Page 1: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

OPERATION AND MAINTENANCE PLANMARION (BRAGG) LANDFILL

MARION, INDIANA

AUGUST 1991

(revised December 1992)

PREPARED FOR

MARION (BRAGG) LANDFILL GROUP

PREPARED BY

O & M, INC.P.O. BOX 90348

KNOXVILLE, TENNESSEE 37990

Page 2: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

TABLE OF CONTENTS

Title_______________________________________________Page1.0 INTRODUCTION. .............................................. 7

1.1 General Site Description..............................7

2.0 MAINTENANCE TASKS .......................................... 8

2.1 Perimeter Fence (Access Control)......................8

2.1.1 Description of the Fence (Access Control)......8

2.1.2 Maintenance Tasks.............................. 8

2.1.3 Costs—Capital and Maintenance................. 9

2.2 Wells................................................ .9

2.3 Cap System............................................ 9

2.3.1 Description of Cap System...................... 9

2.3.2 Maintenance Tasks............................. 10

2.3.3 Flood Protection (Erosion Control)............ 12

Measures

2.3.4 Flood Protection (Erosion Control)............ 13

Maintenance

2.3.5 Costs—Capital and Maintenance................ 13

2.4 Ground Water and Surface Water Monitoring............ 16

2.4.1 Overview of Monitoring Program................ 16

2.4.2 Ground Water Monitoring Program............... 16

2.4.3 Surface Water Monitoring Program.............. 18

2.4.4 Costs—Capital, Annual Sampling...............19

and Maintenance

3.0 OTHER COSTS ............................................... 21

4.0 CONTINGENCY............................................... 22

5.0 REPORTS AND RECORDKEEPING................................. 23

6 . 0 HEALTH AND SAFETY PLAN.................................... 23

ATTACHMENTS

Page 3: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

ATTACHMENTS

FIGURES

TABLES

APPENDICES

Page 4: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

LIST OP FIGURES

Figure 1

Figure 2

Figure 3

Figure 4A

Figure 4B

Figure 5

Figure 6

Figure 7

Figure 8

Figure 9

Site Location

Site Map

Fence, Sign, and Gate DetailsLocation of Vehicle and Man Gates

Location of Vehicle and Man Gates

Inspection Log

Typical Sections thru the Cap

Design Detail of Wells

Ground Water, Surface Water and Pond WaterSampling Locations

Ground Water and Surface Water Sampling Schedule

Page 5: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

LIST OF TABLES

Table 1 Site Emergency Contacts

Table 2 Marion (Bragg) Landfill Parameter List

Target Compound List(TCL)/Target Analyte

List (TAL) (Less Pesticides and PCB's)

Table 3 Indicator Parameters

Page 6: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

LIST OF APPENDICES

A MAINTENANCE SCHEDULE

B ESTIMATED ANNUAL POST-CLOSURE COSTS

C EXCERPTS FROM EARTHWORK SPECIFICATIONS

D EXCERPTS FROM LAWN SPECIFICATIONS

E LANDFILL GAS MONITORING PLAN

F HEALTH AND SAFETY PLAN

Page 7: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

1.0 INTRODUCTION

This operation & maintenance plan (Plan) has beenprepared for the Marion (Bragg) Landfill, also referred toas the Marion (Bragg) Dump site, located in Marion, Indiana.This plan covers those activities necessary to provide forthe performance of the implemented remedy. This includesthe routine inspection and subsequent repair and/orreplacement of the fence and attached warning signs, the capsystem, flood protection measures and monitoring wellnetwork. Ground water and surface water monitoring isincluded as part of operations and maintenance.Responsibility for implementation of these activities areshared between the City of Marion and the Marion (Bragg)Landfill Group (Group). The City of Marion'sresponsibilities include the following; inspection andmaintenance of the fence and attached warning signs, the capsystem, and flood protection measures. The Group will beresponsible for ground water and surface water monitoringprogram and maintenance of the monitoring wells and surfacewater level gages. Included in this plan are schedules formonitoring and maintenance, a general site map, estimatedannual costs, design details for the cap system, signs,fence, wells, and a general site health and safety plan.Details of the operations and maintenance tasks are alsoprovided.

1.1 General Site DescriptionThe Marion (Bragg) Landfill site consists of a 72-acre

parcel of land located on the southeast edge of Marion,Grant County, Indiana (See Figure 1 for site location).Approximately 45 of the site's 72 acres were used forlandfilling purposes prior to closing in 1975. The remedialaction includes monitoring of ground and surface water, andconstruction of the cap system. The cap construction hasbeen completed.

The Mississinewa River borders the site to the east andnorth, a cemetery borders it to the west, and an abandoned

Page 8: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

gravel pond, borders it to the south. A pond ofapproximately 15 acres lies near the center of the site. Asmall asphalt/construction business, identified as DobsonConstruction Company is located along the southwest cornerof the site, (See Figure 2 for site map).

2.0 MAINTENANCE TASKS

2.1 Perimeter Fence (Access Control)

2.1.1 Description of the Fence (Access Control)A fence has been installed to prevent unauthorized

persons from entering the facility. It consists of a 6 foothigh galvanized chain-link fence with three vehicle gatesand six man gates (See Figure 3 for design detail) . Twovehicle gates are located near Central Avenue, and a thirdvehicle gate along the river near MB-7. Four man gates arelocated along the river and two along the former East SideCove property. Figures 4A and 4B indicate the location ofthe gates. Warning signs (See Figure 3 for design detail)have been attached to the fence at intervals ofapproximately 200 feet.

2.1.2 Maintenance TasksMaintenance of the perimeter fence, attached warning

signs, the gates and locks consists of repairs necessitatedby damage from vandalism and/or normal wear and tearincluding accidents. One roll of fencing, five posts, fivesigns and five gate locks will be kept by the City of Marionfor use in repair and/or replacement of the fencecomponents.

A weekly inspection will be conducted to determine therequired fence maintenance, if any, and is performed by theCity of Marion. This inspection can be performed by drivingthe perimeter of the site. That portion of the fence notvisible will need to be walked. A more thorough inspectionof the fence will be performed on a monthly basis and noted

Page 9: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

in the "Inspection Log", Figure 5. This inspection will beperformed by walking the entire perimeter and noting anynecessary repairs. Also at this time, all of the gate lockswill be lubricated with a dry graphite spray. Any necessarymaintenance identified during the inspections would bescheduled within 24 hours and completed as soon as possible.See Appendix A for details of monthly inspections.

2.1.3 Costs—Capital and MaintenanceThe capital cost for the perimeter fence is

approximately $90,000, which also includes the warning signsand gates. The post-closure costs are estimated to be$5000/yr to include replenishing replacement stock offencing, posts, gate locks and warning signs, if needed.Also included in the costs are the monthly inspections andrequired maintenance as indicated by the monthly inspectionon the "Inspection Log" (Figure 5) . See Appendix B for anestimate of Annual Post-Closure Costs.

2.2 WellsInspection of the well casings, locks, and concrete

pads will be performed by the City of Marion in conjunctionwith their monthly inspection. Lubrication of the welllocks with a dry graphite spray will be performed inconjunction with any sampling activity.

2.3 Cap System

2.3.1 Description of Cap SystemThe surface of the existing landfill has been regraded

to a slope of not less than two percent as specified in thedesign, using a combination of common fill, clay, andtopsoil. The use of a minimum slope of two percent wasconsidered acceptable by the Indiana Department ofEnvironmental Management (IDEM), and therefore consistentwith IDEM 329 IAC 2-8-7c (proposed April 1, 1987) . Thecommon fill was placed to bring low areas up to anappropriate grade. A clay cap of appropriate thickness wasthen placed directly above the common fill and landfill

Page 10: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

material. The clay cap was placed in layers of not morethan 8 inches and compacted to a total minimum thickness oftwo feet (the clay thickness was greater on steeper slopes)and a maximum permeability of Ix 10~6 cm/sec.

A six inch layer of topsoil was placed over the clayfor the purpose of seeding. In the areas that lie in themain flood channel of the Mississinewa River, a geosyntheticerosional control matting (Enkamat) or ECM, was placed overthe topsoil for the purpose of flood protection and erosioncontrol. In the areas outside of the main flood channel,jute matting or an equivalent was placed on the steepslopes. The topsoil was then seeded and fertilized.

2.3.2 Maintenance TasksMaintenance of the cap system consists of the following

tasks to be performed by the City of Marion:

* A monthly inspection of the entire cap systemto determine what, if any, maintenance isrequired. The results of the inspection willbe recorded on the "Inspection Log", (Figure5) . This inspection will include inspectionfor areas of vector disturbance such asrodent burrowing and insect infestation,cracking, erosional damage, and areas ofstressed vegetation or unvegetated areas(areas without grass). If vector disturbanceis identified, a licensed exterminator willbe called to rid the affected location. Nochemicals will be used to exterminate thevectors without prior consent of EPA andIDEM. Areas of stressed vegetation will beinvestigated to determine the cause of thestress. Refer to the Inspection Log as shownin Figure 5 for a complete checklist.

* Repair of erosion damage which has progressedinto the clay, rebuilding and regrading ofcapped areas which have settled and generalmaintenance to include clay and topsoilreplacement, reseeding, and re-applyingfertilizer of undeveloped areas of vegetative

Page 11: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

cover (areas without grass), as necessary.The replacement of clay and topsoil shall beconsistent with the design and be replaced toappropriate grades and thickness. Refer tothe excerpts from the cap constructionspecifications in Appendix C for earthwork.Different seeds mixtures are utilized indifferent areas. Fertilizers differing fromthose used in the construction phase must beapproved by EPA and IDEM prior toapplication. Herbicides and pesticides arenot permitted without explicit approval ofEPA and IDEM.

The rip-rap areas along the on-site pond andthe river bank will be inspected monthly, asnoted on the Inspection Log, Figure 5, andnecessary maintenance performed to ensure theintegrity of the rip-rap areas. The rip-rapshelf along the river bank has been designedto allow the shelf to collapse whilemaintaining the appropriate thickness (24inches) of rip-rap on the river bank.Therefore, maintenance of the rip-rap on theriver bank should be conducted to maintainthis minimum rip-rap thickness.

The river and pond banks will be inspectedmonthly for any loss of stability which mayimpact the cap.

The entire Marion (Bragg) landfill site willbe observed for areas of leachate generation.If leachate breaks are identified they willbe reported to the Group for investigation ofappropriate remedial measures. The EPA andIDEM will be similarly notified, and theirconcurrence received prior to conducting anyremedial measures.

Mowing of the entire cap and adjacent areaswhen the grass reaches a maximum height of 24inches (estimated to be 6 times a year).Grass will be cut to a minimum height of 12inches. As part of mowing, the cap surface

i i

Page 12: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

will be inspected for signs of trees or brushthat may be attempting to take hold. Iftrees or brush are noted they will need to beremoved. Mowing should be conducted so asnot to damage the ornamental vegetation nearthe site entrance. At no time willherbicides or pesticides be used on the sitewithout prior approval from the EPA and IDEM.

* Fertilization of the entire cap in May andOctober. Herbicides and pesticides are notpermitted without explicit approval of EPAand IDEM.

* As part of the quarterly and semi-annualmonitoring events a combustible gas meter andHNU will be used for detection of vapors, ifany, venting from the open monitoring wells.This monitoring while being monitored forhealth and safety purposes will also besufficient to detect the migration of anylandfill gas. This monitoring along with aninspection of the site for stressedvegetation, should detect any unacceptablelevels of landfill gas. A more detaileddiscussion of the landfill gas monitoring isprovided in Appendix E.

Inspection of the cap system and any maintenance thatis required is noted on the "Inspection Log" as illustratedin Figure 5.

Mote: If the conditions requiring repair suchas, exposed wastes, leachate seeps, orstressed vegetation are identified, theGroup, EPA and IDEM will be notified andappropriate measures undertaken (See Table1 for the list of persons to becontacted,) Notification of EPA and IDEMwill be in accordance with the time periodrequired by the Consent Decree. Selectionof the measures to be undertaken willrequire evaluation at the time ofoccurrence. Appropriate measures will beimplemented upon receipt of EPA and IDEM

12

Page 13: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

concurrence with the selected remedialmeasure.

2.3.3 Flood Protection (Erosion Control) MeasuresSince portions of the site lie within the main channel

of 100-year floodplain of the Mississinewa River, the caphas been provided with the (ECM) and vegetation to withstandfloodwaters. Only those areas of the cap that lie withinthe main channel 100-year floodplain are covered with theECM, (See Figure 6 for typical cross-section of area that iscovered).

2.3.4 Flood Protection (Erosion Control) MaintenanceFlood protection maintenance to be undertaken by the

City of Marion consists of the following tasks, asrequired, and carried out in conjunction with those of thecap:

* Maintenance of settled and/or eroded areas;ECM repair or replacement; clay and topsoilreplacement; rip-rap repair/replacement;reseeding; and re-applying of fertilizer toundeveloped areas of vegetative cover (areaswithout grass).

Note: .Refer to the excerpt from the capconstruction specifications inAppendix C for grading instructions.The clay must be brought to theoriginally specified grade beforetopsoil can be added. Refer toAppendix D for the type of fertilizerand seed to be used and rate ofapplication to be used in the areawhere the maintenance is to takeplace.

The ECM should only require replacement subsequent toloss in soil stability such as that caused by erosion andfloodwater damage. The jute mat will likely deteriorate in2 to 5 years, at which time vegetation should be establishedand, therefore jute replacement will not be necessary.

Page 14: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

2.3.5 Costs—Capital and MaintenanceThe capital costs for the cap are approximately

$5,500,000. Post-closure costs for the first five years areestimated to be approximately $150,000, and are broken downbelow for each year. It is anticipated that the maintenanceperiod will extend for a total of 30 years which isconsistent with the monitoring period as provided for in theConsent Decree.

Years 1 through 5:

Mowing: 45 acres mowed 6 times a year45 acres = 1,960,200 sq ft1 unit = 1000 sq ft

45 acres = 1960.2 units480 units can be completed per day4.1 days to mow 45 acre site

Cost: [$324.20 (Men & Equipment)][.972 (City costindex adjustment)] = $3l5.l2/day($315.12)(4.1 days) = $1292.00/mowing($1292.00)(6 mowings/year) = $7752.01/year

Maintenance of settled areas and erosional scars in capsystem:Assume 4% of final cover will require maintenance(.04)(45) acres = 1.8 acres or (43,560 sq ft)(1.8) =78,408 sq ftAssume average 0.3 ft settlement, which will require0.5 ft backfillTherefore:{(1.8 acres)(43,560 sq ft/acre)(.5 ft)}/27 cu ft = 1452 cu yds/year fill needed

Men, Machinery, Material, and Compaction:$0.68 per unit to move fill from stockpile1 unit = 1 cu yd $5.00 per unit to replenish stockpile(1452 cu yds fill) ( $5.00) ($0.68) = $4936.80($1048.56) ( .972 City cost index adjustment) =$4798.57/year

Source: R.S. MeansLandscape Cost Data 1990

14

Page 15: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

$0.34 per unit to compact fill1 unit = 1 cu yd(1452 cu yds)($0.34) = $493.68($493.68)(.972 City cost index adjustment) =$479.86/year

Maintenance of Cap Area: $4798.57 + $479.86 = $5278.43

Maintenance of Rip-Rap Area (material & labor included)Assume 1% of total rip-rap will require maintenance(.01)(20,000 tons) = 200 ton/yearcost of rip-rap $35.00/ton(200)($35.00) = $7/000/year

Maintenance in the Main Channel of the Floodplain:Assume 1% of 1.8 acres requiring maintenance will be inthe main channel of the floodplain and are covered byECM.(.01) (1.8) = .018 acres(.018)(43,560 sq ft per acre) = 784.08 sq ft784.08/9 = 87.12 sq yds of Erosion Control Matting(ECM) needed (use 90 sq yds)cost of ECM $12.67/sq yd(90 sq yds)($12.67/sq yd) = $1140.30/year(Cost for earthwork is included in the figures below.)

Fertilizer and Seed:4% of 45 acres = 78,408 sq ft1 unit = 1,000 sq ft78,408/1,000 = 78.41 units$38 per unit for seed$13.50 per unit for fertilizer(78.41 units)($38) = $2979.58 for material, labor isincluded + (78.41 units)(13.50) = $1058.54 formaterial, labor is included$2979.58 + $1058.54 = $4038.12($4038.12) (.972 City cost index adjustment) =$3925.OS/year

Source: R.S. MeansLandscape Cost Data 1990Rheinharts Landscaping Service

15

Page 16: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

Fertilize Entire Cap 2 Times Annually:45 acres = 1,960,200 sq ft

1 unit = 43,560 sq ft or 1 acre1,960,200 = 45 unitsCost per unit = $50.00(45)($50.00) = $2250.00($2250.00)(2/yr) = $4500.00/year

Breakdown of estimated costs for each year:

Mowing $7752.01Maintenance of Cap System $5278.43Maintenance of Rip Rap Area $7000,00ECM $1140.30Fertilizer and Seed $3925.05Fertilize Cap System (2 times/yr) $4500.00Total $29,595.79

Total Cost per year for Years 1 through 5 =$29,595.79/yr) (use $30,ooo/yr)

Source: R.S. MeansLandscape Cost Data 1990Rheinharts Landscaping Service

2.4 Ground Water and Surface Water Monitoring

2.4.1 Overview of Monitoring ProgramThe monitoring plan at the Marion (Bragg) Landfill

consists of ground water and surface water sampling. Groundwater monitoring program includes sampling the tenmonitoring wells (See Figure 7 for design detail of wells)installed during remedial action. Eight of the ten wellsare installed on the landfill property down-gradient fromareas of waste deposition. Two additional wells areinstalled upgradient from the facility to provide dataregarding the quality of ground water entering the site,(See Figure 8 for the ground water monitoring welllocations). The purpose of the surface water sampling

1 6

Page 17: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

program is to determine whether surface water is beingimpacted by the landfill. The five sampling points on theMississinewa River are located as follows; one upstream ofthe landfill, three locations adjacent to the landfill andone location downstream of the landfill. In addition, onesampling point is located along Lugar Creek, two at the on-site pond, and two at the off-site pond, (See Figure 8 forsurface water monitoring locations).

Ground water and surface water sampling and analysismethodologies are provided in the QAPP and its attachments.

2.4.2 Ground Water Monitoring ProgramThe ground water monitoring program, consisting of

quarterly and semi-annual sampling events, was initiatedprior to conclusion of the construction phase of theproject. The semi-annual sampling events consists ofsampling the on-site monitoring wells for analysis of theTarget Compound List(TCL)/Target Analyte List (TAL) lesspesticides and PCB's (see Table 2), and the IndicatorParameters (see Table 3). The quarterly sampling event isfor the Indicator Parameters and, if necessary, anyconfirmatory analysis.

Water level measurements were taken quarterly for theinitial sampling year, and then taken in conjunction witheach sampling event after the first year of sampling wascompleted. Surface water level indicator gages, one in eachof the ponds and two in the river will also be read inconjunction with well water level measurements.

Semi-annual sampling consists of the parametersindicated above. In the quarters between the semi-annualevents, the well network is sampled for the IndicatorParameters. In addition, confirmatory sampling will takeplace during the quarter following the semi-annual samplingevent that revealed the presence of a parameter requiringsuch confirmatory sampling, (See Figure 9 for samplingschedule).

17

Page 18: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

The semi-annual parameter list may be reduced to a listof site specific indicator parameters once a sufficientdatabase is established. Should ground water quality remainrelatively consistent over time, monitoring may not need tobe as extensive and may be reduced after review by the EPAand IDEM.

The procedures for sampling each of the ten wells usingEPA or IDEM protocols are summarized briefly as follows:

* The static water level in each well will bemeasured and recorded.

* Wells will be evacuated of three volumes ofwater or until the well goes dry. The purgewater will be contained in 55 gallon drums,with the final disposition of the purge waterselected upon the results of the monitoringevent.

* Conductivity, pH, dissolved oxygen andtemperature will be measured and recorded inthe field for each of the samples.

* The samples will be stored in appropriatesample bottles provided by the analyticallaboratory. Samples requiring refrigerationfor preservation will be immediatelytransferred to coolers packed with ice or icepacks.

* Appropriate written documentation will beprepared for each sampled well. In addition,complete chain-of-custody information will bemaintained.

For more complete information regarding sampling procedures,refer to the Sampling and Analysis Plan (SAP).

2.4.3 Surface Water Monitoring ProgramSurface water samples are collected from the on-site

pond, the off-site pond, the Mississinewa River, and Lugar

18

Page 19: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

Creek (See Figure 8 for sampling locations). Samplingpoints on the river are located at three areas adjacent tothe landfill site, downstream at one location, and upstreamat one location to serve as background data. One samplingpoint is located along Lugar Creek, two from the on-sitepond, and two more from the off-site pond.

The Mississinewa River and Lugar Creek surface watersampling begins at the farthest downstream location andproceed to upstream locations to minimize potential cross-contamination from suspended material in the streamresulting from sampling activities. The Mississinewa Riversampling locations are positioned between mid-river and theleft shore (facing downstream) to reflect conditionsassociated with the landfill. The Lugar Creek samplinglocation is at the mid-channel position of the creek.Sample locations are identified in the field by a referencemarker on the nearby bank of shore.

Surface water samples are collected along with thesemi-annual round of ground water samples and are analyzedfor TCL/TAL - less pesticides and PCBs, and the IndicatorParameters. Confirmatory samples are taken during thequarter following the semi-annual sampling event thatrevealed the presence of a parameter requiring such aconfirmatory sampling. Metals analysis are conducted onboth unfiltered and filtered samples of surface watersamples. If, after a period of time, analysis of surfacewater indicates no analytes at levels of concern, thesampling program may be modified after EPA and IDEMapproval. Refer to sampling schedule in Figure 9.

2.4.4 Costs—Capital, Annual Sampling/ and MaintenanceThe capital costs for the well network are covered in

the construction contract. Costs for the annual samplingare estimated to be $170,000 and are broken down into costsfor each sampling event. Maintenance costs for themonitoring network and water level gages are estimated to bean additional $5,000/yr.

1 Q

Page 20: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

Semi-Annual Sampling

* Ground Water Sampling and Analysis:

10 monitoring wells for TCL/TAL (lessPesticides and PCB's) and Indicator ParametersSampling: 2 Technicians @ $65/hr @ 4hrs/well @10 wells = $5,200Analysis: 10 wells @ $1700 each = $17,000

4 QA/QC samples @ $1700 each = $6,800

* Surface Water Sampling and Analysis:

Sampling: 2 Technicians @ $65/hr @2hrs/location @ 10 locations = $2,60010 locations @ $1700 each = $17,0004 QA/QC samples @ $1700 each = $6,800

* Data analysis, report preparation, etc. =$10,000

Total estimate for a semi-annual sampling event =$65,400

Quarterly Sampling:

* Ground Water Sampling (Indicator Parameters only):

10 monitoring wellsSampling: 2 Technicians @ $65/hr @ 2hrs/well @10 wells = $2,600Analysis: 10 wells @ $140 each = $1,400

4 QA/QC samples @ $140 each = $560

* Data analysis, report preparation, etc = $6,000A precise parameter list beyond the Indicator Listcannot be developed at this time.

Total estimate for a Quarterly event = $10,560

Page 21: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

Breakdown of estimated costs:

Quarterly events (2 events) $ 21,120Semi-annual events (2 events) $130.800Subtotal $151,920Contingency (approximately 10%) $ 15.190Total Estimate $167,110

(Use $170,000)

Post-closure maintenance of the ground water monitoringsystem includes a monthly inspection conducted in con-junction with the monthly facility inspection performed bythe City of Marion. Any necessary repair or maintenance ofthe wells is noted on the "Inspection Log" and the Groupnotified. Maintenance as well as any well replacement willthen performed by the Group. Maintenance of the wells willinclude:

* Replacement of protective casing locks* Repair of surface seal* Repair of well casings and/or well caps, as

necessary* Damage repairs* Repair of concrete pad around wells* Monitoring well replacement

Costs for the these repairs are estimated to be$5000/yr.

3.0 OTHER COSTSOther costs include those expenses not previously

considered in any other sections of this plan which will beincurred during the closure and post-closure period asfollows:

* Administrative Costs

Throughout the entire closure and post-closure period, a management plan of

21

Page 22: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

sufficient magnitude to ensure that the workencompassed in this plan is carried out on aprofessional basis. This would require thatvarious levels of management direct theoperation of the plan and coordinate theefforts of all involved. To determine thecost of these expenses, an allocation oftime as it pertains to various levels ofmanagement necessary to perform this servicewas utilized.

Costs for these services are estimated to be$25,000/yr.

4 . 0 CONTINGENCYA 10% contingency has been incorporated into various

estimates included in this plan. We believe that this is areasonable estimate considering the large number of projectvariables which can affect the cost. The R. S. MeansCompany, a respected publisher of construction cost data,provides the following advice concerning contingencies:

"The contractor should consider inflationaryprice trends and possible material shortagesduring the course of the job. Theseescalation factors are dependent upon botheconomic conditions and the anticipated timebetween the estimate and actual construction.If drawings are not complete or approved or abudget cost is wanted, it is wise to add 5 to10 percent."

Means advises that a contingency of 10% is notunreasonable if a budget cost is desired. One of the goalsof the cost estimate is to allow for collection ofsufficient fees to fund all future activities at the site.The contingency also allows for changes to the plans whichmay be requested by the Agencies.

22

Page 23: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

5.0 REPORTS AND RECORD KEEPINGThe City of Marion and the Group are responsible for

gathering the necessary information from the appropriatesources and generation of reports required by the agenciesto remain in compliance. Each is also responsible formaintaining records pertaining to maintenance at the site.It is noted that the depository for all site records isBeveridge & Diamond as written in the Consent Decree. Anannual report will be prepared by the both the City ofMarion and the Group for their respective areas ofresponsibility. The Group will also be responsible forsubmittal of a quarterly monitoring report.

6.0 HEALTH AND SAFETY PLANA health and safety plan has been established for the

operation and maintenance period. It is located in AppendixF in it's entirety. The plan which has been establishedconforms with the safety and health standards of the FederalDepartment of Labor, Occupational Safety and HealthAdministration and 29 CFR 1910.120 Safety and HealthStandards and Industrial Standards.

23

Page 24: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDICES

Page 25: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURES

Page 26: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

•Manon

F i g u r e 1Site Location

Marion (Bragg) Landfill

N

Marion/BraggLandfill

1Scale in Miles (Approximate)

INDIANA

01ocoT>t

Sii

Page 27: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

F i g u r e 2Site Map

Marion (Bragg) Landfill

,55>«"<g

£>

^— •••••* «M "- * fcy'*r'*'M^Jfr.'.v'v.'''X'X'^"-- -"--^^ [i. j» ""V 7k,. ^ Off-Sue Pond ^- \

§CO

Site BoundaryMarion Paving Co., Inc.Dobson Construction Co., Inc.Private ResidenceLandfill Area

250 500

Scale in Feet

Sourca: U.S. EPA 1987.

Page 28: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

.uIl2'0.«('

r*«*M

[to 'Qfi 5AJ['9K.NAL «" I

— ,.1

• •

..*— ,If •

"• ', ,

fOOTINC FOB POST «BiN»JS» i-Eoce is f.Ncounrt«tp

,' fr -1 i-4 _JSOU. EflfiKED SfilJflN

"• -•" 1BOLL fOHMiO SECTION OfrcmiNAL a Girt PQSI

> X

ME TMPC Of FASTENING

S«CTIOK

0.0* Iyp« A , 9O*OO

prut r,0i a uvoo

' H " U a 7-5'. isas'i'c'- 1 •

L6i/ LiA Ft

- — 2. 722 2?

—— *-a*

i 60

Z JO

12

•• . ' ' - -^ - ——

r

!

j_

: • • . . !

* ^i

?**'

S'"4'e

-_ . ^2'«.°2S.'> StJtLSJSj™! ..- . H Go. f-om., -s,,.« ».».,«,»' "hv!""* ••«... s,... » «.,,wr'oj; «n.n, . I ftB.J-BiA. I .-qru0m, ».„. r ,p«8 b e , , on l i b s ,n > , sV . 'uw-rfiTVi

«>w«M,j8n jon i r iuvr i ii.nvoo ' • ' • : >' 1 -TTB— iwniA »v« — p p,pe I0tt \ 66'oo ' a? , *(>• r»o« tL^tffi'oD^^ i a?^cwsf. *nFi[o« «rt to j4F f | j voo '•» T r t ».*o [ | -M' IK^-- i s'i ——— ^^25 ——

———— - — — J

-^WZSRNllMr;: "1KtETP |JL 1

TH1S~SITF "CONTSBHSHAZAnnniK «aIRS1[SNTP

jjL2"

J4

2"jiI'A*

^

.. . .. .. -;r—— ""' * "7.r *

BLACK LEGEND ON WHITE GENERAL NOTESBACKGROUND (NON REFLECTIVEI „„.,,., ,.

ONE Slttl ON EACH GATE VM»»« i.. ... — ,. .... „ 0, .„. ,,...„.,,„.

|'/S tw.^fl« Mt '

"™ ' Marion Bragg Landfill Closure sc"lt '""IK 24'Marion, Indiana „,„ FIGURES v 15 ""'

FENCE, SIGN. AND GATE DETAILS

Page 29: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

Marion Bragg Landfi l l ClosureMarion, Indiana FIGURE 4A

LOCATION OF VEHICLE AND MAN GATES

Page 30: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

ii*""g »toc« ro t* "i

Marion Bragg Landfill ClosureMarion, Indiana

FIGURE 48 |j LOCATION OF VEHICLE AND MAN GATES I

Page 31: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURE 5INSPECTION LOG

MARION (BRAGG) LANDFILLMARION, INDIANA

DATE

INSPECTOR(s)

INSPECTION/MAINTENANCE AREA: GROUNDS & MONITORING WELLS

ActionRequiredYES NO

Erosion of cap and adjacent areas

Ponding on cap

Grass to be mowed

Loss or stressed vegetation

Fence (entire perimeter to be walked)

Gates & locks

Warning signs

On-site access road

Casing locks on monitoring wells

Monitoring well casings and caps

Concrete pad around monitoring wells

River bank

Vector damage

Rip-Rap areas

M

X

NOTES:

W - Items checked in this column will be inspected on a weeklybasis.

M - Items checked in this column will be inspected on a monthlybasis.

Items indicated in the monthly column will be inspected inconjunction with the quarterly sampling event.

Use a separate sheet of paper to document items requiring action,

Inspector(s) Signature_

Page 32: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

MITER SURFACE

T Y P I C A L SECTION THRU C L A Y CAP. TERMINATING ON SANK TYPICAL. _. SECTIONi THRU FLOOD PRQTECTlON

, -for ion. SEIDED

fhflu CLAT CAP.

Marion Bragg Landfill ClosureMarion, Indiana

FIGURE 6

TYPICAL SECTIONS THRUTHE CAP

Page 33: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURE 7

DESIGN DETAIL OF WELLS

STEEL PROTECTOR CAP WITH LOC«S)

WELL WITH SANITARY SEAL

CONCRETE CAP (TYPE IIPORTLAND CEMENT)

TYPE II PORTLAND CEMENTAND SODIUM BENTONITEGROUT MIXTURE

WELL DIAMETER - 2"

MINIMDM BORE HOLE DIAMETER

BENTONITE PELLET SEAL(THICKNESS 2 FEET OR MOREABOVE FILTER PACK)

SAND FILTER PACK

FILTER PACK (2 FEET OR LESSABOVE SCREEN)

SCREENED INTERVAL(MAXIMUM OF 10 FEET)

BOTTOM CAP

Th«

Page 34: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURE 8

Ground Water, Surface Water andPond Water Sampling Locations

Monitoring Wtlls

MB-i • new monitoring wellMW-7 o remedial Investigation monitoring well

(S) shallow zone ol upper aquifer(D) deep zone ol upper aquifer

Sl«ft G«ug««_____________________

SQR-10 river locationSQP-tO pond location

Surtic* W«l«r S«mpl««______________

SW-1 o surface water sample location

Pond W«Uf S«mpl««________ ____

PW-i v pond water sample location(T) sample collected near water surface(B) sample collected near pond bottom

Groundwater, Surface Water and PondWater Sampling Locations

con*ulUnUllmlM

Figure8

18 Jan 91Rev 01

bcofc

Page 35: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURE 9GROUND WATER AND SURFACE WATER SAMPLING SCHEDULE

Elapsed Time(years)

CCapplnc

PPID

) 0.Started

+ AEM IDEM

25 0Capping C

PP+ CSP IDI

5 0.Completed

+ AEM IDEM

75 1Vegetal!*

PP+ CSP ID

1.t/e Cover

+ AEM IDEM

25

+ CSP

1

PPID

5 1.

+ AEM IDEM

75 2

PP + A+ CSP IDEM 1C

2.25 2.5

PP + A)EM + CSP IDEM

2.75

IDEM + CSP

r

PPIDI

4

1 3.

+ AEM IDEM

25 3.5

PP + A+ CSP IDEM 1C

5 4.

PP + AIDEM IDEM

75 5

PP + A+ CSP IDEM

3.75 4

PP + AJEM + CSP IDEM

4.25

IDEM + CSP

NOTE: Schedule shown Is for a 5-year time period. This schedule will be repeated for 30 years, but will be subjectto review at the end of the 5-year period.

PP + A » Priority Pollutants (minus pesticides and PCBs) plus AmmoniaIDEM = IDEM Indicator Parameter UstCSP = Confirmatory Sampling Parameters (determined after each semi-annual sampling event)

Page 36: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

COLLI

CQ

Page 37: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

TABLE 1

SITE EMERGENCY CONTACTS

PRP, City of Marion, USEPA,Indiana Department of Environmental Management, o & M Inc

Marion (Bragg) Landfill PRP Groupc/o John Hanson, Esq.Beveridge & Diamond

1350 I Street, N.W. Suite 700Washington, DC 20005

(202) 789-6000

The City of MarionJohn J. FineCity Attorney

314 S. Boots St.Marion IN 46952(317) 662-9991

USEPA Region VBernie Shorle

77 West Jackson BoulevardChicago, IL 60604

(312) 886-4746

Indiana Department of Environmental ManagementGabriele Hauer

5500 W. Bradbury AvenueIndianapolis, IN 46241

(317) 243-5188

0 & M, Inc.Kelly L. FiferP. O. BOX 90348

Knoxville, TN 37990(615) 691-6254

Page 38: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

TABLE 2

MARION (BRAGG) LANDFILL PARAMETER LISTTARGET COMPOUND LIST(TCL)/TARGET ANALYTE LIST(TAL)

(LESS PESTICIDES AND PCS'3)

Volatiles

1. Chloromethane•2. Bromomethane3. Vinyl Chloride4. Chloroethane5. Methylene Chloride

6. Acetone7. Carbon Disulfide8. 1,1-Dichloroethene9. 1,1-Dichloroethane10. 1,2-Dichloroethene (total)

11. Chloroform12. 1,2-Dichloroethane13. 2-Butanone14. 1,1,1-Triochloroethane15. Carbon Tetrachloride

16. Vinyl Acetate17. Bromodichloromethane18. 1,1,2,2-Tetrachloroethane19. 1,2-Dichloropropane20. cis-1,3-Dichloropropene

21. Trichloroethene22. Dibromochloromethane23. 1,1,2-Trichloroethane24. Benzene25. trans-1,3-Dichloropropene

26. Bromoform27. 2-Hexanone28. 4-Methyl-2-Pentanone29. Tetrachloroethane30. Toluene

Page 39: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

TABLE 2

MARION (BRAGG) LANDFILL PARAMETER LISTTARGET COMPOUND LIST(TCL)/TARGET ANALYTE LIST(TAL)

(LESS PESTICIDES AND PCB's)(continued)

31. Chlorobenzene32. Ethyl Benzene33. Styrene34. Total Xylenes

Semi-Volatiles

35. Phenol36. bis(2-chloroethyl)ether37. 2-Chlorophenol38. 1,3-Dichlorobenzene39. 1,4-Dichlorobenzene

40. Benzol Alcohol41. 1,2-Dichlorobenzene42. 2-Methylphenol43. bis(2-Chloroisopropyl)

ether

44. 4-Methylphenol

45. N-Nitroso-Dipropylamine46. Hexachloroethane47. Nitrobenzene48. Isophorone49. 2-Nitrophenol

50. 2,4-dimethylphenol51. Benzoic Acid52. bis(2-Chloroethoxy)methane53. 2,4-Dichlorophenol54. 1,2,4-Trichlorobenzene

55. Naphthalene56. 4-Chloroaniline57. Hexachlorobutadiene58. 4-Chloro-3-methylphenol59. 2-Methylnapthalene

Page 40: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

TABLE 2

MARION (BRAGG) LANDFILL PARAMETER LISTTARGET COMPOUND LIST(TCL)/TARGET ANALYTE LIST(TAL)

(LESS PESTICIDES AND PCB'S)(continued)

60. Hexachlorocyclopentadiene61. 2,4,6-Trichlorophenol62. 2,4,5-Trichlorophenol63. 2-Chloronapthalene64. N-Nitroaniline65. Dimethyl Phthalate66. Acenaphthylene67. 3-Nitroaniline68. acenaphthene

69. 2,4-Dinitrophenol70. 4-Nitrophenol71. Dibenzofuran72. 2,4-Dinitrotoluene73. 2,6-Dinitrotoloune

74. Diethylphthalate75. 4-Chlorophenyl Phenyl Ether76. Fluorene

77. 4-Nitroaniline78. 4,6-Dinitro-2-Methylphenol79. N-nitrosodiphenylamine80. 4-Bromophenyl Phenyl ether81. Hexachlorobenzene82. Pentachlorophenol83. Phenanthrene

84. Anthracene85. Di-n-Butylphthalate86. Fluoranthene87. Pyrene88. Butyl Benzyl Phthalate89. 3,3'-Dichlorobenzidine90. Benzo(a)anthracene91. bis(2-ethylhexyl)phthalate92. Crysene93. Di-n-octyl Phthalate94. Benzo(b)fluoranthene95. Benzo(k)fluoranthene96. Benzo(a)pyrene97. Indeno(1,2,3-cd)pyrene98. Dibenzo (a,h)anthracene99. Benzo(g,h,i)perylene

Page 41: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

TABLE 2

MARION (BRA66) LANDFILL PARAMETER LISTTARGET COMPOUND LIST(TCL)/TARGET ANALYTE LIST(TAL)

(LESS PESTICIDES AND PCB'S)(continued)

Metals/Inorganics

AluminumAntimonyArsenicBariumBerylliumCadmiumCalciumChromiumCobaltCopperIronLeadMagnesiumManganeseMercuryNickelPotassiumSeleniumSodiumSilverThalliumVanadiumZinc

Cyanide

Page 42: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

TABLE 3

INDICATOR PARAMETERS

TemperaturePHTotal Suspended Solids (TSS)Specific Conductivity (field measurement)CODNH3-NChloridesDissolved Oxygen (field measurement)TOC

Page 43: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX A

MAINTENANCE SCHEDULE

Page 44: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX A

MAINTENANCE SCHEDULE

November thru March

* A weekly inspection of the fence, gates and

locks.

* Monthly inspection of well casings, well

locks, cap system, and flood protection

system.* Repairs to various systems as determined

necessary by the monthly inspection.* Clear roadway and paths to wells when access

is necessary.

April thru October

* A weekly inspection of the fence, gates andlocks.

* Monthly inspection of well casings, well

locks, cap system, and flood protection

system.

* Repairs to various systems as determined

necessary by the monthly inspection.

* Fertilize cap in May and October.

* Mowing of cap and adjacent areas.* Clear roadway and paths to wells when access

is necessary; re-rock roadway as needed.

Page 45: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX A

MAINTENANCE SCHEDULE

Page 46: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX A

MAINTENANCE SCHEDULE

November thru March

* A weekly inspection of the fence, gates andlocks.

* Monthly inspection of well casings, well

locks, cap system, and flood protectionsystem.

* Repairs to various systems as determined

necessary by the monthly inspection.* Clear roadway and paths to wells when access

is necessary.

April thru October

* A weekly inspection of the fence, gates andlocks.

* Monthly inspection of well casings, well

locks, cap system, and flood protectionsystem.

* Repairs to various systems as determined

necessary by the monthly inspection.

* Fertilize cap in May and October.

* Mowing of cap and adjacent areas.

* Clear roadway and paths to wells when access

is necessary; re-rock roadway as needed.

Page 47: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX B

ESTIMATED ANNUAL POST CLOSURE COSTS

Page 48: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX B

ESTIMATED ANNUAL POST CLOSURE COSTS

Year

1

2

3

4

5

Fence/Access

5,

5,

5,

5,

5,

000

000

000

000

000

Grounds/Cap

30,000

30,000

30,000

30,000

30,000

Sampling &Analysis

170,

170,

170,

170,

170,

000

000

000

000

000

WellMaint.

5,000

5,000

5,000

5,000

5,000

other1

35,

35,

35,

35,

35,

000

000

000

000

000

Contingency2

7

7

7

7

7

, 500

,500

,500

,500

,500

Total

320,000

320,000

320,000

320, 000

320.000

Total estimated annual costs for the first 5 years $1.600.OOP

Other includes Administrative Costs.

Contingency is based upon post-closure costs, excluding Samplingand Analysis costs which already contain contingency.

Page 49: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX C

EXCERPTS FROM

EARTHWORK SPECIFICATIONS

Page 50: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX CEXCERPTS FROM EARTHWORK SPECIFICATIONS

(FOR CONTRACT DOCUMENTS ANDDESIGN PACKAGE FOR THE MARION (BRAGG) LANDFILL)

1.5 GROUP'S Quality Control Testing1.5.1 GROUP shall employ an independenttesting laboratory to secure representativesamples and to perform quality control tests onall soil materials as specified herein.1.5.2 Soil tests, as required herein, shall beperformed to the following standards:

Test MethodType of Test

Pollutants

Classification of Soils forEngineering Purpose

Gradation(Including hydrometer)

Moisture Content

Liquid Limit

Plastic Limit

Moisture-Density Curve

Density of Soil, in place

Density of Soil, in placeby Nuclear Methods(shallow depth)

Lab Permeability(Triaxial Cell Method)

Standard Methods asapproved by U.S. EPA

ASTM D-2487

ASTM D-422

ASTM D-2216

ASTM D-423

ASTM D-424

ASTM D-1557

ASTM D-1556 orASTM D-2167

ASTM D-2922

U.S. Army Corps ofEngineers Manual,EM-1110-2-1906,Appendix VII,"Permeability Tests"

Aooendix C - 1

Page 51: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

1.5.3 Pollutant test shall include analysisfor Priority Pollutants.1.5.4 Soil samples shall be taken and analyzedat the intervals specified below.1.5.5 Contractor shall provide the GROUP 30days notice prior to excavating any material foreventual transport to the Site, and shall in noway obstruct or interfere with the work of theTesting Laboratory.

2.0 ROUGH GRADING

Grade the project site as shown on the Plans ordirected by the Construction Engineer Representative. Donot disturb the existing landfill surface. Do not disturbor damage underground construction such as sewers, drainagepipes, or drainage structures.

2.1 Rough grade as follows:2.1.1 Grade areas under impervious cap to thelines and elevations shown on the plans or asreguired by the Construction EngineerRepresentative. Maximum roughness, measured witha 20-foot straight edge shall be six inches.2.1.2 Grade areas to be landscaped to 6 inchesbelow finished grade.

2.2 Confine construction traffic to designated routesaway from areas to be landscaped.2.3 In areas rutted by traffic or eroded by water,regrade, compact, and restore to established roughgrade.

3.0 COMMON FILL

3.1 General3.1.1 Provide common fill to lines and gradesshown on plans or as directed by ConstructionEngineer Representative.3.1.2 Where solid waste is exposed on thesurface, or where directed by the ConstructionEngineer Representative, place Common fill by

Appendix C - 2

Page 52: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

conveyor or spreading by track equipment to avoidvehicle traffic on solid waste material.

3.2 Material3.2.1 Common fill shall be soil, rock, pit rungravel, and only on-site masonry rubble, concreterubble, or other material capable of beingcompacted into a compact mass.3.2.2 Brush, tree stumps, wood scrap, or otherorganic waste, peat, organic soils muck, asphalt,or other material which, in the ConstructionEngineer Representative's judgement, cannot beadequately compacted, will not be included asCommon Fill.3.2.3 Rocks or other particles larger than 12inches in diameter shall not be included.3.2.4 The top two feet of common fill willcontain no particles larger than six inches indiameter.

3.3 Placement3.3.1 Place Common Fill in areas shown onplans or where directed by Construction EngineerRepresentative. Fill shall be placed in lifts ofnot more than two feet. The final 18 inches ofcommon fill shall be placed in lifts not exceeding9 inches.3.3.2 Do not place fill material in water, onfrozen ground, or on other surfaces not approvedby Construction Engineer Representative.3.3.3 Compact each layer, using approvedmeans, to a minimum of 90 percent of maximumlaboratory density, as determined by modifiedProctor Test.

Annendix C - 3

Page 53: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

3.4 Quality Control Testing3.4.1 FrequencyType of Test Test Method

Moisture Content 1 test/5,000 cu. yd.Moisture Density Curve 1 test/5,000 cu. yd.Moisture & Density 1 test/5,000 cu. yd.Tests after placement3.4.2 Tests for Pollutants shall be performedby GROUP at their discretion prior to acceptanceof fill material. One test per 10,000 cubic yardsof common fill may be performed. Contractor shallnotify Construction Engineer Representative atleast 30 working days in advance of common fillexcavation, to permit collection and analysis ofsamples.3.4.3 Quality control tests shall be performedat locations designated by Construction EngineerRepresentative.

4.0 IMPERVIOUS CAP

4.1 General4.1.1 Construct impervious cap to the linesand grades shown on the plans.4.1.2 Impervious cap shall be a minimum of twofeet in thickness, be compacted to a minimum of 95percent of maximum Proctor density, and shall havea maximum permeability of 10 cm/sec.Construction Engineer Representative shall directthat samples from the completed cap be tested forpermeability. Contractor shall seal test holeswith a commercial sodium bentonite sealant such asVolclay Grout as produced by American Colloid Co.,Benseal as produced by the NL Baroid Co. , orequal. Submit manufacturer's data and sample toConstruction Engineer Representative for review.

- 4

Page 54: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

4.1.3 Where solid waste is exposed on thesurface, or where directed by the ConstructionEngineer Representative, place Impervious Capmaterial by conveyor or spreading by trackequipment to avoid vehicle traffic on solid wastematerial.

4.2 Material4.2.1 Impervious cap material shall beobtained from the GROUP.4.2.2 Borrow pit location is indicated on thePlans, along with a suggested haul route.Contractor to provide trucks and transport claymaterial from borrow pit location to project site.4.2.3 Impervious cap material shall beinorganic clay, sandy clay, or silty claycorresponding to USC groups CL.4.2.4 Contractor shall examine the soilstesting data and make his own determination of hiscapability to achieve the required compaction andpermeability.4.2.5 The moisture content of the in situmaterial may require adjustment as describedherein to achieve the required density andpermeability. Contractor shall make his owndetermination of the suitability of the materialsand methods required. The pay items shallconstitute the entire compensation for anyrequired adjustments.4.2.6 Cap material shall be free of refuse,stumps, large roots, stones over 2 inchesdiameter, brush, or other deleterious material.Where more than one stratum is to be excavated forborrow, order the excavation so that a homogeneousmixture of the strata is achieved.

Aooendix C - 5

Page 55: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

4.3 Placement4.3.1 A test pad, having dimensions of 100feet long by 100 feet wide shall be placed andcompacted using the proposed impervious soils andconstruction methods prior to commencing the capconstruction. A minimum of five tests for densityof soil, in place, and moisture content will betaken. A minimum of three undisturbed samplesshall be taken and analyzed for lab permeability(triaxial cell method). Certified test resultsshall be submitted to the Construction EngineerRepresentative for approval before commendingconstruction. Approval shall be received from theConstruction Engineer Representative beforeconstruction.4.3.2 Place cap material in layers over theentire length and width of the cap in layers notmore than 8 inches thick, loose measure. Where atamping roller is used, the loose depth of eachlift shall not exceed the length of the tamperfeet. The surface area of each foot of the tampingroller shall be no less than 5.5 square inches.4.3.3 Disk each layer before rolling to breakup clumps and clods, and achieve thorough mixingof the cap material.4.3.4 Do not place cap material in water, onfrozen ground, or on other surfaces not approvedby Construction Engineer Representative.4.3.5 Compact each layer to at least 90percent of modified Proctor density.

4.4 Moisture Content4.4.1 Place impervious cap material with amoisture content not less than 95 percent, normore than 104 percent by weight of optimummoisture content.

Tv f —

Page 56: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

4.4.2 If the cap material is too dry, addwater by sprinkling followed by disking.4.4.3 If the cap material is too wet, aeratethe material by disking or other means, to removeexcess moisture.4.4.4 Adjustment of moisture content isincidental to placement of the Impervious Cap.

4.5 Quality Control Testing4.5.1 FrequencyType of Test Minimum Frequency of Test

Classification of Soils I test/2,500 cu.yd.for Engineering Purposes

Gradation (including 1 test/2,500 cu.yd.hydrometer)

Moisture Content 1 test/2,500 cu.yd.

Liquid Limit 1 test/2,500 cu.yd.

Plastic Limit 1 test/2,500 cu.yd.

Moisture Density Curve 1 test/2,500 cu.yd.

Lab Permeability from 1 test/2,500 cu.yd.undisturbed samples afterplacement (Triaxial cellmethod)

Density Tests of soils 1 test/2,500 cu.yd.in place4.5.2 Tests for pollutants may be performed byGROUP at their discretion prior to acceptance ofimpervious cap material. One test per 10,000cubic yards of impervious cap may be performed.Contractor shall notify Construction EngineerRepresentative at least 14 working days in advanceof impervious cap placement to permit collectionand analysis of samples.4.5.3 Quality control tests shall be performedat locations designated by Construction EngineerRepresentative.

Appendix C - 7

Page 57: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

5.0 TOPSOIL5.1 Topsoil material shall be obtained by theContractor, transported to project site and placed.5.2 Place topsoil where shown on plans. Topsoil shallbe placed to a thickness of not less than eight inches,loose measure.5.3 Topsoil shall consist of loose, friable soil, freeof refuse, stumps, large roots, stones over 2 inches indiameter, brush, weeds, or other material which wouldbe determined to be detrimental to proper developmentof vegetative growth. It shall be capable ofsupporting normal vegetation.5.4 Topsoil shall not be taken from any source knownto contain any of the noxious weeds defined in theIndiana State Seed Law.5.5 Topsoil shall have a pH value of 6.2 to 7.4.Testing for pH value shall be performed in the field inaccordance with Purdue University AgriculturalExperiment Station Bulletin N. 635. Contractor may addagricultural limestone to topsoil if required to raisepH value to meet specifications.5.6 Tests for Pollutants may be performed by GROUP attheir discretion prior to acceptance of topsoilmaterial. One test per 10,000 cubic yards of topsoilmay be performed. Contractor shall notify ConstructionEngineer Representative at least 14 working days inadvance of topsoil excavation, to permit collection andanalysis of samples.5.7 Topsoil shall not be placed until it is acceptedby the Construction Engineer Representative.

6.0 FINISH GRADING

6.1 Finish grade the completed work area within thelimits designated.6.2 Do not commence finish grading until construction,fill and Impervious Cap have been completed andapproved.

Annendix C - 8

Page 58: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

6.3 Shaped earth shoulder areas, when compacted, shallbe one inch below the adjacent pavement.6.4 Grade areas to be planted, including lawns whencompacted, to the elevations and grades shown.6.5 Prior to landscaping operations, the landscapershall inspect the fine grading and notify Contractorand Construction Engineer Representative.6.6 Areas that have been finish graded shall beprotected from construction traffic. Repair any areathat has become rutted or has settled below the correctgrade.

7.0 MEASUREMENT AND PAYMENT

7.1 Measurement7.1.1 Impervious Cap shall be measured by thecubic yard based on quantities excavated from theborrow pit.7.1.2 Common fill, furnished by theContractor, shall be measured by the cubic yardbased on quantities as compacted and complete in-place and rough graded.7.1.3 Topsoil, furnished by Contractor, shallbe measured by the cubic yard based on quantitiesas compacted and complete in-place and finishgraded.7.1.4 Construction Engineer Representativeshall survey the pit areas before and afterconstruction, and at such intervals as he deemsappropriate.7.1.5 Payment quantities shall be calculatedon the basis of Average End Area Method usingcross sections at intervals deemed appropriate bythe Construction Engineer Representative.7.1.6 Quantities for intermediate payments maybe calculated based on the number of truck loadsdelivered, but final quantities shall becalculated as above.

Appendix C - 9

Page 59: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

7.1.7 Contractor shall provide ConstructionEngineer Representative with 5 working days noticeprior to beginning any excavation, to permit therequired surveys to be made.

7.2 Payment7.2.1 Common Fill, Impervious Cap and Topsoilshall be paid for at the unit prices item for thecorresponding payment items for earthwork.7.2.2 Excavation, hauling, trucking, loading,unloading, placement, moisture adjustment, roughgrading prior to placement of common fill, roughand finish grading, compaction, and all otherassociated work shall be incidental to thecorresponding payment items.

Appendix C - 10

Page 60: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX D

EXCERPTS FROM

LAWN SPECIFICATIONS

Page 61: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX DEXCERPTS FROM LAWN SPECIFICATIONS

(FOR CONTRACT DOCUMENTS ANDDESIGN PACKAGE FOR THE MARION (BRAGG) LANDFILL)

3.0 LAWNS3.1 General

3.1.1 Furnish, plant, and maintain seeding atlocations designated.3.1.2 All areas within the limits of finishgrading or cap not occupied by permanentconstruction or other plantings shall be seededand maintained as lawn areas. Areas outside thelimits of finish grading that have been disturbedby construction operations shall be seeded andmaintained as lawns, unless otherwise specified.3.1.3 On site pond perimeter and otherdesignated areas shall be seeded with Canary grassseed mixture below elevation of 795 feet and asshown on Plans.3.1.4 Seeded 6 percent or steeper slopes shallbe protected in accordance with the specificationfor erosion control in Section 2H.

3.2 Materials3.2.1 Lawn grass seed, using a mixture of thefour listed grass seeds, shall be fresh, clean,new crop seed sown at the following rates peracre:

Alta Fescue 40 poundsPerennial Rye Grass 25 poundsKentucky Bluegrass 10 poundsAnnual Rye grass 35 pounds

* NOTE: The original mixture was changed tothe following combination:

Page 62: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

KY31 Fescue 50%Linn Perennial Ryegrass 25%Chewing Fescue 10%Annual Ryegrass 5%Redtop 5%Kentucky Bluegrass 5%The new mixture is shown in the percentagesof each seed per one hundred pound bag ofseed mix. The rate of application remains110 pounds per acre.

3.2.2 Canary grass seed, using a mixture ofthe three listed grass seeds, shall be fresh,clean, new corp seed, sown at the following ratesper acre:

Reed Canary Grass 15 poundsTall Fescue 16 poundsBirdsfoot Trefoil 4 pounds

3.2.3 Fertilizers shall conform to the statefertilizer laws. Commercial fertilizer for lawnsshall be 10 percent nitrogen (1/2 organic, 1/2inorganic,), 8 percent phosphoric acid, and 6percent potash and trace elements, or 10 percentnitrogen (1/2 organic, 1/2 inorganic), 6 percentphosphoric acid, and 4 percent potash and traceelements.3.2.4 Superphosphate shall be a commercialpreparation containing by weight a minimum of 20percent available phosphoric acid.

3.3 Construction3.3.1 After topsoil has been spread and finalgrades established in accordance with otherSections of the Specifications, fine grade theentire lawn area by discing or tilling to a depthof 4 inches. Then drag the area with a plankfloat to develop a smooth, even surface. Powerequipment may be used for these operations, but

Page 63: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

hand tools shall be used in areas too small forpower equipment.3.3.2 Install jute matting after seedingoperation.3.3.3 Seeding

3.3.3.1 Apply superphosphate at the rate of3.1 Ibs/1,000 sf, commercial fertilizer at2.5 Ibs/1,000 sf, and peat moss at the rateof 3 bales per 1,000 sf. Work thesuperphosphate, fertilizer, and peat mossinto the soil to a minimum depth of 4 inches.3.3.3.2 Sow grass seed in two operations ofequal amounts at right angles to each other.Sow only between April 15 and May 30 andbetween August 10 and September 10. Do notseed during high winds or when the groundsurface is too wet for working.3.3.3.3 Reed canary grass may be spriggedon 2-3 inch centers instead of seeding.3.3.3.4 Lightly rake or drag seeded areasand then roll with a 200 Ib roller.3.3.3.5 After raking and rolling, waterseeded areas with a fine spray until auniform moisture depth of one inch has beenobtained.3.3.3.6 In lieu of mechanical applicationof seed and fertilizer, hydraulic applicationmay be used if the fertilizer and seed areapplied in separate operations. The seed orfertilizer slurry shall be constantlyagitated until pumped from the tank. Do notadd seed to the water more than 4 hoursbefore application.

3.4 Maintenance3.4.1 Maintenance shall consist of watering,cutting, trimming the grass, and performing other

Page 64: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

work necessary to obtain a good stand of grassreasonably free of weeds or obnoxious grasses.3.4.2 The maintenance period shall beginimmediately after seeding operations are completeand continue for not less than 45 days, or untilthe lawn grass has been cut twice, and ifnecessary, until an acceptable stand of grass hasbeen established. Grass cutting shall mean with aminimum of 1-inch of grass cut off the top ofstand of grass with mower height set at 3 inches.3.4.3 At the end of the maintenance periodapply organic fertilizer containing 6 percentnitrogen and 2 percent phosphorus to lawn areas atthe rate of 30 lbs/1,000 sf.

4.0 MEASUREMENT AND PAYMENTS

4.1 Measurement4.1.1 Trees and shrubs shall be measured bycount according to the species planted.4.1.2 Grass shall be measured by the squareyard based on surveys taken after planting.

4.2 Payment4.2.1 Payment shall be made under the paymentitems for trees by species, shrubs by species,lawn grass and canary grass, under payment item"Landscaping".

Page 65: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX E

LANDFILL GAS MONITORING PROGRAM

Page 66: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX E

LANDFILL GAS MONITORING PROGRAM

1.0 Overview of Site ConditionsMarion (Bragg) Landfill site is described in detail

in section 1 of this plan. See Figure 1 for the sitelocation and Figure 2 for the site diagram. The site isbordered by the Mississinewa river on the north and eastand by a pond on the south side. A small constructioncompany, which manufactures asphalt, currently occupiesland to the Southwest of the site.

The site has had a clay cap installed which isdescribed in section 2.3.1 of this plan. The currentsite condition is good with no apparent leachate seepsidentified or indications of stressed vegetation on thecap which may indicate gas migration through the cap.The site has no active utility services. Utilities whichwere present prior to cap construction were removedduring the cap construction.

1.1 Landfill Gas Monitoring ProgramThe landfill gas monitoring plan at the Marion

(Bragg) Landfill site consists of quarterly monitoring ofthe headspace in seven of the ten on-site monitoringwells and also in MW-7 located in the cemetery due westof the site. These seven wells are used becausehistorically there has been no screened interval abovethe water table in the remaining wells. The monitoringwill be performed during the quarterly ground watermonitoring events. The monitoring will consist ofchecking the headspace in wells MB-1, 2, 3, 5, 7, 9, 10and MW-7 prior to determining ground water level readingswhich are taken during each quarterly ground watermonitoring event. The headspace will be checked using anexplosimeter calibrated to methane in air or an

Page 67: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

equivalent standard to determine if combustible levels ofgas exceed 100% of the LEL. The purpose of themonitoring program is to detect any off-site migration ofcombustible landfill gases above these levels.

1.3 Monitoring ProceduresThe landfill gas monitoring program will take place

each quarter in conjunction with the quarterly groundwater monitoring event. As stated previously, the testlocations will be on-site monitoring wells MB-1 through3, MB-5, MB-7, MB-9, MB-10 and well MW-7 located in thecemetery to the west of the site.

Immediately prior to each survey event the MSA Model60 combustible gas indicator will be calibrated using theprocedures outlined in the manufacturer's manual. Priorto opening the monitoring wells used for the gas survey,the instrument will be checked to ensure that it is stilloperational and ready to be used. Each of the wellcovers is equipped with a rubber sanitary seal which willprevent any gases from escaping or moisture from enteringthe well casing. As soon as the well is opened, tubingconnected to the instrument sample inlet port will beplaced in the well casing and the reading taken as soonas the reading stabilizes. Since oxygen deficientatmospheres will cause the instrument to indicate lowerreadings than are actually present in the well, sampleswill not be taken inside the well casing at depthsgreater than four feet. Since the density of methane(0.554) is less than that of air (standard 1.0), theaccumulated gases inside the well casing should begin torise as the representative sample is taken. After thereading has stabilized, the date, time and concentrationwill be recorded in the field activity log being used torecord the ground water monitoring data. After the gasmonitoring has been completed, the ground water levelswill be taken and recorded. At monitoring locations

Page 68: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

where erratic or unusual readings are recorded,additional readings will be taken. The well cover willbe replaced and another reading will be taken after 24hours to allow the gas time to accumulate in the wellcasing.

The results of this landfill gas monitoring programwill be documented in the field activity log book. Allcalibrations including the frequency of calibrations andthe time of calibrations will be performed as describedin manufacturer's instruction manuals and documented inthe field log book.

1.4 Contingency PlanDue to the remote location of the site, danger to

the general public from off-site migration of landfillgas is minimal. Should readings exceed 100% of the LELat any perimeter monitoring location, a report showingthe results and location of the readings will be made tothe EPA, IDEM, and local Fire Officials within 24 hours.Based on the location of any readings above these levelsand the results of further monitoring, a proposal will beprepared to identify the source area and methods toeliminate or contain any further migration of the gas.

TV r"ir*i o r»

Page 69: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX F

HEALTH AND SAFETY PLAN

Page 70: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

HEALTH AND SAFETY PLANOPERATION & MAINTENANCE PERIOD

MARION (BRAGG) LANDFILLMARION, INDIANA

AUGUST 1991(revised September 1992)

PREPARED FOR

MARION (BRAGG) LANDFILL GROUP

PREPARED BY

O & M, INC.P.O. BOX 90348

KNOXVILLE, TENNESSEE 37990

Page 71: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

TABLE OP CONTENTS

Title___________________________________________ Page

1.0 SITE INFORMATION................................... 6

1.1 Site Background.................................... 6

2.0 SITE PERSONNEL RESPONSIBILITIES .................... 6

3.0 PLANNED ACTIVITIES ................................. 7

3.1 Monitoring......................................... 7

3.2 Grounds Maintenance................................ 7

4.0 POTENTIAL HAZARDS .................................. 7

4.1 Chemical........................................... 7

4.2 Physical........................................... 8

4.3 Action Levels...................................... 8

5.0 SITE HEALTH AND SAFETY REQUIREMENTS ................ 9

5.1 Personnel Training................................ 10

6.0 EMERGENCY PROCEDURES .............................. 11

6.1 Personal Injury................................... 11

6.2 Fire or Explosion................................. 12

6.3 Incident Reporting Procedures..................... 12

6.4 Emergency Contacts................................ 13

6.5 Emergency Medical Services ........................ 13

7 . 0 SPECIAL PRECAUTIONS AND PROCEDURES ................ 13

7.1 Heat Stress and Cold Exposure..................... 14

7.2 Heavy Machinery and Equipment..................... 14

7.3 Sampling Bodies of Water.......................... 15

7.4 Additional Safety Precautions..................... 15

ATTACHMENTS

Page 72: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

ATTACHMENTS

FIGURESAPPENDICES

Page 73: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

LIST OF FIGURES

Figure 1Figure 2Figure 3

Figure 4

Figure 5

Figure 6

Figure 7Figure 8

Site Location Map

Site Map

Ground Water and Surface Water Sampling

Schedule

Potential Chemical Hazards

Potential Physical Hazards

Anticipated Personal Protective Equipment

Levels for Site Activities

Emergency Response Telephone Numbers

Map and Directions to Hospital

Page 74: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

LIST OF APPENDICES

A Personal Protective EquipmentB Occupational Safety & Health CertificationC Medical MonitoringD Personnel TrainingE Incident Reporting Form

Page 75: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

1.0 SITE INFORMATIONThe landfill is believed to have started

operations in 1957 as a municipal landfill. Somerecords indicated that the site may have b*en usedfor waste disposal as early as 1949. During thelife of the landfill, both municipal and industrialwastes were accepted. The disposal operations cameto an end in October of 1975. In December 1983, thesite was added to the US EPA National PrioritiesList.

Presently the landfill is capped and vegetatedand does not presently appear to have any erosionproblems. Vegetation covering the landfill consistsof a mix of perennial and annual grasses.

1.1 Site BackgroundThe Marion (Bragg) Landfill site consists of a

72-acre parcel of land located on the southeast edgeof Marion, Grant County, Indiana (See Figure 1 forsite location). Approximately 45 of the site's 72acres were used for landfilling purposes prior toclosing in 1975.

The Mississinewa River borders the site to theeast and north, a cemetery borders it to the west,and an abandoned gravel pond, borders it to thesouth. A pond of approximately 15 acres lies nearthe center of the site. An asphalt/constructionbusiness, identified as Dobson Construction Companyis located along the southwest corner of the site,(See Figure 2 for site map).

2.0 SITE PERSONNEL RESPONSIBILITIESActivities at the site will consist of ground

water and surface water sampling and groundmaintenance which will be performed by the City ofMarion, the Group, and contractors to both. Therewill be no specific personnel assigned to the site.

Page 76: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

However, all City of Marion personnel, Grouprepresentatives and contractors will conform withthe safety and health standards of the FederalDepartment of Labor, Occupational Safety and HealthAdministration and 29 CFR 1910.120 Safety and HealthStandards & Industrial Standards. It will be theresponsibility of the City of Marion and the Marion(Bragg) Group, to assure that their respectivecontractors, if applicable, and subcontractorsconform to these regulations.

3.0 PLANNED ACTIVITIES3.1 Monitoring

Monitoring of ground water and surface waterbegan in February 1990 and will continue throughoutthe O & M period, (thirty years). Refer to Figure 3for Sampling Schedule.

3.2 Grounds MaintenanceGrounds maintenance will begin after the

closure period is complete. Maintenance willinclude the following:

Grass mowing and fertilizationFence, gates, signs and locks repair orreplacementRepair of roadwaysCap repair to include flood protection system,unvegetated areas and erosion repairRip-rap areas

4.0 POTENTIAL HAZARDS4.1 Chemical

Potential chemical hazards will be contactedthrough sampling of ground water and surface water,replacing a fence pole, inspecting or repairing thecap at a leachate seep, use of fertilizers or when

Page 77: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

repairing a deep cut into the cap. A list ofpotential chemical hazards is located in Figure 4.

4.2 PhysicalPossible physical hazards will be mainly

confined to those activities related to grounds andwell maintenance. Potential health and safetyhazards are located in Figure 5. However, potentialhazards are not limited to the ones listed in Figure5. Other unforeseen and unknown hazards may also bepresent.

4 . 3 Action LevelsAction levels have been established for

activity cessation, site evacuation, emergencyresponse, and the upgrade or downgrade in the levelof personal protective equipment. The followingchart summarizes action levels established for theO & M Period.

Action Levels Based onTotal Volatile Organic Vapor Concentrations*

Total VolatileOrganic Compounds (ppm) Level of Protection

Background level to 1 ppm Level D1 ppm to 10 ppm Level C (with half or

full face respirator)10 ppm to 50 ppm Level C (with full-

face respirator)> 50 ppm to SOOppm Level B

As measured in the breathing space.

The above action levels are based on theThreshold Limit Value (TLV) for 1,1-dichloroetheneas established in the revised OSHA permissibleexposure limit standard of 29 CFR Part 1910. OSHA

Page 78: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

has adopted a 1 ppm PEL for 1,1-dichloroethene as atime-weighted average value for an eight-hour day,forty-hour work week. Action levels established inthe above table have been based on this exposurelimit for 1,1-dichloroethene and on the assignedprotection factors for half- and full-face airpurifying respirators.

Though benzene and vinyl chloride have beenfound to be present at the Marion (Bragg) Landfillsite, their concentrations are too low to be used inestablishing the above Action Levels.

Sampling for benzene and vinyl chloride will beperformed periodically during initial activities toensure these compounds are not present in thebreathing zone. Colorimetric indicator tubes willbe used to determine approximate airborneconcentrations of these compounds. Appropriatelevels of protection will be required if eithercompound is determined to be present in the worker'sbreathing space.

5.0 SITE HEALTH AND SAFETY REQUIREMENTSA health and safety plan has been established

for the operation and maintenance period. Thehealth and safety plan which has been establishedconforms with the safety and health standards of theFederal Department of Labor, Occupational Safety andHealth Administration and 29 CFR 1910.120 Safety andHealth Standards and Industrial Standards.

All contractors, City of Marion personnel, andvisitors are required to read this Health and SafetyPlan and sign the sheet provided at the end of theHealth and Safety Plan stating that fact.Contractors and City personnel must also have intheir possession their own Health and Safety Plan oradopt this plan, and designate a health and safety

Page 79: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

officer. If the City or their contractors adopttheir own plan it should meet the minimumrequirements of this plan. Visitors are required toabide by this Health and Safety Plan.

All contractors and City personnel are requiredto have hard hats, safety shoes, hearing and eyeprotection, life jackets or vests and shore lines,and fire fighting equipment (fire extinguishers)when performing activities that deem it necessary touse them or have them available for use. Refer toFigure 6 for anticipated personal protectiveequipment levels for site activities. Refer toAppendix A for a description of Levels B, C, and Dpersonal protective equipment.

5.1 Personnel TrainingAt a minimum all applicable employees must meet

the training requirements specified in 29 CFR1910.120 by having been trained in the areas listedbelow. Contractors and subcontractors mustacknowledge their compliance to the trainingrequirements by completing the form shown inAppendix B.

* Health and Safety Officer and Site ManagementResponsibilities - personnel must understandHealth Safety Officer (H & S Officer) and SiteManagement responsibilities and authority.

* Site-Specific Health and Safety Hazards -personnel must be informed of specific hazardsrelated to site and site operations.

* Personal Protection Equipment (PPE) - personnelmust be trained in proper use of personalprotective equipment. Refer to Appendix A.

* Safe Work Practices/Engineering Controlspersonnel must be informed of appropriate work

Page 80: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

practices and engineering controls that willreduce the risk of exposure to site hazards.

* Safety Equipment Use - personnel mustunderstand the use of monitoring instrumentsand other safety equipment.

* Medical Surveillance Program - personnel mustbe informed of requirements for medicalsurveillance of hazardous waste site employees.Refer to Appendix C.

* Site Control Methods - personnel mustunderstand site methods used to reduce exposureto on-site and off-site personnel.

* Emergency Response - personnel must be trainedin proper emergency response operations andprocedures.

A more detailed discussion of training requirementsis included in Appendix D.

6.0 EMERGENCY PROCEDURESEach subcontractor will be responsible for

assigning the duties of Health and Safety Officer (H& S Officer) to their own personnel. It will thenbe the duty of the H & S Officer to ensure thatappropriate procedures are followed if an on-siteemergency arises. The following standard procedureswill be used by on-site personnel. In the event ofan emergency, site personnel will signal distresswith three blasts from an appropriate horn (vehiclehorn, air horn, etc.)- Once the signal is heard allpersonnel will gather at the site entrance. Allappropriate authorities and the Group will then beimmediately notified of the nature and extent of theemergency.

6.1 Personal InjuryIn the event of an injury, appropriate first

aid should be initiated, and an immediate request

Page 81: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

should be made for an ambulance (if necessary) andthe designated medical facility should be notified,(if required) . (Refer to Figures 7 and 8 foremergency phone numbers and a map showing the routeto the hospital, respectively).

6.2 Fire or ExplosionIn the event that a fire or an explosion occurs

at the site, the fire department should be notified.In the event that either of these requireevacuation, all personnel will meet at the mainaccess gate with an alternate location being eitherof the two man gates which provide access to theformer East Side Cove property. Refer to Figure 7for emergency phone numbers.

6.3 Incident Reporting ProcedureAdherence to this site-specific Health and

Safety Plan and any additional facility safety rulesand regulations will significantly reduce thelikelihood of personnel being exposed to substancesabove permissible exposure limits. However, in theevent an incident does occur, it is imperative thatspecific reporting procedures be followed so thatappropriate corrective action can be taken by theHealth and Safety (H & S) Officer and the ProjectManager. In addition to the incident reportingprocedures specified in the Consent Decree, thefollowing procedures will be implemented should anincident occur at the site. Upon notification of anincident, the H & S Officer will contact theappropriate technical personnel for recommendedmedical diagnosis, and if necessary, treatment. TheProject Manager and the H & S Officer willinvestigate facility/site conditions to determine:(1) whether and at what levels the incident actuallyoccurred, (2) the cause of the incident, and (3) themeans to prevent the incident from recurring.

Page 82: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

exercise extreme caution during operation ofequipment and machinery to avoid physical injury tothemselves or others.

7 . 3 Bodies of WaterSpecial care and precautions must be taken when

working over or near bodies of water. The "BuddySystem" will be in effect. The following OSHAregulations, 29 CFR 1926.106, are to be followedwhen working over or near bodies of water where thedanger of drowning exists:

(a) Employees working over or near water, where thedanger of drowning exists, shall be providedwith U.S. Coast Guard-approved life jacket orbuoyant vests.

(b) Prior to and after each use, the buoyant workvest or life preservers shall be inspected fordefects which would alter their strength orbuoyancy. Defective units shall not be used.

(c) Ring buoys with at least 90 feet of line shallbe provided and readily available for emergencyrescue operations. Distance between ring buoysshall not exceed 200 feet.

(d) At least one life saving skiff shall beimmediately available at locations whereemployees are working over or adjacent towater.

Always be aware of your foot - and handholds. Whenentering water, a lifeline will be used, providingcontact with the person in the water and the personon the shore or connected to a stationary object(e.g., tree). The requirements will not apply ifthe depth of the water is less than 24 inches andthe H & S officer concurs.

Page 83: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

7.4 Additional Safety PracticesThe following are important safety precautions

which will be enforced during this O & M period:

* Eating, drinking, chewing gum or tobacco,smoking, or any practice that increases theprobability of hand-to-mouth transfer andingestion of material is prohibited in any areadesignated as contaminated.

* Whenever decontamination procedures for outergarments are in effect, the entire body shouldbe thoroughly washed as soon as possible afterthe protective garment is removed.

* No excessive facial hair which interferes withthe effectiveness of a respirator will bepermitted on personnel required to wearrespiratory protection equipment. Therespirator must seal against the face so thatthe wearer receives air only through the airpurifying cartridges attached to therespirator. Fit testing shall be performedprior to respirator use to ensure a proper sealis obtained by the wearer.

* Contact with potentially contaminated surfacesshould be avoided whenever possible. Oneshould not walk through puddles, mud or otherdiscolored surfaces; kneel on ground; lean, sitor place equipment on drums, containers,vehicles or the ground without a protectivebarrier (e.g., visqueen).

* Medicine and alcohol can potentiate the effectfrom exposure to certain compounds. Personnelshould consult their physician regarding theuse of prescribed drugs while participating insite activities.

Page 84: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

Personnel and equipment in the work areasshould be minimized, consistent with effectivesite operations.Work areas for various operational activitiesshould be established.Procedures for leaving the work area must beplanned and implemented prior to going to thesite. Work areas and decontaminationprocedures must be established on the basis ofprevailing site conditions.Respirators will be issued for the exclusiveuse of one worker and will be cleaned anddisinfected after each use by the worker.Safety gloves and boots shall be taped to thedisposable chemical-protective suits asnecessary.All unsafe equipment left unattended will beidentified by a "DANGER, DO NOT OPERATE" tag.Noise mufflers or ear plugs may be required forall site personnel working around heavyequipment. This requirement will be at thediscretion of the H & S Officer. Disposable,form-fitting plugs are preferred.Cartridges for air-purifying respirators in usewill be changed daily at a minimum.Self-contained breathing apparatus (SCBA) andair-purifying respirators will be inspectedprior to usage at the site.

Page 85: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURES

Page 86: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

Figure 1SITE LOCATION MAP

GRANTj! -«sCOUNTV * MARION BRAGG

LANDFILL

Page 87: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

F i g u r e 2Site Map

Marion (Bragg) Landfill

Off-Site Pond.

LEG EM

Site BoundaryMarion Paving Co.. Inc.Oobson Construction Co., Inc.Private ResidenceLandfill Area

250 500

Scale in Feet

Sourer U.S. EPA 1987.

Page 88: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURE 3GROUND WATER AND SURFACE WATER SAMPLING SCHEDULE

Elapsed Time(years)

CCappinc

PPIDI

) 0.Started

+ AEM IDEM

25 0Capping (

PP+ CSP IDI

5 0.Completed

+ AEM IDEM

75Vegetatl

PP+ CSP ID

1 1.ve Cover

+ AEM IDEM

25

+ CSP

1

PPID

5 1.

+ AEM IDEM

75 2 2.25

PP + A+ CSP IDEM IDEM + CSF

2.5 2.75

PP + A• IDEM IDEM + CSP

PPIDI

4

PPIDI

] 3.

+ AEM IDEM

25 3.5 3.75

PP + A+ CSP IDEM IDEM + CSP

5 4.

-i- AEM IDEM

75 5

PP + A+ CSP IDEM

4 4.25

PP + AIDEM IDEM + CSP

NOTE: Schedule shown Is for a 5-year time period. This schedule will be repeated for 30 years, but will be subjectto review at the end of the 5-year period.

PP + A = Priority Pollutants (minus pesticides and PCBs) plus AmmoniaIDEM = IDEM Indicator Parameter ListCSP = Confirmatory Sampling Parameters (determined after each semi-annual sampling event)

Page 89: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURE 5POTENTIAL PHYSICAL HAZARDS

Equipment - Light and HeavyOverhead/Underground UtilitiesHeat Producing EquipmentHeat Stress/Cold ExposureSlippery/Uneven GroundLifting - Anything HeavyInsect BitesWorking Over or Near Bodies of Water

Page 90: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURE 6ANTICIPATED PERSONAL PROTECTIVE EQUIPMENT

LEVELS FOR SITE ACTIVITIES

The levels of protection assigned to each activity (below)represent the best estimate of exposure potential andprotective equipment needed for that exposure. The H & SOfficer will revise those levels of protection based on airmonitoring results and on-site assessment of actual exposures.See Appendix A for detailed description and discussion ofpersonal protective equipment.

PhysicalSite Activity

Installation and/orremoval of monitoringwells

Perform ground watermonitoring wellsampling

Maintain accessrestriction (e.g. fenceand gates)

Maintenance oflandfill cover/cap

Perform surface watersampling

Location

Variousareas

MonitoringWells

SitePerimeter

Landfillarea

Variousareas

PersonalProtection Required

Level D, with chemicalresistant coverall, outerboots, inner and outergloves.

Level D, with a chemicalresistant coverall, andouter nitrile gloves orequivalent for chemicalmaterial handling.

Level D, with hard hats,safety glasses, andhearing protection.

Level D, with hard hats,safety glasses, andhearing protection.

Level D, with a chemicalresistant coverall, andouter nitrile gloves orequivalent for chemicalmaterial handling.

Page 91: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

FIGURE 7EMERGENCY RESPONSE TELEPHONE NUMBERS

Hospital:Marion General HospitalEmergency Room317-662-1441

Poison Control Center:

Poison Control Center in Indianapolis1-800-382-9097

Police or Sheriff:

Marion Police Department317-662-9981

Grant County Sheriff Department317-668-8168

Fire Department:

Marion or Township Volunteer Fire Department911

Marion (Bragg) Landfill PRP Group:

c/o John Hanson, Esq.202-789-6000

US EPA Region V:

Bernie Schorle312-886-4746

Indiana Department of Environmental Management:

Gabriele Hauer317-243-5188

O & M, Inc.

Kelly L. Fifer615-691-6254

de maximis, inc.

Mark Travers615-691-5052

Page 92: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

Figure 8

MAP AND DIRECTIONS TO HOSPITAL

MARION GENERALHOSPITAL

Directions to the hospital are as follows:Turn right out of the site onto Central Ave. Go to the stop sign, which is LincolnBlvd/Pemsylvania Avenue and turn right. The road will split, follow PennsylvaniaAvenue (straight). Follow Pennsylvania Avenue to the second light which is Route18 West (also referred to as Third Street) and turn left. Follow Third Street fornine blocks to Nebraska, turn right onto Nebraska. Follow Nebraska four blocksuntil you reach Uabash Avenue, turn left onto Uabash Avenue. Marion General

Hospital is on the left side of Uabash Avenue. The Emergency Entrance is on Uabash

Avenue between Euclid and Cherry (the next street after Euclid).

Page 93: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDICES

Page 94: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX A

PERSONAL PROTECTIVE EQUIPMENT

Page 95: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX APERSONAL PROTECTIVE EQUIPMENT

PROTECTIVE EQUIPMENTAll personnel must be provided with appropriate personal

safety equipment and protective clothing relative to the taskbeing performed. Each individual will be properly trained inthe use of this safety equipment before the start of fieldactivities. Safety equipment and protective clothing shall beused as directed by the Site Health and Safety Officer. Allsuch equipment and clothing will be cleaned and maintained inproper condition by project personnel. The H & S Officer willmonitor the maintenance of personal protective equipment toensure proper procedures are followed.

Personal protective equipment will be worn at all times,as designated by this plan. Levels of protective clothing andequipment have been assigned to specific work tasks.

The personal protective equipment levels designated beloware in conformance with EPA criteria for Levels B, C, and Dprotection. All respiratory protective equipment used will beapproved by NIOSH/MSHA.

LEVEL B PROTECTION* Pressure demand cascade air-line system or other suitable

self-contained, pressure demand breathing apparatus.* Chemical-resistant clothing such as Poly-coated Tyvekr or

Saranexr. Suits will be one piece with booties andelastic wrist bands.

* Outer nitrile and inner latex surgical gloves.* Safety shoes.* Water-resistant tape over protective clothing as

necessary.* Options as required:

Coveralls Hard HatDisposable outer boots Hearing ProtectionFace shield Escape Mask

Page 96: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX APERSONAL PROTECTIVE EQUIPMENT

(continued)

LEVEL C PROTECTION

* Full- or half-face air purifying respirator equipped withappropriate organic vapor/dust canisters or cartridges.

* Chemical-resistant clothing such as Tyvek, Poly-coatedTyvek or Saranex. Suits should be one piece with hoods,booties and elastic wrist bands.

* Outer nitrile gloves and inner latex surgical gloves* Safety shoes* Water-resistant tape over protective clothing as necessary* Options as required:

Coveralls Hearing ProtectionDisposable outer boots Safety GlassesEscape mask Hard hatFace shield

LEVEL D PROTECTION

* Coveralls or long sleeve shirts and long pants.* Outer nitrile gloves or equivalent at a minimum for all

chemical material handling activities (inner latexsurgical gloves are recommended where practical)

* Safety shoes* Options as required:

Disposable outer boots Hard hatSafety glasses Hearing protection

UTVOTJ _ TVT->rioT>«

Page 97: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX B

OCCUPATIONAL SAFETY AND HEALTH CERTIFICATION

Page 98: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX B

OCCUPATIONAL SAFETY AND HEALTH CERTIFICATION

PROJECT: SUBCONTRACTOR:

Contractor certifies that the following personnel to be employed during activities at theMarion (Bragg) Landfill site have met the requirements of the OSHA Hazardous WasteOperations Standard (29 CFR 1910.120) and other applicable OSHA standards, as required bythe Group.

Respirator MedicalTraining Certification Exam

Subcontractor Personnel Date Date Date

SIGNATURE PRINTED NAME

SIGNATURE PRINTED NAME

SIGNATURE PRINTED NAME

SIGNATURE PRINTED NAME

SIGNATURE PRINTED NAME

SIGNATURE PRINTED NAME

Subcontractor certifies that it has received a copy of the Site Health and Safety Plan andwill ensure that its employees are informed and will comply with its requirements.

Subcontractor further certifies that it has read and understands and will comply with allprovisions of its contractual agreement.

* Only applies tr> intriif'ivn and sampling activities.

Page 99: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX C

MEDICAL MONITORING

Page 100: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX CMEDICAL MONITORING

The Occupational Safety and Health Administration (OSHA) hasestablished requirements for a medical surveillance programdesigned to monitor and reduce health risks for employeespotentially exposed to hazardous materials (29 CFR 1910.120).This program has been designed to provide baseline medical datafor each employee involved in hazardous waste operationsincluding field activities, and to determine his/her ability towear personal protective equipment, such as chemical resistantclothing and respirators. Employees who wear or may wearrespiratory protection must be provided respirators asregulated by 29 CFR 1910.134. This Standard requires that anindividual's ability to wear respiratory protection bemedically certified before he/she performs designated duties.Where medical requirements of 29 CFR 1910.120 overlap those of29 CFR 1910.134, the most stringent of the two will beenforced.

The medical examinations must be administered on a pre-employment and annual basis and as warranted by symptoms ofexposure or specialized activities. These examinations shallbe provided by employers without cost or loss of pay to theemployee. For the purposes of this Health and Safety Plan, allsubcontractors shall assume the employer's responsibility inobtaining the necessary medical monitoring and training fortheir employees pursuant to this section of 29 CFR 1910.120.

The examining physician is required to make a report to theemployer of any medical condition which would place suchemployees at increased risk of wearing a respirator or otherpersonal protective equipment. Each employer engaged in sitework shall assume the responsibility of maintaining sitepersonnel medical records as regulated by 29 CFR 1910.120 whereapplicable. Exemption from the medical surveillance programmay be allowed by the Health and Safety Officer. Theseexemptions will be based on interpretation of the requirementsof 1910.120 relative to each individual exemption request.

All employees contracted to work at the site designated by thisPlan will be responsible to insure their employees havereceived the proper medical tests as regulated by 29 CFR1910.120 and shall provide the contractor with certification ofsame.

Only applies to intrusive and sampling activities.

Page 101: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX D

PERSONNEL TRAINING

Page 102: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX DPERSONNEL TRAINING

Site personnel associated with those field activities in whichthe potential for exposure to hazardous substances above thePEL exists will be required to participate in a health andsafety training program that complies with criteria set forthby OSHA as per interim final regulation 29 CFR 1910.120. Thisprogram will instruct employees on general health and safetyprinciples and procedures, proper operation of monitoringinstruments, and use of personal protective equipment.

In addition, site employees will undergo site-specific trainingprior to the start-up of any given project or task. Asactivities change at a particular site, related training willaddress potential hazards and associated risks, site operatingprocedures, emergency response and site control methods to beemployed.

Specialized training will be provided as dictated by the natureof site activities. Specialized training will be provided foractivities such as confined space entry, excavations andhandling of unidentified substances. Employees involved inthese types of activities will be given off-site instructionregarding the potential hazards involved with safety activitiesand the appropriate health and safety procedures to befollowed. Off-site instruction is meant to include any areawhere employees will not be exposed to site hazards.

Site personnel involved in the field activities will havereceived the appropriate basic training plus additionalspecific training where needed. This Health and Safety Planmust be distributed to all subcontractors prior to the start offield activities. A pre-operation meeting will be held todiscuss the contents of the Plan. Specialty training will beprovided as determined by task and responsibility. Alltraining of personnel will be conducted under directsupervision of a trained Health and Safety Officer.

Exemptions from training may be approved by the H & S Officer.

Only applies to intrusive and sampling activities.

Page 103: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX E

INCIDENT REPORT FORM

MARION (BRAGG) LANDFILL

Page 104: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

APPENDIX EEXAMPLE - INCIDENT REPORT FORM

MARION (BRAGG) LANDFILL SITE

CLIENT NAME: LOCATION OF INCIDENT;DATE OF INCIDENT:EMPLOYEE: TYPE OF INCIDENT:EMPLOYEE JOB TITLE:SPECIFIC JOB AT TIME OF INCIDENT:LEVEL OF PROTECTION WORN AT TIME OF INCIDENT:SUMMARY OF WHAT OCCURRED:

ACTIONS TAKEN TO CORRECT SITUATION (Engineering, P.P.E., etc.)

EMPLOYEE SIGNATURE:HEALTH & SAFETY OFFICER:TIME & DATE OF REPORT:

Page 105: OPERATION AND MAINTENANCE PLAN MARION (BRAGG) LANDFILL ... · operation and maintenance plan marion (bragg) landfill marion, indiana august 1991 (revised december 1992) prepared for

All persons entering the facility have read the above Health and SafetyPlan, and are familiar with and will abide by it's provisions.

NAME SIGNATURE COMPANY DATE