2/49
TABLE
OF
CONTENTS
1
TABLE OF CONTENTS
PREFACE
P.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
P.2 A pplicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
P.3 A uthority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
P.4 R eferences . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
P.5 C ancellation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
CHAPTER 1STRATEGIC MANAGEMENT SYSTEM
1.1 O verview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.2 Strategic Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.3 Im plem entation: Perform ance and B udget Planning . . . . . . . . . . . . 6
1.4 Perform ance Evaluation and R eporting . . . . . . . . . . . . . . . . . . . . . . 7
CHAPTER 2ROLES AND RESPONSIBILITIES
2.1 O rganizational O verview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92.2 A gency M anagem ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2.3 Enterprise M anagem ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
2.4 Functional M anagem ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
2.5 C rosscutting Process M anagem ent. . . . . . . . . . . . . . . . . . . . . . . . 22
2.6 M anage Strategically. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.7 Provide A erospace Products and C apabilities. . . . . . . . . . . . . . . . 23
2.8 G enerate K now ledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
2.9 C om m unicate K now ledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242.10 N A SA and Its Em ployees: M utual R esponsibilities. . . . . . . . . . . . . 24
2.11 O ffice of Inspector G eneral. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
CHAPTER 3STRATEGIC PLANNING
3.1 The G overnm ent Perform ance and R esults Act of 1993. . . . . . . . . 25
3.2 N A SA Strategic Planning R equirem ents . . . . . . . . . . . . . . . . . . . . 25
3.3 N A SAs Strategic Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263.4 Enterprise Strategic Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
3.5 C apital Investm ent Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
3.6 Functional O ffice Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
-
8/11/2019 NASA Strategic Project Management Handbook
3/49
CHAPTER 4IMPLEMENTATION PLANNING
4.1 Perform ance and B udget Planning Process . . . . . . . . . . . . . . . . . 29
4.2 Five-Year B udget Planning O verview . . . . . . . . . . . . . . . . . . . . . . . 29
4.3 Perform ance Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
4.4 D eveloping and Issuing G uidance . . . . . . . . . . . . . . . . . . . . . . . . 31
4.5 Perform ance and B udget D ecisionm aking Process . . . . . . . . . . . . 32
4.6 M anag em ent and Em ployee Perform ance Planning . . . . . . . . . . . 35
4.7 Im plem entation in the O perating Year . . . . . . . . . . . . . . . . . . . . . . 36
CHAPTER 5PERFORMANCE EVALUATION
5.1 Perform ance Evaluation Process . . . . . . . . . . . . . . . . . . . . . . . . . . 37
5.2 A gency A nnual G PR A Perform ance Report and O ther External
R eporting R equirem ents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
5.3 External R eview s. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
5.4 Independent Validation of Perform ance M easures. . . . . . . . . . . . . 38
5.5 Education, Training, and R ew ards in Strategic M anagem ent. . . . . 39
APPENDICES
A D esignated C enter M ission Areas and C enters of Excellence . . . . 41
B Principal C enter D esignations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
C Lead C enter Program A ssignm ents. . . . . . . . . . . . . . . . . . . . . . . . 45
D N A SA Policy D irectives (N PD ) and N A SA Procedures and
G uidelines (N PG ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
E N ational A eronautics and Space A ct, as Am end ed . . . . . . . . . . . . 49
F G overnm ent Perform ance and R esults Act of 1993 . . . . . . . . . . . . 51
2S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
4/49
P
REFACE
3
PREFACE
P.1 Purpose
N A SAs Strateg ic M anagem ent System enables the A gency to establish
strategy, m ake decisions, allocate resources, and m anage program s
safely, effectively, and efficientlyin w ays that are consistent w ith
N A SAs strategic plans and perform ance plans. The purpose of this
directive is to docum ent that system . This directive includes:
a. Strateg ic planning
b. Im plem entation
c. Perform ance evaluation
This directive also describes the strategic m anagem ent roles and rela-
tionships of N A SAs various organizational elem ents, from the
A dm inistrator to all N A SA em ployees. N A SAs S trategic Enterprises,
A gencyw ide Functional O ffices, and C rosscutting Processes are the
fram ew ork for N A SAs Strategic M anagem ent System .
P.2 Applicability
P.2.1 This N PG applies to N A SA H eadquarters and the N A SA C enters,
including C om ponent Facilities, and to the Jet Propulsion Laboratory as
provided in the contract.
P.2.2 D escriptions of policies, authorities, roles, and responsibilities for strate-
gic m anagem ent in this N PG supplem ent N PG 1000.3, The N A SA
O rganization.
P.2.3 D escriptions of A gency-level policies, processes, proced ures, and
guidelines specific to organizational activities and m ore detailed ele-
m ents of strategic m anagem ent are docum ented in the N A SA directives
system , C enter-specific docum entation, and the ISO 9000 docum enta-
tion for N A SA H eadquarters and C enters. A description of the directives
system can be found in N PD 1400.1, N ASA D irectives System ,and
N PG 1400.2, N ASA D irectives System Procedures and G uidelines.
P.3 Authority
42 U .S.C . 2473(c)(1), Section 203(c)(1), of the N ational A eronautics and
Space A ct of 1958, as am ended
-
8/11/2019 NASA Strategic Project Management Handbook
5/49
P.4 References
a. 31 U .S.C . 11011119, 97039704, the G overnm ent Perform ance
and R esults A ct of 1993, as am ended
b. 31 U .S.C . 501506, 901903, 3511, et seq., the C hief Financial
O fficers A ct of 1990, as am end ed
c. 40 U .S.C . 1401, et seq ., the C linger-C ohen A ct of 1996 (Section
808 of Public Law (P.L.) 104-208, renam ing, in pertinent part, the
Inform ation Technology M anagem ent R eform A ct (D ivision E of P.L.
104-106))
d. N PD 1000.1, N A SA Strategic Plan
e. N PD 1080.1, N A SA G enerate K now ledg e (G K ) Process for
Prog ram s and Projects
f. N PG 1080.x, G uidelines for the G enerate K now ledge Process forProg ram s and Projects
g. N PD 1090.x, N A SA C om m unicate K now ledg e Process for
Prog ram s and Projects
h. N PG 1090.x, C om m unicating N A SAs Know ledge from Program s
and Projects
i. N PG 1000.3, The N A SA O rganization
j. N PD 1400.1, N A SA D irectives System
k. N PG 1400.1, N A SA D irectives System Procedures and G uidelines
l. N PD 8700.1, N A SA Policy for Safety and M ission S uccessm . N PD 7120.4, Program /Project M anagem ent
n. N PG 7120.5A , N A SA Program and Project M anagem ent Processes
and R equirem ents
o. N PD 8730.3, N A SA Q uality M anagem ent System Policy (ISO 9000)
p. N PD 9800.1, N A SA O ffice of Inspector G eneral Program s
P.5 Cancellation
N A SA Strategic M anagem ent H andbook (O ctober 1996)
[Signed 1-19-00]
D aniel S. G oldin
A dm inistrator
D ISTR IB U TIO N : N O D IS
4S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
6/49
CHAPTER 1
STRATEGIC MANAGEMENT SYSTEM
1.1 Overview
1.1.1 N A SA consists of N A SA H eadquarters, nine C enters, the Jet Propulsion
Laboratory (operated under contract to N A SA by the C alifornia Institute
of Technology), and several ancillary installations and offices in the
U nited States and abroad. A s a result of the A gencys d ecentralized
operations, N A SAs organization has evolved into a tw o-tiered structure
of A gencyw ide m anagem ent: (a) A gency m anagem ent, including the
A dm inistrator, officials w ithin the O ffice of the A dm inistrator, andFunctional O ffices; and (b) Enterprise m anagem ent, including
Enterprise A ssociate A dm inistrators and C enter D irectors. The im ple-
m entation of N A SA program s and aeronautical and space/Earth sci-
ence and technology research occurs prim arily at the C enters.
1.1.2 The success of N A SAs m issions relies in p art on the A gencys four
C rosscutting Processes.These processes are the w ay w e perform our
m ission. A ll activity w ithin N A SA is contained w ithin one or m ore of these
four processes: provide aerospace products and capabilities, generateknow led ge, com m unicate know led ge, and m anag e strateg ically.
Policies and procedural guidelines g overning these C rosscutting
Processes w ill be found in their respective N PDs and N PG s.
1.1.3 N A SAs strateg ic m anagem ent system is a set of ongoing and inter-
linked activities that includes strategic planning, im plem entation and
perform ance planning , and perform ance evaluation. A s show n in
Figures 11 and 12, these activities enable the A gency to m ake deci-
sions about its long-term goals, near-term activities, and institutionalcapabilities that are consistent w ith achieving the m ission and objec-
tives to w hich it com m its itself in its Strategic Plan.
1.2 Strategic Planning
Strategic Planning establishes the direction for all A gency efforts and
form s the basis for strategic and tactical decisionm aking, resource allo-
cation, and capital investm ent. It does so in the context of the A gencys
vision, m ission, goals, objectives, values, and policies, as w ell as exter-nal and internal environm ents. The Strategic Planning process requires
alignm ent am ong N A SAs S trategic Plan, the Enterprise Strategic Plans,
program s, and institutional capabilities (see Figure 12).
S
TRATEGIC
MANAG
EMENTS
YSTEM
5
-
8/11/2019 NASA Strategic Project Management Handbook
7/49
1.3 Implementation: Performance and Budget Planning
The im plem entation planning process p rod uces annual budget form u-
lation guidance and perform ance p lans to achieve the g oals and objec-
tives identified during the Strategic Planning process. It is a cyclical
process that is ongoing throughout the developm ent of N A SAs
Strategic Plan and Enterprise Strategic Plans, capital investm ent plans,
and A gency budgets and form s the basis for perform ance evaluation.
1.4 Performance Evaluation and Reporting
N A SAs progress in achieving the objectives of its Strategic Plan is rou-
tinely evaluated by both internal and external organizations. The
G overnm ent Perform ance and R esults A ct (G PR A ) of 1993) req uires
Federal agencies to subm it annual perform ance plans follow ing the
6S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
StrategicPlanning
PerformanceEvaluation
Performanceand
ImplementationPlanning
Figure 11. Strategic M anagem ent System
-
8/11/2019 NASA Strategic Project Management Handbook
8/49
transm ittal to C ongress of the Presidents budget. N A SAs perform ance
report w ill reflect the perform ance goals against w hich the A gency
expects its effectiveness to be m easured in any given fiscal year.
1.4.1 B ecause investm ents in research and developm ent can yield results
5, 10, and 20 years in the future, N A SAs annual perform ance m easures
m ust incorporate m easures of both output and outcom e, addressing a
longer term view than fiscal year by fiscal year. N A SA w ill continue to
rely on its internal m anagem ent councils, its advisory com m ittees, and
the N ational R esearch C ouncil for assistance in evaluating its perform -
ance over extended periods of tim e.
S
TRATEGIC
MANAG
EMENTS
YSTEM
7
Agency
Performance
Plan/BudgetIntegration &Submittal
Admin. &
CongressApproval/Appropriation
5-Year Budget(IncludingLong-Term
CapitalInvestments)
Agency
StrategicPlan
FunctionalLeadership
Initiatives/Plans
AgencyPerformance
Planning &Budget (ProgramOperating Plan)
Guidance
Agency
PerformancePlan
FunctionalOffice
PerformanceEvaluation
Agency
Perform.Evaluation& Reports
Enterprise
PerformancePlanning &
BudgetIntegration
EnterpriseStrategic
PlanPerformance
Plans
EnterpriseAA
PerformancePlans
EnterprisePerformance &Budget (POP)
Guidance
ImplementationPlans (Updates)
PerformancePlans
(IncludingIndividuals)
Center Implementation Plans(Including Centers of Excellence,
Program Lead and SupportResponsibilities, and Institutional
Investments)
Program/Project
ProgramOperating Plan
Revisions
Program/
ProjectManager
PerformancePlan
ProposedProgram/Project Plan
(Updates & New)
StrategicPlanning
Implementation andPerformance Planning PerformanceEvaluation
EnterpriseAA
Perform.Evaluation
Perform.Evaluation(Including
Individuals)
Program/
ProjectPerform.Evaluation& Reports
Note:This cycle is implemented on a regular basis, with the results and evaluation of prior-year performanceserving as a starting point for strategy development activities.
Centers
Functional/Staff AA
PerformancePlan
Employees
Individual Performance Plans and Evaluations
Figure 12. Strategic M anagem ent Elem ents
-
8/11/2019 NASA Strategic Project Management Handbook
9/49
1.4.2 The perform ance evaluation process allow s N ASA to identify potential
opportunities for im provem ent in program execution and process m an-
agem ent and to ensure safety and health, efficiency, and effectiveness.
Perform ance evaluation can also yield inform ation that m ay indicate a
need to change the Agencys long-term strategies or near-term objectives.N ASA w ill report publicly on the results of its perform ance evaluations to
the Adm inistration and C ongress in an annual perform ance report.
8S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
10/49
CHAPTER 2
ROLES AND RESPONSIBILITIES
2.1 Organizational Overview
N A SAs organizational structure encom passes corporate, A gencyw ide
m anag em ent and the m anagem ent of N A SAs Strategic Enterprises.
Strateg ic Enterprise m anag em ent includ es the m anag em ent of N A SAs
C enters as w ell as program s and projects. A num ber of m anagem ent
councils and boards coordinate A gency planning. N A SAs organiza-
tional structure is displayed in Figure 21 and is described in greater
detail in N PG 1000.3.
2.2 Agency Management
A gency m anagem ent is resp onsible for A gency leadership, the devel-
opm ent of N A SAs strategy, and the integrated m anagem ent of the
Strategic Enterprises. It is the external focal point for N A SA com m uni-
cation and accountability, serving as the principal interface w ith the
A dm inistration, C ongress, and oversight agencies. A gency m anage-
m ent integrates the N A SA budget, determ ines long-term institutional
investm ent strategy, sets N A SA policy and standards, and ensures
A gency functional m anagem ent. A gency m anagem ent defines the
Strategic Enterprises and is responsible for review ing requirem ents,
allocating resources, assessing perform ance, and setting investm ent
R
OLES
AND
RESPONSIBILITIES
9
Functional Offices
Office of theAdministrator
Enterprise and InstitutionalProgram Office (IPO)
Management
Goddard Space Flight Center
Earth ScienceEnterprise and IPO
Jet Propulsion Laboratory*
Space ScienceEnterprise and IPO
Human Exploration &Development of Space
Enterprise and IPO
Johnson Space CenterKennedy Space CenterMarshall Space Flight CenterStennis Space Center
Ames Research CenterDryden Flight Research CenterGlenn Research CenterLangley Research Center
Aero-SpaceTechnology
Enterprise and IPO
Agency Councilsand Boards
* Wherever Jet Propulsion Laboratory or JPL appears in this document, note that the Jet Propulsion Laboratory (JPL) isNASA-owned, but contractor-operated.
Figure 21. Agency and Enterprise M anagem ent Structure
-
8/11/2019 NASA Strategic Project Management Handbook
11/49
goals across the Enterprises. Executive m anagem ent authority for the
A gency resides w ith the A dm inistrator, D eputy A dm inistrator, and
A ssociate D eputy A dm inistrator, advised and supported by the staff offi-
cials of the O ffice of the A dm inistrator and the senior-level councils and
boards chartered to perform A gency-level integration (see Figure 22).
2.2.1 N ASA Adm inistrator
The A dm inistrator serves as N A SAs chief executive officer, accountable
to the President for the leadership necessary to achieve the A gencys
m ission. This leadership requires articulating the A gencys vision, set-
ting its program m atic and budget priorities and internal policies, and
assessing A gency p erform ance. Senior staff officials w ithin the O ffice of
the A dm inistrator include the D eputy A dm inistrator, A ssociate D eputyA dm inistrator, C hief Engineer, C hief Inform ation O fficer, and C hief
Scientist.
2.2.2 Senior M anagem ent C ouncil
N A SA 's Senior M anagem ent C ouncil is chaired by the A dm inistrator
and consists of A ssociate A dm inistrators, O fficials-in-C harge of
H eadquarters offices, and C enter D irectors. This council advises the
A dm inistrator on the institutional health of the A gency and the status ofits program s and plans and serves as a forum for the discussion of
issues affecting A gency m anagem ent. The council review s the A gency
and Enterprise Strategic Plans, C enter Im plem entation Plans, and
Functional Leadership Plans, and it recom m ends approval or redirec-
tion by the A dm inistrator.
10S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
InformationTechnologyInvestment
Council
ProgramManagement
Council
CapitalInvestment
Council
Senior Management Council
Administrator
ChiefFinancialOfficerCouncil
ScienceCouncil
TechnologyLeadership
Council
EngineeringManagement
Council
SpaceOperations
ManagementCouncil
InformationTechnology
SecurityCouncil
SpaceTransportation
Council
MedicalPolicyBoard
OccupationalHealth and
SafetyBoard
FacilitiesReviewBoard
EEOBoard
CIORepresentatives
Board
EnvironmentalManagement
Board
SpaceStation
UtilizationBoard
AgencyPerformance
ReviewBoard
FlightAssignment
Board
AdministrativeIssuesBoard
Figure 22. Agency C ouncils and Boards
-
8/11/2019 NASA Strategic Project Management Handbook
12/49
2.2.3 Program M anagem ent C ouncil (PM C )
The P M C review s the readiness of program s in form ulation to p roceed
to im plem entation according to criteria established through the
approval process. The PM C w ill also review the im plem entation ofselected Enterprise program s and projects, as d efined in the Program
C om m itm ent A greem ent, and functional initiatives referred to it by the
C ap ital Investm ent C ouncil and requiring Prog ram C om m itm ent
A greem ents. The review of som e program s m ay be delegated to C enter
Program M anagem ent C ouncils. The PM Cs form al review process eval-
uates cost, schedule, technical content, perform ance, and safety to
ensure that N A SA m eets its program m atic com m itm ents.
2.2.4 C apital Investm ent C ouncil (C IC )
2.2.4.1 The C IC exam ines A gencyw ide capital investm ents and policy issues.
This includes the balance am ong Enterprise program investm ents,
crosscutting technology investm ents, and institutional investm ents. The
C IC ensures an A gency perspective for all large, long-term investm ents
that enable the A gency and the Strategic Enterprises to execute their
program s. Investm ent areas include:
a. Facilities
b. Environm ental M anagem entc. Inform ation Technology
d. Science
e. Technology
f. H um an Resources
g. Safety and O ccupational H ealth
h. O ther designated investm ents
2.2.4.2 The C IC is the principal advisory group to the A dm inistrator in resolving
issues, prioritizing activities (capital investm ents, Functional O ffice initia-tives, and program s), and balancing resources am ong the Strategic
Enterprises. The C ICs advice to the A dm inistrator is a significant elem ent
of the A gencys d etailed im plem entation planning process and during
the budget developm ent process. The council resolves or recom m ends
options to the A dm inistrator on issues am ong the Enterprises, Functional
O ffices, and C enters, or com binations thereof, in term s of A gency invest-
m ent in assets or functional capabilities. The council also review s m ajor
Functional O ffice initiatives and review s and recom m ends budget guid-
ance initiating each annual budget cycle. W hen these review s arerequired, the council w ill consider, am ong other criteria, the cum ulative
effect a proposed initiative w ill have on A gency resources. The
Adm inistrative Issues B oard provides support for this review activity.
2.2.4.3 Significant augm entation of a C enter of Excellence facility, hum an
resource levels and skill m ix, and proposals to change or designate
new C enters of Excellence are all A gency investm ent decisions, on
w hich the C IC m akes form al recom m endations to the A dm inistrator.
R
OLES
AND
RESPONSIBILITIES
11
-
8/11/2019 NASA Strategic Project Management Handbook
13/49
2.2.5 O ther C ouncils of the O ffice of the Adm inistrator
The A dm inistrator also has chartered the follow ing councils, w hich are
chaired by individuals from the O ffice of the A dm inistrator or the C hief
Financial O fficer (C FO ).
2.2.5.1 Science C ouncil
2.2.5.1.1 The Science C ouncil, chaired by the C hief Scientist, coordinates
N A SAs science activities, prom otes public com m unication, and
ensures the quality of the A gencys science program . This council
advises the A dm inistrator on all aspects of science related to N A SAs
flight and ground program s.
2.2.5.1.2 The Science C ouncil serves as a forum for review ing Agency policies, prac-
tices, and issues as they relate to science activities; com m unicating and
discussing interdisciplinary science goals and the national and internation-
al policies that guide their developm ent; and integrating science plans. The
council also participates in the Agencys process of developing recom -
m endations for Agency-level science priorities and budgets. It shares
inform ation about operational areas of the Agencys Strategic Enterprises
as they relate to the quality and content of the science program .
2.2.5.2 Technology Leadership C ouncil
The Technology Leadership C ouncil, chaired by the A ssociate
A dm inistrator for A ero-Space Technology, advises the A dm inistrator on
all m aterial asp ects of technology related to N A SAs flight and ground
program s. It coordinates N A SAs technology activities, including
advanced research and develop m ent, across Enterprises and pro-
m otes pub lic com m unication of N A SAs technology prog ram s. The
Technology Leadership C ouncil also serves as a forum for review ingA gency p olicies, practices, and issues as they relate to technology
activities, com m unicating and discussing technology goals and the
national policies that guide their developm ent, and integrating technol-
ogy plans. The council participates in the A gencys process of devel-
oping recom m endations for technology priorities across E nterprise
bud gets for technology and sup ports the C IC w ith recom m end ations for
C enter of Excellence designation.
2.2.5.3 Engineering M anagem ent C ouncil
The Eng ineering M anag em ent C ouncil, chaired by the C hief Eng ineer,
is a forum for assessing and im proving A gency engineering practices,
policies, training and certification standards, procedures, and capabili-
ties. W hen requested by the chair of the PM C or the C hief Engineer, this
council conducts or supports independent technical review s of N A SA
program s and technolog y/advanced develop m ent activities.
12S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
14/49
2.2.5.4 Space O perations C ouncil
The Space O perations C ouncil, chaired by the C hief Engineer, serves as
a forum for assessing and im proving A gency space operations policies,
practices, standards, procedures, and capabilities, w hile providingA gencyw ide policy guidance for activities associated w ith N A SA opera-
tions. This council also provides policy guidance and recom m ends issue
resolution to the N A SA space operations m anagem ent organization that
provides operational m ission support to all N A SA Enterprises.
2.2.5.5 Space Transportation C ouncil
The Space Transportation C ouncil, chaired by the C hief Engineer,
advises the A dm inistrator and coordinates all aspects of space trans-portation investm ents related to N A SAs flight and ground technology
program s. The council serves as a forum for establishing and review ing
A gency and interagency policies, practices, and issues related to
space transportation requirem ents and technology developm ent. The
council also defines an investm ent plan necessary for space trans-
portation technolog y developm ent and system upgrad es and partici-
pates in the A gency process of developing recom m end ations for trans-
portation technology priorities and advanced developm ent program s
across the individual Enterprises.
2.2.5.6 Inform ation Technology Investm ent C ouncil
The Inform ation Technology Investm ent C ouncil, chaired by the C hief
Inform ation O fficer, is responsible for establishing A gency-level inform a-
tion technology policies, plans, and standards. This council approves
N A SAs inform ation technology plans and conducts review s of proposed
m ajor inform ation technology investm ents required to accom plish these
plans. The council also serves as the supporting panel for inform ationtechnology and provides recom m endations on proposed inform ation
technology investm ents to the C IC . W ith the support of this council, the
C hief Inform ation O fficer provides leadership and advice to the
A dm inistrator and other senior officials for inform ation technology plans,
policies, and standards, as w ell as for assessing returns on inform ation
technology investm ents in term s of m ission outcom es or support.
2.2.5.7 Inform ation Technology Security (ITS) C ouncil
The ITS C ouncil, co-chaired by the C hief Inform ation O fficer and the
C hief Infrastructure A ssurance O fficer (currently the A ssociate
A dm inistrator for M anagem ent System s), is responsible for the coordi-
nation of A gency unclassified and classified ITS efforts. W ith the sup-
port of this council, the C hief Inform ation O fficer and the A ssociate
A dm inistrator for M anagem ent System s provide sup port and ad vice to
the A dm inistrator and other senior officials for ITS.
R
OLES
AND
RESPONSIBILITIES
13
-
8/11/2019 NASA Strategic Project Management Handbook
15/49
2.2.5.8 C hief Financial O fficer C ouncil
The C hief Financial O fficer C ouncil, chaired by the C FO , is responsible for
im proving financial and resource m anagem ent, strengthening com m uni-
cations, im proving coordination, and prom oting professional developm ent.The council advises and coordinates the activities of the Agency on such
m atters as the developm ent and im plem entation of financial and budget
system s, the im provem ent of the quality of financial and resources infor-
m ation, financial data and inform ation standards, m anagem ent controls,
professional developm ent standards, and any other m atters that w ill facil-
itate financial and resources m anagem ent excellence.
2.2.6 Internal Senior M anagem ent Boards
To coordinate and support A gencyw ide m anagem ent in certain key
areas, N A SA has estab lished internal Senior M anag em ent B oards,
w hich are chaired by one of N A SAs A ssociate A dm inistrators or, in
selected cases, by a designated senior A gency official. These boards
include, but are not lim ited to:
a. A dm inistrative Issues B oard
b. A gency Perform ance R eview B oard
c. C hief Inform ation O fficer R epresentatives B oard
d. Environm ental M anagem ent B oarde. Equal Em ploym ent O pportunity B oard
f. Facilities R eview B oard
g. Flight A ssignm ent B oard
h. Integrated Financial M anagem ent B oard
i. M edical Policy B oard
j. O ccupational H ealth and Safety Executive B oard
k. Space S tation U tilization B oard
2.3 Enterprise Management
N A SA has established the four Strategic Enterprises to function in pri-
m ary business areas for im plem enting N A SAs m ission and serving cus-
tom ers. Each Enterprise has a unique set of strategic goals, objectives,
and im plem enting strategies that address the requirem ents of the
A gencys prim ary custom ers.
2.3.1 Enterprise Associate Adm inistrators/Institutional Program O fficers
2.3.1.1 The Enterprise A ssociate A dm inistrators are accountable for delivering
program results to the N A SA A dm inistrator. A s such, they serve as the
stew ards, advocates, and chief executives of their resp ective
Enterprises, setting Enterprise priorities and strategies for achieving
them . In addition, the Strategic Enterprises provide program definition
(requirem ents, opportunities for cross-program efficiency, and synergy).
They are responsible for the safety and hum an health of their
14S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
16/49
Enterprises activities, integrated Enterprise budget developm ent, pro-
gram resource allocation, perform ance assessm ent, policies and stan-
dards, and the im plem entation of N A SA policies.
2.3.1.2 The Enterprise A ssociate A dm inistrator is the senior official in theEnterprise w ith principal resp onsibility for developing long-term strate-
gy and ensuring that the necessary capabilities are in place to m eet
both the near-term program objectives and the longer term goals.
2.3.1.3 A s the E nterprise leader, the A ssociate A dm inistrator determ ines w hat
the Enterprise does and w hy, w ith a specific focus on the requirem ents
of external custom ers. In this context, the Enterprise A ssociate
A dm inistrators are resp onsible for:
a. D eveloping Enterprise strategy, policy, and standards that fulfill theA gencys g oals and objectives
b. Form ulating program req uirem ents and ob jectives
c. Providing ad vocacy for the Enterprise
d. Providing external/custom er interfaces
e. A llocating resources for the full cost of each program , including
personnel and facilities, w ithin the context of A gency strategic
determ inations
f. A ssessing program perform ance
g. Selecting projectsh. Serving as the N A SA internal custom er
i. M aking Lead C enter assignm ents for the Adm inistrators approval
j. O verseeing Enterprise education and pub lic outreach
k. C oordinating interactions betw een the O ffice of M anag em ent and
B udget and N A SAs O ffice of the C hief Financial O fficer
l. C oordinating interactions b etw een C ongress and N A SAs O ffice of
Legislative A ffairs
m . C oordinating all international partnership arrangem ents w ith the
O ffice of External R elations
2.3.1.4 The A ssociate A dm inistrators for Space S cience, Earth S cience, and
Life and M icrogravity Sciences and A pplications have oversight of
N A SAs scientific research program s. These A ssociate A dm inistrators
resp onsibilities in science research include strategic planning, im ple-
m entation and perform ance p lanning, the selection of m issions and
investigations, and the ongoing evaluation of research activities. The
A ssociate A dm inistrator for Life and M icrogravity Sciences and
A pplications is also resp onsible for all A gency health activities.Enterprise A ssociate A dm inistrators are responsible for m anaging pro-
gram initiation, form ulation and integration, science m anagem ent, and
prog ram oversight and perform ance assessm ent. The C enters are
responsible for program im plem entation on behalf of their respective
Enterprise A ssociate A dm inistrator (see Figure 23).
R
OLES
AND
RESPONSIBILITIES
15
-
8/11/2019 NASA Strategic Project Management Handbook
17/49
2.3.1.5 W hen a Strategic E nterprise consists of m ultiple H eadquarters organi-
zations, a Lead A ssociate A dm inistrator is appointed w ho is responsi-
ble for setting policy and requirem ents g uidance for that Enterprise. The
A ssociate A dm inistrator for Space Flight is the Lead A ssociate
A dm inistrator for the H um an Exploration and D evelop m ent of Space(H ED S) Enterprise and is responsible for an integrated hum an explo-
ration and developm ent of space strategy. The A ssociate A dm inistrator
for Life and M icrogravity Sciences and A pplications reports to the
N A SA A dm inistrator and is a key m em ber of the H ED S Enterprise. In
this instance, the A ssociate A dm inistrator is not an Enterprise A ssociate
A dm inistrator, but has the full responsibilities of an Enterprise A ssociate
A dm inistrator for program m atic activities in the areas of life sciences,
agency health activities, m icrogravity sciences, and associated space
product and com m ercial developm ent.
2.3.1.6 To ensure alignm ent betw een program s and institutional capabilities, the
A dm inistrator w ill norm ally designate the Enterprise A ssociate
A dm inistrator for the predom inant activity at each C enter that C enters
Institutional Program O fficer. A s an Institutional Program O fficer, the
A ssociate A dm inistrator is responsible for ensuring that the C enter has
the capability to m eet its program m atic and functional com m itm ents, as
w ell as long-term m ission responsibilities, in a safe and effective m anner.
The Institutional Program O fficer/A ssociate A dm inistrator is also respon-sible for im plem entation, conform ance, and the assurance of safe and
efficient functional operations. Enterprise A ssociate A dm inistrators serv-
ing as Institutional Program O fficers m ust have a broader perspective
than their individual Strategic Enterprises. In this m anagem ent capacity,
the Institutional Program O fficer w orks w ith the C enters, other Enterprise
A ssociate A dm inistrators, and Functional O ffices to:
16S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
Strategy
ChiefScientist
Implementation Evaluation
Consult on Science EnterprisesPlanning, Programs, and Budgets Assess Effectiveness of Policiesand Integrated Science Results
EnterpriseAssociateAdministrator
Assess Compliance andPerformance Against Strategic Plan
Integrate Research Results Program Assessment
CenterScientist
Contribute to Science PlanDevelopment
Develop Project Science Plans with theScience Community
Support External Investigations Project Scientist Management Conduct Successfully Proposed
Research
Lead Center*/ProgramManager
Support Program Definition Assess Technology Readiness Develop Mission Alternatives Manage Program Planning Establish Project Structure Manage Execution
* When required for enabling technology programs and flight and ground system development programs
Note: Bold type reflects primary management responsibilities.
Science Policy Development
Develop Enterprise Strategy Develop Science Plan Establish Program
Requirements External Advocacy External Coordination
Advisory Committee Interface Cross-Enterprise/Agency
Coordination Allocate Research/Program Budgets Establish Science Priorities Develop Research Campaigns Select Research/Mission Proposals Oversee International Partnering
Support Program Evaluation
Support Program Evaluation
Roles andResponsibilities
Figure 23. Science M anagem ent Roles and Responsibilities
-
8/11/2019 NASA Strategic Project Management Handbook
18/49
a. Provide safe and healthful w orkplaces and environm entally sound
w ork processes
b. Plan long-term institutional strategies
c. D eterm ine institutional and infrastructure investm ent requirem ents
d. Pursue integration and synergies, crosscutting strategies, andinvestm ents across m ultiple C enters
e. A pprove institutional budgets proposed by the C enter
f. D evelop a long-term institutional investm ent strategy
g. D eterm ine m ajor adjustm ents to and trad eoffs am ong the prog ram s
and institutions w ithin overall budget availability
h. A ssess the perform ance of the C enter in m eeting its m ission and
C enter of Excellence resp onsibilities
i. R eview Functional O ffice initiatives, as a m em ber of the
A dm inistrative Issues B oard.
2.3.1.7 Each Institutional Program O fficer also ensures a broad perspective by
providing the opportunity for all the Enterprises that have w ork at the
C enter to participate in institutional decision processes. These process-
es encom pass policy decisions, allocation of com m on resources,
approval of the C enters institutional operations budgets, and recom -
m endations on proposed capital investm ents, including determ ining
fund sources.
2.3.2 C enters and C enter D irectors
N A SAs C enters are responsible for the safety and occupational health
of their w orkforce and for the safe im plem entation of the A gency plans,
program s, and activities of the Strategic Enterprises. C enters of
Excellence and C enter m issions are tw o key concepts in the m anag e-
m ent of N A SA . N A SAs C enter D irectors are responsible for program
m anagem ent and execution. They determ ine how Enterprise program s
and central services w ill be im plem ented. C enter D irectors m anage theinstitution (including capability d evelopm ent and m aintenance), m an-
age m ulti-Enterprise resources, im plem ent functional leadership and
central service activities, and im plem ent N A SA , Strategic Enterprise,
and A gency-level functional policies. In collaboration w ith A gency-level
Functional O ffices, the C enter D irectors w ill establish oversight and
evaluations of C enter functions through self-assessm ents, ISO 9000
audits, perform ance m etrics, or other requirem ents identified. The
C enter D irectors serve as both m em bers of the Senior M anag em ent
C ouncil and as heads of their resp ective C enters. In this latter role, theyhave prim ary m anagem ent responsibility in three areas: program m an-
agem ent (determ ining how program s are accom plished), institutional
infrastructure (m aintaining and enhancing both hum an and physical
resources), and the assurance of the A gencys capabilities in assigned
C enters of Excellence.
R
OLES
AND
RESPONSIBILITIES
17
-
8/11/2019 NASA Strategic Project Management Handbook
19/49
2.3.2.1 C enter M issions
C enter m issions identify the prim ary area of concentration of each
C enters capabilities. A C enter m ission is a long-term resp onsibility. The
C enter D irectors are responsible for building and m aintaining hum anand physical resources to support their C entersm issions. Enterprise
program and project assignm ents are b ased on m ission designations.
The A dm inistrator assigns the C enter m issions. In im plem enting its m is-
sion, the C enter m ay capitalize on capabilities residing at supporting
C enters or outside of N A SA , as necessary, to provide the cost-effective
im plem entation of its m ission. D esignated C enter M ission A reas and
C enters of Excellence are listed in A ppendix A .
2.3.2.2 Lead C enter D irectors for Program s
2.3.2.2.1 Each N A SA program involving m ore than one C enter is assigned to a
Lead C enter for im plem entation. N A SA program Lead C enter assign-
m ents are selected by the Enterprise A ssociate A dm inistrator and
approved by the A dm inistrator. In m aking such assignm ents, the
Enterprise A ssociate A dm inistrators w ill consider C enter m ission and
C enter of Excellence responsibilities. (Lead C enter designations for
N A SAs current program s are listed in A ppendix C .) Lead C enter
D irectors have full program m anagem ent responsibility and authority.They are fully accountable for ensuring that assigned program s are
m anaged to ag reed-on sched ule m ilestones, bud get guidelines, tech-
nical requirem ents, and all safety and reliability standards.
2.3.2.2.2 The Enterprise A ssociate A dm inistrators m ust configure each program
so that it can be efficiently and effectively accom plished w ithin the
fram ew ork of Lead C enter assignm ents and funding allocations. The
level and num ber of Enterprise A ssociate A dm inistratorcontrolled
requirem ents m ust be consistent w ith safety, m ission success, custom erexpectations, and statutory and regulatory requirem ents. The Lead
C enter D irectors, in turn, establish supporting assignm ents for other
C enters (Supporting C enters), considering C enter m ission and C enter of
Excellence responsibilities. The C enter D irectors delegate m anagem ent
responsibility to the Program M anagers w ho report to them .
2.3.2.3 C enters of Excellence
2.3.2.3.1 C enter of Excellence designation represents exceptional A gency capa-bilities in certain areas of science, engineering, or technology. These
capabilities include personnel, facilities, and tools and m ay reside at
m ore than one N A SA C enter. The exceptional capabilities a C enter of
Excellence represents are expected to serve the needs of the
Enterprises as w ell as N A SAs strategic objectives, and they are the
responsibility of the C enter D irector.
18S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
20/49
-
8/11/2019 NASA Strategic Project Management Handbook
21/49
flight and ground system s developm ent and operations m anagem ent
resp onsibilities are delegated to the C enters. N A SAs C enter scientists
provide enab ling support to the broader space research com m unity byserving as project scientists and operating unique C enter facilities. In
addition, C enter scientists m ay com pete w ith external researchers for
funding to conduct original research of their ow n (including instrum ent
developm ent) that also m aintains their scientific currency. A gency p oli-
cies and guidelines for science prog ram m anag em ent are provided in
N PD 1080 and N PG 1080, currently under developm ent.
2.4 Functional Management
2.4.1 The H eadquarters Functional O ffice A ssociate A dm inistrators and
O fficials-in-C harge are the A dm inistrators principal advisors for their
areas of resp onsibility. They establish plans to im prove functional per-
form ance across the A gency, dissem inate internal A gency policies,
and, in collaboration w ith the Enterprise A ssociate A dm inistrators and
C enter D irectors, m aintain sufficient insight into Enterprise and
Institutional Program O ffice activities to ensure that they are conducted
in accordance w ith all statutory, regulatory, and fiduciary resp onsibili-
ties. In addition, these officials advise the A dm inistrator and senior m an-agers of potential efficiencies and required com pliance to be gained by
im plem enting proposed functional initiatives.
2.4.2 H eadquarters Functional O ffices include the O ffices of the C hief
Financial O fficer, C hief Engineer, C hief Inform ation O fficer, and C hief
Scientist, as w ell as H eadquarters O perations, Equal O pportunity
Prog ram s, H um an R esources and Education, G eneral C ounsel,
20S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
Strategy
EnterpriseAssociateAdministrator
Implementation Planning Implementation and Evaluation
Coordinate Cross-Enterprise Activities Integrate Enterprise Programs Select Projects and Lead Centers Allocate Budget to Programs Approve Implementation Plans
Assess Compliance andPerformance Against ProgramRequirements and CustomerExpectations
Lead CenterDirector*
Integrate Strategies withInstitutional Capabilities
Develop Centers of ExcellenceStrategies
Ensure Compliance to Policy/Standards
Maintain Dual Path for Qualityand Independent Assessment
ProgramManager
Support HeadquartersFormulation
Conduct Feasibility Planning
Implement Programs Allocate Budgets to Projects Project Oversight Report Status Control Program Changes
ProjectManager
Develop Specific Proposals Innovate Assess Technology Readiness
Develop Alternatives Establish Contracts and Support
Agreements
Note:Bold type reflects primary management responsibilities.
* Center Directors with projects supporting programs perform functions similar to those of lead Center Directors, but at the projectlevel at their individual centers.
Develop Enterprise Strategy Customer Interface Establish Program
Requirements/Metrics External Advocacy Long-Term Investment Strategy Formulate Programs
Integrate Institutional Resources withProgram Needs
Develop Implementation Plans (TotalCenter)
Coordinate Cross-Center Activities Select Program Manager
Manage Program Planning Develop Program Resource Needs Establish Project Requirements and
Performance Metrics Balance Requirements/Resources
Implement Projects Administer Contracts Manage Supporting Tasks Report Metrics
Roles andResponsibilities
Figure 24. Enterprise Program M anagem ent Roles and Responsibilities
-
8/11/2019 NASA Strategic Project Management Handbook
22/49
Procurem ent, External R elations, M anagem ent System s, Sm all and
D isadvantaged B usiness U tilization, Legislative A ffairs, Public A ffairs,
Safety and M ission A ssurance, and Policy and Plans. The A ssociate
A dm inistrator for M anagem ent System s serves as the A gencys C hief
Infrastructure A ssurance O fficer.
2.4.3 Functional O ffice activities fall into any or all of three m ajor categories:
functional leadership, staff to the A dm inistrator, and central services
across the A gency. The O ffice of H eadquarters O perations w ill be
responsible for m atters pertaining to the planning, execution, and eval-
uation of the m anagem ent of the H eadquarters institution. Figure 25 is
an overview of N A SAs Functional O ffice roles and resp onsibilities.
2.4.3.1 A s functional leaders, Functional O ffice A ssociate A dm inistrators andO fficials-in-C harge focus on im proving processes, stim ulating efficiency
in the perform ance of activities related to the program s, and providing
consistency, w hen consistency serves Agency m anag em ent
objectives, across the Strategic Enterprises. They oversee the perform -
ance of their particular functions across all of the C enters, as w ell as pro-
vide liaison to external organizations perform ing sim ilar functions and
stakeholders w ho establish G overnm entw ide policy and requirem ents.
R
OLES
AND
RESPONSIBILITIES
21
Functional Leadership
Intent
Products
Customer
PrincipalActivities
Mode ofOperation
Examples
Efficiency Effective Support to
Agency Mission
Central Service
Efficiency
Policy/Standards Budget Guidance
Functional Leadership Plans Assessments/ReportsImprovements
Standards and Architecture Training
Discrete Service Enterprise Staff Support
Enterprises/Centers Enterprises/Centers
Coordination and Integration Establish Policies Insight and Review Internal Focal Point External Liaison Analysis and Reporting Facilitate Standards
Development Facilitate Capital Investment
Requirements Determinationand Consolidation
Assessment Support
Value-Added Policy andStandards
Extensive Involvement ofCustomers and Stakeholders,Including Enterprises and Centers
Customer Responsiveness Co-located (Staff Only) Negotiate Implementation Plans Negotiate Performance Plans
Human Resources Planning Development of NASAs
Financial Management PlanningSystem
Environmental Management andCoordination
Facilities Management
PAO (Headquarters Only) Communications Network Agency Training and Education
Staff to the Administrator
Cross-Enterprise Balance andSynergy
Ensure Consistent Message toExternal Customers
Statutory Compliance andAccountability
Recommendations Assessments and Reports
Communiqus Functional Initiatives
Administrator
Coordination and Planning External Liaison Analysis and Reporting Independent Assessment Functional Initiative Sponsorship
and Direction
Independent Reporting toAdministrator, Coordinated withEnterprises as Appropriate
Coordinating Public AffairsActivities and Events
Legislative Hearing Coordination Agency Strategic and
Performance Plan Development
Figure 25. Functional O ffice Roles and Responsibilities
-
8/11/2019 NASA Strategic Project Management Handbook
23/49
2.4.3.2 C entral services for specific functional activities are offered to gain effi-
ciencies and to elim inate redundancy across the A gency. The decision
to provide a function centrally (for exam ple, A gencyw ide payroll pro-
cessing) is m ade by the A dm inistrator, on the C ICs recom m endation, on
a case-by-case basis show ing a clear benefit to the A gency. AFunctional O ffice or Strategic Enterprise m ay provide central services.
Such services include staff support, training, internal com m unications,
and consolidated m ainfram e com puting operations. The C IC w ill recom -
m end a control m echanism (such as a m em orandum of understanding)
for the service provision. O nce established, the service provision w ill be
evaluated annually as part of the budget process and continued on the
basis of cost-effective support to A gency custom er requirem ents.
2.4.3.3 Principal C enters m ay be established to lead particular functional leader-ship operations. The Functional O ffice selects the C enter that can best
execute the function on behalf of N A SA and subm its that selection, w ith
the concurrence of the Institutional Program O ffice A ssociate
A dm inistrator and the A ssociate A dm inistrator for H eadquarters
O perations, to the D eputy A dm inistrator for approval. D elegations of
authority to conduct these responsibilities are negotiated and docum ent-
ed w ith m em oranda of understanding, signed by the Functional O ffice
Associate A dm inistrator or O fficial-in-C harge, the Institutional Program
O ffice A ssociate A dm inistrator, the A ssociate A dm inistrator forH eadquarters O perations, and the C enter D irector. The m em oranda of
understanding m ust contain provisions for direction and funding flow, as
w ell as perform ance review. The Principal C enter D irector, in turn, m ay
establish supporting assignm ents for other C enters (Supporting C enters)
considering their particular functional capability. The m em oranda of
understanding m ust stipulate that budget processes w ill follow guidance
provided by the H eadquarters O ffice of the C hief Financial O fficer and
O ffice of H eadquarters O perations. (Principal C enter designations for
N A SAs current program s and processes are listed in Appendix B .)
2.5 Crosscutting Process Management
2.5.1 N A SA recognizes that the broad application of certain op erating princi-
ples can enhance the returns on its w ork tow ard diverse program m atic
and functional objectives. A s a fram ew ork for operating in accordance
w ith these principles, N A SA has grouped the follow ing m ajor activities
into four C rosscutting Processes:
a. M anage Strategicallyb. Provide A erospace Products and C apab ilities
c. G enerate K now ledge
d. C om m unicate K now ledge
22S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
24/49
2.5.2 The A dm inistrator assigns stew ardship responsibilities for the
C rosscutting Processes. These responsibilities have been assigned to:
A ssociate A dm inistrator for Policy and PlansM anage Strategically
C hief EngineerProvide A erospace Products and C apabilities
C hief ScientistG enerate K now ledgeC hief ScientistC om m unicate K now ledge
2.6 Manage Strategically
2.6.1 N o N A SA organization can succeed for long unless N A SA succeeds.
Interorganization coordination and collaboration are essential to defin-
ing com m on strategic goals and operating principles, im plem entation
planning , and achieving m ission success. To bring ab out A gencyw ide
coordination and collaboration am ong all of its organizational units, theA gency designed the Strategic M anagem ent System that is described
in this N A SA Procedures and G uidelines directive (N PG 1000.2).
2.6.2 The stew ardship of N A SAs strategic m anagem ent process is the respon-
sibility of the O ffice of Policy and Plans. The process is im plem ented by
all N A SA organizations as indicated in this directive (N PG 1000.2).
2.6.3 The scope of N A SAs com m itm ent to m anag ing strategically is far-
reaching and all-inclusive. The process includes the roles and respon-sibilities of A gency and Enterprise m anagem ent as w ell as Functional
O ffices (see N PG 1000.3).
2.6.4 The O ffice of Policy and Plans is resp onsible for scheduling and coor-
dinating an orderly, w ell-docum ented, and inclusive A gency process to
update every 3 years the A gencys Strategic Plan and, as needed, its
strategic m anagem ent guidelines (N PG 1000.2). This office also collab-
orates w ith the O ffice of the C hief Financial O fficer to define and apply
assessm ent tools to evaluate its perform ance.
2.7 Provide Aerospace Products and Capabilities
N A SA cond ucts aerospace p rog ram s to p rovide aeronautical and
space technology to researchers, industry, and the general public.
Provide A erospace Products and C apabilities is N A SAs process for
delivering system s (for exam ple, aeronautics, space and ground),
technologies, data, and operational services to N A SA custom ers.
M anagem ent policies, procedures, and guidelines for the form ulation,approval, im plem entation, and evaluation of N A SA program s and proj-
ects are p rovided in N PD 7120.4 and N PG 7120.5.
R
OLES
AND
RESPONSIBILITIES
23
-
8/11/2019 NASA Strategic Project Management Handbook
25/49
2.8 Generate Knowledge
N A SA conducts and supports basic and ap plied research to extend the
boundaries of know ledge of science, technology, and engineering, to
capture new know ledge in useful and transferable m edia, and to share
new know ledge w ith custom ers. This C rosscutting Process provides a
fram ew ork for ensuring that the research is consistent w ith the A gencys
strategic plans and that the quality of the research is m aintained to the
highest standards. D irectives and guidelines for the G enerate
K now ledge process w ill be in N PD 1080.x and N PG 1080.x.
2.9 Communicate Knowledge
The C om m unicate K now ledge process coordinates, integrates, dissem i-
nates, and shares consistent inform ation and experiences about the con-
tent, relevance, results, applications, and excitem ent of N A SAs m ission of
research, developm ent, education, and exploration. This process w ill be
described in greater detail in N PD 1090.x and N PG 1090.x.
2.10 NASA and Its Employees: Mutual Responsibilities
The success of N A SAs strategic plans, perform ance plans, and
Strateg ic M anag em ent System , dep ends on the active support of all
A gency em ployees. N A SA m anagem ent conducts the A gencys plan-
ning activities in an inclusive, open, and w ell-docum ented m anner. A ll
em ployees, including m anagers and executives, are responsible for
fam iliarizing them selves w ith their resp ective A gency, Enterprise,
Functional O ffice, and C enter plans. N A SA m akes an investm ent w ith
each em ployee. Em ployee develop m ent is an essential form of capital
investm ent for the A gency.
2.11 Office of Inspector General
N A SAs O ffice of Inspector G eneral (O IG ) is an independent organiza-
tion w ith responsibility to detect fraud, w aste, abuse, and m ism anage-
m ent, w hile prom oting econom y, efficiency, and effectiveness in the
A gencys program s and operations. The O IG conducts audits, crim inal
investigations, inspections, and assessm ents. The O IG staffs are locat-
ed at N A SA H eadquarters, all N A SA C enters, the Jet Prop ulsion
Laboratory, and som e ancillary offices. A dditional inform ation about
O IG activities can be found in N PD 9800.1.
24S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
26/49
CHAPTER 3
STRATEGIC PLANNING
N A SAs purpose as an A gency of the U .S. G overnm ent is defined by its
enabling statute, the N ational A eronautics and Space A ct of 1958, as
am ended. This and other Federal statutes and regulations elaborate on
the kinds of program s C ong ress and the President have directed N A SA
to carry out, as w ell as the regulations that govern how N A SA m anages
the national resources entrusted to it by the A m erican people. N ot long
after it w as established, the A gency undertook the first in a series of
long-range plans to ensure that it used those resources effectively, not
only to m eet current expectations, but also in anticipation of future
needs. These long-range plans evolved into the N A SA Strategic Plan.
3.1 The Government Performance and Results Act of 1993
In 1993, C ongress passed the G overnm ent Perform ance and R esults
A ct (G PR A ) to im prove the confidence of the A m erican people in the
capability of the Federal G overnm ent, by system atically holding Federal
agencies accountable for achieving program results . . . [by] setting
prog ram goals, m easuring prog ram perform ance against those goals,
and reporting publicly on their progress.G PR A requires the follow ingof Federal agencies (including N A SA ):
a. D evelop periodic A gency strategic plans, setting forth N A SAs m is-
sion, long-term goals, and associated resource requirem ents. The
Strategic Plan is to cover a period of not less than 5 years forw ard
from the fiscal year in w hich it w as subm itted.U pdated Strategic
Plans m ust be subm itted every 3 years.
b. Prep are and subm it to the President and C ongress annual
perform ance plans that establish perform ance goals, m easurable
objectives, and associated resources required to achieve long-term goals.
c. Subm it annual perform ance reports that set forth the perform ance
indicators established in the A gency perform ance plan . . . along
w ith the actual prog ram perform ance achieved .W hen perform -
ance goals have not been achieved, explanations should be pro-
vided, along w ith plans for m eeting the unattained goals, or rea-
sons for revising perform ance goals.
3.2 NASA Strategic Planning Requirements
In resp onse to G PR A , the Strateg ic Plans develop ed for the A gency and
the Strategic Enterprises w ill contain:
a. A com prehensive m ission statem ent covering N A SAs m ajor func-
tions and operations
b. G eneral goals and objectives, including outcom e-related goals
and objectives, for m ajor functions and operations
S
TRATEGIC
PLANNING
25
-
8/11/2019 NASA Strategic Project Management Handbook
27/49
c. A description of how the goals and objectives are to be achieved
d. A n identification of those key factors, external to the A gency and
beyond its control, that could significantly affect the achievem ent of
the general goals and objectives
e. The prog ram evaluations used in establishing or revising generalgoals and objectives
3.3 NASAs Strategic Plan
N A SAs S trategic Plan articulates the A gencys vision, m ission, goals,
and objectives, as w ell as A gencyw ide strategies for achieving them . In
so doing, it gives direction to the w ork of all N A SA organizations and
em ployees. Strategic planning is a continuous process. N A SAs
Strategic Plan is fully review ed and updated at least every 3 years.Interim adjustm ents m ay be m ade as needed, in parallel w ith the annu-
al perform ance planning process (see Figure 31).
3.4 Enterprise Strategic Plans
Enterprise Strategic Plans w ill elaborate on their resp ective m ission and
goals, in alignm ent w ith N A SAs Strategic Plan, w ith detailed objectives,
im plem enting strategies, and brief descriptions of their principal pro-
gram s and/or processes. They m ust be signed by their respectiveEnterprise A ssociate A dm inistrators. Enterprise Strategic Plans w ill be
review ed by the O ffice of Policy and Plans for consistency w ith N A SAs
Strategic Plan and other Enterprise Strategic Plans. Enterprise Strategic
Plans are review ed by the Senior M anag em ent C ouncil and ap proved
by the A dm inistrator. To ensure that they rem ain current, Enterprise
plans w ill be review ed and up dated as p art of any up date to the N A SA
Strategic Plan, but in any event, not less than every 3 years.
3.5 Capital Investment Planning
3.5.1 N A SA has established an A gencyw ide capital investm ent planning
process because the size, scope, tim e horizon, and technical nature of
these investm ents are critical to long-term A gency viability. In addition,
such investm ents m ust be balanced across N A SA organizations and
prioritized on an A gencyw ide basis, consistent w ith external financial
constraints and partnership opportunities. This planning process also
sup ports N A SA com pliance w ith related Federal guidance on
capital/asset investm ents (O ffice of M anag em ent and B ud get (O M B )C ircular A -11, Part 3).
3.5.2 C apital investm ent planning represents a key activity in the strategic
m anagem ent process and an im portant elem ent of N A SAs 5-year finan-
cial planning and budget activities. N A SAs C apital Investm ent C ouncil
(C IC ) advises the A dm inistrator during preparation of the A gencys
Program O perating Plan (PO P) guidance at the beg inning of the
26S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
28/49
S
TRATEGIC
PLANNING
27
CYX
3
J
A
S
O
N
D
J
FM
A
M
J
J
A
S
O
N
D
CYX2
CYX1
CYX
CYX
+1
J
FM
A
M
J
J
A
S
O
N
D
J
FM
A
M
J
J
A
S
O
N
D
J
FM
A
M
J
J
A
S
O
N
D
CY:
FY:
FY
X
Enterp
risePlans
(FullU
pdates)
StrategicPlanFullU
pdate
StrategicPlanInterim
Adjustments(Optional)
Budge
t
Perfor
mancePlan
Perfor
manceReport
Key:
I
P
R
O
i
O
P
I
R
OO
MB
iP
reliminaryInput
IInputDeadline
P
Pas
sBackfromO
MB
R
Rel
ease
Z
Sub
mittoCodeZ
C
POPCall
OP
OperatingPlan
A
CongressionalAppropriation
Q
QuarterlyReport
=datecanshiftinagivenyear
I
P
R
O
R
RevisedPlan(Optional)
C
Final
Q
Q
I
Q
O
R
O
P
I
R
A
OP
C
Revisedas
Required
Z
R
Consultation/
Concurrence
Figure
31.NASA
Strategic
Planningand
BudgetSched
ule
forFY
X
-
8/11/2019 NASA Strategic Project Management Handbook
29/49
im plem entation planning process and during the annual bud get devel-
opm ent process. The council m eets as often as the chair deem s ap pro-
priate. Its m eetings w ill exam ine interrelated A gencyw ide issues, such
as inform ation technology and security, critical infrastructure protection,
hum an resources, technical capabilities, high-risk generic technolo-gies, Functional O ffice initiatives, and facilities.
3.5.3 The C IC ensures the integration of Enterprise, C enter of Excellence,
and other investm ent plans; it review s and recom m ends investm ents
and provides guidance to N A SA entities for sub seq uent im plem enta-
tion. The council also exam ines such p roposals as A gency-level dow n-
sizing or restructuring.
3.6 Functional Office Planning
3.6.1 The Functional O ffices form ulate Functional Leadership Plans, w ith
Enterprise support, to im plem ent the A gencys Strategic Plan, im prove
A gency m anag em ent, and respond to new external direction. A
Functional Leadership Plan establishes the overall purpose and direc-
tion of functional activities, including goals, objectives, and perform -
ance m etrics or indicators used to assess success. It is based on the
Enterprise Strategic Plans, self-assessm ents, and externally m andated
requirem ents. Each plan m ust include a general description of pro-posed and statutorily required functional initiatives deem ed necessary
to im plem ent the A gency Strategic Plan and statutory m andates. The
Senior M anag em ent C ouncil m ust receive a presentation of and concur
w ith the Functional Leadership Plans, and then the A dm inistrator m ust
approve them . The plans are up dated, review ed , and ap proved again
as required by the A dm inistrator.
3.6.2 Follow ing presentation to and concurrence w ith the Functional
Lead ership Plans by the Senior M anagem ent C ouncil and approval bythe A dm inistrator, decision and guidance are to be docum ented for
inclusion in the N A SA PO P guidance and, in the case of new policies,
for form al coordination and dissem ination. The Functional O ffices also
ensure that the appropriate m etrics or perform ance indicators are
developed to evaluate function perform ance.
28S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
30/49
IM
PLEMEN
TATIONP
LANNING
29
CHAPTER 4
IMPLEMENTATION PLANNING
4.1 Performance and Budget Planning Process
Im plem entation planning ensures that the detailed planning, resources,
and perform ance exp ectations are aligned to sup port the achievem ent
of the N A SA and Enterprise Strategic Plans. Im plem entation planning is
based on the previous cycle of N A SA and Enterprise Strategic Plans,
capital investm ent planning, the 5-year A gency budget, and the results
of the ongoing perform ance evaluation process. Essential elem ents of
im plem entation planning include program planning to establish techni-
cal, schedule, and cost, as w ell as perform ance criteria at all m anage-
m ent levels. N A SAs budget planning process is the vehicle for inte-
grating these im plem entation plans.
4.2 Five-Year Budget Planning Overview
4.2.1 N A SAs budget planning is an ongoing process that incorporates a
detailed analysis of current requirem ents w ith outyear projections of
fund ing need s. Each bud get cycle is initiated by guidance from O M B
that includes planning estim ates, as w ell as policy guidance for the
preparation of the A gencys budget request. This broad guidance uses
the 5-year runout of the Presidents b udget request for N A SA before
C ongress at the tim e, and it updates the total to reflect further econom -
ic policy or prog ram decisions that m ay have been m ade.
4.2.2 A gency guidance for allocations am ong the Strategic Enterprises, pri-
orities for decisionm aking and tradeoffs, and any broad strategy issues
are developed to initiate both the internal planning and budget process-
es. The A dm inistrator issues this guidance, w ith full participation and
advice of the C IC , through the A gency C FO . The C FO and C om ptroller
then integrate the A dm inistrators guidance w ith m ore detailed pro-
gram m atic and funding guidance provided by the Strategic Enterprises
and the Functional O ffices. The m ultiyear budget estim ates, program
assum ptions, and strategic direction establish a baseline for planning
and budget form ulation activities and are distributed as guidelines to
the N A SA C enters.
4.2.3 R esponding to Program O perating Plan (PO P) guidance from the C FO ,the C enters assess their program planning and develop integrated
resource requirem ents w ith the assistance of their resp ective
Institutional Program O ffices. They review these requirem ents w ith the
Lead C enters and incorporate Lead C enter decisions. The Lead
C enters subm it integrated resource recom m endations to their
Enterprise A ssociate A dm inistrators and Institutional Program O fficers
-
8/11/2019 NASA Strategic Project Management Handbook
31/49
for integration into the A gencys annual subm ission of its 5-year budg-
et. C oordination am ong the Strategic Enterprises and the Functional
O ffices enables a com prehensive A gency bud get sub m ission that is
reflected in Program C om m itm ent A greem ents, Program and Project
Plans, and institutional planning.
4.2.4 A s the b udget form ulation p rocess proceeds, decisions m ust be m ade
about activities that have been form ulatedfor exam ple, w hether they
can be afforded w ithin the guideline level and those that w ill be pro-
posed as over-guideline activities. Each Strategic Enterprise m ust justi-
fy the relevance of the requested program s to the N A SA and Enterprise
Strategic Plans. N ew initiative candidates m ust be prioritized. The
approval of such initiatives for inclusion in the A gency b udget general-
ly is subject to their having reached an appropriate stage of m aturity inthe form ulation processes outlined in N PG 7120.5, as applicable.
4.2.5 In their capacity as principal advisors to the A dm inistrator in their
respective subject areas, the C hief Scientist, C hief Inform ation O fficer,
and C hief Engineer w ill review the A gency budget proposals and eval-
uate them for science, inform ation system s, and engineering m erit.
4.2.6 The final bud get request transm itted to O M B reflects this decision
process for the entire A gency. The budget process w ill be com patiblew ith N A SAs Strategic Plan. The content of the budget request describes
the w ay in w hich the A dm inistrator plans to achieve progress tow ard
m eeting the goals and objectives that appear in the N A SA Strategic Plan
w ithin the m ultiyear funding allow ance available. The A dm inistrator
approves the final 5-year budget subm ittal (see Figure 41).
4.3 Performance Planning
G PR A requires the sub m ission of an A gency P erform ance Plan, follow -ing the transm ittal to C ongress of the Presidents budget. This annual
Perform ance Plan sets out m easurable goals that define w hat w ill be
accom plished during a fiscal year. The goals should reflect a level of
accom plishm ent com m ensurate w ith the resources requested and sub-
sequently funded. For a fiscal year, at least tw o iterations of N A SAs
annual Perform ance Plan are prepared: an initial plan (subm itted along
w ith the N A SA budget request to O M B ) and a final plan that reflects
budget, policy, and program m atic decisions and is consistent w ith the
Presidents budget. A final plan revised to reflect congressional actionon an agencys bud get req uest is not req uired by G PR A , but m ay b e
subm itted by N A SA , if necessary, early in the new fiscal year.
30S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
-
8/11/2019 NASA Strategic Project Management Handbook
32/49
IM
PLEMEN
TATIONP
LANNING
31
4.4 Developing and Issuing Guidance
The developm ent of im plem entation guidelines flow s from the approval
of the A gency and Enterprise S trategic P lans and approved Functional
Leadership Plans. A nnually, the N A SA A dm inistrator issues guidance to
the Enterprise A ssociate A dm inistrators and the Functional O ffice
A ssociate A dm inistrators and O fficials-in-C harge, consistent w ith those
plans. The Strategic Enterprises and Functional O ffices, in turn, trans-late the A dm inistrators guidance into a set of technical, m anagerial,
and budgetary guidelines.
4.4.1 Agency G uidance
4.4.1.1 The A dm inistrators guidance initiates the im plem entation planning
cycle. This guidance is developed taking into account the results of the
prior-year planning cycle, new guidance from O M B , and any significant
changes in the A gencys external and/or internal environm ent. TheN A SA A dm inistrators guidance w ill also be influenced by p olicy and
budget recom m endations to the President from the N ational Science
and Technology C ouncil and prelim inary discussions w ith C ongress. In
developing N A SAs PO P guidance, the A dm inistrator establishes first-
order priorities for program content, also giving consideration to infor-
m ation received from senior m anagem ent.
Providesannual
guidance forAgency
budget andperformance
planning
Providescapital
investmentand furtherstrategicguidance
Providespreliminaryguidance
FunctionalOffices provide
guidance
Preliminary programallocations and
guidance
Provide guidanceinputs to Enterprise
Integrates and issuesannual budget and
performanceguidance
FunctionalOffices provide
input/issues
CFO issues integrated Agency guidance
Program and institutionalallocations and guidance
Integrate Centersubmits
Forward submits toother Enterprises
or FunctionalOffices
Provide feedback onsubmits to supporting
Centers
Build POPsubmits
Iterate inputs withLead Centers
Prepare finalinput to
Enterprise/IPOs
IntegrateEnterprise/Functional
Office inputsIdentify Issues
Resolve internal issuesDevelop Enterprise
Submit
Iterate issuesDevelop recommendations
Adjusts request to respondto CIC issues/direction
Approve ordirect revision
Submit toOMB
Develop Agency budget andperformance recommendations
Revise per Administrator decisions
dministrator CapitalInvestment
Council
CFO Functional/Staff Offices
Enterprises/IPOs SupportingCenters
Lead Centers
Figure 41. Im plem entation: N ASAs Perform ance and Budgeting Planning
-
8/11/2019 NASA Strategic Project Management Handbook
33/49
32S
TRATEGIC
MANAG
EMENTH
ANDBOO
K
4.4.1.2 O n behalf of the A dm inistrator, the N A SA O ffice of the C hief Financial
O fficer (C FO ) integrates the budget guidance from O M B , the
A dm inistrators guidance, the specific program m atic guidance from the
Enterprises, institutional guidance from the Institutional Program O ffices,
and guidance from Functional O ffices into the integrated N A SA PO Pguidance. The resulting PO P guidance w ill contain directions for prepar-
ing and subm itting budget and Perform ance Plan data, including for-
m ats and due dates. This guidance reflects prior-year budget plans and
capital investm ent decisions docum ented by the C IC . It also includes
additional guidance for potential new initiatives, an investm ent profile for
ongoing prog ram s, perform ance goals, and associated m etrics.
4.5 Performance and Budget Decisionmaking Process
4.5.1 Enterprise D ecisionm aking
The Strategic Enterprises integrate program planning and resource
planning during the budget process. The Enterprises m ake a series of
prelim inary program decisions in response to changes in funding, new
prog ram em phases, and ongoing perform ancedecisions that are
reflected in the PO P guidance to the C enters. O nce the Enterprise
offices have received their C entersbudget requirem ents in response to
the PO P call, they w ork w ith their Lead C enters to balance anticipatedresources w ith activities identified during im plem entation planning. This
w ill entail integration and adjustm ent of C enter im plem entation plans
w ith Enterprise custom er requirem ents and expected resources. The
Institutional Program O ffices are resp onsible for forw arding funding
requirem ents and corresponding im plem entation plans from the
C enters to the appropriate Functional O ffices. This assists the
Functional O ffices in identifying needs for conflicts of a functional or
institutional nature. The Functional O ffices are resp onsible for advising
and m aking recom m endations to the Institutional Program O ffices onthe C enter budget subm issions. Functional O ffice review s m ay also be
used to develop associated perform ance m easures or ind icators.
Enterprise A ssociate A dm inistrators then reallocate resources am ong
program s and revise p erform ance requirem ents as necessary to estab -
lish perform ance baselines. This integrated package of perform ance
objectives and resource requirem ents is subsequently provided to the
A dm inistrator, through the O ffice of the C hief Financial O fficer.
4.5.2 Functional O ffice Im plem entation Planning
Functional O ffice im plem entation planning defines activities required to
im plem ent the Functional Leadership Plans (described in Section 3.6). In
collaboration w ith the Strategic Enterprises and C enters, the Functional
O ffices ensure that Agency activities are conducted in accordance w ith
all statutory and regulatory requirem ents and fiduciary responsibilities.
-
8/11/2019 NASA Strategic Project Management Handbook
34/49
4.5.2.1 Functional O ffice initiatives are efforts developed or sponsored by
Functional O ffices to m eet new requirem ents, im prove a current
process or procedure, adapt to externally im posed m andates, or
recognize evolving functional standards or trends. Such initiatives can
reasonably be exp ected to have a significant A gencyw ide im pact onpersonnel, resources, or organizations outside the Functional O ffice
developing or sponsoring the initiative. B ecause the cum ulative im pact
of functional initiatives on the A gencys program and institutional
resources m ay be substantial, proposed functional initiatives require
thorough A gency discussion and review prior to approval. The heads of
Functional O ffices developing initiatives likely to have a significant
A gencyw ide im pact on p ersonnel, resources, or organizations outside
the originating Functional O ffice m ust m eet w ith the affected organiza-
tion(s) to determ ine w hether agreem ent on the initiatives im plem enta-tion can be reached. If the affected organizations reach agreem ent,
w hich m ust have the docum ented concurrence of the cognizant
Institutional Program O fficers and/or O fficials-in-C harge, im plem enta-
tion shall proceed in accordance w ith the agreem ent.
4.5.2.2 If agreem ent is not reached, the Functional O ffice shall prepare a
statem ent of need, along w ith an estim ate of the costs and a projection
of the benefits of the initiative, and subm it this statem ent to the C IC for
review . The A dm inistrative Issues B oard serves as staff to the C IC forthese review s and m ay, for significant initiatives, request a m ore
detailed im plem entation plan, including, as appropriate, the scope,
resource requirem ents (hum an, financial, and physical), a schedule, the
im pact on the C enters and Enterprises, the potential im pact on other
proposed or ongoing activities, and the expected return on investm ent.
The A dm inistrative Issues B oard m ay also ask those Enterprises or
C enters that do not agree to the initiatives im plem entation for their
analyses of the im pacts on resources, operations, or other Enterprise-
or C enter-related activities.
4.5.2.3 The C IC ensures the integration of requirem ents w ith the support of the
A dm inistrative Issues B oard. The C IC also prioritizes funding to be
included in the budget guidance during the annual budget developm ent
and review cycle. If the C IC supports the initiative, the C IC w ill recom -
m end the proposal to the A dm inistrator for approval and integration into
N A SAs bud get req uest. The C IC m ay recom m end to the A dm inistrator
that the proposing office create a Prog ram C om m itm ent A greem ent,
w hich w ill define the Program M anagem ent C ouncils review require-m ents. Program C om m itm ent A greem ents w ill be signed by the propos-
ing office A ssociate A dm inistrator or O fficial-in-C harge and the
A dm inistrator after form ulation and prior to im plem entation. If the C IC
does not support the initiative, the proposing A ssociate A dm inistrator or
O fficial-in-C harge m ay appeal directly to the A dm inistrator.
IM
PLEMEN
TATIONP
LANNING
33
-
8/11/2019 NASA Strategic Project Management Handbook
35/49
4.5.2.4 R equired initiatives originating from external requirem ents or from the
A dm inistrators direction shall be review ed by the C IC , w ith support
from the A dm inistrative Issues B oard, for im pact and im plem entation
issues only.
4.5.3 Agency Perform ance Plan and Budget Subm ission
4.5.3.1 N A SAs annual Perform ance Plan integ rates the perform ance plans pro-
vided by the A gencys Strategic Enterprises. C onsistent w ith G PR A
requirem ents, this plan includes:
a. Perform ance goals
b. Level of perform ance to be achieved during the budget year
c. Specific nonp rog ram m atic actions planned w ithin the tim efram e
and fiscal scope of the proposed bud getd. Perform ance indicators to m easure or otherw ise evaluate A gency
perform ance
4.5.3.2 The annual goals, perform ance objectives, and associated inform ation
included in this plan w ill be grouped by Strategic Enterprise and
C rosscutting Process.
4.5.3.3 C rosscutting Process perform ance targets and ind icators m ust be
developed and updated, if necessary, in parallel w ith the other per-form ance planning activities of the A gency.
4.5.3.4 The O ffice of the C