national water conservation and water demand...

26
1 National National Water Conservation and Water Water Conservation and Water Demand Management Demand Management Deborah Mochotlhi Deborah Mochotlhi Chief Directorate: Water Use Chief Directorate: Water Use Directorate: Water Use Efficiency Directorate: Water Use Efficiency Be Waterwise Masibambane Masibambane Support Support Programme Programme …” …”

Upload: lydien

Post on 19-Mar-2018

222 views

Category:

Documents


5 download

TRANSCRIPT

1

NationalNationalWater Conservation and Water Water Conservation and Water

Demand ManagementDemand Management

Deborah MochotlhiDeborah MochotlhiChief Directorate: Water UseChief Directorate: Water Use

Directorate: Water Use EfficiencyDirectorate: Water Use EfficiencyBe Waterwise

““MasibambaneMasibambane Support Support ProgrammeProgramme…”…”

2

Presentation Outline

1. Support for 2007/08

2. Beneficiary Municipalities 2008/09

3. Criteria used to share limited

resources

4. Expectation from DWAF

5. Future WCWDM programmes

3

Area Beneficiary Tasks/projects Budget

Total plus VAT

Limpopo Lephalale LM Pilot implementation of WC/WDM R 2.4 million

Uthukela District WC/WDM Business Plan & Pilot R 2 millionKwa-Zulu Natal

uMkhanyakude DM WC/WDM Business Plan & Pilot R 5  million

Mangaung LM Pilot implementation of  WC/WDM R 9.5 million

Eastern Cape Chris Hani DM WC/WDM Business Plan & Pilot R 2 million

Ekurhuleni Metro Pilot implementation of  WC/WDM R 12 million

Emfuleni LM Pilot implementation of WC/WDM R 10.5 million

Mogale City Pilot implementation of WC/WDM R 5.7 million

Total R50 million

Gauteng

Free State

Beneficiary Municipalities 2007/08

4

WinningWinning WC/WDM WC/WDM StrategiesStrategiesAppropriately Appropriately BalancesBalances……

EconomicTechnical

Institutional

Social

To effectively implement WC/WDM for short term to sustainable long term

5

6

Social Technical EconomicLegislativeInstitutional

• Social education & awarenessTraining and capacity

building for community

Schools awareness

programme

Media campaign through

advertisement

Waterwise gardening

Capacity building of

community liaison

officers

Capacity bld of plumbers

Awareness program

Awareness creation

Informative billing

Local Government

DISTR. MANAGEMENT

Pressure Management &

Metering (including audit)

Replacement of

Infrastructure

Preventive maintenance &

Loss Min.

Dual Distr. & Infrastructure

optimis.

Retrofitting

Loss Minimisation (repair

leaks, real losses)

Loss Minimisation (repair leaks, apparent losses)Loss Minimisation (repair leaks, public & private)Economic assets life cycle

management

Establishment of descreet

zones

Rain Water Tanks

(Harvesting)

Reservoir refurbishment

Treatment plant

(maintenance)

• Consumer Demand Management

Effective Pricing

Effective Billing

Rebates scheme

Incentives scheme

Price elasticity of

demand

Debt recovery

Fund for WC/WDM

implementation

• Legislative & Institutional framework

Tariff policy

Water conservation

by laws

Institutionalisation of

Water Conservation

and Demand

Management

WC/WDM strategies

WC/WDM BP’sNRW balanceMonitoring and evaluation WC/WDMEnforcement and Compliance

7

Achievements for 2007/08 SOCIAL INTERVENTION(Increase awareness & educate)

•Launch of WC/WDM program in Mangaung•Kwa-Thema (Ekurhuleni) Ministerial event during WW•Hare Krishna (WC/WDM in Uthukela)•WC/WDM ward workshops in Emfuleni, Umkhanyakude, Ekurhuleni, Chris Hani, Lephalale•Awareness raising through material distributions in Mangaung, Lephalale, Emfuleni•Introduction of Informative Billing in Mangaung

TECHNICAL INTERVENTION

•Retrofitting of Indigent households in Duduza(Ekurhuleni), •Repairing leaks in Kwa-Masiza hostel (Emfuleni)•Refurbishment of top 100 consumer meters in Mangaung•Installation domestic meters in Mangaung•Meter audit in Mogale City, Ekurhuleni•Sectorisation/ zone discreteness in Ekurhuleni, MogaleCity, Emfuleni, Managung•Installation of telemetry system in Mogale City•Pressure Management in Uthukela & Emfuleni

8

Achievements for 2007/08 (Cont..)ECONIMC INTERVENTIONS

•Development of block tariff structure in Emfuleni•Introduction of rebates in Uthukela DM•Emfuleni, Ekurhuleni, Mangaung,Lephalaleallocated budget internally for WC/WDM

LEGILATIVE/ INSTITUTIONAL INTERVENTION

•Establishment of water loss management system in Mangaung•Establishment of WC/WDM unit in Mogale & Emfuleni•Development of WC/WDM strategy in Ekurhuleni•Training for plumbers, Community liaison Officers (CLO’s) and leak detectors in Mangaung, Umkhanyakude, Emfuleni, Ekurhuleni, Chris Hani & Mogale•Training of learner technicians in Mogale

9

In most areas, water savings will not be realized In most areas, water savings will not be realized overnight ( WC /WDM is not an event, but a long term overnight ( WC /WDM is not an event, but a long term

process process -- Sustainable Strategic BPSustainable Strategic BP’’s)s)

2005 TO 2010 YEAR STRATEGY

Reduce non-revenue water (real losses, property leakage)

2015 TO 2025 YEAR STRATEGYReduce inefficient usage

(Billed consumption)

2010 TO 2025 YEAR STRATEGYMaintain level of non-revenue

water and efficient use

2005 2010 2015 2020 2025

10

-8 -4 0 4 8 12 16 20 24

Wat

er s

uppl

y/de

man

d (v

olum

e)

Time (years)

Four year delay in construction of infrastructure owing to water conservationmeasures

Original water supply

Increased supply

Normal demand

Water demand withwater conservationmeasures implemented

To be able to defer next augmentation scheme

11

Some achievements for 2007/08

Created +/- 800 jobs

12

KWA THEMA Ministerial Event :Retrofitting of Water Efficient Devices

13

Some achievements for 2007/08 Blue Bus Water Wise Campaign – increased awareness

Ministerial WC/WDM Sector Awards 2206/07

14

• No common understanding & uniformity when implementing WC/WDM

Challenges for 2007/08

• Limited ownership & commitment on the program

• In fighting over appointment of consultants

• “unnecessary’’ delays over appointment of consultants and contractors

• resources used for other unrelated activities

• failure to comply with the set project management standards

• Still awaiting final reports from 7 of 8 pilot

15

Beneficiary Municipalities 2008/09 Area Beneficiary Tasks/projects Budget

NationalWUE‐IS  pilot  (Ekurhuleni 

&  Emfuleni selected sites) 

Water Use Efficiency Information System & Real Time system installation to access municipal data required to feed into the WUE‐IS and determine trends & efficiency status.

R3 million

NationalSALGA & LG

Provision  of  technical  Expertise  support Team  to  municipalities  in  the implementation of WC/WDM.

R3 million

RegionsInstitutionalisation Funding  the  appointment  of  WC/WDM 

personnel in the regional offices R2.5 million

Ekurhuleni Metro Pilot implementation of WC/WDM R 6 million

Emfuleni LM Pilot implementation of WC/WDM R0 million

Tshwane Metro WC/WDM Business Plan & Pilot  R2 million

City of Jo’burg Metro WC/WDM Business Plan & Pilot R2 million

Nokeng tsa Taemane WC/WDM Business Plan & Pilot R 1 million

Chief Albert Luthuli WC/WDM Business Plan & Pilot R 1.5 million

Mbombela LM WC/WDM Business Plan & Pilot R 1.5 million

Govan Mbeki LM WC/WDM BP and Pilot R 1 million

Uthukela District WC/WDM Business Plan & Pilot R2 million

uMkhanyakude DM WC/WDM Business Plan & Pilot R 0.5 million

Zululand District WC/WDM Business Plan & Pilot R0million

Umgungundlovu DM (Msundizi LM) WC/WDM Business Plan & Pilot R 2 million

Kwa­Zulu Natal

Mpumalanga

Gauteng

16

Lephalale LM Pilot implementation of WC/WDM R 1 million

Capricon DM (Lebowakgomo)

WC/WDM Business Plan & Pilot R2 million

Mangaung LM Pilot implementation of WC/WDM R5 million

Masilonyana LM WC/WDM Business Plan & Pilot R1 million

Matjhabeng LM WC/WDM BP & Pilot R 1 million

Siyanda DM WC/WDM Business Plan & Pilot R2 million

Pixley ka Seme DM WC/WDM Business Plan & Pilot R0.5 million

Chris Hani DM WC/WDM Business Plan & Pilot R1.5 million

OR Tambo (Mthata) WC/WDM Business Plan & Pilot R0.5 million

Okahlamba DM WC/WDM BP & Pilot R 1.5 million

Nelson Mandela Metro Pilot implementation of WC/WDM R 1.5 million

City of Cape Town Pilot implementation of WC/WDM R1.5 million

Drankenstein LM WC/WDM Business Plan & Pilot R0.5 million

Southern District DM WC/WDM Business Plan & Pilot R0.5 million

Mmabatho WC/WDM Business Plan & Pilot R 1 million

Moretele LM WC/WDM Business Plan & Pilot R 1 million

Total R50 million

North West

Western Cape

Eastern Cape

Northern Cape

Free State

Limpopo

Beneficiary Municipalities 2008/09

17

Criteria employed to select MunicipalitiesCriteria employed to select Municipalities• National representative of all provinces in the country• High levels of non-revenue water and leakages;• Low cost recovery and/or non-payment of services;• Lack of sustainable quality services in previously

disadvantaged areas;• Intermittent water supply with potential to escalate water

tariffs;• Need for further bulk infrastructure; • Socio economic distressed communities that experience high

civil protest• Challenges with achieving Millennium Development Goals

with regard to sanitation and water services provision;• Lack of adequate budget for WC/WDM; and • Significant potential of WCWDM in reducing water demand

of municipalities

18

PROJECT PLANNING

National Project Steering Committee – D, CD, Salga and PM levels

DWAF D: WUE overall accounting unit

DWAF Regional Office implementation of the projects, sign off

progress reports and invoices

Municipalities buy – in / accept and avail resources to support projects:

√ MM and MMC sign off approvals and acceptance letters√ Technical water division personnel

√ Information about water supply infrastructure, conditions for operation and maintenance (lay out plans of infrastructure, as build drawing, age and performance, peak daily water demand and so on)

√ Treasury information about water bills and water consumptions

√ Insight about water use practices, behavior patterns, education and awareness about importance of WCWDM

19

Project Approach & Methodology

20

DEVELOP PROJECT IMPLEMENTATION PLAN TO BE APPROVEDBY DWAF & WSA WHICH SHOULD INCLUDE AMONGST OTHERS:

Project Implementation Plan

• Cover page – WSA and DWAF logos;• Problem to be addressed (Problem statement);• Background, problem analysis and justification – indicating

participants, beneficiaries, sustainability in form of current initiatives;

• Project Objectives and success criteria (indicators & measures);

• Work breakdown structure;• Budget;• Cost Estimate & Projected cashflow;• Management & Implementation arrangement;• Risk assessment;• Stakeholder identification;• Pre & Post impact assessment

21

Project Implementation Plan should include at most ff componentsdevelopment of WC/WDM (i.e. Phased approach of Project

Implementation Plan)

• WC/WDM Situation Assessment Report– How much water is available and used?– How much water is being lost? (Water balance);– Where is that water being lost? (Network audit);– Why is the water being lost? (review operating rules & practices);– What WC/WDM interventions can be used to reduce losses, manage demand and

improve performance (Business Plan); and– How can we maintain the WC/WDM strategy and sustain the achievement gained

(Policy change, resource requirements).

• Business Plan (it’s development)– Identified measures– Budget required– Period/ duration for implementation of measures– Pay back period

• Implementation Plan– Prioritize implementation of identified WC/WDM measures

• Physical Implementation of the identified WC/WDM• Monitoring & Evaluation of WC/WDM measures

22

Signatories of Project Implementation Plan

• Municipal Manager

• Mayoral Management Committee

• Regional Office Program Managers

• Director: Water Use Efficiency

23

• In accordance to project implementation plans• Monthly progress reports which includes:

√ Narrative progress report;√ Template format report;√ Attachments where applicable;√ Photos where applicable;√ Cash flow projections

• Quarterly Regional/ national meetings – e.g. WC/WDM quarterly meeting!!!

• All reports must be signed off by Program managers in all three institutions

Progress Reporting

24

STATE OF PROJECTS AT VARIOUS MUNICIPALITIES

All the Municipalities have to submit the PIP by end May 2008;

– Moretele & Nokeng tsa Taemeng alreaysubmitted their respective PIP’s

25

FINANCIAL EXPENDITURE TO DATE

• Zero

26

Way forward

• Sign off project approvals with outstanding municipalities

• Verify inclusion of WCWDM in Regional Office Business

Plans

• Continue with support to Municipalities

• Monitor and evaluate progress with implementation

• Ensure achievement of project deliverables

• Ensure financial performance linked with implementation