![Page 1: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/1.jpg)
![Page 2: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/2.jpg)
COLLABORATION A D COMMUNICATION OF PROJECT TEAM IN PWD
WEB BA ED PROJECT MO ITORING SYSTEM
REDZ J\N BIN JAAFAR
A capstone project report submitted in partial fulfilment of the
requirement for the award ofthe degree of
Master of Project Management
Faculty of Civil Engineering
nivcrsiti Teknologi Malaysia
DISEMBER 2010
![Page 3: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/3.jpg)
ABSTRACT
Collaboration and communication among project teams are essential for web
based project monitoring system to generate real time reports. Up to date information
can overcome potential problems that will affect project target. Public Works
Department of Malaysia (PWD) has been using its web based system ( hich i
known as SKALA) to generate real time reporting for project monitoring. KALA
reporting system depend on the accuracy of data input by project team members.
Lagging of real time data input at any event will produce inaccurate project
reporting. This study emphasized on the collaboration technology that can facilitate
real time data capturing into KALA from collaborative working among project
team members. The research methodology comprised literature revie data
collection and analysis. Data collection was based on survey questionnaires which
were distributed randomly among PWD s project teams. Statistical method such as
Frequency Analysis, Average Index and Kruskal Wallis were used to anal e the
data collected. Finally the result of this study has identified various factor for
SKALA improvements -.: ith regard to project teams ' collaboration and
communication. This will assist PWD to implement, manage and monitor all its
projects in a timely manner in order to take prompt action .
![Page 4: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/4.jpg)
ABSTRAK
Kolaborasi dan komunikasi di antara pasukan projek adalah sangat penting
untuk sesuatu sistem pemantauan projek yang berasaskan web bagi menghasilkan
laporan secara masa sebenar. Maklumat terkini mengenai status projek akan dapat
mengatasi berlakunya poten i ang akan menjejaskan sa aran projek . Jabatan Kerja
Raya Malaysia (JKR) telah menggunakan sistem pemantauan yang berasaskan web
(yang dikenali sebagai KALA) untuk menghasilkan laporan projek secara rna a
sebenar. Sistem pelaporan SKAL sangat bergantung pada ketepatan masa
kemasukan data oleh ahli-ahli pa ukan projek JKR. Sekiranya berlaku penangguhan
kemasukan data ke dalam Sistem SKALA, ianya akan mengakibatkan penjanaan
laporan projek yang tidak tcpat. Kajian ini menekankan kepada teknologi kolaborasi
yang mana akan dapat membantu penawanan data secara masa sebenar kepada
sistcm SKALA melalui kola bora i di an tara pasukan projek JKR. Metodologi kaj ian
terdiri daripada kajian literatur, pengumpulan data dan analisis. Pengumpulan data
adalah berdasarkan borang soal selidik yang dibcrikan secara rawak di antara ahli
ahli pasukan projek JKR. Analisi data bagi kajian ini dibuat dengan menggunakan
beberapa kaedah statistik seperti nalisis Frekuensi, Kaedah Purata lndeks dan
Kruskal Wallis. Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi
penambahbaikan sistem SKALA khususnya untuk kolaborasi dan komunikasi di
antara pasukan projck JKR. Ini akan dapat membantu JKR untuk mengurus,
memantau dan melaksanakan semua projek-projeknya secara lebih tepat dan cepat.
![Page 5: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/5.jpg)
CHAPTER
2
TABLE OF CONTENTS
DECLARATlO
DEDIC TIO
ACKNOWLEDGEME T
ABSTRACT
ABSTRAK
TABL OF 0 T E T
LlST 0 TABLE
LTST OF FIG RE
LIST OF BBREY 10
LIST OF APPE DI E
TNTROD CTIO
1.1 Introduction
I .2 Background
I .3 Problem tatement
TITLE
1.4 The Aim and Objectives of the Stud
1.5 cope of the stud
1.6 Research Methodology
1. 7 Summary of Chapter
PROJE T COMM ICATIO D COLL BOR TIO
Introduction 2.1
2.2 Project Team Members ' Collaboration and
Communication
PAGE
II
iii
II
xi
xii
2
4
5
6
6
8
9
9
10
![Page 6: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/6.jpg)
3
4
VIII
2.2.1 Effe ti e Communication for Project Team 13
Members
2.2.2 Communication Methods
2.3 Collaboration Technology
2.3 .I Adoption of Collaboration Techno log
2.3.2 Collaboration tools
2.4 ummary of Chapter
PROJECT COLLABORATION AND COMMU ICATIO
IN EXISTI G SKAL SYSTEM
17
22
27
28
39
40
3.1 Introduction 40
3.2 y tern Architecture of SKALA 40
3.3 sers' Role and Responsibilities for Project 42
Collaboration in KALA
3.4 Communication Method in SKALA 43
3.5 Major ta ks for project team members in SKALA 45
3.5.1 Planning Phase 45
3.5.2 De ign Pha e 46
3.6
3.5.3 Procurement Phase
3.5 .4 Con truction Phase
3.5.5 Handing Over Pha e
SKAL Reporting
3.7 xisting ollaboration Technology in SKALA
3.8 Summary of Chapter
RESEARCH METHODOLOGY
4.1 Introduction
4.2 Pha e I
4.3
4.2.1 Determine the Aim and Objective of Study
4.2.2 Literature Review
4.2.3 , i ting project collaboration and
communication in SKALA ystem
Phase 2
4.3.1 Data collection
47
48
49
50
51
54
55
55
56
56
56
58
58
58
![Page 7: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/7.jpg)
IX
4.3.2 ur e Questionnaires 59 4.3.3 Que tionnaire designed 59 4.3.4 Demography ofRespondents 60 4.3 .5 Feedback on project team requirements for 61
collaboration and communication
4.3.6 Feedba k on the Improvement of Project 62 Collaboration and Communication in SKALA
4.3 .7 Feedback on the appropriate features of 62 Collaboration Tools for SKALA
4.4 Phase 3 62
4.4.1 Data Analysis 63 4.5 Summary of Chapter 65
5 DATA COLLECTIO DANALYSIS 67 5.1 Introduction 67 5.2 Section A: Demography of respondents 68
5.2.1 Re pondent roles in PWD's project team 68
members
5.2.2 Re pondcnt s involvement in the phases of 70
project life cycle
5.2.3 Rc pondent ' geographically-disper ed 71
office
5.3 ection 8 : To in estigate on the project collaboration 72
and communication requirements
5.3 .1 Respondents ' perception on project 72
collaboration and communication
5.3 .2 Le el of important factors for Project 73
Collaboration and Communication
Requirements
5.4 Section C: To identify the required improvements of 75
SKALA in collaboration and communication
![Page 8: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/8.jpg)
6
7
5.4.1 Re pondent feedback on the shortcoming of 75
SKALA in project collaboration and
communication
5.4.2 Ranking of factors for SKALA improvements 77
in project collaboration and communication
5.5 Section C: To determine the appropriate features of 79
project collaboration tools for SKALA improvements.
5.6 Summary ofChapter 81
DISC S 10 82
82 6.1 Introduction
6.2 Investigation of project collaboration and 83
communication requirements
6.2.1 Perception on Project Collaboration and 83
6.3
Communication
6.2.2 Factors for Project Collaboration and
Communication Requirements
Identification of SKALA improvements in project
collaboration and communication
84
86
6.3.1 Feedback on the Shortcoming Of SKALA in 86
Project Collaboration and Communication
6.3.2 Factor For SKALA fmprovements ln Project 87
6.4
6.5
Collaboration nd Communication
Features Of Project Collaboration Tools Tn SKALA
Summary of Chapter
CONCL 10 A D RECOMMENDATfON
7.1 Introduction
7.2
7.3
7.3
Conclusion
Recommendation
Recommendations for further study
90
95
96
96
97
100
100
REFERENCES 101
![Page 9: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/9.jpg)
Chapter I
INTRODUCTION
1.1 Introduction
Collaboration and communication among project team members are vital in
order to identify i ues, misundcr tandings and other challenges to project
completion. At the same time it can also contribute to real time project reporting to
an web based project monitoring tern . Currently, Public Works Department of
Malaysia (PWD) has been using its v eb based project monitoring system to generate
real time project reporting. ince PWD has to manage and monitor thou and of
projects at any point of time, it must require an effective web based project
monitoring system. Effecti e project monitoring system will lead to prompt action
by PWD in accomplishing the projects ' targets. This study emphasized on the project
team collaboration and communication platform for PWD's web based project
monitoring system (which is knov n as SKALA).
Although sy tern ' s integration and collaboration is not a new research topic, it
believed to be the key for enabling technologies that drives the construction
industry in impro ing producti ity and efficien ( hen et a/. , 201 0). Recent
literature are more focus on computer-aided design collaboration while er little
attention was directed to address the potential use of collaboration technolog in
project stakeholder communication (Chung et al. , 2009).
![Page 10: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/10.jpg)
1.2 Background
PWD is a technical go ernment department that has been entrusted with
constructing and maintaining public infra tructure in Mala sia. It as formed in
1872 a the technical ad isor to the Go emment (PWD Strategic Frame ark ,
2007). Projects implemented b PWD include roads, airports government buildings
maritime and ports. According to PWD Strategic Frameworks (2007) PWD's ision
i to become a world class er ice provider and centre of excellence in a set
management, project management and engineering services for the de elopment of
nation ' s infrastructure through creati e and innovative human capital and state of the
art technology.
Ba cd on PWD Strateg Map 2006- 2020 (PWD Strategic Frameworks, 2007),
PWD has to leverage on ICT to enhance its project del ivery s stem. In managing
projects, PWD is in ol ed in the planning designing, procurement, implementing
and monitoring aspects of the project . In any project implementation, PWD has to
balance the time, resources, cost and quality factors of the project according to
PWD s standard quality and it client ' needs (PWD Quality Manual, 2009). During
9lh Malaysian Plan, PWD has been gi en the authority by the Malaysian Government
to implement 5889 projects with the total cost of RM40 billion (PWD Strategic
Frameworks 2007).
ince PWD is committed to deliver its projects to the clients as stated in its
core business objectives in term of time, cost and quality, it needs comprehensi e
monitoring tools to help the organisation to control its project effective! and
efficiently. The reports produced are er critical for fast decision and policies
making to o ercome the problem occurred during project implementation.
Currently, PWD is using a number of s tern or application to execute or monitor
its projects. The systems or applications are ba ed on variety of software ranging
from commercial oftware such as Microsoft Project or Primavera to in-house
development of software's applications.
![Page 11: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/11.jpg)
3
SKALA is a web based project monitoring for PWD Malaysia and was fir t
developed in-house by PWD Information and Communication Technology (ICT)
Branch in 1985 (SKALA Manual, 2006). Although there are other oftware s
applications for project management s stem the uniqueness of SKALA is that it is
tailored to PWD s certified ISO 9001 Quality Management System processes
(PWD ' Qualit Procedure, 2004). It v a developed to customise the need of
PWD's main core business which is project management. The main function of
SKALA ystem is to generate real time project status for all PWD personnel as well
as its clients. The on-line reports generated by SKALA include details of project
information a well a project performance such as project progress.
KALA has been used by all PWD project team members throughout project
life cycle starting from receiving project from the clients until handing over the
projects as shown in Figure 1.1.
PLANNING
•Project brief
•Project Quality Plan
• Assign team members
• Project Cost
PWD's Project Life Cycle
DESIGN
~~iiiiii! PROCUREMENT
• Drawings •Design changes
•Specs
liiiiiiiiii!!i3 CO NSTRUCTI 0 N • Project Advert isement
• Contract doc. •Letter of Acceptance
•CPM •Quality records
•PWD66 •VO / EOT
DEFECTS
LIABILITY PERIOD
·Handing Over
•CMGD
PROGRAM MANAGER HEAD OF PROCUREMENT PROJECT SITE HEAD OF PROJECT DESIGN TEAM OFFICE TEAM
PWD's Project Team Members
Figure 1.1 PWD's project team members throughout various project life cycles
![Page 12: N Master of Project Management Faculty of Civil ...epsmg.jkr.gov.my/images/3/3a/COLLABORATION_A_D...Di akhir kajian ini, bebcrapa faktor telah dikenalpasti bagi ... 6.2 Investigation](https://reader033.vdocuments.mx/reader033/viewer/2022041906/5e6361cf36842855b71c56fc/html5/thumbnails/12.jpg)
4
SKALA users consist of PWD's top managements and other personnel tn
project teams such as Program Manager , I lead of Project Team, Head of Design
Team, Procurement Officers and Project ite Team Members (SKALA Manual
2006).