Work codes for consentrating project:
Area Sub area Activity
CON1 Column 1 Walkways 1 Fabricate steel structure 50 QA Field
Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2 Erect steel structure 51 QA Office
Department / Crew : Supervisor : 3 Cleaning columns 3 Demolish steel structure, grating etc. 52 Handover Document
Date : Superintendent : 4 Painting columns 4 Erect scaffolding 53 Project Control/ Planner/ Scheduler
5 Painting Structural Steel 5 Demolish scaffolding 54 Document Control
No Id Number Name Position Status Time in Time out Mile Point Area Activity6 Cut off existing pipe 6 Cleaning steel structure 55 Drafting
7 Replace and modify existing 7 Cleaning tank 56 Electrical demolish
1 80002407 RIYANTO Store Assistant column to be composit column 8 Cleaning pipe 57 Install cable ladder / tray
8 Cleaning up pipe and cable 9 Painting steel structure 58 Install support / bracket
2 9 New staircase to Basement 10 Painting tank 59 Fabricate ladder / tray
10 Change steel grating of Walkway 11 Painting pipe 60 Install conduit
3 to be Fiberglass grating 12 Excavation 61 Install cable
11 Walkways (Phase 2) 13 Levelling and compacting 62 Install field device
4 14 Demolish existing concrete 63 Install panel / DB
CON2 Laydown 1 Gabion wall behind office 15 Formwork and rebar 64 Cable termination
5 2 Re-arrange laydown yard 16 Pouring concrete 65 Pre-commissioning
3 Temporary fabrication facility 17 Install gabion basket 66 Commissioning
6 4 Laydown pad concrete 18 Put rock in gabion basket 67 Internal Report (LCI)
5 Temporary power supply 19 Install wall, ceiling and roof 68 External Report (PTFI)
7 20 Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)
CON3 Mechanica 1 Erect scaffold skirting, vinyl 70 External Meeting (PTFI)
8 Scavenger 2 Install temporary lights 21 Install door and window 71 Input data of plant & equipment
Line 3 Replace pipe line support 22 Painting wall, ceiling, door and window 72 Equipment control
9 4 Clean-up pipe line 23 Demolish& relocation existing roof, 73 Machinary maintenance
5 Coating Works wall, door, window, etc. 74 Input data for administration
10 6 Dismantle temporary lights 24 Install furniture 75 Accounting
7 Dismantle scaffold 25 Delivery material 76 Maintenance of power supply
11 26 Lifting material and temporary lighting
27 Issue material
12 28 Issued and return tools
29 stock control
13 30 Survey Topografhy
31 Survey Traverse
14 32 Calculation of Survey Data
33 Staking out coordinate position of
15 Site Plan ,Grid Line
34 Setting Bow Plank
16 35 Marking for position of Foundation
36 Monitoring for excavation
17 37 Setting and Levelling Ancor Bolt
38 Levelling Top Concrete ( checking
18 before pouring concrete)
39 Survey Plumbnes
19 40 Marking elevation of top Floor
and centre of grid line
20 41 Marking position of room, window,
door,celling ,ect
42 marking monitoring
Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43 Surveying for as built Drawing data
44 Safety induction and training
45 Supervising and monitoring
46 Input data for safety
47 Site inspection and testing
Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48 Field and documentation audit
Name Name Name Name 49 Prepare permit and 5.4.3 document
Sub Area
BU3 Form - People
Work codes for consentrating project:
Area Sub area Activity
CON1 Column 1 Walkways 1 Fabricate steel structure 50 QA Field
Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2 Erect steel structure 51 QA Office
Department / Crew : Supervisor : 3 Cleaning columns 3 Demolish steel structure, grating etc. 52 Handover Document
Date : Superintendent : 4 Painting columns 4 Erect scaffolding 53 Project Control/ Planner/ Scheduler
5 Painting Structural Steel 5 Demolish scaffolding 54 Document Control
No Id Number Name Position Status Time in Time out Mile Point Area Activity6 Cut off existing pipe 6 Cleaning steel structure 55 Drafting
7 Replace and modify existing 7 Cleaning tank 56 Electrical demolish
1 80004404 SUTISNA BIN MARNA Steel Erection FM column to be composit column 8 Cleaning pipe 57 Install cable ladder / tray
8 Cleaning up pipe and cable 9 Painting steel structure 58 Install support / bracket
2 V99179 TARSIM Steel Erection L/H 9 New staircase to Basement 10 Painting tank 59 Fabricate ladder / tray
10 Change steel grating of Walkway 11 Painting pipe 60 Install conduit
3 80002350 BUSRIYONO Welder to be Fiberglass grating 12 Excavation 61 Install cable
11 Walkways (Phase 2) 13 Levelling and compacting 62 Install field device
4 V85586 SADAM Welder 14 Demolish existing concrete 63 Install panel / DB
CON2 Laydown 1 Gabion wall behind office 15 Formwork and rebar 64 Cable termination
5 80003338 SLAMET RIYADI Welder 2 Re-arrange laydown yard 16 Pouring concrete 65 Pre-commissioning
3 Temporary fabrication facility 17 Install gabion basket 66 Commissioning
6 80002355 ASEP SUNARYA Steel Erection 4 Laydown pad concrete 18 Put rock in gabion basket 67 Internal Report (LCI)
5 Temporary power supply 19 Install wall, ceiling and roof 68 External Report (PTFI)
7 80003102 USMADI Steel Erection 20 Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)
CON3 Mechanica 1 Erect scaffold skirting, vinyl 70 External Meeting (PTFI)
8 V120461 ASEP SAEPUDIN Steel Erection Scavenger 2 Install temporary lights 21 Install door and window 71 Input data of plant & equipment
Line 3 Replace pipe line support 22 Painting wall, ceiling, door and window 72 Equipment control
9 V120802 ADE FATULAH APRIANSSteel Erection 4 Clean-up pipe line 23 Demolish& relocation existing roof, 73 Machinary maintenance
5 Coating Works wall, door, window, etc. 74 Input data for administration
10 6 Dismantle temporary lights 24 Install furniture 75 Accounting
7 Dismantle scaffold 25 Delivery material 76 Maintenance of power supply
11 26 Lifting material and temporary lighting
27 Issue material
12 28 Issued and return tools
29 stock control
13 30 Survey Topografhy
31 Survey Traverse
14 32 Calculation of Survey Data
33 Staking out coordinate position of
15 Site Plan ,Grid Line
34 Setting Bow Plank
16 35 Marking for position of Foundation
36 Monitoring for excavation
17 37 Setting and Levelling Ancor Bolt
38 Levelling Top Concrete ( checking
18 before pouring concrete)
39 Survey Plumbnes
19 40 Marking elevation of top Floor
and centre of grid line
20 41 Marking position of room, window,
door,celling ,ect
42 marking monitoring
Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43 Surveying for as built Drawing data
44 Safety induction and training
45 Supervising and monitoring
46 Input data for safety
47 Site inspection and testing
Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48 Field and documentation audit
Name Name Name Name 49 Prepare permit and 5.4.3 document
Sub Area
BU3 Form - People
Work codes for consentrating project:
Area Sub area Activity
CON1 Column 1 Walkways 1 Fabricate steel structure 50 QA Field
Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2 Erect steel structure 51 QA Office
Department / Crew : Supervisor : 3 Cleaning columns 3 Demolish steel structure, grating etc. 52 Handover Document
Date : Superintendent : 4 Painting columns 4 Erect scaffolding 53 Project Control/ Planner/ Scheduler
5 Painting Structural Steel 5 Demolish scaffolding 54 Document Control
No Id Number Name Position Status Time in Time out Mile Point Area Activity6 Cut off existing pipe 6 Cleaning steel structure 55 Drafting
7 Replace and modify existing 7 Cleaning tank 56 Electrical demolish
1 80002440 HERU GUNAWAN HSE Assistant column to be composit column 8 Cleaning pipe 57 Install cable ladder / tray
8 Cleaning up pipe and cable 9 Painting steel structure 58 Install support / bracket
2 80002445 SAMINO HSE Assistant 9 New staircase to Basement 10 Painting tank 59 Fabricate ladder / tray
10 Change steel grating of Walkway 11 Painting pipe 60 Install conduit
3 to be Fiberglass grating 12 Excavation 61 Install cable
11 Walkways (Phase 2) 13 Levelling and compacting 62 Install field device
4 14 Demolish existing concrete 63 Install panel / DB
CON2 Laydown 1 Gabion wall behind office 15 Formwork and rebar 64 Cable termination
5 2 Re-arrange laydown yard 16 Pouring concrete 65 Pre-commissioning
3 Temporary fabrication facility 17 Install gabion basket 66 Commissioning
6 4 Laydown pad concrete 18 Put rock in gabion basket 67 Internal Report (LCI)
5 Temporary power supply 19 Install wall, ceiling and roof 68 External Report (PTFI)
7 20 Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)
CON3 Mechanica 1 Erect scaffold skirting, vinyl 70 External Meeting (PTFI)
8 Scavenger 2 Install temporary lights 21 Install door and window 71 Input data of plant & equipment
Line 3 Replace pipe line support 22 Painting wall, ceiling, door and window 72 Equipment control
9 4 Clean-up pipe line 23 Demolish& relocation existing roof, 73 Machinary maintenance
5 Coating Works wall, door, window, etc. 74 Input data for administration
10 6 Dismantle temporary lights 24 Install furniture 75 Accounting
7 Dismantle scaffold 25 Delivery material 76 Maintenance of power supply
11 26 Lifting material and temporary lighting
27 Issue material
12 28 Issued and return tools
29 stock control
13 30 Survey Topografhy
31 Survey Traverse
14 32 Calculation of Survey Data
33 Staking out coordinate position of
15 Site Plan ,Grid Line
34 Setting Bow Plank
16 35 Marking for position of Foundation
36 Monitoring for excavation
17 37 Setting and Levelling Ancor Bolt
38 Levelling Top Concrete ( checking
18 before pouring concrete)
39 Survey Plumbnes
19 40 Marking elevation of top Floor
and centre of grid line
20 41 Marking position of room, window,
door,celling ,ect
42 marking monitoring
Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43 Surveying for as built Drawing data
44 Safety induction and training
45 Supervising and monitoring
46 Input data for safety
47 Site inspection and testing
Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48 Field and documentation audit
Name Name Name Name 49 Prepare permit and 5.4.3 document
Sub Area
BU3 Form - People
Work codes for consentrating project:
Area Sub area Activity
CON1 Column 1 Walkways 1 Fabricate steel structure 50 QA Field
Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2 Erect steel structure 51 QA Office
Department / Crew : Supervisor : 3 Cleaning columns 3 Demolish steel structure, grating etc. 52 Handover Document
Date : Superintendent : 4 Painting columns 4 Erect scaffolding 53 Project Control/ Planner/ Scheduler
5 Painting Structural Steel 5 Demolish scaffolding 54 Document Control
No Id Number Name Position Status Time in Time out Mile Point Area Activity6 Cut off existing pipe 6 Cleaning steel structure 55 Drafting
7 Replace and modify existing 7 Cleaning tank 56 Electrical demolish
1 80002831 FITRA KUSUMA Scaffolder L/H column to be composit column 8 Cleaning pipe 57 Install cable ladder / tray
8 Cleaning up pipe and cable 9 Painting steel structure 58 Install support / bracket
2 80002522 AGUS SUBHAN MAULANScaffolder 9 New staircase to Basement 10 Painting tank 59 Fabricate ladder / tray
10 Change steel grating of Walkway 11 Painting pipe 60 Install conduit
3 80005263 HENDRIK PAJAN Scaffolder to be Fiberglass grating 12 Excavation 61 Install cable
11 Walkways (Phase 2) 13 Levelling and compacting 62 Install field device
4 80004463 HARIYONO Scaffolder 14 Demolish existing concrete 63 Install panel / DB
CON2 Laydown 1 Gabion wall behind office 15 Formwork and rebar 64 Cable termination
5 2 Re-arrange laydown yard 16 Pouring concrete 65 Pre-commissioning
3 Temporary fabrication facility 17 Install gabion basket 66 Commissioning
6 4 Laydown pad concrete 18 Put rock in gabion basket 67 Internal Report (LCI)
5 Temporary power supply 19 Install wall, ceiling and roof 68 External Report (PTFI)
7 20 Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)
CON3 Mechanica 1 Erect scaffold skirting, vinyl 70 External Meeting (PTFI)
8 Scavenger 2 Install temporary lights 21 Install door and window 71 Input data of plant & equipment
Line 3 Replace pipe line support 22 Painting wall, ceiling, door and window 72 Equipment control
9 4 Clean-up pipe line 23 Demolish& relocation existing roof, 73 Machinary maintenance
5 Coating Works wall, door, window, etc. 74 Input data for administration
10 6 Dismantle temporary lights 24 Install furniture 75 Accounting
7 Dismantle scaffold 25 Delivery material 76 Maintenance of power supply
11 26 Lifting material and temporary lighting
27 Issue material
12 28 Issued and return tools
29 stock control
13 30 Survey Topografhy
31 Survey Traverse
14 32 Calculation of Survey Data
33 Staking out coordinate position of
15 Site Plan ,Grid Line
34 Setting Bow Plank
16 35 Marking for position of Foundation
36 Monitoring for excavation
17 37 Setting and Levelling Ancor Bolt
38 Levelling Top Concrete ( checking
18 before pouring concrete)
39 Survey Plumbnes
19 40 Marking elevation of top Floor
and centre of grid line
20 41 Marking position of room, window,
door,celling ,ect
42 marking monitoring
Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43 Surveying for as built Drawing data
44 Safety induction and training
45 Supervising and monitoring
46 Input data for safety
47 Site inspection and testing
Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48 Field and documentation audit
Name Name Name Name 49 Prepare permit and 5.4.3 document
Sub Area
BU3 Form - People
Work codes for consentrating project:
Area Sub area Activity
CON1 Column 1 Walkways 1 Fabricate steel structure 50 QA Field
Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2 Erect steel structure 51 QA Office
Department / Crew : Supervisor : 3 Cleaning columns 3 Demolish steel structure, grating etc. 52 Handover Document
Date : Superintendent : 4 Painting columns 4 Erect scaffolding 53 Project Control/ Planner/ Scheduler
5 Painting Structural Steel 5 Demolish scaffolding 54 Document Control
No Id Number Name Position Status Time in Time out Mile Point Area Activity6 Cut off existing pipe 6 Cleaning steel structure 55 Drafting
7 Replace and modify existing 7 Cleaning tank 56 Electrical demolish
1 80002886 NANA TARYANA Mason L/H column to be composit column 8 Cleaning pipe 57 Install cable ladder / tray
8 Cleaning up pipe and cable 9 Painting steel structure 58 Install support / bracket
2 80002614 AHMAD JEJEN Mason 9 New staircase to Basement 10 Painting tank 59 Fabricate ladder / tray
10 Change steel grating of Walkway 11 Painting pipe 60 Install conduit
3 80003086 WAWAN ERNAWAN Mason to be Fiberglass grating 12 Excavation 61 Install cable
11 Walkways (Phase 2) 13 Levelling and compacting 62 Install field device
4 14 Demolish existing concrete 63 Install panel / DB
CON2 Laydown 1 Gabion wall behind office 15 Formwork and rebar 64 Cable termination
5 2 Re-arrange laydown yard 16 Pouring concrete 65 Pre-commissioning
3 Temporary fabrication facility 17 Install gabion basket 66 Commissioning
6 4 Laydown pad concrete 18 Put rock in gabion basket 67 Internal Report (LCI)
5 Temporary power supply 19 Install wall, ceiling and roof 68 External Report (PTFI)
7 20 Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)
CON3 Mechanica 1 Erect scaffold skirting, vinyl 70 External Meeting (PTFI)
8 Scavenger 2 Install temporary lights 21 Install door and window 71 Input data of plant & equipment
Line 3 Replace pipe line support 22 Painting wall, ceiling, door and window 72 Equipment control
9 4 Clean-up pipe line 23 Demolish& relocation existing roof, 73 Machinary maintenance
5 Coating Works wall, door, window, etc. 74 Input data for administration
10 6 Dismantle temporary lights 24 Install furniture 75 Accounting
7 Dismantle scaffold 25 Delivery material 76 Maintenance of power supply
11 26 Lifting material and temporary lighting
27 Issue material
12 28 Issued and return tools
29 stock control
13 30 Survey Topografhy
31 Survey Traverse
14 32 Calculation of Survey Data
33 Staking out coordinate position of
15 Site Plan ,Grid Line
34 Setting Bow Plank
16 35 Marking for position of Foundation
36 Monitoring for excavation
17 37 Setting and Levelling Ancor Bolt
38 Levelling Top Concrete ( checking
18 before pouring concrete)
39 Survey Plumbnes
19 40 Marking elevation of top Floor
and centre of grid line
20 41 Marking position of room, window,
door,celling ,ect
42 marking monitoring
Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43 Surveying for as built Drawing data
44 Safety induction and training
45 Supervising and monitoring
46 Input data for safety
47 Site inspection and testing
Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48 Field and documentation audit
Name Name Name Name 49 Prepare permit and 5.4.3 document
Sub Area
BU3 Form - People
Work codes for consentrating project:
Area Sub area Activity
CON1 Column 1 Walkways 1 Fabricate steel structure 50 QA Field
Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2 Erect steel structure 51 QA Office
Department / Crew : Supervisor : 3 Cleaning columns 3 Demolish steel structure, grating etc. 52 Handover Document
Date : Superintendent : 4 Painting columns 4 Erect scaffolding 53 Project Control/ Planner/ Scheduler
5 Painting Structural Steel 5 Demolish scaffolding 54 Document Control
No Id Number Name Position Status Time in Time out Mile Point Area Activity6 Cut off existing pipe 6 Cleaning steel structure 55 Drafting
7 Replace and modify existing 7 Cleaning tank 56 Electrical demolish
1 80002446 SAMAN B KARMAN Mason column to be composit column 8 Cleaning pipe 57 Install cable ladder / tray
8 Cleaning up pipe and cable 9 Painting steel structure 58 Install support / bracket
2 80002453 TABRONI Mason 9 New staircase to Basement 10 Painting tank 59 Fabricate ladder / tray
10 Change steel grating of Walkway 11 Painting pipe 60 Install conduit
3 to be Fiberglass grating 12 Excavation 61 Install cable
11 Walkways (Phase 2) 13 Levelling and compacting 62 Install field device
4 14 Demolish existing concrete 63 Install panel / DB
CON2 Laydown 1 Gabion wall behind office 15 Formwork and rebar 64 Cable termination
5 2 Re-arrange laydown yard 16 Pouring concrete 65 Pre-commissioning
3 Temporary fabrication facility 17 Install gabion basket 66 Commissioning
6 4 Laydown pad concrete 18 Put rock in gabion basket 67 Internal Report (LCI)
5 Temporary power supply 19 Install wall, ceiling and roof 68 External Report (PTFI)
7 20 Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)
CON3 Mechanica 1 Erect scaffold skirting, vinyl 70 External Meeting (PTFI)
8 Scavenger 2 Install temporary lights 21 Install door and window 71 Input data of plant & equipment
Line 3 Replace pipe line support 22 Painting wall, ceiling, door and window 72 Equipment control
9 4 Clean-up pipe line 23 Demolish& relocation existing roof, 73 Machinary maintenance
5 Coating Works wall, door, window, etc. 74 Input data for administration
10 6 Dismantle temporary lights 24 Install furniture 75 Accounting
7 Dismantle scaffold 25 Delivery material 76 Maintenance of power supply
11 26 Lifting material and temporary lighting
27 Issue material
12 28 Issued and return tools
29 stock control
13 30 Survey Topografhy
31 Survey Traverse
14 32 Calculation of Survey Data
33 Staking out coordinate position of
15 Site Plan ,Grid Line
34 Setting Bow Plank
16 35 Marking for position of Foundation
36 Monitoring for excavation
17 37 Setting and Levelling Ancor Bolt
38 Levelling Top Concrete ( checking
18 before pouring concrete)
39 Survey Plumbnes
19 40 Marking elevation of top Floor
and centre of grid line
20 41 Marking position of room, window,
door,celling ,ect
42 marking monitoring
Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43 Surveying for as built Drawing data
44 Safety induction and training
45 Supervising and monitoring
46 Input data for safety
47 Site inspection and testing
Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48 Field and documentation audit
Name Name Name Name 49 Prepare permit and 5.4.3 document
Sub Area
BU3 Form - People
Work codes for consentrating project:
Area Sub area Activity
CON1 Column 1 Walkways 1 Fabricate steel structure 50 QA Field
Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2 Erect steel structure 51 QA Office
Department / Crew : Supervisor : 3 Cleaning columns 3 Demolish steel structure, grating etc. 52 Handover Document
Date : Superintendent : 4 Painting columns 4 Erect scaffolding 53 Project Control/ Planner/ Scheduler
5 Painting Structural Steel 5 Demolish scaffolding 54 Document Control
No Id Number Name Position Status Time in Time out Mile Point Area Activity6 Cut off existing pipe 6 Cleaning steel structure 55 Drafting
7 Replace and modify existing 7 Cleaning tank 56 Electrical demolish
1 80002990 DADAN KUSWARA Electrician L/H column to be composit column 8 Cleaning pipe 57 Install cable ladder / tray
8 Cleaning up pipe and cable 9 Painting steel structure 58 Install support / bracket
2 80002905 SAHRONI LCI Electrician 9 New staircase to Basement 10 Painting tank 59 Fabricate ladder / tray
10 Change steel grating of Walkway 11 Painting pipe 60 Install conduit
3 to be Fiberglass grating 12 Excavation 61 Install cable
11 Walkways (Phase 2) 13 Levelling and compacting 62 Install field device
4 14 Demolish existing concrete 63 Install panel / DB
CON2 Laydown 1 Gabion wall behind office 15 Formwork and rebar 64 Cable termination
5 2 Re-arrange laydown yard 16 Pouring concrete 65 Pre-commissioning
3 Temporary fabrication facility 17 Install gabion basket 66 Commissioning
6 4 Laydown pad concrete 18 Put rock in gabion basket 67 Internal Report (LCI)
5 Temporary power supply 19 Install wall, ceiling and roof 68 External Report (PTFI)
7 20 Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)
CON3 Mechanica 1 Erect scaffold skirting, vinyl 70 External Meeting (PTFI)
8 Scavenger 2 Install temporary lights 21 Install door and window 71 Input data of plant & equipment
Line 3 Replace pipe line support 22 Painting wall, ceiling, door and window 72 Equipment control
9 4 Clean-up pipe line 23 Demolish& relocation existing roof, 73 Machinary maintenance
5 Coating Works wall, door, window, etc. 74 Input data for administration
10 6 Dismantle temporary lights 24 Install furniture 75 Accounting
7 Dismantle scaffold 25 Delivery material 76 Maintenance of power supply
11 26 Lifting material and temporary lighting
27 Issue material
12 28 Issued and return tools
29 stock control
13 30 Survey Topografhy
31 Survey Traverse
14 32 Calculation of Survey Data
33 Staking out coordinate position of
15 Site Plan ,Grid Line
34 Setting Bow Plank
16 35 Marking for position of Foundation
36 Monitoring for excavation
17 37 Setting and Levelling Ancor Bolt
38 Levelling Top Concrete ( checking
18 before pouring concrete)
39 Survey Plumbnes
19 40 Marking elevation of top Floor
and centre of grid line
20 41 Marking position of room, window,
door,celling ,ect
42 marking monitoring
Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43 Surveying for as built Drawing data
44 Safety induction and training
45 Supervising and monitoring
46 Input data for safety
47 Site inspection and testing
Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48 Field and documentation audit
Name Name Name Name 49 Prepare permit and 5.4.3 document
Sub Area
BU3 Form - People