Public Kick-Off Meeting

July 12th, 2012

2

Project Location Okeechobee Road (US 27/SR 25) from SR 997/Krome Avenue to NW 79th Avenue Miami-Dade County, FL

3

Project Purpose and Need

• Implement roadway improvements that will enhance safety and mobility

• Provide intersection modifications to reduce overall vehicular delay along Okeechobee Road

• Develop frontage road enhancements

• Develop multimodal options

• Determine feasibility of providing grade separated improvements

• Determine needs for improvements to bridges over Miami Canal

• Develop short term and long term improvement options

4

Project Issues • High density residential area to the

north

o City of Hialeah

o City of Hialeah Gardens

• Large industrial area to the south

o Town of Medley

• Closely spaced parallel facilities

o Close Proximity of frontage roads causes severe weaving issues

o Truck queues block intersections at NW S River Drive

o 3 signalized intersection connections between NW S River Dr, Okeechobee Rd & Frontage Rd

• High truck traffic percentage along Okeechobee Rd

• Few Access Points

5

Key Project Components • Engineering Analysis

• Existing conditions o Crash Review o Access o Design o Operational o Structural (Bridges)

• Develop cost feasible solutions that address project needs

• Environmental Analysis • Analyze existing environmental

features • Determine environmental impacts

• Public Involvement • Perform comprehensive public

outreach plan • Coordination • Gain public consensus

oblique

6

Engineering Analysis

• Data Collection

• Traffic and Safety Analysis

• Analysis of existing roadway and structural features

• Alternative Development and Evaluation

o No Build

o Transportation Systems Management and

Operations (TSM&O) Options

o Build Options

o Project Phasing

Alternative Selection Process

7

Okeechobee Road (US 27/SR 25) From SR 997/Krome Ave to SR 821/HEFT (4.8 miles)

Project Alternatives

• Divided rural principal arterial

• Two12-ft lanes in each direction

• SIS facility • Posted speed: 55 mph • Restricted Access

(Class 2)

8

Okeechobee Road (US 27/SR 25) From SR 997/Krome Ave to SR 821/HEFT (4.8 miles)

• Segmental Improvement Areas 1-4

Project Alternatives

9

Segmental Improvement Area 1 • Realigns Krome avenue intersections

• Provides additional capacity at the intersection

• Intersection improvements to allow adequate area for turning radius of large trucks

10

Segmental Improvement Area 2 • Provides a right-out only at Frontage Road to provide space for adequate

acceleration and deceleration lanes

• Intersection improvements to allow adequate area for turning radius of large trucks

11

Segmental Improvement Area 3 • Closure of the NW 127 Avenue Access to Okeechobee Road and provision of a new

access point at NW 129 Avenue to provide space for adequate acceleration and deceleration lanes

• Additional SB to EB left turn lane at the NW 154 Street intersection

• Intersection improvements to allow adequate area for turning radius of large trucks

12

Segmental Improvement Area 4 • Intersection improvements to allow adequate area for turning radius of large trucks

• In addition to improvements proposed as part of HEFT and the Gratigny West PD&E Studies, provides addition EB left to NB HEFT

13

Okeechobee Road (US 27/SR 25) From SR 821/HEFT to NW 79 Avenue (4.9 miles)

Project Alternatives

• Divided urban principal arterial

• Three12-ft lanes in each direction

• SIS facility • Restricted Access (Class 2) • Posted speed – 50 mph • Existing R/W varies – 260’

along most of the corridor & 350’ at intersections

14

Okeechobee Road (US 27/SR 25) From SR 821/HEFT to NW 79 Avenue (4.9 miles)

• Segmental Improvement Areas

Project Alternatives

15

Segmental Improvement Area 5 • Intersection improvements to provide additional intersection capacity and allow

adequate area for turning radius of large trucks

• NW 107 Avenue bridge widening to accommodate additional turning movements and provision of three WB turbo lanes

16

Segmental Improvement Area 6 • Elevates the Okeechobee Road mainline over NW 116 Way and provides a diamond

type configuration with the Frontage Road and NW South River Drive

• Provides flyover bridge from SB NW 116 Way to EB Okeechobee Road

• Provides improvements to the NW 121 Way intersection and widening of the bridge over the Miami Canal to accommodate additional turn lanes.

17

Segmental Improvement Area 7 • Depresses the Okeechobee Road mainline under NW 87 Avenue and provides a service

road for the local movements to NW 87 Avenue • Realigns NW 103 Street further to the north • Provides two flyover ramps from NB/SB NW 87 Avenue to WB/EB Okeechobee Road • Relocates the NW 105 Way bridge further west to NW 106 Street.

Alternative C

18

Segmental Improvement Area 8 • Provides additional through lanes along both the mainline from west of NW 95

Street to NW 79 Avenue (total 4 through lanes in each direction)

• Intersection improvements and bridge widening to provide additional intersection capacity and allow adequate area for turning radius of large trucks

19

Bicycle and Pedestrian Consideration

• Existing pedestrian facilities o Small link along Frontage Road

o N/S approaches along major crossing corridors

• Proposed pedestrian facilities o Connections across Okeechobee Road along

major corridors

o Continuous sidewalks on the north side of Frontage Road

o Continuous sidewalks on the south side of NW S River Drive

20

Bicycle and Pedestrian Consideration

DETAIL • Sidewalk across Okeechobee Road

connecting proposed pedestrian facilities along both sides of the road

Example 1

21

Bicycle and Pedestrian Consideration

DETAIL • Continuity of

pedestrian facility along north side of Frontage Road

22

Bicycle and Pedestrian Consideration

• Okeechobee Road from Krome Avenue to HEFT (existing bike lanes)

• Okeechobee Road from HEFT to NW 79 Avenue (proposed bike lanes) D.S.= 60 mph

D.S.= 65 mph

PROPOSED TYPICAL SECTIONS

23

• On-going/Planned Developments

• Miami-Dade County

• Miami-Dade Expressway Authority (MDX)

• Florida Turnpike Enterprise (FTE)

• Miami-Dade Public Works (MDPW)

• Miami-Dade Transit (MDT)

• Florida Highway Administration (FHWA)

• Florida Department of Environmental Protection (FDEP)

• South Florida Water Management District (SFWMD)

• Florida Power & Light (FPL)

• CSX Transportation (CSX)

• City of Hialeah Gardens

• City of Hialeah

• Town of Medley

Public Involvement • Coordination

24

Public Involvement • Public Involvement Meetings Held

• Elected Official/Agency Kick-Off (July 12, 2012)

• Public Kick-Off (July 12, 2012)

• Project Advisory Committee #1 (September 6, 2012)

• Project Advisory Committee #2 ( January 29, 2013)

• Alternatives Public Work Shop (April 11, 2013)

• Project Advisory Committee #3 (February 27, 2014)

• Alternatives Public Workshop #2 (March 26, 2014)

• Upcoming Public Involvement Meetings

• Project Advisory Committee #4

• Public Hearing

25

Bao-Ying Wang, P.E. - FDOT Project Manager Florida Department of Transportation, District Six

1000 NW 111th Avenue, Room 6251, Miami, Florida 33172 Phone: (305) 470-521 Fax: (305) 640-7558

E-mail: [email protected]

Robert Linares, P.E. - Consultant Project Manager Metric Engineering, Inc.

13940 SW 136 Street, Miami, Florida 33186 Phone: (305) 235-5098 Fax: (305) 251-5894

E-mail: [email protected]

Okeechobee Rd PD&E Study Team Contact Information:

Or Visit the Project Website:

www.fdotmiamidade.com/okeechobeeroadstudy

26

Thank You!!