    NASA

    Strategic Management

    Handbook

    The Red Book

    NPG 1000.2

    February 2000

    PerformanceEvaluation

    StrategicPlanning

    Performance andImplementation

    Planning

    H

    A

    N

    D

    B

    O

    O

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    2/49

    TABLE

    OF

    CONTENTS

    1

    TABLE OF CONTENTS

    PREFACE

    P.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

    P.2 A pplicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

    P.3 A uthority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

    P.4 R eferences . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

    P.5 C ancellation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

    CHAPTER 1STRATEGIC MANAGEMENT SYSTEM

    1.1 O verview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

    1.2 Strategic Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

    1.3 Im plem entation: Perform ance and B udget Planning . . . . . . . . . . . . 6

    1.4 Perform ance Evaluation and R eporting . . . . . . . . . . . . . . . . . . . . . . 7

    CHAPTER 2ROLES AND RESPONSIBILITIES

    2.1 O rganizational O verview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92.2 A gency M anagem ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    2.3 Enterprise M anagem ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

    2.4 Functional M anagem ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

    2.5 C rosscutting Process M anagem ent. . . . . . . . . . . . . . . . . . . . . . . . 22

    2.6 M anage Strategically. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

    2.7 Provide A erospace Products and C apabilities. . . . . . . . . . . . . . . . 23

    2.8 G enerate K now ledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

    2.9 C om m unicate K now ledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242.10 N A SA and Its Em ployees: M utual R esponsibilities. . . . . . . . . . . . . 24

    2.11 O ffice of Inspector G eneral. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

    CHAPTER 3STRATEGIC PLANNING

    3.1 The G overnm ent Perform ance and R esults Act of 1993. . . . . . . . . 25

    3.2 N A SA Strategic Planning R equirem ents . . . . . . . . . . . . . . . . . . . . 25

    3.3 N A SAs Strategic Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263.4 Enterprise Strategic Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

    3.5 C apital Investm ent Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

    3.6 Functional O ffice Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

  • 8/11/2019 NASA Strategic Project Management Handbook

    3/49

    CHAPTER 4IMPLEMENTATION PLANNING

    4.1 Perform ance and B udget Planning Process . . . . . . . . . . . . . . . . . 29

    4.2 Five-Year B udget Planning O verview . . . . . . . . . . . . . . . . . . . . . . . 29

    4.3 Perform ance Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

    4.4 D eveloping and Issuing G uidance . . . . . . . . . . . . . . . . . . . . . . . . 31

    4.5 Perform ance and B udget D ecisionm aking Process . . . . . . . . . . . . 32

    4.6 M anag em ent and Em ployee Perform ance Planning . . . . . . . . . . . 35

    4.7 Im plem entation in the O perating Year . . . . . . . . . . . . . . . . . . . . . . 36

    CHAPTER 5PERFORMANCE EVALUATION

    5.1 Perform ance Evaluation Process . . . . . . . . . . . . . . . . . . . . . . . . . . 37

    5.2 A gency A nnual G PR A Perform ance Report and O ther External

    R eporting R equirem ents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

    5.3 External R eview s. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

    5.4 Independent Validation of Perform ance M easures. . . . . . . . . . . . . 38

    5.5 Education, Training, and R ew ards in Strategic M anagem ent. . . . . 39

    APPENDICES

    A D esignated C enter M ission Areas and C enters of Excellence . . . . 41

    B Principal C enter D esignations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

    C Lead C enter Program A ssignm ents. . . . . . . . . . . . . . . . . . . . . . . . 45

    D N A SA Policy D irectives (N PD ) and N A SA Procedures and

    G uidelines (N PG ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

    E N ational A eronautics and Space A ct, as Am end ed . . . . . . . . . . . . 49

    F G overnm ent Perform ance and R esults Act of 1993 . . . . . . . . . . . . 51

    2S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    4/49

    P

    REFACE

    3

    PREFACE

    P.1 Purpose

    N A SAs Strateg ic M anagem ent System enables the A gency to establish

    strategy, m ake decisions, allocate resources, and m anage program s

    safely, effectively, and efficientlyin w ays that are consistent w ith

    N A SAs strategic plans and perform ance plans. The purpose of this

    directive is to docum ent that system . This directive includes:

    a. Strateg ic planning

    b. Im plem entation

    c. Perform ance evaluation

    This directive also describes the strategic m anagem ent roles and rela-

    tionships of N A SAs various organizational elem ents, from the

    A dm inistrator to all N A SA em ployees. N A SAs S trategic Enterprises,

    A gencyw ide Functional O ffices, and C rosscutting Processes are the

    fram ew ork for N A SAs Strategic M anagem ent System .

    P.2 Applicability

    P.2.1 This N PG applies to N A SA H eadquarters and the N A SA C enters,

    including C om ponent Facilities, and to the Jet Propulsion Laboratory as

    provided in the contract.

    P.2.2 D escriptions of policies, authorities, roles, and responsibilities for strate-

    gic m anagem ent in this N PG supplem ent N PG 1000.3, The N A SA

    O rganization.

    P.2.3 D escriptions of A gency-level policies, processes, proced ures, and

    guidelines specific to organizational activities and m ore detailed ele-

    m ents of strategic m anagem ent are docum ented in the N A SA directives

    system , C enter-specific docum entation, and the ISO 9000 docum enta-

    tion for N A SA H eadquarters and C enters. A description of the directives

    system can be found in N PD 1400.1, N ASA D irectives System ,and

    N PG 1400.2, N ASA D irectives System Procedures and G uidelines.

    P.3 Authority

    42 U .S.C . 2473(c)(1), Section 203(c)(1), of the N ational A eronautics and

    Space A ct of 1958, as am ended

  • 8/11/2019 NASA Strategic Project Management Handbook

    5/49

    P.4 References

    a. 31 U .S.C . 11011119, 97039704, the G overnm ent Perform ance

    and R esults A ct of 1993, as am ended

    b. 31 U .S.C . 501506, 901903, 3511, et seq., the C hief Financial

    O fficers A ct of 1990, as am end ed

    c. 40 U .S.C . 1401, et seq ., the C linger-C ohen A ct of 1996 (Section

    808 of Public Law (P.L.) 104-208, renam ing, in pertinent part, the

    Inform ation Technology M anagem ent R eform A ct (D ivision E of P.L.

    104-106))

    d. N PD 1000.1, N A SA Strategic Plan

    e. N PD 1080.1, N A SA G enerate K now ledg e (G K ) Process for

    Prog ram s and Projects

    f. N PG 1080.x, G uidelines for the G enerate K now ledge Process forProg ram s and Projects

    g. N PD 1090.x, N A SA C om m unicate K now ledg e Process for

    Prog ram s and Projects

    h. N PG 1090.x, C om m unicating N A SAs Know ledge from Program s

    and Projects

    i. N PG 1000.3, The N A SA O rganization

    j. N PD 1400.1, N A SA D irectives System

    k. N PG 1400.1, N A SA D irectives System Procedures and G uidelines

    l. N PD 8700.1, N A SA Policy for Safety and M ission S uccessm . N PD 7120.4, Program /Project M anagem ent

    n. N PG 7120.5A , N A SA Program and Project M anagem ent Processes

    and R equirem ents

    o. N PD 8730.3, N A SA Q uality M anagem ent System Policy (ISO 9000)

    p. N PD 9800.1, N A SA O ffice of Inspector G eneral Program s

    P.5 Cancellation

    N A SA Strategic M anagem ent H andbook (O ctober 1996)

    [Signed 1-19-00]

    D aniel S. G oldin

    A dm inistrator

    D ISTR IB U TIO N : N O D IS

    4S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    6/49

    CHAPTER 1

    STRATEGIC MANAGEMENT SYSTEM

    1.1 Overview

    1.1.1 N A SA consists of N A SA H eadquarters, nine C enters, the Jet Propulsion

    Laboratory (operated under contract to N A SA by the C alifornia Institute

    of Technology), and several ancillary installations and offices in the

    U nited States and abroad. A s a result of the A gencys d ecentralized

    operations, N A SAs organization has evolved into a tw o-tiered structure

    of A gencyw ide m anagem ent: (a) A gency m anagem ent, including the

    A dm inistrator, officials w ithin the O ffice of the A dm inistrator, andFunctional O ffices; and (b) Enterprise m anagem ent, including

    Enterprise A ssociate A dm inistrators and C enter D irectors. The im ple-

    m entation of N A SA program s and aeronautical and space/Earth sci-

    ence and technology research occurs prim arily at the C enters.

    1.1.2 The success of N A SAs m issions relies in p art on the A gencys four

    C rosscutting Processes.These processes are the w ay w e perform our

    m ission. A ll activity w ithin N A SA is contained w ithin one or m ore of these

    four processes: provide aerospace products and capabilities, generateknow led ge, com m unicate know led ge, and m anag e strateg ically.

    Policies and procedural guidelines g overning these C rosscutting

    Processes w ill be found in their respective N PDs and N PG s.

    1.1.3 N A SAs strateg ic m anagem ent system is a set of ongoing and inter-

    linked activities that includes strategic planning, im plem entation and

    perform ance planning , and perform ance evaluation. A s show n in

    Figures 11 and 12, these activities enable the A gency to m ake deci-

    sions about its long-term goals, near-term activities, and institutionalcapabilities that are consistent w ith achieving the m ission and objec-

    tives to w hich it com m its itself in its Strategic Plan.

    1.2 Strategic Planning

    Strategic Planning establishes the direction for all A gency efforts and

    form s the basis for strategic and tactical decisionm aking, resource allo-

    cation, and capital investm ent. It does so in the context of the A gencys

    vision, m ission, goals, objectives, values, and policies, as w ell as exter-nal and internal environm ents. The Strategic Planning process requires

    alignm ent am ong N A SAs S trategic Plan, the Enterprise Strategic Plans,

    program s, and institutional capabilities (see Figure 12).

    S

    TRATEGIC

    MANAG

    EMENTS

    YSTEM

    5

  • 8/11/2019 NASA Strategic Project Management Handbook

    7/49

    1.3 Implementation: Performance and Budget Planning

    The im plem entation planning process p rod uces annual budget form u-

    lation guidance and perform ance p lans to achieve the g oals and objec-

    tives identified during the Strategic Planning process. It is a cyclical

    process that is ongoing throughout the developm ent of N A SAs

    Strategic Plan and Enterprise Strategic Plans, capital investm ent plans,

    and A gency budgets and form s the basis for perform ance evaluation.

    1.4 Performance Evaluation and Reporting

    N A SAs progress in achieving the objectives of its Strategic Plan is rou-

    tinely evaluated by both internal and external organizations. The

    G overnm ent Perform ance and R esults A ct (G PR A ) of 1993) req uires

    Federal agencies to subm it annual perform ance plans follow ing the

    6S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

    StrategicPlanning

    PerformanceEvaluation

    Performanceand

    ImplementationPlanning

    Figure 11. Strategic M anagem ent System

  • 8/11/2019 NASA Strategic Project Management Handbook

    8/49

    transm ittal to C ongress of the Presidents budget. N A SAs perform ance

    report w ill reflect the perform ance goals against w hich the A gency

    expects its effectiveness to be m easured in any given fiscal year.

    1.4.1 B ecause investm ents in research and developm ent can yield results

    5, 10, and 20 years in the future, N A SAs annual perform ance m easures

    m ust incorporate m easures of both output and outcom e, addressing a

    longer term view than fiscal year by fiscal year. N A SA w ill continue to

    rely on its internal m anagem ent councils, its advisory com m ittees, and

    the N ational R esearch C ouncil for assistance in evaluating its perform -

    ance over extended periods of tim e.

    S

    TRATEGIC

    MANAG

    EMENTS

    YSTEM

    7

    Agency

    Performance

    Plan/BudgetIntegration &Submittal

    Admin. &

    CongressApproval/Appropriation

    5-Year Budget(IncludingLong-Term

    CapitalInvestments)

    Agency

    StrategicPlan

    FunctionalLeadership

    Initiatives/Plans

    AgencyPerformance

    Planning &Budget (ProgramOperating Plan)

    Guidance

    Agency

    PerformancePlan

    FunctionalOffice

    PerformanceEvaluation

    Agency

    Perform.Evaluation& Reports

    Enterprise

    PerformancePlanning &

    BudgetIntegration

    EnterpriseStrategic

    PlanPerformance

    Plans

    EnterpriseAA

    PerformancePlans

    EnterprisePerformance &Budget (POP)

    Guidance

    ImplementationPlans (Updates)

    PerformancePlans

    (IncludingIndividuals)

    Center Implementation Plans(Including Centers of Excellence,

    Program Lead and SupportResponsibilities, and Institutional

    Investments)

    Program/Project

    ProgramOperating Plan

    Revisions

    Program/

    ProjectManager

    PerformancePlan

    ProposedProgram/Project Plan

    (Updates & New)

    StrategicPlanning

    Implementation andPerformance Planning PerformanceEvaluation

    EnterpriseAA

    Perform.Evaluation

    Perform.Evaluation(Including

    Individuals)

    Program/

    ProjectPerform.Evaluation& Reports

    Note:This cycle is implemented on a regular basis, with the results and evaluation of prior-year performanceserving as a starting point for strategy development activities.

    Centers

    Functional/Staff AA

    PerformancePlan

    Employees

    Individual Performance Plans and Evaluations

    Figure 12. Strategic M anagem ent Elem ents

  • 8/11/2019 NASA Strategic Project Management Handbook

    9/49

    1.4.2 The perform ance evaluation process allow s N ASA to identify potential

    opportunities for im provem ent in program execution and process m an-

    agem ent and to ensure safety and health, efficiency, and effectiveness.

    Perform ance evaluation can also yield inform ation that m ay indicate a

    need to change the Agencys long-term strategies or near-term objectives.N ASA w ill report publicly on the results of its perform ance evaluations to

    the Adm inistration and C ongress in an annual perform ance report.

    8S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    10/49

    CHAPTER 2

    ROLES AND RESPONSIBILITIES

    2.1 Organizational Overview

    N A SAs organizational structure encom passes corporate, A gencyw ide

    m anag em ent and the m anagem ent of N A SAs Strategic Enterprises.

    Strateg ic Enterprise m anag em ent includ es the m anag em ent of N A SAs

    C enters as w ell as program s and projects. A num ber of m anagem ent

    councils and boards coordinate A gency planning. N A SAs organiza-

    tional structure is displayed in Figure 21 and is described in greater

    detail in N PG 1000.3.

    2.2 Agency Management

    A gency m anagem ent is resp onsible for A gency leadership, the devel-

    opm ent of N A SAs strategy, and the integrated m anagem ent of the

    Strategic Enterprises. It is the external focal point for N A SA com m uni-

    cation and accountability, serving as the principal interface w ith the

    A dm inistration, C ongress, and oversight agencies. A gency m anage-

    m ent integrates the N A SA budget, determ ines long-term institutional

    investm ent strategy, sets N A SA policy and standards, and ensures

    A gency functional m anagem ent. A gency m anagem ent defines the

    Strategic Enterprises and is responsible for review ing requirem ents,

    allocating resources, assessing perform ance, and setting investm ent

    R

    OLES

    AND

    RESPONSIBILITIES

    9

    Functional Offices

    Office of theAdministrator

    Enterprise and InstitutionalProgram Office (IPO)

    Management

    Goddard Space Flight Center

    Earth ScienceEnterprise and IPO

    Jet Propulsion Laboratory*

    Space ScienceEnterprise and IPO

    Human Exploration &Development of Space

    Enterprise and IPO

    Johnson Space CenterKennedy Space CenterMarshall Space Flight CenterStennis Space Center

    Ames Research CenterDryden Flight Research CenterGlenn Research CenterLangley Research Center

    Aero-SpaceTechnology

    Enterprise and IPO

    Agency Councilsand Boards

    * Wherever Jet Propulsion Laboratory or JPL appears in this document, note that the Jet Propulsion Laboratory (JPL) isNASA-owned, but contractor-operated.

    Figure 21. Agency and Enterprise M anagem ent Structure

  • 8/11/2019 NASA Strategic Project Management Handbook

    11/49

    goals across the Enterprises. Executive m anagem ent authority for the

    A gency resides w ith the A dm inistrator, D eputy A dm inistrator, and

    A ssociate D eputy A dm inistrator, advised and supported by the staff offi-

    cials of the O ffice of the A dm inistrator and the senior-level councils and

    boards chartered to perform A gency-level integration (see Figure 22).

    2.2.1 N ASA Adm inistrator

    The A dm inistrator serves as N A SAs chief executive officer, accountable

    to the President for the leadership necessary to achieve the A gencys

    m ission. This leadership requires articulating the A gencys vision, set-

    ting its program m atic and budget priorities and internal policies, and

    assessing A gency p erform ance. Senior staff officials w ithin the O ffice of

    the A dm inistrator include the D eputy A dm inistrator, A ssociate D eputyA dm inistrator, C hief Engineer, C hief Inform ation O fficer, and C hief

    Scientist.

    2.2.2 Senior M anagem ent C ouncil

    N A SA 's Senior M anagem ent C ouncil is chaired by the A dm inistrator

    and consists of A ssociate A dm inistrators, O fficials-in-C harge of

    H eadquarters offices, and C enter D irectors. This council advises the

    A dm inistrator on the institutional health of the A gency and the status ofits program s and plans and serves as a forum for the discussion of

    issues affecting A gency m anagem ent. The council review s the A gency

    and Enterprise Strategic Plans, C enter Im plem entation Plans, and

    Functional Leadership Plans, and it recom m ends approval or redirec-

    tion by the A dm inistrator.

    10S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

    InformationTechnologyInvestment

    Council

    ProgramManagement

    Council

    CapitalInvestment

    Council

    Senior Management Council

    Administrator

    ChiefFinancialOfficerCouncil

    ScienceCouncil

    TechnologyLeadership

    Council

    EngineeringManagement

    Council

    SpaceOperations

    ManagementCouncil

    InformationTechnology

    SecurityCouncil

    SpaceTransportation

    Council

    MedicalPolicyBoard

    OccupationalHealth and

    SafetyBoard

    FacilitiesReviewBoard

    EEOBoard

    CIORepresentatives

    Board

    EnvironmentalManagement

    Board

    SpaceStation

    UtilizationBoard

    AgencyPerformance

    ReviewBoard

    FlightAssignment

    Board

    AdministrativeIssuesBoard

    Figure 22. Agency C ouncils and Boards

  • 8/11/2019 NASA Strategic Project Management Handbook

    12/49

    2.2.3 Program M anagem ent C ouncil (PM C )

    The P M C review s the readiness of program s in form ulation to p roceed

    to im plem entation according to criteria established through the

    approval process. The PM C w ill also review the im plem entation ofselected Enterprise program s and projects, as d efined in the Program

    C om m itm ent A greem ent, and functional initiatives referred to it by the

    C ap ital Investm ent C ouncil and requiring Prog ram C om m itm ent

    A greem ents. The review of som e program s m ay be delegated to C enter

    Program M anagem ent C ouncils. The PM Cs form al review process eval-

    uates cost, schedule, technical content, perform ance, and safety to

    ensure that N A SA m eets its program m atic com m itm ents.

    2.2.4 C apital Investm ent C ouncil (C IC )

    2.2.4.1 The C IC exam ines A gencyw ide capital investm ents and policy issues.

    This includes the balance am ong Enterprise program investm ents,

    crosscutting technology investm ents, and institutional investm ents. The

    C IC ensures an A gency perspective for all large, long-term investm ents

    that enable the A gency and the Strategic Enterprises to execute their

    program s. Investm ent areas include:

    a. Facilities

    b. Environm ental M anagem entc. Inform ation Technology

    d. Science

    e. Technology

    f. H um an Resources

    g. Safety and O ccupational H ealth

    h. O ther designated investm ents

    2.2.4.2 The C IC is the principal advisory group to the A dm inistrator in resolving

    issues, prioritizing activities (capital investm ents, Functional O ffice initia-tives, and program s), and balancing resources am ong the Strategic

    Enterprises. The C ICs advice to the A dm inistrator is a significant elem ent

    of the A gencys d etailed im plem entation planning process and during

    the budget developm ent process. The council resolves or recom m ends

    options to the A dm inistrator on issues am ong the Enterprises, Functional

    O ffices, and C enters, or com binations thereof, in term s of A gency invest-

    m ent in assets or functional capabilities. The council also review s m ajor

    Functional O ffice initiatives and review s and recom m ends budget guid-

    ance initiating each annual budget cycle. W hen these review s arerequired, the council w ill consider, am ong other criteria, the cum ulative

    effect a proposed initiative w ill have on A gency resources. The

    Adm inistrative Issues B oard provides support for this review activity.

    2.2.4.3 Significant augm entation of a C enter of Excellence facility, hum an

    resource levels and skill m ix, and proposals to change or designate

    new C enters of Excellence are all A gency investm ent decisions, on

    w hich the C IC m akes form al recom m endations to the A dm inistrator.

    R

    OLES

    AND

    RESPONSIBILITIES

    11

  • 8/11/2019 NASA Strategic Project Management Handbook

    13/49

    2.2.5 O ther C ouncils of the O ffice of the Adm inistrator

    The A dm inistrator also has chartered the follow ing councils, w hich are

    chaired by individuals from the O ffice of the A dm inistrator or the C hief

    Financial O fficer (C FO ).

    2.2.5.1 Science C ouncil

    2.2.5.1.1 The Science C ouncil, chaired by the C hief Scientist, coordinates

    N A SAs science activities, prom otes public com m unication, and

    ensures the quality of the A gencys science program . This council

    advises the A dm inistrator on all aspects of science related to N A SAs

    flight and ground program s.

    2.2.5.1.2 The Science C ouncil serves as a forum for review ing Agency policies, prac-

    tices, and issues as they relate to science activities; com m unicating and

    discussing interdisciplinary science goals and the national and internation-

    al policies that guide their developm ent; and integrating science plans. The

    council also participates in the Agencys process of developing recom -

    m endations for Agency-level science priorities and budgets. It shares

    inform ation about operational areas of the Agencys Strategic Enterprises

    as they relate to the quality and content of the science program .

    2.2.5.2 Technology Leadership C ouncil

    The Technology Leadership C ouncil, chaired by the A ssociate

    A dm inistrator for A ero-Space Technology, advises the A dm inistrator on

    all m aterial asp ects of technology related to N A SAs flight and ground

    program s. It coordinates N A SAs technology activities, including

    advanced research and develop m ent, across Enterprises and pro-

    m otes pub lic com m unication of N A SAs technology prog ram s. The

    Technology Leadership C ouncil also serves as a forum for review ingA gency p olicies, practices, and issues as they relate to technology

    activities, com m unicating and discussing technology goals and the

    national policies that guide their developm ent, and integrating technol-

    ogy plans. The council participates in the A gencys process of devel-

    oping recom m endations for technology priorities across E nterprise

    bud gets for technology and sup ports the C IC w ith recom m end ations for

    C enter of Excellence designation.

    2.2.5.3 Engineering M anagem ent C ouncil

    The Eng ineering M anag em ent C ouncil, chaired by the C hief Eng ineer,

    is a forum for assessing and im proving A gency engineering practices,

    policies, training and certification standards, procedures, and capabili-

    ties. W hen requested by the chair of the PM C or the C hief Engineer, this

    council conducts or supports independent technical review s of N A SA

    program s and technolog y/advanced develop m ent activities.

    12S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    14/49

    2.2.5.4 Space O perations C ouncil

    The Space O perations C ouncil, chaired by the C hief Engineer, serves as

    a forum for assessing and im proving A gency space operations policies,

    practices, standards, procedures, and capabilities, w hile providingA gencyw ide policy guidance for activities associated w ith N A SA opera-

    tions. This council also provides policy guidance and recom m ends issue

    resolution to the N A SA space operations m anagem ent organization that

    provides operational m ission support to all N A SA Enterprises.

    2.2.5.5 Space Transportation C ouncil

    The Space Transportation C ouncil, chaired by the C hief Engineer,

    advises the A dm inistrator and coordinates all aspects of space trans-portation investm ents related to N A SAs flight and ground technology

    program s. The council serves as a forum for establishing and review ing

    A gency and interagency policies, practices, and issues related to

    space transportation requirem ents and technology developm ent. The

    council also defines an investm ent plan necessary for space trans-

    portation technolog y developm ent and system upgrad es and partici-

    pates in the A gency process of developing recom m end ations for trans-

    portation technology priorities and advanced developm ent program s

    across the individual Enterprises.

    2.2.5.6 Inform ation Technology Investm ent C ouncil

    The Inform ation Technology Investm ent C ouncil, chaired by the C hief

    Inform ation O fficer, is responsible for establishing A gency-level inform a-

    tion technology policies, plans, and standards. This council approves

    N A SAs inform ation technology plans and conducts review s of proposed

    m ajor inform ation technology investm ents required to accom plish these

    plans. The council also serves as the supporting panel for inform ationtechnology and provides recom m endations on proposed inform ation

    technology investm ents to the C IC . W ith the support of this council, the

    C hief Inform ation O fficer provides leadership and advice to the

    A dm inistrator and other senior officials for inform ation technology plans,

    policies, and standards, as w ell as for assessing returns on inform ation

    technology investm ents in term s of m ission outcom es or support.

    2.2.5.7 Inform ation Technology Security (ITS) C ouncil

    The ITS C ouncil, co-chaired by the C hief Inform ation O fficer and the

    C hief Infrastructure A ssurance O fficer (currently the A ssociate

    A dm inistrator for M anagem ent System s), is responsible for the coordi-

    nation of A gency unclassified and classified ITS efforts. W ith the sup-

    port of this council, the C hief Inform ation O fficer and the A ssociate

    A dm inistrator for M anagem ent System s provide sup port and ad vice to

    the A dm inistrator and other senior officials for ITS.

    R

    OLES

    AND

    RESPONSIBILITIES

    13

  • 8/11/2019 NASA Strategic Project Management Handbook

    15/49

    2.2.5.8 C hief Financial O fficer C ouncil

    The C hief Financial O fficer C ouncil, chaired by the C FO , is responsible for

    im proving financial and resource m anagem ent, strengthening com m uni-

    cations, im proving coordination, and prom oting professional developm ent.The council advises and coordinates the activities of the Agency on such

    m atters as the developm ent and im plem entation of financial and budget

    system s, the im provem ent of the quality of financial and resources infor-

    m ation, financial data and inform ation standards, m anagem ent controls,

    professional developm ent standards, and any other m atters that w ill facil-

    itate financial and resources m anagem ent excellence.

    2.2.6 Internal Senior M anagem ent Boards

    To coordinate and support A gencyw ide m anagem ent in certain key

    areas, N A SA has estab lished internal Senior M anag em ent B oards,

    w hich are chaired by one of N A SAs A ssociate A dm inistrators or, in

    selected cases, by a designated senior A gency official. These boards

    include, but are not lim ited to:

    a. A dm inistrative Issues B oard

    b. A gency Perform ance R eview B oard

    c. C hief Inform ation O fficer R epresentatives B oard

    d. Environm ental M anagem ent B oarde. Equal Em ploym ent O pportunity B oard

    f. Facilities R eview B oard

    g. Flight A ssignm ent B oard

    h. Integrated Financial M anagem ent B oard

    i. M edical Policy B oard

    j. O ccupational H ealth and Safety Executive B oard

    k. Space S tation U tilization B oard

    2.3 Enterprise Management

    N A SA has established the four Strategic Enterprises to function in pri-

    m ary business areas for im plem enting N A SAs m ission and serving cus-

    tom ers. Each Enterprise has a unique set of strategic goals, objectives,

    and im plem enting strategies that address the requirem ents of the

    A gencys prim ary custom ers.

    2.3.1 Enterprise Associate Adm inistrators/Institutional Program O fficers

    2.3.1.1 The Enterprise A ssociate A dm inistrators are accountable for delivering

    program results to the N A SA A dm inistrator. A s such, they serve as the

    stew ards, advocates, and chief executives of their resp ective

    Enterprises, setting Enterprise priorities and strategies for achieving

    them . In addition, the Strategic Enterprises provide program definition

    (requirem ents, opportunities for cross-program efficiency, and synergy).

    They are responsible for the safety and hum an health of their

    14S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    16/49

    Enterprises activities, integrated Enterprise budget developm ent, pro-

    gram resource allocation, perform ance assessm ent, policies and stan-

    dards, and the im plem entation of N A SA policies.

    2.3.1.2 The Enterprise A ssociate A dm inistrator is the senior official in theEnterprise w ith principal resp onsibility for developing long-term strate-

    gy and ensuring that the necessary capabilities are in place to m eet

    both the near-term program objectives and the longer term goals.

    2.3.1.3 A s the E nterprise leader, the A ssociate A dm inistrator determ ines w hat

    the Enterprise does and w hy, w ith a specific focus on the requirem ents

    of external custom ers. In this context, the Enterprise A ssociate

    A dm inistrators are resp onsible for:

    a. D eveloping Enterprise strategy, policy, and standards that fulfill theA gencys g oals and objectives

    b. Form ulating program req uirem ents and ob jectives

    c. Providing ad vocacy for the Enterprise

    d. Providing external/custom er interfaces

    e. A llocating resources for the full cost of each program , including

    personnel and facilities, w ithin the context of A gency strategic

    determ inations

    f. A ssessing program perform ance

    g. Selecting projectsh. Serving as the N A SA internal custom er

    i. M aking Lead C enter assignm ents for the Adm inistrators approval

    j. O verseeing Enterprise education and pub lic outreach

    k. C oordinating interactions betw een the O ffice of M anag em ent and

    B udget and N A SAs O ffice of the C hief Financial O fficer

    l. C oordinating interactions b etw een C ongress and N A SAs O ffice of

    Legislative A ffairs

    m . C oordinating all international partnership arrangem ents w ith the

    O ffice of External R elations

    2.3.1.4 The A ssociate A dm inistrators for Space S cience, Earth S cience, and

    Life and M icrogravity Sciences and A pplications have oversight of

    N A SAs scientific research program s. These A ssociate A dm inistrators

    resp onsibilities in science research include strategic planning, im ple-

    m entation and perform ance p lanning, the selection of m issions and

    investigations, and the ongoing evaluation of research activities. The

    A ssociate A dm inistrator for Life and M icrogravity Sciences and

    A pplications is also resp onsible for all A gency health activities.Enterprise A ssociate A dm inistrators are responsible for m anaging pro-

    gram initiation, form ulation and integration, science m anagem ent, and

    prog ram oversight and perform ance assessm ent. The C enters are

    responsible for program im plem entation on behalf of their respective

    Enterprise A ssociate A dm inistrator (see Figure 23).

    R

    OLES

    AND

    RESPONSIBILITIES

    15

  • 8/11/2019 NASA Strategic Project Management Handbook

    17/49

    2.3.1.5 W hen a Strategic E nterprise consists of m ultiple H eadquarters organi-

    zations, a Lead A ssociate A dm inistrator is appointed w ho is responsi-

    ble for setting policy and requirem ents g uidance for that Enterprise. The

    A ssociate A dm inistrator for Space Flight is the Lead A ssociate

    A dm inistrator for the H um an Exploration and D evelop m ent of Space(H ED S) Enterprise and is responsible for an integrated hum an explo-

    ration and developm ent of space strategy. The A ssociate A dm inistrator

    for Life and M icrogravity Sciences and A pplications reports to the

    N A SA A dm inistrator and is a key m em ber of the H ED S Enterprise. In

    this instance, the A ssociate A dm inistrator is not an Enterprise A ssociate

    A dm inistrator, but has the full responsibilities of an Enterprise A ssociate

    A dm inistrator for program m atic activities in the areas of life sciences,

    agency health activities, m icrogravity sciences, and associated space

    product and com m ercial developm ent.

    2.3.1.6 To ensure alignm ent betw een program s and institutional capabilities, the

    A dm inistrator w ill norm ally designate the Enterprise A ssociate

    A dm inistrator for the predom inant activity at each C enter that C enters

    Institutional Program O fficer. A s an Institutional Program O fficer, the

    A ssociate A dm inistrator is responsible for ensuring that the C enter has

    the capability to m eet its program m atic and functional com m itm ents, as

    w ell as long-term m ission responsibilities, in a safe and effective m anner.

    The Institutional Program O fficer/A ssociate A dm inistrator is also respon-sible for im plem entation, conform ance, and the assurance of safe and

    efficient functional operations. Enterprise A ssociate A dm inistrators serv-

    ing as Institutional Program O fficers m ust have a broader perspective

    than their individual Strategic Enterprises. In this m anagem ent capacity,

    the Institutional Program O fficer w orks w ith the C enters, other Enterprise

    A ssociate A dm inistrators, and Functional O ffices to:

    16S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

    Strategy

    ChiefScientist

    Implementation Evaluation

    Consult on Science EnterprisesPlanning, Programs, and Budgets Assess Effectiveness of Policiesand Integrated Science Results

    EnterpriseAssociateAdministrator

    Assess Compliance andPerformance Against Strategic Plan

    Integrate Research Results Program Assessment

    CenterScientist

    Contribute to Science PlanDevelopment

    Develop Project Science Plans with theScience Community

    Support External Investigations Project Scientist Management Conduct Successfully Proposed

    Research

    Lead Center*/ProgramManager

    Support Program Definition Assess Technology Readiness Develop Mission Alternatives Manage Program Planning Establish Project Structure Manage Execution

    * When required for enabling technology programs and flight and ground system development programs

    Note: Bold type reflects primary management responsibilities.

    Science Policy Development

    Develop Enterprise Strategy Develop Science Plan Establish Program

    Requirements External Advocacy External Coordination

    Advisory Committee Interface Cross-Enterprise/Agency

    Coordination Allocate Research/Program Budgets Establish Science Priorities Develop Research Campaigns Select Research/Mission Proposals Oversee International Partnering

    Support Program Evaluation

    Support Program Evaluation

    Roles andResponsibilities

    Figure 23. Science M anagem ent Roles and Responsibilities

  • 8/11/2019 NASA Strategic Project Management Handbook

    18/49

    a. Provide safe and healthful w orkplaces and environm entally sound

    w ork processes

    b. Plan long-term institutional strategies

    c. D eterm ine institutional and infrastructure investm ent requirem ents

    d. Pursue integration and synergies, crosscutting strategies, andinvestm ents across m ultiple C enters

    e. A pprove institutional budgets proposed by the C enter

    f. D evelop a long-term institutional investm ent strategy

    g. D eterm ine m ajor adjustm ents to and trad eoffs am ong the prog ram s

    and institutions w ithin overall budget availability

    h. A ssess the perform ance of the C enter in m eeting its m ission and

    C enter of Excellence resp onsibilities

    i. R eview Functional O ffice initiatives, as a m em ber of the

    A dm inistrative Issues B oard.

    2.3.1.7 Each Institutional Program O fficer also ensures a broad perspective by

    providing the opportunity for all the Enterprises that have w ork at the

    C enter to participate in institutional decision processes. These process-

    es encom pass policy decisions, allocation of com m on resources,

    approval of the C enters institutional operations budgets, and recom -

    m endations on proposed capital investm ents, including determ ining

    fund sources.

    2.3.2 C enters and C enter D irectors

    N A SAs C enters are responsible for the safety and occupational health

    of their w orkforce and for the safe im plem entation of the A gency plans,

    program s, and activities of the Strategic Enterprises. C enters of

    Excellence and C enter m issions are tw o key concepts in the m anag e-

    m ent of N A SA . N A SAs C enter D irectors are responsible for program

    m anagem ent and execution. They determ ine how Enterprise program s

    and central services w ill be im plem ented. C enter D irectors m anage theinstitution (including capability d evelopm ent and m aintenance), m an-

    age m ulti-Enterprise resources, im plem ent functional leadership and

    central service activities, and im plem ent N A SA , Strategic Enterprise,

    and A gency-level functional policies. In collaboration w ith A gency-level

    Functional O ffices, the C enter D irectors w ill establish oversight and

    evaluations of C enter functions through self-assessm ents, ISO 9000

    audits, perform ance m etrics, or other requirem ents identified. The

    C enter D irectors serve as both m em bers of the Senior M anag em ent

    C ouncil and as heads of their resp ective C enters. In this latter role, theyhave prim ary m anagem ent responsibility in three areas: program m an-

    agem ent (determ ining how program s are accom plished), institutional

    infrastructure (m aintaining and enhancing both hum an and physical

    resources), and the assurance of the A gencys capabilities in assigned

    C enters of Excellence.

    R

    OLES

    AND

    RESPONSIBILITIES

    17

  • 8/11/2019 NASA Strategic Project Management Handbook

    19/49

    2.3.2.1 C enter M issions

    C enter m issions identify the prim ary area of concentration of each

    C enters capabilities. A C enter m ission is a long-term resp onsibility. The

    C enter D irectors are responsible for building and m aintaining hum anand physical resources to support their C entersm issions. Enterprise

    program and project assignm ents are b ased on m ission designations.

    The A dm inistrator assigns the C enter m issions. In im plem enting its m is-

    sion, the C enter m ay capitalize on capabilities residing at supporting

    C enters or outside of N A SA , as necessary, to provide the cost-effective

    im plem entation of its m ission. D esignated C enter M ission A reas and

    C enters of Excellence are listed in A ppendix A .

    2.3.2.2 Lead C enter D irectors for Program s

    2.3.2.2.1 Each N A SA program involving m ore than one C enter is assigned to a

    Lead C enter for im plem entation. N A SA program Lead C enter assign-

    m ents are selected by the Enterprise A ssociate A dm inistrator and

    approved by the A dm inistrator. In m aking such assignm ents, the

    Enterprise A ssociate A dm inistrators w ill consider C enter m ission and

    C enter of Excellence responsibilities. (Lead C enter designations for

    N A SAs current program s are listed in A ppendix C .) Lead C enter

    D irectors have full program m anagem ent responsibility and authority.They are fully accountable for ensuring that assigned program s are

    m anaged to ag reed-on sched ule m ilestones, bud get guidelines, tech-

    nical requirem ents, and all safety and reliability standards.

    2.3.2.2.2 The Enterprise A ssociate A dm inistrators m ust configure each program

    so that it can be efficiently and effectively accom plished w ithin the

    fram ew ork of Lead C enter assignm ents and funding allocations. The

    level and num ber of Enterprise A ssociate A dm inistratorcontrolled

    requirem ents m ust be consistent w ith safety, m ission success, custom erexpectations, and statutory and regulatory requirem ents. The Lead

    C enter D irectors, in turn, establish supporting assignm ents for other

    C enters (Supporting C enters), considering C enter m ission and C enter of

    Excellence responsibilities. The C enter D irectors delegate m anagem ent

    responsibility to the Program M anagers w ho report to them .

    2.3.2.3 C enters of Excellence

    2.3.2.3.1 C enter of Excellence designation represents exceptional A gency capa-bilities in certain areas of science, engineering, or technology. These

    capabilities include personnel, facilities, and tools and m ay reside at

    m ore than one N A SA C enter. The exceptional capabilities a C enter of

    Excellence represents are expected to serve the needs of the

    Enterprises as w ell as N A SAs strategic objectives, and they are the

    responsibility of the C enter D irector.

    18S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    20/49

  • 8/11/2019 NASA Strategic Project Management Handbook

    21/49

    flight and ground system s developm ent and operations m anagem ent

    resp onsibilities are delegated to the C enters. N A SAs C enter scientists

    provide enab ling support to the broader space research com m unity byserving as project scientists and operating unique C enter facilities. In

    addition, C enter scientists m ay com pete w ith external researchers for

    funding to conduct original research of their ow n (including instrum ent

    developm ent) that also m aintains their scientific currency. A gency p oli-

    cies and guidelines for science prog ram m anag em ent are provided in

    N PD 1080 and N PG 1080, currently under developm ent.

    2.4 Functional Management

    2.4.1 The H eadquarters Functional O ffice A ssociate A dm inistrators and

    O fficials-in-C harge are the A dm inistrators principal advisors for their

    areas of resp onsibility. They establish plans to im prove functional per-

    form ance across the A gency, dissem inate internal A gency policies,

    and, in collaboration w ith the Enterprise A ssociate A dm inistrators and

    C enter D irectors, m aintain sufficient insight into Enterprise and

    Institutional Program O ffice activities to ensure that they are conducted

    in accordance w ith all statutory, regulatory, and fiduciary resp onsibili-

    ties. In addition, these officials advise the A dm inistrator and senior m an-agers of potential efficiencies and required com pliance to be gained by

    im plem enting proposed functional initiatives.

    2.4.2 H eadquarters Functional O ffices include the O ffices of the C hief

    Financial O fficer, C hief Engineer, C hief Inform ation O fficer, and C hief

    Scientist, as w ell as H eadquarters O perations, Equal O pportunity

    Prog ram s, H um an R esources and Education, G eneral C ounsel,

    20S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

    Strategy

    EnterpriseAssociateAdministrator

    Implementation Planning Implementation and Evaluation

    Coordinate Cross-Enterprise Activities Integrate Enterprise Programs Select Projects and Lead Centers Allocate Budget to Programs Approve Implementation Plans

    Assess Compliance andPerformance Against ProgramRequirements and CustomerExpectations

    Lead CenterDirector*

    Integrate Strategies withInstitutional Capabilities

    Develop Centers of ExcellenceStrategies

    Ensure Compliance to Policy/Standards

    Maintain Dual Path for Qualityand Independent Assessment

    ProgramManager

    Support HeadquartersFormulation

    Conduct Feasibility Planning

    Implement Programs Allocate Budgets to Projects Project Oversight Report Status Control Program Changes

    ProjectManager

    Develop Specific Proposals Innovate Assess Technology Readiness

    Develop Alternatives Establish Contracts and Support

    Agreements

    Note:Bold type reflects primary management responsibilities.

    * Center Directors with projects supporting programs perform functions similar to those of lead Center Directors, but at the projectlevel at their individual centers.

    Develop Enterprise Strategy Customer Interface Establish Program

    Requirements/Metrics External Advocacy Long-Term Investment Strategy Formulate Programs

    Integrate Institutional Resources withProgram Needs

    Develop Implementation Plans (TotalCenter)

    Coordinate Cross-Center Activities Select Program Manager

    Manage Program Planning Develop Program Resource Needs Establish Project Requirements and

    Performance Metrics Balance Requirements/Resources

    Implement Projects Administer Contracts Manage Supporting Tasks Report Metrics

    Roles andResponsibilities

    Figure 24. Enterprise Program M anagem ent Roles and Responsibilities

  • 8/11/2019 NASA Strategic Project Management Handbook

    22/49

    Procurem ent, External R elations, M anagem ent System s, Sm all and

    D isadvantaged B usiness U tilization, Legislative A ffairs, Public A ffairs,

    Safety and M ission A ssurance, and Policy and Plans. The A ssociate

    A dm inistrator for M anagem ent System s serves as the A gencys C hief

    Infrastructure A ssurance O fficer.

    2.4.3 Functional O ffice activities fall into any or all of three m ajor categories:

    functional leadership, staff to the A dm inistrator, and central services

    across the A gency. The O ffice of H eadquarters O perations w ill be

    responsible for m atters pertaining to the planning, execution, and eval-

    uation of the m anagem ent of the H eadquarters institution. Figure 25 is

    an overview of N A SAs Functional O ffice roles and resp onsibilities.

    2.4.3.1 A s functional leaders, Functional O ffice A ssociate A dm inistrators andO fficials-in-C harge focus on im proving processes, stim ulating efficiency

    in the perform ance of activities related to the program s, and providing

    consistency, w hen consistency serves Agency m anag em ent

    objectives, across the Strategic Enterprises. They oversee the perform -

    ance of their particular functions across all of the C enters, as w ell as pro-

    vide liaison to external organizations perform ing sim ilar functions and

    stakeholders w ho establish G overnm entw ide policy and requirem ents.

    R

    OLES

    AND

    RESPONSIBILITIES

    21

    Functional Leadership

    Intent

    Products

    Customer

    PrincipalActivities

    Mode ofOperation

    Examples

    Efficiency Effective Support to

    Agency Mission

    Central Service

    Efficiency

    Policy/Standards Budget Guidance

    Functional Leadership Plans Assessments/ReportsImprovements

    Standards and Architecture Training

    Discrete Service Enterprise Staff Support

    Enterprises/Centers Enterprises/Centers

    Coordination and Integration Establish Policies Insight and Review Internal Focal Point External Liaison Analysis and Reporting Facilitate Standards

    Development Facilitate Capital Investment

    Requirements Determinationand Consolidation

    Assessment Support

    Value-Added Policy andStandards

    Extensive Involvement ofCustomers and Stakeholders,Including Enterprises and Centers

    Customer Responsiveness Co-located (Staff Only) Negotiate Implementation Plans Negotiate Performance Plans

    Human Resources Planning Development of NASAs

    Financial Management PlanningSystem

    Environmental Management andCoordination

    Facilities Management

    PAO (Headquarters Only) Communications Network Agency Training and Education

    Staff to the Administrator

    Cross-Enterprise Balance andSynergy

    Ensure Consistent Message toExternal Customers

    Statutory Compliance andAccountability

    Recommendations Assessments and Reports

    Communiqus Functional Initiatives

    Administrator

    Coordination and Planning External Liaison Analysis and Reporting Independent Assessment Functional Initiative Sponsorship

    and Direction

    Independent Reporting toAdministrator, Coordinated withEnterprises as Appropriate

    Coordinating Public AffairsActivities and Events

    Legislative Hearing Coordination Agency Strategic and

    Performance Plan Development

    Figure 25. Functional O ffice Roles and Responsibilities

  • 8/11/2019 NASA Strategic Project Management Handbook

    23/49

    2.4.3.2 C entral services for specific functional activities are offered to gain effi-

    ciencies and to elim inate redundancy across the A gency. The decision

    to provide a function centrally (for exam ple, A gencyw ide payroll pro-

    cessing) is m ade by the A dm inistrator, on the C ICs recom m endation, on

    a case-by-case basis show ing a clear benefit to the A gency. AFunctional O ffice or Strategic Enterprise m ay provide central services.

    Such services include staff support, training, internal com m unications,

    and consolidated m ainfram e com puting operations. The C IC w ill recom -

    m end a control m echanism (such as a m em orandum of understanding)

    for the service provision. O nce established, the service provision w ill be

    evaluated annually as part of the budget process and continued on the

    basis of cost-effective support to A gency custom er requirem ents.

    2.4.3.3 Principal C enters m ay be established to lead particular functional leader-ship operations. The Functional O ffice selects the C enter that can best

    execute the function on behalf of N A SA and subm its that selection, w ith

    the concurrence of the Institutional Program O ffice A ssociate

    A dm inistrator and the A ssociate A dm inistrator for H eadquarters

    O perations, to the D eputy A dm inistrator for approval. D elegations of

    authority to conduct these responsibilities are negotiated and docum ent-

    ed w ith m em oranda of understanding, signed by the Functional O ffice

    Associate A dm inistrator or O fficial-in-C harge, the Institutional Program

    O ffice A ssociate A dm inistrator, the A ssociate A dm inistrator forH eadquarters O perations, and the C enter D irector. The m em oranda of

    understanding m ust contain provisions for direction and funding flow, as

    w ell as perform ance review. The Principal C enter D irector, in turn, m ay

    establish supporting assignm ents for other C enters (Supporting C enters)

    considering their particular functional capability. The m em oranda of

    understanding m ust stipulate that budget processes w ill follow guidance

    provided by the H eadquarters O ffice of the C hief Financial O fficer and

    O ffice of H eadquarters O perations. (Principal C enter designations for

    N A SAs current program s and processes are listed in Appendix B .)

    2.5 Crosscutting Process Management

    2.5.1 N A SA recognizes that the broad application of certain op erating princi-

    ples can enhance the returns on its w ork tow ard diverse program m atic

    and functional objectives. A s a fram ew ork for operating in accordance

    w ith these principles, N A SA has grouped the follow ing m ajor activities

    into four C rosscutting Processes:

    a. M anage Strategicallyb. Provide A erospace Products and C apab ilities

    c. G enerate K now ledge

    d. C om m unicate K now ledge

    22S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    24/49

    2.5.2 The A dm inistrator assigns stew ardship responsibilities for the

    C rosscutting Processes. These responsibilities have been assigned to:

    A ssociate A dm inistrator for Policy and PlansM anage Strategically

    C hief EngineerProvide A erospace Products and C apabilities

    C hief ScientistG enerate K now ledgeC hief ScientistC om m unicate K now ledge

    2.6 Manage Strategically

    2.6.1 N o N A SA organization can succeed for long unless N A SA succeeds.

    Interorganization coordination and collaboration are essential to defin-

    ing com m on strategic goals and operating principles, im plem entation

    planning , and achieving m ission success. To bring ab out A gencyw ide

    coordination and collaboration am ong all of its organizational units, theA gency designed the Strategic M anagem ent System that is described

    in this N A SA Procedures and G uidelines directive (N PG 1000.2).

    2.6.2 The stew ardship of N A SAs strategic m anagem ent process is the respon-

    sibility of the O ffice of Policy and Plans. The process is im plem ented by

    all N A SA organizations as indicated in this directive (N PG 1000.2).

    2.6.3 The scope of N A SAs com m itm ent to m anag ing strategically is far-

    reaching and all-inclusive. The process includes the roles and respon-sibilities of A gency and Enterprise m anagem ent as w ell as Functional

    O ffices (see N PG 1000.3).

    2.6.4 The O ffice of Policy and Plans is resp onsible for scheduling and coor-

    dinating an orderly, w ell-docum ented, and inclusive A gency process to

    update every 3 years the A gencys Strategic Plan and, as needed, its

    strategic m anagem ent guidelines (N PG 1000.2). This office also collab-

    orates w ith the O ffice of the C hief Financial O fficer to define and apply

    assessm ent tools to evaluate its perform ance.

    2.7 Provide Aerospace Products and Capabilities

    N A SA cond ucts aerospace p rog ram s to p rovide aeronautical and

    space technology to researchers, industry, and the general public.

    Provide A erospace Products and C apabilities is N A SAs process for

    delivering system s (for exam ple, aeronautics, space and ground),

    technologies, data, and operational services to N A SA custom ers.

    M anagem ent policies, procedures, and guidelines for the form ulation,approval, im plem entation, and evaluation of N A SA program s and proj-

    ects are p rovided in N PD 7120.4 and N PG 7120.5.

    R

    OLES

    AND

    RESPONSIBILITIES

    23

  • 8/11/2019 NASA Strategic Project Management Handbook

    25/49

    2.8 Generate Knowledge

    N A SA conducts and supports basic and ap plied research to extend the

    boundaries of know ledge of science, technology, and engineering, to

    capture new know ledge in useful and transferable m edia, and to share

    new know ledge w ith custom ers. This C rosscutting Process provides a

    fram ew ork for ensuring that the research is consistent w ith the A gencys

    strategic plans and that the quality of the research is m aintained to the

    highest standards. D irectives and guidelines for the G enerate

    K now ledge process w ill be in N PD 1080.x and N PG 1080.x.

    2.9 Communicate Knowledge

    The C om m unicate K now ledge process coordinates, integrates, dissem i-

    nates, and shares consistent inform ation and experiences about the con-

    tent, relevance, results, applications, and excitem ent of N A SAs m ission of

    research, developm ent, education, and exploration. This process w ill be

    described in greater detail in N PD 1090.x and N PG 1090.x.

    2.10 NASA and Its Employees: Mutual Responsibilities

    The success of N A SAs strategic plans, perform ance plans, and

    Strateg ic M anag em ent System , dep ends on the active support of all

    A gency em ployees. N A SA m anagem ent conducts the A gencys plan-

    ning activities in an inclusive, open, and w ell-docum ented m anner. A ll

    em ployees, including m anagers and executives, are responsible for

    fam iliarizing them selves w ith their resp ective A gency, Enterprise,

    Functional O ffice, and C enter plans. N A SA m akes an investm ent w ith

    each em ployee. Em ployee develop m ent is an essential form of capital

    investm ent for the A gency.

    2.11 Office of Inspector General

    N A SAs O ffice of Inspector G eneral (O IG ) is an independent organiza-

    tion w ith responsibility to detect fraud, w aste, abuse, and m ism anage-

    m ent, w hile prom oting econom y, efficiency, and effectiveness in the

    A gencys program s and operations. The O IG conducts audits, crim inal

    investigations, inspections, and assessm ents. The O IG staffs are locat-

    ed at N A SA H eadquarters, all N A SA C enters, the Jet Prop ulsion

    Laboratory, and som e ancillary offices. A dditional inform ation about

    O IG activities can be found in N PD 9800.1.

    24S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    26/49

    CHAPTER 3

    STRATEGIC PLANNING

    N A SAs purpose as an A gency of the U .S. G overnm ent is defined by its

    enabling statute, the N ational A eronautics and Space A ct of 1958, as

    am ended. This and other Federal statutes and regulations elaborate on

    the kinds of program s C ong ress and the President have directed N A SA

    to carry out, as w ell as the regulations that govern how N A SA m anages

    the national resources entrusted to it by the A m erican people. N ot long

    after it w as established, the A gency undertook the first in a series of

    long-range plans to ensure that it used those resources effectively, not

    only to m eet current expectations, but also in anticipation of future

    needs. These long-range plans evolved into the N A SA Strategic Plan.

    3.1 The Government Performance and Results Act of 1993

    In 1993, C ongress passed the G overnm ent Perform ance and R esults

    A ct (G PR A ) to im prove the confidence of the A m erican people in the

    capability of the Federal G overnm ent, by system atically holding Federal

    agencies accountable for achieving program results . . . [by] setting

    prog ram goals, m easuring prog ram perform ance against those goals,

    and reporting publicly on their progress.G PR A requires the follow ingof Federal agencies (including N A SA ):

    a. D evelop periodic A gency strategic plans, setting forth N A SAs m is-

    sion, long-term goals, and associated resource requirem ents. The

    Strategic Plan is to cover a period of not less than 5 years forw ard

    from the fiscal year in w hich it w as subm itted.U pdated Strategic

    Plans m ust be subm itted every 3 years.

    b. Prep are and subm it to the President and C ongress annual

    perform ance plans that establish perform ance goals, m easurable

    objectives, and associated resources required to achieve long-term goals.

    c. Subm it annual perform ance reports that set forth the perform ance

    indicators established in the A gency perform ance plan . . . along

    w ith the actual prog ram perform ance achieved .W hen perform -

    ance goals have not been achieved, explanations should be pro-

    vided, along w ith plans for m eeting the unattained goals, or rea-

    sons for revising perform ance goals.

    3.2 NASA Strategic Planning Requirements

    In resp onse to G PR A , the Strateg ic Plans develop ed for the A gency and

    the Strategic Enterprises w ill contain:

    a. A com prehensive m ission statem ent covering N A SAs m ajor func-

    tions and operations

    b. G eneral goals and objectives, including outcom e-related goals

    and objectives, for m ajor functions and operations

    S

    TRATEGIC

    PLANNING

    25

  • 8/11/2019 NASA Strategic Project Management Handbook

    27/49

    c. A description of how the goals and objectives are to be achieved

    d. A n identification of those key factors, external to the A gency and

    beyond its control, that could significantly affect the achievem ent of

    the general goals and objectives

    e. The prog ram evaluations used in establishing or revising generalgoals and objectives

    3.3 NASAs Strategic Plan

    N A SAs S trategic Plan articulates the A gencys vision, m ission, goals,

    and objectives, as w ell as A gencyw ide strategies for achieving them . In

    so doing, it gives direction to the w ork of all N A SA organizations and

    em ployees. Strategic planning is a continuous process. N A SAs

    Strategic Plan is fully review ed and updated at least every 3 years.Interim adjustm ents m ay be m ade as needed, in parallel w ith the annu-

    al perform ance planning process (see Figure 31).

    3.4 Enterprise Strategic Plans

    Enterprise Strategic Plans w ill elaborate on their resp ective m ission and

    goals, in alignm ent w ith N A SAs Strategic Plan, w ith detailed objectives,

    im plem enting strategies, and brief descriptions of their principal pro-

    gram s and/or processes. They m ust be signed by their respectiveEnterprise A ssociate A dm inistrators. Enterprise Strategic Plans w ill be

    review ed by the O ffice of Policy and Plans for consistency w ith N A SAs

    Strategic Plan and other Enterprise Strategic Plans. Enterprise Strategic

    Plans are review ed by the Senior M anag em ent C ouncil and ap proved

    by the A dm inistrator. To ensure that they rem ain current, Enterprise

    plans w ill be review ed and up dated as p art of any up date to the N A SA

    Strategic Plan, but in any event, not less than every 3 years.

    3.5 Capital Investment Planning

    3.5.1 N A SA has established an A gencyw ide capital investm ent planning

    process because the size, scope, tim e horizon, and technical nature of

    these investm ents are critical to long-term A gency viability. In addition,

    such investm ents m ust be balanced across N A SA organizations and

    prioritized on an A gencyw ide basis, consistent w ith external financial

    constraints and partnership opportunities. This planning process also

    sup ports N A SA com pliance w ith related Federal guidance on

    capital/asset investm ents (O ffice of M anag em ent and B ud get (O M B )C ircular A -11, Part 3).

    3.5.2 C apital investm ent planning represents a key activity in the strategic

    m anagem ent process and an im portant elem ent of N A SAs 5-year finan-

    cial planning and budget activities. N A SAs C apital Investm ent C ouncil

    (C IC ) advises the A dm inistrator during preparation of the A gencys

    Program O perating Plan (PO P) guidance at the beg inning of the

    26S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    28/49

    S

    TRATEGIC

    PLANNING

    27

    CYX

    3

    J

    A

    S

    O

    N

    D

    J

    FM

    A

    M

    J

    J

    A

    S

    O

    N

    D

    CYX2

    CYX1

    CYX

    CYX

    +1

    J

    FM

    A

    M

    J

    J

    A

    S

    O

    N

    D

    J

    FM

    A

    M

    J

    J

    A

    S

    O

    N

    D

    J

    FM

    A

    M

    J

    J

    A

    S

    O

    N

    D

    CY:

    FY:

    FY

    X

    Enterp

    risePlans

    (FullU

    pdates)

    StrategicPlanFullU

    pdate

    StrategicPlanInterim

    Adjustments(Optional)

    Budge

    t

    Perfor

    mancePlan

    Perfor

    manceReport

    Key:

    I

    P

    R

    O

    i

    O

    P

    I

    R

    OO

    MB

    iP

    reliminaryInput

    IInputDeadline

    P

    Pas

    sBackfromO

    MB

    R

    Rel

    ease

    Z

    Sub

    mittoCodeZ

    C

    POPCall

    OP

    OperatingPlan

    A

    CongressionalAppropriation

    Q

    QuarterlyReport

    =datecanshiftinagivenyear

    I

    P

    R

    O

    R

    RevisedPlan(Optional)

    C

    Final

    Q

    Q

    I

    Q

    O

    R

    O

    P

    I

    R

    A

    OP

    C

    Revisedas

    Required

    Z

    R

    Consultation/

    Concurrence

    Figure

    31.NASA

    Strategic

    Planningand

    BudgetSched

    ule

    forFY

    X

  • 8/11/2019 NASA Strategic Project Management Handbook

    29/49

    im plem entation planning process and during the annual bud get devel-

    opm ent process. The council m eets as often as the chair deem s ap pro-

    priate. Its m eetings w ill exam ine interrelated A gencyw ide issues, such

    as inform ation technology and security, critical infrastructure protection,

    hum an resources, technical capabilities, high-risk generic technolo-gies, Functional O ffice initiatives, and facilities.

    3.5.3 The C IC ensures the integration of Enterprise, C enter of Excellence,

    and other investm ent plans; it review s and recom m ends investm ents

    and provides guidance to N A SA entities for sub seq uent im plem enta-

    tion. The council also exam ines such p roposals as A gency-level dow n-

    sizing or restructuring.

    3.6 Functional Office Planning

    3.6.1 The Functional O ffices form ulate Functional Leadership Plans, w ith

    Enterprise support, to im plem ent the A gencys Strategic Plan, im prove

    A gency m anag em ent, and respond to new external direction. A

    Functional Leadership Plan establishes the overall purpose and direc-

    tion of functional activities, including goals, objectives, and perform -

    ance m etrics or indicators used to assess success. It is based on the

    Enterprise Strategic Plans, self-assessm ents, and externally m andated

    requirem ents. Each plan m ust include a general description of pro-posed and statutorily required functional initiatives deem ed necessary

    to im plem ent the A gency Strategic Plan and statutory m andates. The

    Senior M anag em ent C ouncil m ust receive a presentation of and concur

    w ith the Functional Leadership Plans, and then the A dm inistrator m ust

    approve them . The plans are up dated, review ed , and ap proved again

    as required by the A dm inistrator.

    3.6.2 Follow ing presentation to and concurrence w ith the Functional

    Lead ership Plans by the Senior M anagem ent C ouncil and approval bythe A dm inistrator, decision and guidance are to be docum ented for

    inclusion in the N A SA PO P guidance and, in the case of new policies,

    for form al coordination and dissem ination. The Functional O ffices also

    ensure that the appropriate m etrics or perform ance indicators are

    developed to evaluate function perform ance.

    28S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    30/49

    IM

    PLEMEN

    TATIONP

    LANNING

    29

    CHAPTER 4

    IMPLEMENTATION PLANNING

    4.1 Performance and Budget Planning Process

    Im plem entation planning ensures that the detailed planning, resources,

    and perform ance exp ectations are aligned to sup port the achievem ent

    of the N A SA and Enterprise Strategic Plans. Im plem entation planning is

    based on the previous cycle of N A SA and Enterprise Strategic Plans,

    capital investm ent planning, the 5-year A gency budget, and the results

    of the ongoing perform ance evaluation process. Essential elem ents of

    im plem entation planning include program planning to establish techni-

    cal, schedule, and cost, as w ell as perform ance criteria at all m anage-

    m ent levels. N A SAs budget planning process is the vehicle for inte-

    grating these im plem entation plans.

    4.2 Five-Year Budget Planning Overview

    4.2.1 N A SAs budget planning is an ongoing process that incorporates a

    detailed analysis of current requirem ents w ith outyear projections of

    fund ing need s. Each bud get cycle is initiated by guidance from O M B

    that includes planning estim ates, as w ell as policy guidance for the

    preparation of the A gencys budget request. This broad guidance uses

    the 5-year runout of the Presidents b udget request for N A SA before

    C ongress at the tim e, and it updates the total to reflect further econom -

    ic policy or prog ram decisions that m ay have been m ade.

    4.2.2 A gency guidance for allocations am ong the Strategic Enterprises, pri-

    orities for decisionm aking and tradeoffs, and any broad strategy issues

    are developed to initiate both the internal planning and budget process-

    es. The A dm inistrator issues this guidance, w ith full participation and

    advice of the C IC , through the A gency C FO . The C FO and C om ptroller

    then integrate the A dm inistrators guidance w ith m ore detailed pro-

    gram m atic and funding guidance provided by the Strategic Enterprises

    and the Functional O ffices. The m ultiyear budget estim ates, program

    assum ptions, and strategic direction establish a baseline for planning

    and budget form ulation activities and are distributed as guidelines to

    the N A SA C enters.

    4.2.3 R esponding to Program O perating Plan (PO P) guidance from the C FO ,the C enters assess their program planning and develop integrated

    resource requirem ents w ith the assistance of their resp ective

    Institutional Program O ffices. They review these requirem ents w ith the

    Lead C enters and incorporate Lead C enter decisions. The Lead

    C enters subm it integrated resource recom m endations to their

    Enterprise A ssociate A dm inistrators and Institutional Program O fficers

  • 8/11/2019 NASA Strategic Project Management Handbook

    31/49

    for integration into the A gencys annual subm ission of its 5-year budg-

    et. C oordination am ong the Strategic Enterprises and the Functional

    O ffices enables a com prehensive A gency bud get sub m ission that is

    reflected in Program C om m itm ent A greem ents, Program and Project

    Plans, and institutional planning.

    4.2.4 A s the b udget form ulation p rocess proceeds, decisions m ust be m ade

    about activities that have been form ulatedfor exam ple, w hether they

    can be afforded w ithin the guideline level and those that w ill be pro-

    posed as over-guideline activities. Each Strategic Enterprise m ust justi-

    fy the relevance of the requested program s to the N A SA and Enterprise

    Strategic Plans. N ew initiative candidates m ust be prioritized. The

    approval of such initiatives for inclusion in the A gency b udget general-

    ly is subject to their having reached an appropriate stage of m aturity inthe form ulation processes outlined in N PG 7120.5, as applicable.

    4.2.5 In their capacity as principal advisors to the A dm inistrator in their

    respective subject areas, the C hief Scientist, C hief Inform ation O fficer,

    and C hief Engineer w ill review the A gency budget proposals and eval-

    uate them for science, inform ation system s, and engineering m erit.

    4.2.6 The final bud get request transm itted to O M B reflects this decision

    process for the entire A gency. The budget process w ill be com patiblew ith N A SAs Strategic Plan. The content of the budget request describes

    the w ay in w hich the A dm inistrator plans to achieve progress tow ard

    m eeting the goals and objectives that appear in the N A SA Strategic Plan

    w ithin the m ultiyear funding allow ance available. The A dm inistrator

    approves the final 5-year budget subm ittal (see Figure 41).

    4.3 Performance Planning

    G PR A requires the sub m ission of an A gency P erform ance Plan, follow -ing the transm ittal to C ongress of the Presidents budget. This annual

    Perform ance Plan sets out m easurable goals that define w hat w ill be

    accom plished during a fiscal year. The goals should reflect a level of

    accom plishm ent com m ensurate w ith the resources requested and sub-

    sequently funded. For a fiscal year, at least tw o iterations of N A SAs

    annual Perform ance Plan are prepared: an initial plan (subm itted along

    w ith the N A SA budget request to O M B ) and a final plan that reflects

    budget, policy, and program m atic decisions and is consistent w ith the

    Presidents budget. A final plan revised to reflect congressional actionon an agencys bud get req uest is not req uired by G PR A , but m ay b e

    subm itted by N A SA , if necessary, early in the new fiscal year.

    30S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

  • 8/11/2019 NASA Strategic Project Management Handbook

    32/49

    IM

    PLEMEN

    TATIONP

    LANNING

    31

    4.4 Developing and Issuing Guidance

    The developm ent of im plem entation guidelines flow s from the approval

    of the A gency and Enterprise S trategic P lans and approved Functional

    Leadership Plans. A nnually, the N A SA A dm inistrator issues guidance to

    the Enterprise A ssociate A dm inistrators and the Functional O ffice

    A ssociate A dm inistrators and O fficials-in-C harge, consistent w ith those

    plans. The Strategic Enterprises and Functional O ffices, in turn, trans-late the A dm inistrators guidance into a set of technical, m anagerial,

    and budgetary guidelines.

    4.4.1 Agency G uidance

    4.4.1.1 The A dm inistrators guidance initiates the im plem entation planning

    cycle. This guidance is developed taking into account the results of the

    prior-year planning cycle, new guidance from O M B , and any significant

    changes in the A gencys external and/or internal environm ent. TheN A SA A dm inistrators guidance w ill also be influenced by p olicy and

    budget recom m endations to the President from the N ational Science

    and Technology C ouncil and prelim inary discussions w ith C ongress. In

    developing N A SAs PO P guidance, the A dm inistrator establishes first-

    order priorities for program content, also giving consideration to infor-

    m ation received from senior m anagem ent.

    Providesannual

    guidance forAgency

    budget andperformance

    planning

    Providescapital

    investmentand furtherstrategicguidance

    Providespreliminaryguidance

    FunctionalOffices provide

    guidance

    Preliminary programallocations and

    guidance

    Provide guidanceinputs to Enterprise

    Integrates and issuesannual budget and

    performanceguidance

    FunctionalOffices provide

    input/issues

    CFO issues integrated Agency guidance

    Program and institutionalallocations and guidance

    Integrate Centersubmits

    Forward submits toother Enterprises

    or FunctionalOffices

    Provide feedback onsubmits to supporting

    Centers

    Build POPsubmits

    Iterate inputs withLead Centers

    Prepare finalinput to

    Enterprise/IPOs

    IntegrateEnterprise/Functional

    Office inputsIdentify Issues

    Resolve internal issuesDevelop Enterprise

    Submit

    Iterate issuesDevelop recommendations

    Adjusts request to respondto CIC issues/direction

    Approve ordirect revision

    Submit toOMB

    Develop Agency budget andperformance recommendations

    Revise per Administrator decisions

    dministrator CapitalInvestment

    Council

    CFO Functional/Staff Offices

    Enterprises/IPOs SupportingCenters

    Lead Centers

    Figure 41. Im plem entation: N ASAs Perform ance and Budgeting Planning

  • 8/11/2019 NASA Strategic Project Management Handbook

    33/49

    32S

    TRATEGIC

    MANAG

    EMENTH

    ANDBOO

    K

    4.4.1.2 O n behalf of the A dm inistrator, the N A SA O ffice of the C hief Financial

    O fficer (C FO ) integrates the budget guidance from O M B , the

    A dm inistrators guidance, the specific program m atic guidance from the

    Enterprises, institutional guidance from the Institutional Program O ffices,

    and guidance from Functional O ffices into the integrated N A SA PO Pguidance. The resulting PO P guidance w ill contain directions for prepar-

    ing and subm itting budget and Perform ance Plan data, including for-

    m ats and due dates. This guidance reflects prior-year budget plans and

    capital investm ent decisions docum ented by the C IC . It also includes

    additional guidance for potential new initiatives, an investm ent profile for

    ongoing prog ram s, perform ance goals, and associated m etrics.

    4.5 Performance and Budget Decisionmaking Process

    4.5.1 Enterprise D ecisionm aking

    The Strategic Enterprises integrate program planning and resource

    planning during the budget process. The Enterprises m ake a series of

    prelim inary program decisions in response to changes in funding, new

    prog ram em phases, and ongoing perform ancedecisions that are

    reflected in the PO P guidance to the C enters. O nce the Enterprise

    offices have received their C entersbudget requirem ents in response to

    the PO P call, they w ork w ith their Lead C enters to balance anticipatedresources w ith activities identified during im plem entation planning. This

    w ill entail integration and adjustm ent of C enter im plem entation plans

    w ith Enterprise custom er requirem ents and expected resources. The

    Institutional Program O ffices are resp onsible for forw arding funding

    requirem ents and corresponding im plem entation plans from the

    C enters to the appropriate Functional O ffices. This assists the

    Functional O ffices in identifying needs for conflicts of a functional or

    institutional nature. The Functional O ffices are resp onsible for advising

    and m aking recom m endations to the Institutional Program O ffices onthe C enter budget subm issions. Functional O ffice review s m ay also be

    used to develop associated perform ance m easures or ind icators.

    Enterprise A ssociate A dm inistrators then reallocate resources am ong

    program s and revise p erform ance requirem ents as necessary to estab -

    lish perform ance baselines. This integrated package of perform ance

    objectives and resource requirem ents is subsequently provided to the

    A dm inistrator, through the O ffice of the C hief Financial O fficer.

    4.5.2 Functional O ffice Im plem entation Planning

    Functional O ffice im plem entation planning defines activities required to

    im plem ent the Functional Leadership Plans (described in Section 3.6). In

    collaboration w ith the Strategic Enterprises and C enters, the Functional

    O ffices ensure that Agency activities are conducted in accordance w ith

    all statutory and regulatory requirem ents and fiduciary responsibilities.

  • 8/11/2019 NASA Strategic Project Management Handbook

    34/49

    4.5.2.1 Functional O ffice initiatives are efforts developed or sponsored by

    Functional O ffices to m eet new requirem ents, im prove a current

    process or procedure, adapt to externally im posed m andates, or

    recognize evolving functional standards or trends. Such initiatives can

    reasonably be exp ected to have a significant A gencyw ide im pact onpersonnel, resources, or organizations outside the Functional O ffice

    developing or sponsoring the initiative. B ecause the cum ulative im pact

    of functional initiatives on the A gencys program and institutional

    resources m ay be substantial, proposed functional initiatives require

    thorough A gency discussion and review prior to approval. The heads of

    Functional O ffices developing initiatives likely to have a significant

    A gencyw ide im pact on p ersonnel, resources, or organizations outside

    the originating Functional O ffice m ust m eet w ith the affected organiza-

    tion(s) to determ ine w hether agreem ent on the initiatives im plem enta-tion can be reached. If the affected organizations reach agreem ent,

    w hich m ust have the docum ented concurrence of the cognizant

    Institutional Program O fficers and/or O fficials-in-C harge, im plem enta-

    tion shall proceed in accordance w ith the agreem ent.

    4.5.2.2 If agreem ent is not reached, the Functional O ffice shall prepare a

    statem ent of need, along w ith an estim ate of the costs and a projection

    of the benefits of the initiative, and subm it this statem ent to the C IC for

    review . The A dm inistrative Issues B oard serves as staff to the C IC forthese review s and m ay, for significant initiatives, request a m ore

    detailed im plem entation plan, including, as appropriate, the scope,

    resource requirem ents (hum an, financial, and physical), a schedule, the

    im pact on the C enters and Enterprises, the potential im pact on other

    proposed or ongoing activities, and the expected return on investm ent.

    The A dm inistrative Issues B oard m ay also ask those Enterprises or

    C enters that do not agree to the initiatives im plem entation for their

    analyses of the im pacts on resources, operations, or other Enterprise-

    or C enter-related activities.

    4.5.2.3 The C IC ensures the integration of requirem ents w ith the support of the

    A dm inistrative Issues B oard. The C IC also prioritizes funding to be

    included in the budget guidance during the annual budget developm ent

    and review cycle. If the C IC supports the initiative, the C IC w ill recom -

    m end the proposal to the A dm inistrator for approval and integration into

    N A SAs bud get req uest. The C IC m ay recom m end to the A dm inistrator

    that the proposing office create a Prog ram C om m itm ent A greem ent,

    w hich w ill define the Program M anagem ent C ouncils review require-m ents. Program C om m itm ent A greem ents w ill be signed by the propos-

    ing office A ssociate A dm inistrator or O fficial-in-C harge and the

    A dm inistrator after form ulation and prior to im plem entation. If the C IC

    does not support the initiative, the proposing A ssociate A dm inistrator or

    O fficial-in-C harge m ay appeal directly to the A dm inistrator.

    IM

    PLEMEN

    TATIONP

    LANNING

    33

  • 8/11/2019 NASA Strategic Project Management Handbook

    35/49

    4.5.2.4 R equired initiatives originating from external requirem ents or from the

    A dm inistrators direction shall be review ed by the C IC , w ith support

    from the A dm inistrative Issues B oard, for im pact and im plem entation

    issues only.

    4.5.3 Agency Perform ance Plan and Budget Subm ission

    4.5.3.1 N A SAs annual Perform ance Plan integ rates the perform ance plans pro-

    vided by the A gencys Strategic Enterprises. C onsistent w ith G PR A

    requirem ents, this plan includes:

    a. Perform ance goals

    b. Level of perform ance to be achieved during the budget year

    c. Specific nonp rog ram m atic actions planned w ithin the tim efram e

    and fiscal scope of the proposed bud getd. Perform ance indicators to m easure or otherw ise evaluate A gency

    perform ance

    4.5.3.2 The annual goals, perform ance objectives, and associated inform ation

    included in this plan w ill be grouped by Strategic Enterprise and

    C rosscutting Process.

    4.5.3.3 C rosscutting Process perform ance targets and ind icators m ust be

    developed and updated, if necessary, in parallel w ith the other per-form ance planning activities of the A gency.

    4.5.3.4 The O ffice of the C