outcome based report - future ready comprehensive planning ... · 6dvqr\pr=omarqeb`mbrtg...
TRANSCRIPT
-
RYNOLD M
605 W Walnut t
CI chool Plan | 2020 - 2021
VIION FOR LARNING
We are dedicated to providing students and their families a respectful, inclusive, student-led learning
environment that develops college, career, and communit-read skills.
-
TRING COMMITT
Name Position uilding/Group
Josh Keene Director of chools Office of Teaching &Learning
Karen Wnn Director of Instructional Programs and ProfessionalDevelopment
Office of Teaching &Learning
Aaron winton Principal Renolds Middle chool
Marie ler Assistant Principal Renolds Middle chool
Angela Kerrick Assistant Principal Renolds Middle chool
WendMoncak
Instructional Coach Renolds Middle chool
JassinaAlvarado
Coordinator of chool Climate Office of tudentervices
AigailDoughert
Tiered upport Team Leader / MT upport Coach Renolds Middle chool
AndrewCooradt
IU 13
Therese Lewis IU 13
-
vidence-ased trateg
Provide a tiered sstem of instructional and ehavioral supports and interventions. (TRONG)
Practice guides developed and availale through What Works Cleaninghouse suggest the
e ectiveness of Response to Intervention approaches for elementar reading and math (Gerstron,
2009). In addition, recent e ect sizes John Hattie (2016) are high (1.07).
Measurale Goals
Goal Nickname Measurale Goal tatement (mart Goal)
TALIHD PRIORITI
Priorit tatement Outcome Categor
If we foster a culture of high ehavioral expectations with a seamless sstem ofprevention, intentional implementation and ongoing proactive ehavioralsupport for all students, we will then effectivel identif and address individualstudent ehavioral needs.
ssential Practices
3: Provide
tudent-Centered
upport stems
chool climate
and culture
ssential Practices
3: Provide
tudent-Centered
upport stems
If we explicitl implement tep Up to Writing, the qualit of student writing willincrease as demonstrated on the LA PA.
nglish Language
Arts
chool climate
and culture
Career tandards
enchmark
If we implement targeted instruction specific to Modeling with Math andMaking ense of Prolems through the Numer stem, then students willdemonstrate an increase across all MATH PA reporting categories.
Mathematics
Career tandards
enchmark
Career tandards
enchmark
ACTION PLAN AND TP
-
Goal Nickname Measurale Goal tatement (mart Goal)
PI June 2021, 50% of students receiving PI Tier 1 supports willparticipate in the school’s PI sstem using PI language to self-regulate and engaged in classroom instruction as measured CAT,walkthrough data, & PI rewards.
Action tepAnticipatedtart/Completion
LeadPerson/Position
Materials/Resources/upportsNeeded
Create an electronic walkthroughform with student "look fors"using iOservation
2020-08-24 -2020-09-03
Coordinator ofchoolClimate
iOservation
Create a walkthrough schedule 2020-08-24 -2020-09-30
Coordinator ofchoolClimate Tieredupport/MT
walkthrough form
Create a schedule forinstructional staff walkthroughsusing the Classroom AssistanceTool
2020-08-24 -2020-09-30
TieredupportInstructionalCoach
walkthrough form
Conduct professionaldevelopment on the Tier 2screening and referral process
2020-08-24 -2020-09-30
Tieredupport/MTInstructionalCoachPrincipalAssistantPrincipal
Host focus groups with studentsto receive feedack on studentcentered climate and culture
2020-08-24 -2021-05-31
Tieredupport/MTGuidance
Create incentives for individualsand homerooms with estquarterl attendance
2020-10-01 -2021-06-11
Tieredupport/MTPI Team
Conduct monthl classroomwalkthroughs
2020-08-24 -2021-06-01
Leadership iOservation
Instructional staff will conductquarterl informal walkthroughsusing the CAT.
- Instructionaltaff
CAT
Teacher will receive monthl PD 2020-09-01 - Leadership
-
Action tepAnticipatedtart/Completion
LeadPerson/Position
Materials/Resources/upportsNeeded
on est practices for climate,ehavioral interventions, andstrengthening PIImplementation
2021-05-15 Tieredupport/MTInstructionalCoach
Teachers will utilize the ehaviorflowchart to address specificehaviors that are linked toschool-wide expectations andused across settings.
2020-08-24 -2021-06-01
ClassroomTeachers
ehavior Flowchart
chool will hold eginning of theear "PI Kick-Off" wherestudents will learn aout school-wide expectations andprocedures that promote apositive school climate.
2020-08-24 -2020-09-30
PI TeamTieredupport/MT
Teachers will implement the Tier1 practices defined in items 1-11 ofthe elf-Assessment urve:Classroom stems.
2020-08-24 -2020-09-30
ClassroomTeachers
Teachers will review schoolwidedata regularl and provide inputon universal foundations (e.g.,expectations,acknowledgements, definitions,consequences).
2020-08-24 -2021-06-10
Tieredupport/MT
The student services team willtrack student progress andgrowth through towardsimprovement through nergdocumentation. Additionalsupports or referrals are made asneeded.
2020-08-24 -2021-06-10
tudentervices Team
Conduct elf-Assessment urve 2020-08-24 -2020-10-30
Coordinator ofchoolClimate
Conduct quarterl informalwalkthroughs of Tier 1 stems
2020-08-24 -2021-06-10
Coordinator ofchoolClimate
-
Action tepAnticipatedtart/Completion
LeadPerson/Position
Materials/Resources/upportsNeeded
Anticipated Outcome
Decrease in classroom oservations (issues) and o ce referrals Increased classroom engagement
Increased academic achievement
Monitoring/valuation
nerg (I) Classroom oservations/walkthroughs tudent achievement data (grades, CDTs, work
samples, IXL)
vidence-ased trateg
ngage instructional teams in assessing and monitoring student master. (TRONG); Master
learning and frequent assessment of student master through formative assessment approaches are
wellsupported research (Hattie & Timperle, 2007). Hattie’s e ect sizes also show strong e ects
for master learning and frequent formative evaluation.
Measurale Goals
Goal Nickname Measurale Goal tatement (mart Goal)
Writing June 30, 2021, 85% of students will demonstrate growth in theirwriting performance, as demonstrated an increase of at least onelevel on the LA PA Text-Dependent Analsis, compared to the FallWritten Response assessment (unless otaining a score of 3 or higheron the aseline assessment).
Conduct Tiered Fidelit Inventor(TFI) (2) and Action Plan
2020-08-24 -2021-02-01
Coordinator ofchoolClimate
TFI Action Plan
Conduct PI famil surveduring Parent/TeacherConferences (Novemer &Feruar)
2020-08-24 -2021-03-01
PI Team PI urve
Action tepAnticipatedtart/Completion
LeadPerson/Position
Materials/Resources/upportsNeeded
District and chool LeadershipTeams will plan and provideongoing professionaldevelopment specific to
2020-08-17 -2021-06-30
Coordinator ofecondarLA andocial tudies
tep Up to WritingFramework
-
Action tepAnticipatedtart/Completion
LeadPerson/Position
Materials/Resources/upportsNeeded
strengthening student writingthrough the use of tep Up toWriting.
PrincipalAssistantPrincipalInstructionalCoach
tudents will take aseline tepUp to Writing Assessment.
2020-08-24 -2020-09-30
InstructionalCoachClassroomTeachers
tep Up to WritingFramework
Teachers will utilize tep Up toWriting scoring guides (rurics)and exemplars that identif whatstudents need to do to revisetheir writing to reach proficientand advanced levels.
2020-08-24 -2021-06-30
ClassroomTeacher
tep Up to Writing coringGuide
Teachers will teach studentscommon expectations andlanguage for writing instructionacross all LA and content areaclassrooms.
2020-08-24 -2021-06-30
ClassroomTeacher
tep Up to WritingResources
tudents will e provided withfrequent opportunities todemonstrate writing throughinformative/explanator,opinion/argument, and narrativewriting.
2020-08-24 -2021-06-30
ClassroomTeachers
tep Up to WritingResources
Teachers will engage in ongoingprogress monitoring examining student work. This willoccur during grade level andsuject specific team meetings.
2020-08-24 -2021-06-30
ClassroomTeachers
tudent Work
Teachers will conference withstudents specific to supportingwriting development.
2020-08-24 -2021-06-30
ClassroomTeachers
tudent Work
pecial ducation, L, andclassroom teachers will engagein ongoing collaoration onspecific student needs.
2020-08-24 -2021-06-30
ClassroomTeachersInstructionalCoach
tudent writing samples
-
Action tepAnticipatedtart/Completion
LeadPerson/Position
Materials/Resources/upportsNeeded
Anticipated Outcome
Monitoring/valuation
vidence-ased trateg
Provide a tiered sstem of instructional and ehavioral supports and interventions. (TRONG)
Practice guides developed and availale through What Works Cleaninghouse suggest the
e ectiveness of Response to Intervention approaches for elementar reading and math (Gerstron,
2009). In addition, recent e ect sizes John Hattie (2016) are high (1.07).
Measurale Goals
Goal Nickname Measurale Goal tatement (mart Goal)
PA Math June 2021, 33.5% of students will e proficient or advanced on theMath PA.
Teachers will e evaluated ontheir progress toward meetingthe standards for their teachingpractice ased on their personalinstructional planning andpractice and then given specificfeedack to ensure continuedprofessional growth.
2020-09-01 -2021-06-30
PrincipalAssistantPrincipal
iOservation
Teachers who are not meetingexpectations will receiveadditional intensive support fromthe Leadership Team and/orInstructional Coach.
2020-09-30 -2021-06-30
PrincipalAssistantPrincipalInstructionalCoach
iOservation Report
Action tepAnticipatedtart/Completion
LeadPerson/Position
Materials/Resources/upportsNeeded
Administer the full Math CDT to allstudents.
2020-08-24 -2020-09-30
InstructionalCoachCoordinator ofecondarMath
Classroom Diagnostic Test
-
Action tepAnticipatedtart/Completion
LeadPerson/Position
Materials/Resources/upportsNeeded
Anticipated Outcome
Coordinator ofAssessment,valuation,and Research
Teachers will meet with studentsindividuall to conference andidentif a math goal.
2020-08-24 -2020-10-16
ClassroomTeachers
CDT Results Goal Trackingheet
tudents will engage in iXL MathIntervention Program to strengthenthe numer sstem skills necessarfor success across all mathcategories.
2020-09-01 -2021-06-30
ClassroomTeacher
iXL Math Interventiontudent iPads
Teachers will monitor studentperformance and adjustinterventions responsivelaccording to iXL, CDT , andclassroom data.
2020-09-01 -2021-06-30
ClassroomTeachers
tudent AchievementReports iXL MathIntervention
Administer the CDT: DiagnosticCategor – Numers andOperations – Winter and pring
2020-12-12 -2021-03-31
InstructionalCoachCoordinator ofecondarMathCoordinator ofAssessment,valuation,and Research
CDT
Administrative Leadership Teamwill develop schedule forimplementing theOservation/upervision/valuationProcess. Leadership team memerswill oserve (formal and informal)Math classes and interventionperiods and provide feedackased on standards alignedinstruction and rigor of tasks.
2020-08-24 -2020-09-15
PrincipalAssistantPrincipal
Oservation cheduleiOservation
-
Monitoring/valuation
-
ADDNDUM A: ACKGROUND INFORMATION TO INFORM PLAN
trengths
LA/Literature-L--Increase over 2017/2018 of10% respectivel
Mathematics/Algera-tudents withDisailities-Increase over 2017/2018 of 3.4%
arl Indicators of uccess-Grade 7 Math-Increase of 8.5% over 2017/2018
Local LA written response-9% increase inoverall scores from Winter 2019 to Winter2020
7th Grade LA 49% Proficient/Advanced-Outperformed overall uilding percentage 6.4%
7th Grade Proficient/Advanced 19%-Outperformed uilding 2%
8th Grade cience-Reporting Categor 2iological ciences-Out performed overalluilding score 8.3%
Implement an evidence-ased sstem ofschoolwide positive ehavior interventionsand supports
Identif professional learning needs throughanalsis of a variet of data
Use multiple professional learning designs tosupport the learning needs of staff
Implement a multi-tiered sstem of supportsfor academics and ehavior
Increases over 2017/2018 of 10%
Decrease in overall referrals from 2018/2019
Outperformed the statewide averageperformance standard enchmark 1.9%
Challenges
Math Written Response-decrease 3% eachear from 2018 to 2020
8th Grade LA 30% Proficient/Advanced-Under performed overall uilding percentage 12.6%
8th Grade Proficient/Advanced 13%-Underperformed uilding 4%
28.7% of students meeting thegoal/improvement target in 8th Gradecience--37.3% elow the statewide averagefor 8th Grade cience
Align curricular materials and lesson plans tothe PA tandards
Use a variet of assessments (includingdiagnostic, formative, and summative) tomonitor student learning and adjust programsand instructional practices
Provide frequent, timel, and sstematicfeedack and support on instructionalpractices
Collectivel shape the vision for continuousimprovement of teaching and learning
Foster a culture of high expectations forsuccess for all students, educators, families,and communit memers
LA/Literature PVAA-Decrease in all studentgroups over 2017/2018
Mathematics/Algera PVAA-Decrease in allstudent groups over 2017/2018
The school lacks consistent expectations,processes, rurics for writing across contentareas and grade levels
-
Challenges
tudents are struggling with all math tasksecause the lack the foundational skillsnecessar to complete grade level prolems
Underperformed overall school score 4.4%in LA; 2.1% in Math; 4.0% in cience
No consistent decrease in the numer OfficeReferrals
40% of classroom oservations (issues) arecoded as Defiance/ Disrespect/NonCompliance
Underperformed the performance standardenchmark 6.3%
Most Notale Oservations/Patterns
In examining Math PA and local written response data, we noticed that student performancescores in numers and operations (6th & 7th grade) and algeraic concepts (8th grade) continue todecrease over the past 4 ears. Across grade levels, students are scoring well elow the possilepoint totals for written responses in oth LA and Math.
-
Challenges Discussion Point Priorit for Planning
Math Written Response-decrease3% each ear from 2018 to 2020
Foster a culture of highexpectations for success for allstudents, educators, families, andcommunit memers
tudents are demonstrating negativeehaviors that effect their ailit toparticipate meaningfull in instruction anddisrupt the learning environment forothers.
The school lacks consistentexpectations, processes, ruricsfor writing across content areasand grade levels
Our students are not ale to producewriting that meets the expectations oftheir grade level.
tudents are struggling with allmath tasks ecause the lack thefoundational skills necessar tocomplete grade level prolems
tudents lack the foundational skills touild upon new content. Consequentl,students are disconnected with math.
No consistent decrease in thenumer Office Referrals
40% of classroom oservations(issues) are coded as Defiance/Disrespect/ NonCompliance
-
ADDNDUM : ACTION PLAN
Action Plan: Provide a tiered sstem of instructional and ehavioral supports and interventions.
(TRONG) Practice guides developed and availale through What Works Cleaninghouse suggest the
e ectiveness of Response to Intervention approaches for elementar reading and math (Gerstron,
2009). In addition, recent e ect sizes John Hattie (2016) are high (1.07).
Action teps Anticipated tart/Completion Date
Create an electronic walkthrough form with student"look fors" using iOservation
08/24/2020 - 09/03/2020
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
iOservation no
Action teps Anticipated tart/Completion Date
Create a walkthrough schedule 08/24/2020 - 09/30/2020
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
walkthrough form no
-
Action teps Anticipated tart/Completion Date
Create a schedule for instructional staff walkthroughsusing the Classroom Assistance Tool
08/24/2020 - 09/30/2020
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
walkthrough form no
Action teps Anticipated tart/Completion Date
Conduct professional development on the Tier 2screening and referral process
08/24/2020 - 09/30/2020
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
es
-
Action teps Anticipated tart/Completion Date
Host focus groups with students to receive feedackon student centered climate and culture
08/24/2020 - 05/31/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
no
Action teps Anticipated tart/Completion Date
Create incentives for individuals and homerooms withest quarterl attendance
10/01/2020 - 06/11/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
no
-
Action teps Anticipated tart/Completion Date
Conduct monthl classroom walkthroughs 08/24/2020 - 06/01/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
iOservation no
Action teps Anticipated tart/Completion Date
Instructional staff will conduct quarterl informalwalkthroughs using the CAT.
01/01/0001 - 01/01/0001
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
CAT no
-
Action teps Anticipated tart/Completion Date
Teacher will receive monthl PD on est practices forclimate, ehavioral interventions, and strengtheningPI Implementation
09/01/2020 - 05/15/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
es
Action teps Anticipated tart/Completion Date
Teachers will utilize the ehavior flowchart to addressspecific ehaviors that are linked to school-wideexpectations and used across settings.
08/24/2020 - 06/01/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
ehavior Flowchart no
-
Action teps Anticipated tart/Completion Date
chool will hold eginning of the ear "PI Kick-Off"where students will learn aout school-wideexpectations and procedures that promote a positiveschool climate.
08/24/2020 - 09/30/2020
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
no
Action teps Anticipated tart/Completion Date
Teachers will implement the Tier 1 practices defined initems 1-11 of the elf-Assessment urve: Classroomstems.
08/24/2020 - 09/30/2020
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
no
-
Action teps Anticipated tart/Completion Date
Teachers will review schoolwide data regularl andprovide input on universal foundations (e.g.,expectations, acknowledgements, definitions,consequences).
08/24/2020 - 06/10/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
no
Action teps Anticipated tart/Completion Date
The student services team will track student progressand growth through towards improvement throughnerg documentation. Additional supports orreferrals are made as needed.
08/24/2020 - 06/10/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
es
-
Action teps Anticipated tart/Completion Date
Conduct elf-Assessment urve 08/24/2020 - 10/30/2020
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
no
Action teps Anticipated tart/Completion Date
Conduct quarterl informal walkthroughs of Tier 1stems
08/24/2020 - 06/10/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
no
-
Action teps Anticipated tart/Completion Date
Conduct Tiered Fidelit Inventor (TFI) (2) and ActionPlan
08/24/2020 - 02/01/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
TFI Action Plan no
Action teps Anticipated tart/Completion Date
Conduct PI famil surve during Parent/TeacherConferences (Novemer & Feruar)
08/24/2020 - 03/01/2021
Monitoring/valuation Anticipated Output
nerg (I) Classroom oservations/walkthroughstudent achievement data (grades, CDTs, worksamples, IXL)
Decrease in classroom oservations(issues) and office referrals Increasedclassroom engagement Increasedacademic achievement
Material/Resources/upports Needed PD tep
PI urve no
Action Plan: ngage instructional teams in assessing and monitoring student master. (TRONG);
Master learning and frequent assessment of student master through formative assessment
approaches are wellsupported research (Hattie & Timperle, 2007). Hattie’s e ect sizes also
show strong e ects for master learning and frequent formative evaluation.
-
Action teps Anticipated tart/Completion Date
District and chool Leadership Teams will plan andprovide ongoing professional development specific tostrengthening student writing through the use of tepUp to Writing.
08/17/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tep Up to Writing Framework es
Action teps Anticipated tart/Completion Date
tudents will take aseline tep Up to WritingAssessment.
08/24/2020 - 09/30/2020
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tep Up to Writing Framework no
-
Action teps Anticipated tart/Completion Date
Teachers will utilize tep Up to Writing scoring guides(rurics) and exemplars that identif what studentsneed to do to revise their writing to reach proficientand advanced levels.
08/24/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tep Up to Writing coring Guide no
Action teps Anticipated tart/Completion Date
Teachers will teach students common expectationsand language for writing instruction across all LA andcontent area classrooms.
08/24/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tep Up to Writing Resources no
-
Action teps Anticipated tart/Completion Date
tudents will e provided with frequent opportunitiesto demonstrate writing throughinformative/explanator, opinion/argument, andnarrative writing.
08/24/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tep Up to Writing Resources no
Action teps Anticipated tart/Completion Date
Teachers will engage in ongoing progress monitoring examining student work. This will occur duringgrade level and suject specific team meetings.
08/24/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tudent Work no
Action teps Anticipated tart/Completion Date
Teachers will conference with students specific tosupporting writing development.
08/24/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tudent Work no
-
Action teps Anticipated tart/Completion Date
pecial ducation, L, and classroom teachers willengage in ongoing collaoration on specific studentneeds.
08/24/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tudent writing samples no
Action teps Anticipated tart/Completion Date
Teachers will e evaluated on their progress towardmeeting the standards for their teaching practiceased on their personal instructional planning andpractice and then given specific feedack to ensurecontinued professional growth.
09/01/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
iOservation no
-
Action teps Anticipated tart/Completion Date
Teachers who are not meeting expectations willreceive additional intensive support from theLeadership Team and/or Instructional Coach.
09/30/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
iOservation Report no
Action Plan: Provide a tiered sstem of instructional and ehavioral supports and interventions.
(TRONG) Practice guides developed and availale through What Works Cleaninghouse suggest the
e ectiveness of Response to Intervention approaches for elementar reading and math (Gerstron,
2009). In addition, recent e ect sizes John Hattie (2016) are high (1.07).
Action teps Anticipated tart/Completion Date
Administer the full Math CDT to all students. 08/24/2020 - 09/30/2020
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
Classroom Diagnostic Test no
-
Action teps Anticipated tart/Completion Date
Teachers will meet with students individuall toconference and identif a math goal.
08/24/2020 - 10/16/2020
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
CDT Results Goal Tracking heet no
Action teps Anticipated tart/Completion Date
tudents will engage in iXL Math Intervention Programto strengthen the numer sstem skills necessar forsuccess across all math categories.
09/01/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
iXL Math Intervention tudent iPads no
Action teps Anticipated tart/Completion Date
Teachers will monitor student performance and adjustinterventions responsivel according to iXL, CDT , andclassroom data.
09/01/2020 - 06/30/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
tudent Achievement Reports iXL Math Intervention no
-
Action teps Anticipated tart/Completion Date
Administer the CDT: Diagnostic Categor – Numersand Operations – Winter and pring
12/12/2020 - 03/31/2021
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
CDT no
Action teps Anticipated tart/Completion Date
Administrative Leadership Team will developschedule for implementing theOservation/upervision/valuation Process.Leadership team memers will oserve (formal andinformal) Math classes and intervention periods andprovide feedack ased on standards alignedinstruction and rigor of tasks.
08/24/2020 - 09/15/2020
Monitoring/valuation Anticipated Output
Material/Resources/upports Needed PD tep
Oservation chedule iOservation no
-
ADDNDUM C: PROFIONAL DVLOPMNT PLAN
Measurale GoalsAction PlanName
ProfessionalDevelopment tep
AnticipatedTimeline
June 2021, 50% of students receiving PI
Tier 1 supports will participate in the school’s
PI sstem using PI language to self-
regulate and engaged in classroom
instruction as measured CAT, walkthrough
data, & PI rewards. (PI)
Provide atiered sstemof instructionaland ehavioralsupports andinterventions.(TRONG)Practiceguidesdeveloped andavailalethrough WhatWorksCleaninghousesuggest theeffectivenessof Response toInterventionapproaches forelementarreading andmath(Gerstron,2009). Inaddition,recent effectsizes JohnHattie (2016)are high (1.07).
Conductprofessionaldevelopment onthe Tier 2screening andreferral process
08/24/2020-09/30/2020
June 2021, 50% of students receiving PI
Tier 1 supports will participate in the school’s
PI sstem using PI language to self-
regulate and engaged in classroom
instruction as measured CAT, walkthrough
data, & PI rewards. (PI)
Provide atiered sstemof instructionaland ehavioralsupports andinterventions.(TRONG)Practiceguidesdeveloped andavailale
Teacher willreceive monthlPD on estpractices forclimate,ehavioralinterventions, andstrengtheningPIImplementation
09/01/2020- 05/15/2021
-
Measurale GoalsAction PlanName
ProfessionalDevelopment tep
AnticipatedTimeline
through WhatWorksCleaninghousesuggest theeffectivenessof Response toInterventionapproaches forelementarreading andmath(Gerstron,2009). Inaddition,recent effectsizes JohnHattie (2016)are high (1.07).
June 2021, 50% of students receiving PI
Tier 1 supports will participate in the school’s
PI sstem using PI language to self-
regulate and engaged in classroom
instruction as measured CAT, walkthrough
data, & PI rewards. (PI)
Provide atiered sstemof instructionaland ehavioralsupports andinterventions.(TRONG)Practiceguidesdeveloped andavailalethrough WhatWorksCleaninghousesuggest theeffectivenessof Response toInterventionapproaches forelementarreading andmath(Gerstron,2009). Inaddition,recent effect
The studentservices team willtrack studentprogress andgrowth throughtowardsimprovementthrough nergdocumentation.Additionalsupports orreferrals are madeas needed.
08/24/2020- 06/10/2021
-
Measurale GoalsAction PlanName
ProfessionalDevelopment tep
AnticipatedTimeline
sizes JohnHattie (2016)are high (1.07).
June 30, 2021, 85% of students will
demonstrate growth in their writing
performance, as demonstrated an increase
of at least one level on the LA PA Text-
Dependent Analsis, compared to the Fall
Written Response assessment (unless
otaining a score of 3 or higher on the
aseline assessment). (Writing)
ngageinstructionalteams inassessing andmonitoringstudentmaster.(TRONG);Masterlearning andfrequentassessment ofstudentmasterthroughformativeassessmentapproachesarewellsupported research(Hattie &Timperle,2007). Hattie’seffect sizesalso showstrong effectsfor masterlearning andfrequentformativeevaluation.
District andchool LeadershipTeams will planand provideongoingprofessionaldevelopmentspecific tostrengtheningstudent writingthrough the use oftep Up toWriting.
08/17/2020-06/30/2021
PROFIONAL DVLOPMNT PLAN
-
Professional Development tep Audience Topics of Prof. Dev
Tier 2 creening and ReferralProcess
All staff Referral process for Tier 2Identifing appropriateinterventions ehaviorinterventions Roles that teacherpla in Tier 2 supports
vidence of Learning Anticipated Timeframe Lead Person/Position
Proper sumission of referralsInformal Classroom Walkthroughs
08/24/2020 - 09/30/2020 Tiered upport/MTtudent upport Team
Danielson Framework Component Met in this Plan:This tep meets theRequirements of tateRequired Trainings:
4e: Growing and Developing Professionall Teaching Diverse Learners inan Inclusive ettingTeaching Diverse Learners inan Inclusive etting
Professional Development tep Audience Topics of Prof. Dev
PI Implementation All staff Classroom Managementtrategies Restorative Practicesehavior InterventionsDeescalation trategiesngagement trategies
vidence of Learning Anticipated Timeframe Lead Person/Position
Informal/Formal Oservationsehavioral Data
08/24/2020 - 05/01/2021 Tiered upport/MT tudentervices Team
-
Danielson Framework Component Met in this Plan:This tep meets theRequirements of tateRequired Trainings:
2d: Managing tudent ehavior
2a: Creating and nvironment of Respect and Rapport
2a: Creating and nvironment of Respect and Rapport
2: stalishing a Culture for Learning
2a: Creating and nvironment of Respect and Rapport
2d: Managing tudent ehavior
Teaching Diverse Learners inan Inclusive ettingTeaching Diverse Learners inan Inclusive ettingTeaching Diverse Learners inan Inclusive etting
Professional Development tep Audience Topics of Prof. Dev
tep Up to Writing Classroom Teachers Common coring Prompt WritingAnalzing student outcomesCurriculum IntegrationFramework ImplementationFoundational Writing kills
vidence of Learning Anticipated Timeframe Lead Person/Position
tudent work samples RuricsTeacher Feedack
08/24/2020 - 05/01/2021 Instructional CoachPrincipal/Assistant Principals
Danielson Framework Component Met in this Plan:This tep meets theRequirements of tateRequired Trainings:
4d: Participating in a Professional Communit
1a: Demonstrating Knowledge of Content and Pedagog
Language and LiteracAcquistion for All tudentsLanguage and LiteracAcquistion for All tudentsLanguage and LiteracAcquistion for All tudents