fort bragg, nc
DESCRIPTION
2011 FEDCON SummitTRANSCRIPT
![Page 1: Fort Bragg, NC](https://reader035.vdocuments.mx/reader035/viewer/2022081413/54682640af7959a2358b4fc1/html5/thumbnails/1.jpg)
![Page 2: Fort Bragg, NC](https://reader035.vdocuments.mx/reader035/viewer/2022081413/54682640af7959a2358b4fc1/html5/thumbnails/2.jpg)
204 Stationing Actions – Making Fort Bragg 1/10th of the Army Population Soldier/Civilian Growth: From 54,631 to 77,092 Trips per Day: 90,000 to 150,000 Command Growth: 2005 2011
15,000,000 sf of new facility requirements (not including COF/TEMF deficit). 2,250 new Family Housing Units (6,238 total) $3 Billion in new Military Construction (FY03-15) Traffic/Parking Congestion
2 – 3-Star Commands 5 – 2-Star Commands 3 – 1-Star Commands21 – Brigade Equivalents
1 – 4-Star Command 4 – 3-Star Commands 5 – 2-Star Commands 3 – 1-Star Commands28 – Brigade Equivalent
![Page 3: Fort Bragg, NC](https://reader035.vdocuments.mx/reader035/viewer/2022081413/54682640af7959a2358b4fc1/html5/thumbnails/3.jpg)
WE MADE
Real Property Master Plan
DIGEST
Fort Bragg, North Carolina
WORKSWORKSPUBLICPUBLIC
![Page 4: Fort Bragg, NC](https://reader035.vdocuments.mx/reader035/viewer/2022081413/54682640af7959a2358b4fc1/html5/thumbnails/4.jpg)
• Roads• Motor Pools• Company Operations Facilities• Fitness Centers
MILCON Program
![Page 5: Fort Bragg, NC](https://reader035.vdocuments.mx/reader035/viewer/2022081413/54682640af7959a2358b4fc1/html5/thumbnails/5.jpg)
Program Highlights:• Funding Based on FSM• Building Renovation/Construction• Energy Efficiencies•HVAC/Electrical Upgrades• Plumbing Repair• Paving, Paving, Paving• Roofing
SRM Program
0
20
40
60
80
100
120
140
160
180
200
$Mill
ion
![Page 6: Fort Bragg, NC](https://reader035.vdocuments.mx/reader035/viewer/2022081413/54682640af7959a2358b4fc1/html5/thumbnails/6.jpg)
FY12• Retro-Commission multiple buildings on the installation
– Need A/E’s, RCx agents, control and mechanical contractors• Renewable Energy Geothermal & Retro Cx Historical District• Transpired Solar Collectors for Various buildings• PV and Solar Water projects
FY13• ECIP Renewable Solar Heating and DDC Conversion• Retro-Commission multiple buildings on the installation• Combined heat and power plant
FY14• New Geothermal central energy plant• Bio-mass plant
Energy Program
![Page 7: Fort Bragg, NC](https://reader035.vdocuments.mx/reader035/viewer/2022081413/54682640af7959a2358b4fc1/html5/thumbnails/7.jpg)
Program Highlights:• Water & Wastewater Infrastructure
•Fort Bragg, Pope AAF, Camp MacKall•Housing
• Continuous Life Cycle Renewal & Replacement• System Wide Water and Sewer Modeling• Water and Sewer Pipeline Replacement• Backflow Preventer Replacement• Lift Station Rehabilitation
Water Wastewater Infrastructure
0
5
10
15
20
25
30
35
40
45
$M
illio
n
Pipeline Replacement
BFP Replacement
LS Rehabilitation
![Page 8: Fort Bragg, NC](https://reader035.vdocuments.mx/reader035/viewer/2022081413/54682640af7959a2358b4fc1/html5/thumbnails/8.jpg)
TO JOIN THE FORT BRAGG
TEAM