monte james keene jr updated resume 1

5
Monte James Keene Jr. Post Office Box 55 Crystal City, Texas 78839 | (479)647- 0625 | [email protected] Summary 21 years of pipeline experience, includes working as a laborer, heavy equipment operator, truck driver, welder and contract inspection of all phases of construction, starting in 2006 - 2012 with Chesapeake, 2012-2014 Access Midstream, 2014-2015 Nustar Energy. I hold NACE CIP1 & NWIS CPWI+ certifications CAREER BASED CONTINUED TRAINING Hazard Recognition training JSA Permit Writing Speed Shore (trench safety) training Trench Entry Permit Training H2S Safety training Hot Work training Hot Work Permit Writing Lock Out Tag Out Training Smith System Safety Course, 2004 OPERATOR QUALIFIED INDIVIDUAL I currently hold required OQ’s from Veriforce and ISNetworld Experience 2015 Nustar Energy: Senior utility, Inspection duties include witnessing contractor excavate next to Nustar 12” pipeline. Phillips 66, 18” being installed 3’ wall to wall in Exxon Corridor Baytown Tx. (Damage Prevention) 2014 Nustar Energy: 60 miles 12” pipeline senior utility, Inspection included witnessing welders test, and coating. Used Positector

Upload: james-keene

Post on 17-Aug-2015

129 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Monte James Keene Jr Updated Resume 1

‍ |   | 

Summary

21‍years‍of‍pipeline‍experience,‍includes‍working‍as‍a‍laborer,‍heavy‍equipment‍operator,‍truck‍driver,‍welder‍and‍contract‍inspection‍of‍all‍phases‍of‍construction,‍starting‍in‍2006‍-‍2012‍with‍Chesapeake,2012-2014‍Access‍Midstream,‍2014-2015‍Nustar‍Energy.‍I‍hold‍NACE‍CIP1‍&‍NWIS‍CPWI+‍certifications‍

CAREER BASED CONTINUED TRAINING

Hazard‍Recognition‍training

JSA‍Permit‍Writing

Speed‍Shore‍(trench‍safety)‍training

Trench‍Entry‍Permit‍Training

H2S‍Safety‍training

Hot‍Work‍training

Hot‍Work‍Permit‍Writing

Lock‍Out‍Tag‍Out‍Training

Smith‍System‍Safety‍Course,‍2004

OPERATOR QUALIFIED INDIVIDUAL

I‍currently‍hold‍required‍OQ’s‍from‍Veriforce‍and‍ISNetworld

Experience

2015

Nustar‍Energy:‍Senior‍utility,‍Inspection‍duties‍include‍witnessing‍contractor‍excavate‍next‍to‍Nustar‍12”‍pipeline.‍Phillips‍66,‍18”‍being‍installed‍3’‍wall‍to‍wall‍in‍Exxon‍Corridor‍Baytown‍Tx.‍(Damage‍Prevention)

2014

Nustar‍Energy:‍60‍miles‍12”‍pipeline‍senior‍utility,‍Inspection‍included‍witnessing‍welders‍test,‍and‍coating.‍Used‍Positector‍Inspection‍equipment‍to‍record‍environmental‍conditions,‍surface‍profiles,‍and‍DFT.

Access‍Midstream:‍Chief‍Inspector,‍Inspected‍and‍managed‍time‍and‍material‍crew‍on‍multiple‍hot‍taps,‍well‍connects‍and‍short‍laterals‍‍‍Inspection‍duties‍included‍procurement,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.

Access‍Midstream:‍5900’‍8”‍pipeline,‍relocate‍8”‍scraper‍trap,‍build‍and‍install‍½‍mainline‍block‍valve.‍‍Chief‍Inspector,‍Inspection‍duties‍included‍procurement‍,‍utility,‍Welding‍,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍‍and‍documentation

2013

Page 2: Monte James Keene Jr Updated Resume 1

Access‍Midstream:‍38,000’‍12”‍pipeline‍installed‍2‍prefabbed‍12”‍scraper‍traps.‍After‍de-water‍pipeline‍was‍dried‍to‍–‍40‍dew‍point.‍Chief‍Inspection‍duties‍included‍procurement,‍HDD‍‘S,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.‍Supervised‍1‍welding‍inspector,‍2‍HDD‍inspectors,‍1‍coating‍inspector,‍3‍utility‍inspectors.

Access‍Midstream:‍22,000’‍12”NGL‍plus‍22,000’‍8”Crude‍Oil‍trunk‍line,‍relocate‍12”‍scraper‍trap,‍8”‍scraper‍trap,‍and‍install‍12”‍and‍8”‍½‍mainline‍block‍valve.‍Chief‍Inspection‍duties‍included‍procurement,‍HDD‍‘S,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.‍Supervised‍1‍welding‍inspector,‍2‍HDD‍inspectors,‍1‍coating‍inspector,‍3‍utility‍inspectors.

Chesapeake:‍Inspected‍and‍managed‍time‍and‍material‍crew‍on‍multiple‍well‍connects,‍setting‍meter‍runs,‍setting‍LACT‍Units,‍Crude‍Oil‍pumps,‍saltwater‍pumps‍and‍short‍laterals‍on‍several‍locations‍with‍multiple‍wells‍per‍pad.‍(Faith‍Ranch)Pipe‍sizes‍ranging‍from‍4”‍to‍6”.‍Inspection‍duties‍included‍procurement,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.

Access/Chesapeake:‍32,000’‍12”‍NG‍Trunk‍line,‍32,000’‍crude‍oil‍line.‍Fabricate‍2‍-6”‍scraper‍traps,‍install‍2‍prefabbed‍12”‍scraper‍traps.‍Install‍3-4”‍futures,‍Install‍3-12”‍futures,‍meter‍runs,‍setting‍LACT‍Units,‍Crude‍Oil‍pumps,‍saltwater‍pumps‍and‍short‍laterals‍with‍multiple‍wells‍per‍pad.‍(Faith‍Ranch)Pipe‍size‍4”.‍‍Inspection‍duties‍included‍procurement,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.‍Supervised‍1‍Lead,‍1‍welding‍and‍2‍utility‍inspectors

2012

Chesapeake:‍58,000’‍4”Faith‍Ranch ‍crude‍oil‍trunk‍line,‍fabrication‍of‍two‍scraper‍traps‍,‍padded‍ditch‍with‍sand‍and‍installed‍unshielded‍fiber‍optics‍cable’‍padded‍cable‍with‍sand‍.‍Cable‍was‍installed‍for‍leak‍detection.‍‍‍Chief‍inspection‍duties‍included‍overseeing‍1‍assistant‍chief,‍procurement‍inspector,‍Welding‍inspector,‍1‍lead‍inspector‍and‍5‍utility‍inspectors.‍‍Plus‍documentation

Chesapeake:‍38,000’‍8”‍Faith‍Ranch‍crude‍oil‍trunk‍line.‍,‍fabrication‍of‍two‍scraper‍traps,‍padded‍ditch‍with‍sand‍and‍installed‍unshielded‍fiber‍optics‍cable’‍padded‍cable‍with‍sand.‍Cable‍was‍installed‍for‍leak‍detection.‍‍‍Chief‍inspection‍duties‍included‍overseeing‍1‍assistant‍chief,‍procurement‍inspector,‍Welding‍inspector,‍1‍lead‍inspector‍and‍5‍utility‍inspectors.‍‍Plus‍documentation

Chesapeake:‍Inspected‍and‍managed‍time‍and‍material‍crew‍on‍multiple‍well‍connects,‍setting‍LACT‍Units,‍Crude‍Oil‍pumps,‍saltwater‍pumps‍and‍short‍laterals‍on‍several‍locations‍with‍multiple‍wells‍per‍pad.‍(Faith‍Ranch)Pipe‍sizes‍ranging‍from‍4”‍to‍6”.‍‍Inspection‍duties‍included‍procurement,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.‍Supervised‍2‍Chief‍inspectors,‍2‍lead‍inspectors,‍and‍4‍utility‍inspectors.

Chesapeake:‍25,000’12”‍NG‍Trunk‍line,‍25,000’6”‍crude‍oil‍line,‍fabricated‍1-‍12”‍scraper‍trap‍and‍1-‍6”‍scraper‍trap,‍1-‍12”‍mainline‍block‍valve‍with‍6”‍futures,‍1-6”‍mainline‍block‍valve‍and‍4-4”‍futures.‍‍4‍well‍connects,‍setting‍meter‍runs,‍setting‍LACT‍Units,‍Crude‍Oil‍pumps,‍saltwater‍pumps‍and‍short‍laterals‍with‍multiple‍wells‍per‍pad.‍(Faith‍Ranch)Pipe‍size‍4”.‍‍Inspection‍duties‍included‍procurement,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.‍Supervised‍1‍Lead,‍1‍welding‍and‍2‍utility‍inspectors.

Chesapeake:‍37,000’‍12”‍NG‍Trunk‍line,‍37,000’‍4”‍crude‍oil‍line‍Built‍1‍acre‍pad‍site,‍relocated‍12”‍scraper‍trap,‍fabricated‍2-4‍scraper‍traps.‍‍Set‍2-4”‍futures.‍‍2‍well‍connects,‍setting‍meter‍runs,‍setting‍LACT‍Units,‍Crude‍Oil‍pumps,‍saltwater‍pumps‍and‍short‍laterals‍with‍multiple‍wells‍per‍pad.‍(Faith‍Ranch)Pipe‍size‍4”.‍‍Inspection‍duties‍included‍procurement,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.‍Supervised‍1‍Chief,‍1‍welding‍and‍2‍utility‍inspectors.

2011

53,000‍‘16”Pipeline,‍Fabricate‍2‍scraper‍traps‍and‍1‍mainline‍block‍valve.‍Install‍3,‍4”‍futures‍,‍complete‍3,‍‍4”‍

Page‍2

Page 3: Monte James Keene Jr Updated Resume 1

Well‍connects.‍Chief‍inspection‍duties‍included‍overseeing‍1‍assistant‍chief‍,‍procurement‍inspector,

Welding‍inspector‍and‍3‍utility‍inspectors.‍‍Plus‍documentation‍

26,400’‍8”‍oil‍trunk‍line,‍fabrication‍of‍two‍scraper‍traps,‍padded‍ditch‍with‍sand‍and‍installed‍unshielded‍fiber‍optics‍cable’‍padded‍cable‍with‍sand.‍Cable‍was‍installed‍for‍leak‍detection.‍‍.‍Chief‍inspection‍duties‍included‍overseeing‍1‍assistant‍chief,‍procurement‍inspector,‍Welding‍inspector‍and‍3‍utility‍inspectors.‍‍Plus‍documentation‍

31,680’‍6”‍oil‍trunk‍line,‍fabrication‍of‍two‍scraper‍traps,‍padded‍ditch‍with‍sand‍and‍installed‍unshielded‍fiber‍optics‍cable’‍padded‍cable‍with‍sand.‍Cable‍was‍installed‍for‍leak‍detection.‍‍.‍Chief‍inspection‍duties‍included‍overseeing‍1‍assistant‍chief,‍procurement‍inspector,‍Welding‍inspector‍and‍3‍utility‍inspectors.‍‍Plus‍documentation‍

95,000’‍10”‍oil‍trunk‍line,‍fabrication‍of‍two‍scraper‍traps,‍padded‍ditch‍with‍sand‍and‍installed‍unshielded‍fiber‍optics‍cable’‍padded‍cable‍with‍sand.‍Cable‍was‍installed‍for‍leak‍detection.‍‍.‍Chief‍inspection‍duties

2010

Route‍Development‍Barnett‍Shale,‍walked‍new‍routes‍Ft.‍Worth‍metropolis,‍worked‍with‍Chesapeake‍construction‍coordinators‍and‍Freese‍and‍Nichols‍Civil‍Engineers‍developing‍new‍routes.

12,000’‍10”‍pipeline‍plus‍fabrication‍of‍two‍scraper‍traps.‍Inspection‍duties‍included‍procurement,

HDD‍‘S,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.

37,000’‍24”‍pipeline‍6000’‍12.75”‍plus‍fabrication‍of‍two‍scraper‍traps‍.Chief‍Inspection‍duties‍included‍procurement,‍HDD’S,‍welding,‍as-built‍drawings,‍coating,‍hydrostatic‍testing,‍and‍documentation.‍Included‍overseeing‍1‍assistant‍chief,‍procurement‍inspector,‍Welding‍inspector‍and‍5‍utility‍inspectors.‍‍Plus‍documentation‍

2009

Inspected‍and‍managed‍time‍and‍material‍crew‍on‍multiple‍well‍connects‍and‍short‍laterals‍

Pipe‍sizes‍ranging‍from‍4”‍to‍16”.‍.‍Inspection‍duties‍included‍procurement‍,‍utility,

‍Welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.

Route‍Development‍Barnett‍Shale,‍walked‍new‍routes‍Ft.‍Worth‍metropolis,‍worked‍with‍Chesapeake‍construction‍coordinators‍and‍Freese‍and‍Nichols‍Civil‍Engineers‍developing‍new‍pipeline‍routes.

2008

Inspected‍and‍managed‍time‍and‍material‍crew‍on‍multiple‍well‍connects‍and‍short‍laterals‍

Including‍first‍34‍well‍connects‍at‍DFW‍Airport.

Pipe‍sizes‍ranging‍from‍4”‍to‍16”.‍.‍Inspection‍duties‍included‍procurement‍,‍utility,

‍Welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.

2007

6000’‍12.75”‍plus‍fabrication‍of‍two‍scraper‍traps.‍Inspection‍duties‍included‍procurement,

HDD‍‘S,‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.

Inspected‍and‍managed‍time‍and‍material‍crew‍on‍multiple‍well‍connects‍and‍short‍laterals‍

Pipe‍sizes‍ranging‍from‍4”‍to‍16”.‍.‍Inspection‍duties‍included‍procurement‍,‍utility,

‍Welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍and‍documentation.2006

Inspected‍and‍managed‍time‍and‍material‍crews‍for

Page‍3

Page 4: Monte James Keene Jr Updated Resume 1

Well‍connect‍and‍short‍laterals.

10,200’‍10”‍plus‍fabrication‍of‍two‍scraper‍trap.‍Inspection‍duties‍included‍procurement‍,HDD’S,

‍utility,‍welding,‍as-built‍drawings,‍weld‍mapping,‍coating,‍hydrostatic‍testing,‍‍and‍documentation

PROFESSIONAL TRUCK DRIVER OPERATOR | 1984 - 2006  

Managed‍the‍operation‍of‍semi-truck‍across‍48‍United‍States‍and‍Canada.‍

Nine‍years‍as‍an‍owner‍operator‍professional‍truck‍driver.

Accomplished‍over‍2,760,000‍safely‍driven‍miles.

Computer Skills Excel

Word

EDUCATION 1973 | Dover‍High‍School,‍Dover‍Ok

NACE‍Coating‍Inspector‍Level‍1‍Certified‍Cert.‍#‍4864

NWIS‍CPWI+‍Registration‍#‍63765778‍

REFERENCES

Bill‍Means‍(Access‍Midstream)‍830-255-8431

Joedy‍Musick‍(‍NuStar)210-265-7841

Dean‍Abraham‍(Williams)‍318-554-9009

‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍

Page‍4