCoach

    iOservation Report

    Action tepAnticipatedtart/Completion

    LeadPerson/Position

    Materials/Resources/upportsNeeded

    Administer the full Math CDT to allstudents.

    2020-08-24 -2020-09-30

    InstructionalCoachCoordinator ofecondarMath

    Classroom Diagnostic Test

  • Action tepAnticipatedtart/Completion

    LeadPerson/Position

    Materials/Resources/upportsNeeded

    Anticipated Outcome

    Coordinator ofAssessment,valuation,and Research

    Teachers will meet with studentsindividuall to conference andidentif a math goal.

    2020-08-24 -2020-10-16

    ClassroomTeachers

    CDT Results Goal Trackingheet

    tudents will engage in iXL MathIntervention Program to strengthenthe numer sstem skills necessarfor success across all mathcategories.

    2020-09-01 -2021-06-30

    ClassroomTeacher

    iXL Math Interventiontudent iPads

    Teachers will monitor studentperformance and adjustinterventions responsivelaccording to iXL, CDT , andclassroom data.

    2020-09-01 -2021-06-30

    ClassroomTeachers

    tudent AchievementReports iXL MathIntervention

    Administer the CDT: DiagnosticCategor – Numers andOperations – Winter and pring

    2020-12-12 -2021-03-31

    InstructionalCoachCoordinator ofecondarMathCoordinator ofAssessment,valuation,and Research

    CDT

    Administrative Leadership Teamwill develop schedule forimplementing theOservation/upervision/valuationProcess. Leadership team memerswill oserve (formal and informal)Math classes and interventionperiods and provide feedackased on standards alignedinstruction and rigor of tasks.

    2020-08-24 -2020-09-15

    PrincipalAssistantPrincipal

    Oservation cheduleiOservation

  • Monitoring/valuation

  • ADDNDUM A: ACKGROUND INFORMATION TO INFORM PLAN

    trengths

    LA/Literature-L--Increase over 2017/2018 of10% respectivel

    Mathematics/Algera-tudents withDisailities-Increase over 2017/2018 of 3.4%

    arl Indicators of uccess-Grade 7 Math-Increase of 8.5% over 2017/2018

    Local LA written response-9% increase inoverall scores from Winter 2019 to Winter2020

    7th Grade LA 49% Proficient/Advanced-Outperformed overall uilding percentage 6.4%

    7th Grade Proficient/Advanced 19%-Outperformed uilding  2%

    8th Grade cience-Reporting Categor 2iological ciences-Out performed overalluilding score  8.3%

    Implement an evidence-ased sstem ofschoolwide positive ehavior interventionsand supports

    Identif professional learning needs throughanalsis of a variet of data

    Use multiple professional learning designs tosupport the learning needs of staff

    Implement a multi-tiered sstem of supportsfor academics and ehavior

    Increases over 2017/2018 of 10%

    Decrease in overall referrals from 2018/2019

    Outperformed the statewide averageperformance standard enchmark  1.9%

    Challenges

    Math Written Response-decrease 3% eachear from 2018 to 2020

    8th Grade LA 30% Proficient/Advanced-Under performed overall uilding percentage 12.6%

    8th Grade Proficient/Advanced 13%-Underperformed uilding  4%

    28.7% of students meeting thegoal/improvement target in 8th Gradecience--37.3% elow the statewide averagefor 8th Grade cience

    Align curricular materials and lesson plans tothe PA tandards

    Use a variet of assessments (includingdiagnostic, formative, and summative) tomonitor student learning and adjust programsand instructional practices

    Provide frequent, timel, and sstematicfeedack and support on instructionalpractices

    Collectivel shape the vision for continuousimprovement of teaching and learning

    Foster a culture of high expectations forsuccess for all students, educators, families,and communit memers

    LA/Literature PVAA-Decrease in all studentgroups over 2017/2018

    Mathematics/Algera PVAA-Decrease in allstudent groups over 2017/2018

    The school lacks consistent expectations,processes, rurics for writing across contentareas and grade levels

  • Challenges

    tudents are struggling with all math tasksecause the lack the foundational skillsnecessar to complete grade level prolems

    Underperformed overall school score  4.4%in LA; 2.1% in Math; 4.0% in cience

    No consistent decrease in the numer OfficeReferrals

    40% of classroom oservations (issues) arecoded as Defiance/ Disrespect/NonCompliance

    Underperformed the performance standardenchmark  6.3%

    Most Notale Oservations/Patterns

    In examining Math PA and local written response data, we noticed that student performancescores in numers and operations (6th & 7th grade) and algeraic concepts (8th grade) continue todecrease over the past 4 ears. Across grade levels, students are scoring well elow the possilepoint totals for written responses in oth LA and Math.

  • Challenges Discussion Point Priorit for Planning

    Math Written Response-decrease3% each ear from 2018 to 2020

    Foster a culture of highexpectations for success for allstudents, educators, families, andcommunit memers

    tudents are demonstrating negativeehaviors that effect their ailit toparticipate meaningfull in instruction anddisrupt the learning environment forothers.

    The school lacks consistentexpectations, processes, ruricsfor writing across content areasand grade levels

    Our students are not ale to producewriting that meets the expectations oftheir grade level.

    tudents are struggling with allmath tasks ecause the lack thefoundational skills necessar tocomplete grade level prolems

    tudents lack the foundational skills touild upon new content. Consequentl,students are disconnected with math.

    No consistent decrease in thenumer Office Referrals

    40% of classroom oservations(issues) are coded as Defiance/Disrespect/ NonCompliance

  • ADDNDUM : ACTION PLAN

    Action Plan: Provide a tiered sstem of instructional and ehavioral supports and interventions.

    (TRONG) Practice guides developed and availale through What Works Cleaninghouse suggest the

    e ectiveness of Response to Intervention approaches for elementar reading and math (Gerstron,

    2009). In addition, recent e ect sizes  John Hattie (2016) are high (1.07).

    Action teps Anticipated tart/Completion Date

    Create an electronic walkthrough form with student"look fors" using iOservation

    08/24/2020 - 09/03/2020

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    iOservation no

    Action teps Anticipated tart/Completion Date

    Create a walkthrough schedule 08/24/2020 - 09/30/2020

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    walkthrough form no

  • Action teps Anticipated tart/Completion Date

    Create a schedule for instructional staff walkthroughsusing the Classroom Assistance Tool

    08/24/2020 - 09/30/2020

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    walkthrough form no

    Action teps Anticipated tart/Completion Date

    Conduct professional development on the Tier 2screening and referral process

    08/24/2020 - 09/30/2020

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    es

  • Action teps Anticipated tart/Completion Date

    Host focus groups with students to receive feedackon student centered climate and culture

    08/24/2020 - 05/31/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    no

    Action teps Anticipated tart/Completion Date

    Create incentives for individuals and homerooms withest quarterl attendance

    10/01/2020 - 06/11/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    no

  • Action teps Anticipated tart/Completion Date

    Conduct monthl classroom walkthroughs 08/24/2020 - 06/01/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    iOservation no

    Action teps Anticipated tart/Completion Date

    Instructional staff will conduct quarterl informalwalkthroughs using the CAT.

    01/01/0001 - 01/01/0001

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    CAT no

  • Action teps Anticipated tart/Completion Date

    Teacher will receive monthl PD on est practices forclimate, ehavioral interventions, and strengtheningPI Implementation

    09/01/2020 - 05/15/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    es

    Action teps Anticipated tart/Completion Date

    Teachers will utilize the ehavior flowchart to addressspecific ehaviors that are linked to school-wideexpectations and used across settings.

    08/24/2020 - 06/01/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    ehavior Flowchart no

  • Action teps Anticipated tart/Completion Date

    chool will hold eginning of the ear "PI Kick-Off"where students will learn aout school-wideexpectations and procedures that promote a positiveschool climate.

    08/24/2020 - 09/30/2020

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    no

    Action teps Anticipated tart/Completion Date

    Teachers will implement the Tier 1 practices defined initems 1-11 of the elf-Assessment urve: Classroomstems.

    08/24/2020 - 09/30/2020

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    no

  • Action teps Anticipated tart/Completion Date

    Teachers will review schoolwide data regularl andprovide input on universal foundations (e.g.,expectations, acknowledgements, definitions,consequences).

    08/24/2020 - 06/10/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    no

    Action teps Anticipated tart/Completion Date

    The student services team will track student progressand growth through towards improvement throughnerg documentation. Additional supports orreferrals are made as needed.

    08/24/2020 - 06/10/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    es

  • Action teps Anticipated tart/Completion Date

    Conduct elf-Assessment urve 08/24/2020 - 10/30/2020

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    no

    Action teps Anticipated tart/Completion Date

    Conduct quarterl informal walkthroughs of Tier 1stems

    08/24/2020 - 06/10/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    no

  • Action teps Anticipated tart/Completion Date

    Conduct Tiered Fidelit Inventor (TFI) (2) and ActionPlan

    08/24/2020 - 02/01/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    TFI Action Plan no

    Action teps Anticipated tart/Completion Date

    Conduct PI famil surve during Parent/TeacherConferences (Novemer & Feruar)

    08/24/2020 - 03/01/2021

    Monitoring/valuation Anticipated Output

    nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)

    Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement

    Material/Resources/upports Needed PD tep

    PI urve no

    Action Plan: ngage instructional teams in assessing and monitoring student master. (TRONG);

    Master learning and frequent assessment of student master through formative assessment

    approaches are wellsupported  research (Hattie & Timperle, 2007). Hattie’s e ect sizes also

    show strong e ects for master learning and frequent formative evaluation.

  • Action teps Anticipated tart/Completion Date

    District and chool Leadership Teams will plan andprovide ongoing professional development specific tostrengthening student writing through the use of tepUp to Writing.

    08/17/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tep Up to Writing Framework es

    Action teps Anticipated tart/Completion Date

    tudents will take aseline tep Up to WritingAssessment.

    08/24/2020 - 09/30/2020

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tep Up to Writing Framework no

  • Action teps Anticipated tart/Completion Date

    Teachers will utilize tep Up to Writing scoring guides(rurics) and exemplars that identif what studentsneed to do to revise their writing to reach proficientand advanced levels.

    08/24/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tep Up to Writing coring Guide no

    Action teps Anticipated tart/Completion Date

    Teachers will teach students common expectationsand language for writing instruction across all LA andcontent area classrooms.

    08/24/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tep Up to Writing Resources no

  • Action teps Anticipated tart/Completion Date

    tudents will e provided with frequent opportunitiesto demonstrate writing throughinformative/explanator, opinion/argument, andnarrative writing.

    08/24/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tep Up to Writing Resources no

    Action teps Anticipated tart/Completion Date

    Teachers will engage in ongoing progress monitoring examining student work. This will occur duringgrade level and suject specific team meetings.

    08/24/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tudent Work no

    Action teps Anticipated tart/Completion Date

    Teachers will conference with students specific tosupporting writing development.

    08/24/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tudent Work no

  • Action teps Anticipated tart/Completion Date

    pecial ducation, L, and classroom teachers willengage in ongoing collaoration on specific studentneeds.

    08/24/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tudent writing samples no

    Action teps Anticipated tart/Completion Date

    Teachers will e evaluated on their progress towardmeeting the standards for their teaching practiceased on their personal instructional planning andpractice and then given specific feedack to ensurecontinued professional growth.

    09/01/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    iOservation no

  • Action teps Anticipated tart/Completion Date

    Teachers who are not meeting expectations willreceive additional intensive support from theLeadership Team and/or Instructional Coach.

    09/30/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    iOservation Report no

    Action Plan: Provide a tiered sstem of instructional and ehavioral supports and interventions.

    (TRONG) Practice guides developed and availale through What Works Cleaninghouse suggest the

    e ectiveness of Response to Intervention approaches for elementar reading and math (Gerstron,

    2009). In addition, recent e ect sizes  John Hattie (2016) are high (1.07).

    Action teps Anticipated tart/Completion Date

    Administer the full Math CDT to all students. 08/24/2020 - 09/30/2020

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    Classroom Diagnostic Test no

  • Action teps Anticipated tart/Completion Date

    Teachers will meet with students individuall toconference and identif a math goal.

    08/24/2020 - 10/16/2020

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    CDT Results Goal Tracking heet no

    Action teps Anticipated tart/Completion Date

    tudents will engage in iXL Math Intervention Programto strengthen the numer sstem skills necessar forsuccess across all math categories.

    09/01/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    iXL Math Intervention tudent iPads no

    Action teps Anticipated tart/Completion Date

    Teachers will monitor student performance and adjustinterventions responsivel according to iXL, CDT , andclassroom data.

    09/01/2020 - 06/30/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    tudent Achievement Reports iXL Math Intervention no

  • Action teps Anticipated tart/Completion Date

    Administer the CDT: Diagnostic Categor – Numersand Operations – Winter and pring

    12/12/2020 - 03/31/2021

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    CDT no

    Action teps Anticipated tart/Completion Date

    Administrative Leadership Team will developschedule for implementing theOservation/upervision/valuation Process.Leadership team memers will oserve (formal andinformal) Math classes and intervention periods andprovide feedack ased on standards alignedinstruction and rigor of tasks.

    08/24/2020 - 09/15/2020

    Monitoring/valuation Anticipated Output

    Material/Resources/upports Needed PD tep

    Oservation chedule iOservation no

  • ADDNDUM C: PROFIONAL DVLOPMNT PLAN

    Measurale GoalsAction PlanName

    ProfessionalDevelopment tep

    AnticipatedTimeline

     June 2021, 50% of students receiving PI

    Tier 1 supports will participate in the school’s

    PI sstem using PI language to self-

    regulate and engaged in classroom

    instruction as measured  CAT, walkthrough

    data, & PI rewards. (PI)

    Provide atiered sstemof instructionaland ehavioralsupports andinterventions.(TRONG)Practiceguidesdeveloped andavailalethrough WhatWorksCleaninghousesuggest theeffectivenessof Response toInterventionapproaches forelementarreading andmath(Gerstron,2009). Inaddition,recent effectsizes  JohnHattie (2016)are high (1.07).

    Conductprofessionaldevelopment onthe Tier 2screening andreferral process

    08/24/2020-09/30/2020

     June 2021, 50% of students receiving PI

    Tier 1 supports will participate in the school’s

    PI sstem using PI language to self-

    regulate and engaged in classroom

    instruction as measured  CAT, walkthrough

    data, & PI rewards. (PI)

    Provide atiered sstemof instructionaland ehavioralsupports andinterventions.(TRONG)Practiceguidesdeveloped andavailale

    Teacher willreceive monthlPD on estpractices forclimate,ehavioralinterventions, andstrengtheningPIImplementation

    09/01/2020- 05/15/2021

  • Measurale GoalsAction PlanName

    ProfessionalDevelopment tep

    AnticipatedTimeline

    through WhatWorksCleaninghousesuggest theeffectivenessof Response toInterventionapproaches forelementarreading andmath(Gerstron,2009). Inaddition,recent effectsizes  JohnHattie (2016)are high (1.07).

     June 2021, 50% of students receiving PI

    Tier 1 supports will participate in the school’s

    PI sstem using PI language to self-

    regulate and engaged in classroom

    instruction as measured  CAT, walkthrough

    data, & PI rewards. (PI)

    Provide atiered sstemof instructionaland ehavioralsupports andinterventions.(TRONG)Practiceguidesdeveloped andavailalethrough WhatWorksCleaninghousesuggest theeffectivenessof Response toInterventionapproaches forelementarreading andmath(Gerstron,2009). Inaddition,recent effect

    The studentservices team willtrack studentprogress andgrowth throughtowardsimprovementthrough nergdocumentation.Additionalsupports orreferrals are madeas needed.

    08/24/2020- 06/10/2021

  • Measurale GoalsAction PlanName

    ProfessionalDevelopment tep

    AnticipatedTimeline

    sizes  JohnHattie (2016)are high (1.07).

     June 30, 2021, 85% of students will

    demonstrate growth in their writing

    performance, as demonstrated  an increase

    of at least one level on the LA PA Text-

    Dependent Analsis, compared to the Fall

    Written Response assessment (unless

    otaining a score of 3 or higher on the

    aseline assessment). (Writing)

    ngageinstructionalteams inassessing andmonitoringstudentmaster.(TRONG);Masterlearning andfrequentassessment ofstudentmasterthroughformativeassessmentapproachesarewellsupported research(Hattie &Timperle,2007). Hattie’seffect sizesalso showstrong effectsfor masterlearning andfrequentformativeevaluation.

    District andchool LeadershipTeams will planand provideongoingprofessionaldevelopmentspecific tostrengtheningstudent writingthrough the use oftep Up toWriting.

    08/17/2020-06/30/2021

    PROFIONAL DVLOPMNT PLAN

  • Professional Development tep Audience Topics of Prof. Dev

    Tier 2 creening and ReferralProcess

    All staff Referral process for Tier 2Identifing appropriateinterventions ehaviorinterventions Roles that teacherpla in Tier 2 supports

    vidence of Learning Anticipated Timeframe Lead Person/Position

    Proper sumission of referralsInformal Classroom Walkthroughs

    08/24/2020 - 09/30/2020 Tiered upport/MTtudent upport Team

    Danielson Framework Component Met in this Plan:This tep meets theRequirements of tateRequired Trainings:

    4e: Growing and Developing Professionall Teaching Diverse Learners inan Inclusive ettingTeaching Diverse Learners inan Inclusive etting

    Professional Development tep Audience Topics of Prof. Dev

    PI Implementation All staff Classroom Managementtrategies Restorative Practicesehavior InterventionsDeescalation trategiesngagement trategies

    vidence of Learning Anticipated Timeframe Lead Person/Position

    Informal/Formal Oservationsehavioral Data

    08/24/2020 - 05/01/2021 Tiered upport/MT tudentervices Team

  • Danielson Framework Component Met in this Plan:This tep meets theRequirements of tateRequired Trainings:

    2d: Managing tudent ehavior

    2a: Creating and nvironment of Respect and Rapport

    2a: Creating and nvironment of Respect and Rapport

    2: stalishing a Culture for Learning

    2a: Creating and nvironment of Respect and Rapport

    2d: Managing tudent ehavior

    Teaching Diverse Learners inan Inclusive ettingTeaching Diverse Learners inan Inclusive ettingTeaching Diverse Learners inan Inclusive etting

    Professional Development tep Audience Topics of Prof. Dev

    tep Up to Writing Classroom Teachers Common coring Prompt WritingAnalzing student outcomesCurriculum IntegrationFramework ImplementationFoundational Writing kills

    vidence of Learning Anticipated Timeframe Lead Person/Position

    tudent work samples RuricsTeacher Feedack

    08/24/2020 - 05/01/2021 Instructional CoachPrincipal/Assistant Principals

    Danielson Framework Component Met in this Plan:This tep meets theRequirements of tateRequired Trainings:

    4d: Participating in a Professional Communit

    1a: Demonstrating Knowledge of Content and Pedagog

    Language and LiteracAcquistion for All tudentsLanguage and LiteracAcquistion for All tudentsLanguage and LiteracAcquistion for All tudents